SlideShare ist ein Scribd-Unternehmen logo
1 von 55
Downloaden Sie, um offline zu lesen
Is PLM more important than ERP?

           Ingmar Boon
        Stephan Monsieur
         December 2011
Agenda


 What is PLM ?

 Typical processes supported by PLM

 One Practical example of PLM

 PLM + ERP = VALUE

 Final thoughts …

 Q&A




                                       2
What is PLM?




               3
Understanding PLM


Introduced at the turn of the century, PLM still lacks a common, definitive definition


                          PTC defines PLM as:
             A solution that enables manufacturers to
           optimize the management and evolution of
              all aspects of the product’s definition
        (bill-of-materials such as eBOM, mBOM, sBOM,
         bill-of-processes such as Process Plans, Bill of
           Resources) throughout the product’s entire
         lifecycle – from conception to retirement – in a
                         single environment

           PLM typically focuses for 90% on the phases before
                       ‘Release To Manufacturing’
                                                                                         4
PLM versus ERP


                    Physical
    SUPPLIERS       Product


     Digital
     Product



                                 MANUFACTURING
                     Digital                     Physical   CUSTOMERS
   ENGINEERING
                     Product                     Product
                                 PROCUREMENT
                  Release to
                 Manufacturing
                                   MARKETING

                     Digital         SALES        Digital
                     Product
                                                  Product
                                    SERVICE




                                                                        5
What are their focus points?

 ERP (Enterprise Resource Planning)
                            Execution of
  Manufacturing,              repeated                              Planning &
  Sourcing and              transactions                              Control
   Distribution                              BOM to procured
   processes         Inventory /              part/assembly
                   order lifecycles                level

 PLM (Product Lifecycle Management)

   Innovation -                                                      Controlled
     Managed                                                          change
                     Design                 Complete BOM            management
    Creativity
                    Processes                Management
                                        (spanning as-designed BOM, as-
           Visibility across          planned BOM, as-serviced BOM, and
                                                 as-built BOM)
          the entire product
               lifecycle
                                                                                  6
Is PLM more important than ERP?

 Where is the cost of a product determined?


                                              Committed Cost vs. Lifecycle
                                                        “Total Product Confidence”




      100                                              85%
                  Digital                                                                                  Physical
                                        70%
                 Product                                                     Life Cycle Cost               Product
       80                                                                    Determination

       60

                                         35%
       40
                                                        22%


       20                                                                                      Cost Reduction
                                                                                               Opportunities

                    Conceptual Design          Detailed Design                  Production           Operations Support

                                                          Release to Manufacturing


Source: DARPA RaDEO Project




                                                                                                                          7
Typical processes supported by PLM




                                     8
Optimizing Product Development Processes is Critical
                                                                     PRODUCT DEVELOPMENT LIFECYCLE

   Organization      Plan                  Concept                 Design                 Validate               Production            Support

                    Portfolio Management
                             Program Management
                             Project Management
Management                        Environmental Performance Management
                                               Regulatory Compliance
                                                Quality & Reliability Management
                                                  Change and Configuration Management

                     Proposal Response
Sales & Marketing
                             Requirements Capture and Management                                                               Release to
                                 Concept Development
                                                                                                                              Manufacturing
                                                  System Design
                                                                  Detailed Design
Engineering
                                           Verification and Validation
                                                            Variant Design & Generation
                                   Design Outsourcing

                                     Early Sourcing
Sourcing
                                               Component and Supplier Management

                                                       Manufacturing Process Management
Manufacturing                                          Tooling Design and Manufacture
                                                       Manufacturing Outsourcing
                                                                  Product Support Analysis & Planning
Service                                                                  Technical Information Creation & Delivery
                    Main PLM Focus                                                                              Performance Analysis & Feedback

                                                                                                                                                  9
One Practical example of PLM




                               10
The actors in the Product Development Process
Example




                                              Peter
                                         Project Manager



      Dimitri
     Designer



                                            Mike
                                         Manufacturer

                            © 2011 PTC                     11
Which tools is Dimitri Designer using ?



              MCAD
             Applicatie
                                   CAD

                                                      Viewing application

             Technical
           Documentation
                                                  Product   CAD     Deliverables




                           Documentation tool



 Dimitri
             Technical
Designer    Illustration                                PLM Application

                             Illustration tool
                                                            PDF – web



            Documents,
           Spreadsheets,
             Email, …
                               Microsoft Office

                                                                     © 2011 PTC    12
The process …



      CAD                  Illustration
                                                        Viewing                         ERP




                                 Release                                Accept
                                                                        Release
Documentation
                 Dimitri                             Peter                            Mike
                Designer                        Project Manager                    Manufacturer




       PLM                  MS Office
                                                                                  PLM
                                                PLM
                                                                  Viewing



                                             Change needed !
                                           © 2011 PTC                                             13
Dimitri Designer performs a last check before initiating
the release


      CAD                  Illustration
                                                   ProductView                             ERP




                                 Release                             Accept
                                                                     Release
Documentation
                 Dimitri                             Peter                            Mike
                Designer                        Project Manager                    Manufacturer




       PLM             Microsoft Office
                                                                               Windchill
                                             Windchill                         PDMLink
                                                             ProductView
                                             PDMLink



                                             Change needed !
                                           © 2011 PTC                                             14
Dimitri uses his PLM tool to centralise all Product data


                    Product



                              Housing                                  Requirements
                              Battery               Viewables
                                                                            CAD Model
                              Purchased Assy
                                                                               Data Sheets
                                    AML / AVL

                              PCA                                               Analysis
                                                                              Discloses &
                                            Schematic                         Declarations
                                            PCB                       Approved Suppliers
                                                        Classified Component
                                            Std Parts         Attributes

                                                            AML / AVL
                                            ASICs

                                            Firmware Assy

                                                            Component

                                                            Software

                                         Mechanical Parts

                                                            AVL

                              Software

                              Manual




                                               © 2011 PTC                                    15
Dimitri uploads an important email to PLM




                             © 2011 PTC     16
Dimitri performs a final check on the Creo data




                                                               17
                                                  © 2011 PTC
Dimitri’s illustration created in Arbortext Isodraw is also
ready




                                © 2011 PTC


                                                              18
He inserted the illustration in the product manual
(Arbortext Editor)




                               © 2011 PTC

                                                     19
Dimitri Designer initiates the release process



    Creo            Arbortext Isodraw
                                                ProductView                             ERP




                             Release                              Accept
                                                                  Release
Arbortext
  Editor
               Dimitri                            Peter                            Mike
              Designer                       Project Manager                    Manufacturer




  Windchill          Microsoft Office
                                                                            Windchill
  PDMLink                                 Windchill                         PDMLink
                                                          ProductView
                                          PDMLink



                                          Change needed !
                                        © 2011 PTC                                             20
The release process gets started in PLM




                                          Promotion
                                           Request
                                          Approved
               Approve
              Promotion
               Request
                                          Promotion
                                           Request
                                           Denied




                             © 2011 PTC               21
Peter Project Manager gets a notification email about
his task




                              © 2011 PTC                22
Peter Project Manager performs review before approving
the releasing


    Creo            Arbortext Isodraw
                                                     Viewing                               ERP




                             Release                                 Accept
                                                                     Release
Arbortext
  Editor
               Dimitri                            Peter                               Mike
              Designer                       Project Manager                       Manufacturer




  Windchill          Microsoft Office
                                                                               Windchill
  PDMLink                                    PLM                               PDMLink
                                                               Viewing



                                          Change needed !
                                        © 2011 PTC                                                23
Peter has all information available to perform his review


                    Product



                              Housing                                  Requirements
                              Battery               Viewables
                                                                            CAD Model
                              Purchased Assy
                                                                               Data Sheets
                                    AML / AVL

                              PCA                                               Analysis
                                                                              Discloses &
                                            Schematic                         Declarations
                                            PCB                       Approved Suppliers
                                                        Classified Component
                                            Std Parts         Attributes

                                                            AML / AVL
                                            ASICs

                                            Firmware Assy

                                                            Component

                                                            Software

                                         Mechanical Parts

                                                            AVL

                              Software

                              Manual




                                               © 2011 PTC                                    24
Peter uses ProductView to view all MCAD information




                            © 2011 PTC                25
Peter opens the PDF manual in ProductView
(or Acrobat)




                           © 2011 PTC       26
After reviewing all material Peter approves the Release
in PDMLink




                              © 2011 PTC                  27
Mike Manufacturer has all information available from ERP



    Creo            Arbortext Isodraw
                                                ProductView                       ERP




                             Release                              Accept
                                                                  Release
Arbortext
  Editor
               Dimitri                            Peter                         Mike
              Designer                       Project Manager                 Manufacturer




  Windchill          Microsoft Office
                                                                            PLM
  PDMLink                                 Windchill
                                                          ProductView
                                          PDMLink



                                          Change needed !
                                        © 2011 PTC                                          28
Sara-Item Lines




                  29
Mike Manufacturer wants to initiate a Change …



    Creo            Arbortext Isodraw
                                                ProductView                             ERP




                             Release                              Accept
                                                                  Release
Arbortext
  Editor
               Dimitri                            Peter                            Mike
              Designer                       Project Manager                    Manufacturer




  Windchill          Microsoft Office
                                                                            Windchill
  PDMLink                                 Windchill                         PDMLink
                                                          ProductView
                                          PDMLink



                                          Change needed !
                                        © 2011 PTC                                             30
The change needs to end up in the PLM system

                            The change




                ERP




                                    PLM




                           © 2011 PTC          31
Mike creates a markup in Viewing Application
to indicate what needs to be changed




                             © 2011 PTC        32
Mike creates the Change Notice in PLM
by copying the data from the clipboard




                             © 2011 PTC   33
Dimitri Designer performs change actions using PLM



      CAD                  Illustration
                                                   ProductView                             ERP




                                 Release                             Accept
                                                                     Release
Documentation
                 Dimitri                             Peter                            Mike
                Designer                        Project Manager                    Manufacturer




       PLM             Microsoft Office
                                                                               Windchill
                                             Windchill                         PDMLink
                                                             ProductView
                                             PDMLink



                                             Change needed !
                                           © 2011 PTC                                             34
Dimitri designer gets a notification saying
he needs to perform a Change Notice task




                              © 2011 PTC      35
Dimitri makes the change in CAD and
checks it into PLM




                            © 2011 PTC

                                         36
The illustration gets updated automatically




                               © 2011 PTC


                                              37
The manual gets updated automatically




                            © 2011 PTC   38
The viewable gets updated automatically




                             © 2011 PTC   39
The complete BOM in PLM gets updated automatically




                           © 2011 PTC                40
The process …



      CAD                  Illustration
                                                        Viewing                         ERP




                                 Release                                Accept
                                                                        Release
Documentation
                 Dimitri                             Peter                            Mike
                Designer                        Project Manager                    Manufacturer




       PLM             Microsoft Office
                                                                                  PLM
                                                PLM
                                                                  Viewing



                                             Change needed !
                                           © 2011 PTC                                             41
PLM + ERP = VALUE




                    42
PLM and Production Systems are Complementary




       54%                       “ Best in class companies 
                                   are 1.5 times more likely 
                                   to have process that span 
                                   PLM and ERP systems.” 
                      35%



                                          Aberdeen
                                          “Integrating the PLM Ecosystem”




   Best in Class   All Others


                                                                            43
Key Applications Groups
Range of Processes Covered



           What                                 How                               Where and When

                                          Process Design                   Production         Production
CAD          Product Design
                                     -    Bridging the Gap –                Planning          Execution
                                                 MBOM
                                          Process Plan (routing)
                                            Workinstructions

 Processes
 Supporting applications

                           PLM Solution
                                                   ?
                                                                   ERP Solution

                                                            MES                            MES Solution
                                      Where?

 Where should we draw the line between PLM and ERP/MES?
 How do we implement a business process across two value chains?
                                                                                                           44
Concurrent Product and Manufacturing Process Design
is Key to Drive Profitable Growth




     Concept Development

               System Design                                                          Reduce
                                                                                     Cycle time
                               Detailed Design
Limited opportunity 
for Manufacturing to 
influence design and                                 Manufacturing Process              Production                Full scale
                                                        Management                       Ramp-up                  Production
reduce cost
                                                                                                            Reduce Cost of Change
                                                                                                                      Reduce
                                                                                                                     MFG Cost



 “   [Manufacturing companies] identified that the need to reduce manufacturing costs was driving their 
    need to improve their manufacturing planning process at practically the same rate as compressed 
    development schedules.”
                                    Aberdeen Group, Digital Manufacturing Planning – Concurrent Development of Product and Process, 11/2007
                                                                                                                                          45
PD Processes span PLM and ERP systems

                PLM                                           ERP

    Requirements Capture and Management

             Configuration Management

          System Design

          Detailed Design

        Variant Design and Generation

         Manufacturing Process Management

                                 Change Management

                                                 Production Scheduling

                                                 Inventory Management

                                            Sourcing and Procurement

                                             Sales and Order Management

                                                         Shipping Logistics

                                                 Accounting and Financial Reporting

                                                                                      46
Use case 1

                PLM                                           ERP

    Requirements Capture and Management

             Configuration Management

          System Design

          Detailed Design

        Variant Design and Generation

         Manufacturing Process Management

                                 Change Management

                                                 Production Scheduling

                                                 Inventory Management

                                            Sourcing and Procurement

                                             Sales and Order Management

                                                         Shipping Logistics

                                                 Accounting and Financial Reporting

                                                                                      47
Example Use Cases linked to the Development Process

Typical Development Work

    PLM                    - Stocklevel
                           - LeadTime
                           - Cost

                           - Stocklevel
                           - LeadTime
                           - Cost

                           - Stocklevel
                           - LeadTime
                           - Cost



                                                                          TOPLEVEL


                                          Partial Release   Subassy 10    Subassy 20    Subassy 30



                                                                Part 11       Part 21       Part 31



                                                                Part 12       Part 22       Part 32




                   Long Lead Items                                            Part 23




                                                                                                      48
Use case 2

                PLM                                           ERP

    Requirements Capture and Management

             Configuration Management

          System Design

          Detailed Design

        Variant Design and Generation

         Manufacturing Process Management

                                 Change Management

                                                 Production Scheduling

                                                 Inventory Management

                                            Sourcing and Procurement

                                             Sales and Order Management

                                                         Shipping Logistics

                                                 Accounting and Financial Reporting

                                                                                      49
Example Use Cases linked to Release To Manufacturing

Release To Manufacturing

   PLM                                                                        TOPLEVEL                    Subassy 10
                                                                                                                        TOPLEVEL



                                                                                                                        Subassy 20    Subassy 30
                           TOPLEVEL


                                                                Subassy 10    Subassy 20    Subassy 30        Part 11       Part 21       Part 31
             Subassy 10    Subassy 20    Subassy 30


                                                                    Part 11       Part 21       Part 31       Part 12       Part 22       Part 32
                 Part 11       Part 21       Part 31


                                                                    Part 12       Part 22       Part 32                     Part 23
                 Part 12       Part 22       Part 32


                                                                                  Part 23
                               Part 23




                EBOM                                                     MBOM
                                                                          RTM




                                                       ERRORS




                                                                                                                                                    50
Final thoughts …




                   51
How PLM is Evolving

Best of breed PLM’s are now enterprise systems

             Yesterday                                        Today
                                            Design                Supplier
                                            Strategy              Strategy



       CRM               PLM
                                      Cost &
                                      Green
                                     Strategy
                                                       PLM
               ERP
                           HR
                                        Service
      SCM                               Strategy
                                                         Mfg.
                Mfg.                                   Strategy
                                                                              ERP
                                                                                         ….


                                                                                    HR
                                                                             CRM



                                       © 2010 PTC                                             52
The PTC Value Roadmap




                        © 2010 PTC 53
Call to Action




                 Contact PTC
                 • Stephan Monsieur      You can connect
                   (smonsieur@ptc.com)   with an existing
                 • Ingmar Boon             PTC partner
                   (iboon@ptc.com)




                                                            54
Questions ?
•   Diamond Sponsors
                      Thanks to


• Gold Sponsors

Weitere ähnliche Inhalte

Was ist angesagt?

А.Маглияс (Lappeenranta Univ) "ISPMA: международный стандарт для обучения и с...
А.Маглияс (Lappeenranta Univ) "ISPMA: международный стандарт для обучения и с...А.Маглияс (Lappeenranta Univ) "ISPMA: международный стандарт для обучения и с...
А.Маглияс (Lappeenranta Univ) "ISPMA: международный стандарт для обучения и с...
PCampRussia
 
Exploiting Tools for Faster, More Acceptable Process Improvement Initiatives
Exploiting Tools for Faster, More Acceptable Process Improvement InitiativesExploiting Tools for Faster, More Acceptable Process Improvement Initiatives
Exploiting Tools for Faster, More Acceptable Process Improvement Initiatives
Mahesh Singh
 
Agile & Business Analysis: A Successful Combination
Agile & Business Analysis: A Successful CombinationAgile & Business Analysis: A Successful Combination
Agile & Business Analysis: A Successful Combination
Luiz C. Parzianello
 
Innovation Code Presentation "More with Less in Product Design and Development"
Innovation Code Presentation "More with Less in Product Design and Development"Innovation Code Presentation "More with Less in Product Design and Development"
Innovation Code Presentation "More with Less in Product Design and Development"
anneladawan
 
3 D – Management Constructor
3 D – Management Constructor3 D – Management Constructor
3 D – Management Constructor
Vadim Salnikov
 
Optimising and prioritising your SDLC using business intelligence
Optimising and prioritising your SDLC using business intelligenceOptimising and prioritising your SDLC using business intelligence
Optimising and prioritising your SDLC using business intelligence
Kurt Solarte
 
New product development
New product developmentNew product development
New product development
Amitesh Sinha
 

Was ist angesagt? (20)

А.Маглияс (Lappeenranta Univ) "ISPMA: международный стандарт для обучения и с...
А.Маглияс (Lappeenranta Univ) "ISPMA: международный стандарт для обучения и с...А.Маглияс (Lappeenranta Univ) "ISPMA: международный стандарт для обучения и с...
А.Маглияс (Lappeenranta Univ) "ISPMA: международный стандарт для обучения и с...
 
Value Reference Model - Information and Knowledge Mgt
Value Reference Model - Information and Knowledge MgtValue Reference Model - Information and Knowledge Mgt
Value Reference Model - Information and Knowledge Mgt
 
Enterprise Applications
Enterprise ApplicationsEnterprise Applications
Enterprise Applications
 
Exploiting Tools for Faster, More Acceptable Process Improvement Initiatives
Exploiting Tools for Faster, More Acceptable Process Improvement InitiativesExploiting Tools for Faster, More Acceptable Process Improvement Initiatives
Exploiting Tools for Faster, More Acceptable Process Improvement Initiatives
 
Meego의 현재와 미래(1)
Meego의 현재와 미래(1)Meego의 현재와 미래(1)
Meego의 현재와 미래(1)
 
IBM Rational 8/16 Webinar Presentation
IBM Rational 8/16 Webinar PresentationIBM Rational 8/16 Webinar Presentation
IBM Rational 8/16 Webinar Presentation
 
Product Lifecycle Management Process and Software Tools
Product Lifecycle Management Process and Software ToolsProduct Lifecycle Management Process and Software Tools
Product Lifecycle Management Process and Software Tools
 
PLM Solutions
PLM SolutionsPLM Solutions
PLM Solutions
 
Agile & Business Analysis: A Successful Combination
Agile & Business Analysis: A Successful CombinationAgile & Business Analysis: A Successful Combination
Agile & Business Analysis: A Successful Combination
 
Innovation Code Presentation "More with Less in Product Design and Development"
Innovation Code Presentation "More with Less in Product Design and Development"Innovation Code Presentation "More with Less in Product Design and Development"
Innovation Code Presentation "More with Less in Product Design and Development"
 
Oracle soa and e2.0 partner community forum bpm léon smiers share
Oracle soa and e2.0 partner community forum bpm léon smiers shareOracle soa and e2.0 partner community forum bpm léon smiers share
Oracle soa and e2.0 partner community forum bpm léon smiers share
 
Product Engineering
Product EngineeringProduct Engineering
Product Engineering
 
3 D – Management Constructor
3 D – Management Constructor3 D – Management Constructor
3 D – Management Constructor
 
Tech innovation s3_tools
Tech innovation s3_toolsTech innovation s3_tools
Tech innovation s3_tools
 
APPROACH TO VALUE ENGINEERING USING PRO/ENGINEER
APPROACH TO VALUE ENGINEERING USING PRO/ENGINEERAPPROACH TO VALUE ENGINEERING USING PRO/ENGINEER
APPROACH TO VALUE ENGINEERING USING PRO/ENGINEER
 
Product Lifecycle management PowerPoint Presentation Slides
Product Lifecycle management PowerPoint Presentation Slides Product Lifecycle management PowerPoint Presentation Slides
Product Lifecycle management PowerPoint Presentation Slides
 
2 effra roadmap-decubber
2 effra roadmap-decubber2 effra roadmap-decubber
2 effra roadmap-decubber
 
Optimising and prioritising your SDLC using business intelligence
Optimising and prioritising your SDLC using business intelligenceOptimising and prioritising your SDLC using business intelligence
Optimising and prioritising your SDLC using business intelligence
 
AdvaMed Panel J Fraser Beyond Tradeoffs
AdvaMed Panel J Fraser Beyond TradeoffsAdvaMed Panel J Fraser Beyond Tradeoffs
AdvaMed Panel J Fraser Beyond Tradeoffs
 
New product development
New product developmentNew product development
New product development
 

Andere mochten auch

ERP and PLM Integration Considerations by Richard Bourke
ERP and PLM Integration Considerations by Richard BourkeERP and PLM Integration Considerations by Richard Bourke
ERP and PLM Integration Considerations by Richard Bourke
Amplephi
 

Andere mochten auch (6)

Erp diagram
Erp diagramErp diagram
Erp diagram
 
ERP and PLM Integration Considerations by Richard Bourke
ERP and PLM Integration Considerations by Richard BourkeERP and PLM Integration Considerations by Richard Bourke
ERP and PLM Integration Considerations by Richard Bourke
 
PLM-Seminar at Gardermoen: How the idea of single BoM can fit variant and con...
PLM-Seminar at Gardermoen: How the idea of single BoM can fit variant and con...PLM-Seminar at Gardermoen: How the idea of single BoM can fit variant and con...
PLM-Seminar at Gardermoen: How the idea of single BoM can fit variant and con...
 
PLM and ERP: Separated by a common Bill of Materials (BOM)
PLM and ERP: Separated by a common Bill of Materials (BOM)PLM and ERP: Separated by a common Bill of Materials (BOM)
PLM and ERP: Separated by a common Bill of Materials (BOM)
 
PLM - ERP integration
PLM - ERP integrationPLM - ERP integration
PLM - ERP integration
 
PLM-ERP Integration
PLM-ERP IntegrationPLM-ERP Integration
PLM-ERP Integration
 

Ähnlich wie Is plm more important than erp (question mark)

Product life cycle and design for total cost
Product life cycle and design for total costProduct life cycle and design for total cost
Product life cycle and design for total cost
Kobi Vider
 
Oracle bpm-suite-11g-overview-slide
Oracle bpm-suite-11g-overview-slideOracle bpm-suite-11g-overview-slide
Oracle bpm-suite-11g-overview-slide
Aericon
 
Heizer om10 ch05-designh good and services
Heizer om10 ch05-designh good and servicesHeizer om10 ch05-designh good and services
Heizer om10 ch05-designh good and services
Rozaimi Mohd Saad
 
Product design and development
Product design and developmentProduct design and development
Product design and development
Vishal Kachhdiya
 
RDM Keynote Robin Bater
RDM Keynote Robin BaterRDM Keynote Robin Bater
RDM Keynote Robin Bater
Roopa Nadkarni
 
1 rdm keynote-robin_bater
1 rdm keynote-robin_bater1 rdm keynote-robin_bater
1 rdm keynote-robin_bater
IBM
 
IBM Rational Software Conference 2009: Process, Project and Portfolio Managem...
IBM Rational Software Conference 2009: Process, Project and Portfolio Managem...IBM Rational Software Conference 2009: Process, Project and Portfolio Managem...
IBM Rational Software Conference 2009: Process, Project and Portfolio Managem...
Kathy (Kat) Mandelstein
 
1 ppm keynote
1 ppm keynote1 ppm keynote
1 ppm keynote
IBM
 
Pulse Design & Delivery Panel
Pulse Design & Delivery PanelPulse Design & Delivery Panel
Pulse Design & Delivery Panel
Mauricio Godoy
 

Ähnlich wie Is plm more important than erp (question mark) (20)

Guide to Product Lifecycle Management
Guide to Product Lifecycle ManagementGuide to Product Lifecycle Management
Guide to Product Lifecycle Management
 
Product life cycle and design for total cost
Product life cycle and design for total costProduct life cycle and design for total cost
Product life cycle and design for total cost
 
Aras Ptpl Plm
Aras Ptpl PlmAras Ptpl Plm
Aras Ptpl Plm
 
The Product Management Value Chain
The Product Management Value ChainThe Product Management Value Chain
The Product Management Value Chain
 
Product Final
Product FinalProduct Final
Product Final
 
Tml Deployment Strategy Overview V 1
Tml Deployment Strategy Overview V 1Tml Deployment Strategy Overview V 1
Tml Deployment Strategy Overview V 1
 
Oracle bpm-suite-11g-overview-slide
Oracle bpm-suite-11g-overview-slideOracle bpm-suite-11g-overview-slide
Oracle bpm-suite-11g-overview-slide
 
Heizer om10 ch05-designh good and services
Heizer om10 ch05-designh good and servicesHeizer om10 ch05-designh good and services
Heizer om10 ch05-designh good and services
 
Product design and development
Product design and developmentProduct design and development
Product design and development
 
RDM Keynote Robin Bater
RDM Keynote Robin BaterRDM Keynote Robin Bater
RDM Keynote Robin Bater
 
1 rdm keynote-robin_bater
1 rdm keynote-robin_bater1 rdm keynote-robin_bater
1 rdm keynote-robin_bater
 
IBM Rational Software Conference 2009: Process, Project and Portfolio Managem...
IBM Rational Software Conference 2009: Process, Project and Portfolio Managem...IBM Rational Software Conference 2009: Process, Project and Portfolio Managem...
IBM Rational Software Conference 2009: Process, Project and Portfolio Managem...
 
Apqp ppt
Apqp pptApqp ppt
Apqp ppt
 
PPM Keynote
PPM KeynotePPM Keynote
PPM Keynote
 
1 ppm keynote
1 ppm keynote1 ppm keynote
1 ppm keynote
 
Pulse Design & Delivery Panel
Pulse Design & Delivery PanelPulse Design & Delivery Panel
Pulse Design & Delivery Panel
 
Value Reference Model - Development
Value Reference Model - DevelopmentValue Reference Model - Development
Value Reference Model - Development
 
Application Lifecycle Management & VSTS
Application Lifecycle Management & VSTSApplication Lifecycle Management & VSTS
Application Lifecycle Management & VSTS
 
Business Process Intelligence Keynote
Business Process Intelligence KeynoteBusiness Process Intelligence Keynote
Business Process Intelligence Keynote
 
How to be a successful agile product manager
How to be a successful agile product managerHow to be a successful agile product manager
How to be a successful agile product manager
 

Mehr von dynamicscom

Plm & erp their respective roles in marketing
Plm & erp   their respective roles in marketingPlm & erp   their respective roles in marketing
Plm & erp their respective roles in marketing
dynamicscom
 
Map your best_route_to_product_value_ebook
Map your best_route_to_product_value_ebookMap your best_route_to_product_value_ebook
Map your best_route_to_product_value_ebook
dynamicscom
 
Ptc & microsoft partnership
Ptc & microsoft partnershipPtc & microsoft partnership
Ptc & microsoft partnership
dynamicscom
 
Dynamics CRM2011 Update 7, Tim Schaeps
Dynamics CRM2011 Update 7, Tim SchaepsDynamics CRM2011 Update 7, Tim Schaeps
Dynamics CRM2011 Update 7, Tim Schaeps
dynamicscom
 
Dynamics NAV, Windows Azure & Windows Phone 7, Eric Wauters
Dynamics NAV, Windows Azure & Windows Phone 7, Eric WautersDynamics NAV, Windows Azure & Windows Phone 7, Eric Wauters
Dynamics NAV, Windows Azure & Windows Phone 7, Eric Wauters
dynamicscom
 
Keynote - Cloud Transformation, Guus Krabbenborg
Keynote - Cloud Transformation, Guus KrabbenborgKeynote - Cloud Transformation, Guus Krabbenborg
Keynote - Cloud Transformation, Guus Krabbenborg
dynamicscom
 
AX2012 Technical Track - Infrastructure, Davy Vliegen
AX2012 Technical Track - Infrastructure, Davy VliegenAX2012 Technical Track - Infrastructure, Davy Vliegen
AX2012 Technical Track - Infrastructure, Davy Vliegen
dynamicscom
 
AX2012 Technical Track - Entreprise portal, Czesia Langoswka
AX2012 Technical Track -  Entreprise portal, Czesia LangoswkaAX2012 Technical Track -  Entreprise portal, Czesia Langoswka
AX2012 Technical Track - Entreprise portal, Czesia Langoswka
dynamicscom
 
AX2012 Functional track - Steven Eggermont
AX2012 Functional track - Steven EggermontAX2012 Functional track - Steven Eggermont
AX2012 Functional track - Steven Eggermont
dynamicscom
 
AX 2012 Functional Track - Steven Hermans
AX 2012 Functional Track - Steven HermansAX 2012 Functional Track - Steven Hermans
AX 2012 Functional Track - Steven Hermans
dynamicscom
 

Mehr von dynamicscom (12)

Plm & erp their respective roles in marketing
Plm & erp   their respective roles in marketingPlm & erp   their respective roles in marketing
Plm & erp their respective roles in marketing
 
Map your best_route_to_product_value_ebook
Map your best_route_to_product_value_ebookMap your best_route_to_product_value_ebook
Map your best_route_to_product_value_ebook
 
Ptc & microsoft partnership
Ptc & microsoft partnershipPtc & microsoft partnership
Ptc & microsoft partnership
 
Dynamics CRM2011 Update 7, Tim Schaeps
Dynamics CRM2011 Update 7, Tim SchaepsDynamics CRM2011 Update 7, Tim Schaeps
Dynamics CRM2011 Update 7, Tim Schaeps
 
Dynamics NAV, Windows Azure & Windows Phone 7, Eric Wauters
Dynamics NAV, Windows Azure & Windows Phone 7, Eric WautersDynamics NAV, Windows Azure & Windows Phone 7, Eric Wauters
Dynamics NAV, Windows Azure & Windows Phone 7, Eric Wauters
 
Keynote - Cloud Transformation, Guus Krabbenborg
Keynote - Cloud Transformation, Guus KrabbenborgKeynote - Cloud Transformation, Guus Krabbenborg
Keynote - Cloud Transformation, Guus Krabbenborg
 
AX2012 Technical Track - Infrastructure, Davy Vliegen
AX2012 Technical Track - Infrastructure, Davy VliegenAX2012 Technical Track - Infrastructure, Davy Vliegen
AX2012 Technical Track - Infrastructure, Davy Vliegen
 
AX2012 Technical Track - Entreprise portal, Czesia Langoswka
AX2012 Technical Track -  Entreprise portal, Czesia LangoswkaAX2012 Technical Track -  Entreprise portal, Czesia Langoswka
AX2012 Technical Track - Entreprise portal, Czesia Langoswka
 
AX2012 Functional track - Steven Eggermont
AX2012 Functional track - Steven EggermontAX2012 Functional track - Steven Eggermont
AX2012 Functional track - Steven Eggermont
 
AX2012 - Keynote from Rudi America, Theuma
AX2012 - Keynote from Rudi America, TheumaAX2012 - Keynote from Rudi America, Theuma
AX2012 - Keynote from Rudi America, Theuma
 
AX 2012 Functional Track - Steven Hermans
AX 2012 Functional Track - Steven HermansAX 2012 Functional Track - Steven Hermans
AX 2012 Functional Track - Steven Hermans
 
Microsoft Worldwide Partnerconference 2011 - CRM recap for the BDC
Microsoft Worldwide Partnerconference 2011 - CRM recap for the BDCMicrosoft Worldwide Partnerconference 2011 - CRM recap for the BDC
Microsoft Worldwide Partnerconference 2011 - CRM recap for the BDC
 

Kürzlich hochgeladen

Kürzlich hochgeladen (20)

08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?
 
Tech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdfTech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdf
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Evaluating the top large language models.pdf
Evaluating the top large language models.pdfEvaluating the top large language models.pdf
Evaluating the top large language models.pdf
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 

Is plm more important than erp (question mark)

  • 1. Is PLM more important than ERP? Ingmar Boon Stephan Monsieur December 2011
  • 2. Agenda  What is PLM ?  Typical processes supported by PLM  One Practical example of PLM  PLM + ERP = VALUE  Final thoughts …  Q&A 2
  • 4. Understanding PLM Introduced at the turn of the century, PLM still lacks a common, definitive definition PTC defines PLM as: A solution that enables manufacturers to optimize the management and evolution of all aspects of the product’s definition (bill-of-materials such as eBOM, mBOM, sBOM, bill-of-processes such as Process Plans, Bill of Resources) throughout the product’s entire lifecycle – from conception to retirement – in a single environment PLM typically focuses for 90% on the phases before ‘Release To Manufacturing’ 4
  • 5. PLM versus ERP Physical SUPPLIERS Product Digital Product MANUFACTURING Digital Physical CUSTOMERS ENGINEERING Product Product PROCUREMENT Release to Manufacturing MARKETING Digital SALES Digital Product Product SERVICE 5
  • 6. What are their focus points? ERP (Enterprise Resource Planning) Execution of Manufacturing, repeated Planning & Sourcing and transactions Control Distribution BOM to procured processes Inventory / part/assembly order lifecycles level PLM (Product Lifecycle Management) Innovation - Controlled Managed change Design Complete BOM management Creativity Processes Management (spanning as-designed BOM, as- Visibility across planned BOM, as-serviced BOM, and as-built BOM) the entire product lifecycle 6
  • 7. Is PLM more important than ERP? Where is the cost of a product determined? Committed Cost vs. Lifecycle “Total Product Confidence” 100 85% Digital Physical 70% Product Life Cycle Cost Product 80 Determination 60 35% 40 22% 20 Cost Reduction Opportunities Conceptual Design Detailed Design Production Operations Support Release to Manufacturing Source: DARPA RaDEO Project 7
  • 9. Optimizing Product Development Processes is Critical PRODUCT DEVELOPMENT LIFECYCLE Organization Plan Concept Design Validate Production Support Portfolio Management Program Management Project Management Management Environmental Performance Management Regulatory Compliance Quality & Reliability Management Change and Configuration Management Proposal Response Sales & Marketing Requirements Capture and Management Release to Concept Development Manufacturing System Design Detailed Design Engineering Verification and Validation Variant Design & Generation Design Outsourcing Early Sourcing Sourcing Component and Supplier Management Manufacturing Process Management Manufacturing Tooling Design and Manufacture Manufacturing Outsourcing Product Support Analysis & Planning Service Technical Information Creation & Delivery Main PLM Focus Performance Analysis & Feedback 9
  • 11. The actors in the Product Development Process Example Peter Project Manager Dimitri Designer Mike Manufacturer © 2011 PTC 11
  • 12. Which tools is Dimitri Designer using ? MCAD Applicatie CAD Viewing application Technical Documentation Product CAD Deliverables Documentation tool Dimitri Technical Designer Illustration PLM Application Illustration tool PDF – web Documents, Spreadsheets, Email, … Microsoft Office © 2011 PTC 12
  • 13. The process … CAD Illustration Viewing ERP Release Accept Release Documentation Dimitri Peter Mike Designer Project Manager Manufacturer PLM MS Office PLM PLM Viewing Change needed ! © 2011 PTC 13
  • 14. Dimitri Designer performs a last check before initiating the release CAD Illustration ProductView ERP Release Accept Release Documentation Dimitri Peter Mike Designer Project Manager Manufacturer PLM Microsoft Office Windchill Windchill PDMLink ProductView PDMLink Change needed ! © 2011 PTC 14
  • 15. Dimitri uses his PLM tool to centralise all Product data Product Housing Requirements Battery Viewables CAD Model Purchased Assy Data Sheets AML / AVL PCA Analysis Discloses & Schematic Declarations PCB Approved Suppliers Classified Component Std Parts Attributes AML / AVL ASICs Firmware Assy Component Software Mechanical Parts AVL Software Manual © 2011 PTC 15
  • 16. Dimitri uploads an important email to PLM © 2011 PTC 16
  • 17. Dimitri performs a final check on the Creo data 17 © 2011 PTC
  • 18. Dimitri’s illustration created in Arbortext Isodraw is also ready © 2011 PTC 18
  • 19. He inserted the illustration in the product manual (Arbortext Editor) © 2011 PTC 19
  • 20. Dimitri Designer initiates the release process Creo Arbortext Isodraw ProductView ERP Release Accept Release Arbortext Editor Dimitri Peter Mike Designer Project Manager Manufacturer Windchill Microsoft Office Windchill PDMLink Windchill PDMLink ProductView PDMLink Change needed ! © 2011 PTC 20
  • 21. The release process gets started in PLM Promotion Request Approved Approve Promotion Request Promotion Request Denied © 2011 PTC 21
  • 22. Peter Project Manager gets a notification email about his task © 2011 PTC 22
  • 23. Peter Project Manager performs review before approving the releasing Creo Arbortext Isodraw Viewing ERP Release Accept Release Arbortext Editor Dimitri Peter Mike Designer Project Manager Manufacturer Windchill Microsoft Office Windchill PDMLink PLM PDMLink Viewing Change needed ! © 2011 PTC 23
  • 24. Peter has all information available to perform his review Product Housing Requirements Battery Viewables CAD Model Purchased Assy Data Sheets AML / AVL PCA Analysis Discloses & Schematic Declarations PCB Approved Suppliers Classified Component Std Parts Attributes AML / AVL ASICs Firmware Assy Component Software Mechanical Parts AVL Software Manual © 2011 PTC 24
  • 25. Peter uses ProductView to view all MCAD information © 2011 PTC 25
  • 26. Peter opens the PDF manual in ProductView (or Acrobat) © 2011 PTC 26
  • 27. After reviewing all material Peter approves the Release in PDMLink © 2011 PTC 27
  • 28. Mike Manufacturer has all information available from ERP Creo Arbortext Isodraw ProductView ERP Release Accept Release Arbortext Editor Dimitri Peter Mike Designer Project Manager Manufacturer Windchill Microsoft Office PLM PDMLink Windchill ProductView PDMLink Change needed ! © 2011 PTC 28
  • 30. Mike Manufacturer wants to initiate a Change … Creo Arbortext Isodraw ProductView ERP Release Accept Release Arbortext Editor Dimitri Peter Mike Designer Project Manager Manufacturer Windchill Microsoft Office Windchill PDMLink Windchill PDMLink ProductView PDMLink Change needed ! © 2011 PTC 30
  • 31. The change needs to end up in the PLM system The change ERP PLM © 2011 PTC 31
  • 32. Mike creates a markup in Viewing Application to indicate what needs to be changed © 2011 PTC 32
  • 33. Mike creates the Change Notice in PLM by copying the data from the clipboard © 2011 PTC 33
  • 34. Dimitri Designer performs change actions using PLM CAD Illustration ProductView ERP Release Accept Release Documentation Dimitri Peter Mike Designer Project Manager Manufacturer PLM Microsoft Office Windchill Windchill PDMLink ProductView PDMLink Change needed ! © 2011 PTC 34
  • 35. Dimitri designer gets a notification saying he needs to perform a Change Notice task © 2011 PTC 35
  • 36. Dimitri makes the change in CAD and checks it into PLM © 2011 PTC 36
  • 37. The illustration gets updated automatically © 2011 PTC 37
  • 38. The manual gets updated automatically © 2011 PTC 38
  • 39. The viewable gets updated automatically © 2011 PTC 39
  • 40. The complete BOM in PLM gets updated automatically © 2011 PTC 40
  • 41. The process … CAD Illustration Viewing ERP Release Accept Release Documentation Dimitri Peter Mike Designer Project Manager Manufacturer PLM Microsoft Office PLM PLM Viewing Change needed ! © 2011 PTC 41
  • 42. PLM + ERP = VALUE 42
  • 43. PLM and Production Systems are Complementary 54% “ Best in class companies  are 1.5 times more likely  to have process that span  PLM and ERP systems.”  35% Aberdeen “Integrating the PLM Ecosystem” Best in Class All Others 43
  • 44. Key Applications Groups Range of Processes Covered What How Where and When Process Design Production Production CAD Product Design - Bridging the Gap – Planning Execution MBOM Process Plan (routing) Workinstructions Processes Supporting applications PLM Solution ? ERP Solution MES MES Solution Where? Where should we draw the line between PLM and ERP/MES? How do we implement a business process across two value chains? 44
  • 45. Concurrent Product and Manufacturing Process Design is Key to Drive Profitable Growth Concept Development System Design Reduce Cycle time Detailed Design Limited opportunity  for Manufacturing to  influence design and  Manufacturing Process Production Full scale Management Ramp-up Production reduce cost Reduce Cost of Change Reduce MFG Cost “   [Manufacturing companies] identified that the need to reduce manufacturing costs was driving their  need to improve their manufacturing planning process at practically the same rate as compressed  development schedules.” Aberdeen Group, Digital Manufacturing Planning – Concurrent Development of Product and Process, 11/2007 45
  • 46. PD Processes span PLM and ERP systems PLM ERP Requirements Capture and Management Configuration Management System Design Detailed Design Variant Design and Generation Manufacturing Process Management Change Management Production Scheduling Inventory Management Sourcing and Procurement Sales and Order Management Shipping Logistics Accounting and Financial Reporting 46
  • 47. Use case 1 PLM ERP Requirements Capture and Management Configuration Management System Design Detailed Design Variant Design and Generation Manufacturing Process Management Change Management Production Scheduling Inventory Management Sourcing and Procurement Sales and Order Management Shipping Logistics Accounting and Financial Reporting 47
  • 48. Example Use Cases linked to the Development Process Typical Development Work PLM - Stocklevel - LeadTime - Cost - Stocklevel - LeadTime - Cost - Stocklevel - LeadTime - Cost TOPLEVEL Partial Release Subassy 10 Subassy 20 Subassy 30 Part 11 Part 21 Part 31 Part 12 Part 22 Part 32 Long Lead Items Part 23 48
  • 49. Use case 2 PLM ERP Requirements Capture and Management Configuration Management System Design Detailed Design Variant Design and Generation Manufacturing Process Management Change Management Production Scheduling Inventory Management Sourcing and Procurement Sales and Order Management Shipping Logistics Accounting and Financial Reporting 49
  • 50. Example Use Cases linked to Release To Manufacturing Release To Manufacturing PLM TOPLEVEL Subassy 10 TOPLEVEL Subassy 20 Subassy 30 TOPLEVEL Subassy 10 Subassy 20 Subassy 30 Part 11 Part 21 Part 31 Subassy 10 Subassy 20 Subassy 30 Part 11 Part 21 Part 31 Part 12 Part 22 Part 32 Part 11 Part 21 Part 31 Part 12 Part 22 Part 32 Part 23 Part 12 Part 22 Part 32 Part 23 Part 23 EBOM MBOM RTM ERRORS 50
  • 52. How PLM is Evolving Best of breed PLM’s are now enterprise systems Yesterday Today Design Supplier Strategy Strategy CRM PLM Cost & Green Strategy PLM ERP HR Service SCM Strategy Mfg. Mfg. Strategy ERP …. HR CRM © 2010 PTC 52
  • 53. The PTC Value Roadmap © 2010 PTC 53
  • 54. Call to Action Contact PTC • Stephan Monsieur You can connect (smonsieur@ptc.com) with an existing • Ingmar Boon PTC partner (iboon@ptc.com) 54
  • 55. Questions ? • Diamond Sponsors Thanks to • Gold Sponsors