Introduction to

    Facility Management
    Project Audit
    Technical Due Diligence
    Development/Asset Planning
    Building Consultancy




1
Consultancy
   To date, surveyed and audited 200 plus
    projects, over a million homes, 1.8 million
    sq m of office/commercial;


   Work with major mainland developers and
    Railway Corp (MTR, SZMTR, SHMetro,
    Vanke, Gemdale Corp, Soho China, Can
    High, Citic);

   Work with most of the major funds, Ibanks,
    overseas investors;

   Completed projects in over 30 mainland
    cities, plus Thailand, Singapore, Malaysia,
    Philippines, Vietnam etc;

   Sustainable Construction - China Green
    Construction & Environmental rating
    system;

   GBC member with LEED accreditation
    capability
Introduction to Building Consultancy / Facility
Management, Hong Kong
Based in Hong Kong and Shanghai we can assembled Architects, Engineers, Surveyors, Project
Managers, Facility Managers and assisted by their locally based colleagues typically provide the following
specialist services;

Hong Kong Based Services;

Architectural Design, Interior Design, Surveys, Renovation, AP Services, Building Due Diligence, Project
Management, License Application;

Greater China / SE Asia Based Services;

• Project Audit – Monitoring Construction Quality Progress;
• Engineering Services – Report on Construction Processes;
• Development Consultancy – Advise on Mixed Developments;
• Technical Due Diligence – Assess Building Condition, including CAPEX/OPEX projections and make
investment recommendations from a technical perspective
• Project Coordination / Management – To coordinate and manage projects i.e. an office /shop fit-out
• FM Consultancy – CAM Reports, Fit Out Guides, Operators Handbooks.
•Facility Management – Consultancy.
China
        Real estate consultancies in
        Greater China to provide
        integrated building project audit,
        monitoring and due diligence
        services with property demand
        based real estate consultancy and
        valuation. Our extensive
        experience extends over mainland
        China and other parts of Asia.

        Essentially our aim is to provide
        the type of information which is
        critical for making strategic
        investment decisions. Our
        comprehensive auditing, surveying
        and due diligence reports covers
        the full range of investment advice
        which goes beyond that of a
        traditional building survey report to
        assist our client in making sound
        investment decisions. We are able
        to mobilize our team at short
        notice and produce full reports
        within weeks, sometime days if
        needed.


 4
Processes




5
Management Process

                            Consult
                      Planned Maintenance
                      Routine maintenance
                      Procurement methodology
                      Benchmarking service levels
                      Outsourcing
                      IT Systems
                      Systems Audit
                      Energy Conservation
         Manage
                                                        Enhance
     Asset
                                                 Support desk
     Project
                                                 Cleaning
     Utility
                                                 Procurement of service contracts
     Lease
                                                 Space planning
     Financial
                                                 Architectural services
     Property
                                                 Interior design
     Data
                                                 Security services
     Contract
                                                 Office furnishings
     Administration
                          Maintain
                      Electrical systems
                      Mechanical systems
                      HVAC systems
                      Plumbing systems
                      Fire systems
                      Security systems
                      UPS systems
                      Emergency systems and
                      backup
Process – Design and Project Management


                                                                                Construct an
                               Define Project
           Assemble                                    Define Project
                                                                                 initial Plan
                                Objectives
             Team                                          Scope




                                                      Adjust the
                                                       Plan, &
                                Analyze                                                Design
                                                       Manage
                                Current                                               Revision
                                                       Project
                                Status                                               and Budget
                                                       Change                        Estimation




                        Collect Progress
        Close Project                           Publish the Plan        Obtain Client’s approvaI
                          Information
Project Auditing – Scope and Purpose

                       Carry out independent check to evaluate the
                        quality of site work through an inspection of:

                             Site construction works

                             Site progress

                             Safety, environmental and health issues on
                              site

                             Documentary management

                       Achieve the level of quality in satisfaction of
                        building occupiers

                       Identify potential problem during construction stage
                        that may affect Client’s financial strategies and risk
                        management


8
Project Auditing


 Auditing System – the use of independent auditors

    Inspection- regular & systematic project audits




    Identification - objectively assess performances, problem identifications and take


    records`
    Analysis - identify solutions, potential risks, strengths and weaknesses.





        Inspect                         Identify                       Analyse




9
Project Auditing
Methodology
                      One full day inspection (half day for site
                       inspection and half day for documents checking)
                      Experienced auditors, surveyors and engineers
                      Random unannounced site audit
                      Tailor-made score sheets
                      Ranking performance and improvements
                      Re-check/reinspect previous problems
                      Benchmarking
                      Lessons learnt, improvements, problems, what to
                       do and what not to do.
                      Alignment with customer/end user surveys
                      Re-evaluate, feed back, continuous improvement




10
Prefabrication construction (PC)
Pre-cast Concrete panels




11
Project Experience
     • Project Management
     • Project Audit
     • Project Monitoring
     • FM Services




12
Project Management – Case Study I
Existing Office Layout
Project Management
New Office Layout
“The new look gives a much brighter, lighter and more open appearance and of course
means we use the space more efficiently and can therefore fit in the whole team, with
some room for further expansion.” COO of the Client
Project Management – Case Study
Baker & McKenzie, Jimao Tower Shanghai
Project Management – Case Study
Molecular Devices – New Built Construction, Nanhui
Project Management – Case Study
DDB – Grand Gateway Shanghai
Fitting Out Project Management



KCS Limited is one of Asia's leading independent and
integrated providers of corporate accounting, corporate
secretarial, payroll outsourcing and trust and estate
administration services. They have offices in Hong Kong,
Singapore, Shanghai, Beijing, Shenzhen, Jakarta and
Sydney.

Knight Frank was appointed as Project Manager to
oversee the fitting-out work of their new offices in Beijing,
Shanghai and Shenzhen. We cope with our Client’s tight
schedule and quality requirements and our professionalism
was well recognized. Our strong team in Hong Kong and
Mainland China was proved by serial contracts awarded
from the Client in providing Project Management Services.

We participate the project and provide professional advise
to Client from early design stage, assist in fitting-out
contract procurement and carry out supervision of site work
until Client move-in.




 21
The Link REIT

                Appointed by the Hong Kong Housing
                    Authority, their advisors JP Morgan
                    and the Joint Global Coordinators
                    (UBS, Goldman Sachs, & HSBC) to
                    review a portfolio of 213 centres.
                Review covered building and building
                    services due diligence, asset
                    enhancement, shopper profile and
                    a commentary of the proposed
                    divestment boundaries. We also
                    produced 10-year Opex and Capex
                    accounts.

                Ultimately 180 centres were selected for
                     listing. The IPO was delayed in
                     December 2004, but finally listed in
                     November 2005.

                We were appointed in January 2007 to
                    review the portfolio and issue
                    updated 10 year Operational and
                    Capex reports and to review the
                    building reports.

                In May 2008 we were again appointed to
                     review the building integrity of the
                     portfolio and give our views of
                     asset enhancement of 8 retail
                     centres.
22
Industrial Valuation & Building Due Diligence


                      We have been appointed by Macquarie Goodman to prepare a combination of
                      valuation and building due diligence reports on three industrial buildings in Hong
                      Kong. The case study highlighted in this summary is Global Gateway, a 27-
                      storey industrial building in Tsuen Wan. In this case we were asked to prepare
                      valuation and building due diligence reports. The total gross floor area of the
                      building is in excess of 1M sq ft. Specific tasks included:

                        • Valuation of the building using the discounted cash flow to arrive at the
                          market value;
                        • Conducted comprehensive building and building services condition surveys
                          to confirm structural integrity and identify existing defects;
                        • Identified areas of deviation from relevant building and building services
                          regulations and codes of practice;
                        • Prepared estimates of the cost of rectifying existing defects and non-
                          compliances;
                        • Compiled a 5-year forecast of repair, maintenance and capital expenditure;
                        • Compiled an Asset Register of plant and equipment;
                        • Calculated the replacement cost for insurance purposes; and
                        • Carried out a land survey to confirm the location of the building on the lot.




23
JTC Corporation
Singapore
JTC Corporation (JTC), is a Singapore government
statutory board in charge of planning, developing and
managing industrial space and facilities. Their portfolio
comprises of 51 estates having a a GFA of some 2.7
million square metres.


Details
Sizable portfolio of industrial cluster comprises of 9 flatted
factories, 3 food court buildings and a single amenity
building was reviewed in 2006 and a portfolio comprises of
flatted factories, stack-up factories, ramp up factories,
business park and amenities centres having over
600,000sq.m. of GFA were reviewed in 2007.


Service Provided
We are appointed to conduct a site inspections of the
development cluster. A Cost allocation review was also
carried out for an analysis on capital expenditure (CAPEX)
and operational expenditure (OPEX) and to provide
Comparative analysis using life cycle approach to test the
valuation assumptions. Our CAPEX and OPEX forecasts
have been associated with capital market transactions and
accepted by the independent valuer and incorporated in full
in the valuation cash flow.

 24
Macquarie Bank’s Acquisition of China Retail
Centres for Wholesale Fund’s Offer




     With the due diligence we conducted comprehensive
     building and building services condition surveys of the
     retail centres to confirm their structural integrity and
     identify existing defects. We prepared estimates of the
     cost of rectifying existing defects and non-compliances
     and we compiled 5-year forecasts of repair, maintenance
     and capital expenditure.

     We also oversaw Environmental Site Assessments that
     were used to identify potential areas of environmental
     concern, in particular, issues associated with site history,
     contamination or existing environmental conditions.




25
Macquarie Bank’s Acquisition of China Retail
Centres for Wholesale Fund’s Offer
The centres are all located in
provincial Chinese cities. Given the
location of the properties and detail
that was required, the programme set
by the client was incredibly tight.                                                  Harbin


We were instructed on 25 January
2005, we delivered valuation
certificates with DCF analysis and                                              S henyang
summary due diligence reports on 18
                                                                               D alian
February.                                                       Tianjin

                                                                Jinan
Full detailed due diligence reports
were delivered on 28 February and
valuation reports followed on 31
March 2005.                                                          Nanjing

                                                         W uhan
In 2006, we were instructed again to
value 6 additional retail centres in 6             C hangs ha
different cities.


                                         Nanning




 26
IPO experience with RREEF CCT



RREEF China Commercial Trust (“RREEF CCT” or “the Trust”) is a
distinctive real estate investment trust (“REIT”) established to invest
on a long-term basis in a diversified portfolio of institutional quality
office and mixed-use properties in major cities in Greater China.


Its flagship asset – Beijing Gateway Plaza is a Premium Grade A
office complex comprising two 29-storey office tower including 3
levels of linked podium and 3 levels of basement, and a total GFA
about 139,093 sq.m. It is situated in Beijing’s sought-after Lufthansa
area, one of four established business districts in Beijing.


Provided comprehensive building and building services condition
surveys of the building to confirm structural integrity and identify
existing defects; compliance check against relevant statutory
requirements; cost allocation review to carry out an analysis on
capital expenditure (CAPEX) and operational expenditure (OPEX).
The results were used by the valuers and the investment bank for
the initial public offering of the REIT in Hong Kong 2007.



 27
IPO - Technical Due Diligence – Parkway Life
REIT Singapore




     “Parkway Life REIT is established by Parkway Holdings to invest primarily in income-producing real estate and/or real estate-related
     assets in the Asia-Pacific region (including Singapore) that are used primarily for healthcare and/or healthcare-related purposes
     (including but not limited to, hospitals, healthcare facilities and real estate and/or real estate assets used in connection with healthcare
     research, education, and the manufacture or storage of drugs, medicine and other healthcare goods and devices).

     Knight Frank was appointed as the Independent Property Auditor to provide a comprehensive Building Surveying Audit with 10 years
     CAPEX and OPEX forecast, identifying major defects and non-compliances for all the buildings that has been included in the
     divestment portfolio.

     The Portfolio comprised namely three hospitals, medical centres, various offices, testing laboratories, research facilities and car parks.

     Post IPO, we were appointed as auditor to for technical due diligence for potential new purchases and for asset improvement work,
     progress auditing reporting for assets to be included in the portfolio.

28
Shenzhen Metro


                 Shenzhen Metro Co., Ltd. (SZMC) was established on
                 July 31st, 1998 and its business scope ranges from the
                 constructions and operations of urban rail transit system to
                 the development of metro-related property and business.
                 Having authorized from State-owned Assets Supervision
                 and Administration Commission of Shenzhen Municipal
                 Government as a large state-owned and single-funded
                 enterprise, SZMC independently undertakes the financing,
                 investment, construction and operation of Shenzhen urban
                 rail transit system, as well as the value-keeping and the
                 value-adding of state-owned assets”


                 Provide consultancy services for superstructure property
                 development of Qian Hai Wan Depot site. We advised on
                 the strategic planning, phasing, market positioning and
                 development methodology.




29
Handover Inspection of Crown Hotel, Macau

      Appointed in May 2007 to provide handover inspection
     service for this newly completed 40 storey 6–star luxury
     casino hotel with total floor area of approximately 90,000
     sq. meters in Taipa, Macau. The team was tasked with
     producing a comprehensive project audit for project
     completion which includes:


 1. Carry out desk study of all plans and specifications.

 1. Set up the workmanship standard with the Client and concerned
    parties based on the main construction contract and approve the
    sample room/floor of each type for the handover standard.

 1. Assign of a team of technical staff to conduct handover inspection
    of all independent guest rooms, functional and common areas.

 1. Conduct 100% inspection including casino, gaming hall, health
    club, restaurants, BOH areas, office, guest rooms etc. and make
    records with reference to the agreed handover standard.

 1. Carry out external facade, glass, metal cladding & louver and
    prepare survey report.




30
China Vanke – Portfolio of Projects in
Shanghai
                                         Completed Projects
                                         In Shanghai (over 1m2
                                         GFA)
                                         Stratford
                                         Racho Santa Fe
                                         Spring Dew Mansion
                                         Beloved Home
                                         White Horse Garden
                                         Holiday Town
                                         Yannan Villas
                                         Everest Town
                                         Blue Mountain
                                         Wonderland
                                         Deep Blue
                                         Aureate City




31
Project Auditing – China Vanke


                                 China Vanke is the largest listed property developers in China. Our
                                 relationship started with them since 2005. Today we are one of their
                                 strategic partners and independent project auditors, providing project
                                 monitoring services to over 70 developments of China Vanke’s
                                 portfolio throughout China.

                                 We are responsible for auditing work of 40 projects in the Shanghai/
                                 Huadong areas including Wuxi, Nanchang, Nanjing, Suzhou,
                                 Hangzhou and Shanghai City as well as the Chengdu region.

                                 We are handling 37 projects in Southern China including Shenzhen,
                                 Guangzhou and Dongguan, Foshan at different stages of
                                 development.

                                 Our specific work scope included:
                                  • Design audit focusing on sustainability, environmental and energy
                                    concerns
                                  • Monitor and assess the project progress
                                  • Assess quality management and environmental health & safety
                                    management issues
                                  • Project management reporting
                                  • Recommend improvements and preventive actions for the client
                                  • Score and rank performance with Key Performance Indicators
                                    (KPI)




32
Development Consultancy - China Vanke




 We have been appointed by China Vanke as the lead development consultant for its mixed development project at Qibao No. 53.

 The specific tasks included:
  • Provide master planning and strategic advice
  • Prepare the schematic design of planning and elevation
  • Marketing
  • Review documentations
  • Design management




33
地下鐵入口


                                     主力店            商業車輛主入口
           地下鐵入口                  ( 大型百貨商店 )
                     購物中心
                                                      住宅地下車庫入口
     主入口

                                      辦公樓
           城市廣場
                     中心商業廣場
                                               行政廣場
                                主題花園 住宅
               主力店                                    住宅停車處
                      中央花園
            ( 休閒 /娛樂中心 )
                                     主題花園
                                住宅
                      下沉綠化
                                                    連接廣場
                                     住宅
                            下沉綠化
                     住宅
                                      主題花園
                                               住宅
                      全天侯走廊
                                                           往七寶老街
                           住宅
                                     住宅
                           下沉綠化

                           住宅


34
Project Monitoring - Beijing Yintai Centre

Beijing Yintai Centre is one of the the biggest mix
development in Beijing with a total GFA of over half a
million sq m. It is one of the landmark in Beijing, including
a tower of hotel, apartment and office tower.

We were appointed by Hypo International as an
independent project auditor for the project monitoring of
one of the 40 storeys (90,000 sq m) West Tower.

Our specific tasks included:
 • Monitor and assess the project progress
 • Projection of completion date
 • Review of construction budget
 • Verification of progress payment to contractor
 • Review current status of leasing
 • Review development consents obtained and applied
   for

We advised our Client on the potential delay of the
construction work happened on site and associated risks
revealed from the progress during our inspection. In such
a way, our Client as an investor, have had first-hand
information of the site progress and prepared contingency
plan to minimize possible risks and loss in advance.




 35
Facilities Management of AVAYA Properties in
 Hong Kong and China
Newmark Knight Frank Global Management service (NKFGMS) was appointed by AVAYA to provide
global facilities management for AVAYA. For the Greater China Region Knight Frank oversee the
provision of our service in Hong Kong, Beijing, Shanghai, Dalian, Chengdu and Guangzhou.

A bespoke centralized communication system has been developed to enhances the quality of
facilities management. Through Knight Frank’s global offices support, this enhanced system can
make efficient use of resources, to provide a standard management methodology and unique
communication system between AVAYA’s staff and Newmark Knight Frank’s Facilities Managers in
the worldwide.

NKFGMS Service include:
                                                                                         “Our Objective, therefore, is to be
§         develop and implement a facility management program,
                                                                                         “Gatekeepers” of the real estate we are
§         establish and maintain a good working relationship with Company’s landlords,
                                                                                         entrusted with. We are not caretakers,
§         provide the highest level of customer service,
                                                                                         we are responsible to pro-actively
§         minimize Company costs and expenses,
                                                                                         manage the facilities and provide
§         identify opportunities for improvement,
                                                                                         accurate, timely information, and identify
§         increase service levels,
                                                                                         methods and changes to improve
§         improve facility management strategies,
                                                                                         operations, drive out costs, and provide a
§         and manage potential optimization of space and services
                                                                                         healthy, safe and productive
                                                                                         environment.“




  36
Our Experience with City of Dreams




 City of Dreams is an integrated resort being developed on the Cotai           Operators Handbook – To compliment the Fit-Out Guide we have
 Strip in Macau and at US$2.5B represents the second largest
                                                                                produced a Operators Handbook to assist Retailers with services,
 investment on the strip.
                                                                                management, safety and other information about the development and
                                                                                Macao to allow them to successfully launch and operate their
 The project includes a 420,000 sq ft casino and three high end                businesses.
 hotels and luxury serviced apartments with a combined total of over
 2,400 rooms as well as an entertainment venue hosting permanent
                                                                                Service Charge Report – We have produced an in depth analysis of
 staged shows. The retail component includes around 300,000 sq ft
 net of up market boutique retailing and fine dining restaurants. We            both OPEX and CAPEX forecasts to allow us to recommend to the client
 are appointed to provide our services for the following projects for           a Service Fee and other costs to charge retailers upon opening in 2009.
 the Retail and Food & Beverage Mall of the Development.
                                                                                Our report uses a number of prudent assumptions enabling our client to
                                                                                have a defensible report to assist with negotiations with potential
 Fit Out Guide – Our team has produced a comprehensive, colour                 operators. Our report includes recommendations on staffing,
 coded, user friendly and compliant guide to assist a diverse range of          maintenance, cleaning and operating costs and as well as capital
 Retailers to Fit-Out their retail units efficiently, safely, whilst adhering
                                                                                expenditure figures forecasted over 10 years.
 to the own design concept in accordance to international building
 and local government codes and ordinances.
37
Project Monitoring in Bangkok, Thailand




               The Wellcome Trust is the world's second largest medical charitable institution with net assets of
               £15.1 billion ($30.2 billion).

               The overall mission of the trust is quot;to foster and promote research with the aim of improving human
               and animal healthquot;, and in addition to funding biomedical research it supports the public
               understanding of science.

               Knight Frank provides project monitoring service for one of the Trusts projects – Mahidol-Oxford
               Tropical Medicine Research Unit (MORU) at 420/6 Rajvithi Road Bangkok, Thailand. Our work
               includes:

                Monitor the construction of an office floor and two floors of Laboratories including a secure a Bio
               Safety Level 3 (BSL 3) Lab, in Bangkok, Thailand

                Monthly inspections, to report on progress, budget and quality

                Detailed monthly reports were forwarded to client

                Final report contained a number of recommendations to be implemented in future projects in
               developing economies similar to Thailand
38
Insurance Valuation – Tsing Sha Control Area
                    The whole Tsing Sha Control Area covers 13.6km of road network linking Sha Tin
                    and Tsing Yi.

                    Knight Frank was appointed by Transport Infrastructure Management Ltd to
                    provide insurance valuation on building, structure, plant and equipment for the
                    following portion in Tsing Sha Control Area:

                    1. Tai Wai Enclosed Section
                    2. Sha Tin Heights Tunnel
                    3. Toll Plaza
                    4. Sha Tin Administration Building
                    5. Eagle’s Nest Tunnel
                    6. Lai Chi Kok Viaduct
                    7. Ngong Shuen Chau Viaduct
                    8. Ventilation Building
                    9. Portal Buildings
                    10. Connecting interchanges, slip roads and accesses
                    11. Control Point located along the route use for traffic control

                    1.Plant and equipment we valued include power supply system, tunnel ventilation,
                    building services, lighting, Central Monitoring and Control System (CMCS), CCTV
                    system, communication system, Traffic Control and Surveillance System (TCSS),
                    Toll Collection System (TCS), Ticket Scanning System, Speed Detection
                    Equipment, Global Positioning System and Image Monitoring System, fire
                    protection system and water supply.

                    1.Our services aimed to provide Client an reinstatement with new cost for
                    insurance purpose. Type of properties we valued include buildings and also
                    infrastructures like Tsing Sha Control Area in this case.




39
Project Management of Coastline Villa
Renovation


Coastline Villa consists of 23 blocks of low rise development with a
total of 230 units. Knight Frank was appointed by Discovery Bay
Services Management as Project Manager to drive the whole
renovation process. We conducted condition Surveys and addressed
the problems in the building and proposed corresponding repair works.
 Tender documents were drafted afterward and invited tenderers to
bid. Knight Frank act as an advisor to Client and analyze the returned
tender. During the construction stage, we closely monitored the work
in order to be completed on time and up to a good standard of
workmanship. Every payments submitted by contractor were verified
and certificate of payments were issued to Client for payments.

Scope of Coastline Villa Renovation includes:
• External wall patch repair
• Internal common areas renovation
• G/F lift lobby enhancement
• Repair of uPVC windows
• Enhancement of occupational safety facilities in the development




 40
146 & 148 Argyle Street, Kowloon

                        We have been appointed by Sky Treasure Ltd to apply for Lease
                        Modification to relax the restrictions on the number of storeys and
                        building height under the existing land grant conditions governing the lot
                        to enable a redevelopment under the parameters stipulated under the
                        latest Outline Zoning Plan. The lease modification enabled the plot ratio
                        is increased from 4 to 5.

                        Our challenges is to secure a fair premium assessment in a volatile
                        market situation.

                        Knight Frank is also appointed as Project Manager to oversee the
                        redevelopment which will provide over 120,000 sq ft of luxury flats. The
                        project is targeted for completion in 2012.




41
Cyberport, Pokfulam, Hong Kong
                     We have been appointed by Pacific Century Premium Developments
                     Limited to apply for the Certificate of Compliance (CC) for the entire
                     Cyberport development comprising 4 million sq ft of residential space,
                     1.8 million sq ft of retail and office space and a 173 rooms hotel. The
                     development spanned over 8 years and responsible for coordinating the
                     building plan approval process to enable the luxury domestic units can
                     be completed on time and delivered to the purchasers.

                     We worked with a multi discipline team of planner, architect, landscape
                     architect, engineers and the CC was issued in late 2008 which marked
                     the full completion of the largest private participation project in recent
                     years.

                     Knight Frank also appointed for building consultancy service in applying
                     clubhouse license from Home Affairs Department(HAD). Our building
                     professional directed the whole process and take care of every
                     requirements that HAD requires for the clubhouse license.




42
Selection of some of the major clients from
     current and previous projects




43
Some of our other clients




 44
Our clients - continued




                             
                                                                                
                                                                          




    45
Clients - REIT’S ( 房地產投資信託 )

Advised on more the following REITs listed in Singapore and Hong Kong.
China Clients
3M Offices 1,700                      CYTEC INDUSTRIES Offices 660           KODAK R & D 200                   MOTOROLA -CHENGDU Offices 800

AKZO NOBEL Offices 2,202              DELL COMPUTER Offices 344              KODAK R & D 200                   MOTOROLA -WUHAN Offices 750

AKZO NOBEL Offices 446                DFID (BRITISH EMBASSY) Offices 1,250   KODAK R & D 200                   MOTOROLA-CHENGDU Offices 6,000

ALCATEL Industrial 3,000              DRESDNER BANK Offices 1,200            KPMG Offices 2,694                MOTOROLA-JINAN Offices 750

ALCATEL Offices 1,400                 DRESDNER BANK Offices 1,700            KPMG Offices 399                  MOTOROLA-NANJING Offices 700

ALCATEL Offices 5,574                 EACHNET.COM Offices 2,000              KPMG Offices 4,998                MOTOROLA-SHANGHAI Offices 3,000

APC Offices 1,300                     EUROPEAN UNION Offices 1,250           KPMG Offices 6,600                NEWMARGIN Offices 799

AT KEARNEY (PH. I & II) Offices 300   EUROPEAN UNION Residential 350         KVAERNER Offices 600              ROLEX Offices 800

BAKER & MCKENZIE Offices 929          FRENCH SCHOOL Education 2,500          LOUIS DREYFUS Offices 860         ROEDL & PARTNER Offices 900

BAYER Offices 5,203                   FUJITSU Offices 1,347                  MANULIFE Offices 1,300            SASOL Offices 1,200

BRITISH EMBASSY Residential VARIOUS   GEDAS Offices 600                      MANULIFE Offices 2,202            SOHU.COM Offices 13,000

CANADIAN EMBASSY Offices 3,500        GENERAL MOTORS Offices 4,600           MICROSOFT Offices 2,000           SOLVAY Offices 700

CISCO Offices 2,300                   HSBC Offices 2,000                     MOTORALA-CHENGDU Offices 5,998    WICRESOFT Offices 1,347

CITIBANK Residential 300              IMS (FACTORY) Industrial 3,500         MOTORLA-NANJING Offices 5,992     WICRESOFT Offices 1,347

CITYBANK Offices 2,000                INGERSOLL RAND Offices 3,800           MOTOROLA –BEIJING Offices 1,350   WICRESOFT Offices 2.044

CLIFFORD CHANCE Offices 880           KING& WOOD Offices 5,000               MOTOROLA -CHENGDU Offices 1,500   WINTERTHUR Offices 1,500
China Clients continue
CLIENT              FACILITY              CLIENT              FACILITY
                               AREA, M2                                  AREA, M2
Kodak                                     Motorola-Shanghai   Offices
                    R&D          200                                       3,000
Kodak                                     Motorola-Chengdu    Offices
                    R&D          200                                       6,000
Kodak                                     Motorla-Nanjing     Offices
                    R&D          200                                       5,992
KPMG                Offices               Motorala-Chengdu    Offices
                                 4,998                                     5,998
KPMG                Offices               NewMargin           Offices
                                 399                                       799
KPMG                Offices               Roedl & Partner     Offices
                                 6,000                                     900
KPMG                Offices               ROLEX               Offices
                                 2,694                                     800
Kvaerner            Offices               SASOL               Offices
                                 700                                       1,000
King& Wood          Offices               SPX                 Offices
                                 5,000                                     3,500
Louis Dreyfus       Offices               Sohu.com            Offices
                                 860                                      13,000
Manulife            Offices               Solvay              Offices
                                 2,202                                     700
Manulife            Offices               Wacker              Offices
                                 1,300                                     1,500
Microsoft           Offices               Winterthur          Offices
                                 2,000                                     1,500
Motorola –Beijing   Offices               Wicresoft           Offices
                                 1,350                                     2.044
Motorola -Chengdu   Offices               Wicresoft           Offices
                                 800                                       1,347
Motorola -Chengdu   Offices      1,500
Motorola-Nanjing    Offices      700
Motorola -Wuhan     Offices      750
Motorola-Jinan      Offices      750
Profile

     Published Articles

     Conferences speaking




49
Resume


                                      Photo image

                                    1.88”(W) x 1.84(H)




 David Chan MSc HKIA
 RIBA MCIOB NFPA SFPE

 David Chan is a partner of Compass Studio Ltd, He has over 20 years experience within the
 construction and property industry working for both the public and private sectors. David is UK
 educated with a Master Degree in Construction Management and Economics. He is a qualified
 architect, a chartered builder and a fire engineer. He has extensive experience in building
 design, fire engineering, construction, project and facilities and environmental management and
 worked on several major infrastructure and property development projects across the region.
 Prior to joining Compass, David was the Divisional Director of Knight Frank building consultancy
 and facility management division and worked on the listing of several major property REIT and
 sizable projects across China, Hong Kong and other parts of the Asia Pacific . Prior to that, David
 heads the Facilities Management for KCRC (MTR) Property Division responsible for the
 management of over 10 billion of property assets.



50
Conference Presentation
Selected Press Articles




 53
54
55
56
57
Investment in China




58
59
For further information, please contact:


              David Chan
             Tel: 6650 9128
       email:dtfchan@gmail.com




60

Weitere ähnliche Inhalte

Was ist angesagt?

Romeo.mitchell
Romeo.mitchellRomeo.mitchell
Romeo.mitchellNASAPMC
 
Eggert.joe
Eggert.joeEggert.joe
Eggert.joeNASAPMC
 
Charles.leising
Charles.leisingCharles.leising
Charles.leisingNASAPMC
 
Hr Transformation Overview
Hr Transformation OverviewHr Transformation Overview
Hr Transformation OverviewMark Gavora
 
Lau.cheevon
Lau.cheevonLau.cheevon
Lau.cheevonNASAPMC
 
Ziyad CV
Ziyad CVZiyad CV
Ziyad CVzzsz77
 
Vonnie simonsen
Vonnie simonsenVonnie simonsen
Vonnie simonsenNASAPMC
 
Pojectmanagementver4
Pojectmanagementver4Pojectmanagementver4
Pojectmanagementver4sami325
 
Jim.cassidy
Jim.cassidyJim.cassidy
Jim.cassidyNASAPMC
 
Speaking with facts tq & od project dimensions(1)
Speaking with facts tq & od project dimensions(1)Speaking with facts tq & od project dimensions(1)
Speaking with facts tq & od project dimensions(1)Beth Perez
 
Project Management Professional (PMP) / 42 Processes
Project Management Professional (PMP) / 42 ProcessesProject Management Professional (PMP) / 42 Processes
Project Management Professional (PMP) / 42 Processesedtichy
 
Change Management
Change ManagementChange Management
Change Managementpromoking
 
R simpson elee
R simpson eleeR simpson elee
R simpson eleeNASAPMC
 
Pmbok 4th edition chapter 5 - Project Scope Management
Pmbok 4th edition   chapter 5 - Project Scope Management Pmbok 4th edition   chapter 5 - Project Scope Management
Pmbok 4th edition chapter 5 - Project Scope Management Ahmad Maharma, PMP,RMP
 
Harvey.tony
Harvey.tonyHarvey.tony
Harvey.tonyNASAPMC
 
Richard.laws
Richard.lawsRichard.laws
Richard.lawsNASAPMC
 
Kelly.elliott
Kelly.elliottKelly.elliott
Kelly.elliottNASAPMC
 
Corporater at BSC and Strategy Forum - March 2013
Corporater at BSC and Strategy Forum - March 2013Corporater at BSC and Strategy Forum - March 2013
Corporater at BSC and Strategy Forum - March 2013Pedro S. Pereira
 
Lindley.johnson.pe
Lindley.johnson.peLindley.johnson.pe
Lindley.johnson.peNASAPMC
 

Was ist angesagt? (20)

Romeo.mitchell
Romeo.mitchellRomeo.mitchell
Romeo.mitchell
 
Methodology
MethodologyMethodology
Methodology
 
Eggert.joe
Eggert.joeEggert.joe
Eggert.joe
 
Charles.leising
Charles.leisingCharles.leising
Charles.leising
 
Hr Transformation Overview
Hr Transformation OverviewHr Transformation Overview
Hr Transformation Overview
 
Lau.cheevon
Lau.cheevonLau.cheevon
Lau.cheevon
 
Ziyad CV
Ziyad CVZiyad CV
Ziyad CV
 
Vonnie simonsen
Vonnie simonsenVonnie simonsen
Vonnie simonsen
 
Pojectmanagementver4
Pojectmanagementver4Pojectmanagementver4
Pojectmanagementver4
 
Jim.cassidy
Jim.cassidyJim.cassidy
Jim.cassidy
 
Speaking with facts tq & od project dimensions(1)
Speaking with facts tq & od project dimensions(1)Speaking with facts tq & od project dimensions(1)
Speaking with facts tq & od project dimensions(1)
 
Project Management Professional (PMP) / 42 Processes
Project Management Professional (PMP) / 42 ProcessesProject Management Professional (PMP) / 42 Processes
Project Management Professional (PMP) / 42 Processes
 
Change Management
Change ManagementChange Management
Change Management
 
R simpson elee
R simpson eleeR simpson elee
R simpson elee
 
Pmbok 4th edition chapter 5 - Project Scope Management
Pmbok 4th edition   chapter 5 - Project Scope Management Pmbok 4th edition   chapter 5 - Project Scope Management
Pmbok 4th edition chapter 5 - Project Scope Management
 
Harvey.tony
Harvey.tonyHarvey.tony
Harvey.tony
 
Richard.laws
Richard.lawsRichard.laws
Richard.laws
 
Kelly.elliott
Kelly.elliottKelly.elliott
Kelly.elliott
 
Corporater at BSC and Strategy Forum - March 2013
Corporater at BSC and Strategy Forum - March 2013Corporater at BSC and Strategy Forum - March 2013
Corporater at BSC and Strategy Forum - March 2013
 
Lindley.johnson.pe
Lindley.johnson.peLindley.johnson.pe
Lindley.johnson.pe
 

Ähnlich wie David Chan Profile And Experience

Enterprise Project Management
Enterprise Project ManagementEnterprise Project Management
Enterprise Project ManagementMartin Mehalchin
 
Business PMO & IT Pmo What Is The Difference
Business PMO & IT Pmo What Is The DifferenceBusiness PMO & IT Pmo What Is The Difference
Business PMO & IT Pmo What Is The DifferenceStefan Rank
 
Asset information management for design build r novak arc 2008
Asset information management for design build r novak arc 2008Asset information management for design build r novak arc 2008
Asset information management for design build r novak arc 2008ARC Advisory Group
 
Skyward Erp Presentation
Skyward Erp PresentationSkyward Erp Presentation
Skyward Erp Presentationvishalnvora1
 
[DSBW Spring 2009] Unit 03: WebEng Process Models
[DSBW Spring 2009] Unit 03: WebEng Process Models[DSBW Spring 2009] Unit 03: WebEng Process Models
[DSBW Spring 2009] Unit 03: WebEng Process ModelsCarles Farré
 
Equable Lean Six Sigma Boe English Presentation
Equable Lean Six Sigma Boe English PresentationEquable Lean Six Sigma Boe English Presentation
Equable Lean Six Sigma Boe English Presentationfranckstrub
 
Process performance models case study
Process performance models case studyProcess performance models case study
Process performance models case studyKobi Vider
 
The Analytical Design Planning Technique (ADePT)
The Analytical Design Planning Technique (ADePT)The Analytical Design Planning Technique (ADePT)
The Analytical Design Planning Technique (ADePT)PaulWaskett
 
Project management at a glance
Project management at a glanceProject management at a glance
Project management at a glanceevdgriend
 
Kepner Tregoe Developing Your Hr Project Management Skills
Kepner Tregoe  Developing Your Hr Project Management SkillsKepner Tregoe  Developing Your Hr Project Management Skills
Kepner Tregoe Developing Your Hr Project Management SkillsJessica Booth
 
Advanced Projects(tm) Brochure Oct09
Advanced Projects(tm)   Brochure   Oct09Advanced Projects(tm)   Brochure   Oct09
Advanced Projects(tm) Brochure Oct09dbevort
 
MOF 4 Overviewv - ITSM Academy Webinar
MOF 4 Overviewv - ITSM Academy WebinarMOF 4 Overviewv - ITSM Academy Webinar
MOF 4 Overviewv - ITSM Academy WebinarITSM Academy, Inc.
 
Proj Mgmt Capability
Proj Mgmt CapabilityProj Mgmt Capability
Proj Mgmt Capabilitysmcasas
 
Project Governance Model
Project Governance ModelProject Governance Model
Project Governance ModelConstient
 
Considerations in Selecting and Protecting Your IT Investment
Considerations in Selecting and Protecting Your IT InvestmentConsiderations in Selecting and Protecting Your IT Investment
Considerations in Selecting and Protecting Your IT InvestmentHelene Heller, PMP
 
Rm Now Management R Short Presentation 1.5.2009
Rm Now Management R Short Presentation 1.5.2009Rm Now Management R Short Presentation 1.5.2009
Rm Now Management R Short Presentation 1.5.2009peterottervanger
 
01 Ts A Pmg Product Write Up
01 Ts A Pmg Product Write Up01 Ts A Pmg Product Write Up
01 Ts A Pmg Product Write UpStefan Afendoulis
 
Real Estate Solutions Services
Real Estate Solutions ServicesReal Estate Solutions Services
Real Estate Solutions ServicesManeer
 
Debra Lewis Kugler Resume March 2009
Debra Lewis Kugler Resume March 2009Debra Lewis Kugler Resume March 2009
Debra Lewis Kugler Resume March 2009drlk698
 

Ähnlich wie David Chan Profile And Experience (20)

Enterprise Project Management
Enterprise Project ManagementEnterprise Project Management
Enterprise Project Management
 
About LiTmus
About LiTmusAbout LiTmus
About LiTmus
 
Business PMO & IT Pmo What Is The Difference
Business PMO & IT Pmo What Is The DifferenceBusiness PMO & IT Pmo What Is The Difference
Business PMO & IT Pmo What Is The Difference
 
Asset information management for design build r novak arc 2008
Asset information management for design build r novak arc 2008Asset information management for design build r novak arc 2008
Asset information management for design build r novak arc 2008
 
Skyward Erp Presentation
Skyward Erp PresentationSkyward Erp Presentation
Skyward Erp Presentation
 
[DSBW Spring 2009] Unit 03: WebEng Process Models
[DSBW Spring 2009] Unit 03: WebEng Process Models[DSBW Spring 2009] Unit 03: WebEng Process Models
[DSBW Spring 2009] Unit 03: WebEng Process Models
 
Equable Lean Six Sigma Boe English Presentation
Equable Lean Six Sigma Boe English PresentationEquable Lean Six Sigma Boe English Presentation
Equable Lean Six Sigma Boe English Presentation
 
Process performance models case study
Process performance models case studyProcess performance models case study
Process performance models case study
 
The Analytical Design Planning Technique (ADePT)
The Analytical Design Planning Technique (ADePT)The Analytical Design Planning Technique (ADePT)
The Analytical Design Planning Technique (ADePT)
 
Project management at a glance
Project management at a glanceProject management at a glance
Project management at a glance
 
Kepner Tregoe Developing Your Hr Project Management Skills
Kepner Tregoe  Developing Your Hr Project Management SkillsKepner Tregoe  Developing Your Hr Project Management Skills
Kepner Tregoe Developing Your Hr Project Management Skills
 
Advanced Projects(tm) Brochure Oct09
Advanced Projects(tm)   Brochure   Oct09Advanced Projects(tm)   Brochure   Oct09
Advanced Projects(tm) Brochure Oct09
 
MOF 4 Overviewv - ITSM Academy Webinar
MOF 4 Overviewv - ITSM Academy WebinarMOF 4 Overviewv - ITSM Academy Webinar
MOF 4 Overviewv - ITSM Academy Webinar
 
Proj Mgmt Capability
Proj Mgmt CapabilityProj Mgmt Capability
Proj Mgmt Capability
 
Project Governance Model
Project Governance ModelProject Governance Model
Project Governance Model
 
Considerations in Selecting and Protecting Your IT Investment
Considerations in Selecting and Protecting Your IT InvestmentConsiderations in Selecting and Protecting Your IT Investment
Considerations in Selecting and Protecting Your IT Investment
 
Rm Now Management R Short Presentation 1.5.2009
Rm Now Management R Short Presentation 1.5.2009Rm Now Management R Short Presentation 1.5.2009
Rm Now Management R Short Presentation 1.5.2009
 
01 Ts A Pmg Product Write Up
01 Ts A Pmg Product Write Up01 Ts A Pmg Product Write Up
01 Ts A Pmg Product Write Up
 
Real Estate Solutions Services
Real Estate Solutions ServicesReal Estate Solutions Services
Real Estate Solutions Services
 
Debra Lewis Kugler Resume March 2009
Debra Lewis Kugler Resume March 2009Debra Lewis Kugler Resume March 2009
Debra Lewis Kugler Resume March 2009
 

Kürzlich hochgeladen

How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...SOFTTECHHUB
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024Adnet Communications
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfShashank Mehta
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdfShaun Heinrichs
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdfShaun Heinrichs
 
Driving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon HarmerDriving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon HarmerAggregage
 
Pitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deckPitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deckHajeJanKamps
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environmentelijahj01012
 
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdftrending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdfMintel Group
 
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdfGUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdfDanny Diep To
 
NAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors DataNAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
WSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdfWSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdfJamesConcepcion7
 
Unveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic ExperiencesUnveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic ExperiencesDoe Paoro
 
digital marketing , introduction of digital marketing
digital marketing , introduction of digital marketingdigital marketing , introduction of digital marketing
digital marketing , introduction of digital marketingrajputmeenakshi733
 
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...ssuserf63bd7
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxmbikashkanyari
 
Appkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxAppkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxappkodes
 
EUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersEUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersPeter Horsten
 

Kürzlich hochgeladen (20)

How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdf
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf
 
Driving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon HarmerDriving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon Harmer
 
Pitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deckPitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deck
 
Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environment
 
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdftrending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
 
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdfGUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
 
NAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors DataNAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors Data
 
WSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdfWSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdf
 
Unveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic ExperiencesUnveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic Experiences
 
digital marketing , introduction of digital marketing
digital marketing , introduction of digital marketingdigital marketing , introduction of digital marketing
digital marketing , introduction of digital marketing
 
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
 
Appkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxAppkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptx
 
WAM Corporate Presentation April 12 2024.pdf
WAM Corporate Presentation April 12 2024.pdfWAM Corporate Presentation April 12 2024.pdf
WAM Corporate Presentation April 12 2024.pdf
 
EUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersEUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exporters
 

David Chan Profile And Experience

  • 1. Introduction to Facility Management Project Audit Technical Due Diligence Development/Asset Planning Building Consultancy 1
  • 2. Consultancy  To date, surveyed and audited 200 plus projects, over a million homes, 1.8 million sq m of office/commercial;  Work with major mainland developers and Railway Corp (MTR, SZMTR, SHMetro, Vanke, Gemdale Corp, Soho China, Can High, Citic);  Work with most of the major funds, Ibanks, overseas investors;  Completed projects in over 30 mainland cities, plus Thailand, Singapore, Malaysia, Philippines, Vietnam etc;  Sustainable Construction - China Green Construction & Environmental rating system;  GBC member with LEED accreditation capability
  • 3. Introduction to Building Consultancy / Facility Management, Hong Kong Based in Hong Kong and Shanghai we can assembled Architects, Engineers, Surveyors, Project Managers, Facility Managers and assisted by their locally based colleagues typically provide the following specialist services; Hong Kong Based Services; Architectural Design, Interior Design, Surveys, Renovation, AP Services, Building Due Diligence, Project Management, License Application; Greater China / SE Asia Based Services; • Project Audit – Monitoring Construction Quality Progress; • Engineering Services – Report on Construction Processes; • Development Consultancy – Advise on Mixed Developments; • Technical Due Diligence – Assess Building Condition, including CAPEX/OPEX projections and make investment recommendations from a technical perspective • Project Coordination / Management – To coordinate and manage projects i.e. an office /shop fit-out • FM Consultancy – CAM Reports, Fit Out Guides, Operators Handbooks. •Facility Management – Consultancy.
  • 4. China Real estate consultancies in Greater China to provide integrated building project audit, monitoring and due diligence services with property demand based real estate consultancy and valuation. Our extensive experience extends over mainland China and other parts of Asia. Essentially our aim is to provide the type of information which is critical for making strategic investment decisions. Our comprehensive auditing, surveying and due diligence reports covers the full range of investment advice which goes beyond that of a traditional building survey report to assist our client in making sound investment decisions. We are able to mobilize our team at short notice and produce full reports within weeks, sometime days if needed. 4
  • 6. Management Process Consult Planned Maintenance Routine maintenance Procurement methodology Benchmarking service levels Outsourcing IT Systems Systems Audit Energy Conservation Manage Enhance Asset Support desk Project Cleaning Utility Procurement of service contracts Lease Space planning Financial Architectural services Property Interior design Data Security services Contract Office furnishings Administration Maintain Electrical systems Mechanical systems HVAC systems Plumbing systems Fire systems Security systems UPS systems Emergency systems and backup
  • 7. Process – Design and Project Management Construct an Define Project Assemble Define Project initial Plan Objectives Team Scope Adjust the Plan, & Analyze Design Manage Current Revision Project Status and Budget Change Estimation Collect Progress Close Project Publish the Plan Obtain Client’s approvaI Information
  • 8. Project Auditing – Scope and Purpose  Carry out independent check to evaluate the quality of site work through an inspection of:  Site construction works  Site progress  Safety, environmental and health issues on site  Documentary management  Achieve the level of quality in satisfaction of building occupiers  Identify potential problem during construction stage that may affect Client’s financial strategies and risk management 8
  • 9. Project Auditing  Auditing System – the use of independent auditors Inspection- regular & systematic project audits  Identification - objectively assess performances, problem identifications and take  records` Analysis - identify solutions, potential risks, strengths and weaknesses.  Inspect Identify Analyse 9
  • 10. Project Auditing Methodology  One full day inspection (half day for site inspection and half day for documents checking)  Experienced auditors, surveyors and engineers  Random unannounced site audit  Tailor-made score sheets  Ranking performance and improvements  Re-check/reinspect previous problems  Benchmarking  Lessons learnt, improvements, problems, what to do and what not to do.  Alignment with customer/end user surveys  Re-evaluate, feed back, continuous improvement 10
  • 12. Project Experience • Project Management • Project Audit • Project Monitoring • FM Services 12
  • 13. Project Management – Case Study I Existing Office Layout
  • 15. “The new look gives a much brighter, lighter and more open appearance and of course means we use the space more efficiently and can therefore fit in the whole team, with some room for further expansion.” COO of the Client
  • 16.
  • 17.
  • 18. Project Management – Case Study Baker & McKenzie, Jimao Tower Shanghai
  • 19. Project Management – Case Study Molecular Devices – New Built Construction, Nanhui
  • 20. Project Management – Case Study DDB – Grand Gateway Shanghai
  • 21. Fitting Out Project Management KCS Limited is one of Asia's leading independent and integrated providers of corporate accounting, corporate secretarial, payroll outsourcing and trust and estate administration services. They have offices in Hong Kong, Singapore, Shanghai, Beijing, Shenzhen, Jakarta and Sydney. Knight Frank was appointed as Project Manager to oversee the fitting-out work of their new offices in Beijing, Shanghai and Shenzhen. We cope with our Client’s tight schedule and quality requirements and our professionalism was well recognized. Our strong team in Hong Kong and Mainland China was proved by serial contracts awarded from the Client in providing Project Management Services. We participate the project and provide professional advise to Client from early design stage, assist in fitting-out contract procurement and carry out supervision of site work until Client move-in. 21
  • 22. The Link REIT Appointed by the Hong Kong Housing Authority, their advisors JP Morgan and the Joint Global Coordinators (UBS, Goldman Sachs, & HSBC) to review a portfolio of 213 centres. Review covered building and building services due diligence, asset enhancement, shopper profile and a commentary of the proposed divestment boundaries. We also produced 10-year Opex and Capex accounts. Ultimately 180 centres were selected for listing. The IPO was delayed in December 2004, but finally listed in November 2005. We were appointed in January 2007 to review the portfolio and issue updated 10 year Operational and Capex reports and to review the building reports. In May 2008 we were again appointed to review the building integrity of the portfolio and give our views of asset enhancement of 8 retail centres. 22
  • 23. Industrial Valuation & Building Due Diligence We have been appointed by Macquarie Goodman to prepare a combination of valuation and building due diligence reports on three industrial buildings in Hong Kong. The case study highlighted in this summary is Global Gateway, a 27- storey industrial building in Tsuen Wan. In this case we were asked to prepare valuation and building due diligence reports. The total gross floor area of the building is in excess of 1M sq ft. Specific tasks included: • Valuation of the building using the discounted cash flow to arrive at the market value; • Conducted comprehensive building and building services condition surveys to confirm structural integrity and identify existing defects; • Identified areas of deviation from relevant building and building services regulations and codes of practice; • Prepared estimates of the cost of rectifying existing defects and non- compliances; • Compiled a 5-year forecast of repair, maintenance and capital expenditure; • Compiled an Asset Register of plant and equipment; • Calculated the replacement cost for insurance purposes; and • Carried out a land survey to confirm the location of the building on the lot. 23
  • 24. JTC Corporation Singapore JTC Corporation (JTC), is a Singapore government statutory board in charge of planning, developing and managing industrial space and facilities. Their portfolio comprises of 51 estates having a a GFA of some 2.7 million square metres. Details Sizable portfolio of industrial cluster comprises of 9 flatted factories, 3 food court buildings and a single amenity building was reviewed in 2006 and a portfolio comprises of flatted factories, stack-up factories, ramp up factories, business park and amenities centres having over 600,000sq.m. of GFA were reviewed in 2007. Service Provided We are appointed to conduct a site inspections of the development cluster. A Cost allocation review was also carried out for an analysis on capital expenditure (CAPEX) and operational expenditure (OPEX) and to provide Comparative analysis using life cycle approach to test the valuation assumptions. Our CAPEX and OPEX forecasts have been associated with capital market transactions and accepted by the independent valuer and incorporated in full in the valuation cash flow. 24
  • 25. Macquarie Bank’s Acquisition of China Retail Centres for Wholesale Fund’s Offer With the due diligence we conducted comprehensive building and building services condition surveys of the retail centres to confirm their structural integrity and identify existing defects. We prepared estimates of the cost of rectifying existing defects and non-compliances and we compiled 5-year forecasts of repair, maintenance and capital expenditure. We also oversaw Environmental Site Assessments that were used to identify potential areas of environmental concern, in particular, issues associated with site history, contamination or existing environmental conditions. 25
  • 26. Macquarie Bank’s Acquisition of China Retail Centres for Wholesale Fund’s Offer The centres are all located in provincial Chinese cities. Given the location of the properties and detail that was required, the programme set by the client was incredibly tight. Harbin We were instructed on 25 January 2005, we delivered valuation certificates with DCF analysis and S henyang summary due diligence reports on 18 D alian February. Tianjin Jinan Full detailed due diligence reports were delivered on 28 February and valuation reports followed on 31 March 2005. Nanjing W uhan In 2006, we were instructed again to value 6 additional retail centres in 6 C hangs ha different cities. Nanning 26
  • 27. IPO experience with RREEF CCT RREEF China Commercial Trust (“RREEF CCT” or “the Trust”) is a distinctive real estate investment trust (“REIT”) established to invest on a long-term basis in a diversified portfolio of institutional quality office and mixed-use properties in major cities in Greater China. Its flagship asset – Beijing Gateway Plaza is a Premium Grade A office complex comprising two 29-storey office tower including 3 levels of linked podium and 3 levels of basement, and a total GFA about 139,093 sq.m. It is situated in Beijing’s sought-after Lufthansa area, one of four established business districts in Beijing. Provided comprehensive building and building services condition surveys of the building to confirm structural integrity and identify existing defects; compliance check against relevant statutory requirements; cost allocation review to carry out an analysis on capital expenditure (CAPEX) and operational expenditure (OPEX). The results were used by the valuers and the investment bank for the initial public offering of the REIT in Hong Kong 2007. 27
  • 28. IPO - Technical Due Diligence – Parkway Life REIT Singapore “Parkway Life REIT is established by Parkway Holdings to invest primarily in income-producing real estate and/or real estate-related assets in the Asia-Pacific region (including Singapore) that are used primarily for healthcare and/or healthcare-related purposes (including but not limited to, hospitals, healthcare facilities and real estate and/or real estate assets used in connection with healthcare research, education, and the manufacture or storage of drugs, medicine and other healthcare goods and devices). Knight Frank was appointed as the Independent Property Auditor to provide a comprehensive Building Surveying Audit with 10 years CAPEX and OPEX forecast, identifying major defects and non-compliances for all the buildings that has been included in the divestment portfolio. The Portfolio comprised namely three hospitals, medical centres, various offices, testing laboratories, research facilities and car parks. Post IPO, we were appointed as auditor to for technical due diligence for potential new purchases and for asset improvement work, progress auditing reporting for assets to be included in the portfolio. 28
  • 29. Shenzhen Metro Shenzhen Metro Co., Ltd. (SZMC) was established on July 31st, 1998 and its business scope ranges from the constructions and operations of urban rail transit system to the development of metro-related property and business. Having authorized from State-owned Assets Supervision and Administration Commission of Shenzhen Municipal Government as a large state-owned and single-funded enterprise, SZMC independently undertakes the financing, investment, construction and operation of Shenzhen urban rail transit system, as well as the value-keeping and the value-adding of state-owned assets” Provide consultancy services for superstructure property development of Qian Hai Wan Depot site. We advised on the strategic planning, phasing, market positioning and development methodology. 29
  • 30. Handover Inspection of Crown Hotel, Macau Appointed in May 2007 to provide handover inspection service for this newly completed 40 storey 6–star luxury casino hotel with total floor area of approximately 90,000 sq. meters in Taipa, Macau. The team was tasked with producing a comprehensive project audit for project completion which includes: 1. Carry out desk study of all plans and specifications. 1. Set up the workmanship standard with the Client and concerned parties based on the main construction contract and approve the sample room/floor of each type for the handover standard. 1. Assign of a team of technical staff to conduct handover inspection of all independent guest rooms, functional and common areas. 1. Conduct 100% inspection including casino, gaming hall, health club, restaurants, BOH areas, office, guest rooms etc. and make records with reference to the agreed handover standard. 1. Carry out external facade, glass, metal cladding & louver and prepare survey report. 30
  • 31. China Vanke – Portfolio of Projects in Shanghai Completed Projects In Shanghai (over 1m2 GFA) Stratford Racho Santa Fe Spring Dew Mansion Beloved Home White Horse Garden Holiday Town Yannan Villas Everest Town Blue Mountain Wonderland Deep Blue Aureate City 31
  • 32. Project Auditing – China Vanke China Vanke is the largest listed property developers in China. Our relationship started with them since 2005. Today we are one of their strategic partners and independent project auditors, providing project monitoring services to over 70 developments of China Vanke’s portfolio throughout China. We are responsible for auditing work of 40 projects in the Shanghai/ Huadong areas including Wuxi, Nanchang, Nanjing, Suzhou, Hangzhou and Shanghai City as well as the Chengdu region. We are handling 37 projects in Southern China including Shenzhen, Guangzhou and Dongguan, Foshan at different stages of development. Our specific work scope included: • Design audit focusing on sustainability, environmental and energy concerns • Monitor and assess the project progress • Assess quality management and environmental health & safety management issues • Project management reporting • Recommend improvements and preventive actions for the client • Score and rank performance with Key Performance Indicators (KPI) 32
  • 33. Development Consultancy - China Vanke We have been appointed by China Vanke as the lead development consultant for its mixed development project at Qibao No. 53. The specific tasks included: • Provide master planning and strategic advice • Prepare the schematic design of planning and elevation • Marketing • Review documentations • Design management 33
  • 34. 地下鐵入口 主力店 商業車輛主入口 地下鐵入口 ( 大型百貨商店 ) 購物中心 住宅地下車庫入口 主入口 辦公樓 城市廣場 中心商業廣場 行政廣場 主題花園 住宅 主力店 住宅停車處 中央花園 ( 休閒 /娛樂中心 ) 主題花園 住宅 下沉綠化 連接廣場 住宅 下沉綠化 住宅 主題花園 住宅 全天侯走廊 往七寶老街 住宅 住宅 下沉綠化 住宅 34
  • 35. Project Monitoring - Beijing Yintai Centre Beijing Yintai Centre is one of the the biggest mix development in Beijing with a total GFA of over half a million sq m. It is one of the landmark in Beijing, including a tower of hotel, apartment and office tower. We were appointed by Hypo International as an independent project auditor for the project monitoring of one of the 40 storeys (90,000 sq m) West Tower. Our specific tasks included: • Monitor and assess the project progress • Projection of completion date • Review of construction budget • Verification of progress payment to contractor • Review current status of leasing • Review development consents obtained and applied for We advised our Client on the potential delay of the construction work happened on site and associated risks revealed from the progress during our inspection. In such a way, our Client as an investor, have had first-hand information of the site progress and prepared contingency plan to minimize possible risks and loss in advance. 35
  • 36. Facilities Management of AVAYA Properties in Hong Kong and China Newmark Knight Frank Global Management service (NKFGMS) was appointed by AVAYA to provide global facilities management for AVAYA. For the Greater China Region Knight Frank oversee the provision of our service in Hong Kong, Beijing, Shanghai, Dalian, Chengdu and Guangzhou. A bespoke centralized communication system has been developed to enhances the quality of facilities management. Through Knight Frank’s global offices support, this enhanced system can make efficient use of resources, to provide a standard management methodology and unique communication system between AVAYA’s staff and Newmark Knight Frank’s Facilities Managers in the worldwide. NKFGMS Service include: “Our Objective, therefore, is to be §         develop and implement a facility management program, “Gatekeepers” of the real estate we are §         establish and maintain a good working relationship with Company’s landlords, entrusted with. We are not caretakers, §         provide the highest level of customer service, we are responsible to pro-actively §         minimize Company costs and expenses, manage the facilities and provide §         identify opportunities for improvement, accurate, timely information, and identify §         increase service levels, methods and changes to improve §         improve facility management strategies, operations, drive out costs, and provide a §         and manage potential optimization of space and services healthy, safe and productive environment.“ 36
  • 37. Our Experience with City of Dreams City of Dreams is an integrated resort being developed on the Cotai Operators Handbook – To compliment the Fit-Out Guide we have Strip in Macau and at US$2.5B represents the second largest produced a Operators Handbook to assist Retailers with services, investment on the strip. management, safety and other information about the development and Macao to allow them to successfully launch and operate their The project includes a 420,000 sq ft casino and three high end businesses. hotels and luxury serviced apartments with a combined total of over 2,400 rooms as well as an entertainment venue hosting permanent Service Charge Report – We have produced an in depth analysis of staged shows. The retail component includes around 300,000 sq ft net of up market boutique retailing and fine dining restaurants. We both OPEX and CAPEX forecasts to allow us to recommend to the client are appointed to provide our services for the following projects for a Service Fee and other costs to charge retailers upon opening in 2009. the Retail and Food & Beverage Mall of the Development. Our report uses a number of prudent assumptions enabling our client to have a defensible report to assist with negotiations with potential Fit Out Guide – Our team has produced a comprehensive, colour operators. Our report includes recommendations on staffing, coded, user friendly and compliant guide to assist a diverse range of maintenance, cleaning and operating costs and as well as capital Retailers to Fit-Out their retail units efficiently, safely, whilst adhering expenditure figures forecasted over 10 years. to the own design concept in accordance to international building and local government codes and ordinances. 37
  • 38. Project Monitoring in Bangkok, Thailand The Wellcome Trust is the world's second largest medical charitable institution with net assets of £15.1 billion ($30.2 billion). The overall mission of the trust is quot;to foster and promote research with the aim of improving human and animal healthquot;, and in addition to funding biomedical research it supports the public understanding of science. Knight Frank provides project monitoring service for one of the Trusts projects – Mahidol-Oxford Tropical Medicine Research Unit (MORU) at 420/6 Rajvithi Road Bangkok, Thailand. Our work includes:  Monitor the construction of an office floor and two floors of Laboratories including a secure a Bio Safety Level 3 (BSL 3) Lab, in Bangkok, Thailand  Monthly inspections, to report on progress, budget and quality  Detailed monthly reports were forwarded to client  Final report contained a number of recommendations to be implemented in future projects in developing economies similar to Thailand 38
  • 39. Insurance Valuation – Tsing Sha Control Area The whole Tsing Sha Control Area covers 13.6km of road network linking Sha Tin and Tsing Yi. Knight Frank was appointed by Transport Infrastructure Management Ltd to provide insurance valuation on building, structure, plant and equipment for the following portion in Tsing Sha Control Area: 1. Tai Wai Enclosed Section 2. Sha Tin Heights Tunnel 3. Toll Plaza 4. Sha Tin Administration Building 5. Eagle’s Nest Tunnel 6. Lai Chi Kok Viaduct 7. Ngong Shuen Chau Viaduct 8. Ventilation Building 9. Portal Buildings 10. Connecting interchanges, slip roads and accesses 11. Control Point located along the route use for traffic control 1.Plant and equipment we valued include power supply system, tunnel ventilation, building services, lighting, Central Monitoring and Control System (CMCS), CCTV system, communication system, Traffic Control and Surveillance System (TCSS), Toll Collection System (TCS), Ticket Scanning System, Speed Detection Equipment, Global Positioning System and Image Monitoring System, fire protection system and water supply. 1.Our services aimed to provide Client an reinstatement with new cost for insurance purpose. Type of properties we valued include buildings and also infrastructures like Tsing Sha Control Area in this case. 39
  • 40. Project Management of Coastline Villa Renovation Coastline Villa consists of 23 blocks of low rise development with a total of 230 units. Knight Frank was appointed by Discovery Bay Services Management as Project Manager to drive the whole renovation process. We conducted condition Surveys and addressed the problems in the building and proposed corresponding repair works. Tender documents were drafted afterward and invited tenderers to bid. Knight Frank act as an advisor to Client and analyze the returned tender. During the construction stage, we closely monitored the work in order to be completed on time and up to a good standard of workmanship. Every payments submitted by contractor were verified and certificate of payments were issued to Client for payments. Scope of Coastline Villa Renovation includes: • External wall patch repair • Internal common areas renovation • G/F lift lobby enhancement • Repair of uPVC windows • Enhancement of occupational safety facilities in the development 40
  • 41. 146 & 148 Argyle Street, Kowloon We have been appointed by Sky Treasure Ltd to apply for Lease Modification to relax the restrictions on the number of storeys and building height under the existing land grant conditions governing the lot to enable a redevelopment under the parameters stipulated under the latest Outline Zoning Plan. The lease modification enabled the plot ratio is increased from 4 to 5. Our challenges is to secure a fair premium assessment in a volatile market situation. Knight Frank is also appointed as Project Manager to oversee the redevelopment which will provide over 120,000 sq ft of luxury flats. The project is targeted for completion in 2012. 41
  • 42. Cyberport, Pokfulam, Hong Kong We have been appointed by Pacific Century Premium Developments Limited to apply for the Certificate of Compliance (CC) for the entire Cyberport development comprising 4 million sq ft of residential space, 1.8 million sq ft of retail and office space and a 173 rooms hotel. The development spanned over 8 years and responsible for coordinating the building plan approval process to enable the luxury domestic units can be completed on time and delivered to the purchasers. We worked with a multi discipline team of planner, architect, landscape architect, engineers and the CC was issued in late 2008 which marked the full completion of the largest private participation project in recent years. Knight Frank also appointed for building consultancy service in applying clubhouse license from Home Affairs Department(HAD). Our building professional directed the whole process and take care of every requirements that HAD requires for the clubhouse license. 42
  • 43. Selection of some of the major clients from current and previous projects 43
  • 44. Some of our other clients 44
  • 45. Our clients - continued                                                                                                                                45
  • 46. Clients - REIT’S ( 房地產投資信託 ) Advised on more the following REITs listed in Singapore and Hong Kong.
  • 47. China Clients 3M Offices 1,700 CYTEC INDUSTRIES Offices 660 KODAK R & D 200 MOTOROLA -CHENGDU Offices 800 AKZO NOBEL Offices 2,202 DELL COMPUTER Offices 344 KODAK R & D 200 MOTOROLA -WUHAN Offices 750 AKZO NOBEL Offices 446 DFID (BRITISH EMBASSY) Offices 1,250 KODAK R & D 200 MOTOROLA-CHENGDU Offices 6,000 ALCATEL Industrial 3,000 DRESDNER BANK Offices 1,200 KPMG Offices 2,694 MOTOROLA-JINAN Offices 750 ALCATEL Offices 1,400 DRESDNER BANK Offices 1,700 KPMG Offices 399 MOTOROLA-NANJING Offices 700 ALCATEL Offices 5,574 EACHNET.COM Offices 2,000 KPMG Offices 4,998 MOTOROLA-SHANGHAI Offices 3,000 APC Offices 1,300 EUROPEAN UNION Offices 1,250 KPMG Offices 6,600 NEWMARGIN Offices 799 AT KEARNEY (PH. I & II) Offices 300 EUROPEAN UNION Residential 350 KVAERNER Offices 600 ROLEX Offices 800 BAKER & MCKENZIE Offices 929 FRENCH SCHOOL Education 2,500 LOUIS DREYFUS Offices 860 ROEDL & PARTNER Offices 900 BAYER Offices 5,203 FUJITSU Offices 1,347 MANULIFE Offices 1,300 SASOL Offices 1,200 BRITISH EMBASSY Residential VARIOUS GEDAS Offices 600 MANULIFE Offices 2,202 SOHU.COM Offices 13,000 CANADIAN EMBASSY Offices 3,500 GENERAL MOTORS Offices 4,600 MICROSOFT Offices 2,000 SOLVAY Offices 700 CISCO Offices 2,300 HSBC Offices 2,000 MOTORALA-CHENGDU Offices 5,998 WICRESOFT Offices 1,347 CITIBANK Residential 300 IMS (FACTORY) Industrial 3,500 MOTORLA-NANJING Offices 5,992 WICRESOFT Offices 1,347 CITYBANK Offices 2,000 INGERSOLL RAND Offices 3,800 MOTOROLA –BEIJING Offices 1,350 WICRESOFT Offices 2.044 CLIFFORD CHANCE Offices 880 KING& WOOD Offices 5,000 MOTOROLA -CHENGDU Offices 1,500 WINTERTHUR Offices 1,500
  • 48. China Clients continue CLIENT FACILITY CLIENT FACILITY AREA, M2 AREA, M2 Kodak Motorola-Shanghai Offices R&D 200 3,000 Kodak Motorola-Chengdu Offices R&D 200 6,000 Kodak Motorla-Nanjing Offices R&D 200 5,992 KPMG Offices Motorala-Chengdu Offices 4,998 5,998 KPMG Offices NewMargin Offices 399 799 KPMG Offices Roedl & Partner Offices 6,000 900 KPMG Offices ROLEX Offices 2,694 800 Kvaerner Offices SASOL Offices 700 1,000 King& Wood Offices SPX Offices 5,000 3,500 Louis Dreyfus Offices Sohu.com Offices 860 13,000 Manulife Offices Solvay Offices 2,202 700 Manulife Offices Wacker Offices 1,300 1,500 Microsoft Offices Winterthur Offices 2,000 1,500 Motorola –Beijing Offices Wicresoft Offices 1,350 2.044 Motorola -Chengdu Offices Wicresoft Offices 800 1,347 Motorola -Chengdu Offices 1,500 Motorola-Nanjing Offices 700 Motorola -Wuhan Offices 750 Motorola-Jinan Offices 750
  • 49. Profile Published Articles Conferences speaking 49
  • 50. Resume Photo image 1.88”(W) x 1.84(H) David Chan MSc HKIA RIBA MCIOB NFPA SFPE David Chan is a partner of Compass Studio Ltd, He has over 20 years experience within the construction and property industry working for both the public and private sectors. David is UK educated with a Master Degree in Construction Management and Economics. He is a qualified architect, a chartered builder and a fire engineer. He has extensive experience in building design, fire engineering, construction, project and facilities and environmental management and worked on several major infrastructure and property development projects across the region. Prior to joining Compass, David was the Divisional Director of Knight Frank building consultancy and facility management division and worked on the listing of several major property REIT and sizable projects across China, Hong Kong and other parts of the Asia Pacific . Prior to that, David heads the Facilities Management for KCRC (MTR) Property Division responsible for the management of over 10 billion of property assets. 50