Evolution of
                      the PI System
                      in Tenaga’s Power
                      Generation Fleet
Presented by Dhana Raj Markandu
             Senior Engineer, Generation Division
                                                          © Cop yri g h t 2012
                                                    Tenaga Nasional Berhad
Contents

       • About Tenaga...
       • Our journey with the PI System...
           –   Why we needed it...
           –   How we deployed it...
           –   What we’re doing with it...
           –   Where we’re going with it...
       • Summary & Conclusions...

                                                    © Cop yri g h t 2012
                                              Tenaga Nasional Berhad       2
About
Tenaga


               © Cop yri g h t 2012
         Tenaga Nasional Berhad       3
Where we’re from...




Images courtesy of Google Maps



                                       © Cop yri g h t 2012
                                 Tenaga Nasional Berhad       4
What we do...
                                                    Established in 1949

                                           Largest electricity utility in Malaysia

      CORE      NON-CORE
                                                   USD 24 billion assets

   Power         Repair, maintenance
                 & diagnostic services     USD 11.5 billion market capitalisation
 Generation
               Operation & maintenance

                Power sector projects
                                                     28,000 employees
   Power
Transmission     Training & education
                                          Installed generation capacity of 11 GW
               Research & development

   Power        Consultancy services
Distribution
                                         Contributes 55% of total national capacity

                                                                           © Cop yri g h t 2012
                                                                     Tenaga Nasional Berhad       5
Our journey
with the
PI System

              © Cop yri g h t 2012
        Tenaga Nasional Berhad       6
Why we needed it...
                                           Gas-fired
                                           Coal-fired
                                           Hydroelectric
                                                                     Diverse power plant fleet
300 MW

              300 km
                                             400 MW
                                                           Inhomogeneous sources of operational data
                                               1010 MW
1200 MW
2100 MW
                                                           Real-time process data locked within isolated
                                           250 km                        control systems
   250 MW

         HQ
                                                           Technical performance & business intelligence
  2300 MW                                                              reliant on offline data
  760 MW

               580 MW
                        1400 MW
                                               300 km         UNIFIED REAL-TIME DATA PLATFORM
                                  640 MW                       EASILY ACCESSIBLE TO ALL STAFF

                                                                                                       © Cop yri g h t 2012
                                                                                                 Tenaga Nasional Berhad       7
How we deployed it...
     Phase I (2005 - 2007)                       Phase II (2007 - ongoing)
 Pilot project at one plant & headquarters     Concurrent deployment to the other 9 plants

     Turnkey project implementation            Federated in-house project implementation

             PROJECT VENDOR                               TENAGA PERSONNEL
PI System infrastructure, applications, user   PI System infrastructure, applications, user
        training & technical support                   training & technical support

      No direct OSIsoft involvement               OSIsoft involvement at initial project
                                                  deployment & as backup techsupport

                                                          USD 7 million savings

                                                      Staff competency in PI System

                                                                                    © Cop yri g h t 2012
                                                                              Tenaga Nasional Berhad       8
How we
deployed it         Generic architecture...
                        STATION A                                                                 STATION B
                    Redundant PI Servers                    WAN                                Redundant PI Servers
       PI         PI Server      PI Server                                        PI         PI Server         PI Server
   Interface      (Primary)     (Secondary)                                   Interface      (Primary)        (Secondary)
     Node                                                                       Node


                                              GENERATION HEADQUARTERS
                                                 Redundant PI Servers
                                                PI Server     PI Server
                                                (Primary)    (Secondary)



                      Station A Network                                                          Station B Network




Station Control                                                            Station Control
    System                                                                     System

                                                       HQ Network
                     Station A Clients                                                          Station B Clients




                                                 Headquarters Clients



                                                                                                               © Cop yri g h t 2012
                                                                                                         Tenaga Nasional Berhad       9
How we
deployed it   Actual infrastructure...
                                               11 sites

                                    ~ 20 unique data sources
                                       8 unique primary plant
                                          control systems

                                             26 PI Servers

                                         > 50 Interfaces
                                     25            12           > 15
                                  Standard      PI-to-PI       Custom

                                             150,000 tags

                                        AND GROWING...

                                                           © Cop yri g h t 2012
                                                     Tenaga Nasional Berhad       10
How we
   deployed it        Interfacing cybersecurity...
Control System                          PI Server      PI Server      DIRECTIONAL FILTERING
                                        (Primary)     (Secondary)
                                                                      Data from control network
                                                                    can flow to corporate network,
                                                                           but not vice versa

                                                                         PORT FILTERING
                             Firewall                                Only data on PI Server port
                                                                          5450 is enabled
                 Port 5450

                                             Station Network                 IP FILTERING
                                                                    PI Interface can only connect
                                                                              to PI servers
PI Interface
                                                                       Audited & approved by
                                                                       security experts from
                                            Station Clients             Tenaga ICT Division

                                                                                          © Cop yri g h t 2012
                                                                                    Tenaga Nasional Berhad       11
How we
     deployed it    Change management...
                                       Internal branding:
                   GENERATION PLANT MANAGEMENT SYSTEM


    Key Messages                        Key Tactics                       Key Actions
   ...technical & business        ...empower all staff with real-     ...regular and customised
    performance project,         time data & use quick-win live     training conducted internally
       NOT an IT project.           demos wherever possible.              for all levels of staff.

...a platform that makes data    ...demonstrate multiple streams     ...constant user engagement
   easily available, BUT the         of actual or potential cost     via workshops, newsletters,
application of that data is in   savings & return on investment     internal conferences, & subtle
  the hands of the end user.        to gain management buy-in.        integration into daily work.

                                                                                        © Cop yri g h t 2012
                                                                                  Tenaga Nasional Berhad       12
What are we doing with it...
                                   UNLOCK

Diverse power plant fleet           UNIFY

                                   HISTORISE
    Inhomogeneous
       sources of
    operational data               DISPLAY




                            DATA
Real-time process data              NOTIFY
locked within isolated
   control systems                  REPORT

Technical performance              DIAGNOSE
& business intelligence
 reliant on offline data           ANALYSE

                                   OPTIMISE

                                                     © Cop yri g h t 2012
                                               Tenaga Nasional Berhad       13
What are we
doing with it   Display, notify & report...
                                                       PI ProcessBook

                                                  Real-time fleet monitoring

                                            Linked to outage management system

                                              Scheduled reports automatically
                                            compiled, formatted & e-mailed daily

                                           Ad-hoc snapshots delivered on-demand
                                                using e-mail or text message

                                          Trip notifications by e-mail & text message

                                                 Fleet status anytime, anywhere
All notifications done using customised
  VBA coding within PI ProcessBook                    Management buy-in

                                                                              © Cop yri g h t 2012
                                                                        Tenaga Nasional Berhad       14
What are we
doing with it   Diagnose...
                                          PI ProcessBook

                              Real-time process data overlaid on static
                                          plant schematics

                               Hyperlinked plant schematics for fast
                                      navigation & drill-down

                                          Ad-hoc trending

                                        Historical playback

                                      Virtual on-site presence

                                     Faster plant troubleshooting

                                   Improve technical competencies

                                                                  © Cop yri g h t 2012
                                                            Tenaga Nasional Berhad       15
What are we
doing with it   Analyse...
                             PI ProcessBook, PI Datalink, PI ACE, PI AF

                                 Real-time performance analysis of
                                individual equipment & overall plant

                                    Mass & heat balance analysis

                                        Degradation tracking

                                         Recoverable losses

                             Justification for plant improvement projects

                                     Over USD 10 million expected
                                       annual fuel cost savings

                                    Greater performance awareness

                                                                 © Cop yri g h t 2012
                                                           Tenaga Nasional Berhad       16
What are we
doing with it   Optimise...
                              PI ProcessBook, PI Datalink, PI ACE, PI AF

                                Real-time unit dispatch optimiser for
                                        hydroelectric plant

                              Potential savings by displacing gas units

                              Dynamic tracking of unit efficiency curves

                                  Load advisor & what-if simulator

                                  Daily automated report via e-mail

                                      USD 3000 average daily fuel
                                         cost savings in 2011

                                    Greater optimisation awareness

                                                                  © Cop yri g h t 2012
                                                            Tenaga Nasional Berhad       17
Where are we going with it...
                    Installation                                                         Derive value from the PI System
                                   STATION A
                               Redundant PI Servers                                  by going beyond being just an end user
                  PI         PI Server      PI Server
              Interface      (Primary)     (Secondary)
                Node


                                                         Interfacing
Training




                                                                             2010 - Provide PI System deployment services for others

                                 Station A Network

                                                                            2008 - Continuous in-house application development
           Station Control
               System


                                Station A Clients
                                                                          2007 - Deploy the PI System with internal personnel
                Tech Support
                                                                       2005 - Engage vendor for pilot PI System deployment



                                                                                                                                       Internally-developed
                                                                                                                                           applications
                                                                             60+ years of power industry experience

                                                                                                                                               © Cop yri g h t 2012
                                                                                                                                         Tenaga Nasional Berhad       18
Where are we
  going with it   Internal & external services...
             Internal Clients                               External Clients
 Expand PI System to other Tenaga divisions        Provide full scope of PI System deployment
                                                         services to external customers
    Pilot project with Distribution ongoing
                                                  Completed projects: Two independent power
                                                   plants in Malaysia & one integrated water
 Preliminary talks with Transmission ongoing            and power plant in Saudi Arabia

Offering PI System infrastructure for corporate   Additional training & application development
     Facility Energy Management project                requested after project completion

         The PI System as preferred data                   Establish track record as PI
               unification platform                         System service provider

         Enterprise agreement for Tenaga                   Non-core revenue for Tenaga

                                                                                         © Cop yri g h t 2012
                                                                                   Tenaga Nasional Berhad       19
Where are we
going with it    Enhancing ourselves...
                                                  Enterprise
                                                 agreement?
                       2014

                              2013                                   Data mining
                                                  PI Coresight
                                     2012

      Staff training                                                       Application development

                                               Tag expansion
             Hardware                            (+ 60,000)                  Dedicated
            technology                                                      diagnostics
              refresh                                                          team
                                            Improved cybersecurity
                                                 (ISO 27001)
                Deployment for
                 3 new plants
                                                           Tag expansion

                                                                                            © Cop yri g h t 2012
                                                                                      Tenaga Nasional Berhad       20
Summary &
Conclusions


             © Cop yri g h t 2012
       Tenaga Nasional Berhad       21
EVOLUTION OF THE PI SYSTEM IN
TENAGA’S POWER GENERATION FLEET

“Deploying the PI System provides the infrastructure to
unify, store, visualise and analyse our data. The real
challenge is to transform this data into actionable
information in order to make the right decisions and thus
improve our technical and business performance.”

Abd Ghafar Abd Latif
Project Manager
Generation Plant Management System


  BUSINESS CHALLENGE                                  SOLUTION                           RESULTS & BENEFITS
      Diverse power plant fleet            Deploy the PI System as a unifying          Plant data available to all personnel
                                          data infrastructure for the entire fleet
     Inhomogeneous sources of                                                          Over USD 7 million savings from in-
          operational data                   Adopt in-house implementation           house project implementation approach
                                         approach to build internal competencies
Real-time process data locked within                                                  Over USD 10 million tangible savings
       isolated control systems             Continuous change management               from plant analysis & optimisation
 Technical performance & business           Continuous in-house application            Generate revenue by providing PI
  intelligence reliant on offline data              development                       System deployment service to others

                                                                                                               © Cop yri g h t 2012
                                                                                                         Tenaga Nasional Berhad       22
Conclusions...
 Tenaga has reaped the benefits of the PI System not just as a
  user, but also as a project implementer & service provider
    Tangible benefits                               Intangible benefits


   Project cost savings      PI SYSTEM INTERNAL     Skills development
                            PROJECT IMPLEMENTER


 Operational cost savings     PI SYSTEM USER      Operational awareness



   Revenue generation       PI SYSTEM EXTERNAL    Business diversification
                             SERVICE PROVIDER

                                                                      © Cop yri g h t 2012
                                                                Tenaga Nasional Berhad       23
Dhana Markandu
dhana@tnb.com.my




                         © Cop yri g h t 2012
                   Tenaga Nasional Berhad       24
Brought to you by

                          © Cop yri g h t 2012
                    Tenaga Nasional Berhad

Weitere ähnliche Inhalte

Was ist angesagt?

Infocom03 rajiv
Infocom03 rajivInfocom03 rajiv
Infocom03 rajivzt5169
 
Rdl oilfield basra_2012-11-07 pptx
Rdl oilfield basra_2012-11-07 pptxRdl oilfield basra_2012-11-07 pptx
Rdl oilfield basra_2012-11-07 pptxrdlcom
 
Emc world 2011 gelsinger finalb
Emc world 2011 gelsinger finalbEmc world 2011 gelsinger finalb
Emc world 2011 gelsinger finalbTina Jiang
 
OpenStack Summit Portland April 2013 talk - Quantum and EC2
OpenStack Summit Portland April 2013 talk - Quantum and EC2OpenStack Summit Portland April 2013 talk - Quantum and EC2
OpenStack Summit Portland April 2013 talk - Quantum and EC2Naveen Joy
 
Telecom Challenges and Electric Vehicles
Telecom Challenges and Electric VehiclesTelecom Challenges and Electric Vehicles
Telecom Challenges and Electric VehiclesWim D'Hondt
 
Evaluating Approaches to Building DPI into an LTE Network at the PDN Gateway ...
Evaluating Approaches to Building DPI into an LTE Network at the PDN Gateway ...Evaluating Approaches to Building DPI into an LTE Network at the PDN Gateway ...
Evaluating Approaches to Building DPI into an LTE Network at the PDN Gateway ...Continuous Computing
 
Modern Carrier Strategies for Traffic Engineering
Modern Carrier Strategies for Traffic EngineeringModern Carrier Strategies for Traffic Engineering
Modern Carrier Strategies for Traffic EngineeringVishal Sharma, Ph.D.
 
LTE Components Drive Multimode Mobile Broadband
LTE Components Drive Multimode Mobile BroadbandLTE Components Drive Multimode Mobile Broadband
LTE Components Drive Multimode Mobile BroadbandEneaSoftware
 
Universal Edge Service: Innovation for the Next Decade
Universal Edge Service: Innovation for the Next DecadeUniversal Edge Service: Innovation for the Next Decade
Universal Edge Service: Innovation for the Next DecadeJuniper Networks
 
EValu8 offer presentation
EValu8 offer presentationEValu8 offer presentation
EValu8 offer presentationrfenner
 
Building Efficient Networks
Building Efficient NetworksBuilding Efficient Networks
Building Efficient NetworksMichael Peeters
 
2013 02 08 annunci power 7 plus sito cta
2013 02 08 annunci power 7 plus sito cta2013 02 08 annunci power 7 plus sito cta
2013 02 08 annunci power 7 plus sito ctaLorenzo Corbetta
 

Was ist angesagt? (20)

Intelligent Mobile Broadband
Intelligent Mobile BroadbandIntelligent Mobile Broadband
Intelligent Mobile Broadband
 
20111130 ssn english
20111130 ssn english20111130 ssn english
20111130 ssn english
 
Infocom03 rajiv
Infocom03 rajivInfocom03 rajiv
Infocom03 rajiv
 
Rdl oilfield basra_2012-11-07 pptx
Rdl oilfield basra_2012-11-07 pptxRdl oilfield basra_2012-11-07 pptx
Rdl oilfield basra_2012-11-07 pptx
 
Emc world 2011 gelsinger finalb
Emc world 2011 gelsinger finalbEmc world 2011 gelsinger finalb
Emc world 2011 gelsinger finalb
 
10 fn s29
10 fn s2910 fn s29
10 fn s29
 
10 fn s43
10 fn s4310 fn s43
10 fn s43
 
OpenStack Summit Portland April 2013 talk - Quantum and EC2
OpenStack Summit Portland April 2013 talk - Quantum and EC2OpenStack Summit Portland April 2013 talk - Quantum and EC2
OpenStack Summit Portland April 2013 talk - Quantum and EC2
 
Patel Work Skills
Patel Work SkillsPatel Work Skills
Patel Work Skills
 
Power Saving Methods in EPON
Power Saving Methods in EPONPower Saving Methods in EPON
Power Saving Methods in EPON
 
Telecom Challenges and Electric Vehicles
Telecom Challenges and Electric VehiclesTelecom Challenges and Electric Vehicles
Telecom Challenges and Electric Vehicles
 
Evaluating Approaches to Building DPI into an LTE Network at the PDN Gateway ...
Evaluating Approaches to Building DPI into an LTE Network at the PDN Gateway ...Evaluating Approaches to Building DPI into an LTE Network at the PDN Gateway ...
Evaluating Approaches to Building DPI into an LTE Network at the PDN Gateway ...
 
Modern Carrier Strategies for Traffic Engineering
Modern Carrier Strategies for Traffic EngineeringModern Carrier Strategies for Traffic Engineering
Modern Carrier Strategies for Traffic Engineering
 
LTE Components Drive Multimode Mobile Broadband
LTE Components Drive Multimode Mobile BroadbandLTE Components Drive Multimode Mobile Broadband
LTE Components Drive Multimode Mobile Broadband
 
GPON-Doctor 8000
GPON-Doctor 8000GPON-Doctor 8000
GPON-Doctor 8000
 
Fujitsu
FujitsuFujitsu
Fujitsu
 
Universal Edge Service: Innovation for the Next Decade
Universal Edge Service: Innovation for the Next DecadeUniversal Edge Service: Innovation for the Next Decade
Universal Edge Service: Innovation for the Next Decade
 
EValu8 offer presentation
EValu8 offer presentationEValu8 offer presentation
EValu8 offer presentation
 
Building Efficient Networks
Building Efficient NetworksBuilding Efficient Networks
Building Efficient Networks
 
2013 02 08 annunci power 7 plus sito cta
2013 02 08 annunci power 7 plus sito cta2013 02 08 annunci power 7 plus sito cta
2013 02 08 annunci power 7 plus sito cta
 

Andere mochten auch

Ulimwengu wa frimasonri. swahili (kiswahili)
Ulimwengu wa frimasonri. swahili (kiswahili)Ulimwengu wa frimasonri. swahili (kiswahili)
Ulimwengu wa frimasonri. swahili (kiswahili)HarunyahyaSwahili
 
Non technical analysis
Non technical analysisNon technical analysis
Non technical analysistetty_tee
 
Tanggungjawab anak terhadap orang tua
Tanggungjawab anak terhadap orang tuaTanggungjawab anak terhadap orang tua
Tanggungjawab anak terhadap orang tuapjj_kemenkes
 
Reliability Program Approval Presentation_
Reliability Program Approval Presentation_Reliability Program Approval Presentation_
Reliability Program Approval Presentation_Chad Broussard
 
OSIsoft PI System Presentation
OSIsoft PI System PresentationOSIsoft PI System Presentation
OSIsoft PI System PresentationIslam Gaber
 
Reliability-Centered Maintenance's Role in Asset Performance Management
Reliability-Centered Maintenance's Role in Asset Performance ManagementReliability-Centered Maintenance's Role in Asset Performance Management
Reliability-Centered Maintenance's Role in Asset Performance ManagementUSC Consulting Group
 
Building Service 2 Report on Tesco Extra
Building Service 2 Report on Tesco ExtraBuilding Service 2 Report on Tesco Extra
Building Service 2 Report on Tesco ExtraKellyann Hiew
 
Condition-Based Maintenance: 10 Steps Towards Continuous Improvement
Condition-Based Maintenance: 10 Steps Towards Continuous ImprovementCondition-Based Maintenance: 10 Steps Towards Continuous Improvement
Condition-Based Maintenance: 10 Steps Towards Continuous ImprovementOSIsoft, LLC
 
Calculation of short circuit currents
Calculation of short circuit currents Calculation of short circuit currents
Calculation of short circuit currents Maria Romina Angustia
 
Building Service 2 Presentation
Building Service 2 PresentationBuilding Service 2 Presentation
Building Service 2 PresentationKellyann Hiew
 
Building Services Project 1
Building Services Project 1Building Services Project 1
Building Services Project 1Gertrude Lee
 
literature on bipv-added values
literature on bipv-added valuesliterature on bipv-added values
literature on bipv-added valuesA. H. Haris
 
Sc and oc test on transformer
Sc and oc test on transformerSc and oc test on transformer
Sc and oc test on transformerPooja Dubey
 
Kuching | Jan-15 | Micro Grid - Renewable Energy TNB Experiences Towards Rura...
Kuching | Jan-15 | Micro Grid - Renewable Energy TNB Experiences Towards Rura...Kuching | Jan-15 | Micro Grid - Renewable Energy TNB Experiences Towards Rura...
Kuching | Jan-15 | Micro Grid - Renewable Energy TNB Experiences Towards Rura...Smart Villages
 
open circuit and short circuit test on transformer
open circuit and short circuit test on transformeropen circuit and short circuit test on transformer
open circuit and short circuit test on transformerMILAN MANAVAR
 

Andere mochten auch (20)

Kanisa Linahitaji Kujua (Swahili)
Kanisa Linahitaji Kujua (Swahili)Kanisa Linahitaji Kujua (Swahili)
Kanisa Linahitaji Kujua (Swahili)
 
Ulimwengu wa frimasonri. swahili (kiswahili)
Ulimwengu wa frimasonri. swahili (kiswahili)Ulimwengu wa frimasonri. swahili (kiswahili)
Ulimwengu wa frimasonri. swahili (kiswahili)
 
Rashi Bates: 2013 Sandia National Laboratoies Wind Plant Reliability Workshop
Rashi Bates: 2013 Sandia National Laboratoies Wind Plant Reliability WorkshopRashi Bates: 2013 Sandia National Laboratoies Wind Plant Reliability Workshop
Rashi Bates: 2013 Sandia National Laboratoies Wind Plant Reliability Workshop
 
Non technical analysis
Non technical analysisNon technical analysis
Non technical analysis
 
Tanggungjawab anak terhadap orang tua
Tanggungjawab anak terhadap orang tuaTanggungjawab anak terhadap orang tua
Tanggungjawab anak terhadap orang tua
 
Reliability Program Approval Presentation_
Reliability Program Approval Presentation_Reliability Program Approval Presentation_
Reliability Program Approval Presentation_
 
OSIsoft PI System Presentation
OSIsoft PI System PresentationOSIsoft PI System Presentation
OSIsoft PI System Presentation
 
Reliability-Centered Maintenance's Role in Asset Performance Management
Reliability-Centered Maintenance's Role in Asset Performance ManagementReliability-Centered Maintenance's Role in Asset Performance Management
Reliability-Centered Maintenance's Role in Asset Performance Management
 
Building Service 2 Report on Tesco Extra
Building Service 2 Report on Tesco ExtraBuilding Service 2 Report on Tesco Extra
Building Service 2 Report on Tesco Extra
 
USM_Mechanical and Electrical Engineers in Land Development Projects
USM_Mechanical and Electrical Engineers in Land Development Projects USM_Mechanical and Electrical Engineers in Land Development Projects
USM_Mechanical and Electrical Engineers in Land Development Projects
 
Condition-Based Maintenance: 10 Steps Towards Continuous Improvement
Condition-Based Maintenance: 10 Steps Towards Continuous ImprovementCondition-Based Maintenance: 10 Steps Towards Continuous Improvement
Condition-Based Maintenance: 10 Steps Towards Continuous Improvement
 
Calculation of short circuit currents
Calculation of short circuit currents Calculation of short circuit currents
Calculation of short circuit currents
 
Tea Talk IEM 2015: The Development of Solar Power Plant in Malaysia
Tea Talk IEM 2015: The Development of Solar Power Plant in MalaysiaTea Talk IEM 2015: The Development of Solar Power Plant in Malaysia
Tea Talk IEM 2015: The Development of Solar Power Plant in Malaysia
 
Eat105 Chapter 1
Eat105 Chapter 1Eat105 Chapter 1
Eat105 Chapter 1
 
Building Service 2 Presentation
Building Service 2 PresentationBuilding Service 2 Presentation
Building Service 2 Presentation
 
Building Services Project 1
Building Services Project 1Building Services Project 1
Building Services Project 1
 
literature on bipv-added values
literature on bipv-added valuesliterature on bipv-added values
literature on bipv-added values
 
Sc and oc test on transformer
Sc and oc test on transformerSc and oc test on transformer
Sc and oc test on transformer
 
Kuching | Jan-15 | Micro Grid - Renewable Energy TNB Experiences Towards Rura...
Kuching | Jan-15 | Micro Grid - Renewable Energy TNB Experiences Towards Rura...Kuching | Jan-15 | Micro Grid - Renewable Energy TNB Experiences Towards Rura...
Kuching | Jan-15 | Micro Grid - Renewable Energy TNB Experiences Towards Rura...
 
open circuit and short circuit test on transformer
open circuit and short circuit test on transformeropen circuit and short circuit test on transformer
open circuit and short circuit test on transformer
 

Ähnlich wie Dhana Raj Markandu: Evolution of the PI System in Tenaga's Power Generation Fleet (Slides)

Thomas Van Maele, Partner Corporate Finance, Econopolis (Market structure and...
Thomas Van Maele, Partner Corporate Finance, Econopolis (Market structure and...Thomas Van Maele, Partner Corporate Finance, Econopolis (Market structure and...
Thomas Van Maele, Partner Corporate Finance, Econopolis (Market structure and...Vlerick_Alumni
 
GE Smallworld Overview September2010
GE Smallworld Overview September2010GE Smallworld Overview September2010
GE Smallworld Overview September2010cwilson5496
 
GE Smallworld Network Inventory Overview
GE Smallworld Network Inventory OverviewGE Smallworld Network Inventory Overview
GE Smallworld Network Inventory Overviewcwilson5496
 
4G (LTE) Business Case for 2.6 GHz
4G (LTE) Business Case for 2.6 GHz4G (LTE) Business Case for 2.6 GHz
4G (LTE) Business Case for 2.6 GHzAndrea Calcagno
 
Webinar Presentation: 506Mbps over 72MHz Satellite Transponder: 5 Secrets Rev...
Webinar Presentation: 506Mbps over 72MHz Satellite Transponder: 5 Secrets Rev...Webinar Presentation: 506Mbps over 72MHz Satellite Transponder: 5 Secrets Rev...
Webinar Presentation: 506Mbps over 72MHz Satellite Transponder: 5 Secrets Rev...Newtec
 
Keeping Your Internet Business IT Asset Light By Mandar Kulkarni
Keeping Your Internet Business IT Asset Light By Mandar KulkarniKeeping Your Internet Business IT Asset Light By Mandar Kulkarni
Keeping Your Internet Business IT Asset Light By Mandar Kulkarniiamwire
 
Traffic Management, DPI, Internet Offload Gateway
Traffic Management, DPI, Internet Offload GatewayTraffic Management, DPI, Internet Offload Gateway
Traffic Management, DPI, Internet Offload GatewayContinuous Computing
 
Cccc net app_wallacefung
Cccc net app_wallacefungCccc net app_wallacefung
Cccc net app_wallacefungCloud Congress
 
CCCC NetApp Wallace Fung
CCCC NetApp Wallace FungCCCC NetApp Wallace Fung
CCCC NetApp Wallace FungCloud Congress
 
iMinds the conference 2012: Marcel Mampaey
iMinds the conference 2012: Marcel MampaeyiMinds the conference 2012: Marcel Mampaey
iMinds the conference 2012: Marcel Mampaeyimec
 
Cloud Computing and VCE
Cloud Computing and VCECloud Computing and VCE
Cloud Computing and VCECenk Ersoy
 
Juniper Networks IR Investor and Analyst Update - Mobile World Congress 2012
Juniper Networks IR Investor and Analyst Update - Mobile World Congress 2012Juniper Networks IR Investor and Analyst Update - Mobile World Congress 2012
Juniper Networks IR Investor and Analyst Update - Mobile World Congress 2012Juniper Networks
 
Apcbyschneider 27mai2011-110602085611-phpapp01
Apcbyschneider 27mai2011-110602085611-phpapp01Apcbyschneider 27mai2011-110602085611-phpapp01
Apcbyschneider 27mai2011-110602085611-phpapp01a4asif
 
Top Ten Imperatives for Service Providers
Top Ten Imperatives for Service ProvidersTop Ten Imperatives for Service Providers
Top Ten Imperatives for Service ProvidersJuniper Networks
 
Neutral Host Networks
Neutral Host NetworksNeutral Host Networks
Neutral Host Networkscouchp
 
CIsco Energy Efficient Data Center
CIsco Energy Efficient Data CenterCIsco Energy Efficient Data Center
CIsco Energy Efficient Data CenterCisco
 

Ähnlich wie Dhana Raj Markandu: Evolution of the PI System in Tenaga's Power Generation Fleet (Slides) (20)

Thomas Van Maele, Partner Corporate Finance, Econopolis (Market structure and...
Thomas Van Maele, Partner Corporate Finance, Econopolis (Market structure and...Thomas Van Maele, Partner Corporate Finance, Econopolis (Market structure and...
Thomas Van Maele, Partner Corporate Finance, Econopolis (Market structure and...
 
GE Smallworld Overview September2010
GE Smallworld Overview September2010GE Smallworld Overview September2010
GE Smallworld Overview September2010
 
3G & LTE Wireless Solutions
3G & LTE Wireless Solutions3G & LTE Wireless Solutions
3G & LTE Wireless Solutions
 
GE Smallworld Network Inventory Overview
GE Smallworld Network Inventory OverviewGE Smallworld Network Inventory Overview
GE Smallworld Network Inventory Overview
 
Embedded Service Oriented Monitoring for the Energy Aware Factory
Embedded Service Oriented Monitoring for the Energy Aware Factory Embedded Service Oriented Monitoring for the Energy Aware Factory
Embedded Service Oriented Monitoring for the Energy Aware Factory
 
4G (LTE) Business Case for 2.6 GHz
4G (LTE) Business Case for 2.6 GHz4G (LTE) Business Case for 2.6 GHz
4G (LTE) Business Case for 2.6 GHz
 
Webinar Presentation: 506Mbps over 72MHz Satellite Transponder: 5 Secrets Rev...
Webinar Presentation: 506Mbps over 72MHz Satellite Transponder: 5 Secrets Rev...Webinar Presentation: 506Mbps over 72MHz Satellite Transponder: 5 Secrets Rev...
Webinar Presentation: 506Mbps over 72MHz Satellite Transponder: 5 Secrets Rev...
 
Keeping Your Internet Business IT Asset Light By Mandar Kulkarni
Keeping Your Internet Business IT Asset Light By Mandar KulkarniKeeping Your Internet Business IT Asset Light By Mandar Kulkarni
Keeping Your Internet Business IT Asset Light By Mandar Kulkarni
 
Traffic Management, DPI, Internet Offload Gateway
Traffic Management, DPI, Internet Offload GatewayTraffic Management, DPI, Internet Offload Gateway
Traffic Management, DPI, Internet Offload Gateway
 
Embrace private cloud with confidence
Embrace private cloud with confidenceEmbrace private cloud with confidence
Embrace private cloud with confidence
 
Cccc net app_wallacefung
Cccc net app_wallacefungCccc net app_wallacefung
Cccc net app_wallacefung
 
CCCC NetApp Wallace Fung
CCCC NetApp Wallace FungCCCC NetApp Wallace Fung
CCCC NetApp Wallace Fung
 
iMinds the conference 2012: Marcel Mampaey
iMinds the conference 2012: Marcel MampaeyiMinds the conference 2012: Marcel Mampaey
iMinds the conference 2012: Marcel Mampaey
 
Cloud Computing and VCE
Cloud Computing and VCECloud Computing and VCE
Cloud Computing and VCE
 
Juniper Networks IR Investor and Analyst Update - Mobile World Congress 2012
Juniper Networks IR Investor and Analyst Update - Mobile World Congress 2012Juniper Networks IR Investor and Analyst Update - Mobile World Congress 2012
Juniper Networks IR Investor and Analyst Update - Mobile World Congress 2012
 
Apcbyschneider 27mai2011-110602085611-phpapp01
Apcbyschneider 27mai2011-110602085611-phpapp01Apcbyschneider 27mai2011-110602085611-phpapp01
Apcbyschneider 27mai2011-110602085611-phpapp01
 
Top Ten Imperatives for Service Providers
Top Ten Imperatives for Service ProvidersTop Ten Imperatives for Service Providers
Top Ten Imperatives for Service Providers
 
Neutral Host Networks
Neutral Host NetworksNeutral Host Networks
Neutral Host Networks
 
CIsco Energy Efficient Data Center
CIsco Energy Efficient Data CenterCIsco Energy Efficient Data Center
CIsco Energy Efficient Data Center
 
Lam Chee Keong
Lam Chee KeongLam Chee Keong
Lam Chee Keong
 

Kürzlich hochgeladen

Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024BookNet Canada
 
Assure Ecommerce and Retail Operations Uptime with ThousandEyes
Assure Ecommerce and Retail Operations Uptime with ThousandEyesAssure Ecommerce and Retail Operations Uptime with ThousandEyes
Assure Ecommerce and Retail Operations Uptime with ThousandEyesThousandEyes
 
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxPasskey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxLoriGlavin3
 
Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024Hiroshi SHIBATA
 
Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...
Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...
Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...panagenda
 
Genislab builds better products and faster go-to-market with Lean project man...
Genislab builds better products and faster go-to-market with Lean project man...Genislab builds better products and faster go-to-market with Lean project man...
Genislab builds better products and faster go-to-market with Lean project man...Farhan Tariq
 
Rise of the Machines: Known As Drones...
Rise of the Machines: Known As Drones...Rise of the Machines: Known As Drones...
Rise of the Machines: Known As Drones...Rick Flair
 
Data governance with Unity Catalog Presentation
Data governance with Unity Catalog PresentationData governance with Unity Catalog Presentation
Data governance with Unity Catalog PresentationKnoldus Inc.
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxLoriGlavin3
 
Potential of AI (Generative AI) in Business: Learnings and Insights
Potential of AI (Generative AI) in Business: Learnings and InsightsPotential of AI (Generative AI) in Business: Learnings and Insights
Potential of AI (Generative AI) in Business: Learnings and InsightsRavi Sanghani
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .Alan Dix
 
The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxLoriGlavin3
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsSergiu Bodiu
 
2024 April Patch Tuesday
2024 April Patch Tuesday2024 April Patch Tuesday
2024 April Patch TuesdayIvanti
 
Modern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better StrongerModern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better Strongerpanagenda
 
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxA Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxLoriGlavin3
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxLoriGlavin3
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.Curtis Poe
 
Manual 508 Accessibility Compliance Audit
Manual 508 Accessibility Compliance AuditManual 508 Accessibility Compliance Audit
Manual 508 Accessibility Compliance AuditSkynet Technologies
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc
 

Kürzlich hochgeladen (20)

Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
 
Assure Ecommerce and Retail Operations Uptime with ThousandEyes
Assure Ecommerce and Retail Operations Uptime with ThousandEyesAssure Ecommerce and Retail Operations Uptime with ThousandEyes
Assure Ecommerce and Retail Operations Uptime with ThousandEyes
 
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxPasskey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
 
Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024
 
Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...
Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...
Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...
 
Genislab builds better products and faster go-to-market with Lean project man...
Genislab builds better products and faster go-to-market with Lean project man...Genislab builds better products and faster go-to-market with Lean project man...
Genislab builds better products and faster go-to-market with Lean project man...
 
Rise of the Machines: Known As Drones...
Rise of the Machines: Known As Drones...Rise of the Machines: Known As Drones...
Rise of the Machines: Known As Drones...
 
Data governance with Unity Catalog Presentation
Data governance with Unity Catalog PresentationData governance with Unity Catalog Presentation
Data governance with Unity Catalog Presentation
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
 
Potential of AI (Generative AI) in Business: Learnings and Insights
Potential of AI (Generative AI) in Business: Learnings and InsightsPotential of AI (Generative AI) in Business: Learnings and Insights
Potential of AI (Generative AI) in Business: Learnings and Insights
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .
 
The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptx
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platforms
 
2024 April Patch Tuesday
2024 April Patch Tuesday2024 April Patch Tuesday
2024 April Patch Tuesday
 
Modern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better StrongerModern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
 
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxA Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.
 
Manual 508 Accessibility Compliance Audit
Manual 508 Accessibility Compliance AuditManual 508 Accessibility Compliance Audit
Manual 508 Accessibility Compliance Audit
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
 

Dhana Raj Markandu: Evolution of the PI System in Tenaga's Power Generation Fleet (Slides)

  • 1. Evolution of the PI System in Tenaga’s Power Generation Fleet Presented by Dhana Raj Markandu Senior Engineer, Generation Division © Cop yri g h t 2012 Tenaga Nasional Berhad
  • 2. Contents • About Tenaga... • Our journey with the PI System... – Why we needed it... – How we deployed it... – What we’re doing with it... – Where we’re going with it... • Summary & Conclusions... © Cop yri g h t 2012 Tenaga Nasional Berhad 2
  • 3. About Tenaga © Cop yri g h t 2012 Tenaga Nasional Berhad 3
  • 4. Where we’re from... Images courtesy of Google Maps © Cop yri g h t 2012 Tenaga Nasional Berhad 4
  • 5. What we do... Established in 1949 Largest electricity utility in Malaysia CORE NON-CORE USD 24 billion assets Power Repair, maintenance & diagnostic services USD 11.5 billion market capitalisation Generation Operation & maintenance Power sector projects 28,000 employees Power Transmission Training & education Installed generation capacity of 11 GW Research & development Power Consultancy services Distribution Contributes 55% of total national capacity © Cop yri g h t 2012 Tenaga Nasional Berhad 5
  • 6. Our journey with the PI System © Cop yri g h t 2012 Tenaga Nasional Berhad 6
  • 7. Why we needed it... Gas-fired Coal-fired Hydroelectric Diverse power plant fleet 300 MW 300 km 400 MW Inhomogeneous sources of operational data 1010 MW 1200 MW 2100 MW Real-time process data locked within isolated 250 km control systems 250 MW HQ Technical performance & business intelligence 2300 MW reliant on offline data 760 MW 580 MW 1400 MW 300 km UNIFIED REAL-TIME DATA PLATFORM 640 MW EASILY ACCESSIBLE TO ALL STAFF © Cop yri g h t 2012 Tenaga Nasional Berhad 7
  • 8. How we deployed it... Phase I (2005 - 2007) Phase II (2007 - ongoing) Pilot project at one plant & headquarters Concurrent deployment to the other 9 plants Turnkey project implementation Federated in-house project implementation PROJECT VENDOR TENAGA PERSONNEL PI System infrastructure, applications, user PI System infrastructure, applications, user training & technical support training & technical support No direct OSIsoft involvement OSIsoft involvement at initial project deployment & as backup techsupport USD 7 million savings Staff competency in PI System © Cop yri g h t 2012 Tenaga Nasional Berhad 8
  • 9. How we deployed it Generic architecture... STATION A STATION B Redundant PI Servers WAN Redundant PI Servers PI PI Server PI Server PI PI Server PI Server Interface (Primary) (Secondary) Interface (Primary) (Secondary) Node Node GENERATION HEADQUARTERS Redundant PI Servers PI Server PI Server (Primary) (Secondary) Station A Network Station B Network Station Control Station Control System System HQ Network Station A Clients Station B Clients Headquarters Clients © Cop yri g h t 2012 Tenaga Nasional Berhad 9
  • 10. How we deployed it Actual infrastructure... 11 sites ~ 20 unique data sources 8 unique primary plant control systems 26 PI Servers > 50 Interfaces 25 12 > 15 Standard PI-to-PI Custom 150,000 tags AND GROWING... © Cop yri g h t 2012 Tenaga Nasional Berhad 10
  • 11. How we deployed it Interfacing cybersecurity... Control System PI Server PI Server DIRECTIONAL FILTERING (Primary) (Secondary) Data from control network can flow to corporate network, but not vice versa PORT FILTERING Firewall Only data on PI Server port 5450 is enabled Port 5450 Station Network IP FILTERING PI Interface can only connect to PI servers PI Interface Audited & approved by security experts from Station Clients Tenaga ICT Division © Cop yri g h t 2012 Tenaga Nasional Berhad 11
  • 12. How we deployed it Change management... Internal branding: GENERATION PLANT MANAGEMENT SYSTEM Key Messages Key Tactics Key Actions ...technical & business ...empower all staff with real- ...regular and customised performance project, time data & use quick-win live training conducted internally NOT an IT project. demos wherever possible. for all levels of staff. ...a platform that makes data ...demonstrate multiple streams ...constant user engagement easily available, BUT the of actual or potential cost via workshops, newsletters, application of that data is in savings & return on investment internal conferences, & subtle the hands of the end user. to gain management buy-in. integration into daily work. © Cop yri g h t 2012 Tenaga Nasional Berhad 12
  • 13. What are we doing with it... UNLOCK Diverse power plant fleet UNIFY HISTORISE Inhomogeneous sources of operational data DISPLAY DATA Real-time process data NOTIFY locked within isolated control systems REPORT Technical performance DIAGNOSE & business intelligence reliant on offline data ANALYSE OPTIMISE © Cop yri g h t 2012 Tenaga Nasional Berhad 13
  • 14. What are we doing with it Display, notify & report... PI ProcessBook Real-time fleet monitoring Linked to outage management system Scheduled reports automatically compiled, formatted & e-mailed daily Ad-hoc snapshots delivered on-demand using e-mail or text message Trip notifications by e-mail & text message Fleet status anytime, anywhere All notifications done using customised VBA coding within PI ProcessBook Management buy-in © Cop yri g h t 2012 Tenaga Nasional Berhad 14
  • 15. What are we doing with it Diagnose... PI ProcessBook Real-time process data overlaid on static plant schematics Hyperlinked plant schematics for fast navigation & drill-down Ad-hoc trending Historical playback Virtual on-site presence Faster plant troubleshooting Improve technical competencies © Cop yri g h t 2012 Tenaga Nasional Berhad 15
  • 16. What are we doing with it Analyse... PI ProcessBook, PI Datalink, PI ACE, PI AF Real-time performance analysis of individual equipment & overall plant Mass & heat balance analysis Degradation tracking Recoverable losses Justification for plant improvement projects Over USD 10 million expected annual fuel cost savings Greater performance awareness © Cop yri g h t 2012 Tenaga Nasional Berhad 16
  • 17. What are we doing with it Optimise... PI ProcessBook, PI Datalink, PI ACE, PI AF Real-time unit dispatch optimiser for hydroelectric plant Potential savings by displacing gas units Dynamic tracking of unit efficiency curves Load advisor & what-if simulator Daily automated report via e-mail USD 3000 average daily fuel cost savings in 2011 Greater optimisation awareness © Cop yri g h t 2012 Tenaga Nasional Berhad 17
  • 18. Where are we going with it... Installation Derive value from the PI System STATION A Redundant PI Servers by going beyond being just an end user PI PI Server PI Server Interface (Primary) (Secondary) Node Interfacing Training 2010 - Provide PI System deployment services for others Station A Network 2008 - Continuous in-house application development Station Control System Station A Clients 2007 - Deploy the PI System with internal personnel Tech Support 2005 - Engage vendor for pilot PI System deployment Internally-developed applications 60+ years of power industry experience © Cop yri g h t 2012 Tenaga Nasional Berhad 18
  • 19. Where are we going with it Internal & external services... Internal Clients External Clients Expand PI System to other Tenaga divisions Provide full scope of PI System deployment services to external customers Pilot project with Distribution ongoing Completed projects: Two independent power plants in Malaysia & one integrated water Preliminary talks with Transmission ongoing and power plant in Saudi Arabia Offering PI System infrastructure for corporate Additional training & application development Facility Energy Management project requested after project completion The PI System as preferred data Establish track record as PI unification platform System service provider Enterprise agreement for Tenaga Non-core revenue for Tenaga © Cop yri g h t 2012 Tenaga Nasional Berhad 19
  • 20. Where are we going with it Enhancing ourselves... Enterprise agreement? 2014 2013 Data mining PI Coresight 2012 Staff training Application development Tag expansion Hardware (+ 60,000) Dedicated technology diagnostics refresh team Improved cybersecurity (ISO 27001) Deployment for 3 new plants Tag expansion © Cop yri g h t 2012 Tenaga Nasional Berhad 20
  • 21. Summary & Conclusions © Cop yri g h t 2012 Tenaga Nasional Berhad 21
  • 22. EVOLUTION OF THE PI SYSTEM IN TENAGA’S POWER GENERATION FLEET “Deploying the PI System provides the infrastructure to unify, store, visualise and analyse our data. The real challenge is to transform this data into actionable information in order to make the right decisions and thus improve our technical and business performance.” Abd Ghafar Abd Latif Project Manager Generation Plant Management System BUSINESS CHALLENGE SOLUTION RESULTS & BENEFITS Diverse power plant fleet Deploy the PI System as a unifying Plant data available to all personnel data infrastructure for the entire fleet Inhomogeneous sources of Over USD 7 million savings from in- operational data Adopt in-house implementation house project implementation approach approach to build internal competencies Real-time process data locked within Over USD 10 million tangible savings isolated control systems Continuous change management from plant analysis & optimisation Technical performance & business Continuous in-house application Generate revenue by providing PI intelligence reliant on offline data development System deployment service to others © Cop yri g h t 2012 Tenaga Nasional Berhad 22
  • 23. Conclusions... Tenaga has reaped the benefits of the PI System not just as a user, but also as a project implementer & service provider Tangible benefits Intangible benefits Project cost savings PI SYSTEM INTERNAL Skills development PROJECT IMPLEMENTER Operational cost savings PI SYSTEM USER Operational awareness Revenue generation PI SYSTEM EXTERNAL Business diversification SERVICE PROVIDER © Cop yri g h t 2012 Tenaga Nasional Berhad 23
  • 24. Dhana Markandu dhana@tnb.com.my © Cop yri g h t 2012 Tenaga Nasional Berhad 24
  • 25. Brought to you by © Cop yri g h t 2012 Tenaga Nasional Berhad

Hinweis der Redaktion

  1. Sites (11) – HQ, JMJG, GLGR, CBPS, PJPS, TJPS, PGPS, PKPS, SGPK, CHPS, KNYRControl Systems (8) – ABB Procontrol P14, ABB Symphony Infi90, GE MkV, GE MkVI, Siemens Teleperm, MHI Diasys Netmation, Toshiba TOSMAP, Onsite SCADAOther sources (10) – Web, Slamat, Callisto, ODBC, GC, CBPS Wireless, TJPS PEMS, GLGR Boiler Monitoring, GLGR TMOS, JMJG CoalStockyard