SlideShare ist ein Scribd-Unternehmen logo
1 von 6
Downloaden Sie, um offline zu lesen
BUILDING A BASIC CUPBOARD
TIMBER FRAMEWORK FOR STORAGE UNITS
This project contains basic principles for building a frame for a basic
cupboard. It can be expanded on by using different designs, the struts can be
moved to accommodate shelves or simply left open plan. It will give you the
idea of building storage space onto your home and can even be adapted to
make a corner cupboard. The timber sizes can be changed and more struts
can be put in to ensure greater strength if you feel you need it. The structure
can be fixed to any wall, ceiling or floor using our guides to fixing. Check the
wall, floor and ceiling area for pipes and cables before you drill anything.
Tape measure, pencil, cross cut saw, tenon saw, carpenters square, bevel edge, adhesive,
power drill, wall plugs, electric screwdriver, countersink bit, masonry drill bits and hss drill bits,
spirit level, hammer, filler and applicator gun, screws, chisels, mortice gauge,
We suggest for this simple cupboard you use 50 x 50mm PSE timber. This
stands for Planed, Squared Edge and simply means prepared for joinery, as
opposed to the "sawn" state timber is in when it leaves the timber mill. It is
also called, in its prepared state, PAR which is Planed All Round.
With the number of different door designs available from kitchen and DIY
stores these days we suggest it may be a good idea for you to find the doors
(if you intend to have them) first. The frame can easily be built around the
door size and you will have guaranteed matching your existing decor.
We have deliberately not given any dimensions in the project. Even when
planed timber can vary by a mm or so and ceiling heights can vary
considerably. Measure your own timber and other dimensions carefully and
remember. Measure twice-Cut once.
Use a carpenters square to make all cuts. Neat joints are impossible without a
completely square face to begin with. Also if the timber is not square at the
end, a measurement to the other end will vary, depending on which side you
measure from. This can make it impossible to get a decent finish.
A variety of joints can be seen in our timber joints projects and some special joints are shown
here. The principle of cutting them is exactly the same as shown in the timber joints projects.
Please remember it takes many years to become a carpenter or joiner. If this is your first
project, or you have not done much carpentry, buy an additional length of timber and practice
your joints before embarking on a project which will become a feature in your home. An 8 foot
length of sawn timber to practice on will cost pennies compared to the waste of materials if
you mess up with the real thing.
Check your walls are square to each other using our 3, 4 5 method shown below.
HOW DO I CHECK MY ROOM IS SQUARE
Floor tiling, carpets, any number of things around
the home require a degree of setting out.
Remember a quarter of an inch out at one end of a
12 foot room, means about 2 inches out at the
other end. It is important to start any appropriate
projects with straight and square lines and it is very
easy to accomplish. The method is called 3,4,5 and
for the technically minded is based on Pythagoras's
theorem which we won't go into now ! Suffice to
say that if you measure along one wall 3 feet (or
metres or any other unit), and along the other wall
4 of the same unit, the diagonal line in between the
points should measure 5 units. If it does your walls
are square, if it doesn't, you need to mark some
points that are square to start your work.
Draw your plan before you start.
Error!
All joints need to be "made" before any of the frame is fixed to the wall, floor or ceiling. Once cut, fix the
two uprights absolutely vertically on the walls using the struts as spacers to get them in the right
position. Fix the struts and the centre upright together using glue and screws. Make sure the screw
heads are counter sunk into the timber or they will push the cladding out. Use a tenon saw to cut the
skirting back if your prefer that to cutting the frame around the skirting. Frame can be fixed to the wall
using a 7mm masonry bit with red wall plugs and (for 50mm timber) 3 inch, number 8 screws. For fixings
to plasterboard use our guide. Also fixing to lathe and plaster.
Floor/ceiling + cross rail joints Cross rail to post
joints
Mark the position of the struts lightly on the walls when your frame is in place. You will not be
able to see them when you are attaching the cladding, making fixing to them a bit of a lottery.
The pencil marks can be rubbed out later.
Next, cut and fix the shelf or shelves. This can be done more easily when you can get to all
sides. The side rails which support the cladding should be fixed at no less than 600mm
centres for 12.5mm cladding and if your cladding is thinner than that, they should be spaced
at 450mm centres.
The shelves and cladding material we have left up to you.
We always prefer to use screws to fix the cladding to the frame even if we are using
plasterboard. Sink screw heads into the cladding and fill over them to get a flush face on
which to decorate.
The joints between the cupboard and the wall/ceiling can easily be filled with flexible filler or
decorators caulk using an sealant or "applicator" gun as shown below. Alternatively you may
like to fix some coving or a shaped timber moulding.
Use butt, flush or butterfly hinges to hang the doors and either a roller catch or magnetic
catch to close it.

Weitere ähnliche Inhalte

Mehr von Zulaiha Amaria

Mehr von Zulaiha Amaria (20)

Application of disciplinary system
Application of disciplinary systemApplication of disciplinary system
Application of disciplinary system
 
girl culture dictionary
girl culture dictionarygirl culture dictionary
girl culture dictionary
 
Wiring a ring main
Wiring a ring mainWiring a ring main
Wiring a ring main
 
Wallpapering techniques
Wallpapering techniquesWallpapering techniques
Wallpapering techniques
 
Wallpaper stripping
Wallpaper strippingWallpaper stripping
Wallpaper stripping
 
Wallpaper a ceiling
Wallpaper a ceilingWallpaper a ceiling
Wallpaper a ceiling
 
Wall tiling
Wall tilingWall tiling
Wall tiling
 
Wainscotting
WainscottingWainscotting
Wainscotting
 
Upvc fascia
Upvc fasciaUpvc fascia
Upvc fascia
 
Tow dolly plans
Tow dolly plansTow dolly plans
Tow dolly plans
 
Timber decking
Timber deckingTimber decking
Timber decking
 
Timber cutting hand saws
Timber cutting hand sawsTimber cutting hand saws
Timber cutting hand saws
 
Size conversion charts
Size conversion chartsSize conversion charts
Size conversion charts
 
Shelving and storage
Shelving and storageShelving and storage
Shelving and storage
 
Replacing a brick
Replacing a brickReplacing a brick
Replacing a brick
 
Replace broken tiles
Replace broken tilesReplace broken tiles
Replace broken tiles
 
Repairing a dripping tap
Repairing a dripping tapRepairing a dripping tap
Repairing a dripping tap
 
Remove a radiator
Remove a radiatorRemove a radiator
Remove a radiator
 
Radial circuit
Radial circuitRadial circuit
Radial circuit
 
Pvc and polycarbonate roofing
Pvc and polycarbonate roofingPvc and polycarbonate roofing
Pvc and polycarbonate roofing
 

Kürzlich hochgeladen

Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
A305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdfA305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdftbatkhuu1
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...Suhani Kapoor
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876dlhescort
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...lizamodels9
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsMichael W. Hawkins
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 

Kürzlich hochgeladen (20)

Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
A305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdfA305_A2_file_Batkhuu progress report.pdf
A305_A2_file_Batkhuu progress report.pdf
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
VIP Call Girls Gandi Maisamma ( Hyderabad ) Phone 8250192130 | ₹5k To 25k Wit...
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
Call Girls In Holiday Inn Express Gurugram➥99902@11544 ( Best price)100% Genu...
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 

Building a basic cupboard

  • 1. BUILDING A BASIC CUPBOARD TIMBER FRAMEWORK FOR STORAGE UNITS This project contains basic principles for building a frame for a basic cupboard. It can be expanded on by using different designs, the struts can be moved to accommodate shelves or simply left open plan. It will give you the idea of building storage space onto your home and can even be adapted to make a corner cupboard. The timber sizes can be changed and more struts can be put in to ensure greater strength if you feel you need it. The structure can be fixed to any wall, ceiling or floor using our guides to fixing. Check the wall, floor and ceiling area for pipes and cables before you drill anything. Tape measure, pencil, cross cut saw, tenon saw, carpenters square, bevel edge, adhesive, power drill, wall plugs, electric screwdriver, countersink bit, masonry drill bits and hss drill bits, spirit level, hammer, filler and applicator gun, screws, chisels, mortice gauge, We suggest for this simple cupboard you use 50 x 50mm PSE timber. This stands for Planed, Squared Edge and simply means prepared for joinery, as opposed to the "sawn" state timber is in when it leaves the timber mill. It is also called, in its prepared state, PAR which is Planed All Round. With the number of different door designs available from kitchen and DIY stores these days we suggest it may be a good idea for you to find the doors (if you intend to have them) first. The frame can easily be built around the door size and you will have guaranteed matching your existing decor. We have deliberately not given any dimensions in the project. Even when planed timber can vary by a mm or so and ceiling heights can vary considerably. Measure your own timber and other dimensions carefully and remember. Measure twice-Cut once.
  • 2. Use a carpenters square to make all cuts. Neat joints are impossible without a completely square face to begin with. Also if the timber is not square at the end, a measurement to the other end will vary, depending on which side you measure from. This can make it impossible to get a decent finish. A variety of joints can be seen in our timber joints projects and some special joints are shown here. The principle of cutting them is exactly the same as shown in the timber joints projects. Please remember it takes many years to become a carpenter or joiner. If this is your first project, or you have not done much carpentry, buy an additional length of timber and practice your joints before embarking on a project which will become a feature in your home. An 8 foot length of sawn timber to practice on will cost pennies compared to the waste of materials if you mess up with the real thing. Check your walls are square to each other using our 3, 4 5 method shown below. HOW DO I CHECK MY ROOM IS SQUARE Floor tiling, carpets, any number of things around the home require a degree of setting out. Remember a quarter of an inch out at one end of a 12 foot room, means about 2 inches out at the other end. It is important to start any appropriate projects with straight and square lines and it is very easy to accomplish. The method is called 3,4,5 and for the technically minded is based on Pythagoras's theorem which we won't go into now ! Suffice to say that if you measure along one wall 3 feet (or metres or any other unit), and along the other wall 4 of the same unit, the diagonal line in between the points should measure 5 units. If it does your walls are square, if it doesn't, you need to mark some points that are square to start your work. Draw your plan before you start. Error!
  • 3. All joints need to be "made" before any of the frame is fixed to the wall, floor or ceiling. Once cut, fix the two uprights absolutely vertically on the walls using the struts as spacers to get them in the right position. Fix the struts and the centre upright together using glue and screws. Make sure the screw heads are counter sunk into the timber or they will push the cladding out. Use a tenon saw to cut the skirting back if your prefer that to cutting the frame around the skirting. Frame can be fixed to the wall using a 7mm masonry bit with red wall plugs and (for 50mm timber) 3 inch, number 8 screws. For fixings to plasterboard use our guide. Also fixing to lathe and plaster.
  • 4. Floor/ceiling + cross rail joints Cross rail to post joints Mark the position of the struts lightly on the walls when your frame is in place. You will not be able to see them when you are attaching the cladding, making fixing to them a bit of a lottery. The pencil marks can be rubbed out later. Next, cut and fix the shelf or shelves. This can be done more easily when you can get to all sides. The side rails which support the cladding should be fixed at no less than 600mm centres for 12.5mm cladding and if your cladding is thinner than that, they should be spaced at 450mm centres. The shelves and cladding material we have left up to you.
  • 5. We always prefer to use screws to fix the cladding to the frame even if we are using plasterboard. Sink screw heads into the cladding and fill over them to get a flush face on which to decorate.
  • 6. The joints between the cupboard and the wall/ceiling can easily be filled with flexible filler or decorators caulk using an sealant or "applicator" gun as shown below. Alternatively you may like to fix some coving or a shaped timber moulding. Use butt, flush or butterfly hinges to hang the doors and either a roller catch or magnetic catch to close it.