Presentation to Green Economy
          Expo 2010

Environmental Impact Assessment
and Planning Legislation for Wind
             Farms
Agenda
•   About IWCM
•   Legislation
•   Planning System
•   Environment Impact Assessment
•   Natura 2000 Sites / Appropriate Assessment
•   2010 Planning Bill



                                                 2
About IWCM
• Irish Wind Energy Consultancy
• Planning, Advisory, Project Management and
  Engineering Services
• 10 Professional and 10 Support Staff




                                               3
Legislation
• European Community (Environmental Impact Assessment)
  Regulations, 1989 (SI No. 349 of 1989), amended in 1994 by
  (SI No. 93 of 1999)
• EU Environmental Impact Assessment (EIA) Directive
  97/11/EEC
• The Planning and Development Regulations, 2001 (SI 600 of
  2001), Schedule 5 Part 10. Section 3 (Energy Industry) (i) –
• Part 10 of the Planning and Development Act, 2000
  ENVIRONMENTAL IMPACT ASSESSMENT (EIA) under Section
  176, that the application be accompanied by an
  Environmental Impact Assessment.

                                                                 4
Irish Planning System

•   Local Authority
•   An Bord Pleanala
•   SID
•   Judicial Review



                             5
Typical Planning Timelines
• Lodgement
• Submission Period (5 weeks)
• Decision Due (8 weeks from lodgement)
• Further Information (6 months to respond)
• Notification of Decision (Grant / Refusal) (4
  weeks)
• 1st/3rd party Appeal to An Bord Pleanala (18
  weeks)
                                                  6
Requirement for an Environmental
       Impact Statement
• An EIS is mandatory for any development with
  more than 5 turbines or having a total output
  greater than 5 MW.
• Sub-Threshold typically 1 to 2 turbines
• Auto-production
• Planning Authority can request EIA for any
  Development

                                              7
Environmental Impact Assessment
• Scope
• Non Technical
  Summary
• Environmental
  Impact Statement
• EPA and WF Planning
  Guidelines


                              8
Existing Environment
•   Human Beings
•   Ecology
•   Ornithology
•   Soils and Water
•   Air
•   Landscape
•   Material Assets
•   Interaction of the Foregoing

                                    9
Proposed Development

•   Alternatives
•   Characteristics
•   Existence
•   Other Developments




                                10
EIA Process
• Assessment of Impacts
  – Significance
• Mitigation
  – Avoid
  – Reduce
  – Compensate
• Interaction of the Foregoing
• Design of Project Informed by EIA Process
                                              11
Public Access to Information
• Structure
• Presentation
• Public Access
• Non-Technical
  Summary
• Requirement
                                   12
Appropriate Assessment
• Natura 2000
• AA required within 15
  km from a Natura
  2000 site
• Precautionary
  Principle
• NI Statement
  included with the EIS

                               13
AA 4 Stages




              14
SAC and SPA’s in Ireland




                           15
2010 Planning Bill
  Moved to Committee Stage; May
  • Enactment of the Bill expected
    before Summer Recess
  • Significant Input and Debate
  • Defines Obligations for
    Planning Bodies
  • Statutory Guidelines for Wind
    Farm Applications

                                     16
2009 Planning and Development Bill

• Requirement for Substantial Works Removed but
    – Only One Extension Allowed
    – Need for Consistent Interpretation Remains
    – 8 Week Time Frame for Determination Diluted
• 10 Year Planning not Guaranteed for New
  Permissions
• Projects SID Threshold under Review
• Will Address EU Habitats and Birds Directives

                                                    17
Conclusions

• Irish Planning Process
• EIA Process
• Obligations of the Habitats Directive
• Appropriate Assessment
• 2010 Planning Bill




                                          18
IWCM Contact Details

• IWCM, Unit1 Cootehill Enterprise Centre,
  Cootehill, Co. Cavan
• Contact Details ck@iwcm.ie
• www.iwcm.ie
• Telephone 049 5555050


                                         19

More Related Content

What's hot

CIL: Evidence
CIL: EvidenceCIL: Evidence
CIL: EvidencePAS_Team
 
CIL: The fundamentals
CIL: The fundamentalsCIL: The fundamentals
CIL: The fundamentalsPAS_Team
 
Bristol Event Presentations
Bristol Event PresentationsBristol Event Presentations
Bristol Event PresentationsPAS_Team
 
Ip Payback From Investment In Landscape
Ip   Payback From Investment In LandscapeIp   Payback From Investment In Landscape
Ip Payback From Investment In Landscapeiplfp
 
Minor Alterations to the London Plan
Minor Alterations to the London PlanMinor Alterations to the London Plan
Minor Alterations to the London PlanPAS_Team
 
Place RESI 2014: Jaimie Ferguson, Turley Associates
Place RESI 2014: Jaimie Ferguson, Turley AssociatesPlace RESI 2014: Jaimie Ferguson, Turley Associates
Place RESI 2014: Jaimie Ferguson, Turley AssociatesPlace North West
 
Jim Curran, Head of Estates, HSE
Jim Curran, Head of Estates, HSEJim Curran, Head of Estates, HSE
Jim Curran, Head of Estates, HSEInvestnet
 
PAS - Unconventional Hydrocarbon Exploration Planning Workshop
PAS - Unconventional Hydrocarbon Exploration Planning WorkshopPAS - Unconventional Hydrocarbon Exploration Planning Workshop
PAS - Unconventional Hydrocarbon Exploration Planning WorkshopPAS_Team
 
Councillor briefing , Developer contributions - Cil, s106 obligations, Viabil...
Councillor briefing , Developer contributions - Cil, s106 obligations, Viabil...Councillor briefing , Developer contributions - Cil, s106 obligations, Viabil...
Councillor briefing , Developer contributions - Cil, s106 obligations, Viabil...PAS_Team
 
Public hearing presentation howard hartrey tif final 10.28.13
Public hearing presentation howard hartrey tif final 10.28.13Public hearing presentation howard hartrey tif final 10.28.13
Public hearing presentation howard hartrey tif final 10.28.13cityofevanston
 
Making CIL Work
Making CIL WorkMaking CIL Work
Making CIL WorkPAS_Team
 
CIL vs S106 vs S108
CIL vs S106 vs S108CIL vs S106 vs S108
CIL vs S106 vs S108PAS_Team
 
Housing Standards Review: DCLG Presentation
Housing Standards Review: DCLG PresentationHousing Standards Review: DCLG Presentation
Housing Standards Review: DCLG PresentationPAS_Team
 
Viability rate setting
Viability rate setting Viability rate setting
Viability rate setting PAS_Team
 
Anna Rose, Milton Keynes Council - Creating an environment for investment
Anna Rose, Milton Keynes Council - Creating an environment for investmentAnna Rose, Milton Keynes Council - Creating an environment for investment
Anna Rose, Milton Keynes Council - Creating an environment for investmentPAS_Team
 
Land & Environmental Claims Report
Land & Environmental Claims Report Land & Environmental Claims Report
Land & Environmental Claims Report Nickey Oosthuizen
 
Darren WIlding, DCLG - Section 106: What they are and where we are
Darren WIlding, DCLG - Section 106: What they are and where we areDarren WIlding, DCLG - Section 106: What they are and where we are
Darren WIlding, DCLG - Section 106: What they are and where we arePAS_Team
 
Welcome Presentation | Sue Roaf
Welcome Presentation | Sue RoafWelcome Presentation | Sue Roaf
Welcome Presentation | Sue Roaficarb
 

What's hot (20)

CIL: Evidence
CIL: EvidenceCIL: Evidence
CIL: Evidence
 
CIL: The fundamentals
CIL: The fundamentalsCIL: The fundamentals
CIL: The fundamentals
 
Bristol Event Presentations
Bristol Event PresentationsBristol Event Presentations
Bristol Event Presentations
 
Ip Payback From Investment In Landscape
Ip   Payback From Investment In LandscapeIp   Payback From Investment In Landscape
Ip Payback From Investment In Landscape
 
Minor Alterations to the London Plan
Minor Alterations to the London PlanMinor Alterations to the London Plan
Minor Alterations to the London Plan
 
Place RESI 2014: Jaimie Ferguson, Turley Associates
Place RESI 2014: Jaimie Ferguson, Turley AssociatesPlace RESI 2014: Jaimie Ferguson, Turley Associates
Place RESI 2014: Jaimie Ferguson, Turley Associates
 
Jim Curran, Head of Estates, HSE
Jim Curran, Head of Estates, HSEJim Curran, Head of Estates, HSE
Jim Curran, Head of Estates, HSE
 
PAS - Unconventional Hydrocarbon Exploration Planning Workshop
PAS - Unconventional Hydrocarbon Exploration Planning WorkshopPAS - Unconventional Hydrocarbon Exploration Planning Workshop
PAS - Unconventional Hydrocarbon Exploration Planning Workshop
 
Councillor briefing , Developer contributions - Cil, s106 obligations, Viabil...
Councillor briefing , Developer contributions - Cil, s106 obligations, Viabil...Councillor briefing , Developer contributions - Cil, s106 obligations, Viabil...
Councillor briefing , Developer contributions - Cil, s106 obligations, Viabil...
 
Public hearing presentation howard hartrey tif final 10.28.13
Public hearing presentation howard hartrey tif final 10.28.13Public hearing presentation howard hartrey tif final 10.28.13
Public hearing presentation howard hartrey tif final 10.28.13
 
Annexation Update
Annexation UpdateAnnexation Update
Annexation Update
 
Making CIL Work
Making CIL WorkMaking CIL Work
Making CIL Work
 
CIL vs S106 vs S108
CIL vs S106 vs S108CIL vs S106 vs S108
CIL vs S106 vs S108
 
Housing Standards Review: DCLG Presentation
Housing Standards Review: DCLG PresentationHousing Standards Review: DCLG Presentation
Housing Standards Review: DCLG Presentation
 
Viability rate setting
Viability rate setting Viability rate setting
Viability rate setting
 
Anna Rose, Milton Keynes Council - Creating an environment for investment
Anna Rose, Milton Keynes Council - Creating an environment for investmentAnna Rose, Milton Keynes Council - Creating an environment for investment
Anna Rose, Milton Keynes Council - Creating an environment for investment
 
Land & Environmental Claims Report
Land & Environmental Claims Report Land & Environmental Claims Report
Land & Environmental Claims Report
 
Darren WIlding, DCLG - Section 106: What they are and where we are
Darren WIlding, DCLG - Section 106: What they are and where we areDarren WIlding, DCLG - Section 106: What they are and where we are
Darren WIlding, DCLG - Section 106: What they are and where we are
 
Welcome Presentation | Sue Roaf
Welcome Presentation | Sue RoafWelcome Presentation | Sue Roaf
Welcome Presentation | Sue Roaf
 
Fail Better
Fail BetterFail Better
Fail Better
 

Viewers also liked

Viewers also liked (8)

Joe heron greenexpo
Joe heron greenexpoJoe heron greenexpo
Joe heron greenexpo
 
Dalkia green expo
Dalkia green expoDalkia green expo
Dalkia green expo
 
Brian britton greenexpo
Brian britton greenexpoBrian britton greenexpo
Brian britton greenexpo
 
Dell green_expo
Dell  green_expoDell  green_expo
Dell green_expo
 
Juice point
Juice pointJuice point
Juice point
 
Mc cannfitzgerald greenexpo
Mc cannfitzgerald greenexpoMc cannfitzgerald greenexpo
Mc cannfitzgerald greenexpo
 
Ibm green expo
Ibm green expoIbm green expo
Ibm green expo
 
Halo green expo
Halo green expoHalo green expo
Halo green expo
 

Similar to Iwcm green_expo

Juliet long, Environment Agency
Juliet long, Environment Agency   Juliet long, Environment Agency
Juliet long, Environment Agency IES / IAQM
 
Stormwater Monitoring - Newington Solid Waste Facility
Stormwater Monitoring - Newington Solid Waste FacilityStormwater Monitoring - Newington Solid Waste Facility
Stormwater Monitoring - Newington Solid Waste FacilityFairfax County
 
Oneia excess soils session, September 9, 2014
Oneia excess soils session, September 9, 2014Oneia excess soils session, September 9, 2014
Oneia excess soils session, September 9, 2014ONEIA
 
Environment Clearance Procedure-India
Environment Clearance Procedure-IndiaEnvironment Clearance Procedure-India
Environment Clearance Procedure-IndiaKezar Ali. Shah
 
Philip Nugent, IES/IBN Discussion meeting: Waste soils on development sites o...
Philip Nugent, IES/IBN Discussion meeting: Waste soils on development sites o...Philip Nugent, IES/IBN Discussion meeting: Waste soils on development sites o...
Philip Nugent, IES/IBN Discussion meeting: Waste soils on development sites o...IES / IAQM
 
Waste-to-energy plants - public private partnership Singapore
Waste-to-energy plants - public private partnership SingaporeWaste-to-energy plants - public private partnership Singapore
Waste-to-energy plants - public private partnership SingaporeZhou HE (贺舟)
 
Environmental Impact Assessment, Initial Environmental Examination
Environmental Impact Assessment, Initial Environmental ExaminationEnvironmental Impact Assessment, Initial Environmental Examination
Environmental Impact Assessment, Initial Environmental ExaminationNabin Lamichhane
 
2012 ceqa presentation for ce class
2012 ceqa presentation for ce class2012 ceqa presentation for ce class
2012 ceqa presentation for ce classCEQAplanner
 
3.-DENR-Compliances-for-Business-Operation.pdf
3.-DENR-Compliances-for-Business-Operation.pdf3.-DENR-Compliances-for-Business-Operation.pdf
3.-DENR-Compliances-for-Business-Operation.pdfAngelaLlauderSantos1
 
OPDC second revised draft Local Plan consultation - Transport and Old Oak North
OPDC second revised draft Local Plan consultation - Transport and Old Oak North OPDC second revised draft Local Plan consultation - Transport and Old Oak North
OPDC second revised draft Local Plan consultation - Transport and Old Oak North Alexandra Dobson
 
Construction Futures Wales - Boost your green performance 2016
Construction Futures Wales - Boost your green performance 2016Construction Futures Wales - Boost your green performance 2016
Construction Futures Wales - Boost your green performance 2016Rae Davies
 
1Introduction to Petroleum Engineering Prepared by Dr Mino
1Introduction to Petroleum Engineering Prepared by Dr Mino1Introduction to Petroleum Engineering Prepared by Dr Mino
1Introduction to Petroleum Engineering Prepared by Dr MinoAnastaciaShadelb
 
Programme Management challenges on the UK Governments Geological Disposal Fac...
Programme Management challenges on the UK Governments Geological Disposal Fac...Programme Management challenges on the UK Governments Geological Disposal Fac...
Programme Management challenges on the UK Governments Geological Disposal Fac...Association for Project Management
 
Environmental clearance of airports
Environmental clearance of airportsEnvironmental clearance of airports
Environmental clearance of airportsAbhishek Kumar Sinha
 
Bog Rewetting: A Farmer Discussion
Bog Rewetting: A Farmer DiscussionBog Rewetting: A Farmer Discussion
Bog Rewetting: A Farmer DiscussionIrishFarmers
 
Climate Adaptation Strategy for Built & Archaeological Heritage - Workshop 2
Climate Adaptation Strategy for Built & Archaeological Heritage - Workshop 2Climate Adaptation Strategy for Built & Archaeological Heritage - Workshop 2
Climate Adaptation Strategy for Built & Archaeological Heritage - Workshop 2Irish Green Building Council
 

Similar to Iwcm green_expo (20)

Juliet long, Environment Agency
Juliet long, Environment Agency   Juliet long, Environment Agency
Juliet long, Environment Agency
 
EPA H2020 SC5 Info Day: Sean Finlay, Director, Geoscience Ireland
 EPA H2020 SC5 Info Day: Sean Finlay, Director, Geoscience Ireland EPA H2020 SC5 Info Day: Sean Finlay, Director, Geoscience Ireland
EPA H2020 SC5 Info Day: Sean Finlay, Director, Geoscience Ireland
 
Stormwater Monitoring - Newington Solid Waste Facility
Stormwater Monitoring - Newington Solid Waste FacilityStormwater Monitoring - Newington Solid Waste Facility
Stormwater Monitoring - Newington Solid Waste Facility
 
Oneia excess soils session, September 9, 2014
Oneia excess soils session, September 9, 2014Oneia excess soils session, September 9, 2014
Oneia excess soils session, September 9, 2014
 
Ghg roundup ii_agriculture
Ghg roundup ii_agricultureGhg roundup ii_agriculture
Ghg roundup ii_agriculture
 
Environment Clearance Procedure-India
Environment Clearance Procedure-IndiaEnvironment Clearance Procedure-India
Environment Clearance Procedure-India
 
Philip Nugent, IES/IBN Discussion meeting: Waste soils on development sites o...
Philip Nugent, IES/IBN Discussion meeting: Waste soils on development sites o...Philip Nugent, IES/IBN Discussion meeting: Waste soils on development sites o...
Philip Nugent, IES/IBN Discussion meeting: Waste soils on development sites o...
 
Waste-to-energy plants - public private partnership Singapore
Waste-to-energy plants - public private partnership SingaporeWaste-to-energy plants - public private partnership Singapore
Waste-to-energy plants - public private partnership Singapore
 
ADBA Spring Regulatory Forum - May 2016
ADBA Spring Regulatory Forum - May 2016ADBA Spring Regulatory Forum - May 2016
ADBA Spring Regulatory Forum - May 2016
 
Environmental Impact Assessment, Initial Environmental Examination
Environmental Impact Assessment, Initial Environmental ExaminationEnvironmental Impact Assessment, Initial Environmental Examination
Environmental Impact Assessment, Initial Environmental Examination
 
2012 ceqa presentation for ce class
2012 ceqa presentation for ce class2012 ceqa presentation for ce class
2012 ceqa presentation for ce class
 
3.-DENR-Compliances-for-Business-Operation.pdf
3.-DENR-Compliances-for-Business-Operation.pdf3.-DENR-Compliances-for-Business-Operation.pdf
3.-DENR-Compliances-for-Business-Operation.pdf
 
OPDC second revised draft Local Plan consultation - Transport and Old Oak North
OPDC second revised draft Local Plan consultation - Transport and Old Oak North OPDC second revised draft Local Plan consultation - Transport and Old Oak North
OPDC second revised draft Local Plan consultation - Transport and Old Oak North
 
An update on the UK Government's CCS policy, Brian Allison, DECC - UKCCSRC St...
An update on the UK Government's CCS policy, Brian Allison, DECC - UKCCSRC St...An update on the UK Government's CCS policy, Brian Allison, DECC - UKCCSRC St...
An update on the UK Government's CCS policy, Brian Allison, DECC - UKCCSRC St...
 
Construction Futures Wales - Boost your green performance 2016
Construction Futures Wales - Boost your green performance 2016Construction Futures Wales - Boost your green performance 2016
Construction Futures Wales - Boost your green performance 2016
 
1Introduction to Petroleum Engineering Prepared by Dr Mino
1Introduction to Petroleum Engineering Prepared by Dr Mino1Introduction to Petroleum Engineering Prepared by Dr Mino
1Introduction to Petroleum Engineering Prepared by Dr Mino
 
Programme Management challenges on the UK Governments Geological Disposal Fac...
Programme Management challenges on the UK Governments Geological Disposal Fac...Programme Management challenges on the UK Governments Geological Disposal Fac...
Programme Management challenges on the UK Governments Geological Disposal Fac...
 
Environmental clearance of airports
Environmental clearance of airportsEnvironmental clearance of airports
Environmental clearance of airports
 
Bog Rewetting: A Farmer Discussion
Bog Rewetting: A Farmer DiscussionBog Rewetting: A Farmer Discussion
Bog Rewetting: A Farmer Discussion
 
Climate Adaptation Strategy for Built & Archaeological Heritage - Workshop 2
Climate Adaptation Strategy for Built & Archaeological Heritage - Workshop 2Climate Adaptation Strategy for Built & Archaeological Heritage - Workshop 2
Climate Adaptation Strategy for Built & Archaeological Heritage - Workshop 2
 

More from Damian Connon

European commission _greenexpo
European commission _greenexpoEuropean commission _greenexpo
European commission _greenexpoDamian Connon
 
Graduate careers ireland
Graduate careers irelandGraduate careers ireland
Graduate careers irelandDamian Connon
 
Burren greeneconomy 2010
Burren greeneconomy 2010Burren greeneconomy 2010
Burren greeneconomy 2010Damian Connon
 
Skillnets green.economy.may2010
Skillnets green.economy.may2010Skillnets green.economy.may2010
Skillnets green.economy.may2010Damian Connon
 
Ei starting a_greenbusiness
Ei starting a_greenbusinessEi starting a_greenbusiness
Ei starting a_greenbusinessDamian Connon
 
Green expo ogilvy 210510 final.pptm
Green expo ogilvy 210510 final.pptmGreen expo ogilvy 210510 final.pptm
Green expo ogilvy 210510 final.pptmDamian Connon
 
Arthur cox greenexpo
Arthur cox greenexpoArthur cox greenexpo
Arthur cox greenexpoDamian Connon
 
Paul mcternan greenexpo
Paul mcternan greenexpoPaul mcternan greenexpo
Paul mcternan greenexpoDamian Connon
 
Mircosoft green expo
Mircosoft green expoMircosoft green expo
Mircosoft green expoDamian Connon
 
Bank ofireland greenexpo
Bank ofireland greenexpoBank ofireland greenexpo
Bank ofireland greenexpoDamian Connon
 
Ecocem green economyexpopresentation 20may-ver2a
Ecocem green economyexpopresentation 20may-ver2aEcocem green economyexpopresentation 20may-ver2a
Ecocem green economyexpopresentation 20may-ver2aDamian Connon
 

More from Damian Connon (20)

Jj leahy expo
Jj leahy expoJj leahy expo
Jj leahy expo
 
4 front energy
4 front energy4 front energy
4 front energy
 
European commission _greenexpo
European commission _greenexpoEuropean commission _greenexpo
European commission _greenexpo
 
Camara
CamaraCamara
Camara
 
Cloughjordan
CloughjordanCloughjordan
Cloughjordan
 
Repak
RepakRepak
Repak
 
Graduate careers ireland
Graduate careers irelandGraduate careers ireland
Graduate careers ireland
 
Burren greeneconomy 2010
Burren greeneconomy 2010Burren greeneconomy 2010
Burren greeneconomy 2010
 
Skillnets green.economy.may2010
Skillnets green.economy.may2010Skillnets green.economy.may2010
Skillnets green.economy.may2010
 
Glenisk
GleniskGlenisk
Glenisk
 
Ei starting a_greenbusiness
Ei starting a_greenbusinessEi starting a_greenbusiness
Ei starting a_greenbusiness
 
Green expo ogilvy 210510 final.pptm
Green expo ogilvy 210510 final.pptmGreen expo ogilvy 210510 final.pptm
Green expo ogilvy 210510 final.pptm
 
Arthur cox greenexpo
Arthur cox greenexpoArthur cox greenexpo
Arthur cox greenexpo
 
Arup green expo
Arup green expoArup green expo
Arup green expo
 
Paul mcternan greenexpo
Paul mcternan greenexpoPaul mcternan greenexpo
Paul mcternan greenexpo
 
Mircosoft green expo
Mircosoft green expoMircosoft green expo
Mircosoft green expo
 
Cisco green expo
Cisco green expoCisco green expo
Cisco green expo
 
Bank ofireland greenexpo
Bank ofireland greenexpoBank ofireland greenexpo
Bank ofireland greenexpo
 
Ikea green expo
Ikea green expoIkea green expo
Ikea green expo
 
Ecocem green economyexpopresentation 20may-ver2a
Ecocem green economyexpopresentation 20may-ver2aEcocem green economyexpopresentation 20may-ver2a
Ecocem green economyexpopresentation 20may-ver2a
 

Recently uploaded

WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure servicePooja Nehwal
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Servicegiselly40
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024Results
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024The Digital Insurer
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonAnna Loughnan Colquhoun
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...apidays
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Drew Madelung
 
Developing An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilDeveloping An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilV3cube
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking MenDelhi Call girls
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking MenDelhi Call girls
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...Martijn de Jong
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Miguel Araújo
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024The Digital Insurer
 

Recently uploaded (20)

WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
Developing An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of BrazilDeveloping An App To Navigate The Roads of Brazil
Developing An App To Navigate The Roads of Brazil
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024
 

Iwcm green_expo

  • 1. Presentation to Green Economy Expo 2010 Environmental Impact Assessment and Planning Legislation for Wind Farms
  • 2. Agenda • About IWCM • Legislation • Planning System • Environment Impact Assessment • Natura 2000 Sites / Appropriate Assessment • 2010 Planning Bill 2
  • 3. About IWCM • Irish Wind Energy Consultancy • Planning, Advisory, Project Management and Engineering Services • 10 Professional and 10 Support Staff 3
  • 4. Legislation • European Community (Environmental Impact Assessment) Regulations, 1989 (SI No. 349 of 1989), amended in 1994 by (SI No. 93 of 1999) • EU Environmental Impact Assessment (EIA) Directive 97/11/EEC • The Planning and Development Regulations, 2001 (SI 600 of 2001), Schedule 5 Part 10. Section 3 (Energy Industry) (i) – • Part 10 of the Planning and Development Act, 2000 ENVIRONMENTAL IMPACT ASSESSMENT (EIA) under Section 176, that the application be accompanied by an Environmental Impact Assessment. 4
  • 5. Irish Planning System • Local Authority • An Bord Pleanala • SID • Judicial Review 5
  • 6. Typical Planning Timelines • Lodgement • Submission Period (5 weeks) • Decision Due (8 weeks from lodgement) • Further Information (6 months to respond) • Notification of Decision (Grant / Refusal) (4 weeks) • 1st/3rd party Appeal to An Bord Pleanala (18 weeks) 6
  • 7. Requirement for an Environmental Impact Statement • An EIS is mandatory for any development with more than 5 turbines or having a total output greater than 5 MW. • Sub-Threshold typically 1 to 2 turbines • Auto-production • Planning Authority can request EIA for any Development 7
  • 8. Environmental Impact Assessment • Scope • Non Technical Summary • Environmental Impact Statement • EPA and WF Planning Guidelines 8
  • 9. Existing Environment • Human Beings • Ecology • Ornithology • Soils and Water • Air • Landscape • Material Assets • Interaction of the Foregoing 9
  • 10. Proposed Development • Alternatives • Characteristics • Existence • Other Developments 10
  • 11. EIA Process • Assessment of Impacts – Significance • Mitigation – Avoid – Reduce – Compensate • Interaction of the Foregoing • Design of Project Informed by EIA Process 11
  • 12. Public Access to Information • Structure • Presentation • Public Access • Non-Technical Summary • Requirement 12
  • 13. Appropriate Assessment • Natura 2000 • AA required within 15 km from a Natura 2000 site • Precautionary Principle • NI Statement included with the EIS 13
  • 15. SAC and SPA’s in Ireland 15
  • 16. 2010 Planning Bill Moved to Committee Stage; May • Enactment of the Bill expected before Summer Recess • Significant Input and Debate • Defines Obligations for Planning Bodies • Statutory Guidelines for Wind Farm Applications 16
  • 17. 2009 Planning and Development Bill • Requirement for Substantial Works Removed but – Only One Extension Allowed – Need for Consistent Interpretation Remains – 8 Week Time Frame for Determination Diluted • 10 Year Planning not Guaranteed for New Permissions • Projects SID Threshold under Review • Will Address EU Habitats and Birds Directives 17
  • 18. Conclusions • Irish Planning Process • EIA Process • Obligations of the Habitats Directive • Appropriate Assessment • 2010 Planning Bill 18
  • 19. IWCM Contact Details • IWCM, Unit1 Cootehill Enterprise Centre, Cootehill, Co. Cavan • Contact Details ck@iwcm.ie • www.iwcm.ie • Telephone 049 5555050 19