EFFECTIVE SHOP FLOOR ORGANIZATION
       FOR MICRO & SMALL
   FURNITURE MANUFACTURERS
Today you will learn:


3 . How to organize your production space
4 . Plan a better work flow
5 . About the Factories act
6 . How to keep a safe work environment
7 . How maintenance of equipment can help you
Agenda                                                       Start   End     Time
Module 1 Operations Organization
Registration & introduction                                  9:00    9:30    0.50 hr.
a. Effective shop floor organization for small facilities:                   2.5 hrs.


Effective layout options for small facilities                9:30    10:00   0.75 hr
Process Flow & Shop Floor Organization                       10:00   11:00   1.00 hr
                         Coffee Break                        11:00   11:15   0.25 hr
Space Utilization for efficiency including 5-S methodology   11:15   11:45   0.50 hr.
b. Safety for small furniture manufacturers:                                 3.5 hrs


Introduction to the Factories Act and OSHA Stds.             11:45   12:15   0.50 hr
                             Lunch                           12:15   1:15    1.00 hr
Basic Equipment maintenance tips                             1:15    1:45    0.50 hr.
Preventing Electrical Hazards                                1:45    2:15    0.5 hr
Impact of lighting and ventilation on safety                 2:15    2:45    0.5 hr
Wrap up and close                                            2:45    3:00    0.25hr
Total Workshop time                                                          6.0 hrs.
EFFECTIVE SHOP FLOOR ORGANIZATION
WHAT HAPPENS IF YOUR SHOP FLOOR
      IS NOT ORGANIZED?
• You spend more time looking for things
• It is difficult to know how much waste you have
• It is hard to move around
• It is harder to produce quality work
• You can lose things and not know
• Space is wasted
• Everything is confusing
HOW CAN YOU SOLVE THESE
      PROBLEMS?
1. Proper LAYOUT of production space

  Why do you need a proper layout?
  The objective of facility layout id to locate people,
  machines and processes in a logical, time-saving and
  money-saving manner that meets anticipated production
  levels
1. Proper LAYOUT of production space

  Some goals to achieve through layout design
  2. Maximize the use of machine tools
  3. Minimize labour requirements
  4. Provide a smooth flow of materials and products
  5. Minimize health hazards
  6. Minimize material handling effort
  7. Maximize the use of available space
  8. Provide maximum flexibility to avoid “hiccups” in operations
  9. Maximize output
Materials in                 Materials in




                                     Process




Product or line
                                                                  TYPES OF LAYOUT




                  Finished product             Finished product
Product or Line Layout:
Focus is on sequence of production or assembly of
products
Ideal for Mass Manufacturing situations
Workstation sequence is fixed and does allow changes to
production
Not flexible to product changes
Process Layout:
Group machines that perform similar or related functions
together or close to each other, such as saws.
It allows flexibility in making several types of products at
the same time
It requires careful production planning and material
handling to avoid bottlenecks and delays in production
Process Layout:
Exercise:
a. Name the different functions needed to make a side table:
_____________________________
_____________________________
_____________________________
_____________________________
Process Layout:
Exercise:
b. Do a rough sketch to show how the materials flow from machine
to machine:
Assume you have:

Table saw                       Jigsaw (or handsaw)
Miter saw                       Belt sander
Router                          Clamps (for Shop note)
                                Other hand tools
Process Layout:
“5-S”
Putting the “5-S” system in place to clean up & manage
                    your shop floor
What is “5-S”?
The Five S program focuses on having visual order,
organization, cleanliness and standardization.
The results you can expect from a Five S program are:
improved profitability, efficiency, service and safety.

The 5-S concept originated in Toyota, Japan.
- Factories in Japan are reputed for their
  cleanliness and orderliness.
- This is due to their ability to instill a sense of
  responsibility and discipline into their workers,
  particularly at the plant (shop-floor) level.
S   ort


S   et in Order


S   hine


S   tandardize

S   ustain
Some benefits of “5-S”?
               • Improves safety / Reduces accidents
               • Reduces downtime
               • Enhances operational control of processes
               • Creates a healthier corporate climate
               • Improves product quality
               • Improves efficiency and productivity
               • Improves delivery times and assists in reducing
                 costs
               • Creates a positive work environment
               • Improves customer perceptions
SORT
Sorting is the first step in cleaning up your floor. It helps
to identify things which are no longer necessary in the
space.
Separate according to:
   •What Is Needed
   •Needed Later
   •Not Needed

Discard What Is Not Needed
Separate Needed Items By Frequency of use
SORT


Name 5 things in your work area which aren’t necessary.


When you return, make it a duty to remove them!
SORT

For items which are needed – identify where they
should go.
For items non needed – remove them from the floor
and into the garbage!
SORT

Exercise:
List some of the things you can think of in your own
factory that can be thrown away?
SORT

Exercise:
List some of the things you can think of in your own
factory that can be thrown away?
Old Tools & machines that will never work again
Scrap lumber and other odd pieces
Old drawings, patterns, etc
Old furniture that have not been worked on in over one
to three months
BENEFITS OF SORTING
Keeps the work area clean and clutter free reduces risk
of safety incidents

Creates “extra” work space where necessary items can
be placed

Reduces time spent searching for tools and materials

Removing supplies, materials and paper work not
required to do the work helps improve efficiency
Set in Order

 Can also be called the STRAIGHTENING OR TIDYING UP
 stage.
 At this stage you should now ORGANIZE everything.
 Arrange items so that they are easy to find and can be
 accessed readily.
 “A Place for everything and everything in it’s place”
Set in Order
 Use tags and signs and other labels to identify where
 things should be kept.
Set in Order

 For every item in the workplace we will need to:

    Identify it
    Allocate a place and store it
    Determine how much/how many to store at the work
     place
Example of area marked out for items
Set in Order
•    Decide where to keep needed items
    – Keep frequently used items at point of use
    – Screwdrivers next to screws
•    Organize items in a way that makes sense
    – Make it easy for anyone to find them, use them and put
        them back after use
       • Use outlines and labels
    – Make it obvious when items are not in their correct place
Set in Order
•    Decide where to keep needed items
    – Locate items according to their frequency of use (higher
       frequency = closer to you)
    – Store items together if they are used together (i.e. –
       ratchets with bolts)
    – Store them in the sequence they are used
    – Consider tools on retractable cords (overhead)
    – Simplify – use one tool for multiple functions
Set in Order
SOME BENEFITS OF SET IN ORDER
Safety is improved
            Clean clutter free floors and aisles
Tools and parts are stored properly so there’s less damage
Less waste of motion – reduced searching for materials, tools
& supplies
Reduced inventory of materials, supplies
SHINE
SHINE is all about cleanliness. Clean the workplace
completely so that there is no dust, dirt or garbage on
floor, machine, workbench etc.
Shining results in a cleaner, safer and healthier
workplace.
It helps to maintain the sorting and set in order steps
done before
Shining requires discipline to maintain.
Everyone in the workshop should have the
responsibility to “shine” their work areas daily.
SHINE

By constantly cleaning or “shining”, it will make it easier
to inspect equipment and tools often.


When cleaning machines of sawdust, you can see if
parts become loose, wires begin to break, etc.
This gives you a chance to correct any machine defect
before it breaks down
Shining also lifts the morale and pride of persons
working in the space, and will impress your customers a
lot!
SHINE

To ensure Shining is done regularly:
Make a roster of who is to do what
Make a schedule of when the place is to be cleaned - for
example: empty bins every evening; sweep the floor
every morning; remove scrap wood once a week, etc.
Keep cleaning equipment (brooms, bins, brushes) in a
easy to reach convenient spot.
Give the responsibility to someone to ensure “Shine” is
done
It is important that we
 establish the first 3S
before we progress to
       the next 2S.
STANDARDIZE

Standardizing helps to Maintain a Serene Atmosphere

STANDARDIZE is the means by which we maintain the
first three S’s, namely SORT, SET IN ORDER and SHINE.

- You should maintain high standards of housekeeping
  and workplace organization at all times.

Standardizing is about implementing BEST PRACTICES in
the workplace
STANDARDIZE

Have a written manual or procedures on who is to do
what, when, how and why is a part of standardization.

Develop a schedule that shows who has what
responsibility.

Responsibilities should be a part of every day work
activity
SUSTAIN

SASTAIN is the set of approaches to be used to win hearts
and minds, to make people want to keep applying best
practices in shop organization and housekeeping.

It is having the discipline to maintain the correct
procedures and standards over time

It is creating conditions, or an atmosphere, that encourage
the constant practice of good habits and the elimination of
bad ones
RECAP
• Sort – to put things in order
   – Remove what is not needed & keep what is needed
• Set in order - proper arrangement
   – Place things in a way that they are easily accessible
     whenever they are needed
• Shine – clean
   – Keep things clean & polished; no trash in workplace
• Standardize
   – Standardize best practices / processes for cleaning
• Sustain – commitment and self-discipline
   – Develop an attitude and culture that follows the other 4S’s
BENEFITS


•   Reduced set-up times    • Less wasted labour
•   Reduced cycle times     • Better equipment
•   Reduce searching time     reliability
•   Increased floor space   • Higher Quality
•   Reliable Delivery       • Lower cost
                            • Lower safety
                              incident/accident rate
The End

Jamaica Business Development Corporation.
14 Camp Road, Kingston 4
Tel: 928-5161-5
Or
76 Marcus Garvey Drive, Unit 10A
Kingston 13
Tel: 923-4729

More Related Content

What's hot (20)

How to implement 5 s
How to implement 5 sHow to implement 5 s
How to implement 5 s
 
5S Implementation - The first step to continuous improvement
5S Implementation - The first step to continuous improvement5S Implementation - The first step to continuous improvement
5S Implementation - The first step to continuous improvement
 
5S
5S5S
5S
 
Shop floor management
Shop floor management Shop floor management
Shop floor management
 
"Visual management & 5S " in Lean T.P.S (Workshop slides)
"Visual management &  5S " in Lean T.P.S (Workshop slides)"Visual management &  5S " in Lean T.P.S (Workshop slides)
"Visual management & 5S " in Lean T.P.S (Workshop slides)
 
5s
5s5s
5s
 
5S Techniques by Operational Excellence Consulting
5S Techniques by Operational Excellence Consulting5S Techniques by Operational Excellence Consulting
5S Techniques by Operational Excellence Consulting
 
5S Training
5S Training5S Training
5S Training
 
5s Lean Presentation
5s Lean Presentation5s Lean Presentation
5s Lean Presentation
 
5S - Lean Manufacturing Methodology
5S - Lean Manufacturing Methodology 5S - Lean Manufacturing Methodology
5S - Lean Manufacturing Methodology
 
5 S – A Program To Improve Project
5 S – A Program To Improve Project5 S – A Program To Improve Project
5 S – A Program To Improve Project
 
5S Training and Effective 5S Pratices
5S Training and Effective 5S Pratices5S Training and Effective 5S Pratices
5S Training and Effective 5S Pratices
 
Lean basics
Lean basicsLean basics
Lean basics
 
5S AWARNESS TRAINING PROGRAM
5S AWARNESS  TRAINING  PROGRAM5S AWARNESS  TRAINING  PROGRAM
5S AWARNESS TRAINING PROGRAM
 
7 waste in the production
7 waste in the production7 waste in the production
7 waste in the production
 
Office 5S implementation workshop
Office 5S implementation workshopOffice 5S implementation workshop
Office 5S implementation workshop
 
Lean manufacturing
Lean manufacturingLean manufacturing
Lean manufacturing
 
5 S Manual
5 S Manual5 S Manual
5 S Manual
 
5s ppt
5s ppt5s ppt
5s ppt
 
5S Training Presentation
5S Training Presentation5S Training Presentation
5S Training Presentation
 

Viewers also liked

Introduction to Shop Floor management - Janaury 2017
Introduction to Shop Floor management - Janaury 2017Introduction to Shop Floor management - Janaury 2017
Introduction to Shop Floor management - Janaury 2017W3 Group Canada Inc.
 
LeanCor Consulting Webinar: The PFEP – How to Create Standardization in Mater...
LeanCor Consulting Webinar: The PFEP – How to Create Standardization in Mater...LeanCor Consulting Webinar: The PFEP – How to Create Standardization in Mater...
LeanCor Consulting Webinar: The PFEP – How to Create Standardization in Mater...LeanCor Supply Chain Group
 
Shop Floor Visual Management - November 2016
Shop Floor Visual Management - November 2016Shop Floor Visual Management - November 2016
Shop Floor Visual Management - November 2016W3 Group Canada Inc.
 
Shop Floor Management I I
Shop  Floor  Management  I IShop  Floor  Management  I I
Shop Floor Management I ISoe Lu Kyaw
 
Production scheduling boards - November 2016
Production scheduling boards - November 2016Production scheduling boards - November 2016
Production scheduling boards - November 2016W3 Group Canada Inc.
 
Sap pp shop floor control configuration
Sap pp   shop floor control configurationSap pp   shop floor control configuration
Sap pp shop floor control configurationVikranth Ikkalaki
 
Plan-for-Every-Part (PFEP) - Introduction November 2016
Plan-for-Every-Part (PFEP) - Introduction November 2016Plan-for-Every-Part (PFEP) - Introduction November 2016
Plan-for-Every-Part (PFEP) - Introduction November 2016W3 Group Canada Inc.
 
Operational KPIs - Definitions November 2016
Operational KPIs - Definitions November 2016Operational KPIs - Definitions November 2016
Operational KPIs - Definitions November 2016W3 Group Canada Inc.
 
Pfep introduction
Pfep introductionPfep introduction
Pfep introductionld12987
 
Lean Matrials Management - Introduction to milk run - November 2016
Lean Matrials Management - Introduction to milk run - November 2016Lean Matrials Management - Introduction to milk run - November 2016
Lean Matrials Management - Introduction to milk run - November 2016W3 Group Canada Inc.
 
Introduction to Takt time - January 2017
Introduction to Takt time - January 2017Introduction to Takt time - January 2017
Introduction to Takt time - January 2017W3 Group Canada Inc.
 
Time management and goal setting
Time management and goal settingTime management and goal setting
Time management and goal settingEileen Brumitt
 
Organisation planning
Organisation planningOrganisation planning
Organisation planningOmkar Dalvi
 
DECIMO SALONE D'IMPRESA Carmine Vox
DECIMO SALONE D'IMPRESA Carmine VoxDECIMO SALONE D'IMPRESA Carmine Vox
DECIMO SALONE D'IMPRESA Carmine VoxRoberto Terzi
 
Managing With A Difference Tita Jeslie
Managing With A Difference Tita JeslieManaging With A Difference Tita Jeslie
Managing With A Difference Tita Jesliergamo
 
5 s training shop floor 4
5 s training shop floor 45 s training shop floor 4
5 s training shop floor 4dottinger
 
Paperless shop floor warmup ver 12
Paperless shop floor warmup ver 12Paperless shop floor warmup ver 12
Paperless shop floor warmup ver 12Chuck Catron
 

Viewers also liked (20)

Shop-Floor-Management
Shop-Floor-ManagementShop-Floor-Management
Shop-Floor-Management
 
Introduction to Shop Floor management - Janaury 2017
Introduction to Shop Floor management - Janaury 2017Introduction to Shop Floor management - Janaury 2017
Introduction to Shop Floor management - Janaury 2017
 
LeanCor Consulting Webinar: The PFEP – How to Create Standardization in Mater...
LeanCor Consulting Webinar: The PFEP – How to Create Standardization in Mater...LeanCor Consulting Webinar: The PFEP – How to Create Standardization in Mater...
LeanCor Consulting Webinar: The PFEP – How to Create Standardization in Mater...
 
Shop Floor Visual Management - November 2016
Shop Floor Visual Management - November 2016Shop Floor Visual Management - November 2016
Shop Floor Visual Management - November 2016
 
Shop Floor Management I I
Shop  Floor  Management  I IShop  Floor  Management  I I
Shop Floor Management I I
 
Production scheduling boards - November 2016
Production scheduling boards - November 2016Production scheduling boards - November 2016
Production scheduling boards - November 2016
 
Sap pp shop floor control configuration
Sap pp   shop floor control configurationSap pp   shop floor control configuration
Sap pp shop floor control configuration
 
Plan-for-Every-Part (PFEP) - Introduction November 2016
Plan-for-Every-Part (PFEP) - Introduction November 2016Plan-for-Every-Part (PFEP) - Introduction November 2016
Plan-for-Every-Part (PFEP) - Introduction November 2016
 
Operational KPIs - Definitions November 2016
Operational KPIs - Definitions November 2016Operational KPIs - Definitions November 2016
Operational KPIs - Definitions November 2016
 
Pfep introduction
Pfep introductionPfep introduction
Pfep introduction
 
Lean Matrials Management - Introduction to milk run - November 2016
Lean Matrials Management - Introduction to milk run - November 2016Lean Matrials Management - Introduction to milk run - November 2016
Lean Matrials Management - Introduction to milk run - November 2016
 
Introduction to Takt time - January 2017
Introduction to Takt time - January 2017Introduction to Takt time - January 2017
Introduction to Takt time - January 2017
 
Chapter 24
Chapter 24Chapter 24
Chapter 24
 
Time management and goal setting
Time management and goal settingTime management and goal setting
Time management and goal setting
 
Organisation planning
Organisation planningOrganisation planning
Organisation planning
 
DECIMO SALONE D'IMPRESA Carmine Vox
DECIMO SALONE D'IMPRESA Carmine VoxDECIMO SALONE D'IMPRESA Carmine Vox
DECIMO SALONE D'IMPRESA Carmine Vox
 
Shop Floor Planning & Control
Shop Floor Planning & ControlShop Floor Planning & Control
Shop Floor Planning & Control
 
Managing With A Difference Tita Jeslie
Managing With A Difference Tita JeslieManaging With A Difference Tita Jeslie
Managing With A Difference Tita Jeslie
 
5 s training shop floor 4
5 s training shop floor 45 s training shop floor 4
5 s training shop floor 4
 
Paperless shop floor warmup ver 12
Paperless shop floor warmup ver 12Paperless shop floor warmup ver 12
Paperless shop floor warmup ver 12
 

Similar to Effective shop floor oranization

Similar to Effective shop floor oranization (20)

MSE 507 San Fernando Valley Lattet_ (5S)
MSE 507 San Fernando Valley Lattet_ (5S)MSE 507 San Fernando Valley Lattet_ (5S)
MSE 507 San Fernando Valley Lattet_ (5S)
 
How To 6S by Piercan USA, Inc.
How To 6S by Piercan USA, Inc.How To 6S by Piercan USA, Inc.
How To 6S by Piercan USA, Inc.
 
Introduction to 6S
Introduction to 6SIntroduction to 6S
Introduction to 6S
 
5S Concept- bnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn...
5S Concept- bnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn...5S Concept- bnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn...
5S Concept- bnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn...
 
5 s training -recap
5 s  training -recap5 s  training -recap
5 s training -recap
 
3816121 5 s
3816121 5 s3816121 5 s
3816121 5 s
 
5 s
5 s5 s
5 s
 
5 s
5 s5 s
5 s
 
5 s
5 s5 s
5 s
 
5 s
5 s5 s
5 s
 
Tqm 5s
Tqm 5sTqm 5s
Tqm 5s
 
5S.pptx
5S.pptx5S.pptx
5S.pptx
 
5 S Powerpoint
5 S Powerpoint5 S Powerpoint
5 S Powerpoint
 
KAIZEN Updated 030507
KAIZEN Updated 030507KAIZEN Updated 030507
KAIZEN Updated 030507
 
5 s ppt by me
5 s ppt by me5 s ppt by me
5 s ppt by me
 
Lean manufacturing basics
Lean manufacturing basicsLean manufacturing basics
Lean manufacturing basics
 
5 s
5 s5 s
5 s
 
5 s modul
5 s modul5 s modul
5 s modul
 
7s ppt.pptx
7s ppt.pptx7s ppt.pptx
7s ppt.pptx
 
6S Introduction.pdf
6S Introduction.pdf6S Introduction.pdf
6S Introduction.pdf
 

More from Colin Porter

Energy management & audits
Energy management & auditsEnergy management & audits
Energy management & auditsColin Porter
 
Furniture Trends 2012
Furniture Trends 2012Furniture Trends 2012
Furniture Trends 2012Colin Porter
 
Furniture jamaica overview 2012
Furniture jamaica overview 2012Furniture jamaica overview 2012
Furniture jamaica overview 2012Colin Porter
 
Fa osha-furniture presentation
Fa osha-furniture presentationFa osha-furniture presentation
Fa osha-furniture presentationColin Porter
 
Furniture jamaica furniture trends 2011
Furniture jamaica furniture trends 2011Furniture jamaica furniture trends 2011
Furniture jamaica furniture trends 2011Colin Porter
 
Beneficiary experience (PIMJ)
Beneficiary experience (PIMJ)Beneficiary experience (PIMJ)
Beneficiary experience (PIMJ)Colin Porter
 

More from Colin Porter (6)

Energy management & audits
Energy management & auditsEnergy management & audits
Energy management & audits
 
Furniture Trends 2012
Furniture Trends 2012Furniture Trends 2012
Furniture Trends 2012
 
Furniture jamaica overview 2012
Furniture jamaica overview 2012Furniture jamaica overview 2012
Furniture jamaica overview 2012
 
Fa osha-furniture presentation
Fa osha-furniture presentationFa osha-furniture presentation
Fa osha-furniture presentation
 
Furniture jamaica furniture trends 2011
Furniture jamaica furniture trends 2011Furniture jamaica furniture trends 2011
Furniture jamaica furniture trends 2011
 
Beneficiary experience (PIMJ)
Beneficiary experience (PIMJ)Beneficiary experience (PIMJ)
Beneficiary experience (PIMJ)
 

Recently uploaded

Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environmentelijahj01012
 
Chapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditChapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditNhtLNguyn9
 
Entrepreneurship lessons in Philippines
Entrepreneurship lessons in  PhilippinesEntrepreneurship lessons in  Philippines
Entrepreneurship lessons in PhilippinesDavidSamuel525586
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxmbikashkanyari
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfrichard876048
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFChandresh Chudasama
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Doge Mining Website
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
8447779800, Low rate Call girls in Dwarka mor Delhi NCR
8447779800, Low rate Call girls in Dwarka mor Delhi NCR8447779800, Low rate Call girls in Dwarka mor Delhi NCR
8447779800, Low rate Call girls in Dwarka mor Delhi NCRashishs7044
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024Adnet Communications
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...ssuserf63bd7
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 

Recently uploaded (20)

Cyber Security Training in Office Environment
Cyber Security Training in Office EnvironmentCyber Security Training in Office Environment
Cyber Security Training in Office Environment
 
Chapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditChapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal audit
 
Entrepreneurship lessons in Philippines
Entrepreneurship lessons in  PhilippinesEntrepreneurship lessons in  Philippines
Entrepreneurship lessons in Philippines
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdf
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDF
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
8447779800, Low rate Call girls in Dwarka mor Delhi NCR
8447779800, Low rate Call girls in Dwarka mor Delhi NCR8447779800, Low rate Call girls in Dwarka mor Delhi NCR
8447779800, Low rate Call girls in Dwarka mor Delhi NCR
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 

Effective shop floor oranization

  • 1. EFFECTIVE SHOP FLOOR ORGANIZATION FOR MICRO & SMALL FURNITURE MANUFACTURERS
  • 2. Today you will learn: 3 . How to organize your production space 4 . Plan a better work flow 5 . About the Factories act 6 . How to keep a safe work environment 7 . How maintenance of equipment can help you
  • 3. Agenda Start End Time Module 1 Operations Organization Registration & introduction 9:00 9:30 0.50 hr. a. Effective shop floor organization for small facilities: 2.5 hrs. Effective layout options for small facilities 9:30 10:00 0.75 hr Process Flow & Shop Floor Organization 10:00 11:00 1.00 hr Coffee Break 11:00 11:15 0.25 hr Space Utilization for efficiency including 5-S methodology 11:15 11:45 0.50 hr. b. Safety for small furniture manufacturers: 3.5 hrs Introduction to the Factories Act and OSHA Stds. 11:45 12:15 0.50 hr Lunch 12:15 1:15 1.00 hr Basic Equipment maintenance tips 1:15 1:45 0.50 hr. Preventing Electrical Hazards 1:45 2:15 0.5 hr Impact of lighting and ventilation on safety 2:15 2:45 0.5 hr Wrap up and close 2:45 3:00 0.25hr Total Workshop time 6.0 hrs.
  • 4. EFFECTIVE SHOP FLOOR ORGANIZATION
  • 5. WHAT HAPPENS IF YOUR SHOP FLOOR IS NOT ORGANIZED?
  • 6. • You spend more time looking for things • It is difficult to know how much waste you have • It is hard to move around • It is harder to produce quality work • You can lose things and not know • Space is wasted • Everything is confusing
  • 7. HOW CAN YOU SOLVE THESE PROBLEMS?
  • 8. 1. Proper LAYOUT of production space Why do you need a proper layout? The objective of facility layout id to locate people, machines and processes in a logical, time-saving and money-saving manner that meets anticipated production levels
  • 9. 1. Proper LAYOUT of production space Some goals to achieve through layout design 2. Maximize the use of machine tools 3. Minimize labour requirements 4. Provide a smooth flow of materials and products 5. Minimize health hazards 6. Minimize material handling effort 7. Maximize the use of available space 8. Provide maximum flexibility to avoid “hiccups” in operations 9. Maximize output
  • 10. Materials in Materials in Process Product or line TYPES OF LAYOUT Finished product Finished product
  • 11. Product or Line Layout: Focus is on sequence of production or assembly of products Ideal for Mass Manufacturing situations Workstation sequence is fixed and does allow changes to production Not flexible to product changes
  • 12. Process Layout: Group machines that perform similar or related functions together or close to each other, such as saws. It allows flexibility in making several types of products at the same time It requires careful production planning and material handling to avoid bottlenecks and delays in production
  • 13. Process Layout: Exercise: a. Name the different functions needed to make a side table: _____________________________ _____________________________ _____________________________ _____________________________
  • 14. Process Layout: Exercise: b. Do a rough sketch to show how the materials flow from machine to machine: Assume you have: Table saw Jigsaw (or handsaw) Miter saw Belt sander Router Clamps (for Shop note) Other hand tools
  • 17. Putting the “5-S” system in place to clean up & manage your shop floor
  • 18. What is “5-S”? The Five S program focuses on having visual order, organization, cleanliness and standardization. The results you can expect from a Five S program are: improved profitability, efficiency, service and safety. The 5-S concept originated in Toyota, Japan. - Factories in Japan are reputed for their cleanliness and orderliness. - This is due to their ability to instill a sense of responsibility and discipline into their workers, particularly at the plant (shop-floor) level.
  • 19. S ort S et in Order S hine S tandardize S ustain
  • 20.
  • 21. Some benefits of “5-S”? • Improves safety / Reduces accidents • Reduces downtime • Enhances operational control of processes • Creates a healthier corporate climate • Improves product quality • Improves efficiency and productivity • Improves delivery times and assists in reducing costs • Creates a positive work environment • Improves customer perceptions
  • 22. SORT Sorting is the first step in cleaning up your floor. It helps to identify things which are no longer necessary in the space. Separate according to: •What Is Needed •Needed Later •Not Needed Discard What Is Not Needed Separate Needed Items By Frequency of use
  • 23. SORT Name 5 things in your work area which aren’t necessary. When you return, make it a duty to remove them!
  • 24. SORT For items which are needed – identify where they should go. For items non needed – remove them from the floor and into the garbage!
  • 25. SORT Exercise: List some of the things you can think of in your own factory that can be thrown away?
  • 26. SORT Exercise: List some of the things you can think of in your own factory that can be thrown away? Old Tools & machines that will never work again Scrap lumber and other odd pieces Old drawings, patterns, etc Old furniture that have not been worked on in over one to three months
  • 27. BENEFITS OF SORTING Keeps the work area clean and clutter free reduces risk of safety incidents Creates “extra” work space where necessary items can be placed Reduces time spent searching for tools and materials Removing supplies, materials and paper work not required to do the work helps improve efficiency
  • 28. Set in Order Can also be called the STRAIGHTENING OR TIDYING UP stage. At this stage you should now ORGANIZE everything. Arrange items so that they are easy to find and can be accessed readily. “A Place for everything and everything in it’s place”
  • 29. Set in Order Use tags and signs and other labels to identify where things should be kept.
  • 30. Set in Order For every item in the workplace we will need to: Identify it Allocate a place and store it Determine how much/how many to store at the work place
  • 31. Example of area marked out for items
  • 32. Set in Order • Decide where to keep needed items – Keep frequently used items at point of use – Screwdrivers next to screws • Organize items in a way that makes sense – Make it easy for anyone to find them, use them and put them back after use • Use outlines and labels – Make it obvious when items are not in their correct place
  • 33. Set in Order • Decide where to keep needed items – Locate items according to their frequency of use (higher frequency = closer to you) – Store items together if they are used together (i.e. – ratchets with bolts) – Store them in the sequence they are used – Consider tools on retractable cords (overhead) – Simplify – use one tool for multiple functions
  • 35. SOME BENEFITS OF SET IN ORDER Safety is improved Clean clutter free floors and aisles Tools and parts are stored properly so there’s less damage Less waste of motion – reduced searching for materials, tools & supplies Reduced inventory of materials, supplies
  • 36. SHINE SHINE is all about cleanliness. Clean the workplace completely so that there is no dust, dirt or garbage on floor, machine, workbench etc. Shining results in a cleaner, safer and healthier workplace. It helps to maintain the sorting and set in order steps done before Shining requires discipline to maintain. Everyone in the workshop should have the responsibility to “shine” their work areas daily.
  • 37. SHINE By constantly cleaning or “shining”, it will make it easier to inspect equipment and tools often. When cleaning machines of sawdust, you can see if parts become loose, wires begin to break, etc. This gives you a chance to correct any machine defect before it breaks down Shining also lifts the morale and pride of persons working in the space, and will impress your customers a lot!
  • 38. SHINE To ensure Shining is done regularly: Make a roster of who is to do what Make a schedule of when the place is to be cleaned - for example: empty bins every evening; sweep the floor every morning; remove scrap wood once a week, etc. Keep cleaning equipment (brooms, bins, brushes) in a easy to reach convenient spot. Give the responsibility to someone to ensure “Shine” is done
  • 39. It is important that we establish the first 3S before we progress to the next 2S.
  • 40. STANDARDIZE Standardizing helps to Maintain a Serene Atmosphere STANDARDIZE is the means by which we maintain the first three S’s, namely SORT, SET IN ORDER and SHINE. - You should maintain high standards of housekeeping and workplace organization at all times. Standardizing is about implementing BEST PRACTICES in the workplace
  • 41. STANDARDIZE Have a written manual or procedures on who is to do what, when, how and why is a part of standardization. Develop a schedule that shows who has what responsibility. Responsibilities should be a part of every day work activity
  • 42. SUSTAIN SASTAIN is the set of approaches to be used to win hearts and minds, to make people want to keep applying best practices in shop organization and housekeeping. It is having the discipline to maintain the correct procedures and standards over time It is creating conditions, or an atmosphere, that encourage the constant practice of good habits and the elimination of bad ones
  • 43. RECAP
  • 44. • Sort – to put things in order – Remove what is not needed & keep what is needed • Set in order - proper arrangement – Place things in a way that they are easily accessible whenever they are needed • Shine – clean – Keep things clean & polished; no trash in workplace • Standardize – Standardize best practices / processes for cleaning • Sustain – commitment and self-discipline – Develop an attitude and culture that follows the other 4S’s
  • 45. BENEFITS • Reduced set-up times • Less wasted labour • Reduced cycle times • Better equipment • Reduce searching time reliability • Increased floor space • Higher Quality • Reliable Delivery • Lower cost • Lower safety incident/accident rate
  • 46. The End Jamaica Business Development Corporation. 14 Camp Road, Kingston 4 Tel: 928-5161-5 Or 76 Marcus Garvey Drive, Unit 10A Kingston 13 Tel: 923-4729