DALIA SPEAKS



                                                                                    In former articles ,I have elucidated on the       Owners from then on had to contractually
                                "Dalia Sadany ASK Magazine's design                 disciplines of all team players in the process     engage the services of an architect to
                                                                                    of constructing your dream home such as            perform design services and a contractor
                                                                                    The Architect , The Interior Designer, The         to perform construction services resulting
                                consultant, Chief Designer & Founder of Dezines
                                                                                    Landscaper as well as The Contractor in            in what is commonly known today as the
                                                                                    all his various practices .I have highlighted      Design-Bid-Build project delivery method.
                                Architecture & Interiors, Managing Director &
                                                                                    the definition , the responsibility and the        With it the specialization of services
                                Partner of Decon Contracting as well as the
                                                                                    job expectation of each one of the eminent         increased and new professions emerged
                                                                                    practitioners. A clarification was also            like interior designers, interior decorators,
                                creator of the new furniture brand GUSH is
                                                                                    presented on the vital factors necessary           finishing contractors, landscape architects,
                                                                                    to be fulfilled in choosing the appropriate        landscape contractors, etc.
                                dwelling into the world of Architecture, Interior
                                                                       "            professional, the most successful
                                Design landscaping ,and Contracting.
                                                                                    methodology in dealing with them and               The late 20th century witnessed renewed
                                                                                    broad rules of calculating their fees.             interest in reviving the Masterbuilder
                                                                                                                                       method to address some of the flaws in
                                                                                    We progressed In the previous article about        Design-Bid-Build. As a result, a modern
                                                                                    the legendary profession of the ancient            version of the Masterbuilder emerged
                                                                                    Masterbuilder and historical developments          whereby an integrated team of design and
                                                                                    through the ages leading to the emergence          contracting professionals provide both
Picture credit by Ahmed Mleeg




                                                                                    of the architect and contractor as two             design and construction services under one
                                                                                    distinct professions, as opposed to one            contract in what is commonly known today
                                                                                    eminent, capable individual. The rationale         as the Design-Build project delivery method.
                                                                                    that derived the necessity to dedicate that
                                                                                    last article to the mythical Masterbuilder         Throughout my articles I have always
                                                                                    was the progressive will to explain to             reiterated “Use Pros to do a Pros Job”.
                                                                                                                                       Building a new house 150 years ago the            contractor to perform all the necessary
                                                                                    you the two means of construction
                                                                                                                                       decision was simple – hire a Masterbuilder.       design and contracting services till
                                                                                    methodologies of Design-Bid -build known
                                                                                                                                       Today the same Owner has several options          project delivery. In this context, the
                                                                                    as DBB and Design and Build known
                                                                                                                                       to choose from.                                   full service designer may employ or
                                                                                    as DB. But before diving deep into this
                                                                                                                                                                                         subcontract certain design specialists.
                                                                                    controversial topic , let's recap the historical
                                                                                                                                                                                         Likewise the full service contractor may
                                                                                    development through the ages leading to
                                                                                                                                                                                         employ or subcontract certain contracting
                                                                                    reemergence of a profession where the
                                                                                                                                       Which Pros to Hire?
                                                                                                                                       1. Hire the Maximum Pros Needed: In this          specialists. Contractually this means two
                                                                                    architect and the contractor would be a sole
                                                                                                                                          Option shown in Diagram-1, the Owner           Design and Construction contracts till
                                                                                    entity known as Masterbuilder but applied
                                                                                                                                          hires a specialized design pro and a           project delivery.
                                                                                    practically as a singular unit that applies
                                                                                                                                          specialized contracting pro at every stage
                                                                                    today the method of DB.                                                                            3. Hire One Pro: In this Option shown in
                                                                                                                                          of the home building process thereby using
                                                                                                                                          the maximum pros needed. Contractually         diagram-3, the Owner hires one entity
                                                                                                                                          this means several sequential Design-Bid-      (or an integrated team of designers and
                                                                                    In ancient times well into the 19th century                                                          contractors) to perform all design and
                                                                                                                                          Build contracts till project delivery.
                                                                                    HISTORY & TRENDS
                                                                                    the Masterbuilder worked with the                                                                    contracting services required till project
                                                                                    project Owner providing both design and            2. Hire Two Pros: In this Option shown            completion. Contractually this means
                                                                                    construction as one seamless service.                 in Diagram-2, the Owner hires one full         one Design-Build contract till project
                                                                                    To perform one without the other was                  service designer and one full service          delivery.
                                                                                    unheard. Although some craftsmen like
                                                                                    Michel Angelo took on separate design
                                                                                    contracts and others like Leon Battista
                                                                                    Alberti (Italian Architect and Author) wrote
                                                                                    about establishing the art of architecture
                                                                                    as a profession distinct from engineering
                                                                                    and construction, it wasn’t till the Industrial
                                                                                    Revolution that the separation was made
                                                                                    possible. The reasons for this included an
                                                                                    increased demand for design expertise as
                                                                                    well as the trend toward specialization and
                                                                                    division of labor. This was supported by the
                                                                                    emergence of professional societies such as
                                                                                    the American Institute of Architects (AIIA)
                                                                                    in 1857 as well as formation of architectural
                                                                                    colleges and passing of architectural
                                                                                    licensing laws in 1897. The separation was
                                                                                    made absolute in 1935 with the passage of
                                                                                    the Miller Act which required contractors
                                                                                    on federal projects exceeding a certain
                                                                                    amount to post performance and payment
                                                                                    bonds. The implication was that project



                                18   ASK OCTOBER 2012                                                                                                                                                                                 ASK OCTOBER 2012   19
DALIA SPEAKS

                                                                                                specifications before bids are solicited       contractor. Accordingly the designer
                                                                                                from pre-qualified bidders. In the design      is impartial and looks out for Owner’s
                                                                                                phase the designer would have spent            interest till project delivery.
                                                                                                months and sometimes up to a year with
                                                                                                the Owner defining project requirements      5.Easier to Bring in Own Subcontractor
                                                                                                (preferred style, needs, requirements,       The Owner is significantly involved
                                                                                                budget, etc) and incorporating it in the       throughout the building process.
                                                                                                design before the Owner was satisfied          Accordingly project Owners can bring
                                                                                                with final outcome. This means that there      in their preferred subcontractors to the
                                                                                                should be no room for uncertainty about        project with relative ease compared
                                                                                                what the Owner wants and what the              to the Design-Build method. However,
                                                                                                contractor is required to do.                  it is important to note that bringing in
                                                                                                                                               own subcontractor lengthens delivery
                                                                                              2.Competitive Bidding Lowers Cost                schedules and could jeopardize the
                                                                                              The construction contract is awarded by          flowing workmanship of all contractors
                                                                                                competitive bidding to the lowest bid.         hired under the general contractor.
                                                                                                First, the Owner pre-qualifies contractors
                                                                                                after going through a careful selection
                                                                                                process. The pre-qualified bidders are
                                                                                                                                             1. Owner Involved in Conflicts and Disputes
                                                                                                                                             Disadvantages of Design-Bid-Build

                                                                                                then motivated to give their lowest bid
                                                                                                                                             Responsibility for quality and project
                                                                                                because they know they are competing
                                                                                                                                                delivery is shared between designer and
                                                                                                with others and that price is the basis of
                                                                                                                                                contractor. Since design and construction
                                                                                                selection. Moreover since the project is
                                                                                                                                                of a new project is a complex undertaking
                                                                                                fully defined pre-qualified bidders don’t
                                                                                                                                                conflicts and disputes between the
                                                                                                have to increase their bid to allow for
                                                                                                                                                designer and contractor is not unusual.
                                                                                                contingencies.                                                                                 in back and forth between designer             • Joint venture or partnership between a
                                                                                                                                                “Finger pointing” is common occurrence
                                                                                                                                                with each blaming the other. One major         and contractor due to errors and                  design and contracting company
                                                                                              3.Relative Ease of Assuring Quality Control                                                      omissions in the design drawings and
Contractually Option-1 and Option-2 are                                                                                                         source of conflict is errors and omissions
                                                                                              During construction the awarded contractor                                                       material specifications as well as design      The first two forms are more common in
similar in that they are both Design-Bid-      The Owner sends out the complete set                                                             in the workshop drawings and material
                                                                                                strictly adheres to and follows the                                                                                                           residential type projects with the last with
                                               • Bid Phase:

Build formats with the difference only         of design drawings and specifications to                                                         specifications. The Owner is usually           alterations and change orders.
                                                                                                detailed workshop drawings and material                                                                                                       commercial projects.
being in the number of contracts the Owner     several pre-qualified contractors to present                                                     drawn into these conflicts and ends
                                                                                                specifications prepared by the designer.                                                     4. Costs Unknown Until Late in the Process
administers till project delivery. On the      bids awarding the contract to the lowest                                                         up paying the price of correcting the                                                         The critical aspect is that the Owner
                                                                                                Accordingly the designer can easily                                                          The designer prepares cost estimates as
other hand Option-3 is a Design-Build          bidder.                                                                                          situation.                                                                                    contracts with a single entity, offering a
                                                                                                control quality during site inspections                                                         design work progresses, typically when
format. Therefore having decided to work                                                                                                                                                                                                      single point of responsibility over design
                                                                                                by comparing what is required with                                                              the workshop drawings and material
with pros the first thing the prospective                                                                                                    2. No Constructability Input in Design                                                           and contracting till project delivery.
                                               Contractor builds the project in strict          what has been done. If the documented                                                           specifications are 100% complete. While
home Owner should do is decide which                                                                                                            Process                                                                                       This simple difference transforms the
                                                                                                requirements are not met, it is up to the
                                               •Build Phase:

method to use. Should he or she use            adherence to the set of design drawings                                                       The awarded contractor joins the project           this may give the Owner an indication,
                                               and material specifications under the            contractor to correct the work at their                                                         there is no cost certainty until the design   relationship between the designer and
Design-Bid-Build or Design-Build? And                                                                                                           team after completion of the design                                                           contractor in Design-Build format from
                                               supervision of the designer.                     own expense.                                                                                    phase is complete and construction bids
if Design-Bid-Build should he or she use                                                                                                        phase. By that time detailed workshop                                                         one based on one supervising the other
the maximum number of pros or two? To                                                                                                           drawings and material specifications            received. By that time costs may exceed
                                                                                              4. Designer Looks out for Owner’s Interest                                                        budget leading to design alterations and      (as in Design-Bid-Build) to one based on
answer these questions we first need to                                                       The designer is contracted by the Owner           are complete and sent out to pre-                                                             collaboration and teamwork resulting in
fully appreciate the differences between                                                                                                        qualified bidders. That means there is no       change orders.
                                               1.Project Fully Defined                           to design the project and supervise
                                               Advantages of Design-Bid-Build

                                                                                                                                                                                                                                              cost and time savings as well as better
both methods.                                  The project is fully defined with detailed        execution. There is no contractual             contractor input in the design process                                                        productivity.
                                                 workshop drawings and material                  relationship between the designer and          (costs, availability, methods, technology,
                                                                                                                                                etc) that could otherwise improve project    As mentioned earlier the Design-Build
                                                                                                                                                                                             What is Design-Build?

                                                                                                                                                design.                                      project delivery method is the modern
WHAT IS DESIGN-BID-BUILD?
Design-Bid-Build is the most orthodox                                                                                                                                                        version of the masterbuilder system - the
                                                                                                                                                                                                                                              The Design-Build Process

usable project delivery method. It is also                                                                                                   3. Slow Project Delivery                        oldest project delivery system in history.       A. Preliminary Design:
known as the traditional method despite                                                                                                                                                      As mentioned this version developed in
                                                                                                                                                                                                                                              • Design:

                                                                                                                                             Slow project delivery is one of the major                                                        Preliminary design prepared based on input
being around for only 150 years. In                                                                                                             drawbacks of this method. Design-Bid-        response to certain problems that emerged          from Owner with constructability input
this method the Owner enters into two                                                                                                           Build is a sequential process lengthened     over time in the use of the traditional            provided by contractor factored in the design
sequential contractual arrangements. The                                                                                                        by the bidding phase. Further the design     Design-Bid-Build method.                           to insure design fits and budget realistic.
first arrangement is between the Owner                                                                                                          phase could vary from a few months
and the designer and the second between                                                                                                         up to a year and sometimes more. In          In this method the Owner hires a Design-         B. Authorization to Proceed with Detailed
the Owner and contractor. In this structure                                                                                                     the construction phase time is wasted        Build entity to design and build the project       Design:
there is no contractual relationship between                                                                                                                                                 turnkey. Contractually this means one
the designer and contractor, and the owner                                                                                                                                                   single contract for both the design and          Once Owner is satisfied with outcome of
is the laison between both parties.                                                                                                                                                          contracting instead of one contract for           preliminary design the Owner authorizes
                                                                                                                                                                                             design and another for contracting as in          designer to start preparing detailed design.
The Design-Bid-Build Process                                                                                                                                                                 Design-Bid-Build.

This method involves three separate                                                                                                                                                          The Design-Build entity (or integrated           The construction phase commences as
                                                                                                                                                                                                                                              • Build:

sequential phases as follows:                                                                                                                                                                designer contractor team) can take on              portions of the detailed design become
                                                                                                                                                                                             several forms as follows:                          available. The contractor purchases
                                                                                                                                                                                                                                                materials and equipment and starts
Designer prepares a complete set of design                                                                                                                                                   • Single company with in-house capabilities        on the early construction work such
• Design Phase:

drawings and material specifications with                                                                                                                                                                                                       as plumbing, electrical work, air-
input from the Owner                                                                                                                                                                         • One company subcontracting the other
                                                                                                                                                                                                                                                conditioning, excavation, etc.


20    ASK OCTOBER 2012                                                                                                                                                                                                                                             ASK OCTOBER 2012        21
DALIA SPEAKS

                                                    can opt out with relative ease and go to       2. Subjective Contract Award
                                                    the Design-Bid-Build format if he desires.     Because the project not fully defined the
                                                    Moreover making alterations to design             Design-Build format cannot make use of
                                                    or material specifications during the             competitive bidding where bidders bid on
                                                    construction process can be done easily           the same design. In the Design-Bid-Build
                                                    compared to the Design-Bid-Build.                 method the designer’s contract making
                                                                                                      up 5-10% of project cost is awarded
                                                  4. Single Point of Contact & Responsibility         based on subjective criteria (reputation,
                                                  The Design-Build entity is responsible and          experience, etc) while the contractor’s
                                                     accountable for issues relating to quality,      contract making up 90-95% of total
                                                     cost and delivery schedule. Therefore            project cost based on objective criteria
                                                     the Design-Build entity is motivated to          (lowest bid). In comparison in Design-
                                                     deliver a successful project that meets the      Build the contract is award totally based
                                                     Owner’s expectations, budget and quality         on subjective criteria like reputation,
                                                     standards. Further having only one entity        experience, qualifications and best value.
                                                     to deal with makes for greater clarity
                                                     of communication and reduces risk of          3. Contracting Cost might be Slightly higher
                                                     misinterpretation of Owner requests.          Design-Build entity is responsible for all
                                                     Moreover Owner doesn’t waste time                aspects related to design and contracting
                                                     coordinating between several parties as          and since the project is not fully defined
                                                     in Design-Bid-Build.                             the Design-Build entity usually increases
                                                                                                      the costs on some items for contingency
                                                  5. Less Stressful To Administer                     purposes to cover unseen risks.
                                                  In Design-Build the Owner is involved in
                                                     the design process till satisfied with the    4. Designer Not Impartial                        The Design-Bid-Build method has its               • Do you need to move in to your house          • How many Design-Build projects have
                                                     final outcome and authorizes designer         As the designer and contractor are one           advantages with the main disadvantages being:       within 2 years?                                 they done together (a good team
                                                     to proceed with detailed drawings. The           entity, the Owner cannot rely on the                                                                                                              should have a track record of 5 projects
1. Time Savings
Advantages of Design-Build

                                                     Owner is not involved in the contracting         designer to be impartial and look out         • More stressful to administer                    • Do you have a busy life and haven’t the         minimum)
First by combining selection of both                 process and does not have to go site             for his interests during the construction     As mentioned earlier , the disadvantages of         time to be 100% involved?
   designer and a contractor in one step,            regularly. Further since the designer            process. Under Design-Bid-Build, the            the Design-Bid-Build method such as long                                                        • See portfolio and get into some details –
   Design-Build eliminates time lost                 and contractor are one entity there are          designer will conduct site inspections,         project delivery schedules, High risk of        • Are you doing this project as an                ask about the budget, cost overruns, work
   in the bidding process. Further this              no conflicts and disputes to resolve or          review bills of quantity and change orders,     cost overruns and exceeding budget and            investment?                                     orders and delivery schedules, etc (see if
   method allows the entity’s contractor             issues of coordinating between them as in        and assist in resolving disputes between        more stress to administer, these cons will                                                        anything doesn’t sound right)
   to start construction before the entire                                                                                                                                                            • Is the design you have in mind complex
                                                     Design-Bid-Build.                                Owner and contractor. To overcome this          be compounded if the Owner administers
   design is completed. Accordingly                                                                                                                                                                      requiring close coordination of design       • Try to contact Owners of previous projects
                                                                                                      risk some Owners employ their own               several Design-Bid-Build contracts in one
   there is a significant fast tracking           6. Better Quality                                                                                                                                      and construction expertise?                    and ask about their experience with them.
                                                                                                      adviser knowledgeable in construction,          project (as in Option-1). The project will
   due to overlapping of the design and           The Design-Build entity bears total                 increases costs and animosity that Design-      most likely take a lot longer to complete,      • Are you not familiar with the tedious
   construction phases which saves time.             responsibility for design quality                Build is intended to avoid.                     exceed budget by far and very stressful to        details of either design , construction and
   Moreover the collaborative project                and cannot shift errors in design or                                                             manage. Not to mentions the fees of hiring 7      their colleration and farnkly dont want to
                                                                                                                                                                                                                                                      That was an objective unbiased

   management between the entity’s                   construction defects to a third party.        5. Difficult to Use Own Subs                       different pros is very expensive. On the plus     be neck-deep into them?
                                                                                                                                                                                                                                                      thorough study of both formats, I

   designer and contractor means the                 For this purpose the entity’s designer        The Design-Build entity is responsible             side the Owner benefits from the maximum
                                                                                                                                                                                                                                                      personally have worked on both

   work can be done faster and with fewer            is greatly involved in managing the              for issues relating to quality, cost and        design and construction expertise he or she
                                                                                                                                                                                                                                                      methods over the years , as well as

   problems. The resulting time savings              construction process till project delivery.      delivery schedule. Some Owners, for             can get. Option-1 is probably more suited to
                                                                                                                                                                                                                                                      separate design and contracting

   translates into lower costs and Owner             Paying high attention to quality control         one reason or another, have preferred
                                                                                                                                                                                                      Tips: How to select Design-Build
                                                                                                                                                      a project Owner where:
                                                                                                                                                                                                      A lot of designers and contractors claim to
                                                                                                                                                                                                                                                      assignments in several endeavors

   could move in to his new home earlier.            and quality assurance is an important            subcontractors (carpenter, stonemason,
                                                                                                                                                                                                      entity?
                                                                                                                                                                                                      provide Design-Build turnkey solutions.
                                                                                                                                                                                                                                                      but as I am the first Egyptian female

                                                     feature of this method.                          etc) they want involved in the project. In    • Cost is not an issue
2. Budget Management                                                                                                                                                                                  How to know who is genuine or not:
                                                                                                                                                                                                                                                      Masterbuilder , and a genuine

                                                                                                      general the Design-Build format is not
The entity’s designer and contractor work                                                                                                           • Delivery schedule not important
                                                                                                                                                                                                                                                      advocate for the anti-segregation

                                                                                                      very flexible with regards to using subs
   together as an integrated team evaluating                                                                                                                                                          • Ask about the contract – must be one
                                                                                                      other than their own, but exceptions are
                                                                                                                                                                                                                                                      of both design and construction

   alternative designs, material specs and                                                                                                          • Has preference to use 2 or more pros in           point of responsibility for design and
                                                                                                      made under strict guidelines.
                                                                                                                                                                                                                                                      professions, with an accredited

   methods to tailor a solution that meets                                                                                                            different areas of specialization but in the      contracting
                                                                                                                                                                                                                                                      education and over 15 years of

   Owner’s design and budget requirements.                                                                                                            same field such as interior designer and
                                                                                                                                                                                                                                                      experience in these fields , that

   Accordingly the construction cost is                                                                                                               landscape designer                              • Meet both designer and contractor (see
                                                                                                                                                                                                                                                      expertise has resulted in a more

   known earlier on during the design                                                                                                                                                                   chemistry between them)
                                                                                                   Which Project Delivery Method                                                                                                                      broad perspective and knowledge

   process. Cost inputs are provided by                                                            There is no perfect project delivery
                                                                                                                                                                                                      • Ask about their history, experience and
                                                                                                   is better?                                                                                                                                         of the entire ,more coherent and

   the team’s contractor according to the                                                          method. There are some advantages and
                                                                                                                                                                                                        track record individually and together
                                                                                                                                                    Tips: How to decide which                                                                         less client stressful, Design and

   designer’s specs and the Owner takes “go                                                        disadvantages to both delivery methods.          Both Design-Bid-Build and Design-Build
                                                                                                                                                    method best suits your needs?                                                                     build process , with its obligations

   or no go” decisions early on. This ensures                                                      The project Owner has to appreciate the          formats are applied to all project types from
                                                                                                                                                                                                                                                      , hallmarks and taboos such as the

   that the Owner plays a key role in arriving                                                     differences before deciding which method         small apartments to large villas and for new
                                                                                                   better suits his needs.
                                                                                                                                                                                                                                                      necessity to keep the budgetary

   at final construction cost that meets his or                                                                                                     home construction and renovation. If you
                                                                                                                                                                                                                                                      constraints of the client as an utmost

   her budget. Consequently this reduces the                                                                                                        answer “Yes” to any of the following then
   risk of cost overruns due to fewer design      1. Limited Assurance of Quality Control          If a Project Owner requires one entity to
                                                                                                                                                                                                                                                      importance and that during the

                                                                                                                                                    Design-Build is more appropriate for you.
                                                  Disadvantages of Design-Build

   alterations later on.                          Because the project is not fully defined         be responsible for all aspects of the project
                                                                                                                                                                                                                                                      construction phase , the architectural

                                                     in detail (as in the Design-Bid-Build         from start to finish then Option-3, discussed    • Do you have a good idea of your
                                                                                                                                                                                                                                                      and design integrity must be

3. More Flexible                                     method) at the time of contract with          earlier, is the appropriate choice. However,       requirements (design and budget)?
                                                                                                                                                                                                                                                      maintained. These elements are the

In Design-Build the decision to proceed              the Design-Build entity the Owner may         if the Owner, for any reason, decides on
                                                                                                                                                                                                                                                      bible of a professional, capable DB

   with project is done before substantial           have limited basis to enforce the contract    Design-Bid-Build method he or she is faced       • Do you have a budget ceiling which
                                                                                                                                                                                                                                                      entity to ensure a successful dream

   design cost and with early knowledge of           and little control over the quality of        with two options – hire the maximum pros           is inflexible and need an early cost
                                                                                                                                                                                                                                                      project evolving to reality.

   final project cost. Therefore the Owner           construction work.                            (Option-1) or 2 pros (Option-2).                   commitment?
                                                                                                                                                                                                                                                                          You can reach me at my email
                                                                                                                                                                                                                                                                      daliaspeaks.ask@gmail.com


22     ASK OCTOBER 2012                                                                                                                                                                                                                                                   ASK OCTOBER 2012         23

Weitere ähnliche Inhalte

Mehr von Dalia Sadany Dezines

Contracting no more a male dominated industry
Contracting no more a male dominated industryContracting no more a male dominated industry
Contracting no more a male dominated industryDalia Sadany Dezines
 
A’ Design goes to Dezines … Again
A’ Design goes to Dezines … AgainA’ Design goes to Dezines … Again
A’ Design goes to Dezines … AgainDalia Sadany Dezines
 
Arch. Dalia Sadany … Makes Egypt Proud
Arch. Dalia Sadany … Makes Egypt ProudArch. Dalia Sadany … Makes Egypt Proud
Arch. Dalia Sadany … Makes Egypt ProudDalia Sadany Dezines
 
Dalia Sadany Placing Egypt on the International Map of Design
Dalia Sadany Placing Egypt on the International Map of DesignDalia Sadany Placing Egypt on the International Map of Design
Dalia Sadany Placing Egypt on the International Map of DesignDalia Sadany Dezines
 
The Woman in Construction Boots and Fendi Bag
The Woman in Construction Boots and Fendi Bag The Woman in Construction Boots and Fendi Bag
The Woman in Construction Boots and Fendi Bag Dalia Sadany Dezines
 
Egyptian Architect wins 3 Awards in 2013
Egyptian Architect wins 3 Awards in 2013Egyptian Architect wins 3 Awards in 2013
Egyptian Architect wins 3 Awards in 2013Dalia Sadany Dezines
 
Home Improvement Project - Room Designs
Home Improvement Project - Room Designs Home Improvement Project - Room Designs
Home Improvement Project - Room Designs Dalia Sadany Dezines
 

Mehr von Dalia Sadany Dezines (20)

Contracting no more a male dominated industry
Contracting no more a male dominated industryContracting no more a male dominated industry
Contracting no more a male dominated industry
 
A’ Design goes to Dezines … Again
A’ Design goes to Dezines … AgainA’ Design goes to Dezines … Again
A’ Design goes to Dezines … Again
 
Arch. Dalia Sadany … Makes Egypt Proud
Arch. Dalia Sadany … Makes Egypt ProudArch. Dalia Sadany … Makes Egypt Proud
Arch. Dalia Sadany … Makes Egypt Proud
 
Dalia Sadany Placing Egypt on the International Map of Design
Dalia Sadany Placing Egypt on the International Map of DesignDalia Sadany Placing Egypt on the International Map of Design
Dalia Sadany Placing Egypt on the International Map of Design
 
The Woman in Construction Boots and Fendi Bag
The Woman in Construction Boots and Fendi Bag The Woman in Construction Boots and Fendi Bag
The Woman in Construction Boots and Fendi Bag
 
Egyptian Architect wins 3 Awards in 2013
Egyptian Architect wins 3 Awards in 2013Egyptian Architect wins 3 Awards in 2013
Egyptian Architect wins 3 Awards in 2013
 
Dezines Interior Design portfolio
Dezines Interior Design portfolioDezines Interior Design portfolio
Dezines Interior Design portfolio
 
Winter Home Tips
Winter Home TipsWinter Home Tips
Winter Home Tips
 
Dalia Sadany Doing it All
Dalia Sadany Doing it All Dalia Sadany Doing it All
Dalia Sadany Doing it All
 
Samra interviews dalia
Samra interviews daliaSamra interviews dalia
Samra interviews dalia
 
Before & After Walls Design
Before & After Walls DesignBefore & After Walls Design
Before & After Walls Design
 
Before & After Counter Bar Design
Before & After Counter Bar DesignBefore & After Counter Bar Design
Before & After Counter Bar Design
 
Interior Design Ceilings Gallery
Interior Design Ceilings GalleryInterior Design Ceilings Gallery
Interior Design Ceilings Gallery
 
How to choose a contractor
How to choose a contractorHow to choose a contractor
How to choose a contractor
 
Home Improvement Project - Room Designs
Home Improvement Project - Room Designs Home Improvement Project - Room Designs
Home Improvement Project - Room Designs
 
The Modern MasterBuilder
The Modern MasterBuilderThe Modern MasterBuilder
The Modern MasterBuilder
 
Introducing Landscape Design
Introducing Landscape Design Introducing Landscape Design
Introducing Landscape Design
 
Introducing the Interior Designer
Introducing the Interior Designer Introducing the Interior Designer
Introducing the Interior Designer
 
About the Interior Designer
About the Interior Designer About the Interior Designer
About the Interior Designer
 
About the Contractor
About the Contractor About the Contractor
About the Contractor
 

Kürzlich hochgeladen

social pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajansocial pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajanpragatimahajan3
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...Sapna Thakur
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...fonyou31
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...PsychoTech Services
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpinRaunakKeshri1
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsTechSoup
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 

Kürzlich hochgeladen (20)

social pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajansocial pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajan
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
BAG TECHNIQUE Bag technique-a tool making use of public health bag through wh...
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
Ecosystem Interactions Class Discussion Presentation in Blue Green Lined Styl...
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
IGNOU MSCCFT and PGDCFT Exam Question Pattern: MCFT003 Counselling and Family...
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpin
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 

Design-Build vs Design-Bid-Build

  • 1. DALIA SPEAKS In former articles ,I have elucidated on the Owners from then on had to contractually "Dalia Sadany ASK Magazine's design disciplines of all team players in the process engage the services of an architect to of constructing your dream home such as perform design services and a contractor The Architect , The Interior Designer, The to perform construction services resulting consultant, Chief Designer & Founder of Dezines Landscaper as well as The Contractor in in what is commonly known today as the all his various practices .I have highlighted Design-Bid-Build project delivery method. Architecture & Interiors, Managing Director & the definition , the responsibility and the With it the specialization of services Partner of Decon Contracting as well as the job expectation of each one of the eminent increased and new professions emerged practitioners. A clarification was also like interior designers, interior decorators, creator of the new furniture brand GUSH is presented on the vital factors necessary finishing contractors, landscape architects, to be fulfilled in choosing the appropriate landscape contractors, etc. dwelling into the world of Architecture, Interior " professional, the most successful Design landscaping ,and Contracting. methodology in dealing with them and The late 20th century witnessed renewed broad rules of calculating their fees. interest in reviving the Masterbuilder method to address some of the flaws in We progressed In the previous article about Design-Bid-Build. As a result, a modern the legendary profession of the ancient version of the Masterbuilder emerged Masterbuilder and historical developments whereby an integrated team of design and through the ages leading to the emergence contracting professionals provide both Picture credit by Ahmed Mleeg of the architect and contractor as two design and construction services under one distinct professions, as opposed to one contract in what is commonly known today eminent, capable individual. The rationale as the Design-Build project delivery method. that derived the necessity to dedicate that last article to the mythical Masterbuilder Throughout my articles I have always was the progressive will to explain to reiterated “Use Pros to do a Pros Job”. Building a new house 150 years ago the contractor to perform all the necessary you the two means of construction decision was simple – hire a Masterbuilder. design and contracting services till methodologies of Design-Bid -build known Today the same Owner has several options project delivery. In this context, the as DBB and Design and Build known to choose from. full service designer may employ or as DB. But before diving deep into this subcontract certain design specialists. controversial topic , let's recap the historical Likewise the full service contractor may development through the ages leading to employ or subcontract certain contracting reemergence of a profession where the Which Pros to Hire? 1. Hire the Maximum Pros Needed: In this specialists. Contractually this means two architect and the contractor would be a sole Option shown in Diagram-1, the Owner Design and Construction contracts till entity known as Masterbuilder but applied hires a specialized design pro and a project delivery. practically as a singular unit that applies specialized contracting pro at every stage today the method of DB. 3. Hire One Pro: In this Option shown in of the home building process thereby using the maximum pros needed. Contractually diagram-3, the Owner hires one entity this means several sequential Design-Bid- (or an integrated team of designers and In ancient times well into the 19th century contractors) to perform all design and Build contracts till project delivery. HISTORY & TRENDS the Masterbuilder worked with the contracting services required till project project Owner providing both design and 2. Hire Two Pros: In this Option shown completion. Contractually this means construction as one seamless service. in Diagram-2, the Owner hires one full one Design-Build contract till project To perform one without the other was service designer and one full service delivery. unheard. Although some craftsmen like Michel Angelo took on separate design contracts and others like Leon Battista Alberti (Italian Architect and Author) wrote about establishing the art of architecture as a profession distinct from engineering and construction, it wasn’t till the Industrial Revolution that the separation was made possible. The reasons for this included an increased demand for design expertise as well as the trend toward specialization and division of labor. This was supported by the emergence of professional societies such as the American Institute of Architects (AIIA) in 1857 as well as formation of architectural colleges and passing of architectural licensing laws in 1897. The separation was made absolute in 1935 with the passage of the Miller Act which required contractors on federal projects exceeding a certain amount to post performance and payment bonds. The implication was that project 18 ASK OCTOBER 2012 ASK OCTOBER 2012 19
  • 2. DALIA SPEAKS specifications before bids are solicited contractor. Accordingly the designer from pre-qualified bidders. In the design is impartial and looks out for Owner’s phase the designer would have spent interest till project delivery. months and sometimes up to a year with the Owner defining project requirements 5.Easier to Bring in Own Subcontractor (preferred style, needs, requirements, The Owner is significantly involved budget, etc) and incorporating it in the throughout the building process. design before the Owner was satisfied Accordingly project Owners can bring with final outcome. This means that there in their preferred subcontractors to the should be no room for uncertainty about project with relative ease compared what the Owner wants and what the to the Design-Build method. However, contractor is required to do. it is important to note that bringing in own subcontractor lengthens delivery 2.Competitive Bidding Lowers Cost schedules and could jeopardize the The construction contract is awarded by flowing workmanship of all contractors competitive bidding to the lowest bid. hired under the general contractor. First, the Owner pre-qualifies contractors after going through a careful selection process. The pre-qualified bidders are 1. Owner Involved in Conflicts and Disputes Disadvantages of Design-Bid-Build then motivated to give their lowest bid Responsibility for quality and project because they know they are competing delivery is shared between designer and with others and that price is the basis of contractor. Since design and construction selection. Moreover since the project is of a new project is a complex undertaking fully defined pre-qualified bidders don’t conflicts and disputes between the have to increase their bid to allow for designer and contractor is not unusual. contingencies. in back and forth between designer • Joint venture or partnership between a “Finger pointing” is common occurrence with each blaming the other. One major and contractor due to errors and design and contracting company 3.Relative Ease of Assuring Quality Control omissions in the design drawings and Contractually Option-1 and Option-2 are source of conflict is errors and omissions During construction the awarded contractor material specifications as well as design The first two forms are more common in similar in that they are both Design-Bid- The Owner sends out the complete set in the workshop drawings and material strictly adheres to and follows the residential type projects with the last with • Bid Phase: Build formats with the difference only of design drawings and specifications to specifications. The Owner is usually alterations and change orders. detailed workshop drawings and material commercial projects. being in the number of contracts the Owner several pre-qualified contractors to present drawn into these conflicts and ends specifications prepared by the designer. 4. Costs Unknown Until Late in the Process administers till project delivery. On the bids awarding the contract to the lowest up paying the price of correcting the The critical aspect is that the Owner Accordingly the designer can easily The designer prepares cost estimates as other hand Option-3 is a Design-Build bidder. situation. contracts with a single entity, offering a control quality during site inspections design work progresses, typically when format. Therefore having decided to work single point of responsibility over design by comparing what is required with the workshop drawings and material with pros the first thing the prospective 2. No Constructability Input in Design and contracting till project delivery. Contractor builds the project in strict what has been done. If the documented specifications are 100% complete. While home Owner should do is decide which Process This simple difference transforms the requirements are not met, it is up to the •Build Phase: method to use. Should he or she use adherence to the set of design drawings The awarded contractor joins the project this may give the Owner an indication, and material specifications under the contractor to correct the work at their there is no cost certainty until the design relationship between the designer and Design-Bid-Build or Design-Build? And team after completion of the design contractor in Design-Build format from supervision of the designer. own expense. phase is complete and construction bids if Design-Bid-Build should he or she use phase. By that time detailed workshop one based on one supervising the other the maximum number of pros or two? To drawings and material specifications received. By that time costs may exceed 4. Designer Looks out for Owner’s Interest budget leading to design alterations and (as in Design-Bid-Build) to one based on answer these questions we first need to The designer is contracted by the Owner are complete and sent out to pre- collaboration and teamwork resulting in fully appreciate the differences between qualified bidders. That means there is no change orders. 1.Project Fully Defined to design the project and supervise Advantages of Design-Bid-Build cost and time savings as well as better both methods. The project is fully defined with detailed execution. There is no contractual contractor input in the design process productivity. workshop drawings and material relationship between the designer and (costs, availability, methods, technology, etc) that could otherwise improve project As mentioned earlier the Design-Build What is Design-Build? design. project delivery method is the modern WHAT IS DESIGN-BID-BUILD? Design-Bid-Build is the most orthodox version of the masterbuilder system - the The Design-Build Process usable project delivery method. It is also 3. Slow Project Delivery oldest project delivery system in history. A. Preliminary Design: known as the traditional method despite As mentioned this version developed in • Design: Slow project delivery is one of the major Preliminary design prepared based on input being around for only 150 years. In drawbacks of this method. Design-Bid- response to certain problems that emerged from Owner with constructability input this method the Owner enters into two Build is a sequential process lengthened over time in the use of the traditional provided by contractor factored in the design sequential contractual arrangements. The by the bidding phase. Further the design Design-Bid-Build method. to insure design fits and budget realistic. first arrangement is between the Owner phase could vary from a few months and the designer and the second between up to a year and sometimes more. In In this method the Owner hires a Design- B. Authorization to Proceed with Detailed the Owner and contractor. In this structure the construction phase time is wasted Build entity to design and build the project Design: there is no contractual relationship between turnkey. Contractually this means one the designer and contractor, and the owner single contract for both the design and Once Owner is satisfied with outcome of is the laison between both parties. contracting instead of one contract for preliminary design the Owner authorizes design and another for contracting as in designer to start preparing detailed design. The Design-Bid-Build Process Design-Bid-Build. This method involves three separate The Design-Build entity (or integrated The construction phase commences as • Build: sequential phases as follows: designer contractor team) can take on portions of the detailed design become several forms as follows: available. The contractor purchases materials and equipment and starts Designer prepares a complete set of design • Single company with in-house capabilities on the early construction work such • Design Phase: drawings and material specifications with as plumbing, electrical work, air- input from the Owner • One company subcontracting the other conditioning, excavation, etc. 20 ASK OCTOBER 2012 ASK OCTOBER 2012 21
  • 3. DALIA SPEAKS can opt out with relative ease and go to 2. Subjective Contract Award the Design-Bid-Build format if he desires. Because the project not fully defined the Moreover making alterations to design Design-Build format cannot make use of or material specifications during the competitive bidding where bidders bid on construction process can be done easily the same design. In the Design-Bid-Build compared to the Design-Bid-Build. method the designer’s contract making up 5-10% of project cost is awarded 4. Single Point of Contact & Responsibility based on subjective criteria (reputation, The Design-Build entity is responsible and experience, etc) while the contractor’s accountable for issues relating to quality, contract making up 90-95% of total cost and delivery schedule. Therefore project cost based on objective criteria the Design-Build entity is motivated to (lowest bid). In comparison in Design- deliver a successful project that meets the Build the contract is award totally based Owner’s expectations, budget and quality on subjective criteria like reputation, standards. Further having only one entity experience, qualifications and best value. to deal with makes for greater clarity of communication and reduces risk of 3. Contracting Cost might be Slightly higher misinterpretation of Owner requests. Design-Build entity is responsible for all Moreover Owner doesn’t waste time aspects related to design and contracting coordinating between several parties as and since the project is not fully defined in Design-Bid-Build. the Design-Build entity usually increases the costs on some items for contingency 5. Less Stressful To Administer purposes to cover unseen risks. In Design-Build the Owner is involved in the design process till satisfied with the 4. Designer Not Impartial The Design-Bid-Build method has its • Do you need to move in to your house • How many Design-Build projects have final outcome and authorizes designer As the designer and contractor are one advantages with the main disadvantages being: within 2 years? they done together (a good team to proceed with detailed drawings. The entity, the Owner cannot rely on the should have a track record of 5 projects 1. Time Savings Advantages of Design-Build Owner is not involved in the contracting designer to be impartial and look out • More stressful to administer • Do you have a busy life and haven’t the minimum) First by combining selection of both process and does not have to go site for his interests during the construction As mentioned earlier , the disadvantages of time to be 100% involved? designer and a contractor in one step, regularly. Further since the designer process. Under Design-Bid-Build, the the Design-Bid-Build method such as long • See portfolio and get into some details – Design-Build eliminates time lost and contractor are one entity there are designer will conduct site inspections, project delivery schedules, High risk of • Are you doing this project as an ask about the budget, cost overruns, work in the bidding process. Further this no conflicts and disputes to resolve or review bills of quantity and change orders, cost overruns and exceeding budget and investment? orders and delivery schedules, etc (see if method allows the entity’s contractor issues of coordinating between them as in and assist in resolving disputes between more stress to administer, these cons will anything doesn’t sound right) to start construction before the entire • Is the design you have in mind complex Design-Bid-Build. Owner and contractor. To overcome this be compounded if the Owner administers design is completed. Accordingly requiring close coordination of design • Try to contact Owners of previous projects risk some Owners employ their own several Design-Bid-Build contracts in one there is a significant fast tracking 6. Better Quality and construction expertise? and ask about their experience with them. adviser knowledgeable in construction, project (as in Option-1). The project will due to overlapping of the design and The Design-Build entity bears total increases costs and animosity that Design- most likely take a lot longer to complete, • Are you not familiar with the tedious construction phases which saves time. responsibility for design quality Build is intended to avoid. exceed budget by far and very stressful to details of either design , construction and Moreover the collaborative project and cannot shift errors in design or manage. Not to mentions the fees of hiring 7 their colleration and farnkly dont want to That was an objective unbiased management between the entity’s construction defects to a third party. 5. Difficult to Use Own Subs different pros is very expensive. On the plus be neck-deep into them? thorough study of both formats, I designer and contractor means the For this purpose the entity’s designer The Design-Build entity is responsible side the Owner benefits from the maximum personally have worked on both work can be done faster and with fewer is greatly involved in managing the for issues relating to quality, cost and design and construction expertise he or she methods over the years , as well as problems. The resulting time savings construction process till project delivery. delivery schedule. Some Owners, for can get. Option-1 is probably more suited to separate design and contracting translates into lower costs and Owner Paying high attention to quality control one reason or another, have preferred Tips: How to select Design-Build a project Owner where: A lot of designers and contractors claim to assignments in several endeavors could move in to his new home earlier. and quality assurance is an important subcontractors (carpenter, stonemason, entity? provide Design-Build turnkey solutions. but as I am the first Egyptian female feature of this method. etc) they want involved in the project. In • Cost is not an issue 2. Budget Management How to know who is genuine or not: Masterbuilder , and a genuine general the Design-Build format is not The entity’s designer and contractor work • Delivery schedule not important advocate for the anti-segregation very flexible with regards to using subs together as an integrated team evaluating • Ask about the contract – must be one other than their own, but exceptions are of both design and construction alternative designs, material specs and • Has preference to use 2 or more pros in point of responsibility for design and made under strict guidelines. professions, with an accredited methods to tailor a solution that meets different areas of specialization but in the contracting education and over 15 years of Owner’s design and budget requirements. same field such as interior designer and experience in these fields , that Accordingly the construction cost is landscape designer • Meet both designer and contractor (see expertise has resulted in a more known earlier on during the design chemistry between them) Which Project Delivery Method broad perspective and knowledge process. Cost inputs are provided by There is no perfect project delivery • Ask about their history, experience and is better? of the entire ,more coherent and the team’s contractor according to the method. There are some advantages and track record individually and together Tips: How to decide which less client stressful, Design and designer’s specs and the Owner takes “go disadvantages to both delivery methods. Both Design-Bid-Build and Design-Build method best suits your needs? build process , with its obligations or no go” decisions early on. This ensures The project Owner has to appreciate the formats are applied to all project types from , hallmarks and taboos such as the that the Owner plays a key role in arriving differences before deciding which method small apartments to large villas and for new better suits his needs. necessity to keep the budgetary at final construction cost that meets his or home construction and renovation. If you constraints of the client as an utmost her budget. Consequently this reduces the answer “Yes” to any of the following then risk of cost overruns due to fewer design 1. Limited Assurance of Quality Control If a Project Owner requires one entity to importance and that during the Design-Build is more appropriate for you. Disadvantages of Design-Build alterations later on. Because the project is not fully defined be responsible for all aspects of the project construction phase , the architectural in detail (as in the Design-Bid-Build from start to finish then Option-3, discussed • Do you have a good idea of your and design integrity must be 3. More Flexible method) at the time of contract with earlier, is the appropriate choice. However, requirements (design and budget)? maintained. These elements are the In Design-Build the decision to proceed the Design-Build entity the Owner may if the Owner, for any reason, decides on bible of a professional, capable DB with project is done before substantial have limited basis to enforce the contract Design-Bid-Build method he or she is faced • Do you have a budget ceiling which entity to ensure a successful dream design cost and with early knowledge of and little control over the quality of with two options – hire the maximum pros is inflexible and need an early cost project evolving to reality. final project cost. Therefore the Owner construction work. (Option-1) or 2 pros (Option-2). commitment? You can reach me at my email daliaspeaks.ask@gmail.com 22 ASK OCTOBER 2012 ASK OCTOBER 2012 23