SlideShare a Scribd company logo
1 of 17
EuropeAid

          ENPI
CROSS BORDER COOPERATION

  SEMINAR ON MONITORING
      METHODOLOGY

  1. EU Technical Cooperation and
      management for results

       BRUXELLES, 9 - 10 SEPTEMBER 2010
The ENPI CBC key elements
                                                      EuropeAid
• ENPI CBC programmes shall be to the common
  benefit of local and regional partners on both
  sides of the border
• The combination of EC funding from both ERDF and
  ENPI in one single instrument with one single
  programming process;
• The responsibility of programme partners for
  detailed programming and for implementation,
  through joint operational programmes
• The principle of shared management by a
  commonly agreed Managing Authority and
  other programme management structures
• The rules whereby geographical eligibility for
  activities under the programmes are defined
  (including for the involvement both of participating
  and of adjoining areas).
The EC is reforming how it works with              EuropeAid
Technical Cooperation
  As part of its commitment to implementing the
  Effectiveness of its operations, the EC has
  launched a strategy to reform its Technical
  Cooperation (TC) approach.
  The strategy is designed to achieve the following:
• Provide quality Technical Cooperation that
  supports country-led programmes, based on
  strong partner demand and which focuses on
  achieving sustainable development results; a
• Provide support through partner-owned
  implementation arrangements
                                                       3
Improving management effectiveness                   EuropeAid


• Increase Ownership (respect country leadership)
• Develop Harmonization (reduce number of separate
  missions, adopt common procedures)
• Respect Alignment (use country systems and
  procedures, avoid separate project management
  structures)
• Manage by Results (support results focus and use
  partners’ monitoring and reporting systems)
• Improve Mutual accountability (provide timely and
  transparent information on resources flows)


ENPI CBC programmes have most of these
 criteria embedded in their structure
                                                       4
Features of ENPI CBC Porgrammes                            EuropeAid




• The nature of the new ENPI CBC instrument in terms of
  having joint programming and joint financing with a single
  set of rules is a strength
• The programme development phase has been very positive
  with an important involvement by the partner countries from
  the beginning.
• The overall decision making body for each programme is the
  Joint Monitoring Committee (JMC) made up of
  representatives of each participating country.
• The responsibility for managing the programme rests with
  the Joint Managing Authority (JMA) and, where relevant, its
  executive body, the Joint Technical Secretariat (JTS) at
  programme and country levels.

                                                            5
Eight Guiding Principles                                             EuropeAid



                          1.Primary aim is
   8.Consider               Capacity          2.Demand led
     innovative options     Development         approach where
     for TC provision                           TC is not provided
                                                by default



7.Avoid use of                                   3.Strong result
  Parallel PIU                    EC               orientation
  promote effective            Technical
  Project                     Cooperation
  Management
  Arrangements

   6.Work through                             4.Country owned &
     harmonized and       5.Take account of     managed TC
     aligned actions        country             processes
                            requirements

                                                                      6
Managing by results                                         EuropeAid




 The commitment of the EC to manage for and by results
has developed as part of the establishment of the Activity-
Based Management (ABM) System adopted in 2000.

 Results-oriented design of TC implies rigorous
application of the logic of objective-oriented planning
techniques.

 It is not about filling formats and matrixes, but it is a
systematic way of thinking about specific results to be
achieved and how the partners can get there.

Partner countries and donors embrace the principles of        7


managing for results, starting with their own results-oriented
Results-oriented TC support                                EuropeAid

• Focus on the specific outcomes and performance that
  the partner wants to achieve
• Get the logical chain from results to TC deliverables
  right
• Specify all key activities and inputs from all sources, but
  maintain flexibility
• The quality of dialogue with partner countries
  (government and civil society representatives) is a key to
  establishing effective development cooperation policies and
  to their successful implementation.
• Partnership, ownership of development processes by the
  target population, and strengthening of institutional and
  administrative capacity to effectively manage change, are
  principles driving EC efforts for development.              8
Monitoring and evaluation of TC support                   EuropeAid


• The focus on partner ownership means that the partners
  will have to play a vital role in quality assurance during
  implementation, where monitoring is a key instrument.
• Monitoring the implementation of TC is primarily the
  responsibility of the partner country.
• The partner country institutions are responsible for
  accountability to domestic stakeholders.
• Clear links to outputs and expected outcomes: the full
  logical chain from TC-support to outputs and outcomes
  must be sound and results must be monitored.
• When the EC uses its own Results-Oriented Monitoring
  System, care should be taken to ensure that these
  systems also contribute to domestic accountability
                                                           9
Monitoring actions according to results                  EuropeAid




• Monitoring should take place at several levels consistent
  with the logical chain from impact/outcomes to all inputs
  into a programme.
• The focus should be on
  i) capacity enhancement and service delivery results;
  ii) Capacity Development processes and Technical
  Cooperation performance according to expected
  results.
• Mutual performance assessments between partner
  managers of Technical Assistance may be particularly
  useful as part of this monitoring.

                                                          10
What is monitoring?                                      EuropeAid


• Monitoring is a regular review to keep track of how a
  project is progressing in terms of resource use,
  implementation, delivery of results and the management of
  risks.
• Monitoring is the systematic and continual collection,
  analysis and use of management information to
  support effective decision-making.
• Regular reviews provide an opportunity to reflect on
  progress, agree on the content of progress reports and
  follow-up action required.
• Implementation should thus be seen as a continuous
  learning process whereby experience gained is reviewed
  and fed-back into ongoing planning.
                                                          11
Why monitor?                                       EuropeAid




• Critical element of good project management.
 It Supports:
• Informed and timely decision making by project
  managers/implementers
• Ongoing learning – what works and what doesn’t
• Transparency (information sharing, participation,
  communication)
• Accountability (to beneficiaries and funding
  agencies)
                                                      12
How to monitor?                                          EuropeAid




• While the purpose of monitoring may be clear, the need to
  carefully consider ‘how’ monitoring is best carried
  out/supported is decisive.

• Past experience indicates that donors have been too
  exclusively focused on their own information requirements
  (managing ‘contracts’ and focused on accounting for
  expenditure).

• However it appears that they have not been very effective
  in building local partner capacity to manage and monitor.

                                                          13
Implementation and monitoring: learning   EuropeAid
process




                                           14
Good practices - monitoring and reporting        EuropeAid




Good practices for effective project delivery
 include:

• Relying and building on partner systems
• Coordinating funder reporting and monitoring
  systems
• Simplifying funder reporting and monitoring
  systems
• Making information more transparent and
  available
• Rationalizing review missions                   15
Monitoring, Evaluation, Audit   EuropeAid




                                 16
Activity A – The impact of management for results   EuropeAid
on your task / responsabilities

  Objective: To identify practical implications
  for programme / project management of the
  application of the rule “Management for
  results”
  Small groups discussion :
• Definition of expected results for each ENPI CBC
  programme
• How to measure them
• Summarize on flip-chart paper.
• Feedback to plenary
• Issues and implications for your management
  tasks
                                                     17

More Related Content

What's hot

3a.1 Good practices in the formulation of NAPs and experience with accessing ...
3a.1 Good practices in the formulation of NAPs and experience with accessing ...3a.1 Good practices in the formulation of NAPs and experience with accessing ...
3a.1 Good practices in the formulation of NAPs and experience with accessing ...NAP Events
 
6. Andy Murray - embedding governance (lessons from maturity models) GOV011015
6. Andy Murray - embedding governance (lessons from maturity models) GOV0110156. Andy Murray - embedding governance (lessons from maturity models) GOV011015
6. Andy Murray - embedding governance (lessons from maturity models) GOV011015Association for Project Management
 
Presentation on Incorporating DRR issues into the WASH program of the Governm...
Presentation on Incorporating DRR issues into the WASH program of the Governm...Presentation on Incorporating DRR issues into the WASH program of the Governm...
Presentation on Incorporating DRR issues into the WASH program of the Governm...Shakeb Nabi
 
Programme Evaluation training slides Osvaldo Nestor Feinstein
Programme Evaluation training slides Osvaldo Nestor FeinsteinProgramme Evaluation training slides Osvaldo Nestor Feinstein
Programme Evaluation training slides Osvaldo Nestor Feinsteinstratejikyonetisim
 
PROJECT PLANNING AND MANAGEMENT
PROJECT PLANNING AND MANAGEMENTPROJECT PLANNING AND MANAGEMENT
PROJECT PLANNING AND MANAGEMENTAbraham Ncunge
 
Strengthening the global partnership monitoring framework
Strengthening the global partnership monitoring frameworkStrengthening the global partnership monitoring framework
Strengthening the global partnership monitoring frameworkDr Lendy Spires
 
Project Manager Interview Questions And Answers | PMP Certification Training ...
Project Manager Interview Questions And Answers | PMP Certification Training ...Project Manager Interview Questions And Answers | PMP Certification Training ...
Project Manager Interview Questions And Answers | PMP Certification Training ...Simplilearn
 
Opportunity analysis under strategic program management second edition
Opportunity analysis under strategic program management second editionOpportunity analysis under strategic program management second edition
Opportunity analysis under strategic program management second editionBob Prieto
 
UNOPS IW:LEARN Progress as of June 1, 2007
UNOPS IW:LEARN Progress as of June 1, 2007UNOPS IW:LEARN Progress as of June 1, 2007
UNOPS IW:LEARN Progress as of June 1, 2007Iwl Pcu
 

What's hot (12)

3a.1 Good practices in the formulation of NAPs and experience with accessing ...
3a.1 Good practices in the formulation of NAPs and experience with accessing ...3a.1 Good practices in the formulation of NAPs and experience with accessing ...
3a.1 Good practices in the formulation of NAPs and experience with accessing ...
 
6. Andy Murray - embedding governance (lessons from maturity models) GOV011015
6. Andy Murray - embedding governance (lessons from maturity models) GOV0110156. Andy Murray - embedding governance (lessons from maturity models) GOV011015
6. Andy Murray - embedding governance (lessons from maturity models) GOV011015
 
Presentation of the key findings from the thematic evaluation of ec support t...
Presentation of the key findings from the thematic evaluation of ec support t...Presentation of the key findings from the thematic evaluation of ec support t...
Presentation of the key findings from the thematic evaluation of ec support t...
 
Presentation on Incorporating DRR issues into the WASH program of the Governm...
Presentation on Incorporating DRR issues into the WASH program of the Governm...Presentation on Incorporating DRR issues into the WASH program of the Governm...
Presentation on Incorporating DRR issues into the WASH program of the Governm...
 
Improving Institutional Capability and Financial Viability to Sustain Transport
Improving Institutional Capability and Financial Viability to Sustain TransportImproving Institutional Capability and Financial Viability to Sustain Transport
Improving Institutional Capability and Financial Viability to Sustain Transport
 
Implementation
ImplementationImplementation
Implementation
 
Programme Evaluation training slides Osvaldo Nestor Feinstein
Programme Evaluation training slides Osvaldo Nestor FeinsteinProgramme Evaluation training slides Osvaldo Nestor Feinstein
Programme Evaluation training slides Osvaldo Nestor Feinstein
 
PROJECT PLANNING AND MANAGEMENT
PROJECT PLANNING AND MANAGEMENTPROJECT PLANNING AND MANAGEMENT
PROJECT PLANNING AND MANAGEMENT
 
Strengthening the global partnership monitoring framework
Strengthening the global partnership monitoring frameworkStrengthening the global partnership monitoring framework
Strengthening the global partnership monitoring framework
 
Project Manager Interview Questions And Answers | PMP Certification Training ...
Project Manager Interview Questions And Answers | PMP Certification Training ...Project Manager Interview Questions And Answers | PMP Certification Training ...
Project Manager Interview Questions And Answers | PMP Certification Training ...
 
Opportunity analysis under strategic program management second edition
Opportunity analysis under strategic program management second editionOpportunity analysis under strategic program management second edition
Opportunity analysis under strategic program management second edition
 
UNOPS IW:LEARN Progress as of June 1, 2007
UNOPS IW:LEARN Progress as of June 1, 2007UNOPS IW:LEARN Progress as of June 1, 2007
UNOPS IW:LEARN Progress as of June 1, 2007
 

Viewers also liked (8)

Module 8 rev
Module 8 revModule 8 rev
Module 8 rev
 
Aldata Choices Brochure
Aldata Choices BrochureAldata Choices Brochure
Aldata Choices Brochure
 
Aldata Category Insights
Aldata Category InsightsAldata Category Insights
Aldata Category Insights
 
Module 5 rev
Module 5 revModule 5 rev
Module 5 rev
 
Scientific program
Scientific programScientific program
Scientific program
 
Module 7rev
Module 7revModule 7rev
Module 7rev
 
Module 0rev
Module 0revModule 0rev
Module 0rev
 
Ace2012 invite
Ace2012 inviteAce2012 invite
Ace2012 invite
 

Similar to Module 1rev

Module 2rev
Module 2revModule 2rev
Module 2revcomesa15
 
M&E of development projects and role of imed dr taibur
M&E of development projects and role of imed dr taiburM&E of development projects and role of imed dr taibur
M&E of development projects and role of imed dr taiburDr. Md. Taibur Rahman
 
Developing targets and indicators for the Post-2020 Biodiversity Framework by...
Developing targets and indicators for the Post-2020 Biodiversity Framework by...Developing targets and indicators for the Post-2020 Biodiversity Framework by...
Developing targets and indicators for the Post-2020 Biodiversity Framework by...OECD Environment
 
North West branch Annual General Meeting & "Lessons on Governance"
North West branch Annual General Meeting & "Lessons on Governance"North West branch Annual General Meeting & "Lessons on Governance"
North West branch Annual General Meeting & "Lessons on Governance"Association for Project Management
 
E invoicing, presentation from charles bryant
E invoicing, presentation from charles bryantE invoicing, presentation from charles bryant
E invoicing, presentation from charles bryantFriso de Jong
 
PEG M&E tool: a tool for monitoring and reviewing Progress, Effectiveness & G...
PEG M&E tool: a tool for monitoring and reviewing Progress, Effectiveness & G...PEG M&E tool: a tool for monitoring and reviewing Progress, Effectiveness & G...
PEG M&E tool: a tool for monitoring and reviewing Progress, Effectiveness & G...Tariq A. Deen
 
PEG M&E tool: a tool for monitoring and reviewing Progress, Effectiveness & ...
 PEG M&E tool: a tool for monitoring and reviewing Progress, Effectiveness & ... PEG M&E tool: a tool for monitoring and reviewing Progress, Effectiveness & ...
PEG M&E tool: a tool for monitoring and reviewing Progress, Effectiveness & ...NAP Events
 
Program Office Background
Program Office BackgroundProgram Office Background
Program Office BackgroundGlen Alleman
 
Investment planning and public investment plans: Inssues and Best Practices
Investment planning and public investment plans: Inssues and Best PracticesInvestment planning and public investment plans: Inssues and Best Practices
Investment planning and public investment plans: Inssues and Best PracticesJean-Marc Lepain
 
Busan Partnership for Effective Development Cooperation -
Busan Partnership for Effective Development Cooperation - Busan Partnership for Effective Development Cooperation -
Busan Partnership for Effective Development Cooperation - NIDOS
 
OECD Infrastructure Governance Index - Ana-Maria Ruiz Rivadeneira, OECD
OECD Infrastructure Governance Index - Ana-Maria Ruiz Rivadeneira, OECDOECD Infrastructure Governance Index - Ana-Maria Ruiz Rivadeneira, OECD
OECD Infrastructure Governance Index - Ana-Maria Ruiz Rivadeneira, OECDOECD Governance
 
Innovative Business Development in a Shared Services Model through Project Po...
Innovative Business Development in a Shared Services Model through Project Po...Innovative Business Development in a Shared Services Model through Project Po...
Innovative Business Development in a Shared Services Model through Project Po...Changepoint
 
Partnership and sustainability WP8_gabriela grau_28 aug
Partnership and sustainability WP8_gabriela grau_28 augPartnership and sustainability WP8_gabriela grau_28 aug
Partnership and sustainability WP8_gabriela grau_28 augGlobal Water Partnership
 
Value Chains Analysis for Development (VCA4D)
Value Chains Analysis for Development (VCA4D)Value Chains Analysis for Development (VCA4D)
Value Chains Analysis for Development (VCA4D)Francois Stepman
 

Similar to Module 1rev (20)

Module 2rev
Module 2revModule 2rev
Module 2rev
 
M&E of development projects and role of imed dr taibur
M&E of development projects and role of imed dr taiburM&E of development projects and role of imed dr taibur
M&E of development projects and role of imed dr taibur
 
Project starting report iktimed 2 nov
Project starting report iktimed 2  novProject starting report iktimed 2  nov
Project starting report iktimed 2 nov
 
PPT - SIGMA-GIZ Academies - Topic 3 - Process optimisation.pdf
PPT - SIGMA-GIZ Academies - Topic 3 - Process optimisation.pdfPPT - SIGMA-GIZ Academies - Topic 3 - Process optimisation.pdf
PPT - SIGMA-GIZ Academies - Topic 3 - Process optimisation.pdf
 
Developing targets and indicators for the Post-2020 Biodiversity Framework by...
Developing targets and indicators for the Post-2020 Biodiversity Framework by...Developing targets and indicators for the Post-2020 Biodiversity Framework by...
Developing targets and indicators for the Post-2020 Biodiversity Framework by...
 
North West branch Annual General Meeting & "Lessons on Governance"
North West branch Annual General Meeting & "Lessons on Governance"North West branch Annual General Meeting & "Lessons on Governance"
North West branch Annual General Meeting & "Lessons on Governance"
 
E invoicing, presentation from charles bryant
E invoicing, presentation from charles bryantE invoicing, presentation from charles bryant
E invoicing, presentation from charles bryant
 
PEG M&E tool: a tool for monitoring and reviewing Progress, Effectiveness & G...
PEG M&E tool: a tool for monitoring and reviewing Progress, Effectiveness & G...PEG M&E tool: a tool for monitoring and reviewing Progress, Effectiveness & G...
PEG M&E tool: a tool for monitoring and reviewing Progress, Effectiveness & G...
 
PEG M&E tool: a tool for monitoring and reviewing Progress, Effectiveness & ...
 PEG M&E tool: a tool for monitoring and reviewing Progress, Effectiveness & ... PEG M&E tool: a tool for monitoring and reviewing Progress, Effectiveness & ...
PEG M&E tool: a tool for monitoring and reviewing Progress, Effectiveness & ...
 
Program Office Background
Program Office BackgroundProgram Office Background
Program Office Background
 
Analysis of Albanian monitoring and reporting requirements and practices, SIG...
Analysis of Albanian monitoring and reporting requirements and practices, SIG...Analysis of Albanian monitoring and reporting requirements and practices, SIG...
Analysis of Albanian monitoring and reporting requirements and practices, SIG...
 
Investment planning and public investment plans: Inssues and Best Practices
Investment planning and public investment plans: Inssues and Best PracticesInvestment planning and public investment plans: Inssues and Best Practices
Investment planning and public investment plans: Inssues and Best Practices
 
Busan Partnership for Effective Development Cooperation -
Busan Partnership for Effective Development Cooperation - Busan Partnership for Effective Development Cooperation -
Busan Partnership for Effective Development Cooperation -
 
OECD Infrastructure Governance Index - Ana-Maria Ruiz Rivadeneira, OECD
OECD Infrastructure Governance Index - Ana-Maria Ruiz Rivadeneira, OECDOECD Infrastructure Governance Index - Ana-Maria Ruiz Rivadeneira, OECD
OECD Infrastructure Governance Index - Ana-Maria Ruiz Rivadeneira, OECD
 
Presentation, Karen Hill, SIGMA, Paris, 4 December 2015_English
Presentation, Karen Hill, SIGMA, Paris, 4 December 2015_EnglishPresentation, Karen Hill, SIGMA, Paris, 4 December 2015_English
Presentation, Karen Hill, SIGMA, Paris, 4 December 2015_English
 
Innovative Business Development in a Shared Services Model through Project Po...
Innovative Business Development in a Shared Services Model through Project Po...Innovative Business Development in a Shared Services Model through Project Po...
Innovative Business Development in a Shared Services Model through Project Po...
 
Partnership and sustainability WP8_gabriela grau_28 aug
Partnership and sustainability WP8_gabriela grau_28 augPartnership and sustainability WP8_gabriela grau_28 aug
Partnership and sustainability WP8_gabriela grau_28 aug
 
OECD/DAC - Results Community October 2018 Workshop - Results approaches for t...
OECD/DAC - Results Community October 2018 Workshop - Results approaches for t...OECD/DAC - Results Community October 2018 Workshop - Results approaches for t...
OECD/DAC - Results Community October 2018 Workshop - Results approaches for t...
 
Value Chains Analysis for Development (VCA4D)
Value Chains Analysis for Development (VCA4D)Value Chains Analysis for Development (VCA4D)
Value Chains Analysis for Development (VCA4D)
 
ATCO-BaasKaar Roadmap to SAP Quality Award 2014
ATCO-BaasKaar Roadmap to SAP Quality Award 2014ATCO-BaasKaar Roadmap to SAP Quality Award 2014
ATCO-BaasKaar Roadmap to SAP Quality Award 2014
 

Recently uploaded

RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with CultureSeta Wicaksana
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...amitlee9823
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...allensay1
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptxnandhinijagan9867
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noidadlhescort
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1kcpayne
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableSeo
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLkapoorjyoti4444
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangaloreamitlee9823
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...daisycvs
 

Recently uploaded (20)

RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 

Module 1rev

  • 1. EuropeAid ENPI CROSS BORDER COOPERATION SEMINAR ON MONITORING METHODOLOGY 1. EU Technical Cooperation and management for results BRUXELLES, 9 - 10 SEPTEMBER 2010
  • 2. The ENPI CBC key elements EuropeAid • ENPI CBC programmes shall be to the common benefit of local and regional partners on both sides of the border • The combination of EC funding from both ERDF and ENPI in one single instrument with one single programming process; • The responsibility of programme partners for detailed programming and for implementation, through joint operational programmes • The principle of shared management by a commonly agreed Managing Authority and other programme management structures • The rules whereby geographical eligibility for activities under the programmes are defined (including for the involvement both of participating and of adjoining areas).
  • 3. The EC is reforming how it works with EuropeAid Technical Cooperation As part of its commitment to implementing the Effectiveness of its operations, the EC has launched a strategy to reform its Technical Cooperation (TC) approach. The strategy is designed to achieve the following: • Provide quality Technical Cooperation that supports country-led programmes, based on strong partner demand and which focuses on achieving sustainable development results; a • Provide support through partner-owned implementation arrangements 3
  • 4. Improving management effectiveness EuropeAid • Increase Ownership (respect country leadership) • Develop Harmonization (reduce number of separate missions, adopt common procedures) • Respect Alignment (use country systems and procedures, avoid separate project management structures) • Manage by Results (support results focus and use partners’ monitoring and reporting systems) • Improve Mutual accountability (provide timely and transparent information on resources flows) ENPI CBC programmes have most of these criteria embedded in their structure 4
  • 5. Features of ENPI CBC Porgrammes EuropeAid • The nature of the new ENPI CBC instrument in terms of having joint programming and joint financing with a single set of rules is a strength • The programme development phase has been very positive with an important involvement by the partner countries from the beginning. • The overall decision making body for each programme is the Joint Monitoring Committee (JMC) made up of representatives of each participating country. • The responsibility for managing the programme rests with the Joint Managing Authority (JMA) and, where relevant, its executive body, the Joint Technical Secretariat (JTS) at programme and country levels. 5
  • 6. Eight Guiding Principles EuropeAid 1.Primary aim is 8.Consider Capacity 2.Demand led innovative options Development approach where for TC provision TC is not provided by default 7.Avoid use of 3.Strong result Parallel PIU EC orientation promote effective Technical Project Cooperation Management Arrangements 6.Work through 4.Country owned & harmonized and 5.Take account of managed TC aligned actions country processes requirements 6
  • 7. Managing by results EuropeAid The commitment of the EC to manage for and by results has developed as part of the establishment of the Activity- Based Management (ABM) System adopted in 2000. Results-oriented design of TC implies rigorous application of the logic of objective-oriented planning techniques. It is not about filling formats and matrixes, but it is a systematic way of thinking about specific results to be achieved and how the partners can get there. Partner countries and donors embrace the principles of 7 managing for results, starting with their own results-oriented
  • 8. Results-oriented TC support EuropeAid • Focus on the specific outcomes and performance that the partner wants to achieve • Get the logical chain from results to TC deliverables right • Specify all key activities and inputs from all sources, but maintain flexibility • The quality of dialogue with partner countries (government and civil society representatives) is a key to establishing effective development cooperation policies and to their successful implementation. • Partnership, ownership of development processes by the target population, and strengthening of institutional and administrative capacity to effectively manage change, are principles driving EC efforts for development. 8
  • 9. Monitoring and evaluation of TC support EuropeAid • The focus on partner ownership means that the partners will have to play a vital role in quality assurance during implementation, where monitoring is a key instrument. • Monitoring the implementation of TC is primarily the responsibility of the partner country. • The partner country institutions are responsible for accountability to domestic stakeholders. • Clear links to outputs and expected outcomes: the full logical chain from TC-support to outputs and outcomes must be sound and results must be monitored. • When the EC uses its own Results-Oriented Monitoring System, care should be taken to ensure that these systems also contribute to domestic accountability 9
  • 10. Monitoring actions according to results EuropeAid • Monitoring should take place at several levels consistent with the logical chain from impact/outcomes to all inputs into a programme. • The focus should be on i) capacity enhancement and service delivery results; ii) Capacity Development processes and Technical Cooperation performance according to expected results. • Mutual performance assessments between partner managers of Technical Assistance may be particularly useful as part of this monitoring. 10
  • 11. What is monitoring? EuropeAid • Monitoring is a regular review to keep track of how a project is progressing in terms of resource use, implementation, delivery of results and the management of risks. • Monitoring is the systematic and continual collection, analysis and use of management information to support effective decision-making. • Regular reviews provide an opportunity to reflect on progress, agree on the content of progress reports and follow-up action required. • Implementation should thus be seen as a continuous learning process whereby experience gained is reviewed and fed-back into ongoing planning. 11
  • 12. Why monitor? EuropeAid • Critical element of good project management. It Supports: • Informed and timely decision making by project managers/implementers • Ongoing learning – what works and what doesn’t • Transparency (information sharing, participation, communication) • Accountability (to beneficiaries and funding agencies) 12
  • 13. How to monitor? EuropeAid • While the purpose of monitoring may be clear, the need to carefully consider ‘how’ monitoring is best carried out/supported is decisive. • Past experience indicates that donors have been too exclusively focused on their own information requirements (managing ‘contracts’ and focused on accounting for expenditure). • However it appears that they have not been very effective in building local partner capacity to manage and monitor. 13
  • 14. Implementation and monitoring: learning EuropeAid process 14
  • 15. Good practices - monitoring and reporting EuropeAid Good practices for effective project delivery include: • Relying and building on partner systems • Coordinating funder reporting and monitoring systems • Simplifying funder reporting and monitoring systems • Making information more transparent and available • Rationalizing review missions 15
  • 17. Activity A – The impact of management for results EuropeAid on your task / responsabilities Objective: To identify practical implications for programme / project management of the application of the rule “Management for results” Small groups discussion : • Definition of expected results for each ENPI CBC programme • How to measure them • Summarize on flip-chart paper. • Feedback to plenary • Issues and implications for your management tasks 17