SlideShare ist ein Scribd-Unternehmen logo
1 von 42
An Overview
University of Colorado Capital Projects
Boulder Valley Real Estate Conference
November 21, 2013

University of Colorado at Boulder
Steven C. Thweatt
Assistant Vice Chancellor Facilities Management
East Campus
197 Acres

Main Campus
306 Acres
Williams Village
64 Acres
CU-Boulder South
308 Acres

University of Colorado
at Boulder
5 Campus System

(Not Shown: Mountain
Research Station--192 Acres)
State Funded Capital Requests
Ketchum A&S Classroom Building
Ketchum Arts & Sciences Capital Renewal

o

CU Boulder’s first priority
o

Prior appropriation of state funds in FY07-08 and FY08-09 for part of design and all of construction were rescinded

o

Renovates 59,454 gsf to support undergraduate teaching classes and laboratories

o

Project scope provides replacement of building infrastructure systems
(plumbing, mechanical, electrical, technology and fire safety)

o

Occupancy - fall 2015

Funding
Source
State
Campus
Total

Prior
Appropriation

$657,726
-

FY14-15

Total Cost

$11,592,712 $12,250,438
$1,149,528

$1,149,528

$657,726 $12,742,240 $13,399,966
East campus

Jennie Smoley Caruthers
Biotechnology Building
Jennie Smoley Caruthers Biotechnology Academic Wing

Funding
Source

FY14-15

State

Site

FY15-16

Total Cost

$

$20,243,179

$20,243,179

Campus

$4,022,989

$8,000,000

$12,022,989

Total

$4,022,989

$28,243,179

$32,266,168

o

57,347 GSF addition to $160M cash-funded building on CU Boulder’s East Campus, (LEED Platinum)

o

Undergraduate students will be exposed to
o
o

o

Leading-edge scientific exploration and innovation, and
The process for technology transfer to the private sector

Occupancy August 2016
College of Engineering
And Applied Science
Aerospace & Energy Systems Building
Funds

FY14-15

FY15-16

FY16-17

Total

State

$4,354,159

$22,360,877

$1,575,680

$28,290,716

Campus

$2,902,772

$14,907,251

$1,050,453

$18,860,477

Total

$7,256,931

$37,268,129

$2,626,133

$47,151,192

73,239 GSF New Construction
5,345 GSF Renovation
Scope
o
o

Colorado Ave

Aerospace Science & Engineering
Renewable & sustainable energyrelated teaching & research

Funding

Design
August 2014

Funding from state, campus & private
sector

o

Regent Drive

Engineering Center

o

$47.2M split 60/40 between the state
& campus respectively

Construction
August 2015

Occupancy
January 2017
Cash Funded Capital Requests
Athletics Master Plan
:{
a

The 2 0 1 0 At h l e t i c s
Master Pl an was approved
by Board of Regents in 2001

The campus is now revisiting
Area Plans for Folsom Stadium
and Coors Events Center
Program Plan for a
Football Operations Center


Comprehensive plan to enhance football program
operations at Folsom Stadium



The Department of Intercollegiate Athletics
envisions facilities that will:






maximize both, the competitiveness and academic
performance of student athletes, and

consolidate offices for coaches and staff

Improvements will create:


a more efficient and productive department,



support student athlete academic performance,



enhance recruitment,



assist in retaining top talent, and



foster an environment to support ongoing fundraising for
intercollegiate athletics

Purpose
Arapahoe Avenue

Folsom Street

Existing practice
fields

Grounds/recycling
Dal Ward

Folsom
Stadium

Franklin
Field

Colorado Avenue
Projects in Planning
East campus

SEEC
Sustainability, Energy and Environment Complex

•

289,000 GSF MacAllister Renovation + 83,000 +/GSF wet lab building

•

$100 million

•

ATOC, INSTAAR, CIRES, RASEI, CAW ENVS and
,
NREL
Renovation of 4001 Discovery Drive 289,000 GSF dry laboratory and office
space

Construction of a 4 story, 120,000 gsf
adjacent wet laboratory building

Foothills

SEEC Complex
Crosman

Aden

Libby

Cockerell

Brackett

Farrand

Willard

Reed

Business

Hallett
C4C

Engebretson’s Quadrangle Redevelopment
4 story building
Libby

E

5 story building

Farrand

New Courtyard entry
green space

Expanded Engebretson
Quadrangle green space
Extend Baker Drive for
vehicle access to Quad

New Courtyard entry
green space

Willard

Hallett

Hallett Courtyard
green space
North
Of
Boulder Creek
Capital Renewals
Hellems, Guggenheim, Henderson

•

175,245 GSF

•

$39.6 million

•

Renewal of Infrastructure and Building
Systems
Center for Academic Success
•

80,000 GSF +/-

•

Cost - TBD

•

Potential expansion on top of Euclid Autopark

•

Admissions, International English, Center for
Outreach and Engagement, Academic
Advising
East campus

Pod J
Current Capital Projects
Student Recreation Center
Student Recreation Facilities Improvements
Renovation and renewal of existing 235,242
GSF building
•
•
•

Replacement of 40 year old building systems
Rebuild ice rink
Renovate aquatics area; multi-purpose group
fitness; wellness and athletic training

Addition of 69,199 GSF – 30% increase
•
•
•

Doubles weight training space
Outdoor pool and deck area
Multi-activity gym with indoor turf

Total cost = $63.5 million
Occupancy Spring semester 2014

Funding
Source

State

Revised
FY11-12

Total Cost

$0

$0

Campus

$63,500,000

$63,500,000

Total

$63,500,000

$63,500,000
Student Recreation Center
Student Recreation Center
Campus Utility System Improvements
•

Builds an East District Energy Plant
next to Coors Event Center

•

Rebuilds existing Heating and

Cooling Plant at 18th and Colorado
•

New piping infrastructure

•

Reliance on gas-fired turbines;
reduces carbon footprint

Funding Source

Project Cost

State

$0

Campus Aux

$91.1M

Total Funds

$91.1M
East District Energy Plant
Ekeley Sciences Middle Wing Renovation

•

21,660 GSF

•

$15.6 million

•

Modernizes undergraduate
teaching labs for Chemistry
Baker Hall Renovation

•

114,534 GSF

•

$41.3 million

•

Renovation to 1937 Residence Hall and
RAP
UMC Glenn Miller Ballroom Renovation

•

13,304 GSF

•

$3.8 million estimated

•

Ballroom upgrades, pre-function improvements, kitchen
renovation and gender neutral restroom
Campus Data Center

•

Area SSC on East Campus

•

Cost - $11.8 million (all phases)

•

Research Computing Systems
Cristol Chemistry - Atmospheric Chemistry (Backfill Renovation)

•

8,400 ASF

•

$2.6 million

•

Backfill space vacated for Caruthers
Biochemistry

•

Atmospheric Chemistry
testing chamber

Weitere ähnliche Inhalte

Ähnlich wie Fall Real Estate Conference 2013 - Steve

Imagine Beloit Powerpoint
Imagine Beloit PowerpointImagine Beloit Powerpoint
Imagine Beloit PowerpointRick McGrath
 
Master Planning for a Sustainable Campus
Master Planning for a Sustainable CampusMaster Planning for a Sustainable Campus
Master Planning for a Sustainable CampusUNC FocusFoward
 
Davidreeves 100416151549-phpapp01
Davidreeves 100416151549-phpapp01Davidreeves 100416151549-phpapp01
Davidreeves 100416151549-phpapp01hayat alishah
 
Swofford Construction Brochure Schools Churches
Swofford Construction Brochure Schools ChurchesSwofford Construction Brochure Schools Churches
Swofford Construction Brochure Schools Churcheskellyjohnson
 
Imagine Beloit - Pro Referendum Presentation
Imagine Beloit - Pro Referendum PresentationImagine Beloit - Pro Referendum Presentation
Imagine Beloit - Pro Referendum PresentationAna Kelly
 
Imagine power point.3.1 (March 20)
Imagine power point.3.1 (March 20)Imagine power point.3.1 (March 20)
Imagine power point.3.1 (March 20)Rick McGrath
 
MnSCU Bonding Request
MnSCU Bonding RequestMnSCU Bonding Request
MnSCU Bonding RequestMSCSA
 
Revenue Fund
Revenue FundRevenue Fund
Revenue FundMSCSA
 
Proposed bond referendum community
Proposed bond referendum communityProposed bond referendum community
Proposed bond referendum communityPCSTech
 
ISCN 2016: Working Group 1: Buildings and Their Sustainability Performance
ISCN 2016: Working Group 1: Buildings and Their Sustainability PerformanceISCN 2016: Working Group 1: Buildings and Their Sustainability Performance
ISCN 2016: Working Group 1: Buildings and Their Sustainability PerformanceISCN_Secretariat
 
Final portfolio michael voit 140130
Final portfolio michael voit 140130Final portfolio michael voit 140130
Final portfolio michael voit 140130voit1
 
Effective Energy Management - California Savings Summit 2013
Effective Energy Management - California Savings Summit 2013Effective Energy Management - California Savings Summit 2013
Effective Energy Management - California Savings Summit 2013SchoolDude
 
Wellesley 2025 Presentation
Wellesley 2025 PresentationWellesley 2025 Presentation
Wellesley 2025 Presentationvermeulens
 
Overview of Energy Efficieny and Conservation Block Grants for the City of Ir...
Overview of Energy Efficieny and Conservation Block Grants for the City of Ir...Overview of Energy Efficieny and Conservation Block Grants for the City of Ir...
Overview of Energy Efficieny and Conservation Block Grants for the City of Ir...ckrout
 
University of Denver Case Study - Deferred Maintenance Can Be Managed
University of Denver Case Study - Deferred Maintenance Can Be ManagedUniversity of Denver Case Study - Deferred Maintenance Can Be Managed
University of Denver Case Study - Deferred Maintenance Can Be ManagedSightlines
 
Sp6 cip facilities and parks public works presentation final 1.13.14
Sp6 cip facilities and parks public works presentation final 1.13.14Sp6 cip facilities and parks public works presentation final 1.13.14
Sp6 cip facilities and parks public works presentation final 1.13.14cityofevanston
 
Presentation For December 8 09 Meeting
Presentation For December 8 09 MeetingPresentation For December 8 09 Meeting
Presentation For December 8 09 Meetingbobsd46
 
CMAA Presentation Final Cook County
CMAA Presentation Final Cook CountyCMAA Presentation Final Cook County
CMAA Presentation Final Cook CountyAusrine Rakauskaite
 
CV-S Building Project Presentation
CV-S Building Project PresentationCV-S Building Project Presentation
CV-S Building Project PresentationSteve Schneider
 

Ähnlich wie Fall Real Estate Conference 2013 - Steve (20)

Measure A Status Report, 2010
Measure A Status Report, 2010Measure A Status Report, 2010
Measure A Status Report, 2010
 
Imagine Beloit Powerpoint
Imagine Beloit PowerpointImagine Beloit Powerpoint
Imagine Beloit Powerpoint
 
Master Planning for a Sustainable Campus
Master Planning for a Sustainable CampusMaster Planning for a Sustainable Campus
Master Planning for a Sustainable Campus
 
Davidreeves 100416151549-phpapp01
Davidreeves 100416151549-phpapp01Davidreeves 100416151549-phpapp01
Davidreeves 100416151549-phpapp01
 
Swofford Construction Brochure Schools Churches
Swofford Construction Brochure Schools ChurchesSwofford Construction Brochure Schools Churches
Swofford Construction Brochure Schools Churches
 
Imagine Beloit - Pro Referendum Presentation
Imagine Beloit - Pro Referendum PresentationImagine Beloit - Pro Referendum Presentation
Imagine Beloit - Pro Referendum Presentation
 
Imagine power point.3.1 (March 20)
Imagine power point.3.1 (March 20)Imagine power point.3.1 (March 20)
Imagine power point.3.1 (March 20)
 
MnSCU Bonding Request
MnSCU Bonding RequestMnSCU Bonding Request
MnSCU Bonding Request
 
Revenue Fund
Revenue FundRevenue Fund
Revenue Fund
 
Proposed bond referendum community
Proposed bond referendum communityProposed bond referendum community
Proposed bond referendum community
 
ISCN 2016: Working Group 1: Buildings and Their Sustainability Performance
ISCN 2016: Working Group 1: Buildings and Their Sustainability PerformanceISCN 2016: Working Group 1: Buildings and Their Sustainability Performance
ISCN 2016: Working Group 1: Buildings and Their Sustainability Performance
 
Final portfolio michael voit 140130
Final portfolio michael voit 140130Final portfolio michael voit 140130
Final portfolio michael voit 140130
 
Effective Energy Management - California Savings Summit 2013
Effective Energy Management - California Savings Summit 2013Effective Energy Management - California Savings Summit 2013
Effective Energy Management - California Savings Summit 2013
 
Wellesley 2025 Presentation
Wellesley 2025 PresentationWellesley 2025 Presentation
Wellesley 2025 Presentation
 
Overview of Energy Efficieny and Conservation Block Grants for the City of Ir...
Overview of Energy Efficieny and Conservation Block Grants for the City of Ir...Overview of Energy Efficieny and Conservation Block Grants for the City of Ir...
Overview of Energy Efficieny and Conservation Block Grants for the City of Ir...
 
University of Denver Case Study - Deferred Maintenance Can Be Managed
University of Denver Case Study - Deferred Maintenance Can Be ManagedUniversity of Denver Case Study - Deferred Maintenance Can Be Managed
University of Denver Case Study - Deferred Maintenance Can Be Managed
 
Sp6 cip facilities and parks public works presentation final 1.13.14
Sp6 cip facilities and parks public works presentation final 1.13.14Sp6 cip facilities and parks public works presentation final 1.13.14
Sp6 cip facilities and parks public works presentation final 1.13.14
 
Presentation For December 8 09 Meeting
Presentation For December 8 09 MeetingPresentation For December 8 09 Meeting
Presentation For December 8 09 Meeting
 
CMAA Presentation Final Cook County
CMAA Presentation Final Cook CountyCMAA Presentation Final Cook County
CMAA Presentation Final Cook County
 
CV-S Building Project Presentation
CV-S Building Project PresentationCV-S Building Project Presentation
CV-S Building Project Presentation
 

Mehr von WRONG PERSON

Fall Real Estate Conference 2013 - Jason Elliot
Fall Real Estate Conference 2013 - Jason ElliotFall Real Estate Conference 2013 - Jason Elliot
Fall Real Estate Conference 2013 - Jason ElliotWRONG PERSON
 
Fall Real Estate Conference 2013 - Remax
Fall Real Estate Conference 2013 - RemaxFall Real Estate Conference 2013 - Remax
Fall Real Estate Conference 2013 - RemaxWRONG PERSON
 
Fall Real Estate Conference 2013 - Gibbons
Fall Real Estate Conference 2013 - GibbonsFall Real Estate Conference 2013 - Gibbons
Fall Real Estate Conference 2013 - GibbonsWRONG PERSON
 
Fall Real Estate Conference 2013 - Shinneman
Fall Real Estate Conference 2013 - ShinnemanFall Real Estate Conference 2013 - Shinneman
Fall Real Estate Conference 2013 - ShinnemanWRONG PERSON
 
Fall Real Estate Conference 2013 - Patterson
Fall Real Estate Conference 2013 - PattersonFall Real Estate Conference 2013 - Patterson
Fall Real Estate Conference 2013 - PattersonWRONG PERSON
 
Fall Real Estate Conference 2013 - Driskell
Fall Real Estate Conference 2013 - DriskellFall Real Estate Conference 2013 - Driskell
Fall Real Estate Conference 2013 - DriskellWRONG PERSON
 
Fall Real Estate Conference 2013 - De Jong
Fall Real Estate Conference 2013 - De JongFall Real Estate Conference 2013 - De Jong
Fall Real Estate Conference 2013 - De JongWRONG PERSON
 
Fall Real Estate Conference 2013 - Power
Fall Real Estate Conference 2013 - PowerFall Real Estate Conference 2013 - Power
Fall Real Estate Conference 2013 - PowerWRONG PERSON
 
NZC - Plenary Slide
NZC - Plenary SlideNZC - Plenary Slide
NZC - Plenary SlideWRONG PERSON
 
NZC - Sylvester Colorado Cleantech
NZC - Sylvester Colorado CleantechNZC - Sylvester Colorado Cleantech
NZC - Sylvester Colorado CleantechWRONG PERSON
 
NZC - AEPI Grenoble
NZC - AEPI GrenobleNZC - AEPI Grenoble
NZC - AEPI GrenobleWRONG PERSON
 
Lankao csu october 2013
Lankao csu october 2013Lankao csu october 2013
Lankao csu october 2013WRONG PERSON
 
Pulse - Revolutionary Mindset
Pulse - Revolutionary MindsetPulse - Revolutionary Mindset
Pulse - Revolutionary MindsetWRONG PERSON
 
Pulse - Sponsor Reel
Pulse - Sponsor ReelPulse - Sponsor Reel
Pulse - Sponsor ReelWRONG PERSON
 
Bcbs health reform nov. 2013 v1
Bcbs health reform nov. 2013 v1Bcbs health reform nov. 2013 v1
Bcbs health reform nov. 2013 v1WRONG PERSON
 

Mehr von WRONG PERSON (20)

Claussen
ClaussenClaussen
Claussen
 
Fall Real Estate Conference 2013 - Jason Elliot
Fall Real Estate Conference 2013 - Jason ElliotFall Real Estate Conference 2013 - Jason Elliot
Fall Real Estate Conference 2013 - Jason Elliot
 
Fall Real Estate Conference 2013 - Remax
Fall Real Estate Conference 2013 - RemaxFall Real Estate Conference 2013 - Remax
Fall Real Estate Conference 2013 - Remax
 
Fall Real Estate Conference 2013 - Gibbons
Fall Real Estate Conference 2013 - GibbonsFall Real Estate Conference 2013 - Gibbons
Fall Real Estate Conference 2013 - Gibbons
 
Fall Real Estate Conference 2013 - Shinneman
Fall Real Estate Conference 2013 - ShinnemanFall Real Estate Conference 2013 - Shinneman
Fall Real Estate Conference 2013 - Shinneman
 
Fall Real Estate Conference 2013 - Patterson
Fall Real Estate Conference 2013 - PattersonFall Real Estate Conference 2013 - Patterson
Fall Real Estate Conference 2013 - Patterson
 
Fall Real Estate Conference 2013 - Driskell
Fall Real Estate Conference 2013 - DriskellFall Real Estate Conference 2013 - Driskell
Fall Real Estate Conference 2013 - Driskell
 
Fall Real Estate Conference 2013 - De Jong
Fall Real Estate Conference 2013 - De JongFall Real Estate Conference 2013 - De Jong
Fall Real Estate Conference 2013 - De Jong
 
Fall Real Estate Conference 2013 - Power
Fall Real Estate Conference 2013 - PowerFall Real Estate Conference 2013 - Power
Fall Real Estate Conference 2013 - Power
 
NZC - Plenary Slide
NZC - Plenary SlideNZC - Plenary Slide
NZC - Plenary Slide
 
NZC - Sylvester Colorado Cleantech
NZC - Sylvester Colorado CleantechNZC - Sylvester Colorado Cleantech
NZC - Sylvester Colorado Cleantech
 
NZC - AEPI Grenoble
NZC - AEPI GrenobleNZC - AEPI Grenoble
NZC - AEPI Grenoble
 
NZC - Ben Taube
NZC - Ben TaubeNZC - Ben Taube
NZC - Ben Taube
 
NZC - Thompson
NZC - ThompsonNZC - Thompson
NZC - Thompson
 
Lankao csu october 2013
Lankao csu october 2013Lankao csu october 2013
Lankao csu october 2013
 
NZC - Cateura
NZC - CateuraNZC - Cateura
NZC - Cateura
 
Pulse - Revolutionary Mindset
Pulse - Revolutionary MindsetPulse - Revolutionary Mindset
Pulse - Revolutionary Mindset
 
Pulse - Sponsor Reel
Pulse - Sponsor ReelPulse - Sponsor Reel
Pulse - Sponsor Reel
 
Pulse - Sessions
Pulse - SessionsPulse - Sessions
Pulse - Sessions
 
Bcbs health reform nov. 2013 v1
Bcbs health reform nov. 2013 v1Bcbs health reform nov. 2013 v1
Bcbs health reform nov. 2013 v1
 

Kürzlich hochgeladen

Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxOH TEIK BIN
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
Concept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfConcept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfUmakantAnnand
 
MENTAL STATUS EXAMINATION format.docx
MENTAL     STATUS EXAMINATION format.docxMENTAL     STATUS EXAMINATION format.docx
MENTAL STATUS EXAMINATION format.docxPoojaSen20
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxRoyAbrique
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsKarinaGenton
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
Micromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of PowdersMicromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of PowdersChitralekhaTherkar
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 

Kürzlich hochgeladen (20)

Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptx
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
Concept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.CompdfConcept of Vouching. B.Com(Hons) /B.Compdf
Concept of Vouching. B.Com(Hons) /B.Compdf
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
MENTAL STATUS EXAMINATION format.docx
MENTAL     STATUS EXAMINATION format.docxMENTAL     STATUS EXAMINATION format.docx
MENTAL STATUS EXAMINATION format.docx
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its Characteristics
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Micromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of PowdersMicromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of Powders
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 

Fall Real Estate Conference 2013 - Steve

  • 1. An Overview University of Colorado Capital Projects Boulder Valley Real Estate Conference November 21, 2013 University of Colorado at Boulder Steven C. Thweatt Assistant Vice Chancellor Facilities Management
  • 2. East Campus 197 Acres Main Campus 306 Acres Williams Village 64 Acres CU-Boulder South 308 Acres University of Colorado at Boulder 5 Campus System (Not Shown: Mountain Research Station--192 Acres)
  • 5. Ketchum Arts & Sciences Capital Renewal o CU Boulder’s first priority o Prior appropriation of state funds in FY07-08 and FY08-09 for part of design and all of construction were rescinded o Renovates 59,454 gsf to support undergraduate teaching classes and laboratories o Project scope provides replacement of building infrastructure systems (plumbing, mechanical, electrical, technology and fire safety) o Occupancy - fall 2015 Funding Source State Campus Total Prior Appropriation $657,726 - FY14-15 Total Cost $11,592,712 $12,250,438 $1,149,528 $1,149,528 $657,726 $12,742,240 $13,399,966
  • 6. East campus Jennie Smoley Caruthers Biotechnology Building
  • 7. Jennie Smoley Caruthers Biotechnology Academic Wing Funding Source FY14-15 State Site FY15-16 Total Cost $ $20,243,179 $20,243,179 Campus $4,022,989 $8,000,000 $12,022,989 Total $4,022,989 $28,243,179 $32,266,168 o 57,347 GSF addition to $160M cash-funded building on CU Boulder’s East Campus, (LEED Platinum) o Undergraduate students will be exposed to o o o Leading-edge scientific exploration and innovation, and The process for technology transfer to the private sector Occupancy August 2016
  • 8. College of Engineering And Applied Science
  • 9. Aerospace & Energy Systems Building Funds FY14-15 FY15-16 FY16-17 Total State $4,354,159 $22,360,877 $1,575,680 $28,290,716 Campus $2,902,772 $14,907,251 $1,050,453 $18,860,477 Total $7,256,931 $37,268,129 $2,626,133 $47,151,192 73,239 GSF New Construction 5,345 GSF Renovation Scope o o Colorado Ave Aerospace Science & Engineering Renewable & sustainable energyrelated teaching & research Funding Design August 2014 Funding from state, campus & private sector o Regent Drive Engineering Center o $47.2M split 60/40 between the state & campus respectively Construction August 2015 Occupancy January 2017
  • 11. Athletics Master Plan :{ a The 2 0 1 0 At h l e t i c s Master Pl an was approved by Board of Regents in 2001 The campus is now revisiting Area Plans for Folsom Stadium and Coors Events Center
  • 12. Program Plan for a Football Operations Center
  • 13.  Comprehensive plan to enhance football program operations at Folsom Stadium  The Department of Intercollegiate Athletics envisions facilities that will:    maximize both, the competitiveness and academic performance of student athletes, and consolidate offices for coaches and staff Improvements will create:  a more efficient and productive department,  support student athlete academic performance,  enhance recruitment,  assist in retaining top talent, and  foster an environment to support ongoing fundraising for intercollegiate athletics Purpose
  • 14. Arapahoe Avenue Folsom Street Existing practice fields Grounds/recycling Dal Ward Folsom Stadium Franklin Field Colorado Avenue
  • 17. Sustainability, Energy and Environment Complex • 289,000 GSF MacAllister Renovation + 83,000 +/GSF wet lab building • $100 million • ATOC, INSTAAR, CIRES, RASEI, CAW ENVS and , NREL
  • 18. Renovation of 4001 Discovery Drive 289,000 GSF dry laboratory and office space Construction of a 4 story, 120,000 gsf adjacent wet laboratory building Foothills SEEC Complex
  • 20. 4 story building Libby E 5 story building Farrand New Courtyard entry green space Expanded Engebretson Quadrangle green space Extend Baker Drive for vehicle access to Quad New Courtyard entry green space Willard Hallett Hallett Courtyard green space
  • 22.
  • 23.
  • 24. Capital Renewals Hellems, Guggenheim, Henderson • 175,245 GSF • $39.6 million • Renewal of Infrastructure and Building Systems
  • 25. Center for Academic Success • 80,000 GSF +/- • Cost - TBD • Potential expansion on top of Euclid Autopark • Admissions, International English, Center for Outreach and Engagement, Academic Advising
  • 27.
  • 28.
  • 29.
  • 32. Student Recreation Facilities Improvements Renovation and renewal of existing 235,242 GSF building • • • Replacement of 40 year old building systems Rebuild ice rink Renovate aquatics area; multi-purpose group fitness; wellness and athletic training Addition of 69,199 GSF – 30% increase • • • Doubles weight training space Outdoor pool and deck area Multi-activity gym with indoor turf Total cost = $63.5 million Occupancy Spring semester 2014 Funding Source State Revised FY11-12 Total Cost $0 $0 Campus $63,500,000 $63,500,000 Total $63,500,000 $63,500,000
  • 35. Campus Utility System Improvements • Builds an East District Energy Plant next to Coors Event Center • Rebuilds existing Heating and Cooling Plant at 18th and Colorado • New piping infrastructure • Reliance on gas-fired turbines; reduces carbon footprint Funding Source Project Cost State $0 Campus Aux $91.1M Total Funds $91.1M
  • 37. Ekeley Sciences Middle Wing Renovation • 21,660 GSF • $15.6 million • Modernizes undergraduate teaching labs for Chemistry
  • 38. Baker Hall Renovation • 114,534 GSF • $41.3 million • Renovation to 1937 Residence Hall and RAP
  • 39.
  • 40. UMC Glenn Miller Ballroom Renovation • 13,304 GSF • $3.8 million estimated • Ballroom upgrades, pre-function improvements, kitchen renovation and gender neutral restroom
  • 41. Campus Data Center • Area SSC on East Campus • Cost - $11.8 million (all phases) • Research Computing Systems
  • 42. Cristol Chemistry - Atmospheric Chemistry (Backfill Renovation) • 8,400 ASF • $2.6 million • Backfill space vacated for Caruthers Biochemistry • Atmospheric Chemistry testing chamber

Hinweis der Redaktion

  1. The Boulder Campus’ first priority is the Ketchum Arts & Sciences Capital Renewal project.Prior appropriation of state funds in FY07-08 and FY08-09 make this project a “continuation project” for the state. Part of design funds and all of construction phase funds were later rescinded.Ketchum is the Klauder style building just to the north of ATLAS. It was constructed in 1938. $1,149,528 in cash funds will reduce the FY14-15 state request to $11.6M to complete the projectThe project will modernize building infrastructure systems including plumbing, mechanical, and electrical systems, as well as fire safety.Design is now complete through construction documents.With FY15 funding for construction, re-occupancy could be scheduled for fall 2015
  2. The campus’ FY14-15 request for $4M in cash spending authority provides for the design of the “Academic Wing” on the northwest side of the “Jennie Smoly Caruthers Biotechnology Building”It is hoped that cash-funded design will be followed up with $20.3M from the state for construction, matched with $8M from the campusNow occupied - $160M cash-funded building on CU Boulder’s East Campus, awarded LEED Platinum Undergraduate students will be exposed to leading-edge scientific exploration and innovation, and bear witness to the process of refining commercial applications for technology transfer to the private sectorWorld class educational opportunities await students in the Discovery Learning Apprentice Program and the Howard Hughes Biological Sciences Undergraduate Research Assistance Program Graduates will have gained highly marketable skills while working side-by-side with internationally recognized faculty and research teams. The preparation of an astute workforce supports state Office of Economic Development and International Trade goals to boost the biosciences sector of the Colorado economyOccupancy is planned for August 2016
  3. CU Boulder’s second state priority is for a proposed Aerospace and Energy Systems building. The building will be an expansion of the current Engineering Center Complex to the north. The project will provide the expansion of the Aerospace Engineering program and Renewable and Sustainable Energy-related teaching and research.The Aerospace Engineering program at the Boulder campus continues to provide exceptional opportunities to students; During their first three to five years after graduation, Aerospace Engineering Sciences graduates will have 1) established themselves in professional careers or received a graduate degree; 2) demonstrated ethical leadership, project management, and/or innovation; and 3) played significant roles in the research and development of engineering systems and products.Additional facilities to support Renewable and Sustainable energy-related teaching and research will provide more student access to faculty who are internationally recognized in wind energy, photovoltaics, and power electronics. The Board of Regents approved a renewed program plan in June 2012, which reconfirmed the project educational program, enrollment, space use assumptions, capital costs, funding sources, and code requirements, consistent with CCHE policy.The new building will be approximately 73,239 gross square feet, with 5,345 GSF of renovation associated with connecting the building to the Discovery Learning Center and existing Aerospace Wing.The FY14-15 request is for design, with planned construction by August 2015 and occupancy by January 2017.The funding model for the $47.1M project remains 60% state funds and 40% campus funds.
  4. (Greetings….)The campus hasone request for action being submitted for approval in December.
  5. The program plan provides a comprehensive plan to enhance football program operations. The Department of Intercollegiate Athletics envisions facilities that will maximize both, the competitiveness and academic performance of student athletes, and consolidate offices for coaches and staff. Planned facilities improvements will create a more efficient and productive department, support student athlete academic performance, enhance recruitment, assist in retaining top talent, and foster an environment to support ongoing fundraising for intercollegiate athletics.
  6. The Program Plan for a Football Operations Center will provide improvements at Folsom Stadium on the Main Campus.The site as it exists today is depicted here, with Folsom Stadium on the north end of the campus. Franklin Field lies to the east of the stadium along with Facilities Management operations for Grounds and the Intermediate Processing Facility utilized by CU Recycling.The Dal Ward Athletics Center is on the north end of the stadium.These facilities are all south of Boulder Creek which separates the stadium from improvements in the north of Boulder Creek area.
  7. (Paul Leef)Phase I of the Geosciences Complex will be construction of a 3 to 4 story, 83,708 gsf wet laboratory building adjacent to the MacAllister BuildingPhase II covers the acquisition and renovation of the 289,000 gsf MacAllister Building, formerly occupied by Qwest. This building will provide dry laboratory and office spaceAs this slide depicts, the wet lab building and court will be located to the south of the MacAllister Building. The site is located on the eastern side of the East Campus near Foothills Highway…. approximately 1.5 miles east from the Main Campus along Colorado Avenue. The site provides an excellent opportunity for development and offers the following attributes:Reuse of existing infrastructure including the MacAllister Building and parking areas and circulation drives; utilities such as water, sanitary and electricalAdequate land to locate the wet lab building on the south side of MacAllister. Compatibility with the existing site arrangement, ease of access to parking, pedestrian routes, and the existing building;Remarkable views towards the west;Site topography suitable for drainage and the new building foundation;Opportunities for future related building surrounding the MacAllister BuildingDirect vehicular and pedestrian access to Discovery Drive;Large and spacious quality of the site with mature landscaping;