SlideShare ist ein Scribd-Unternehmen logo
1 von 8
Downloaden Sie, um offline zu lesen
CASE STUDIES:
LIFE SCIENCE EXPERIENCE
Moving Beyond the Data
TECHNOLOGY ASSESSMENT
CASE STUDY:
Implementation and
Adoption of a Statistical
Computing Environment
2
www.d-wise.com
Implementation and Adoption of Statistical Computing Environment
About d-Wise
d-Wise Technologies, Inc. is a technology leader with the expertise to empower world-class life science and health-
care organizations to resolve their business optimization challenges, helping them rapidly harness and leverage data,
systems and processes to gain competitive advantage.
As one of North Carolinas’s fastest growing companies, with offices in the US in Research Triangle Park area of
Raleigh, NC and in the UK in Marlborough, England, d-Wise offers product, service and consulting solutions that help
clients clearly understand technology options, interconnect manual, disparate and point systems and implement best
practices for robust, reliable, and compliant infrastructures that optimize data flow and business process.
d-Wise’s ten year history of tailoring solutions to meet individual client needs as well as delivering data integration, data
warehousing and standards solutions within highly-regulated industries is rooted in extensive domain knowledge of
SAS software, clinical drug development and clinical data standards like CDISC.
d-Wise solutions for clinical trial optimization, metadata management and clinical standards provide a solid foundation
for extracting accurate business analytics to enable critical business decisions to be made rapidly and based on all
the data.
Within the healthcare arena, d-Wise provides data optimization for actuarial, quality, medical-management, and
operational data marts and data warehouses as well as support for fraud detection using data-driven and repeatable
processes.
3
www.d-wise.com
Implementation and Adoption of Statistical Computing Environment
d-Wise Technologies, Inc. Provides Strategic Support for the
Implementation of a Validated Statistical Computing Environment
d-Wise Technologies, Inc. provided consulting services to a leading Pharmaceutical manufacturer to lead and support
their implementation of a Statistical Computing Environment (SCE). The company was using SAS Drug Development
(SDD) as a compliant data repository and platform for user access to their clinical research data. Enabling this
environment included the implementation of new business processes, development of programming standards and
programming validation, and the integration of currently used SDD software tools.
The SCE can be defined as “a data repository of source code, input data, and outputs with compliance features such
as version-control of SCE elements, reusable programming ability, and links to the clinical data management system.”
It serves as the foundation for documenting rigor in the analysis and reporting of clinical trial results in a compliant
environment while increasing productivity and quality.
d-Wise is recognized as a leader in technology implementation based on their extensive knowledge of the clinical
research workflow, the clinical systems architecture, and the integration of SCEs with other clinical systems,. d-Wise
also understands the significant importance of user experience and change management when implementing
technology and process change within an organization, and can provide expertise to spearhead the related tasks
involved with technology adoption. The client also recognized that change management was integral to getting the
best results from the SCE implementation.
During the initial discussions d-Wise noted these components (but did not limit the scope to only these) as key
pieces of the SCE:
»» Implementation of the SCE with SDD as the core technology
»» Development of new business processes to optimize the adoption of the SDD within their organization
»» Integration of existing key software tools with the SCE
»» Implementation of programming standards, including the implementation of a new model for programming
validation
d-Wise worked with the client to develop a preliminary implementation plan broken into four phases including:
1.	 Contract and Planning,
2.	 System Pilot,
3.	 Configuration and Validation, and
4.	 Production Rollout.
Each phase has an estimated duration, activities, prerequisites, and required assumptions. Additionally, the client also
identified the need to engage both technology and process expertise to support all phases of the SCE implementation
project including how to prioritize activities into an iterative project plan for implementation, and to address both the
technical and change management activities. The client also indicated the need for subject matter experts to engage
with them to do the ‘heavy lifting’ of the SCE implementation including defining best practices, system design, and
process definition.
4
www.d-wise.com
Implementation and Adoption of Statistical Computing Environment
	 Overview of the SCE Implementation Scope
The client identified the challenge and associated need to define a strategic implementation plan for the SCE. d-Wise
guided the client through the process of determining which steps to take first, or in parallel, and how to iteratively
develop and roll out processes to address the change management challenges. . Specifically d-Wise discussed their
need for help in defining the scope and project priorities across the SCE Project initiatives described in earlier.
This plan, in order to be most effective, needed to be developed in incremental phases that are defined within short
time intervals, and provide users with immediate benefit, while proactively addressing change management issues.
These intervals allowed the project to be deployed iteratively optimizing project start up and streamlining the project
workflow to best meet the client’s timelines and project objectives.
SCE Project Assessment
d-Wise has extensive experience in developing strategic implementation plans that define priorities, dependencies,
and timelines, balance budget, and show rapid and tangible benefits. The key is to develop an iterative process that
targets quick wins and identifies the critical incremental pieces to tackle first. For example, the first step within the
SCE implementation might only include the development of a standard hierarchy, user roles, and working guidelines
for moving data in and out of the system. Essentially, the system might be used as a secure and compliant repository
in the initial rollout leaving the code development workflow to be
implemented as a follow up phase. The d-Wise implementation team
worked closely with the client to define the key components of the
SCE, and the priorities and associated iterations based on the critical
stakeholder’s needs and SCE user community.
Collaborative Meetings
The first step in defining the scope of the project was to engage in a
kick off meeting facilitated by d-Wise. This meeting was organized to
achieve three major tasks.
1.	 Review of the current status, including:
»» 	 Reviewing the status of the current environment including processes, technologies, tasks and user 		
		 roles around both the current environment and the desired future SCE environment
»» 	 Assessing the client’s current programming standards, programming validation model, and process 		
		 along with future state objectives for automation and implementation
Review and clarify the SCE Strategy documents provided by the client including the implementation plan, the list of
requirements, and the process roadmap as well as the programming and validation process documents.
2.	 Defining a project plan which included
»» 	 defining the priorities and related iterations
»» 	 agreeing to a high level design
»» 	 and identifying the activities, resources, timelines, dependencies and potential risks for implementing 		
		 each iteration.
3.	 At the end of these meetings, d-Wise was able to understand the current computing environment, user roles and
responsibilities, the capabilities needed across the initiatives of the SCE Implementation strategy and the associated
5
www.d-wise.com
Implementation and Adoption of Statistical Computing Environment
priority of each initiative. With this understanding, d-Wise was in a position to recommend steps forward and to draft an
implementation project plan for the SCE.
Strategic Implementation Plan for the SCE
Once d-Wise had a full understanding of the client’s needs, d-Wise developed a strategic implementation plan. This
plan included the following components:
»» 	 Summary of findings of the existing environment including gaps and/or pains identified
»» 	 High level implementation process organized by project priorities into an iterative approach
»» 	 Description of each iteration including priorities tasks, deliverables, and timelines
»» 	 Definition of risks and a mitigation plan
»» 	 Identification of required resources, responsibilities, and level of effort
d-Wise and the client collaborated on finalizing the implementation plan with the goal of creating a well-defined,
phased approach to the implementation. As mentioned earlier, this implementation plan informs and enables the
definition of the SOW(s).
Note: While the objective is to provide a roadmap for implementation, the Strategic Implementation Plan is a dynamic
document and is updated throughout the lifecycle of the SCE implementation.
SCE Pilot Project
Our client identified the need to conduct a pilot implementation of SDD which is acting as the core component of
the SCE. The pilot implementation designed, developed, and tested tools and processes to support the production
implementation of the SCE. d-Wise highly recommended this approach and believes it is the first step to implementing
an effective enterprise solution. Our experience indicates that a best practice for a pilot implementation is to ensure
the implementation team focuses on creating a well-defined scope and timeline for the project that is related to specific
tasks selected from the Strategic Implementation Plan.
Based on the existing implementation plan, the client ran a pilot project on a designated study allowing them to gain
experience with the SDD system capabilities, and to determine the most suitable configuration for the production
system.
In their document, The SCE Implementation Plan, the client states that the goals of the Pilot Project are to:
»»	 Develop the most suitable configuration for production
»» 	 Coordinate the on-going development of department standards
»» 	 Identify requirements for customization of:
»» SCE
»» The programs to be installed in the SCE
»» Interfaces between the SCE and other systems
6
www.d-wise.com
Implementation and Adoption of Statistical Computing Environment
d-Wise follows a high level iterative process for technology and/or process implementation which was presented to
the client during the initial meeting. Based on conversations with the client and the review of their existing project
documents, the process diagram below depicts the d-Wise process tailored to meet the client’s needs related to the
implementation of the SCE. This section describes each step and the associated tasks, deliverables and estimated
timelines.
d-Wise’s process tailored to meet the client’s needs related to the implementation of the SCE
Initiation
Prior to initiating the process described below, the team had a project initiation meeting to develop a project plan
specific to the SCE Pilot which will fall under the umbrella of the overall SCE Implementation Project Plan already
created. The Pilot project plan outlined the objectives and deliverables, roles and responsibilities, meeting schedule,
communication matrix, and decision making process. The project plan was approved by both the client team and
d-Wise to ensure the implementation team understands their roles and responsibilities.
Deliverables: Pilot Project Plan
Define Workflows
The first step in the process was to define user workflows at a high level. This included a list of activities users would
perform within the SCE; activities such as ‘loading data from external EDC’, ‘initiating a new study’, or ‘developing,
testing, and validating SAS programs’. The majority of activities identified were extracted from the existing client
documents and added or refined during the initial project meetings.
The team walked through the process that was included in the strategic implementation plan creating high level user
workflows for each process and user role. In addition, the team began to assess the priority of each use case and the
activities within those uses cases. This process helped define an iterative approach to implementing workflows and
determining the associated functionality most important for the user community. The current use cases were reviewed
7
www.d-wise.com
Implementation and Adoption of Statistical Computing Environment
and updated based on review and discussions between d-Wise and the client. At the end of this step, the team
prioritized the set of workflows and identified a critical subset that was included in the pilot implementation.
Deliverables: Workflow Use Cases
Design Workflows
The next step in the process was to design the workflows at a more granular level, identifying and defining each step
within each workflow. This is analogous to developing use cases which will be used for testing later in the project.
Each use case identified the user, each step the user should take to accomplish the task within the system, and any
alternative flows that must be supported.
One important note here is that the use cases should be developed independent of the chosen technologies so the
client focuses on developing a workflow that meets their needs and not developing workflows solely driven by the
technology at hand. While this could lead to the client developing processes that replicate their existing processes,
d-Wise validates that these workflows are designed with optimization and the selected technology in mind.
Deliverables: Workflow Diagrams and Prioritization
Map Workflow to SDD
After the use cases were designed, each step in the use
case workflow was mapped to SDD functionality. In some
cases, multiple methods were identified and discussed to
determine which component best met the client’s needs.
In addition to identifying the SDD functionality that met
the specific use case, process needs were identified and
documented. This step helped identify where SOPs and
working guidelines needed to be written later within the
project.
This step also served to identify where gaps existed
between the defined use cases for the SCE and theother
client technologies that needed to interface with the SCE . During this step, the team determined how to address the
identified gaps and whether they were to be filled by process, additional tools, or custom code/utilities. The team can
then added the planning and development of additional processes and tools to the project plan.
Deliverables: Draft Functional Specifications
Install and Configure SDD
In parallel to the definition, design, and mapping of the workflows, the team worked with the software vendor to in-
stall and configure a test SDD environment to support the SCE objectives. This environment was used to support the
development of the use cases and prototyping exercise mentioned in the next section. d-Wise helped facilitate this
process with the vendor to make sure it was completed in a timely fashion and in parallel to the completion of the
workflow definition. The team must ensure those two activities are aligned so the next step in the process can proceed
on schedule.
8
www.d-wise.com
Implementation and Adoption of Statistical Computing Environment
Deliverables: System Validation Plan, System Design Specification
Prototyping Workflows
After the workflow definition is complete and the SCE is available for testing, the next critical step was to prototype
each workflow. The team worked through each use case ensuring it met the business process and performance
requirements as well as ad-hoc testing of the system and its capabilities. The goal of the team was to iterate through
this prototyping exercise at least twice and possibly three times during this step. This prototyping will lead to refining
of the workflows, use cases, and functional specifications as well as a better understanding of gaps and methods
for resolving those gaps. Each of these documents was continuously updated during this process with the goal of
delivering robust and complete workflows.
Deliverables: Prototyping Summary, Gap Assessment, final draft Workflow Definition, Use
Cases, and final Functional Specifications
SOP/Working Guidelines Development
During the entire process outlined above, the team began and iteratively updated SOP and working guideline
documents. This was initiated as skeletons but eventually was populated as the pilot progressed. At the end of the
Pilot, well defined draft SOPs and guidelines were available for the production implementation.
Deliverables: Final draft SOPs and Working Guidelines

Weitere ähnliche Inhalte

Was ist angesagt?

McKesson Accelerated Services
McKesson Accelerated ServicesMcKesson Accelerated Services
McKesson Accelerated ServicesMangeserve
 
General checklist for the development project
General checklist for the development projectGeneral checklist for the development project
General checklist for the development projectkeshav2011
 
Episode 23 : PROJECT TIME MANAGEMENT
Episode 23 : PROJECT TIME MANAGEMENTEpisode 23 : PROJECT TIME MANAGEMENT
Episode 23 : PROJECT TIME MANAGEMENTSAJJAD KHUDHUR ABBAS
 
PMP GLOSSARY
PMP GLOSSARYPMP GLOSSARY
PMP GLOSSARYSoumya De
 
Deck uses and users v1
Deck uses and users v1Deck uses and users v1
Deck uses and users v1Daniel Guzzo
 
Plan_QualityManagement
Plan_QualityManagementPlan_QualityManagement
Plan_QualityManagementFahad Saleem
 
Project Iniation And Setup
Project Iniation And SetupProject Iniation And Setup
Project Iniation And SetupSpinnaker_Group
 
Sr. Quality Assurance Analyst (MD) 02-08
Sr. Quality Assurance Analyst (MD) 02-08Sr. Quality Assurance Analyst (MD) 02-08
Sr. Quality Assurance Analyst (MD) 02-08Daniel Orr
 
Episode 21 : Project Scope Management
Episode 21 :  Project Scope ManagementEpisode 21 :  Project Scope Management
Episode 21 : Project Scope ManagementSAJJAD KHUDHUR ABBAS
 
Introduction to Project Management PRINCE 2
Introduction to Project Management PRINCE 2Introduction to Project Management PRINCE 2
Introduction to Project Management PRINCE 2Kunal Hasija
 
Episode 23 : PROJECT TIME MANAGEMENT
Episode 23 : PROJECT TIME MANAGEMENTEpisode 23 : PROJECT TIME MANAGEMENT
Episode 23 : PROJECT TIME MANAGEMENTSAJJAD KHUDHUR ABBAS
 
New projectplandefinition1
New projectplandefinition1New projectplandefinition1
New projectplandefinition1Jonathan Joyce
 
Product based planning
Product based planning Product based planning
Product based planning Ian Cammack
 
Resume of Dale Halterman
Resume of Dale HaltermanResume of Dale Halterman
Resume of Dale Haltermandalehalterman
 
Balancing software project drivers a rational quantitative approach
Balancing software project drivers   a rational quantitative approachBalancing software project drivers   a rational quantitative approach
Balancing software project drivers a rational quantitative approachPragmatic Cohesion Consulting, LLC
 
Project Management - PMI Approach
Project Management - PMI ApproachProject Management - PMI Approach
Project Management - PMI ApproachZaur Ahmadov, PMP
 

Was ist angesagt? (20)

McKesson Accelerated Services
McKesson Accelerated ServicesMcKesson Accelerated Services
McKesson Accelerated Services
 
General checklist for the development project
General checklist for the development projectGeneral checklist for the development project
General checklist for the development project
 
Episode 23 : PROJECT TIME MANAGEMENT
Episode 23 : PROJECT TIME MANAGEMENTEpisode 23 : PROJECT TIME MANAGEMENT
Episode 23 : PROJECT TIME MANAGEMENT
 
PMP GLOSSARY
PMP GLOSSARYPMP GLOSSARY
PMP GLOSSARY
 
D11 Define Review
D11 Define ReviewD11 Define Review
D11 Define Review
 
Chap2 RE processes
Chap2 RE processesChap2 RE processes
Chap2 RE processes
 
Deck uses and users v1
Deck uses and users v1Deck uses and users v1
Deck uses and users v1
 
Plan_QualityManagement
Plan_QualityManagementPlan_QualityManagement
Plan_QualityManagement
 
Project Iniation And Setup
Project Iniation And SetupProject Iniation And Setup
Project Iniation And Setup
 
Sr. Quality Assurance Analyst (MD) 02-08
Sr. Quality Assurance Analyst (MD) 02-08Sr. Quality Assurance Analyst (MD) 02-08
Sr. Quality Assurance Analyst (MD) 02-08
 
Episode 21 : Project Scope Management
Episode 21 :  Project Scope ManagementEpisode 21 :  Project Scope Management
Episode 21 : Project Scope Management
 
Introduction to Project Management PRINCE 2
Introduction to Project Management PRINCE 2Introduction to Project Management PRINCE 2
Introduction to Project Management PRINCE 2
 
Episode 23 : PROJECT TIME MANAGEMENT
Episode 23 : PROJECT TIME MANAGEMENTEpisode 23 : PROJECT TIME MANAGEMENT
Episode 23 : PROJECT TIME MANAGEMENT
 
New projectplandefinition1
New projectplandefinition1New projectplandefinition1
New projectplandefinition1
 
Product based planning
Product based planning Product based planning
Product based planning
 
Resume of Dale Halterman
Resume of Dale HaltermanResume of Dale Halterman
Resume of Dale Halterman
 
Resume
ResumeResume
Resume
 
Balancing software project drivers a rational quantitative approach
Balancing software project drivers   a rational quantitative approachBalancing software project drivers   a rational quantitative approach
Balancing software project drivers a rational quantitative approach
 
Day 2 scope
Day 2 scopeDay 2 scope
Day 2 scope
 
Project Management - PMI Approach
Project Management - PMI ApproachProject Management - PMI Approach
Project Management - PMI Approach
 

Andere mochten auch

Tablet implementation at The Home Depot Canada: Case study at TabTimes Tablet...
Tablet implementation at The Home Depot Canada: Case study at TabTimes Tablet...Tablet implementation at The Home Depot Canada: Case study at TabTimes Tablet...
Tablet implementation at The Home Depot Canada: Case study at TabTimes Tablet...TabTimes
 
VIX Cognity Use Case - Bisam
VIX Cognity Use Case - BisamVIX Cognity Use Case - Bisam
VIX Cognity Use Case - BisamBISAM
 
BISAM Implementation Case Study - International AM Firm
BISAM Implementation Case Study - International AM FirmBISAM Implementation Case Study - International AM Firm
BISAM Implementation Case Study - International AM FirmBISAM
 
Al-Rahim Textile Mills - HCM Software Implementation Case Study Infographic
Al-Rahim Textile Mills - HCM Software Implementation Case Study InfographicAl-Rahim Textile Mills - HCM Software Implementation Case Study Infographic
Al-Rahim Textile Mills - HCM Software Implementation Case Study InfographicEfroTech
 
How to supervise employees with low self esteem
How to supervise employees with low self esteemHow to supervise employees with low self esteem
How to supervise employees with low self esteemEmpxtrack Inc.
 
Gantt Chart Templates by Creately
Gantt Chart Templates by CreatelyGantt Chart Templates by Creately
Gantt Chart Templates by CreatelyCreately
 
Statistics & Business Problems 10 Oct
Statistics & Business Problems 10 OctStatistics & Business Problems 10 Oct
Statistics & Business Problems 10 OctDr. Trilok Kumar Jain
 
Probability Case Study Rheam, Smith, Gandhotra
Probability Case Study Rheam, Smith, GandhotraProbability Case Study Rheam, Smith, Gandhotra
Probability Case Study Rheam, Smith, Gandhotraguest3c11a5
 
ERP Implementation Failure Case Study
ERP Implementation Failure Case StudyERP Implementation Failure Case Study
ERP Implementation Failure Case StudyYuvraj Zala
 
6 Tips to Avoid a Failed Warehouse Management System (WMS) Implementation
6 Tips to Avoid a Failed Warehouse Management System (WMS) Implementation6 Tips to Avoid a Failed Warehouse Management System (WMS) Implementation
6 Tips to Avoid a Failed Warehouse Management System (WMS) ImplementationCommonwealth Supply Chain Advisors
 
Case study on Business Statistics
Case study on Business Statistics Case study on Business Statistics
Case study on Business Statistics Aditya Purohit
 
Слава Панкратов - Личная эффективность для менеджеров проектов
Слава Панкратов - Личная эффективность для менеджеров проектовСлава Панкратов - Личная эффективность для менеджеров проектов
Слава Панкратов - Личная эффективность для менеджеров проектовLuxoft Education Center
 
GSMP_ SMRP_BOK_Training_Catalog_march 2016
GSMP_ SMRP_BOK_Training_Catalog_march 2016GSMP_ SMRP_BOK_Training_Catalog_march 2016
GSMP_ SMRP_BOK_Training_Catalog_march 2016DEEPAK SAHOO
 
Nutrient economics-report-2015
Nutrient economics-report-2015Nutrient economics-report-2015
Nutrient economics-report-2015walled ashwah
 
Capacity Development to Support National Drought
Capacity Development to Support National DroughtCapacity Development to Support National Drought
Capacity Development to Support National Droughtwalled ashwah
 
Como puedo desarrollar mis talentos
Como puedo desarrollar mis talentosComo puedo desarrollar mis talentos
Como puedo desarrollar mis talentosNixon Estrada
 
Keharusan Pembaharuan Pemikiran Islam dan Masalah Integrasi Umat
Keharusan Pembaharuan Pemikiran Islam dan Masalah Integrasi UmatKeharusan Pembaharuan Pemikiran Islam dan Masalah Integrasi Umat
Keharusan Pembaharuan Pemikiran Islam dan Masalah Integrasi UmatFalaqie Nila
 

Andere mochten auch (20)

Case study on Employee Management
Case study on Employee ManagementCase study on Employee Management
Case study on Employee Management
 
Tablet implementation at The Home Depot Canada: Case study at TabTimes Tablet...
Tablet implementation at The Home Depot Canada: Case study at TabTimes Tablet...Tablet implementation at The Home Depot Canada: Case study at TabTimes Tablet...
Tablet implementation at The Home Depot Canada: Case study at TabTimes Tablet...
 
VIX Cognity Use Case - Bisam
VIX Cognity Use Case - BisamVIX Cognity Use Case - Bisam
VIX Cognity Use Case - Bisam
 
BISAM Implementation Case Study - International AM Firm
BISAM Implementation Case Study - International AM FirmBISAM Implementation Case Study - International AM Firm
BISAM Implementation Case Study - International AM Firm
 
Al-Rahim Textile Mills - HCM Software Implementation Case Study Infographic
Al-Rahim Textile Mills - HCM Software Implementation Case Study InfographicAl-Rahim Textile Mills - HCM Software Implementation Case Study Infographic
Al-Rahim Textile Mills - HCM Software Implementation Case Study Infographic
 
How to supervise employees with low self esteem
How to supervise employees with low self esteemHow to supervise employees with low self esteem
How to supervise employees with low self esteem
 
Gantt Chart Templates by Creately
Gantt Chart Templates by CreatelyGantt Chart Templates by Creately
Gantt Chart Templates by Creately
 
Statistics & Business Problems 10 Oct
Statistics & Business Problems 10 OctStatistics & Business Problems 10 Oct
Statistics & Business Problems 10 Oct
 
Probability Case Study Rheam, Smith, Gandhotra
Probability Case Study Rheam, Smith, GandhotraProbability Case Study Rheam, Smith, Gandhotra
Probability Case Study Rheam, Smith, Gandhotra
 
IMRAD FORMAT FOR OLFU STUDENTS orient copy
IMRAD FORMAT FOR OLFU STUDENTS orient copyIMRAD FORMAT FOR OLFU STUDENTS orient copy
IMRAD FORMAT FOR OLFU STUDENTS orient copy
 
ERP Implementation Failure Case Study
ERP Implementation Failure Case StudyERP Implementation Failure Case Study
ERP Implementation Failure Case Study
 
6 Tips to Avoid a Failed Warehouse Management System (WMS) Implementation
6 Tips to Avoid a Failed Warehouse Management System (WMS) Implementation6 Tips to Avoid a Failed Warehouse Management System (WMS) Implementation
6 Tips to Avoid a Failed Warehouse Management System (WMS) Implementation
 
Case study on Business Statistics
Case study on Business Statistics Case study on Business Statistics
Case study on Business Statistics
 
Слава Панкратов - Личная эффективность для менеджеров проектов
Слава Панкратов - Личная эффективность для менеджеров проектовСлава Панкратов - Личная эффективность для менеджеров проектов
Слава Панкратов - Личная эффективность для менеджеров проектов
 
GSMP_ SMRP_BOK_Training_Catalog_march 2016
GSMP_ SMRP_BOK_Training_Catalog_march 2016GSMP_ SMRP_BOK_Training_Catalog_march 2016
GSMP_ SMRP_BOK_Training_Catalog_march 2016
 
Nutrient economics-report-2015
Nutrient economics-report-2015Nutrient economics-report-2015
Nutrient economics-report-2015
 
Writingfor publication2009
Writingfor publication2009Writingfor publication2009
Writingfor publication2009
 
Capacity Development to Support National Drought
Capacity Development to Support National DroughtCapacity Development to Support National Drought
Capacity Development to Support National Drought
 
Como puedo desarrollar mis talentos
Como puedo desarrollar mis talentosComo puedo desarrollar mis talentos
Como puedo desarrollar mis talentos
 
Keharusan Pembaharuan Pemikiran Islam dan Masalah Integrasi Umat
Keharusan Pembaharuan Pemikiran Islam dan Masalah Integrasi UmatKeharusan Pembaharuan Pemikiran Islam dan Masalah Integrasi Umat
Keharusan Pembaharuan Pemikiran Islam dan Masalah Integrasi Umat
 

Ähnlich wie Technology assessment case study implementation and adoption of a statistical computing environment

Software Engineering Practices and Issues.pptx
Software Engineering Practices and Issues.pptxSoftware Engineering Practices and Issues.pptx
Software Engineering Practices and Issues.pptxNikilesh8
 
19701759 project-report-on-railway-reservation-system-by-amit-mittal
19701759 project-report-on-railway-reservation-system-by-amit-mittal19701759 project-report-on-railway-reservation-system-by-amit-mittal
19701759 project-report-on-railway-reservation-system-by-amit-mittalsatyaragha786
 
GAS MANAGEMENT SYSTEM.pdf
GAS MANAGEMENT SYSTEM.pdfGAS MANAGEMENT SYSTEM.pdf
GAS MANAGEMENT SYSTEM.pdfRmsDagi
 
IT Application Development - with SDLC.pptx
IT Application Development - with SDLC.pptxIT Application Development - with SDLC.pptx
IT Application Development - with SDLC.pptxdjualaja88
 
SQA Manager_Profile_Suman Kumar Ghosh
SQA Manager_Profile_Suman Kumar GhoshSQA Manager_Profile_Suman Kumar Ghosh
SQA Manager_Profile_Suman Kumar GhoshSuman Ghosh
 
Online student management system
Online student management systemOnline student management system
Online student management systemMumbai Academisc
 
Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"David Pedreno
 
Jack Holcombe
Jack HolcombeJack Holcombe
Jack Holcombejack0352
 
AjayMehta-Resume08012016
AjayMehta-Resume08012016AjayMehta-Resume08012016
AjayMehta-Resume08012016Ajay Mehta
 
Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"David Pedreno
 
Project/Program Manager - Kjf13b1 chron
Project/Program Manager - Kjf13b1 chronProject/Program Manager - Kjf13b1 chron
Project/Program Manager - Kjf13b1 chronKevinJosephFox
 
Profile pawan chandak
Profile pawan chandakProfile pawan chandak
Profile pawan chandakPawan Chandak
 
Diana M. Arias Resume - 2017
Diana M. Arias Resume - 2017Diana M. Arias Resume - 2017
Diana M. Arias Resume - 2017Diana M. Arias
 
19701759 Project Report On Railway Reservation System By Amit Mittal
19701759 Project Report On Railway Reservation System By Amit Mittal19701759 Project Report On Railway Reservation System By Amit Mittal
19701759 Project Report On Railway Reservation System By Amit MittalCourtney Esco
 
Agile Project Methodology.pptx
Agile Project Methodology.pptxAgile Project Methodology.pptx
Agile Project Methodology.pptxAnandPrasad84
 

Ähnlich wie Technology assessment case study implementation and adoption of a statistical computing environment (20)

CS PRACRICLE.docx
CS PRACRICLE.docxCS PRACRICLE.docx
CS PRACRICLE.docx
 
Data Warehouse 102
Data Warehouse 102Data Warehouse 102
Data Warehouse 102
 
Software Engineering Practices and Issues.pptx
Software Engineering Practices and Issues.pptxSoftware Engineering Practices and Issues.pptx
Software Engineering Practices and Issues.pptx
 
19701759 project-report-on-railway-reservation-system-by-amit-mittal
19701759 project-report-on-railway-reservation-system-by-amit-mittal19701759 project-report-on-railway-reservation-system-by-amit-mittal
19701759 project-report-on-railway-reservation-system-by-amit-mittal
 
GAS MANAGEMENT SYSTEM.pdf
GAS MANAGEMENT SYSTEM.pdfGAS MANAGEMENT SYSTEM.pdf
GAS MANAGEMENT SYSTEM.pdf
 
IT Application Development - with SDLC.pptx
IT Application Development - with SDLC.pptxIT Application Development - with SDLC.pptx
IT Application Development - with SDLC.pptx
 
SQA Manager_Profile_Suman Kumar Ghosh
SQA Manager_Profile_Suman Kumar GhoshSQA Manager_Profile_Suman Kumar Ghosh
SQA Manager_Profile_Suman Kumar Ghosh
 
Online student management system
Online student management systemOnline student management system
Online student management system
 
LCesnick
LCesnickLCesnick
LCesnick
 
Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"
 
Jack Holcombe
Jack HolcombeJack Holcombe
Jack Holcombe
 
AjayMehta-Resume08012016
AjayMehta-Resume08012016AjayMehta-Resume08012016
AjayMehta-Resume08012016
 
LBA SYNOPSIS.pdf
LBA SYNOPSIS.pdfLBA SYNOPSIS.pdf
LBA SYNOPSIS.pdf
 
Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"Asset Finance Systems: Project Initiation "101"
Asset Finance Systems: Project Initiation "101"
 
Project/Program Manager - Kjf13b1 chron
Project/Program Manager - Kjf13b1 chronProject/Program Manager - Kjf13b1 chron
Project/Program Manager - Kjf13b1 chron
 
Profile pawan chandak
Profile pawan chandakProfile pawan chandak
Profile pawan chandak
 
Diana M. Arias Resume - 2017
Diana M. Arias Resume - 2017Diana M. Arias Resume - 2017
Diana M. Arias Resume - 2017
 
Evolve methodology
Evolve methodologyEvolve methodology
Evolve methodology
 
19701759 Project Report On Railway Reservation System By Amit Mittal
19701759 Project Report On Railway Reservation System By Amit Mittal19701759 Project Report On Railway Reservation System By Amit Mittal
19701759 Project Report On Railway Reservation System By Amit Mittal
 
Agile Project Methodology.pptx
Agile Project Methodology.pptxAgile Project Methodology.pptx
Agile Project Methodology.pptx
 

Kürzlich hochgeladen

Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceEluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceDamini Dixit
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptxnandhinijagan9867
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxpriyanshujha201
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Anamikakaur10
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfAdmir Softic
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noidadlhescort
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...rajveerescorts2022
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture conceptP&CO
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756dollysharma2066
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityEric T. Tung
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...amitlee9823
 
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...amitlee9823
 

Kürzlich hochgeladen (20)

Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceEluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture concept
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
 

Technology assessment case study implementation and adoption of a statistical computing environment

  • 1. CASE STUDIES: LIFE SCIENCE EXPERIENCE Moving Beyond the Data TECHNOLOGY ASSESSMENT CASE STUDY: Implementation and Adoption of a Statistical Computing Environment
  • 2. 2 www.d-wise.com Implementation and Adoption of Statistical Computing Environment About d-Wise d-Wise Technologies, Inc. is a technology leader with the expertise to empower world-class life science and health- care organizations to resolve their business optimization challenges, helping them rapidly harness and leverage data, systems and processes to gain competitive advantage. As one of North Carolinas’s fastest growing companies, with offices in the US in Research Triangle Park area of Raleigh, NC and in the UK in Marlborough, England, d-Wise offers product, service and consulting solutions that help clients clearly understand technology options, interconnect manual, disparate and point systems and implement best practices for robust, reliable, and compliant infrastructures that optimize data flow and business process. d-Wise’s ten year history of tailoring solutions to meet individual client needs as well as delivering data integration, data warehousing and standards solutions within highly-regulated industries is rooted in extensive domain knowledge of SAS software, clinical drug development and clinical data standards like CDISC. d-Wise solutions for clinical trial optimization, metadata management and clinical standards provide a solid foundation for extracting accurate business analytics to enable critical business decisions to be made rapidly and based on all the data. Within the healthcare arena, d-Wise provides data optimization for actuarial, quality, medical-management, and operational data marts and data warehouses as well as support for fraud detection using data-driven and repeatable processes.
  • 3. 3 www.d-wise.com Implementation and Adoption of Statistical Computing Environment d-Wise Technologies, Inc. Provides Strategic Support for the Implementation of a Validated Statistical Computing Environment d-Wise Technologies, Inc. provided consulting services to a leading Pharmaceutical manufacturer to lead and support their implementation of a Statistical Computing Environment (SCE). The company was using SAS Drug Development (SDD) as a compliant data repository and platform for user access to their clinical research data. Enabling this environment included the implementation of new business processes, development of programming standards and programming validation, and the integration of currently used SDD software tools. The SCE can be defined as “a data repository of source code, input data, and outputs with compliance features such as version-control of SCE elements, reusable programming ability, and links to the clinical data management system.” It serves as the foundation for documenting rigor in the analysis and reporting of clinical trial results in a compliant environment while increasing productivity and quality. d-Wise is recognized as a leader in technology implementation based on their extensive knowledge of the clinical research workflow, the clinical systems architecture, and the integration of SCEs with other clinical systems,. d-Wise also understands the significant importance of user experience and change management when implementing technology and process change within an organization, and can provide expertise to spearhead the related tasks involved with technology adoption. The client also recognized that change management was integral to getting the best results from the SCE implementation. During the initial discussions d-Wise noted these components (but did not limit the scope to only these) as key pieces of the SCE: »» Implementation of the SCE with SDD as the core technology »» Development of new business processes to optimize the adoption of the SDD within their organization »» Integration of existing key software tools with the SCE »» Implementation of programming standards, including the implementation of a new model for programming validation d-Wise worked with the client to develop a preliminary implementation plan broken into four phases including: 1. Contract and Planning, 2. System Pilot, 3. Configuration and Validation, and 4. Production Rollout. Each phase has an estimated duration, activities, prerequisites, and required assumptions. Additionally, the client also identified the need to engage both technology and process expertise to support all phases of the SCE implementation project including how to prioritize activities into an iterative project plan for implementation, and to address both the technical and change management activities. The client also indicated the need for subject matter experts to engage with them to do the ‘heavy lifting’ of the SCE implementation including defining best practices, system design, and process definition.
  • 4. 4 www.d-wise.com Implementation and Adoption of Statistical Computing Environment Overview of the SCE Implementation Scope The client identified the challenge and associated need to define a strategic implementation plan for the SCE. d-Wise guided the client through the process of determining which steps to take first, or in parallel, and how to iteratively develop and roll out processes to address the change management challenges. . Specifically d-Wise discussed their need for help in defining the scope and project priorities across the SCE Project initiatives described in earlier. This plan, in order to be most effective, needed to be developed in incremental phases that are defined within short time intervals, and provide users with immediate benefit, while proactively addressing change management issues. These intervals allowed the project to be deployed iteratively optimizing project start up and streamlining the project workflow to best meet the client’s timelines and project objectives. SCE Project Assessment d-Wise has extensive experience in developing strategic implementation plans that define priorities, dependencies, and timelines, balance budget, and show rapid and tangible benefits. The key is to develop an iterative process that targets quick wins and identifies the critical incremental pieces to tackle first. For example, the first step within the SCE implementation might only include the development of a standard hierarchy, user roles, and working guidelines for moving data in and out of the system. Essentially, the system might be used as a secure and compliant repository in the initial rollout leaving the code development workflow to be implemented as a follow up phase. The d-Wise implementation team worked closely with the client to define the key components of the SCE, and the priorities and associated iterations based on the critical stakeholder’s needs and SCE user community. Collaborative Meetings The first step in defining the scope of the project was to engage in a kick off meeting facilitated by d-Wise. This meeting was organized to achieve three major tasks. 1. Review of the current status, including: »» Reviewing the status of the current environment including processes, technologies, tasks and user roles around both the current environment and the desired future SCE environment »» Assessing the client’s current programming standards, programming validation model, and process along with future state objectives for automation and implementation Review and clarify the SCE Strategy documents provided by the client including the implementation plan, the list of requirements, and the process roadmap as well as the programming and validation process documents. 2. Defining a project plan which included »» defining the priorities and related iterations »» agreeing to a high level design »» and identifying the activities, resources, timelines, dependencies and potential risks for implementing each iteration. 3. At the end of these meetings, d-Wise was able to understand the current computing environment, user roles and responsibilities, the capabilities needed across the initiatives of the SCE Implementation strategy and the associated
  • 5. 5 www.d-wise.com Implementation and Adoption of Statistical Computing Environment priority of each initiative. With this understanding, d-Wise was in a position to recommend steps forward and to draft an implementation project plan for the SCE. Strategic Implementation Plan for the SCE Once d-Wise had a full understanding of the client’s needs, d-Wise developed a strategic implementation plan. This plan included the following components: »» Summary of findings of the existing environment including gaps and/or pains identified »» High level implementation process organized by project priorities into an iterative approach »» Description of each iteration including priorities tasks, deliverables, and timelines »» Definition of risks and a mitigation plan »» Identification of required resources, responsibilities, and level of effort d-Wise and the client collaborated on finalizing the implementation plan with the goal of creating a well-defined, phased approach to the implementation. As mentioned earlier, this implementation plan informs and enables the definition of the SOW(s). Note: While the objective is to provide a roadmap for implementation, the Strategic Implementation Plan is a dynamic document and is updated throughout the lifecycle of the SCE implementation. SCE Pilot Project Our client identified the need to conduct a pilot implementation of SDD which is acting as the core component of the SCE. The pilot implementation designed, developed, and tested tools and processes to support the production implementation of the SCE. d-Wise highly recommended this approach and believes it is the first step to implementing an effective enterprise solution. Our experience indicates that a best practice for a pilot implementation is to ensure the implementation team focuses on creating a well-defined scope and timeline for the project that is related to specific tasks selected from the Strategic Implementation Plan. Based on the existing implementation plan, the client ran a pilot project on a designated study allowing them to gain experience with the SDD system capabilities, and to determine the most suitable configuration for the production system. In their document, The SCE Implementation Plan, the client states that the goals of the Pilot Project are to: »» Develop the most suitable configuration for production »» Coordinate the on-going development of department standards »» Identify requirements for customization of: »» SCE »» The programs to be installed in the SCE »» Interfaces between the SCE and other systems
  • 6. 6 www.d-wise.com Implementation and Adoption of Statistical Computing Environment d-Wise follows a high level iterative process for technology and/or process implementation which was presented to the client during the initial meeting. Based on conversations with the client and the review of their existing project documents, the process diagram below depicts the d-Wise process tailored to meet the client’s needs related to the implementation of the SCE. This section describes each step and the associated tasks, deliverables and estimated timelines. d-Wise’s process tailored to meet the client’s needs related to the implementation of the SCE Initiation Prior to initiating the process described below, the team had a project initiation meeting to develop a project plan specific to the SCE Pilot which will fall under the umbrella of the overall SCE Implementation Project Plan already created. The Pilot project plan outlined the objectives and deliverables, roles and responsibilities, meeting schedule, communication matrix, and decision making process. The project plan was approved by both the client team and d-Wise to ensure the implementation team understands their roles and responsibilities. Deliverables: Pilot Project Plan Define Workflows The first step in the process was to define user workflows at a high level. This included a list of activities users would perform within the SCE; activities such as ‘loading data from external EDC’, ‘initiating a new study’, or ‘developing, testing, and validating SAS programs’. The majority of activities identified were extracted from the existing client documents and added or refined during the initial project meetings. The team walked through the process that was included in the strategic implementation plan creating high level user workflows for each process and user role. In addition, the team began to assess the priority of each use case and the activities within those uses cases. This process helped define an iterative approach to implementing workflows and determining the associated functionality most important for the user community. The current use cases were reviewed
  • 7. 7 www.d-wise.com Implementation and Adoption of Statistical Computing Environment and updated based on review and discussions between d-Wise and the client. At the end of this step, the team prioritized the set of workflows and identified a critical subset that was included in the pilot implementation. Deliverables: Workflow Use Cases Design Workflows The next step in the process was to design the workflows at a more granular level, identifying and defining each step within each workflow. This is analogous to developing use cases which will be used for testing later in the project. Each use case identified the user, each step the user should take to accomplish the task within the system, and any alternative flows that must be supported. One important note here is that the use cases should be developed independent of the chosen technologies so the client focuses on developing a workflow that meets their needs and not developing workflows solely driven by the technology at hand. While this could lead to the client developing processes that replicate their existing processes, d-Wise validates that these workflows are designed with optimization and the selected technology in mind. Deliverables: Workflow Diagrams and Prioritization Map Workflow to SDD After the use cases were designed, each step in the use case workflow was mapped to SDD functionality. In some cases, multiple methods were identified and discussed to determine which component best met the client’s needs. In addition to identifying the SDD functionality that met the specific use case, process needs were identified and documented. This step helped identify where SOPs and working guidelines needed to be written later within the project. This step also served to identify where gaps existed between the defined use cases for the SCE and theother client technologies that needed to interface with the SCE . During this step, the team determined how to address the identified gaps and whether they were to be filled by process, additional tools, or custom code/utilities. The team can then added the planning and development of additional processes and tools to the project plan. Deliverables: Draft Functional Specifications Install and Configure SDD In parallel to the definition, design, and mapping of the workflows, the team worked with the software vendor to in- stall and configure a test SDD environment to support the SCE objectives. This environment was used to support the development of the use cases and prototyping exercise mentioned in the next section. d-Wise helped facilitate this process with the vendor to make sure it was completed in a timely fashion and in parallel to the completion of the workflow definition. The team must ensure those two activities are aligned so the next step in the process can proceed on schedule.
  • 8. 8 www.d-wise.com Implementation and Adoption of Statistical Computing Environment Deliverables: System Validation Plan, System Design Specification Prototyping Workflows After the workflow definition is complete and the SCE is available for testing, the next critical step was to prototype each workflow. The team worked through each use case ensuring it met the business process and performance requirements as well as ad-hoc testing of the system and its capabilities. The goal of the team was to iterate through this prototyping exercise at least twice and possibly three times during this step. This prototyping will lead to refining of the workflows, use cases, and functional specifications as well as a better understanding of gaps and methods for resolving those gaps. Each of these documents was continuously updated during this process with the goal of delivering robust and complete workflows. Deliverables: Prototyping Summary, Gap Assessment, final draft Workflow Definition, Use Cases, and final Functional Specifications SOP/Working Guidelines Development During the entire process outlined above, the team began and iteratively updated SOP and working guideline documents. This was initiated as skeletons but eventually was populated as the pilot progressed. At the end of the Pilot, well defined draft SOPs and guidelines were available for the production implementation. Deliverables: Final draft SOPs and Working Guidelines