Top Call Girls In Jankipuram ( Lucknow ) 🔝 8923113531 🔝 Cash Payment
Alm Specialist Toolkit Team System 2008 Deep Dive
1.
2. 2000 Succeeded Challenged Failed Source: Extreme Chaos, The Standish Group International, Inc., 2000, 2004, 2006 2004 2006 Average cost overrun: 45% Time overrun: 63% Functionality delivered on average: 67% – Standish Group, 2004 Software Errors: $59B US Economy – NIST, June 2002 28% 23% 49% 34% 15% 51% 35% 19% 46%
3. Lack of Integrated Tools Separation of Business and Technology Poor Team Communication Either Inflexible or Immature Process 2000 Succeeded Challenged Failed Source: Extreme Chaos, The Standish Group International, Inc., 2000, 2004, 2006 2004 2006 28% 23% 49% 34% 15% 51% 35% 19% 46%
4. Author work items in Microsoft Excel Work items show up in Visual Studio Assign work items to resources using Microsoft Project View project status in Microsoft Excel or Microsoft Project
5.
6.
7.
8.
9. “ Dark matter” emerging during iteration Planned work is squeezed out
10.
11.
12.
13.
14. TFS Host TFS Proxy TFS Proxy Current Load 7,000+ Active Team Members 24X7 Parallel Development Hourly Automated Build System Maintenance 0 FT Admins, 2 PT 4 Main Servers 7 Edge Servers Applications Integrated Desktop Framework 40+ Integrated Applications 23K Users Sales Tools Call Center Operational Data Store
15.
16.
17. Area % Savings Comment Automated Builds 1.7% Dev Leads spend less time on the build process. Source Control 14.5% Working the source control requires less time. Advanced features (merge, branch, shelf) create productivity. Defect Resolution 11.6% Integrated work item tracking and defect tracking makes tracking issues and resolutions faster and easier. Producing Test Metrics 25% Creating test metrics took much less time.
18.
19.
20. Visual Studio Team Suite MSF Process and Guidance Visual Studio Team Foundation Server Teamprise Plug-in For Java Eclipse Teamprise Explorer Teamprise Command Line Tools Architecture Edition Development Edition Test Edition Database Edition Visual Studio Team Explorer 2008 Application Modeling Infrastructure and Deployment Modeling Code Analysis Performance Tuning Security Analysis Database Deployment Database Change Mgmt. Database Testing Load Testing Web Testing Manual Testing Test Case Management Visual Studio Professional Edition Change Management Work Item Tracking Reporting Project Site Build Management Project Management Load Test Agent Visio and UML Modeling Class Modeling Unit Testing Code Coverage Code Metrics Team Web Access 2008 Test Data Generation
21. A: Integrated Platform for Collaborating on Software Development Projects. Version Control Work Item Tracking Build Automation Team Communications Reporting
39. Discover who last changed a section of code and get detailed change set information
40.
41.
42.
43.
44.
45.
46.
47.
48. Create table AUCTION ( id int not null, title varchar(25) not null, startDate DateTime not null, length in not null) Test Database Production Database
49.
50.
51.
52.
53.
54.
55.
56. Desktop Media & RIA Web Designer Look, behavior, brand, and emotional connection Developer Function, deployment, data, security, operational integrity Server Vista