Design For Six Sigma
          A Brief Overview
                        April, 2012
            St. Louis ProductCamp
           Presented By: Jerry Fix
Agenda
> Introduction
> What is DFSS (and “Lean” and 6Ϭ and…) ?
> Overview of the DFSS Process (DMADV/IDOV)
> Identify
> Design
> Optimize
> Validate
> DFSS Successes
> Some Best Practices
> Wrap Up

                                              2
Introduction
> 10+ years in Product Management and
    Marketing
>   Practiced Lean and DFSS at Cooper
    Bussmann, Energizer and Parker Hannifin
> DFSS is a philosophy – a way of doing
    things
     It is NOT a certification, a specification or standard

> DFSS needs to be knowledge based
     Focus on knowledge generated to streamline the process –
       not adherence to strict timelines
     Technical competence versus procedural compliance
     Become innovation driven
     Empower employees to make decisions based on knowledge
                                                                 3
       gained
What is DFSS (and lean, 6Ϭ etc…)
> Let’s start with 6Ϭ




                                   4
What is DFSS (and lean, 6Ϭ etc…)
> What is “good” or “bad” ?
    Ultimately the customer determines this
    Six Sigma is a way to compare the “Voice of the process”
      with the “Voice of the customer”




                                                                5
What is DFSS (and lean, 6Ϭ etc…)
> What does Six Sigma actually mean ?
    A measurement of process capability
    Reduce variations (defects)




                                           6
What is DFSS (and lean, 6Ϭ etc…)
> OK – So what’s Lean ?
    Lean is related to six sigma – but NOT the same
    Lean focuses on reducing the steps or parts of the process
    Simplify the “flow” of a process




                                                                  7
What is DFSS (and lean, 6Ϭ etc…)
> So Lean and Six Sigma Together
        Reduce steps in the process (simplify) and center the
          process (reduce variations) so that the number “defects”
Lean      (ie: unwanted results) gets very, very small




                                                                     8
What is DFSS (and lean, 6Ϭ etc…)
> Now that we’ve looked at 6Ϭ and Lean, what
    about DFSS
      We now know that six sigma is a set of tools to reduce the
         variability in a process
        Lean is a set of tools to reduce the complexity (steps) in a
         process
> The end result of the “process” being
    standardized and simplified is your product
    or service
>   The traditional focus of six sigma and lean
    is the manufacturing or production or
    delivery (service) part of the process
>   DFSS is focused on the research, design
    and development part of the process
>   Intent is to “design in” reduced variability
    and increased simplification
                                                                        9
What is DFSS (and lean, 6Ϭ etc…)
> There is a cost associated with optimizing
    and simplifying a process
>   Not all costs are created equal, though




                                               10
What is DFSS (and lean, 6Ϭ etc…)
> DFSS has 4 main goals
      Reduce cycle time in the design and development process
      Reduce “Time To Money” or TTM
      Reduce the cost of poor quality
      Improve predictability (in cost, quality and delivery)


> Does it work ? GE thinks so
> When they implemented DFSS, they
  documented the following:
    A +1ϭ increase in quality at launch versus previous
       designs
      A 25% or greater DECREASE in time to market versus
       previous launches
      An estimated total cost savings in resources utilized of 20%
       - 40%



                                                                      11
What is DFSS (and lean, 6Ϭ etc…)
> So finally, why DFSS ?
    Lean Six Sigma is intended to fix known problems
    DFSS is intended to PREVENT UNKNOWN problems




                         UNKNOWNS                       12
The DFSS Process
> The DFSS process is a structured way to
  step through the design process
    Applying a variety of tools along the way

                    The traditional DFSS process steps

       D              M              A              D            V
     Define         Measure       Analyze        Design        Verify



                      The GE modified process steps

           I               D                O               V
         Identify        Design          Optimize         Validate




                                                                     13
The DFSS Process




                   14
The DFSS Process
> Identify Phase
    The DFSS Scorecard
    Voice of Customer (VOC)
> Design Phase
    Translate VOC (requirements flow-down)
    Concept generation and selection
    TRIZ, Axiomatic Design, Pugh Concept Selection
> Optimize Phase
    Multiple Response Optimization
    Expected Value Analysis (using Monte Carlo sim.)
    Parameter Design
    Tolerance Allocation
> Validate Phase
    High Throughput Testing
    Discrete Event Simulation

                                                        15
The DFSS Process
> MANY tools are available to determine
  outputs for each of the phases
    We will just highlight a few along the way




                                                  16
The Identify Phase
> Key questions to ask in the IDENTIFY
  phase

   1. Why are we working on this project ? What need does it
        address and how has it’s value been determined ?
   2.   Who are the external customer who will benefit from this
        project… who may NOT benefit from it ? Who are the
        internal customers (stakeholders) that may be affected ?
   3.   What are the prioritized functional requirements (Critical
        To Customer) in measurable terms – how do they relate to
        our VOC data ?
   4.   How will we determine success ? What are the measureable
        attributes of the project – and what are the goals for those
        measurements ?




                                                                       17
The Identify Phase
> Key questions to ask in the IDENTIFY phase

   5. Do measurement systems exist to support the project ? If so,
        what is the capability of the system ?
   6.   Have the performance CTC’s been entered into the DFSS
        scorecard (more on this later) ? If so, is the data good ?
   7.   Is there a gap between the performance and goals ? If so,
        what is the risk of this gap ?
   8.   Do we have the right people/skills to undertake this project ?
        Are there resource gaps – and if so where are they ?




                                                                         18
The Identify Phase
> The DFSS Scorecard




                       19
The Identify Phase
> The DFSS Scorecard
    Each identified items is then measured for its Defects per Unit
      (DPU), target values are identified and then samples taken to
      determine the mean values, deviations and ultimately a defects
      per million (yield) which give us the “sigma” of the process

                             Part Scorecard




                           Process Scorecard




                          Performance Scorecard



                                                                       20
The Identify Phase
> The DFSS Scorecard
    The end result is a rolled-up scorecard that provides a sigma
      for each component and for the overall product/project




> Software Scorecard
    This same process can be done for software as well. It’s too
      involved for this presentation – but software AND services can
      be fully comprehended by DFSS

                                                                       21
The Identify Phase
> Voice of the Customer (VOC)
    Basis can be viewed via the Kano model of customer
      satisfaction




                                                          22
The Identify Phase
> Identify your customers – external AND internal
> Segment them in ways that make sense for the
    project
      Age, income, geography, price etc.
>   Obtain the customer requirements
      Some will be given to you by the customer directly
      However, customers do not always know what they want or cannot
        verbalize it – so consider observing or interviewing
       Put yourself in their shoes
       Consider using existing customer data 3rd party research, user tests etc.
> Using your customer (functional) requirements,
  you identify the performance requirements
    The performance requirements are a measure of the customer’s
        functional requirement




                                                                                    23
Afford- Appeal Repair- Reli- Stor-
able ing       able    able able Safe                                                                                                                         Fun
                                                                                                                                                                                                                                                                         Quality




                                                                                                                                                                                                           Customer Attributes




                                                                                Toy is reliable




 Toy is inexpensive
                                                        Toy is easy to repair
                                                                                                                                                                                                                                          R




                                                                                                  Toy is easy to store away
                                                                                                                                                                                                                                        el
                                                                                                                                                                                                                                   at




                                                                                                                              Toy is safe for pre-schoolers
                                                                                                                                                                                                                                 iv
                                                                                                                                                                Toy is fun for parent and child
                                                                                                                                                                                                                             e
                                                                                                                                                                                                                                              Performance Requirements




                      Toy appeals to parent and child
                                                                                                                                                                                                        Im
                                                                                                                                                                                                          po
                                                                                                                                                                                                     rta                                      (CTC)
                                                                                                                                                                                                  nc
                                                                                                                                                                                                    e




 0.06
                      0.25
                                                        0.07
                                                                                0.10
                                                                                                  0.07
                                                                                                                              0.20
                                                                                                                                                                0.25




                                                                                                                                                                                                  Maximum launch velocity

                                                                                                                                                                                                  Maximum mass launch capability

                                                                                                                                                                                                  Storage volume
                                                                                                                                                                                                                                                                                                                                  The Identify Phase




                                                                                                                                                                                                  Mean cycles to failure

                                                                                                                                                                                                  Breaking force of critical components

                                                                                                                                                                                                  Repair part cost

                                                                                                                                                                                                  Tensile strength of home-applied adhesive bond

                                                                                                                                                                                                  Time for disassembly and reassembly

                                                                                                                                                                                                  Material cost

                                                                                                                                                                                                  Time to manufacture
                                                                                                                                                                                                                                                                               > You now have the start of a VOC based House of




24
The Identify Phase
> The CTC’s are ranked by using the importance
  rating. These ranked CTC’s from the HOQ1 then
  become the side of HOQ2. This then repeats.




                                                  25
The Identify Phase
> The end result is a collection of data that allows
  you to identify in order of importance the critical to
  customer requirements. These are then used to
  flow down through the design and manufacturing
  process to identify all the critical performance
  items.




                                                       26
The Design Phase
> Key questions to ask in the Design phase

   1. What are the conceptual designs and technologies
        necessary to support the functional requirements ?
   2.   What are the risks associated with these designs ? Have we
        done FMEA or Pugh on the designs ?
   3.   What are the potential trade-offs to eliminate any identified
        failure modes ?
   4.   Have we completed a requirements flow down maintaining
        links to the CTC’s ?
   5.   What are the key input variables that affect the standard
        deviations ?
   6.   What are the transfer functions for each critical output or
        CTC ?
   7.   Have the DFSS scorecards been updated ?




                                                                        27
The Design Phase
> Design Concepts
     Create alternative designs that fulfill the CTC’s
     Compare designs with the functional
        requirements
       Choose the best design
       Assess risks of chosen design
> Selecting design concepts
    Pugh Concept Selection
    Functional Analysis System Technique (FAST)
    Axiomatic Design
    TRIZ
    Transfer Functions




                                                          28
The Design Phase
> Pugh Concept Selection
    Applicable to a variety of situations
    Prevents team from focusing on small number
       of “pet” projects
      Customer requirement driven
      Excellent tool to aid decision making
      Provides good documentation




                                                   29
The Design Phase
> FAST
   Allows users to quickly design the key
      functionality of the system




  Heat       Generate   Cause       Flood      Break        Press
  Beverage   Heat       Reaction    Chemical   Water Cell   Button




HOW ?

                                                            WHY ?


                                                                30
The Design Phase
> Axiomatic Design
    Helps design teams evaluate the “goodness” of
       designs
      Decomposes customer requirements into 4
       “domains”: Customer, Functional, Physical,
       Process
> TRIZ
    Formed by Altshuller – Russian patent examiner post
       WWII
      Breaks down all design into 39 problem parameters and 40
       “inventive principles”
      Results in a 39 by 39 matrix that is then populated with the
       inventive principles




                                                                      31
The Design Phase
> TRIZ




                   32
The Optimize Phase
Key questions to ask in the IDENTIFY phase

    1. Have we determined the optimal parameters for our design
       ?
    2. How sensitive is the CTC performance measure to changes
       in parameters ? Have done a sensitivity analysis ?
    3. What are the sources of variability in our system ? Which
       can we control and which can we not control ?
    4. Is the variability supplier dependent ? If so, how can we
       minimize this variability ?
    5. Have we confirmed that the design is actually producible
       (process capability) ?
    6. What gaps and risks still exist ?
    7. Have we updated the DFSS scorecards ?




                                                                   33
The Optimize Phase
> Determining optimal parameters
    Multiple Response Optimization simulation
    Done computationally – example is SimWare ProAge, income,
      geography, price etc.


       Design Parameter 1


       Design Parameter 2                      Requirement 1

                                               Requirement 2
       Design Parameter 3     Process

       Design Parameter 4                      Requirement 3




                                                                 34
The Optimize Phase
> Determining optimal parameters
     Monte Carlo simulation can also be used
     Expected Value Analysis (EVA), Robust Parameter Design, Tolerance
       Allocation
> EVA
     If we know the input variable distributions (mean, std dev., shape) and
       the transfer function, we can estimate the output and it’s distribution
       characteristics
> Robust Parameter Design
     A process of finding the optimal mean settings of input variables to
       minimize the resulting dpm (defects per million) or maximize the
       “sigma” of the process
> Tolerance Allocation
     Look at all the input standard deviations of the system.
     Determine which have the largest impact on the output variations
     Focus on controlling those with the largest impact

                                                                                 35
The Validate Phase
> Key questions to ask in the VALIDATE phase

   1. What validation testing has been done, and what are the results ?
   2. Is there a large gap between actual capability and predicted
        capability from the DFSS scorecard ?
   3.   What is the gap between current performance and the CTC’s ?
   4.   Is the existing production system under a state of quality control
        ?
   5.   What unintended consequences or problems of the design exist
        or could exist ? What is the contingency ?
   6.   How has ALL information been documented and communicated
        to stakeholders
   7.   What is the total project benefit in terms of quality, cost and
        delivery ?




                                                                             36
The Validate Phase
>   Validate performance
>   Perform sensitivity analysis
>   Compare predicted and actual capability
>   Do a gap analysis
>   Update scorecards

> Validate Performance
     Actual values for critical parameters are compared
        against predicted values
       Methods to use: prototyping, lab scale production,
        test fixturing of sub assemblies

    If the validation provides poor results…. A gap analysis
    needs to be conducted



                                                               37
The Validate Phase
> One method to validate is called High
  Throughput Testing (HTT)




                                          38
The Validate Phase
> One method to validate is called High
  Throughput Testing (HTT)
    Used to test many factors at once
    Uses a minimum number of runs
    Software driven
    Not DOE – though similar terminology
    Started in the chemical industry where many
      compounds are combined together at different
      strengths to produce a specific reaction




                                                     39
DFSS Success Stories
> General Electric GEMS Lightspeed CT Scanner




                                                40
DFSS Success Stories
> Xerox “Green” Paper




                        41
DFSS Success Stories
> Xerox Printer Belt Tensioning System




                                         42
Characteristics Of Successful
DFSS Implementation
> Commitment and leadership from the top

> Measureable “stretch” goals for each project

> Accountability for project success

> Involvement and commitment from EVERYONE

> Training and support for all the tools and
  knowledge necessary to do it right

   IT IS VERY EASY TO FOCUS ON THE LAST
   ITEM – BUT WITHOUT THE FIRST 4 THE DFSS
   IMPLEMENTATION CANNOT SUCCEED
                                                 43
DFSS Best Practices
> Train leadership to build organizational
    commitment and momentum
>   Begin using DFSS tools and techniques on ALL
    product development projects and provide
    COACHING
>   Weave DFSS tools into your NPD process right
    away
>   Review progress based on DFSS metrics and
    re-align as necessary
>   Build the bridge to innovation – build and use
    the transfer function
>   Build a strong capability in DOE / HTT
>   Establish a good process capability database –
    both in house and with suppliers
>   Link DFSS to business success
>   View DFSS as a cultural change – a mindset –
    not just a set of tools                          44
Thank You !

     Jerry Fix
(314) 255-9938
  jcfix@att.net




                  45

Weitere ähnliche Inhalte

Was ist angesagt?

Requirement management presentation to a software team
Requirement management presentation to a software teamRequirement management presentation to a software team
Requirement management presentation to a software teamrchakra
 
CBAP Study Note
CBAP Study NoteCBAP Study Note
CBAP Study NoteZinus Liu
 
USE OF DMADV METHODOLOGY TO CREATE A MARKETING PROCESS FOR SMARTPHONES IN INDIA
USE OF DMADV METHODOLOGY TO CREATE A MARKETING PROCESS FOR SMARTPHONES IN INDIAUSE OF DMADV METHODOLOGY TO CREATE A MARKETING PROCESS FOR SMARTPHONES IN INDIA
USE OF DMADV METHODOLOGY TO CREATE A MARKETING PROCESS FOR SMARTPHONES IN INDIASheryl Mehra
 
Dell Server Ordering Six Sigma Case Study
Dell Server Ordering Six Sigma Case StudyDell Server Ordering Six Sigma Case Study
Dell Server Ordering Six Sigma Case StudySteven Bonacorsi
 
Requirements Management Booklet Pages
Requirements Management Booklet PagesRequirements Management Booklet Pages
Requirements Management Booklet PagesTonda MacLeod
 
From Productivity to Profitability by Saket Bansal - Lean India Summit 2014
From Productivity to Profitability by Saket Bansal - Lean India Summit 2014From Productivity to Profitability by Saket Bansal - Lean India Summit 2014
From Productivity to Profitability by Saket Bansal - Lean India Summit 2014Lean India Summit
 
Product Life Cycle Management
Product Life Cycle ManagementProduct Life Cycle Management
Product Life Cycle ManagementAnand Subramaniam
 
Outsourcing
OutsourcingOutsourcing
Outsourcingnafia
 
QM-009-Design for Six Sigma 2
QM-009-Design for Six Sigma 2QM-009-Design for Six Sigma 2
QM-009-Design for Six Sigma 2handbook
 
Babok2 chapter9 daxko
Babok2 chapter9 daxko Babok2 chapter9 daxko
Babok2 chapter9 daxko Mudassir Iqbal
 
Quality function deployment
Quality function deploymentQuality function deployment
Quality function deploymentPreeti Mishra
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate templateSteven Bonacorsi
 
Process Guidelines V2
Process Guidelines V2Process Guidelines V2
Process Guidelines V2Imaginea
 
Software life cycle ppt
Software life cycle pptSoftware life cycle ppt
Software life cycle pptArsalanAman
 
Business Process Management CEM Method (update at http://www.slideshare.net/s...
Business Process Management CEM Method (update at http://www.slideshare.net/s...Business Process Management CEM Method (update at http://www.slideshare.net/s...
Business Process Management CEM Method (update at http://www.slideshare.net/s...Steve Towers, CEO and CPP Champion
 

Was ist angesagt? (18)

Requirement management presentation to a software team
Requirement management presentation to a software teamRequirement management presentation to a software team
Requirement management presentation to a software team
 
CBAP Study Note
CBAP Study NoteCBAP Study Note
CBAP Study Note
 
USE OF DMADV METHODOLOGY TO CREATE A MARKETING PROCESS FOR SMARTPHONES IN INDIA
USE OF DMADV METHODOLOGY TO CREATE A MARKETING PROCESS FOR SMARTPHONES IN INDIAUSE OF DMADV METHODOLOGY TO CREATE A MARKETING PROCESS FOR SMARTPHONES IN INDIA
USE OF DMADV METHODOLOGY TO CREATE A MARKETING PROCESS FOR SMARTPHONES IN INDIA
 
Dell Server Ordering Six Sigma Case Study
Dell Server Ordering Six Sigma Case StudyDell Server Ordering Six Sigma Case Study
Dell Server Ordering Six Sigma Case Study
 
Requirements Management Booklet Pages
Requirements Management Booklet PagesRequirements Management Booklet Pages
Requirements Management Booklet Pages
 
Se
SeSe
Se
 
From Productivity to Profitability by Saket Bansal - Lean India Summit 2014
From Productivity to Profitability by Saket Bansal - Lean India Summit 2014From Productivity to Profitability by Saket Bansal - Lean India Summit 2014
From Productivity to Profitability by Saket Bansal - Lean India Summit 2014
 
Product Life Cycle Management
Product Life Cycle ManagementProduct Life Cycle Management
Product Life Cycle Management
 
Outsourcing
OutsourcingOutsourcing
Outsourcing
 
QM-009-Design for Six Sigma 2
QM-009-Design for Six Sigma 2QM-009-Design for Six Sigma 2
QM-009-Design for Six Sigma 2
 
Babok2 chapter9 daxko
Babok2 chapter9 daxko Babok2 chapter9 daxko
Babok2 chapter9 daxko
 
Quality function development
Quality function developmentQuality function development
Quality function development
 
Quality function deployment
Quality function deploymentQuality function deployment
Quality function deployment
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate template
 
Process Guidelines V2
Process Guidelines V2Process Guidelines V2
Process Guidelines V2
 
Software life cycle ppt
Software life cycle pptSoftware life cycle ppt
Software life cycle ppt
 
Define
DefineDefine
Define
 
Business Process Management CEM Method (update at http://www.slideshare.net/s...
Business Process Management CEM Method (update at http://www.slideshare.net/s...Business Process Management CEM Method (update at http://www.slideshare.net/s...
Business Process Management CEM Method (update at http://www.slideshare.net/s...
 

Andere mochten auch

Strategie et-philosophie
Strategie et-philosophieStrategie et-philosophie
Strategie et-philosophieJarrosson Bruno
 
Triz Basics -Product Design & Development
Triz Basics -Product Design & DevelopmentTriz Basics -Product Design & Development
Triz Basics -Product Design & DevelopmentQRCE
 
Triz - Product Design & Development
Triz - Product Design & DevelopmentTriz - Product Design & Development
Triz - Product Design & DevelopmentQRCE
 
TRIZ overview and examples
TRIZ overview and examplesTRIZ overview and examples
TRIZ overview and examplesYaroslav Baronov
 
Ice breaker brain teasers
Ice breaker   brain teasersIce breaker   brain teasers
Ice breaker brain teasersAnupriya Balaji
 
Visual Thinking Games
Visual Thinking GamesVisual Thinking Games
Visual Thinking Gamesscottekim
 
100 energizers
100 energizers100 energizers
100 energizersvickthorr
 
10 Creative Thinking Puzzles
10 Creative Thinking Puzzles10 Creative Thinking Puzzles
10 Creative Thinking PuzzlesOH TEIK BIN
 
Leadership Games and Activities
Leadership Games and ActivitiesLeadership Games and Activities
Leadership Games and ActivitiesLacey
 

Andere mochten auch (10)

Strategie et-philosophie
Strategie et-philosophieStrategie et-philosophie
Strategie et-philosophie
 
Triz Basics -Product Design & Development
Triz Basics -Product Design & DevelopmentTriz Basics -Product Design & Development
Triz Basics -Product Design & Development
 
Design For Six Sigma
Design For Six SigmaDesign For Six Sigma
Design For Six Sigma
 
Triz - Product Design & Development
Triz - Product Design & DevelopmentTriz - Product Design & Development
Triz - Product Design & Development
 
TRIZ overview and examples
TRIZ overview and examplesTRIZ overview and examples
TRIZ overview and examples
 
Ice breaker brain teasers
Ice breaker   brain teasersIce breaker   brain teasers
Ice breaker brain teasers
 
Visual Thinking Games
Visual Thinking GamesVisual Thinking Games
Visual Thinking Games
 
100 energizers
100 energizers100 energizers
100 energizers
 
10 Creative Thinking Puzzles
10 Creative Thinking Puzzles10 Creative Thinking Puzzles
10 Creative Thinking Puzzles
 
Leadership Games and Activities
Leadership Games and ActivitiesLeadership Games and Activities
Leadership Games and Activities
 

Ähnlich wie Dfss jerry fix apr12

Scorecarding with IBM Cognos 10 Business Intelligence
Scorecarding with IBM Cognos 10 Business IntelligenceScorecarding with IBM Cognos 10 Business Intelligence
Scorecarding with IBM Cognos 10 Business IntelligenceSenturus
 
Six sigma awareness
Six sigma awarenessSix sigma awareness
Six sigma awarenesssawate
 
م.47-#تواصل_تطوير-م.محمد العربى-إستخدام مفاهيم الرشاقة للتحول الإستراتيجي للم...
م.47-#تواصل_تطوير-م.محمد العربى-إستخدام مفاهيم الرشاقة للتحول الإستراتيجي للم...م.47-#تواصل_تطوير-م.محمد العربى-إستخدام مفاهيم الرشاقة للتحول الإستراتيجي للم...
م.47-#تواصل_تطوير-م.محمد العربى-إستخدام مفاهيم الرشاقة للتحول الإستراتيجي للم...Egyptian Engineers Association
 
QM-029-Six Sigma Overview
QM-029-Six Sigma OverviewQM-029-Six Sigma Overview
QM-029-Six Sigma Overviewhandbook
 
Software Development Process (SDP).pdf
Software Development Process (SDP).pdfSoftware Development Process (SDP).pdf
Software Development Process (SDP).pdfSagarBhusal17
 
Learn to see, measure and automate with value stream management
Learn to see, measure and automate with value stream managementLearn to see, measure and automate with value stream management
Learn to see, measure and automate with value stream managementLance Knight
 
Quality Assurance Plan White Paper
Quality Assurance Plan White PaperQuality Assurance Plan White Paper
Quality Assurance Plan White PaperGeert Appeltans
 
Introduction To Agile
Introduction To AgileIntroduction To Agile
Introduction To Agilevineet
 
Jason uyderv pmi 2 16 12
Jason uyderv pmi 2 16 12Jason uyderv pmi 2 16 12
Jason uyderv pmi 2 16 12Jason Uyder
 
Breakthrough Improvement
Breakthrough ImprovementBreakthrough Improvement
Breakthrough Improvementunevendock6891
 
Six sigma and PMP: How can they help you togethere?
Six sigma and PMP: How can they help you togethere?Six sigma and PMP: How can they help you togethere?
Six sigma and PMP: How can they help you togethere?Ashish Michael
 
Six Sigma Green Belt Training Part 5
Six Sigma Green Belt Training Part 5Six Sigma Green Belt Training Part 5
Six Sigma Green Belt Training Part 5Skillogic Solutions
 

Ähnlich wie Dfss jerry fix apr12 (20)

Scorecarding with IBM Cognos 10 Business Intelligence
Scorecarding with IBM Cognos 10 Business IntelligenceScorecarding with IBM Cognos 10 Business Intelligence
Scorecarding with IBM Cognos 10 Business Intelligence
 
Six sigma awareness
Six sigma awarenessSix sigma awareness
Six sigma awareness
 
م.47-#تواصل_تطوير-م.محمد العربى-إستخدام مفاهيم الرشاقة للتحول الإستراتيجي للم...
م.47-#تواصل_تطوير-م.محمد العربى-إستخدام مفاهيم الرشاقة للتحول الإستراتيجي للم...م.47-#تواصل_تطوير-م.محمد العربى-إستخدام مفاهيم الرشاقة للتحول الإستراتيجي للم...
م.47-#تواصل_تطوير-م.محمد العربى-إستخدام مفاهيم الرشاقة للتحول الإستراتيجي للم...
 
Paripoorna concept to deployment v 1.0
Paripoorna concept to deployment v 1.0Paripoorna concept to deployment v 1.0
Paripoorna concept to deployment v 1.0
 
QM-029-Six Sigma Overview
QM-029-Six Sigma OverviewQM-029-Six Sigma Overview
QM-029-Six Sigma Overview
 
6 sigma
6 sigma6 sigma
6 sigma
 
Software Development Process (SDP).pdf
Software Development Process (SDP).pdfSoftware Development Process (SDP).pdf
Software Development Process (SDP).pdf
 
Learn to see, measure and automate with value stream management
Learn to see, measure and automate with value stream managementLearn to see, measure and automate with value stream management
Learn to see, measure and automate with value stream management
 
Quality Assurance Plan White Paper
Quality Assurance Plan White PaperQuality Assurance Plan White Paper
Quality Assurance Plan White Paper
 
Introduction to six sigma (www.gotoaims.com)
Introduction to six sigma (www.gotoaims.com)Introduction to six sigma (www.gotoaims.com)
Introduction to six sigma (www.gotoaims.com)
 
Introduction To Agile
Introduction To AgileIntroduction To Agile
Introduction To Agile
 
Software_Testing.pptx
Software_Testing.pptxSoftware_Testing.pptx
Software_Testing.pptx
 
Management techniques of the world by khawar nehal 4 august 2020-1
Management techniques of the world by khawar nehal   4 august 2020-1Management techniques of the world by khawar nehal   4 august 2020-1
Management techniques of the world by khawar nehal 4 august 2020-1
 
Jason uyderv pmi 2 16 12
Jason uyderv pmi 2 16 12Jason uyderv pmi 2 16 12
Jason uyderv pmi 2 16 12
 
Breakthrough Improvement
Breakthrough ImprovementBreakthrough Improvement
Breakthrough Improvement
 
Six sigma and PMP: How can they help you togethere?
Six sigma and PMP: How can they help you togethere?Six sigma and PMP: How can they help you togethere?
Six sigma and PMP: How can they help you togethere?
 
6 Sigma
6 Sigma6 Sigma
6 Sigma
 
DMI Walkthrough
DMI Walkthrough DMI Walkthrough
DMI Walkthrough
 
Six Sigma Green Belt Training Part 5
Six Sigma Green Belt Training Part 5Six Sigma Green Belt Training Part 5
Six Sigma Green Belt Training Part 5
 
DevOps
DevOpsDevOps
DevOps
 

Kürzlich hochgeladen

Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All TimeCall 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Timegargpaaro
 
Falcon Invoice Discounting: Tailored Financial Wings
Falcon Invoice Discounting: Tailored Financial WingsFalcon Invoice Discounting: Tailored Financial Wings
Falcon Invoice Discounting: Tailored Financial WingsFalcon Invoice Discounting
 
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...meghakumariji156
 
Cannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 UpdatedCannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 UpdatedCannaBusinessPlans
 
Rice Manufacturers in India | Shree Krishna Exports
Rice Manufacturers in India | Shree Krishna ExportsRice Manufacturers in India | Shree Krishna Exports
Rice Manufacturers in India | Shree Krishna ExportsShree Krishna Exports
 
Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingNauman Safdar
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityEric T. Tung
 
Power point presentation on enterprise performance management
Power point presentation on enterprise performance managementPower point presentation on enterprise performance management
Power point presentation on enterprise performance managementVaishnaviGunji
 
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Falcon Invoice Discounting
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1kcpayne
 
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGParadip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGpr788182
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptxnandhinijagan9867
 
Arti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfArti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfwill854175
 
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdfTVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdfbelieveminhh
 
Structuring and Writing DRL Mckinsey (1).pdf
Structuring and Writing DRL Mckinsey (1).pdfStructuring and Writing DRL Mckinsey (1).pdf
Structuring and Writing DRL Mckinsey (1).pdflaloo_007
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPanhandleOilandGas
 
Cracking the 'Career Pathing' Slideshare
Cracking the 'Career Pathing' SlideshareCracking the 'Career Pathing' Slideshare
Cracking the 'Career Pathing' SlideshareWorkforce Group
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel
 

Kürzlich hochgeladen (20)

Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All TimeCall 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
 
Falcon Invoice Discounting: Tailored Financial Wings
Falcon Invoice Discounting: Tailored Financial WingsFalcon Invoice Discounting: Tailored Financial Wings
Falcon Invoice Discounting: Tailored Financial Wings
 
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
 
Cannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 UpdatedCannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 Updated
 
Rice Manufacturers in India | Shree Krishna Exports
Rice Manufacturers in India | Shree Krishna ExportsRice Manufacturers in India | Shree Krishna Exports
Rice Manufacturers in India | Shree Krishna Exports
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for Viewing
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Power point presentation on enterprise performance management
Power point presentation on enterprise performance managementPower point presentation on enterprise performance management
Power point presentation on enterprise performance management
 
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGParadip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Arti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfArti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdf
 
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdfTVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
 
Structuring and Writing DRL Mckinsey (1).pdf
Structuring and Writing DRL Mckinsey (1).pdfStructuring and Writing DRL Mckinsey (1).pdf
Structuring and Writing DRL Mckinsey (1).pdf
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
Cracking the 'Career Pathing' Slideshare
Cracking the 'Career Pathing' SlideshareCracking the 'Career Pathing' Slideshare
Cracking the 'Career Pathing' Slideshare
 
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pillsMifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 

Dfss jerry fix apr12

  • 1. Design For Six Sigma A Brief Overview April, 2012 St. Louis ProductCamp Presented By: Jerry Fix
  • 2. Agenda > Introduction > What is DFSS (and “Lean” and 6Ϭ and…) ? > Overview of the DFSS Process (DMADV/IDOV) > Identify > Design > Optimize > Validate > DFSS Successes > Some Best Practices > Wrap Up 2
  • 3. Introduction > 10+ years in Product Management and Marketing > Practiced Lean and DFSS at Cooper Bussmann, Energizer and Parker Hannifin > DFSS is a philosophy – a way of doing things  It is NOT a certification, a specification or standard > DFSS needs to be knowledge based  Focus on knowledge generated to streamline the process – not adherence to strict timelines  Technical competence versus procedural compliance  Become innovation driven  Empower employees to make decisions based on knowledge 3 gained
  • 4. What is DFSS (and lean, 6Ϭ etc…) > Let’s start with 6Ϭ 4
  • 5. What is DFSS (and lean, 6Ϭ etc…) > What is “good” or “bad” ?  Ultimately the customer determines this  Six Sigma is a way to compare the “Voice of the process” with the “Voice of the customer” 5
  • 6. What is DFSS (and lean, 6Ϭ etc…) > What does Six Sigma actually mean ?  A measurement of process capability  Reduce variations (defects) 6
  • 7. What is DFSS (and lean, 6Ϭ etc…) > OK – So what’s Lean ?  Lean is related to six sigma – but NOT the same  Lean focuses on reducing the steps or parts of the process  Simplify the “flow” of a process 7
  • 8. What is DFSS (and lean, 6Ϭ etc…) > So Lean and Six Sigma Together  Reduce steps in the process (simplify) and center the process (reduce variations) so that the number “defects” Lean (ie: unwanted results) gets very, very small 8
  • 9. What is DFSS (and lean, 6Ϭ etc…) > Now that we’ve looked at 6Ϭ and Lean, what about DFSS  We now know that six sigma is a set of tools to reduce the variability in a process  Lean is a set of tools to reduce the complexity (steps) in a process > The end result of the “process” being standardized and simplified is your product or service > The traditional focus of six sigma and lean is the manufacturing or production or delivery (service) part of the process > DFSS is focused on the research, design and development part of the process > Intent is to “design in” reduced variability and increased simplification 9
  • 10. What is DFSS (and lean, 6Ϭ etc…) > There is a cost associated with optimizing and simplifying a process > Not all costs are created equal, though 10
  • 11. What is DFSS (and lean, 6Ϭ etc…) > DFSS has 4 main goals  Reduce cycle time in the design and development process  Reduce “Time To Money” or TTM  Reduce the cost of poor quality  Improve predictability (in cost, quality and delivery) > Does it work ? GE thinks so > When they implemented DFSS, they documented the following:  A +1ϭ increase in quality at launch versus previous designs  A 25% or greater DECREASE in time to market versus previous launches  An estimated total cost savings in resources utilized of 20% - 40% 11
  • 12. What is DFSS (and lean, 6Ϭ etc…) > So finally, why DFSS ?  Lean Six Sigma is intended to fix known problems  DFSS is intended to PREVENT UNKNOWN problems UNKNOWNS 12
  • 13. The DFSS Process > The DFSS process is a structured way to step through the design process  Applying a variety of tools along the way The traditional DFSS process steps D M A D V Define Measure Analyze Design Verify The GE modified process steps I D O V Identify Design Optimize Validate 13
  • 15. The DFSS Process > Identify Phase  The DFSS Scorecard  Voice of Customer (VOC) > Design Phase  Translate VOC (requirements flow-down)  Concept generation and selection  TRIZ, Axiomatic Design, Pugh Concept Selection > Optimize Phase  Multiple Response Optimization  Expected Value Analysis (using Monte Carlo sim.)  Parameter Design  Tolerance Allocation > Validate Phase  High Throughput Testing  Discrete Event Simulation 15
  • 16. The DFSS Process > MANY tools are available to determine outputs for each of the phases  We will just highlight a few along the way 16
  • 17. The Identify Phase > Key questions to ask in the IDENTIFY phase 1. Why are we working on this project ? What need does it address and how has it’s value been determined ? 2. Who are the external customer who will benefit from this project… who may NOT benefit from it ? Who are the internal customers (stakeholders) that may be affected ? 3. What are the prioritized functional requirements (Critical To Customer) in measurable terms – how do they relate to our VOC data ? 4. How will we determine success ? What are the measureable attributes of the project – and what are the goals for those measurements ? 17
  • 18. The Identify Phase > Key questions to ask in the IDENTIFY phase 5. Do measurement systems exist to support the project ? If so, what is the capability of the system ? 6. Have the performance CTC’s been entered into the DFSS scorecard (more on this later) ? If so, is the data good ? 7. Is there a gap between the performance and goals ? If so, what is the risk of this gap ? 8. Do we have the right people/skills to undertake this project ? Are there resource gaps – and if so where are they ? 18
  • 19. The Identify Phase > The DFSS Scorecard 19
  • 20. The Identify Phase > The DFSS Scorecard  Each identified items is then measured for its Defects per Unit (DPU), target values are identified and then samples taken to determine the mean values, deviations and ultimately a defects per million (yield) which give us the “sigma” of the process Part Scorecard Process Scorecard Performance Scorecard 20
  • 21. The Identify Phase > The DFSS Scorecard  The end result is a rolled-up scorecard that provides a sigma for each component and for the overall product/project > Software Scorecard  This same process can be done for software as well. It’s too involved for this presentation – but software AND services can be fully comprehended by DFSS 21
  • 22. The Identify Phase > Voice of the Customer (VOC)  Basis can be viewed via the Kano model of customer satisfaction 22
  • 23. The Identify Phase > Identify your customers – external AND internal > Segment them in ways that make sense for the project  Age, income, geography, price etc. > Obtain the customer requirements  Some will be given to you by the customer directly  However, customers do not always know what they want or cannot verbalize it – so consider observing or interviewing  Put yourself in their shoes  Consider using existing customer data 3rd party research, user tests etc. > Using your customer (functional) requirements, you identify the performance requirements  The performance requirements are a measure of the customer’s functional requirement 23
  • 24. Afford- Appeal Repair- Reli- Stor- able ing able able able Safe Fun Quality Customer Attributes Toy is reliable Toy is inexpensive Toy is easy to repair R Toy is easy to store away el at Toy is safe for pre-schoolers iv Toy is fun for parent and child e Performance Requirements Toy appeals to parent and child Im po rta (CTC) nc e 0.06 0.25 0.07 0.10 0.07 0.20 0.25 Maximum launch velocity Maximum mass launch capability Storage volume The Identify Phase Mean cycles to failure Breaking force of critical components Repair part cost Tensile strength of home-applied adhesive bond Time for disassembly and reassembly Material cost Time to manufacture > You now have the start of a VOC based House of 24
  • 25. The Identify Phase > The CTC’s are ranked by using the importance rating. These ranked CTC’s from the HOQ1 then become the side of HOQ2. This then repeats. 25
  • 26. The Identify Phase > The end result is a collection of data that allows you to identify in order of importance the critical to customer requirements. These are then used to flow down through the design and manufacturing process to identify all the critical performance items. 26
  • 27. The Design Phase > Key questions to ask in the Design phase 1. What are the conceptual designs and technologies necessary to support the functional requirements ? 2. What are the risks associated with these designs ? Have we done FMEA or Pugh on the designs ? 3. What are the potential trade-offs to eliminate any identified failure modes ? 4. Have we completed a requirements flow down maintaining links to the CTC’s ? 5. What are the key input variables that affect the standard deviations ? 6. What are the transfer functions for each critical output or CTC ? 7. Have the DFSS scorecards been updated ? 27
  • 28. The Design Phase > Design Concepts  Create alternative designs that fulfill the CTC’s  Compare designs with the functional requirements  Choose the best design  Assess risks of chosen design > Selecting design concepts  Pugh Concept Selection  Functional Analysis System Technique (FAST)  Axiomatic Design  TRIZ  Transfer Functions 28
  • 29. The Design Phase > Pugh Concept Selection  Applicable to a variety of situations  Prevents team from focusing on small number of “pet” projects  Customer requirement driven  Excellent tool to aid decision making  Provides good documentation 29
  • 30. The Design Phase > FAST  Allows users to quickly design the key functionality of the system Heat Generate Cause Flood Break Press Beverage Heat Reaction Chemical Water Cell Button HOW ? WHY ? 30
  • 31. The Design Phase > Axiomatic Design  Helps design teams evaluate the “goodness” of designs  Decomposes customer requirements into 4 “domains”: Customer, Functional, Physical, Process > TRIZ  Formed by Altshuller – Russian patent examiner post WWII  Breaks down all design into 39 problem parameters and 40 “inventive principles”  Results in a 39 by 39 matrix that is then populated with the inventive principles 31
  • 33. The Optimize Phase Key questions to ask in the IDENTIFY phase 1. Have we determined the optimal parameters for our design ? 2. How sensitive is the CTC performance measure to changes in parameters ? Have done a sensitivity analysis ? 3. What are the sources of variability in our system ? Which can we control and which can we not control ? 4. Is the variability supplier dependent ? If so, how can we minimize this variability ? 5. Have we confirmed that the design is actually producible (process capability) ? 6. What gaps and risks still exist ? 7. Have we updated the DFSS scorecards ? 33
  • 34. The Optimize Phase > Determining optimal parameters  Multiple Response Optimization simulation  Done computationally – example is SimWare ProAge, income, geography, price etc. Design Parameter 1 Design Parameter 2 Requirement 1 Requirement 2 Design Parameter 3 Process Design Parameter 4 Requirement 3 34
  • 35. The Optimize Phase > Determining optimal parameters  Monte Carlo simulation can also be used  Expected Value Analysis (EVA), Robust Parameter Design, Tolerance Allocation > EVA  If we know the input variable distributions (mean, std dev., shape) and the transfer function, we can estimate the output and it’s distribution characteristics > Robust Parameter Design  A process of finding the optimal mean settings of input variables to minimize the resulting dpm (defects per million) or maximize the “sigma” of the process > Tolerance Allocation  Look at all the input standard deviations of the system.  Determine which have the largest impact on the output variations  Focus on controlling those with the largest impact 35
  • 36. The Validate Phase > Key questions to ask in the VALIDATE phase 1. What validation testing has been done, and what are the results ? 2. Is there a large gap between actual capability and predicted capability from the DFSS scorecard ? 3. What is the gap between current performance and the CTC’s ? 4. Is the existing production system under a state of quality control ? 5. What unintended consequences or problems of the design exist or could exist ? What is the contingency ? 6. How has ALL information been documented and communicated to stakeholders 7. What is the total project benefit in terms of quality, cost and delivery ? 36
  • 37. The Validate Phase > Validate performance > Perform sensitivity analysis > Compare predicted and actual capability > Do a gap analysis > Update scorecards > Validate Performance  Actual values for critical parameters are compared against predicted values  Methods to use: prototyping, lab scale production, test fixturing of sub assemblies If the validation provides poor results…. A gap analysis needs to be conducted 37
  • 38. The Validate Phase > One method to validate is called High Throughput Testing (HTT) 38
  • 39. The Validate Phase > One method to validate is called High Throughput Testing (HTT)  Used to test many factors at once  Uses a minimum number of runs  Software driven  Not DOE – though similar terminology  Started in the chemical industry where many compounds are combined together at different strengths to produce a specific reaction 39
  • 40. DFSS Success Stories > General Electric GEMS Lightspeed CT Scanner 40
  • 41. DFSS Success Stories > Xerox “Green” Paper 41
  • 42. DFSS Success Stories > Xerox Printer Belt Tensioning System 42
  • 43. Characteristics Of Successful DFSS Implementation > Commitment and leadership from the top > Measureable “stretch” goals for each project > Accountability for project success > Involvement and commitment from EVERYONE > Training and support for all the tools and knowledge necessary to do it right IT IS VERY EASY TO FOCUS ON THE LAST ITEM – BUT WITHOUT THE FIRST 4 THE DFSS IMPLEMENTATION CANNOT SUCCEED 43
  • 44. DFSS Best Practices > Train leadership to build organizational commitment and momentum > Begin using DFSS tools and techniques on ALL product development projects and provide COACHING > Weave DFSS tools into your NPD process right away > Review progress based on DFSS metrics and re-align as necessary > Build the bridge to innovation – build and use the transfer function > Build a strong capability in DOE / HTT > Establish a good process capability database – both in house and with suppliers > Link DFSS to business success > View DFSS as a cultural change – a mindset – not just a set of tools 44
  • 45. Thank You ! Jerry Fix (314) 255-9938 jcfix@att.net 45