SlideShare ist ein Scribd-Unternehmen logo
1 von 129
Downloaden Sie, um offline zu lesen
Cambicci+Associates
page 2
This page was intentionally left blank
Company profile 2012
page 3 out of 129
CCCooonnnttteeennntttsss
Short presentation
Portfolio
Organisation
Qualifications
Curriculum Vitae
Contact
Cambicci+associates consulting engineers co
Mechanical Electrical Plumbing Energy & Industrial Studies; security; lighting design; photovoltaics; renewable energy; energy inspections;
engineer & management services; supervisions; licensing; certifications
Cambicci+Associates
page 4
This page was intentionally left blank
Company profile 2012
page 5 out of 129
SSShhhooorrrttt ppprrreeessseeennntttaaatttiiiooonnn
The M.E.P. (mechanical, electrical and plumbing) studies office with the title Cambicci+Associates was founded in February 2007 by
Gerasimos Kampitsis (Yerasimo Cambicci), Mechanical Engineer of the Aristotle University of Thessaloniki, following his work experience
in electromechanical design and supervision since February 1992. Furthermore the office was manned with electrical and mechanical en-
gineers aiming at the technologically sufficient and on time preparation of m.e.p. studies and supervisions.
A consulting and engineering services company was legally constituted in 2012.
The scope of our office in its current form is:
• The elaboration of m.e.p. installations studies, for all types of projects (buildings, urban design and infrastructure).
• Renewable energy systems design
• Nearly zero energy buildings design
• Energy feasibility inspections and evaluation of buildings
• Obtaining permits and licences for buildings and installations
• Lighting Studies
• Supervision for all of the above subjects.
• Consulting Services as a Project Manager
Cambicci+Associates
page 6
Our services are provided either by choice, or via competition in the premises of either the “Design & Construct System” or the Greek
S.D.I.T. system(collaborations of the public and private sector). The engineering studies that are elaborated pertain to buildings to be
constructed or renovations and extensions of existing ones.
The mechanical electrical & plumbing studies, referred as mep studies (or building services or electrical mechanical studies) are an im-
portant component of the whole of the technical studies necessary for the completion of all projects, and they can be divided into the fol-
lowing categories:
Mechanical Electrical & Plumbing Studies
Buildings
• Water Supply (pipe networks of potable water, hot-cold water supply networks and recirculation networks, production of hot water,
solar panel systems(classical or of “void” type), storage tanks and pumping systems.
• Irrigation (irrigation with pop-up sprinklers, underground irrigation)
• Rainwater Draining (using typical gravity networks, siphonic systems, under ground pumping systems.)
• Sewage (sewage pipe networks, sewage pumping systems, water-oil seperators, fat-collectors, gasoline-collectors)
• Heating-Airconditioning (Typical heating systems with a boiler, single pipe systems, two-pipe and four-pipe systems, underfloor
heating and floor cooling systems, central air-conditioning systems with air/water heatpumps or water/water cooling towers, air
handling units, fan-coil networks, central and local split unit systems, VAV systems, geothermal systems, seawater het pumps, ex-
haust and airing systems)
• Expense allocation for a central heating system
• Gas fueled systems (natural gas(low and high pressure)and LPG networks)
• Lifting systems (lifts, elevators, rolling stairs, traffic studies)
• Swimming pools (public and private, open or closed type)
• Medium Voltage private substation (medium voltage panels, power transformers, γlow voltage panels, main and auxiliary input
electrical generators, central and local U.P.S. systems, central safety lighting systems)
• Heavy current electrical installation systems(lighting, plugging, in-rush current, electrical distribution in TN-C, TN-Sand IT systems)
• Lightning Protection(Faraday cage and Franklin design systems, special grounding systems)
• Light current electrical installation systems (phone-date networks, sound and pa installations, central R-TV-SAT, central clock sys-
tems, conference systems, translation systems, real time transmittion systems, hotel management systems, building management
systems, remote control systems, control rooms systems)
• Antitheft protection (alarm, Access Control, C.C.T.V., vehicle stoppage systems, peripheral plot and building protection)
• Fire safety (alarm, fire detection, security lighting ang signs, CO2, FM-200, Dry powder, Inergen, Argonite, water droplet automatic
fire suppression systems, fire hose networks, sprinklers systems, foam systems, freezing systems, mobile fire stoppage devices)
Company profile 2012
page 7 out of 129
• Pneumatic tube systems
• Central vacuum
Specifically for Greek Public Sector works (and for the private sector if required):
• Elaboration of studies of all stages (preliminary, final, and construction)
• Formulation of technical reports and specifications reports for the materials used in the study
• Formulation of a general and specific obligations report for all parties involved in the project
• Formulation of Cost analysis reports•
•
Furthermore, in shopping malls and retail markets:
• Formulation of a report of the renter’s obligations
• Monitoring the observance of the renter’s obligations
• Optical sign systems
• Sound systems
• Video Wall systems•
•
Furthermore in Hotels:
• Hotel room management systems
• SPA, Jacuzzi, Sauna, Thalasotherapie systems•
•
Furthermore in Hospitals:
• Medical Gas networks (Oxygen, Nitrogen Protoxide, Vacuum, High and Low pressure air, sleeping gas exhaust)
• Special electrical installations for operating theaters and intensive care units (conductive floors, earthing systems, isolation moni-
toring device for earthing systems, IT networks)
• Medical equipment studies (Operating theaters, Intensive care units, Recovery units, Central Sterilization systems, linear accelera-
tor studies, special medical examination devices studies)
• Steam networks•
•
Furthermore in car parking buildings:
• Exhaust networks for underground parking areas
• Carbon monoxide detection systems
• Management and electric signage systems for parking areas
• Automatic management systems for parking areas (without a driver)
Cambicci+Associates
page 8
•
Furthermore in industrial buildings:
• Industrial machinery devices (soft starters, variable speed systems, medium voltage motors)
• Piping Design Installations for gases & petroil sites
• Antiexplosive installations
• Industrial fluid and gases networks (pressurized air, petrol, oil, lubricants etc.)
• Exhaust networks for spaces and machinery
• Industrial equipment studies
• Steam networks
M.E.P. infrastructure studies
Road Works
• Highway and general road lighting works, overpass and intersection works
• Electric signage
• Special tunnel lighting of every form (drill, cut & cover) and underpass lighting
• Lighting of all types of works
• Tunnel exhaust installations
• Electrical supply networks, of low medium and high voltage
• Fire detection systems and tunnel fire safety
• Tunnel monitoring networks (safety networks, height excess detection, emergency phones, safety lighting)
• Tunnel servicing buildings
• Central control stations for road works – control rooms
• Sewage and garbage processing works
• Primary, secondary and post secondary processing of liquid waste from sewage treatment facilities
• Landfills and waste transportation centers
• Solid waste processing units
• Industrial machinery devices (soft starters, variable speed systems, medium voltage motors)
• Central control installation networks
• Pump stations
• Hydraulic networks for the transportation of water from pumbing stations
• Pumbstation electrical installations
Company profile 2012
page 9 out of 129
Renewable resources studies
• Solar panel systems for hot water production
• Photovoltaic systems
• Photovoltaic parks
• Wind energy
• Smal hydroelectric works
• Systems integrating co-production of energy•
Licencing
• Of industrial buildings & Installations
• Private parking areas
• Private filling stations(liquid or gas fuel)
•
•
Lighting design
• Interior lighting
• Lighting of public or private outdoor areas
• Buildings beautification lighting
• Monument lighting
• Lighting of picturesque landscapes
• Urban lighting plans
•
Safety studies
• Risk analysis
• Safety procedures and protocolls
• Safety devices and measures
• Passive safety devices and measures•
Supervisions
• Technical supervision (technical specifications and obligations observance monitoring, material inspection, monitoring of the con-
struction, testing and adjustments)
• Technical and fiscal supervision (technical supervision and auditing of accounts, validation of new prices, fiscal auditing of certifica-
tions)
• M.E.P. installations certification
Cambicci+Associates
page 10
Energy feasibility studies
• Green building studies
• Evaluation reconstruction and upgrade studies for existing buildings
• Studies according to the Greek Regulation for the energetic evaluation of buildings
• Evaluation of the energy requirements for heating systems
• Thermography of buildings
Management and consulting services
• Licensing coordination and control
• Organizing competitions for the assignment of studies
• M.E.P. studies managment
• Organizing competitions for foster constuctors
• Screening of candidates, objection managment
• Project construction control
• Timetable observance
• Management of the obligations that are not in the initial agreement
• Temporary and final undertaking of a project
Company profile 2012
page 11 out of 129
Our offices are in Pylaia, Thessaloniki and we undertake projects in the whole of Greece and the neighboring countries. Outside of Thes-
saloniki we have offices-contact points in Athens, Thessalia & Thrace.
The office is fully equipped in personnel and technological equipment for the elaboration of mep projects. In our organogram there is an
administration division, an engineering studies division, a services division, a cost analysis division, a quality control division and a secre-
tarial services division. The electronical equipment of our offices, regarding computer based devices and software, is based on the princi-
ple of optimal available and reliable technology and includes a sufficient number of work spaces, computers, a network Server, and high
quality software. There is software for the electromechanical design, software regarding Legislation and scientific literature (International
and Greek) and software for the cost analysis of Public Sector Projects.
Cambicci+Associates
page 12
This page was intentionally left blank
Company profile 2012
page 13 out of 129
PPPooorrrtttfffooollliiiooo
Cambicci+Associates
page 14
Our office associates and personell have successfully taken part in a sufficient number of projects in Greece and other countries and are
notably experienced in the fields that our office specializes in.
In this process all engineers in our office have been part of small or bigger groups for the elaboration of simple or complicated works in a
variety of areas in Greece and abroad.
For the completion of our projects we have the capacity to obtain all necessary Permits and certifications.
Our customers can be multinationals or smaller companies, technical firms, investment groups, private entrepreneurs and the Greek Pub-
lic sector in all its legal forms and ehelons.
Hereupon, some typical projects our office and engineers have been part of, are cited:
Category of projects pages Category of projects pages
Services 15 to 24 Housing 77 to 84
Culture 25 to 30 Urban 85 to 90
Hotels 31 to 40 Industry, Oil & Gas Installations 91 to 98
Education 41 to 46 Infrastructure 99 to 104
Health 47 to 52 Energy 105 to 110
Shoping malls & retail stores 53 to 68 Security 111 to 114
Recreation 69 to 72 Project management 115
Sports 73 to 76
Company profile 2012
page 15 out of 129
SSSeeerrrvvviiiccceeesss
Cambicci+Associates
page 16
B a n k o f G r e e c e B u i l d i n g i n T h e s s a l o n i k i , G r e e c e
Project owner
Bank of Greece SA
Project design parties
Construction manager
Decathlon SA, D.Papazoglou
Architectural study & construction supervision
P.Nikiforidis–B.Cuomo ΤΥ ΤτΕ: BoG TD:
E.Dalaklis-P.Panagakis
Structural study and construction supervision
Μ.Stefanouri–P.Zervas-G.Nikolaidis ΤΥ BoG TD:
Ν.Vrontisis-G.Papadatos
Mep study and construction supervision
Y. Cambicci (*)
BoG TD:Κ.Dimitrakopoulos-Κ.Grigoropoulos
Study period: 2004-2006
Construction details
General contractor: DOMOTECHNIKI SA
Construction period: 2007-2009
Construction status: in operation
Short description of project-services
The project subject is the design and supervi-
sion for the construction of the new building of
Money Circulation and Vaults of the National
Bank of Greece in Thessaloniki
metrics
Buildings surface: 5.500m2
Plot size: 35.000m2
Budget: 5.000.000 €
(*) co-designer 33% for planning & construction supervision
Company profile 2012
page 17 out of 129
O f f i c e B u i l d i n g R e n o v a t i o n i n A t h e n s , G r e e c e
Project owner
Henkel Hellas SA
Project design parties
Construction manager
A.Drazinou-N.Prounias
Architectural study
Tsigarida Architects
Structural study
Mep study
Cambicci+Associates
Study period: 2008
Construction details
General contractor: ΤΕΚΜΑ SA
Construction period: 2009
Construction status: in operation
Short description of project-services
The project scope was the transformation of
the existing office building into a modern mul-
tinational corporation office building in Greece,
with a hairdressing Academy, an auditorium
and an underground closed parking.
Google
metrics
Buildings surface: 8.500m2
Plot size: 4.100m2
Mep budget: 1.100.000 €
Cambicci+Associates
page 18
P o l i c e A d m i n i s t r a t i o n B u i l d i n g i n K o z a n i , G r e e c e
Project owner
MINISTRY OF INTERNAL AFFAIRS –
HELLENIC POLICE DEPARTMENT
Project design parties
Project management
KED SA
Architectural study
406 Studies group, Vasileios Pappas
Structural study
I.Mavrakis and Associates SA
Mep construction study
Cambicci+Associates
Study period: 2008-2009
Construction details
General contractor: ANDREADIS ZISIADIS SA
Construction period: 2009-2011
Construction status: in operation
Short description of project-services
The project scope was the construction study,
for the auction of the new office building con-
struction and underground parking area for the
accommodation of the peripheral Police divi-
sions of Western Macedonia prefecture, in
Greece. Google
metrics
Buildings surface: 5.200m2
Plot size: 4.000m2
Mep budget: 2.000.000 €
Company profile 2012
page 19 out of 129
M a n d a l i d e i o E n d o w m e n t a t N i k i s A v e n u e , T h e s s a l o n i k i , G r e e c e
Project owner
Company for the exploitation of
AUTh real estate
Project design parties
Project management
AUTh Technical Department
Architectural study
NIMAND Architects
Structural study
Ioannis Poulios
Mep study
Cambicci+Associates
Study period: 2009
Construction details
General contractor:
Construction period:
Construction status: ongoing
Short description of project-services
The project scope is the transformation of the
existing building in Nikis Avenue in Thessaloni-
ki into a Multiple Purpose Hall of the
Aritoteleion Univercity of Thessaloniki (A.U.Th.)
at Thessaloniki seafront.
Google
metrics
Buildings surface: 1.600m2
Plot size: 260m2
Mep budget: 800.000 €
Cambicci+Associates
page 20
O f f i c e b u i l d i n g i n T h e s s a l o n i k i
Project owner
Grigorios Karidas limited
Project design parties
Project management
Architectural study
Panetsos Panagiotis
Structural study
G&G Penelis Consulting Engineers SA
Mep study
Cambicci+Associates
Study period: 2007
Construction details
General contractor: ARCON Constructions
Construction period: 2008-2009
Construction status: in operation
Short description of project-services
The project scope is the transformation of the
existing building in Dragoumi Street in Thes-
saloniki into a modern office building.
Google
metrics
Buildings surface: 1.100m2
Plot size: 300m2
Mep budget: 500.000 €
Company profile 2012
page 21 out of 129
M A K E D O N I A I n t . A i r p o r t T e r m i n a l i n T h e s s a l o n i k i , G r e e c e
Project owner
OPPE Thessaloniki 97 –
EYDE of Northern Greece Airports
Project design parties
Project management
OPPE Thessaloniki 97
Architectural study
Polis SA, G.Papakostas, J.Vlahos
Structural study
Concept Consultant-Engineers limited
Mep study
Y. Cambicci (*)
Study period: 1997-2006
Construction details
General contractor: ZINON ATHANASIADIS SA
DOMOTECHNIKI SA – ANASTILOTIKI SA
ANDREADIS ZISIADIS SA
Construction period: 1997-2008
Construction status: in operation
Short description of project-services
Renovation of existing building and new ex-
pansions for a new Makedonia Airport Terminal
in Thessaloniki Greece Google
metrics
Buildings surface: 46.000m2
Plot size: 160.000m2
Mep budget: 40.000.000 €
(*) co-designer 25-50% (depending of the phase)
Cambicci+Associates
page 22
N a t i o n a l B a n k a n d C u l t u r a l C e n t e r i n N o r t h e r n G r e e c e
Project owner
National Bank of Greece SA
Project design parties
Project management
Andreadis-Zisiadis SA
Architectural study
Polis SA, G.Papakostas, J.Vlahos
Structural study
Concept Consultant-Engineers limited
Mep study
Cambicci+Associates
Study period: 2006
Construction details
General contractor: ANDREADIS ZISIADIS SA
Construction period: 2007-2008
Construction status: in operation
Short description of project-services
Expansion of an existing building.
Google
metrics
Buildings surface: 3.600m2
Plot size: 800m2
Mep budget: 800.000 €
Company profile 2012
page 23 out of 129
T o w n H a l l o f P y l a i a
Project owner
Municipality of Pylaia
Project design parties
Architectural study
K.Antoniou,E.Kastro,E.Disli,N.Barbari
Structural study
K.Anastasiadis, P.Panetsos
Mep study
Y. Cambicci (*)
Mep study advisor
Dr K.Pattas AUTh Proffessor
Study period: 1994-1996
Construction details
General contractor:
Construction period: 1997-2000
Construction status: in operation
Short description of project-services
Office building with 2 underground parking
levels in Pylaia, Thessaloniki.
Google
metrics
Buildings surface: 2.700m2
Plot size: 900m2
Mep budget: 1.000.000 €
(*) co-designer 33% for planning
Cambicci+Associates
page 24
O f f i c e b u i l d i n g i n T h e s s a l o n i k i
Project owner
Αsea Βrown Βoveri (ABB) ΑΕ
Project design parties
Architectural study
N.Ktenas
Structural study
OMETE & ASSOCIATES SA
Mep study
Y. Cambicci (*)
Mep construction supervisor
Thomas Kolivopoulos
Study period: 1998-2000
Construction details
General contractor: ERGO3
Construction period: 2002-2004
Construction status: in operation
Short description of project-services
New ABB offices & whole sales building in
North Greece
Google
metrics
Buildings surface: 4.000m2
Plot size: 6.200m2
Mep budget: 1.100.000 €
(*) co-designer 33% for planning
Company profile 2012
page 25 out of 129
CCCuuullltttuuurrreee
Cambicci+Associates
page 26
P l o v d i v O p e r a R e n o v a t i o n i n B u l g a r i a
Project owner
Oblast Plovdiv
Project design parties
Project management
ΑΚΤΟΡ BULGARIA SA
Architectural study
ΜΜΤ SΑ
Structural study
Concept Ltd
Mep study
Cambicci+Associates
Study period: 2007
Construction details
Gen. contr: AKTOR SA & AKTOP BULGARIA SA
Construction period: 2008-ongoing
Construction status: under construction
Short description of project-services
The project scope was the full renovation of
the existing historical building and it’s trans-
formation to a modern Opera House, the for-
mation of a Cultural Centre, the addition of a
commercial building and an automated under-
ground car parking area.
Google
metrics
Buildings surface: 14.000m2
Plot size: 8.000m2
Mep budget: 4.000.000 €
Company profile 2012
page 27 out of 129
T h e r m i M u n i c i p a l A u d i t o r i u m , T h e s s a l o n i k i G r e e c e
Project owner
Municipality of Thermi
Project design parties
Project management
Thermi Municipal TD
Architectural study
ΜΜΤ SA
Structural study
ΜΜΤ SA
Mep study
Cambicci+Associates
Study period: 2009-2010
Construction details
General contractor:
Construction period:
Construction status: ongoing
Short description of project-services
Project scope is the construction study and the
formulation of auction documents for the con-
struction of a new conservatoire in the munici-
pality of Thermi, Thessaloniki.
Google
metrics
Buildings surface: 1.600m2
Plot size: 1.700m2
Mep budget: 800.000 €
Cambicci+Associates
page 28
C u l t u r a l C e n t r e a t T a g a r a d e s , T h e s s a l o n i k i , G r e e c e
Project owner
Municipality of Thermi
Project design parties
Project management
Thermi Municipal TD
Architectural study
ΜΜΤ SA
Structural study
ΜΜΤ SA
Mep study
Cambicci+Associates
Study period: 2009-2010
Construction details
General contractor:
Construction period:
Construction status: ongoing
Short description of project-services
The project scope is the Study of a new Cultur-
al Center with Theatre in the municipality of
Thermi, Thessaloniki.
Google
metrics
Buildings surface: 4.800m2
Plot size: 4.600m2
Mep budget: 1.000.000 €
Company profile 2012
page 29 out of 129
M i c h a n i o n a C u l t u r a l C e n t r e i n T h e s s a l o n i k i , G r e e c e
Project owner
Municipality of Michaniona
Project design parties
Architectural study
E.Disli, X.Kiros, A.Xaritopoulos, Th.Theodoridis
Structural study
Concept Engineers Ltd
Mep study
Cambicci+Associates
Mep study associate
G. Klepkos
Study period: 2010
Construction details
General contractor:
Construction period:
Construction status: ongoing
Short description of project-services
The project scope is the construction study and
the compilation of auction documents for the
construction of the cultural center in the mu-
nicipality of Michaniona, Thessaloniki.
Google
metrics
Buildings surface: 1.200m2
Plot size: 4.000m2
Mep budget: 900.000 €
Cambicci+Associates
page 30
V y z a n t i n e M u s e u m o f V e r i a , G r e e c e
Project owner
Ministry of Culture
Project design parties
Project management
ΑΡΧΙΤΕX SA
Architectural study
G.Anifantis-S.Anifantis,
Κ.Asamopoulos,E.Skaltsa,D.Kontargiris,
Α.Lampakis
Structural study
S.Kounadis, L.Kounadis,
M.Zarkadoula & Associates
Mep study
Y. Cambicci (*)
Study period: 1998-2000
Construction details
General contractor: ARXITEX SA
Construction period: 2001-2003
Construction status: in operation
Short description of project-services
Reconstruction and building expansion of an
existing old factory building (mill) in Veria.
Google
metrics
Buildings surface: 2.500m2
Plot size: 2.400m2
Mep budget: 1.300.000 €
(*) co-designer 30% for planning
Company profile 2012
page 31 out of 129
M a c e d o n i c M u s e u m o f M o d e r n A r t i n T h e s s a l o n i k i , G r e e c e
Project owner
Macedonian Museum of Contemporary Art
Project design parties
Project management
ΑΡΧΙΤΕΤ ΑΤΕ
Architectural study
K.Antoniou-E.Kastro
Structural study
DELCO, N.Deligiannidis
Mep study
Y. Cambicci (*)
Study period: 1998-2000
Construction details
General contractor: ΑRΧΙΤΕΧ SΑ
Construction period: 2001-2003
Construction status: in operation
Short description of project-services
Renovation and expansion of a museum for
modern art in Thessaloniki.
Google
metrics
Buildings surface: 4.400m2
Plot size: 4.150m2
Mep budget: 1.600.000 €
(*) co-designer 33% for planning
Cambicci+Associates
page 32
C u l t u r a l C e n t r e o f t h e L a b o u r C e n t r e o f K o m o t i n i
Project owner
Labor Center of Komotini
Project design parties
Project management
S.Agathakis & F.Stratos
Architectural study
G.Mademlis, Telis Vasiliadis
Mep study
Y. Cambicci (*)
Acoustical study
N.Mparkas-D.Keramidas
Study period: 2001
Construction details
General contractor: AGATHAKIS-STRATOS
Construction period: 2002-2003
Construction status: in operation
Short description of project-services
Renovation of an existing Theater in Komotini
Greece.
Google
metrics
Buildings surface: 800m2
Plot size: 1.300m2
Mep budget: 400.000 €
(*) co-designer 33% for planning
Company profile 2012
page 33 out of 129
HHHooottteeelllsss
Cambicci+Associates
page 34
R e s t a u r a n t s A M M O S - A S T E R I A S a n d B o u s o u l a s a t S a n i R e s o r t i n H a l k i d i k i
Project owner
SANI SA
Project design parties
Architectural study
NIMAND Architects
Structural study
Mep study
Cambicci+Associates
Study period: 2010
Construction details
General contractor: SANI SA
Construction period: 2012
Construction status: in operation
Σύντομη περιγραφή έργου-υπηρεσιών
Renovation of 2 beach-bars & restaurants at
Sani resort in Halkidiki Greece.
Google
Μετρητικά στοιχεία
Buildings surface: 500m2
Plot size: m2
Mep budget: €
Company profile 2012
page 35 out of 129
O p e n T h e a t r e a n d m u l t i - f u n c t i o n a r e a a t t h e S a n i R e s o r t i n H a l k i d i k i
Project owner
SANI SA
Project design parties
Architectural study
NIMAND Architects
Structural study
Mep study
Cambicci+Associates
Lighting design
G-Lights
Study period: 2010
Construction details
General contractor: SANI SA
Construction period: 2010
Construction status: in operation
Short description of project-services
The project scope was the construction of a
new outdoor function area with a sheltered
stage, auxiliary areas and adequate
opticoacoustic equipment for the organization
of cultural events in the SANI RESORT area
Google
metrics
Buildings surface: 2.500m2
Plot size: m2
Mep budget: 500.000 €
Cambicci+Associates
page 36
H o t e l r e n o v a t i o n & e x p a n s i o n i n H a l k i d i k i , G r e e c e
Project owner
Eisaei SA
Project design parties
Project management
ΜΜΤ SA
Architectural study
NIMAND SA – MMT SA
Structural study
ΜΜΤ SA
Mep study
Cambicci+Associates
Study period: 2010
Construction details
General contractor: SYNTHESIS SΑ
Construction period: 2009-ongoing
Construction status: under construction
Short description of project-services
The project scope was the extension, recon-
struction, and upgrade of a 300-bed existing
hotel in Ouranoupolis, Halkidiki, Greece.
Google
metrics
Buildings surface: 9.500m2
Plot size: 25.000m2
Mep budget: 2.500.000 €
Company profile 2012
page 37 out of 129
C o n g r e s s H a l l a t A l e x a n d e r B e a c h H o t e l i n A l e x a n d r o u p o l i , G r e e c e
Project owner
Xatzikonstantinou Bros SA
Project design parties
Architectural study
A&B Stylianidis
Structural study
K.Xatzikonstantinou
Mep study
Y. Cambicci
Mep construction supervisor
Ν. Gemitzakis
Study period: 2006
Construction details
General contractor: ZINON ATHANASIADIS SA
Construction period: 2007
Construction status: in operation
Short description of project-services
The project scope was the construction of a
new versatile E.O.T. approved congress hall,
the formation of the outdoor area of the Hotel,
and the updgrade of the m.e.p. installations of
the Hotel
Google
Μετρητικά στοιχεία
Buildings surface: 1.200m2
Plot size: 10.000m2
Mep budget: 1.800.000 €
Cambicci+Associates
page 38
C a s i n o i n P o r t o C a r r a s G r a n d R e s o r t , H a l k i d i k i G r e e c e
Project owner
CASINO MAGIC PORTO CARRAS SA
Project design parties
Project management
ΑΡΧΙΤΕΧ SA
Architectural study
P.Makridis + Associates
Structural study
Mep study
Y. Cambicci (*)
Study period: 1996
Construction details
General contractor: ARXITEX SA
Construction period: 1996
Construction status: in operation
Short description of project-services
New Casino making in an existing Hotel Build-
ing in Porto Carras Grand Resort.
Google
metrics
Buildings surface: 1.500m2
Plot size: m2
Mep budget: 2.000.000 €
(*) co-designer 33% for planning
Company profile 2012
page 39 out of 129
S m a l l H o t e l i n S a n t o r i n i , G r e e c e
Project owner
Project design parties
Project management
Architectural study
I.Vlahos
Structural study
Mep study
Y. Cambicci (*)
Study period: 2000
Construction details
General contractor:
Construction period:
Construction status: in operation
Short description of project-services
Small Hotel Construction in Fira, Santorini,
Greece.
Google
metrics
Buildings surface: 700m2
Plot size: 8.000m2
Mep budget: 400.000 €
(*) co-designer 50% for planning
Cambicci+Associates
page 40
This page was intentionally left blank
Company profile 2012
page 41 out of 129
ΕΕΕddduuucccaaatttiiiooonnn
Cambicci+Associates
page 42
E x t e n s i o n o f t h e P e d a g o g y D e p a r t m e n t o f t h e A r i s t o t l e U n i v e r s i t y o f T h e s s a l o n i k i
Project owner
Aristotle University of Thessaloniki
Project design parties
Architectural study
Ν.Kalogirou Professor Dpt. Arch. Α.U.Th.
Α.Vasiliadis,Κ.Giatas,D.Koliakos,L.Mavridis
Structural study
Κ.Stylianidis Professor Dpt. Civ.Eng. Α.U.Th.
Ch.Ignatakis Professor Dpt. Civ.Eng. Α.U.Th.
S.Baxevanis
Mep construction study
Cambicci+Associates
Mep study consultant: Κ.Andreou Lecturer Dpt.
El.Eng. Α.U.Th.
Mep study advisor
Κ.Andreou Lecturer Dpt. El.Eng. Α.U.Th.
Study period: 2010
Construction details
General contractor:
Construction period:
Construction status: ongoing
Short description of project-services
The project scope was the costruction study for
the expansion of the pedagogy Department of
the A.U.Th with the addition of two new teach-
ing room wards as well as an auditorium
Google
metrics
Buildings surface: 18.500m2
Plot size: 10.000m2
Mep budget: 5.500.000 €
Company profile 2012
page 43 out of 129
A . U . T h C o n g r e s s H a l l i n P o l y t e c h n i c S c h o o l , G r e e c e
Project owner
Company for the exploitation of
A.U.Th. Real Estate
Project design parties
Project management
A.U.Th TD
Architectural study
ΝΙΜΑΝD Architects
Structural study
Ι.Poulios
Mep study
Cambicci+Associates
Study period: 2009
Construction details
General contractor:
Construction period:
Construction status: ongoing
Short description of project-services
The project scope was the construction study
and the compilation of auction documents for
the renovation of the existing central auditori-
ums of the Polytechnic School and the con-
struction of a modern conference center in
U.A.T. Google
metrics
Buildings surface: 3.200m2
Plot size: m2
Mep budget: 1.000.000 €
Cambicci+Associates
page 44
L i g h t i n g o f t h e A . U . T h P h i l o s o p h y D e p a r t m e n t
Project owner
A.U.Th
Project design parties
Project management
A.U.Th TD
Architectural study
Ν.Μ.Andreadi Professor Dept.Arch.A.U.th.
Mep study
Cambicci+Associates
Lighting design
G-Lights - M.Gourogiannis
Study period: 2010
Construction details
General contractor:
Construction period:
Construction status: ongoing
Short description of project-services
The project scope is the architectural lighting
of the facades of the landmark building of the
Philosophy Dept of the A.U. of Thessaloniki.
Google
metrics
Buildings surface: m2
Plot size: 4.000m2
Mep budget: 500.000 €
Company profile 2012
page 45 out of 129
B i s s e l l C o l l e g e L i b r a r y i n T h e s s a l o n i k i , G r e e c e
Project owner
Board of the American College of Thessaloniki
Project design parties
Project management
P.Makridis
Architectural study
P.Makridis + Associates
Structural study
Mep study
Y. Cambicci (*)
Study period: 1996
Construction details
General contractor: DOMOTECHNIKI SA
Construction period: 1997-1998
Construction status: in operation
Short description of project-services
New Library Building in American College of
Thessaloniki.
Google
metrics
Buildings surface: 4.000m2
Plot size: 10.000m2
Mep budget: 2.150.000 €
(*) co-designer 33% for planning
Cambicci+Associates
page 46
R e c o n s t r u c t i o n o f p r i v a t e s c h o o l i n T h e s s a l o n i k i , G r e e c e
Project owner
American College ‘Anatolia’ of Thessaloniki
Project design parties
Project management
P.Makridis
Architectural study & construction supervision
P.Makridis + Associates SA
Structural study
Mep study & construction supervision
Cambicci+Associates
Study period: 2010
Construction details
General contractor:
Construction period: 2010
Construction status: in operation
Short description of project-services
Elaboration of the construction study and the
cost analysis reports.
Google
metrics
Buildings surface: 1.500m2
Plot size: 20.000m2
Mep budget: 300.000 €
Company profile 2012
page 47 out of 129
HHHeeeaaalllttthhh
Cambicci+Associates
page 48
R e h a b i l i t a t i o n C e n t r e i n S e r r e s , G r e e c e
Project owner
ANANEOSI SA
Project design parties
Project management
SYNTHESIS SA
Architectural study
ΜΜΤ SA
Structural study
ΜΜΤ SA
Mep study
Cambicci+Associates
Study period: 2010
Construction details
General contractor:
Construction period: 2009
Construction status: in operation
Short description of project-services
The project scope was the study of a rehabili-
tation center in the municipality of Emmanouil
Pappas in Serres.
Google
metrics
Buildings surface: 5.200m2
Plot size: 6.700m2
Mep budget: 2.000.000 €
Company profile 2012
page 49 out of 129
R e n o v a t i o n o f t h e B l u e C r o s s C l i n i c i n T h e s s a l o n i k i , G r e e c e
Project owner
EUROMEDICA SA
‘KIANOYS STAYROS’ SA
Project design parties
Project management
EUROMEDICA TD
Architectural study
POLIS SA, MEIONENA
Structural study
K.Makedos
Mep study
Y. Cambicci (*)
Study period: 2000-2001
Construction details
General contractor: AKTOR SA
Construction period: 2001-2002
Construction status: in operation
Short description of project-services
Tottaly reconstruction of a major clinik in Thes-
saloniki.
Google
metrics
Buildings surface: 5.800m2
Plot size: 1.300m2
Mep budget: 3.000.000 €
(*) co-designer 33% for planning
Cambicci+Associates
page 50
C e n t r a l M E P I n s t a l l a t i o n s r e n o v a t i o n a t P r i v a t e G e n e r a l C l i n i c i n T h e s s a l o n i k i
Project owner
EUROMEDICA SA
GENIKI KLINIKI SA
Project design parties
Project management
EUROMEDICA TD
Architectural study
Structural study
Mep study
Y. Cambicci (*)
Study period: 2001-2002
Construction details
General contractor: ERGO3
Construction period: 2002-2003
Construction status: in operation
Short description of project-services
Reconstruction of the central MEP networks in
a general clinik in Thessaloniki.
Google
metrics
Buildings surface: 8.000m2
Plot size: 1.800m2
Mep budget: 1.000.000 €
(*) co-designer 33% for planning
Company profile 2012
page 51 out of 129
N e w S u r g e r y a n d A d m i n i s t r a t i o n B u i l d i n g i n A H E P A H o s p i t a l i n T h e s s a l o n i k i , G r e e c e
Project owner
Ministry of Health
Project design parties
Project management
AHEPA TD
Architectural study
X.Kouloukouris,A.Tseranidis Ε.Ε.
TROPALIS E.T.E.
Structural study
Mep study
Y. Cambicci (*)
Study period: 2001-2002
Construction details
General contractor:
Construction period:
Construction status: postponed
Short description of project-services
New Surgeries, Central Sterilise Department,
Intensive Care Department and administration
building for a General Hospital in Thessaloniki.
Google
metrics
Buildings surface: 5.800m2
Plot size: m2
Mep budget: 5.600.000 €
(*) co-designer 33% for planning
Cambicci+Associates
page 52
E . D . a n d B l o o d D o n a t i o n C e n t r e a t I p p o k r a t e i o H o s p i t a l i n T h e s s a l o n i k i , G r e e c e
Project owner
DEPANOM SA
Project design parties
Project management
J&P AVAX SA
Architectural study
METE SYSM SA
Structural study
METE SYSM SA
Mep study
Y. Cambicci (*)
Study period: 2004
Construction details
General contractor: J&P-AVAX SΑ
Construction period: 2004-2006
Construction status: in operation
Short description of project-services
Reconstruction of existing building for emer-
gency department and making of a new build-
ing for blood donation center.
Google
metrics
Buildings surface: 2.500m2
Plot size: m2
Mep budget: 1.100.000 €
(*) co-designer 33% for planning
Company profile 2012
page 53 out of 129
SSShhhoooppppppiiinnnggg mmmaaallllllsss &&& RRReeetttaaaiiilll ssstttooorrreeesss
Cambicci+Associates
page 54
S h o p p i n g C e n t e r a t X a n t h i , G r e e c e
Project owner
ALPHA RETAIL PARKS SA
Project design parties
Project management
Leonidas Athanasiadis
Architectural study
archigraph architecture_interiors
Structural study
Statoras
Mep study
Cambicci+Associates
Study period: 2010
Construction details
General contractor: ZINON ATHANASIADIS SA
Construction period: 2009-2010
Construction status: in operation
Short description of project-services
New Shopping Center Flamingo in Xanthi.
Google
metrics
Buildings surface: 18.500m2
Plot size: 80.000m2
Mep budget: 2.200.000 €
Company profile 2012
page 55 out of 129
H y p e r m a r k e t a t X a n t h i , G r e e c e
Project owner
PRAKTIKER HELLAS ΑΕ
Project design parties
Project management
Leonidas Athanasiadis
Architectural study
archigraph architecture_interiors
Structural study
Statoras
Mep study
Cambicci+Associates
Study period: 2010
Construction details
General contractor: ZINON ATHANASIADIS SA
Construction period: 2009-2010
Construction status: in operation
Short description of project-services
Hypermarket in Flamingo Shopping Center in
Xanthi. The fire study was inspected and ap-
proved by VdS.
Google
metrics
Buildings surface: 4.500m2
Plot size: 5.500m2
Mep budget: 1.200.000 €
Cambicci+Associates
page 56
E a s t T h e s s a l o n i k i S h o p p i n g C e n t e r
Project owner
ΦΑΜ ΑΕ
Project design parties
Development, Project & Construction
management
Alexander Kalatzis
Architectural study
S.Suchomel-Τ.Kalatzis-Μ.kalatzis
Structural study
G.Papargyris-A.Kardoula & Associates
Mep study
Cambicci+Associates
Study period: 2009
Construction details
General contractor: ΜΑΚΤ SΑ
Construction period: 2009-2010
Construction status: in operation
Short description of project-services
New Shopping Center East Plazza in eastern
Thessaloniki.
Google
metrics
Buildings surface: 9.300m2
Plot size: 30.000m2
Mep budget: 1.800.000 €
Company profile 2012
page 57 out of 129
E a s t T h e s s a l o n i k i H y p e r m a r k e t
Project owner
SATURN-MEDIA MARKT ΑΕ
Project design parties
Project management
MAKT SA-LDK SΑ
Interior Architectural study
LDK ΑΕ
Mep study
LDK SΑ - Cambicci+Associates
Mep construction supervision
LDK SΑ - Cambicci+Associates
Study period: 2009
Construction details
General contractor: ΜΑΚΤ SA
Construction period: 2009-2010
Construction status: in operation
Short description of project-services
Fire safety construction study and MEP super-
vision in Saturn Hypermarket in east Thessalo-
niki.
Google
metrics
Buildings surface: 6.400m2
Plot size: m2
Mep budget: 1.400.000 €
Cambicci+Associates
page 58
W e s t T h e s s a l o n i k i H y p e r m a r k e t
Project owner
HELLINIKI ETERIA IDIOKATASKEVON SA
Project design parties
Project management
ECC Engineering Construction Consulting SA
Architectural study
archigraph architecture_interiors
Structural study
Statoras
Mep study
Cambicci+Associates
Study period: 2009
Construction details
General contractor:
Construction period:
Construction status: under development
Short description of project-services
Mep study for making of a new hypermarket in
Western Thessaloniki.
Google
metrics
Buildings surface: 10.300m2
Plot size: 49.000m2
Mep budget: 1.600.000 €
Company profile 2012
page 59 out of 129
H y p e r m a r k e t i n T i r a n a , A l b a n i a
Project owner
Megatek ShA
Project design parties
Project management
Dionis Teqja
Architectural study
archigraph architecture_interiors
Structural study
Statoras
Mep study
Cambicci+Associates
Study period: 2007
Construction details
General contractor: ZAlba SA
Construction period: 2008-2009
Construction status: in operation
Short description of project-services
Retail & Whole Sale Building for MEGATEK ShA
and new office bulding for DIONIS TEQJA
Companies in Tirana-Durred Highway in Alba-
nia.
Google
metrics
Buildings surface: 25.200m2
Plot size: 75.000m2
Mep budget: 2.600.000 €
Cambicci+Associates
page 60
H y p e r m a r k e t i n L a r i s s a , G r e e c e
Project owner
HELLINIKI ETERIA IDIOKATASKEVON SA
Project design parties
Project management
Focal Project Managers
Architectural study
archigraph architecture_interiors
Structural study
Statoras
Initial mep study
Α.Koutsikos SA
Mep construction study
Cambicci+Associates
Study period: 2008-2009
Construction details
General contractor: ZINON ATHANASIADIS SA
Construction period: 2009
Construction status: in operation
Short description of project-services
Modofications in construction study for a new
hypermarket in Larissa Greece.
Google
metrics
Buildings surface: 7.900m2
Plot size: 38.000m2
Mep budget: 1.400.000 €
Company profile 2012
page 61 out of 129
H y p e r m a r k e t i n V o l o s , G r e e c e
Project owner
MAKRO Cash & Carry SA
Project design parties
Project management
John Ninos
Architectural study & construction supervision
archigraph architecture_interiors
Structural study & construction supervision
Statoras
Mep study & construction supervision
Cambicci+Associates
Study period: 2007
Construction details
Gen. contractor:ΑRΧΙΚΟΝ SA-ANAPLASEON SA
Construction period: 2008
Construction status: in operation
Short description of project-services
Mep Study and construction supervision for a
new makro hypermarket in Volos, Greece.
Google
metrics
Buildings surface: 4.200m2
Plot size: 29.000m2
Mep budget: 1.000.000 €
Cambicci+Associates
page 62
H y p e r m a r k e t i n V e r i a , G r e e c e
Project owner
Kalpakis Panagiotis Co
Project design parties
Initial Architectural study
A.Sidiropoulos
Construction Architectural study
Κ.Papastergiou
Structural study
S.Diamantopoulos
Mep study & construction supervision
Cambicci+Associates
Study period: 2007
Construction details
General contractor: EGERSIS Limited
Construction period: 2007-2008
Construction status: in operation
Short description of project-services
New factory and sales center for Kalpakis De-
sign Company in Veria, Greece.
Google
metrics
Buildings surface: 5.800m2
Plot size: 5.200m2
Mep budget: 1.500.000 €
Company profile 2012
page 63 out of 129
H y p e r m a r k e t i n X a n t h i , G r e e c e
Project owner
MAKRO Cash & Carry SA
Project design parties
Project management
Leonidas Athanasiadis
Architectural study & construction supervision
archigraph architecture_interiors
Structural study & construction supervision
Statoras
Mep study & construction supervision
Cambicci+Associates
Study period: 2006-2007
Construction details
General contractor: ZINON ATHANASIADIS SA
Construction period: 2008
Construction status: in operation
Short description of project-services
Mep Study and construction supervision for a
new makro hypermarket in Xanthi, Greece
Google
metrics
Buildings surface: 4.200m2
Plot size: 22.800m2
Mep budget: 1.000.000 €
Cambicci+Associates
page 64
S h o p p i n g c e n t e r i n T h e s s a l o n i k i , G r e e c e
Project owner
Carrefour Hellas SA
Project design parties
Development, Project &
Cosntruction management
MAKT SA – Alexander Kalatzis
Architectural construction supervision
S.Vergopoulos, N.Dimtsas
Structural construction supervision
G.Papargyris
Mep construction supervision
Cambicci+Associates
Study period: 1998-1999
Construction details
General contractor: ZINON ATHANASIADIS SA
Construction period: 1999-2000
Construction status: in operation
Short description of project-services
MAKEDONIA Major Shopping Center in Thessa-
loniki. In the center exists Carrefour Hyper-
market, Cinema Complex, Shopping Mall, and
Recreational area building.
Google
metrics
Buildings surface: 35.000m2
Plot size: 140.000m2
Mep budget: 4.800.000 €
Company profile 2012
page 65 out of 129
W e s t T h e s s a l o n i k i H y p e r m a r k e t
Project owner
MAKRO Cash & Carry SA
Project design parties
Project management
Leonidas Athanasiadis
Architectural study & construction supervision
archigraph architecture_interiors
Structural study & construction supervision
Statoras
Mep study & construction supervision
Cambicci+Associates
Study period: 2004
Construction details
General contractor: ZINON ATHANASIADIS SA
Construction period: 2004-2005
Construction status: in operation
Short description of project-services
Mep Study and construction supervision for a
new makro hypermarket in Western Thessalo-
niki Area, Greece.
Google
metrics
Buildings surface: 4.200m2
Plot size: 22.000m2
Mep budget: 1.000.000 €
Cambicci+Associates
page 66
E a s t T h e s s a l o n i k i E l e c t r i c a l H y p e r m a r k e t
Project owner
ΤΑΚ AE
Project design parties
Development, Project &
Construction management
MAKT SA - Alexander kalatzis
Architectural study
Μ.Kalatzis-Τ.Kalatzi-S.Suchomel
Structural study & construction supervision
G.Papargyris
Mep construction supervision
Cambicci+Associates
Study period: 2005
Construction details
General contractor: ΜΑΚΤ SΑ
Construction period: 2004-2005
Construction status: in operation
Short description of project-services
Mep construction supervision for a new hyper-
market in Thessaloniki.
Google
metrics
Buildings surface: 7.200m2
Plot size: 17.500m2
Mep budget: 900.000 €
Company profile 2012
page 67 out of 129
H y p e r m a r k e t i n T h e s s a l o n i k i , G r e e c e
Project owner
Diagonios SA
Project design parties
Project management
Architectural study
A.N Tombazis & Associates Architects-
P.Makridis+Associates
Structural study
Ι.Poulios
Mep study
Y. Cambicci (*)
Study period: 2000
Construction details
General contractor: DIAGONIOS SA
Construction period: 2001
Construction status: in operation
Short description of project-services
New Shopping center EUROTECH for building
materials stores in eastern Thessaloniki area.
Google
metrics
Buildings surface: 8.000m2
Plot size: 20.000m2
Mep budget: 1.300.000 €
(*) co-designer 33% for planning
Cambicci+Associates
page 68
D u t y F r e e S h o p s i n B o r d e r S t a t i o n s
Project owner
Hellenic Duty Free Shops SA
Project design parties
Project management
Architectural study
POLIS SA, G.Vlahos
Structural study
Concept SA
Mep study
Y. Cambicci (*)
Study period: 2004
Construction details
General contractor:
Construction period:
Construction status: in operation
Short description of project-services
New stores for Hellenic Duty Free Shops in
Greece Border Stations at Kakavia, Promahona
Rhodes Airport and Katakolo port (construction
postponed).
Google 1 2 3 4 5
metrics
Buildings surface: 5.000m2
Plot size: m2
Mep budget: 650.000 €
(*) co-designer 33% for planning
Company profile 2012
page 69 out of 129
 
 
 
RRReeecccrrreeeaaatttiiiooonnn
Cambicci+Associates
page 70
R e s t a u r a n t i n T h e s s a l o n i k i , G r e e c e
Project owner
Clochard Restaurant
Project design parties
Project management
Architectural study & construction supervision
P.Makridis+Associates SA
Structural study
Mep study & construction supervision
Cambicci+Associates
Study period: 2007
Construction details
General contractor:
Construction period: 2008
Construction status: in operation
Short description of project-services
Restaurant reconstruction in Thessaloniki cen-
ter.
Google
metrics
Buildings surface: m2
Plot size: m2
Mep budget: €
Company profile 2012
page 71 out of 129
C a f é & R e s t a u r a n t i n T i r a n a , A l b a n i a
Project owner
Albanian restaurants Sha
Project design parties
Project management
Vivartia TD-Goodys
Architectural study
archigraph architecture_interiors
Structural study
Mep study
Cambicci+Associates
Study period: 2007
Construction details
General contractor:
Construction period: :
Construction status: postponed
Short description of project-services
Goodys & Flocafé stores in MEGATEK shopping
center in Tirana Albania.
Google
metrics
Buildings surface: 800m2
Plot size: m2
Mep budget: 250.000 €
Cambicci+Associates
page 72
This page was intentionally left blank
Company profile 2012
page 73 out of 129
SSSpppooorrrtttsss
Cambicci+Associates
page 74
R e n o v a t i o n o f T o u m p a a r e a i n T h e s s a l o n i k i , G r e e c e
Project owner
Municipality of Thessaloniki
Project design parties
Project management
Thessaloniki Organisation
Architectural study
A.Panos M.Papadakis Architects,
DEKATHLON SA
Structural study
Concept Engineers
Mep study
Y. Cambicci (*)
Study period: 2004
Construction details
General contractor:
Construction period: 2005-2008
Construction status: in operation
Short description of project-services
Open swimming pool, new cultural center, in
Alana tis Toumpas area of Thessaloniki.
Google
metrics
Buildings surface: 7.200m2
Plot size: 33.000m2
Mep budget: 2.700.000 €
(*) co-designer 33% for planning
Company profile 2012
page 75 out of 129
I n d o o r s w i m m i n g p o o l f a c i l i t y i n V e r i a , G r e e c e
Project owner
Municipality of Veria
Project design parties
Project management
Evripos SA
Architectural study
PETRA SINERGATIKI Consulting Engineers
Structural study
Concept Consulting Engineers
Mep study
Y. Cambicci (*)
Study period: 2006
Construction details
General contractor: EVRIPOS SA
Construction period:
Construction status: postponed
Short description of project-services
New major indoor swimming pool facility in
Veria sports center.
Google
metrics
Buildings surface: 11.000m2
Plot size: 28.000m2
Mep budget: 2.200.000 €
(*) co-designer 33% for planning
Cambicci+Associates
page 76
A r t i f i c i a l l a k e s c o m p l e x i n K a l a m a r i a , T h e s s a l o n i k i
Project owner
Municipality of Kalamaria
Project design parties
Project management
Municipality of Kalamaria TD
Architectural study
Stamatis Koukopoulos
Structural study
Mep study
Cambicci+Associates
Study period: 1999
Construction details
General contractor:
Construction period:
Construction status: cancelled
Short description of project-services
Outdoor major swimming pool and icetrack in
Kalamaria, Thessaloniki, Greece.
Google
metrics
Buildings surface: 3.500m2
Plot size: 19.000m2
Mep budget: 1.200.000 €
Company profile 2012
page 77 out of 129
HHHooouuusssiiinnnggg
Cambicci+Associates
page 78
V I P V i l l a i n P e f k o c h o r i H a l k i d i k i , G r e e c e
Project owner
Project design parties
Project management
ΜΜΤ SA
Architectural study & construction supervision
Peter Schellinger
Ε.Tzekakis, N.Manou-Andreadis
R.Papadakis, D.Aristotelidis
Structural study
Ι.Poulios
Mep study & construction supervision
Cambicci+Associates
Study period: 2011
Construction details
General contractor:
Construction period: 2011-ongoing
Construction status: under construction
Short description of project-services
VIP Villas complex in Pefkochori Halikidiki,
Greece.
Google
metrics
Buildings surface: 700m2
Plot size: 16.000m2
Mep budget: 1.000.000 €
Company profile 2012
page 79 out of 129
T w o c o u n t r y v i l l a s a t S k i a t h o s I s l a n d , G r e e c e
Project owner
Project design parties
Project management
P.Makridis+Associates SA
Architectural study & construction supervision
P.Makridis+Associates SA
Petros Makridis
Thodoris Makridis
Eleana Makridis
Structural study
Mep study & construction supervision
Cambicci+Associates
Study period: 2010
Construction details
General contractor:
Construction period: 2012
Construction status: under construction
Short description of project-services
Two country villas in Skiathos town area.
Google
Μετρητικά στοιχεία
Buildings surface: 220m2
Plot size: 4.000m2
Mep budget: €
Cambicci+Associates
page 80
O f f i c e s & H o u s e s C o m p l e x i n M e t a x o u r g i o A t h e n s , G r e e c e
Project owner
GEK SA
Project design parties
Project management
Architectural study
Tsigarida Architects
Structural study
Α.Xenos
Mep study
Cambicci+Associates
Study period: 2006
Construction details
General contractor:
Construction period:
Construction status:
Short description of project-services
1st
prize in architectural contest in
Metaxourgeio area in Athens, Greece
metrics
Buildings surface: m2
Plot size: m2
Mep budget: €
Company profile 2012
page 81 out of 129
V i l l a i n M o l i v o s , L e s v o s I s l a n d , G r e e c e
Project owner
Project design parties
Project management
Architectural study
Tsigarida Architects
Structural study
Mep study
Cambicci+Associates
Study period: 1999
Construction details
General contractor:
Construction period:
Construction status:
Short description of project-services
Country Villa at Molivos in Lesvos Island,
Greece.
Google
Μετρητικά στοιχεία έργου
Buildings surface: 150m2
Plot size: 4.000m2
Mep budget: €
Cambicci+Associates
page 82
V i l l a i n P o t i d a i a H a l k i d i k i , G r e e c e
Project owner
Project design parties
Project management
Architectural study
archigraph architecture_interiors
Structural study
Statoras
Mep study
Cambicci+Associates
Study period: 2009
Construction details
General contractor:
Construction period:
Construction status: in operation
Short description of project-services
A seaside villa in Halkidiki, Greece
Google
metrics
Buildings surface: m2
Plot size: m2
Mep budget: €
Company profile 2012
page 83 out of 129
P l a g i a r i S . O . S . v i l l a g e f o r o r p h a n c h i l d r e n i n T h e s s a l o n i k i , G r e e c e
Project owner
SOS Village for Northern Greece
Project design parties
Project management
Architectural study
P.Makridis+Associates
Structural study
Mep study
Y. Cambicci (*)
Study period: 1999
Construction details
General contractor:
Construction period:
Construction status: in operation
Short description of project-services
MEP Study for a full village construction, com-
posed of houses, main multipurpose building,
sports areas, roads and infrastructure.
Google
metrics
Buildings surface: 4.000m2
Plot size: 13.000m2
Mep budget: 1.100.000 €
(*) co-designer 33% for planning
Cambicci+Associates
page 84
P r e s s V i l l a g e f o r A t h e n s O l y m p i c G a m e s i n M a r o u s i A t h e n s , G r e e c e
Project owner
Municipality of Amarousion
Project design parties
Project management
Architectural study
Structural study
Mep study
Y. Cambicci (*)
Study period: 1999
Construction details
General contractor:
Construction period:
Construction status: in operation
Short description of project-services
Complete mep study for village buildings made
for the Olympic Games.
Google
metrics
Buildings surface: 8.000m2
Plot size: 30.000m2
Mep budget: €
(*) co-designer 50% for planning
Company profile 2012
page 85 out of 129
UUUrrrbbbaaannn
Cambicci+Associates
page 86
W h i t e T o w e r s q u a r e r e n o v a t i o n i n T h e s s a l o n i k i , G r e e c e
Project owner
Municipality of Thessaloniki
Project design parties
Project management
Architectural study
Tsigarida Architects
Mep study
Y. Cambicci (*)
Lighting design
Duillio Passariello Li-Dac Philips
Study period: 2005
Construction details
General contractor:
Construction period:
Construction status: in operation
Short description of project-services
Mep study for the square of White tower, sym-
bol of the city of Thessaloniki.
Google
metrics
Buildings surface: 100m2
Plot size: 18.000m2
Mep budget: 500.000 €
(*) co-designer 33% for planning
Company profile 2012
page 87 out of 129
K e f a l a r i s p r i n g s a r e a i n D r a m a , G r e e c e
Project owner
DEPOS SΑ
Project design parties
Project management
DEPOS SA
Architectural study
George Triantafyllidis
Structural study
Mep study
Y. Cambicci (*)
Study period: 2005
Construction details
General contractor:
Construction period:
Construction status: in operation
Short description of project-services
Google
metrics
Buildings surface: 500m2
Plot size: 16.000m2
Mep budget: 900.000 €
(*) co-designer 50% for planning
Cambicci+Associates
page 88
H e l l e n i c g a r d e n i n g a r d e n i n g E X P O i n C h i n a
Project owner
HELEXPO SA
Project design parties
Project management
HELEXPO SA
Architectural study
P.Nikiforidis, B.Cuomo
Structural study
Maria Stefanouri
Mep study
Y. Cambicci (*)
Study period: 2006
Construction details
General contractor:
Construction period:
Construction status: in operation
Short description of project-services
A garden for Shen Yang China International
Hogricultural Exposition 2006.
Google
metrics
Buildings surface: m2
Plot size: 1.200m2
Mep budget: €
(*) co-designer 50% for planning
Company profile 2012
page 89 out of 129
R e f u r b i s h m e n t o f t h e n e w p r o m e n a d e o f T h e s s a l o n i k i , G r e e c e
Project owner
Municipality of Thessaloniki
Project design parties
Architectural study
P.Nikiforidis, B.Cuomo,
Atelier R.Castro-S.Denissof
Structural study
I.Lavasas-M.Stefanouri
Plants & trees arrangement study
Iloriki
Mep study
Y. Cambicci (*)
Study period: 2006
Construction details
General contractor: SIDIRODROMIKA ERGA SA
Construction period: phase A+B: 2006-2008
Phase C: 2011-ongoing
Construction status: 50% in operation
50% under construction
Short description of project-services
Full renovation of Thessaloniki promenade.
Google
metrics
Buildings surface: m2
Plot size: 280.000m2
Mep budget: 6.000.000 €
(*) co-designer 33% for planning
Cambicci+Associates
page 90
This page was intentionally left blank
Company profile 2012
page 91 out of 129
IIInnnddduuussstttrrriiiaaalll OOOiiilll &&& GGGaaasss iiinnnssstttaaallllllaaatttiiiooonnnsss
Cambicci+Associates
page 92
E l e c t r i c a l s y s t e m s m a n u f a c t u r i n g f a c t o r y i n K a l o h o r i , T h e s s a l o n i k i , G r e e c e
Project owner
SIAFARAS ELECTRICAL SYSTEMS SA
Project design parties
Architectural study
archigraph architecture_interiors
Structural study
Statoras
Mep study
Cambicci+Associates
Energy study
Energy Technologies ΕΝΤΕ
Study period: 2008-2009
Construction details
General contractor: FRIGOSTAHL SΑ
Construction period: 2010-2011
Construction status: under construction
Short description of project-services
Expansion of existing factory in Thessaloniki
Google
metrics
Buildings surface: 4.200m2
Plot size: 10.000m2
Mep budget: 800.000 €
Company profile 2012
page 93 out of 129
N e w f a c t o r y - m i l l i n S i n d o s i n d u s t r i a l a r e a , G r e e c e
Project owner
E.DI.V.E. SA
(Allatini Mill)
Project design parties
Project management
Architectural study
P.Makridis+Associates
Structural study
Mep study
Y.Cambicci (*)
Study period: 1995-1998
Construction details
Gen. contractor: ΕLLINIKI TECHNODOMIKI SA
ΤΕΚ THESSALONIKI SΑ
Construction period: 1997-1998
Construction status: in operation
Short description of project-services
Mep study & supervision for a new factory in
Sindos area.
Google
metrics
Buildings surface: 9.100m2
Plot size: 33.000m2
Mep budget: 1.200.000 €
(*) co-designer 33% for planning
Cambicci+Associates
page 94
C a r r e p a i r d e p o t
Project owner
Municipality of Thessaloniki
Project design parties
Project management
ΑΡΧΙΤΕΧ SA
Architectural study
Anthi Katsika
Structural study
Parisis Mpillias
Mep study
Y.Cambicci (*)
Study period: 2004
Construction details
General contractor: ARXITEX SA
Construction period: 2004
Construction status: in operation
Short description of project-services
New car repair depot for Thessaloniki munici-
pality.
Google
metrics
Buildings surface: 5.300m2
Plot size: 4.700m2
Mep budget: 900.000 €
(*) co-designer 50% for planning
Company profile 2012
page 95 out of 129
F i s h e r y p r o c e s s i n g f a c t o r y i n K a v a l a i n d u s t r i a l a r e a , G r e e c e
Project owner
TRIFONIDIS SA
Project design parties
Project management
Architectural study
archigraph architecture_interiors
Structural study
G.Papargyris-A.Kardoula
Mep study
Y.Cambicci (*)
Study period: 2002
Construction details
General contractor: ZINON ATHANASIADIS SA
Construction period: 2003
Construction status: in operation
Short description of project-services
New factory in Kavala area.
Google
metrics υ
Buildings surface: 3.200m2
Plot size: 12.000m2
Mep budget: 500.000 €
(*) co-designer 50% for planning
Cambicci+Associates
page 96
F u r n i t u r e f a c t o r y i n K a v a l a r i , T h e s s a l o n i k i , G r e e c e
Project owner
N.KARAPIPERIDIS-S.PARITSIS Co
Project design parties
Project management
Architectural study
archigraph architecture_interiors
Structural study
G.Papargyris-A.Kardoula
Mep study
Y.Cambicci (*)
Study period: 2003
Construction details
General contractor:
Construction period: 2003
Construction status: in operation
Short description of project-services
New factory in Langadas area.
Google
metrics
Buildings surface: 1.500m2
Plot size: 7.000m2
Mep budget: 200.000 €
Company profile 2012
page 97 out of 129
N e w m e a t f a c t o r y i n F l o r i n a , G r e e c e
Project owner
VASILEIOS SAVVOPOULOS SA
Project design parties
Project management
Leonidas Athanasiadis
Architectural study
archigraph architecture_interiors
Structural study
G.Papargyris-A.Kardoula
Mep study
Y.Cambicci (*)
Study period: 1997
Construction details
General contractor: ZINON ATHANASIADIS SA
Construction period: 1997
Construction status: in operation
Short description of project-services
New factory in Florina area.
Google
metrics
Buildings surface: 2.000m2
Plot size: 8.000m2
Mep budget: 500.000 €
(*) co-designer 33% for planning
Cambicci+Associates
page 98
This page was intentionally left blank
Company profile 2012
page 99 out of 129
IIInnnfffrrraaassstttrrruuuccctttuuurrreee
Cambicci+Associates
page 100
P o t i d a i a n e w H i g h w a y B r i d g e i n H a l k i d i k i , G r e e c e
Project owner
EGNATIA ODOS SA
Project design parties
Project management
HELLINIKI TECHNODOMIKI SA
Συγκοινωνιακή μελέτη
GEOGNOSI SA
Structural study
VSL Systems AE
Mep study
Y.Cambicci (*)
Study period: 2001
Construction details
Gen. contractor: ELLINIKI TECHNODOMIKI SA
Construction period: 2001
Construction status: in operation
Short description of project-services
New potidaia bridge with connecting highway
in Halkidiki.
Google
metrics
Buildings surface: m2
Plot size: m2
Mep budget: €
(*) co-designer 50% for planning
Company profile 2012
page 101 out of 129
C u t & C o v e r u n d e r g r o u n d t u n n e l i n T h e s s a l o n i k i - M i c h a n i o n a A v e n u e
Project owner
Region of Central Makedonia
Project design parties
Project management
Συγκοινωνιακή μελέτη
DIKTYO SA
Structural study
ΜΕΤΕ SYSM SA
Mep study
Y.Cambicci (*)
Study period: 2002
Construction details
General contractor:
Construction period:
Construction status: postponed
Short description of project-services
Preliminary mep study for a 3 lanes carriage-
way tunnel, 314m long, in MAKEDONIA Airport
area.
Google
metrics
Buildings surface: m2
Plot size: m2
Mep budget: 3.000.000 €
(*) co-designer 50% for planning
Cambicci+Associates
page 102
W a t e r t r e a t m e n t f a s c i l i t y f o r K o z a n i i n d u s t r i a l a r e a
Project owner
Prefecture of Kozani
Project design parties
Project management
ENCO Co
Χημικοτεχνική μελέτη
ENCO Co
Structural study
Kostas Chatzis
Mep study
Cambicci+Associates
Study period: 2008
Construction details
General contractor: ITHAKI SA-MESOGEOS SA
Construction period: 2008
Construction status: in operation
Short description of project-services
Renovation and expansion of water treatment
fascility center for an industrial area.
Google
metrics
Buildings surface: m2
Plot size: m2
Mep budget: 500.000 €
Company profile 2012
page 103 out of 129
W a t e r t r e a t m e n t f a s c i l i t y f o r A m y n t a i o , G r e e c e
Project owner
Municipality of Amyntaio
Project design parties
Project management
ENCO CO
Chemical study
ENCO CO
Structural study
Kostas Chatzis
Mep study
Cambicci+Associates
Study period: 2007
Construction details
General contractor: DISTILOS SA
Construction period: 2007
Construction status: in operation
Short description of project-services
Renovation and expansion of water treatment
fascility center.
Google
metrics
Buildings surface: m2
Plot size: m2
Mep budget: 650.000 €
Cambicci+Associates
page 104
I r r i g a t i o n n e t w o r k o f M e s s i a n i , K o z a n i s , G r e e c e
Project owner
Prefecture of Kozani
Project design parties
Project management
Anaptixiaki Kozanis
Hydraulic study
Horotechniki SA
Structural study
Akis Mystakidis
Mep study
Y.Cambicci (*)
Study period: 1998
Construction details
General contractor:
Construction period:
Construction status: in operation
Short description of project-services
Pump stations for irrigation networks.
Google
metrics
Buildings surface: m2
Plot size: m2
Mep budget: €
(*) co-designer 33% for planning
Company profile 2012
page 105 out of 129
ΕΕΕnnneeerrrgggyyy
Cambicci+Associates
page 106
T o w n H a l l o f P y l a i a
Project owner
Municipality of Pylaia
Project design parties
Architectural study
K.Antoniou,E.Kastro,E.Disli,N.Barbari
Structural study
K.Anastasiadis, P.Panetsos
Mep study
Y. Cambicci (*)
Mep study advisor
Dr K.Pattas AUTh Proffessor
Study period: 1994-1996
Construction details
General contractor:
Construction period: 1997-2000
Construction status: in operation
Short description of project-services
The first office building with geo-thermal ex-
changers in Greece with Water to water Sourse
Heat Pumps in coordination with the Mechani-
cal Department of A.U.Th.
Google
(*) co-designer 33% for planning
Company profile 2012
page 107 out of 129
T w o V i l l a s i n T h e r m i , G r e e c e
Project owner
Project design parties
Architectural study
Structural study
Mep study
Y. Cambicci (*)
Geothermie systems advisor
I.Mpousgolitis
Study period: 2004
Construction details
General contractor:
Construction period:
Construction status: in operation
Short description of project-services
Two villas with sophisticated water to water
heat pumps network and geothermal exchang-
ers.
Google
(*) co-designer 50% for planning
Cambicci+Associates
page 108
R e s i d e n t i a l P h o t o v o l t a i c s y s t e m s d e s i g n
Project owner
Project design parties
Photovoltaic system study
Cambicci+Associates
Study period: 2010-ongoing
Short description of project-services
Connected residential photovoltaic systems in
northern and central Greece
Systems installed power: 5 up to 10 kWp each
Total installed power: 165kWp
System status: in operation
Company profile 2012
page 109 out of 129
M a j o r p h o t o v o l t a i c s y s t e m s
Project owner
Project design parties
Photovoltaic system study
Cambicci+Associates
Study period: 2011-ongoing
Short description of project-services
Connected photovoltaic systems, on rooftops
and ground in northern and central Greece
Systems installed power: 100 έως 2.000 kWp
Total installed power: 2.400kWp
System status: in various construction phases
Cambicci+Associates
page 110
This page was intentionally left blank
Company profile 2012
page 111 out of 129
SSSeeecccuuurrriiitttyyy
Cambicci+Associates
page 112
B a n k o f G r e e c e B u i l d i n g i n T h e s s a l o n i k i , G r e e c e
Project owner
Bank of Greece SA
Project design parties
Construction manager
Decathlon SA, D.Papazoglou
Architectural study & construction supervision
P.Nikiforidis–B.Cuomo ΤΥ ΤτΕ: BoG TD:
E.Dalaklis-P.Panagakis
Structural study and construction supervision
Μ.Stefanouri–P.Zervas-G.Nikolaidis ΤΥ BoG TD:
Ν.Vrontisis-G.Papadatos
Mep study and construction supervision
Y. Cambicci
BoG TD:Κ.Dimitrakopoulos-Κ.Grigoropoulos
Study period: 2004-2006
Construction details
General contractor: DOMOTECHNIKI SA
Construction period: 2007-2009
Construction status: in operation
Systems description
Sophisticated security systems including intru-
sion control, central access control systems,
closed circuit television networks, perimeter
alarm systems, fully interconnected.
Google
Company profile 2012
page 113 out of 129
P o l i c e A d m i n i s t r a t i o n B u i l d i n g i n K o z a n i , G r e e c e
MINISTRY OF INTERNAL AFFAIRS –
HELLENIC POLICE DEPARTMENT
Project design parties
Project management
KED SA
Architectural study
406 Studies group, Vasileios Pappas
Structural study
I.Mavrakis and Associates SA
Safety & Security study
Cambicci+Associates
Study period: 2008-2009
Construction details
General contractor: ANDREADIS ZISIADIS SA
Construction period: 2009-ongoing
Construction status: under construction
Short description of project-services
Sophisticated security systems including intru-
sion control, central access control systems,
closed circuit television systems and risk anal-
ysis study.
Google
Cambicci+Associates
page 114
V I P V i l l a i n N o r t h e r n G r e e c e
Ιδιώτης VIP πελάτης
Project design parties
Safety & security study
Cambicci+Associates
Study period: 2011
Short description of project-services
Risk analysis study for the safety measures in
VIP Villa in Northern Greece.
Company profile 2012
page 115 out of 129
PPPrrrooojjjeeecccttt mmmaaannnaaagggeeemmmeeennnttt
Cambicci+Associates
page 116
This page was intentionally left blank
Company profile 2012
page 117 out of 129
Project management services for the protection and upgrade of the suburban forest Seih-sou,
in Thessaloniki, Greece.
Project owner
Region of Central Makedonia
Project design parties
Project management
OMICRON E.P.E. CONSORTIUM,
I.Iosifidis, Y.Cambicci,
Services period: 2006-2009
Google
Cambicci+Associates
page 118
This page was intentionally left blank
Company profile 2012
page 119 out of 129
ΟΟΟrrrgggaaannniiisssaaatttiiiooonnn
Our office has the following depertments:
Administration
Mechanological & Plumbing Studies
Electrical Studies
Energy Studies
Industrial Studies
Lighting Design
Security Studies
And Renewable energy systems studies
We have offices also in:
• Alexandroupolis fir Thrace Projects
• Larissa for Thessaly projects
• Athens•
Cambicci+Associates
page 120
This page was intentionally left blank
Company profile 2012
page 121 out of 129
QQQuuuaaallliiifffiiicccaaatttiiiooonnnsss –––dddiiippplllooommmaaasss fffrrrooommm pppuuubbbllliiiccc ssseeeccctttooorrr ppprrrooojjjeeeccctttsss
Our office is equipped (as is necessary by Greek legislation) with a diploma for Public Sector projects in the following categories of Stud-
ies:
Mechanical-Electrical-Electronic Studies:
Class C Diploma
(Category 09)
Environmental Studies:
Class A Diploma
(Category 27)
Engineers who cooperate with our office have Diplomas in other categories.
EEEnnneeerrrgggyyy iiinnnssspppeeeccctttiiiooonnn DDDiiippplllooommmaaasss
The following engineers in our organization have been certified as Energy Inspectors:
Yerasimo Cambicci
(Class Β)
Cambicci+Associates
page 122
This page was intentionally left blank
Company profile 2012
page 123 out of 129
CCCuuurrrrrriiicccuuullluuummm vvviiitttaaaeee
Cambicci+Associates
page 124
1. General Data
Last Name: Cambicci
First Name: Yerasimo
Father’s name: Stylianos
Year of birth: 1968
Place of birth: Xanthi, Greece
Specialty: Diploma Mechanical Engineer A.U.TH.
TCG No: 62405
Greek Public Works Degree
(According to Greek Law 716/77)
Number: 11263
Headquarters: Thessaloniki Valid thrued: 21.05.2008
Studies Categories:
Category No 9: Degree Level C
(MEP Studies)
Category No 27: Degree Level A
(Enviromental Studies)
2. Studies
High School Degree
Year of Graduation: 1985 Grade: Excellent
High School: Xanthi 1st High School
Mechanical Engineer Degree
Year of Graduation: 1992 Grade: Good
Thesis: Thermal Simulation of Artificial Water Tanks
Thesis Grade: Excellent
University: Aristoteleio University of Thessaloniki
Company profile 2012
page 125 out of 129
3. Seminars
Engineers & Personal Computers
Carrier: TCG East Makedonia Section
Period: 1992
Air Pollution
Carrier: Energy Department- Section of Mechanical Engineers
Polytechnic School - A.U.TH.
Period: 1992
Ιnstallation Βus Compact Course
Carrier: Siemens Training Center, Regensburg, Germany
Period: 1997
Education In Lighting
Carrier: Lightolier, USA
Period: 2002
Lighting Technology
Carrier: Rensesealer Polytechnic Institute, New York,
USA
Period: 2007
4. Foreign Languages
English
Diploma: First Certificate in English
Institute: University of Cambridge
Cambicci+Associates
page 126
5. Work Experience
5.1 Employer: North Aegean Petrol Company (NAPC)
Kavala, Greece
Position: Production Engineer
Period: 1987
Duties: Monitoring of the petrol deposit and
supervision of drilling repair works
5.2 Employer: Private & Public Works in Greece Office
Gerasimos Kampitsis + Associates
Position: MEP Design Engineer
Period: 1993-Today
Duties: MEP Design & Construction Supervision, as
follows:
• Mechanical Electrical & Plumbing Installations design, for Buildings, Urban and infrastructure projects.
• Lighting Design Projects
• Supervision of the above studies at the construction phase.
• Environmental Studies
• Project Consultant
• Project Management
6. Main Research Work
6.1 Research Program: New Pilaia Mayor Office – Energy Analysis
Study
Carrier: Pylaia Municipality,
Polytechnic School of AUTH
Position: Researcher
Responsible Professor: Dr Konstantinos Pattas
Period: 1994-1995
Project: Ground Source Heat Pumps
Company profile 2012
page 127 out of 129
6.2 Research Program: New Media Mass Medium
Carrier: A.U.TH.
Position: Researcher
Period: 2003
Project: Preliminary Report of New Building MEP
Installations Study
6.3 Research Program: Expansion of Pedagogigs Building
Carrier: A.U.TH.
Position: Researcher
Period: 2004
Project: Preliminary Report of New Building MEP
Installations Study
6.4 Research Program: Fire Safety Installations in Law School
Building
Carrier: A.U.TH.
Position: Researcher
Responsible Professor: Dr Nikolaos Kyriakis
Period: 2006
Project: Fire Safety Installations execution study
7. Conventions
Urban Nightscape 2006, Hellenic Illumination Committee, September 2006, Goulandris Museum, Athens
8. Publications
Heating System for a Baby Farm, Designing for Hygiene and Security. D.Mpozis, P.Kikidis, Y.Cambicci, D.Giannaraki, Ktirio magazine, Issue 166, 2004.
Cambicci+Associates
page 128
9. Member of
TCG: Technical Chamber of Greece
PSDMH: Hellenic Union of Dipl. Mechanical & Electrical Engineers
SMHBE: Union of Northern Greece Mechanical & Electrical
Engineers
SMEDEKEM Union of Central Makedonia Public Projects Designers
HIC: Hellenic Illumination Commitee
ΕΙΒΑ/KNX: European Installation Bus Association (EIBA/KNX Partner).
IESNA: Illuminating Engineering Society of North America.
ASHRAE: American Society Of Heating Refrigerating and Air
Conditioning, Hellenic Section
Thessaloniki 2012
Γon behalf of Cambicci+Associates
Yerasimo Cambicci
Dipl.Mechanical Engineer AUTh
Company profile 2012
page 129 out of 129
CCCooonnntttaaacccttt
Postal Address:
10 Riga Feraiou & Filikis Eterias, 6th
floor
P.C. GR-555 35 Pylaia, Thessaloniki
Greece
Phones & Fax:
Tel: +30 2310 850 800
+30 2310 262 106
+30 6970 985 805
Fax:+30 2310 850 865
Internet Address:
Email: info@cambicci.eu
Site: www.cambicci.eu
(.com .gr)
Skype: cambicci
Facebook: Cambicci+Associates
LinkedIn: Yerasimo Cambicci
Driving Instructions
Think before you print.

Weitere ähnliche Inhalte

Was ist angesagt?

REHVA: Country reports from benchmark study on European regulations
REHVA: Country reports from benchmark study on European regulationsREHVA: Country reports from benchmark study on European regulations
REHVA: Country reports from benchmark study on European regulationsSitra / Ekologinen kestävyys
 
BASIC EUROPEAN AND INTERNATIONAL STANDARDS ON GLAZED COLLECTORS & HOT WATER S...
BASIC EUROPEAN AND INTERNATIONAL STANDARDS ON GLAZED COLLECTORS & HOT WATER S...BASIC EUROPEAN AND INTERNATIONAL STANDARDS ON GLAZED COLLECTORS & HOT WATER S...
BASIC EUROPEAN AND INTERNATIONAL STANDARDS ON GLAZED COLLECTORS & HOT WATER S...Exergia SA
 
Building Services by Ravikant Kapil
Building Services by Ravikant KapilBuilding Services by Ravikant Kapil
Building Services by Ravikant KapilPriyashaShukla
 
Solar Project Management
Solar Project ManagementSolar Project Management
Solar Project Managementfirstgreen
 
2015 x472 class 8 - codes, construction documentation and coordination
2015 x472 class 8 - codes, construction documentation and coordination2015 x472 class 8 - codes, construction documentation and coordination
2015 x472 class 8 - codes, construction documentation and coordinationmichaeljmack
 

Was ist angesagt? (9)

Syngenta utilities
Syngenta utilitiesSyngenta utilities
Syngenta utilities
 
REHVA: Country reports from benchmark study on European regulations
REHVA: Country reports from benchmark study on European regulationsREHVA: Country reports from benchmark study on European regulations
REHVA: Country reports from benchmark study on European regulations
 
Samuel resume cv
Samuel resume cvSamuel resume cv
Samuel resume cv
 
BASIC EUROPEAN AND INTERNATIONAL STANDARDS ON GLAZED COLLECTORS & HOT WATER S...
BASIC EUROPEAN AND INTERNATIONAL STANDARDS ON GLAZED COLLECTORS & HOT WATER S...BASIC EUROPEAN AND INTERNATIONAL STANDARDS ON GLAZED COLLECTORS & HOT WATER S...
BASIC EUROPEAN AND INTERNATIONAL STANDARDS ON GLAZED COLLECTORS & HOT WATER S...
 
Building Services by Ravikant Kapil
Building Services by Ravikant KapilBuilding Services by Ravikant Kapil
Building Services by Ravikant Kapil
 
Solar Power Plant Procurements
Solar Power Plant ProcurementsSolar Power Plant Procurements
Solar Power Plant Procurements
 
Introduction To Building Services
Introduction To Building ServicesIntroduction To Building Services
Introduction To Building Services
 
Solar Project Management
Solar Project ManagementSolar Project Management
Solar Project Management
 
2015 x472 class 8 - codes, construction documentation and coordination
2015 x472 class 8 - codes, construction documentation and coordination2015 x472 class 8 - codes, construction documentation and coordination
2015 x472 class 8 - codes, construction documentation and coordination
 

Ähnlich wie Cambicci Associates Portfolio

Album engineering solutions for modern building
Album engineering solutions for modern buildingAlbum engineering solutions for modern building
Album engineering solutions for modern buildingCROC
 
AMiT – ievads par kompāniju, AMiT risinājumi un pakalpojumi, AMiT atslēga uz ...
AMiT – ievads par kompāniju, AMiT risinājumi un pakalpojumi, AMiT atslēga uz ...AMiT – ievads par kompāniju, AMiT risinājumi un pakalpojumi, AMiT atslēga uz ...
AMiT – ievads par kompāniju, AMiT risinājumi un pakalpojumi, AMiT atslēga uz ...Elektrumlv
 
Virtualmech energy CSP presentation
Virtualmech energy CSP presentationVirtualmech energy CSP presentation
Virtualmech energy CSP presentationCésar Hoyos Martín
 
Efficiency environment and innovation
Efficiency environment and innovationEfficiency environment and innovation
Efficiency environment and innovationServizi a rete
 
Fire Protection Equipment Inspection, Testing, and Maintenance: An Overview o...
Fire Protection Equipment Inspection, Testing, and Maintenance: An Overview o...Fire Protection Equipment Inspection, Testing, and Maintenance: An Overview o...
Fire Protection Equipment Inspection, Testing, and Maintenance: An Overview o...Antea Group
 
Itco english catalog (1)
Itco english catalog  (1)Itco english catalog  (1)
Itco english catalog (1)ahmad khadem
 
SEA Company. Innovations and Efficiency
SEA Company. Innovations and EfficiencySEA Company. Innovations and Efficiency
SEA Company. Innovations and EfficiencySEA Company
 
Allied consultants (final)
Allied consultants (final)Allied consultants (final)
Allied consultants (final)jemshy
 
Depots presentation
Depots presentationDepots presentation
Depots presentationKumar M.
 
General_Presentation_Altran_Engineering
General_Presentation_Altran_EngineeringGeneral_Presentation_Altran_Engineering
General_Presentation_Altran_EngineeringFred Strijbos
 
Projects for Industries
Projects for IndustriesProjects for Industries
Projects for IndustriesLilianaSimhas
 
Projects for Industries
Projects for IndustriesProjects for Industries
Projects for IndustriesRomelectro
 

Ähnlich wie Cambicci Associates Portfolio (20)

Album engineering solutions for modern building
Album engineering solutions for modern buildingAlbum engineering solutions for modern building
Album engineering solutions for modern building
 
AMiT – ievads par kompāniju, AMiT risinājumi un pakalpojumi, AMiT atslēga uz ...
AMiT – ievads par kompāniju, AMiT risinājumi un pakalpojumi, AMiT atslēga uz ...AMiT – ievads par kompāniju, AMiT risinājumi un pakalpojumi, AMiT atslēga uz ...
AMiT – ievads par kompāniju, AMiT risinājumi un pakalpojumi, AMiT atslēga uz ...
 
Virtualmech energy CSP presentation
Virtualmech energy CSP presentationVirtualmech energy CSP presentation
Virtualmech energy CSP presentation
 
Mohammed seddik-cv
Mohammed seddik-cvMohammed seddik-cv
Mohammed seddik-cv
 
Efficiency environment and innovation
Efficiency environment and innovationEfficiency environment and innovation
Efficiency environment and innovation
 
Fire Protection Equipment Inspection, Testing, and Maintenance: An Overview o...
Fire Protection Equipment Inspection, Testing, and Maintenance: An Overview o...Fire Protection Equipment Inspection, Testing, and Maintenance: An Overview o...
Fire Protection Equipment Inspection, Testing, and Maintenance: An Overview o...
 
Mohamed salem c.v
Mohamed  salem  c.vMohamed  salem  c.v
Mohamed salem c.v
 
MOHAMED SALEM C.V
MOHAMED  SALEM  C.VMOHAMED  SALEM  C.V
MOHAMED SALEM C.V
 
Itco english catalog (1)
Itco english catalog  (1)Itco english catalog  (1)
Itco english catalog (1)
 
KCI Company Presenation Oil & Gas
KCI Company Presenation Oil & GasKCI Company Presenation Oil & Gas
KCI Company Presenation Oil & Gas
 
EPC Solutions LLP_IN
EPC Solutions LLP_INEPC Solutions LLP_IN
EPC Solutions LLP_IN
 
SEA Company. Innovations and Efficiency
SEA Company. Innovations and EfficiencySEA Company. Innovations and Efficiency
SEA Company. Innovations and Efficiency
 
Allied consultants (final)
Allied consultants (final)Allied consultants (final)
Allied consultants (final)
 
Presentation_HealthWay
Presentation_HealthWayPresentation_HealthWay
Presentation_HealthWay
 
Depots presentation
Depots presentationDepots presentation
Depots presentation
 
General_Presentation_Altran_Engineering
General_Presentation_Altran_EngineeringGeneral_Presentation_Altran_Engineering
General_Presentation_Altran_Engineering
 
Energy
EnergyEnergy
Energy
 
Khaled elhag cv
Khaled elhag cvKhaled elhag cv
Khaled elhag cv
 
Projects for Industries
Projects for IndustriesProjects for Industries
Projects for Industries
 
Projects for Industries
Projects for IndustriesProjects for Industries
Projects for Industries
 

Kürzlich hochgeladen

Prestige Somerville Whitefield Bangalore E- Brochure.pdf
Prestige Somerville Whitefield Bangalore E- Brochure.pdfPrestige Somerville Whitefield Bangalore E- Brochure.pdf
Prestige Somerville Whitefield Bangalore E- Brochure.pdffaheemali990101
 
Goyal Orchid Life East Bangalore.pdf.pdf
Goyal Orchid Life East Bangalore.pdf.pdfGoyal Orchid Life East Bangalore.pdf.pdf
Goyal Orchid Life East Bangalore.pdf.pdfkratirudram
 
Prestige Sanctuary Nandi Hills Bangalore.pdf
Prestige Sanctuary Nandi Hills Bangalore.pdfPrestige Sanctuary Nandi Hills Bangalore.pdf
Prestige Sanctuary Nandi Hills Bangalore.pdfashiyadav24
 
The Role of Mortgage Brokers in Retirement Housing: Key Considerations
The Role of Mortgage Brokers in Retirement Housing: Key ConsiderationsThe Role of Mortgage Brokers in Retirement Housing: Key Considerations
The Role of Mortgage Brokers in Retirement Housing: Key Considerationssunlite Mortgage
 
Prestige Orchards Plots in Shamshabad, Mamidipalli, Hyderabad pdf.pdf
Prestige Orchards Plots in Shamshabad, Mamidipalli, Hyderabad pdf.pdfPrestige Orchards Plots in Shamshabad, Mamidipalli, Hyderabad pdf.pdf
Prestige Orchards Plots in Shamshabad, Mamidipalli, Hyderabad pdf.pdfAhanundefined
 
Kolte Patil Universe Hinjewadi Pune Brochure.pdf
Kolte Patil Universe Hinjewadi Pune Brochure.pdfKolte Patil Universe Hinjewadi Pune Brochure.pdf
Kolte Patil Universe Hinjewadi Pune Brochure.pdfPrachiRudram
 
LCAR Unit 22 - Leasing and Property Management - 14th Edition Revised.pptx
LCAR Unit 22 - Leasing and Property Management - 14th Edition Revised.pptxLCAR Unit 22 - Leasing and Property Management - 14th Edition Revised.pptx
LCAR Unit 22 - Leasing and Property Management - 14th Edition Revised.pptxTom Blefko
 
LCAR Unit 20 - Appraising Real Estate - 14th Edition Revised
LCAR Unit 20 - Appraising Real Estate - 14th Edition RevisedLCAR Unit 20 - Appraising Real Estate - 14th Edition Revised
LCAR Unit 20 - Appraising Real Estate - 14th Edition RevisedTom Blefko
 
Mahindra Vista Kandivali East Mumbai Brochure.pdf
Mahindra Vista Kandivali East Mumbai Brochure.pdfMahindra Vista Kandivali East Mumbai Brochure.pdf
Mahindra Vista Kandivali East Mumbai Brochure.pdfPrachiRudram
 
Honer Richmont Hyderabad E brochure - A Life With A View
Honer Richmont Hyderabad E brochure - A Life With A ViewHoner Richmont Hyderabad E brochure - A Life With A View
Honer Richmont Hyderabad E brochure - A Life With A ViewAhanundefined
 
Purva Park Hill Kanakapura Road Bangalore.pdf
Purva Park Hill  Kanakapura Road Bangalore.pdfPurva Park Hill  Kanakapura Road Bangalore.pdf
Purva Park Hill Kanakapura Road Bangalore.pdfashiyadav24
 
Anandtara Iris Residences Mundhwa Pune Brochure.pdf
Anandtara Iris Residences Mundhwa Pune Brochure.pdfAnandtara Iris Residences Mundhwa Pune Brochure.pdf
Anandtara Iris Residences Mundhwa Pune Brochure.pdfabbu831446
 
Listing Turkey - Resim Modern Catalog Istanbul
Listing Turkey - Resim Modern Catalog IstanbulListing Turkey - Resim Modern Catalog Istanbul
Listing Turkey - Resim Modern Catalog IstanbulListing Turkey
 
Listing Turkey Green life Istanbul Eyup Catalog
Listing Turkey Green life Istanbul Eyup CatalogListing Turkey Green life Istanbul Eyup Catalog
Listing Turkey Green life Istanbul Eyup CatalogListing Turkey
 
Radiance Majestic Valasaravakkam Chennai.pdf
Radiance Majestic Valasaravakkam Chennai.pdfRadiance Majestic Valasaravakkam Chennai.pdf
Radiance Majestic Valasaravakkam Chennai.pdfashiyadav24
 
LCAR RE Practice - The Pearson Vue State Exam
LCAR RE Practice - The Pearson Vue State ExamLCAR RE Practice - The Pearson Vue State Exam
LCAR RE Practice - The Pearson Vue State ExamTom Blefko
 
Sobha Oakshire Devanhalli Bangalore.pdf.pdf
Sobha Oakshire Devanhalli Bangalore.pdf.pdfSobha Oakshire Devanhalli Bangalore.pdf.pdf
Sobha Oakshire Devanhalli Bangalore.pdf.pdfkratirudram
 
Provident Ecopolitan Aerospace Park, Bangalore E- Brochure.pdf
Provident Ecopolitan Aerospace Park, Bangalore E- Brochure.pdfProvident Ecopolitan Aerospace Park, Bangalore E- Brochure.pdf
Provident Ecopolitan Aerospace Park, Bangalore E- Brochure.pdffaheemali990101
 
Raymond Ten X Era Viviana Mall Thane Brochure.pdf
Raymond Ten X Era Viviana Mall Thane Brochure.pdfRaymond Ten X Era Viviana Mall Thane Brochure.pdf
Raymond Ten X Era Viviana Mall Thane Brochure.pdfPrachiRudram
 
Sankla East World Hadapsar Pune Brochure.pdf
Sankla East World Hadapsar Pune Brochure.pdfSankla East World Hadapsar Pune Brochure.pdf
Sankla East World Hadapsar Pune Brochure.pdfabbu831446
 

Kürzlich hochgeladen (20)

Prestige Somerville Whitefield Bangalore E- Brochure.pdf
Prestige Somerville Whitefield Bangalore E- Brochure.pdfPrestige Somerville Whitefield Bangalore E- Brochure.pdf
Prestige Somerville Whitefield Bangalore E- Brochure.pdf
 
Goyal Orchid Life East Bangalore.pdf.pdf
Goyal Orchid Life East Bangalore.pdf.pdfGoyal Orchid Life East Bangalore.pdf.pdf
Goyal Orchid Life East Bangalore.pdf.pdf
 
Prestige Sanctuary Nandi Hills Bangalore.pdf
Prestige Sanctuary Nandi Hills Bangalore.pdfPrestige Sanctuary Nandi Hills Bangalore.pdf
Prestige Sanctuary Nandi Hills Bangalore.pdf
 
The Role of Mortgage Brokers in Retirement Housing: Key Considerations
The Role of Mortgage Brokers in Retirement Housing: Key ConsiderationsThe Role of Mortgage Brokers in Retirement Housing: Key Considerations
The Role of Mortgage Brokers in Retirement Housing: Key Considerations
 
Prestige Orchards Plots in Shamshabad, Mamidipalli, Hyderabad pdf.pdf
Prestige Orchards Plots in Shamshabad, Mamidipalli, Hyderabad pdf.pdfPrestige Orchards Plots in Shamshabad, Mamidipalli, Hyderabad pdf.pdf
Prestige Orchards Plots in Shamshabad, Mamidipalli, Hyderabad pdf.pdf
 
Kolte Patil Universe Hinjewadi Pune Brochure.pdf
Kolte Patil Universe Hinjewadi Pune Brochure.pdfKolte Patil Universe Hinjewadi Pune Brochure.pdf
Kolte Patil Universe Hinjewadi Pune Brochure.pdf
 
LCAR Unit 22 - Leasing and Property Management - 14th Edition Revised.pptx
LCAR Unit 22 - Leasing and Property Management - 14th Edition Revised.pptxLCAR Unit 22 - Leasing and Property Management - 14th Edition Revised.pptx
LCAR Unit 22 - Leasing and Property Management - 14th Edition Revised.pptx
 
LCAR Unit 20 - Appraising Real Estate - 14th Edition Revised
LCAR Unit 20 - Appraising Real Estate - 14th Edition RevisedLCAR Unit 20 - Appraising Real Estate - 14th Edition Revised
LCAR Unit 20 - Appraising Real Estate - 14th Edition Revised
 
Mahindra Vista Kandivali East Mumbai Brochure.pdf
Mahindra Vista Kandivali East Mumbai Brochure.pdfMahindra Vista Kandivali East Mumbai Brochure.pdf
Mahindra Vista Kandivali East Mumbai Brochure.pdf
 
Honer Richmont Hyderabad E brochure - A Life With A View
Honer Richmont Hyderabad E brochure - A Life With A ViewHoner Richmont Hyderabad E brochure - A Life With A View
Honer Richmont Hyderabad E brochure - A Life With A View
 
Purva Park Hill Kanakapura Road Bangalore.pdf
Purva Park Hill  Kanakapura Road Bangalore.pdfPurva Park Hill  Kanakapura Road Bangalore.pdf
Purva Park Hill Kanakapura Road Bangalore.pdf
 
Anandtara Iris Residences Mundhwa Pune Brochure.pdf
Anandtara Iris Residences Mundhwa Pune Brochure.pdfAnandtara Iris Residences Mundhwa Pune Brochure.pdf
Anandtara Iris Residences Mundhwa Pune Brochure.pdf
 
Listing Turkey - Resim Modern Catalog Istanbul
Listing Turkey - Resim Modern Catalog IstanbulListing Turkey - Resim Modern Catalog Istanbul
Listing Turkey - Resim Modern Catalog Istanbul
 
Listing Turkey Green life Istanbul Eyup Catalog
Listing Turkey Green life Istanbul Eyup CatalogListing Turkey Green life Istanbul Eyup Catalog
Listing Turkey Green life Istanbul Eyup Catalog
 
Radiance Majestic Valasaravakkam Chennai.pdf
Radiance Majestic Valasaravakkam Chennai.pdfRadiance Majestic Valasaravakkam Chennai.pdf
Radiance Majestic Valasaravakkam Chennai.pdf
 
LCAR RE Practice - The Pearson Vue State Exam
LCAR RE Practice - The Pearson Vue State ExamLCAR RE Practice - The Pearson Vue State Exam
LCAR RE Practice - The Pearson Vue State Exam
 
Sobha Oakshire Devanhalli Bangalore.pdf.pdf
Sobha Oakshire Devanhalli Bangalore.pdf.pdfSobha Oakshire Devanhalli Bangalore.pdf.pdf
Sobha Oakshire Devanhalli Bangalore.pdf.pdf
 
Provident Ecopolitan Aerospace Park, Bangalore E- Brochure.pdf
Provident Ecopolitan Aerospace Park, Bangalore E- Brochure.pdfProvident Ecopolitan Aerospace Park, Bangalore E- Brochure.pdf
Provident Ecopolitan Aerospace Park, Bangalore E- Brochure.pdf
 
Raymond Ten X Era Viviana Mall Thane Brochure.pdf
Raymond Ten X Era Viviana Mall Thane Brochure.pdfRaymond Ten X Era Viviana Mall Thane Brochure.pdf
Raymond Ten X Era Viviana Mall Thane Brochure.pdf
 
Sankla East World Hadapsar Pune Brochure.pdf
Sankla East World Hadapsar Pune Brochure.pdfSankla East World Hadapsar Pune Brochure.pdf
Sankla East World Hadapsar Pune Brochure.pdf
 

Cambicci Associates Portfolio

  • 1.
  • 2. Cambicci+Associates page 2 This page was intentionally left blank
  • 3. Company profile 2012 page 3 out of 129 CCCooonnnttteeennntttsss Short presentation Portfolio Organisation Qualifications Curriculum Vitae Contact Cambicci+associates consulting engineers co Mechanical Electrical Plumbing Energy & Industrial Studies; security; lighting design; photovoltaics; renewable energy; energy inspections; engineer & management services; supervisions; licensing; certifications
  • 4. Cambicci+Associates page 4 This page was intentionally left blank
  • 5. Company profile 2012 page 5 out of 129 SSShhhooorrrttt ppprrreeessseeennntttaaatttiiiooonnn The M.E.P. (mechanical, electrical and plumbing) studies office with the title Cambicci+Associates was founded in February 2007 by Gerasimos Kampitsis (Yerasimo Cambicci), Mechanical Engineer of the Aristotle University of Thessaloniki, following his work experience in electromechanical design and supervision since February 1992. Furthermore the office was manned with electrical and mechanical en- gineers aiming at the technologically sufficient and on time preparation of m.e.p. studies and supervisions. A consulting and engineering services company was legally constituted in 2012. The scope of our office in its current form is: • The elaboration of m.e.p. installations studies, for all types of projects (buildings, urban design and infrastructure). • Renewable energy systems design • Nearly zero energy buildings design • Energy feasibility inspections and evaluation of buildings • Obtaining permits and licences for buildings and installations • Lighting Studies • Supervision for all of the above subjects. • Consulting Services as a Project Manager
  • 6. Cambicci+Associates page 6 Our services are provided either by choice, or via competition in the premises of either the “Design & Construct System” or the Greek S.D.I.T. system(collaborations of the public and private sector). The engineering studies that are elaborated pertain to buildings to be constructed or renovations and extensions of existing ones. The mechanical electrical & plumbing studies, referred as mep studies (or building services or electrical mechanical studies) are an im- portant component of the whole of the technical studies necessary for the completion of all projects, and they can be divided into the fol- lowing categories: Mechanical Electrical & Plumbing Studies Buildings • Water Supply (pipe networks of potable water, hot-cold water supply networks and recirculation networks, production of hot water, solar panel systems(classical or of “void” type), storage tanks and pumping systems. • Irrigation (irrigation with pop-up sprinklers, underground irrigation) • Rainwater Draining (using typical gravity networks, siphonic systems, under ground pumping systems.) • Sewage (sewage pipe networks, sewage pumping systems, water-oil seperators, fat-collectors, gasoline-collectors) • Heating-Airconditioning (Typical heating systems with a boiler, single pipe systems, two-pipe and four-pipe systems, underfloor heating and floor cooling systems, central air-conditioning systems with air/water heatpumps or water/water cooling towers, air handling units, fan-coil networks, central and local split unit systems, VAV systems, geothermal systems, seawater het pumps, ex- haust and airing systems) • Expense allocation for a central heating system • Gas fueled systems (natural gas(low and high pressure)and LPG networks) • Lifting systems (lifts, elevators, rolling stairs, traffic studies) • Swimming pools (public and private, open or closed type) • Medium Voltage private substation (medium voltage panels, power transformers, γlow voltage panels, main and auxiliary input electrical generators, central and local U.P.S. systems, central safety lighting systems) • Heavy current electrical installation systems(lighting, plugging, in-rush current, electrical distribution in TN-C, TN-Sand IT systems) • Lightning Protection(Faraday cage and Franklin design systems, special grounding systems) • Light current electrical installation systems (phone-date networks, sound and pa installations, central R-TV-SAT, central clock sys- tems, conference systems, translation systems, real time transmittion systems, hotel management systems, building management systems, remote control systems, control rooms systems) • Antitheft protection (alarm, Access Control, C.C.T.V., vehicle stoppage systems, peripheral plot and building protection) • Fire safety (alarm, fire detection, security lighting ang signs, CO2, FM-200, Dry powder, Inergen, Argonite, water droplet automatic fire suppression systems, fire hose networks, sprinklers systems, foam systems, freezing systems, mobile fire stoppage devices)
  • 7. Company profile 2012 page 7 out of 129 • Pneumatic tube systems • Central vacuum Specifically for Greek Public Sector works (and for the private sector if required): • Elaboration of studies of all stages (preliminary, final, and construction) • Formulation of technical reports and specifications reports for the materials used in the study • Formulation of a general and specific obligations report for all parties involved in the project • Formulation of Cost analysis reports• • Furthermore, in shopping malls and retail markets: • Formulation of a report of the renter’s obligations • Monitoring the observance of the renter’s obligations • Optical sign systems • Sound systems • Video Wall systems• • Furthermore in Hotels: • Hotel room management systems • SPA, Jacuzzi, Sauna, Thalasotherapie systems• • Furthermore in Hospitals: • Medical Gas networks (Oxygen, Nitrogen Protoxide, Vacuum, High and Low pressure air, sleeping gas exhaust) • Special electrical installations for operating theaters and intensive care units (conductive floors, earthing systems, isolation moni- toring device for earthing systems, IT networks) • Medical equipment studies (Operating theaters, Intensive care units, Recovery units, Central Sterilization systems, linear accelera- tor studies, special medical examination devices studies) • Steam networks• • Furthermore in car parking buildings: • Exhaust networks for underground parking areas • Carbon monoxide detection systems • Management and electric signage systems for parking areas • Automatic management systems for parking areas (without a driver)
  • 8. Cambicci+Associates page 8 • Furthermore in industrial buildings: • Industrial machinery devices (soft starters, variable speed systems, medium voltage motors) • Piping Design Installations for gases & petroil sites • Antiexplosive installations • Industrial fluid and gases networks (pressurized air, petrol, oil, lubricants etc.) • Exhaust networks for spaces and machinery • Industrial equipment studies • Steam networks M.E.P. infrastructure studies Road Works • Highway and general road lighting works, overpass and intersection works • Electric signage • Special tunnel lighting of every form (drill, cut & cover) and underpass lighting • Lighting of all types of works • Tunnel exhaust installations • Electrical supply networks, of low medium and high voltage • Fire detection systems and tunnel fire safety • Tunnel monitoring networks (safety networks, height excess detection, emergency phones, safety lighting) • Tunnel servicing buildings • Central control stations for road works – control rooms • Sewage and garbage processing works • Primary, secondary and post secondary processing of liquid waste from sewage treatment facilities • Landfills and waste transportation centers • Solid waste processing units • Industrial machinery devices (soft starters, variable speed systems, medium voltage motors) • Central control installation networks • Pump stations • Hydraulic networks for the transportation of water from pumbing stations • Pumbstation electrical installations
  • 9. Company profile 2012 page 9 out of 129 Renewable resources studies • Solar panel systems for hot water production • Photovoltaic systems • Photovoltaic parks • Wind energy • Smal hydroelectric works • Systems integrating co-production of energy• Licencing • Of industrial buildings & Installations • Private parking areas • Private filling stations(liquid or gas fuel) • • Lighting design • Interior lighting • Lighting of public or private outdoor areas • Buildings beautification lighting • Monument lighting • Lighting of picturesque landscapes • Urban lighting plans • Safety studies • Risk analysis • Safety procedures and protocolls • Safety devices and measures • Passive safety devices and measures• Supervisions • Technical supervision (technical specifications and obligations observance monitoring, material inspection, monitoring of the con- struction, testing and adjustments) • Technical and fiscal supervision (technical supervision and auditing of accounts, validation of new prices, fiscal auditing of certifica- tions) • M.E.P. installations certification
  • 10. Cambicci+Associates page 10 Energy feasibility studies • Green building studies • Evaluation reconstruction and upgrade studies for existing buildings • Studies according to the Greek Regulation for the energetic evaluation of buildings • Evaluation of the energy requirements for heating systems • Thermography of buildings Management and consulting services • Licensing coordination and control • Organizing competitions for the assignment of studies • M.E.P. studies managment • Organizing competitions for foster constuctors • Screening of candidates, objection managment • Project construction control • Timetable observance • Management of the obligations that are not in the initial agreement • Temporary and final undertaking of a project
  • 11. Company profile 2012 page 11 out of 129 Our offices are in Pylaia, Thessaloniki and we undertake projects in the whole of Greece and the neighboring countries. Outside of Thes- saloniki we have offices-contact points in Athens, Thessalia & Thrace. The office is fully equipped in personnel and technological equipment for the elaboration of mep projects. In our organogram there is an administration division, an engineering studies division, a services division, a cost analysis division, a quality control division and a secre- tarial services division. The electronical equipment of our offices, regarding computer based devices and software, is based on the princi- ple of optimal available and reliable technology and includes a sufficient number of work spaces, computers, a network Server, and high quality software. There is software for the electromechanical design, software regarding Legislation and scientific literature (International and Greek) and software for the cost analysis of Public Sector Projects.
  • 12. Cambicci+Associates page 12 This page was intentionally left blank
  • 13. Company profile 2012 page 13 out of 129 PPPooorrrtttfffooollliiiooo
  • 14. Cambicci+Associates page 14 Our office associates and personell have successfully taken part in a sufficient number of projects in Greece and other countries and are notably experienced in the fields that our office specializes in. In this process all engineers in our office have been part of small or bigger groups for the elaboration of simple or complicated works in a variety of areas in Greece and abroad. For the completion of our projects we have the capacity to obtain all necessary Permits and certifications. Our customers can be multinationals or smaller companies, technical firms, investment groups, private entrepreneurs and the Greek Pub- lic sector in all its legal forms and ehelons. Hereupon, some typical projects our office and engineers have been part of, are cited: Category of projects pages Category of projects pages Services 15 to 24 Housing 77 to 84 Culture 25 to 30 Urban 85 to 90 Hotels 31 to 40 Industry, Oil & Gas Installations 91 to 98 Education 41 to 46 Infrastructure 99 to 104 Health 47 to 52 Energy 105 to 110 Shoping malls & retail stores 53 to 68 Security 111 to 114 Recreation 69 to 72 Project management 115 Sports 73 to 76
  • 15. Company profile 2012 page 15 out of 129 SSSeeerrrvvviiiccceeesss
  • 16. Cambicci+Associates page 16 B a n k o f G r e e c e B u i l d i n g i n T h e s s a l o n i k i , G r e e c e Project owner Bank of Greece SA Project design parties Construction manager Decathlon SA, D.Papazoglou Architectural study & construction supervision P.Nikiforidis–B.Cuomo ΤΥ ΤτΕ: BoG TD: E.Dalaklis-P.Panagakis Structural study and construction supervision Μ.Stefanouri–P.Zervas-G.Nikolaidis ΤΥ BoG TD: Ν.Vrontisis-G.Papadatos Mep study and construction supervision Y. Cambicci (*) BoG TD:Κ.Dimitrakopoulos-Κ.Grigoropoulos Study period: 2004-2006 Construction details General contractor: DOMOTECHNIKI SA Construction period: 2007-2009 Construction status: in operation Short description of project-services The project subject is the design and supervi- sion for the construction of the new building of Money Circulation and Vaults of the National Bank of Greece in Thessaloniki metrics Buildings surface: 5.500m2 Plot size: 35.000m2 Budget: 5.000.000 € (*) co-designer 33% for planning & construction supervision
  • 17. Company profile 2012 page 17 out of 129 O f f i c e B u i l d i n g R e n o v a t i o n i n A t h e n s , G r e e c e Project owner Henkel Hellas SA Project design parties Construction manager A.Drazinou-N.Prounias Architectural study Tsigarida Architects Structural study Mep study Cambicci+Associates Study period: 2008 Construction details General contractor: ΤΕΚΜΑ SA Construction period: 2009 Construction status: in operation Short description of project-services The project scope was the transformation of the existing office building into a modern mul- tinational corporation office building in Greece, with a hairdressing Academy, an auditorium and an underground closed parking. Google metrics Buildings surface: 8.500m2 Plot size: 4.100m2 Mep budget: 1.100.000 €
  • 18. Cambicci+Associates page 18 P o l i c e A d m i n i s t r a t i o n B u i l d i n g i n K o z a n i , G r e e c e Project owner MINISTRY OF INTERNAL AFFAIRS – HELLENIC POLICE DEPARTMENT Project design parties Project management KED SA Architectural study 406 Studies group, Vasileios Pappas Structural study I.Mavrakis and Associates SA Mep construction study Cambicci+Associates Study period: 2008-2009 Construction details General contractor: ANDREADIS ZISIADIS SA Construction period: 2009-2011 Construction status: in operation Short description of project-services The project scope was the construction study, for the auction of the new office building con- struction and underground parking area for the accommodation of the peripheral Police divi- sions of Western Macedonia prefecture, in Greece. Google metrics Buildings surface: 5.200m2 Plot size: 4.000m2 Mep budget: 2.000.000 €
  • 19. Company profile 2012 page 19 out of 129 M a n d a l i d e i o E n d o w m e n t a t N i k i s A v e n u e , T h e s s a l o n i k i , G r e e c e Project owner Company for the exploitation of AUTh real estate Project design parties Project management AUTh Technical Department Architectural study NIMAND Architects Structural study Ioannis Poulios Mep study Cambicci+Associates Study period: 2009 Construction details General contractor: Construction period: Construction status: ongoing Short description of project-services The project scope is the transformation of the existing building in Nikis Avenue in Thessaloni- ki into a Multiple Purpose Hall of the Aritoteleion Univercity of Thessaloniki (A.U.Th.) at Thessaloniki seafront. Google metrics Buildings surface: 1.600m2 Plot size: 260m2 Mep budget: 800.000 €
  • 20. Cambicci+Associates page 20 O f f i c e b u i l d i n g i n T h e s s a l o n i k i Project owner Grigorios Karidas limited Project design parties Project management Architectural study Panetsos Panagiotis Structural study G&G Penelis Consulting Engineers SA Mep study Cambicci+Associates Study period: 2007 Construction details General contractor: ARCON Constructions Construction period: 2008-2009 Construction status: in operation Short description of project-services The project scope is the transformation of the existing building in Dragoumi Street in Thes- saloniki into a modern office building. Google metrics Buildings surface: 1.100m2 Plot size: 300m2 Mep budget: 500.000 €
  • 21. Company profile 2012 page 21 out of 129 M A K E D O N I A I n t . A i r p o r t T e r m i n a l i n T h e s s a l o n i k i , G r e e c e Project owner OPPE Thessaloniki 97 – EYDE of Northern Greece Airports Project design parties Project management OPPE Thessaloniki 97 Architectural study Polis SA, G.Papakostas, J.Vlahos Structural study Concept Consultant-Engineers limited Mep study Y. Cambicci (*) Study period: 1997-2006 Construction details General contractor: ZINON ATHANASIADIS SA DOMOTECHNIKI SA – ANASTILOTIKI SA ANDREADIS ZISIADIS SA Construction period: 1997-2008 Construction status: in operation Short description of project-services Renovation of existing building and new ex- pansions for a new Makedonia Airport Terminal in Thessaloniki Greece Google metrics Buildings surface: 46.000m2 Plot size: 160.000m2 Mep budget: 40.000.000 € (*) co-designer 25-50% (depending of the phase)
  • 22. Cambicci+Associates page 22 N a t i o n a l B a n k a n d C u l t u r a l C e n t e r i n N o r t h e r n G r e e c e Project owner National Bank of Greece SA Project design parties Project management Andreadis-Zisiadis SA Architectural study Polis SA, G.Papakostas, J.Vlahos Structural study Concept Consultant-Engineers limited Mep study Cambicci+Associates Study period: 2006 Construction details General contractor: ANDREADIS ZISIADIS SA Construction period: 2007-2008 Construction status: in operation Short description of project-services Expansion of an existing building. Google metrics Buildings surface: 3.600m2 Plot size: 800m2 Mep budget: 800.000 €
  • 23. Company profile 2012 page 23 out of 129 T o w n H a l l o f P y l a i a Project owner Municipality of Pylaia Project design parties Architectural study K.Antoniou,E.Kastro,E.Disli,N.Barbari Structural study K.Anastasiadis, P.Panetsos Mep study Y. Cambicci (*) Mep study advisor Dr K.Pattas AUTh Proffessor Study period: 1994-1996 Construction details General contractor: Construction period: 1997-2000 Construction status: in operation Short description of project-services Office building with 2 underground parking levels in Pylaia, Thessaloniki. Google metrics Buildings surface: 2.700m2 Plot size: 900m2 Mep budget: 1.000.000 € (*) co-designer 33% for planning
  • 24. Cambicci+Associates page 24 O f f i c e b u i l d i n g i n T h e s s a l o n i k i Project owner Αsea Βrown Βoveri (ABB) ΑΕ Project design parties Architectural study N.Ktenas Structural study OMETE & ASSOCIATES SA Mep study Y. Cambicci (*) Mep construction supervisor Thomas Kolivopoulos Study period: 1998-2000 Construction details General contractor: ERGO3 Construction period: 2002-2004 Construction status: in operation Short description of project-services New ABB offices & whole sales building in North Greece Google metrics Buildings surface: 4.000m2 Plot size: 6.200m2 Mep budget: 1.100.000 € (*) co-designer 33% for planning
  • 25. Company profile 2012 page 25 out of 129 CCCuuullltttuuurrreee
  • 26. Cambicci+Associates page 26 P l o v d i v O p e r a R e n o v a t i o n i n B u l g a r i a Project owner Oblast Plovdiv Project design parties Project management ΑΚΤΟΡ BULGARIA SA Architectural study ΜΜΤ SΑ Structural study Concept Ltd Mep study Cambicci+Associates Study period: 2007 Construction details Gen. contr: AKTOR SA & AKTOP BULGARIA SA Construction period: 2008-ongoing Construction status: under construction Short description of project-services The project scope was the full renovation of the existing historical building and it’s trans- formation to a modern Opera House, the for- mation of a Cultural Centre, the addition of a commercial building and an automated under- ground car parking area. Google metrics Buildings surface: 14.000m2 Plot size: 8.000m2 Mep budget: 4.000.000 €
  • 27. Company profile 2012 page 27 out of 129 T h e r m i M u n i c i p a l A u d i t o r i u m , T h e s s a l o n i k i G r e e c e Project owner Municipality of Thermi Project design parties Project management Thermi Municipal TD Architectural study ΜΜΤ SA Structural study ΜΜΤ SA Mep study Cambicci+Associates Study period: 2009-2010 Construction details General contractor: Construction period: Construction status: ongoing Short description of project-services Project scope is the construction study and the formulation of auction documents for the con- struction of a new conservatoire in the munici- pality of Thermi, Thessaloniki. Google metrics Buildings surface: 1.600m2 Plot size: 1.700m2 Mep budget: 800.000 €
  • 28. Cambicci+Associates page 28 C u l t u r a l C e n t r e a t T a g a r a d e s , T h e s s a l o n i k i , G r e e c e Project owner Municipality of Thermi Project design parties Project management Thermi Municipal TD Architectural study ΜΜΤ SA Structural study ΜΜΤ SA Mep study Cambicci+Associates Study period: 2009-2010 Construction details General contractor: Construction period: Construction status: ongoing Short description of project-services The project scope is the Study of a new Cultur- al Center with Theatre in the municipality of Thermi, Thessaloniki. Google metrics Buildings surface: 4.800m2 Plot size: 4.600m2 Mep budget: 1.000.000 €
  • 29. Company profile 2012 page 29 out of 129 M i c h a n i o n a C u l t u r a l C e n t r e i n T h e s s a l o n i k i , G r e e c e Project owner Municipality of Michaniona Project design parties Architectural study E.Disli, X.Kiros, A.Xaritopoulos, Th.Theodoridis Structural study Concept Engineers Ltd Mep study Cambicci+Associates Mep study associate G. Klepkos Study period: 2010 Construction details General contractor: Construction period: Construction status: ongoing Short description of project-services The project scope is the construction study and the compilation of auction documents for the construction of the cultural center in the mu- nicipality of Michaniona, Thessaloniki. Google metrics Buildings surface: 1.200m2 Plot size: 4.000m2 Mep budget: 900.000 €
  • 30. Cambicci+Associates page 30 V y z a n t i n e M u s e u m o f V e r i a , G r e e c e Project owner Ministry of Culture Project design parties Project management ΑΡΧΙΤΕX SA Architectural study G.Anifantis-S.Anifantis, Κ.Asamopoulos,E.Skaltsa,D.Kontargiris, Α.Lampakis Structural study S.Kounadis, L.Kounadis, M.Zarkadoula & Associates Mep study Y. Cambicci (*) Study period: 1998-2000 Construction details General contractor: ARXITEX SA Construction period: 2001-2003 Construction status: in operation Short description of project-services Reconstruction and building expansion of an existing old factory building (mill) in Veria. Google metrics Buildings surface: 2.500m2 Plot size: 2.400m2 Mep budget: 1.300.000 € (*) co-designer 30% for planning
  • 31. Company profile 2012 page 31 out of 129 M a c e d o n i c M u s e u m o f M o d e r n A r t i n T h e s s a l o n i k i , G r e e c e Project owner Macedonian Museum of Contemporary Art Project design parties Project management ΑΡΧΙΤΕΤ ΑΤΕ Architectural study K.Antoniou-E.Kastro Structural study DELCO, N.Deligiannidis Mep study Y. Cambicci (*) Study period: 1998-2000 Construction details General contractor: ΑRΧΙΤΕΧ SΑ Construction period: 2001-2003 Construction status: in operation Short description of project-services Renovation and expansion of a museum for modern art in Thessaloniki. Google metrics Buildings surface: 4.400m2 Plot size: 4.150m2 Mep budget: 1.600.000 € (*) co-designer 33% for planning
  • 32. Cambicci+Associates page 32 C u l t u r a l C e n t r e o f t h e L a b o u r C e n t r e o f K o m o t i n i Project owner Labor Center of Komotini Project design parties Project management S.Agathakis & F.Stratos Architectural study G.Mademlis, Telis Vasiliadis Mep study Y. Cambicci (*) Acoustical study N.Mparkas-D.Keramidas Study period: 2001 Construction details General contractor: AGATHAKIS-STRATOS Construction period: 2002-2003 Construction status: in operation Short description of project-services Renovation of an existing Theater in Komotini Greece. Google metrics Buildings surface: 800m2 Plot size: 1.300m2 Mep budget: 400.000 € (*) co-designer 33% for planning
  • 33. Company profile 2012 page 33 out of 129 HHHooottteeelllsss
  • 34. Cambicci+Associates page 34 R e s t a u r a n t s A M M O S - A S T E R I A S a n d B o u s o u l a s a t S a n i R e s o r t i n H a l k i d i k i Project owner SANI SA Project design parties Architectural study NIMAND Architects Structural study Mep study Cambicci+Associates Study period: 2010 Construction details General contractor: SANI SA Construction period: 2012 Construction status: in operation Σύντομη περιγραφή έργου-υπηρεσιών Renovation of 2 beach-bars & restaurants at Sani resort in Halkidiki Greece. Google Μετρητικά στοιχεία Buildings surface: 500m2 Plot size: m2 Mep budget: €
  • 35. Company profile 2012 page 35 out of 129 O p e n T h e a t r e a n d m u l t i - f u n c t i o n a r e a a t t h e S a n i R e s o r t i n H a l k i d i k i Project owner SANI SA Project design parties Architectural study NIMAND Architects Structural study Mep study Cambicci+Associates Lighting design G-Lights Study period: 2010 Construction details General contractor: SANI SA Construction period: 2010 Construction status: in operation Short description of project-services The project scope was the construction of a new outdoor function area with a sheltered stage, auxiliary areas and adequate opticoacoustic equipment for the organization of cultural events in the SANI RESORT area Google metrics Buildings surface: 2.500m2 Plot size: m2 Mep budget: 500.000 €
  • 36. Cambicci+Associates page 36 H o t e l r e n o v a t i o n & e x p a n s i o n i n H a l k i d i k i , G r e e c e Project owner Eisaei SA Project design parties Project management ΜΜΤ SA Architectural study NIMAND SA – MMT SA Structural study ΜΜΤ SA Mep study Cambicci+Associates Study period: 2010 Construction details General contractor: SYNTHESIS SΑ Construction period: 2009-ongoing Construction status: under construction Short description of project-services The project scope was the extension, recon- struction, and upgrade of a 300-bed existing hotel in Ouranoupolis, Halkidiki, Greece. Google metrics Buildings surface: 9.500m2 Plot size: 25.000m2 Mep budget: 2.500.000 €
  • 37. Company profile 2012 page 37 out of 129 C o n g r e s s H a l l a t A l e x a n d e r B e a c h H o t e l i n A l e x a n d r o u p o l i , G r e e c e Project owner Xatzikonstantinou Bros SA Project design parties Architectural study A&B Stylianidis Structural study K.Xatzikonstantinou Mep study Y. Cambicci Mep construction supervisor Ν. Gemitzakis Study period: 2006 Construction details General contractor: ZINON ATHANASIADIS SA Construction period: 2007 Construction status: in operation Short description of project-services The project scope was the construction of a new versatile E.O.T. approved congress hall, the formation of the outdoor area of the Hotel, and the updgrade of the m.e.p. installations of the Hotel Google Μετρητικά στοιχεία Buildings surface: 1.200m2 Plot size: 10.000m2 Mep budget: 1.800.000 €
  • 38. Cambicci+Associates page 38 C a s i n o i n P o r t o C a r r a s G r a n d R e s o r t , H a l k i d i k i G r e e c e Project owner CASINO MAGIC PORTO CARRAS SA Project design parties Project management ΑΡΧΙΤΕΧ SA Architectural study P.Makridis + Associates Structural study Mep study Y. Cambicci (*) Study period: 1996 Construction details General contractor: ARXITEX SA Construction period: 1996 Construction status: in operation Short description of project-services New Casino making in an existing Hotel Build- ing in Porto Carras Grand Resort. Google metrics Buildings surface: 1.500m2 Plot size: m2 Mep budget: 2.000.000 € (*) co-designer 33% for planning
  • 39. Company profile 2012 page 39 out of 129 S m a l l H o t e l i n S a n t o r i n i , G r e e c e Project owner Project design parties Project management Architectural study I.Vlahos Structural study Mep study Y. Cambicci (*) Study period: 2000 Construction details General contractor: Construction period: Construction status: in operation Short description of project-services Small Hotel Construction in Fira, Santorini, Greece. Google metrics Buildings surface: 700m2 Plot size: 8.000m2 Mep budget: 400.000 € (*) co-designer 50% for planning
  • 40. Cambicci+Associates page 40 This page was intentionally left blank
  • 41. Company profile 2012 page 41 out of 129 ΕΕΕddduuucccaaatttiiiooonnn
  • 42. Cambicci+Associates page 42 E x t e n s i o n o f t h e P e d a g o g y D e p a r t m e n t o f t h e A r i s t o t l e U n i v e r s i t y o f T h e s s a l o n i k i Project owner Aristotle University of Thessaloniki Project design parties Architectural study Ν.Kalogirou Professor Dpt. Arch. Α.U.Th. Α.Vasiliadis,Κ.Giatas,D.Koliakos,L.Mavridis Structural study Κ.Stylianidis Professor Dpt. Civ.Eng. Α.U.Th. Ch.Ignatakis Professor Dpt. Civ.Eng. Α.U.Th. S.Baxevanis Mep construction study Cambicci+Associates Mep study consultant: Κ.Andreou Lecturer Dpt. El.Eng. Α.U.Th. Mep study advisor Κ.Andreou Lecturer Dpt. El.Eng. Α.U.Th. Study period: 2010 Construction details General contractor: Construction period: Construction status: ongoing Short description of project-services The project scope was the costruction study for the expansion of the pedagogy Department of the A.U.Th with the addition of two new teach- ing room wards as well as an auditorium Google metrics Buildings surface: 18.500m2 Plot size: 10.000m2 Mep budget: 5.500.000 €
  • 43. Company profile 2012 page 43 out of 129 A . U . T h C o n g r e s s H a l l i n P o l y t e c h n i c S c h o o l , G r e e c e Project owner Company for the exploitation of A.U.Th. Real Estate Project design parties Project management A.U.Th TD Architectural study ΝΙΜΑΝD Architects Structural study Ι.Poulios Mep study Cambicci+Associates Study period: 2009 Construction details General contractor: Construction period: Construction status: ongoing Short description of project-services The project scope was the construction study and the compilation of auction documents for the renovation of the existing central auditori- ums of the Polytechnic School and the con- struction of a modern conference center in U.A.T. Google metrics Buildings surface: 3.200m2 Plot size: m2 Mep budget: 1.000.000 €
  • 44. Cambicci+Associates page 44 L i g h t i n g o f t h e A . U . T h P h i l o s o p h y D e p a r t m e n t Project owner A.U.Th Project design parties Project management A.U.Th TD Architectural study Ν.Μ.Andreadi Professor Dept.Arch.A.U.th. Mep study Cambicci+Associates Lighting design G-Lights - M.Gourogiannis Study period: 2010 Construction details General contractor: Construction period: Construction status: ongoing Short description of project-services The project scope is the architectural lighting of the facades of the landmark building of the Philosophy Dept of the A.U. of Thessaloniki. Google metrics Buildings surface: m2 Plot size: 4.000m2 Mep budget: 500.000 €
  • 45. Company profile 2012 page 45 out of 129 B i s s e l l C o l l e g e L i b r a r y i n T h e s s a l o n i k i , G r e e c e Project owner Board of the American College of Thessaloniki Project design parties Project management P.Makridis Architectural study P.Makridis + Associates Structural study Mep study Y. Cambicci (*) Study period: 1996 Construction details General contractor: DOMOTECHNIKI SA Construction period: 1997-1998 Construction status: in operation Short description of project-services New Library Building in American College of Thessaloniki. Google metrics Buildings surface: 4.000m2 Plot size: 10.000m2 Mep budget: 2.150.000 € (*) co-designer 33% for planning
  • 46. Cambicci+Associates page 46 R e c o n s t r u c t i o n o f p r i v a t e s c h o o l i n T h e s s a l o n i k i , G r e e c e Project owner American College ‘Anatolia’ of Thessaloniki Project design parties Project management P.Makridis Architectural study & construction supervision P.Makridis + Associates SA Structural study Mep study & construction supervision Cambicci+Associates Study period: 2010 Construction details General contractor: Construction period: 2010 Construction status: in operation Short description of project-services Elaboration of the construction study and the cost analysis reports. Google metrics Buildings surface: 1.500m2 Plot size: 20.000m2 Mep budget: 300.000 €
  • 47. Company profile 2012 page 47 out of 129 HHHeeeaaalllttthhh
  • 48. Cambicci+Associates page 48 R e h a b i l i t a t i o n C e n t r e i n S e r r e s , G r e e c e Project owner ANANEOSI SA Project design parties Project management SYNTHESIS SA Architectural study ΜΜΤ SA Structural study ΜΜΤ SA Mep study Cambicci+Associates Study period: 2010 Construction details General contractor: Construction period: 2009 Construction status: in operation Short description of project-services The project scope was the study of a rehabili- tation center in the municipality of Emmanouil Pappas in Serres. Google metrics Buildings surface: 5.200m2 Plot size: 6.700m2 Mep budget: 2.000.000 €
  • 49. Company profile 2012 page 49 out of 129 R e n o v a t i o n o f t h e B l u e C r o s s C l i n i c i n T h e s s a l o n i k i , G r e e c e Project owner EUROMEDICA SA ‘KIANOYS STAYROS’ SA Project design parties Project management EUROMEDICA TD Architectural study POLIS SA, MEIONENA Structural study K.Makedos Mep study Y. Cambicci (*) Study period: 2000-2001 Construction details General contractor: AKTOR SA Construction period: 2001-2002 Construction status: in operation Short description of project-services Tottaly reconstruction of a major clinik in Thes- saloniki. Google metrics Buildings surface: 5.800m2 Plot size: 1.300m2 Mep budget: 3.000.000 € (*) co-designer 33% for planning
  • 50. Cambicci+Associates page 50 C e n t r a l M E P I n s t a l l a t i o n s r e n o v a t i o n a t P r i v a t e G e n e r a l C l i n i c i n T h e s s a l o n i k i Project owner EUROMEDICA SA GENIKI KLINIKI SA Project design parties Project management EUROMEDICA TD Architectural study Structural study Mep study Y. Cambicci (*) Study period: 2001-2002 Construction details General contractor: ERGO3 Construction period: 2002-2003 Construction status: in operation Short description of project-services Reconstruction of the central MEP networks in a general clinik in Thessaloniki. Google metrics Buildings surface: 8.000m2 Plot size: 1.800m2 Mep budget: 1.000.000 € (*) co-designer 33% for planning
  • 51. Company profile 2012 page 51 out of 129 N e w S u r g e r y a n d A d m i n i s t r a t i o n B u i l d i n g i n A H E P A H o s p i t a l i n T h e s s a l o n i k i , G r e e c e Project owner Ministry of Health Project design parties Project management AHEPA TD Architectural study X.Kouloukouris,A.Tseranidis Ε.Ε. TROPALIS E.T.E. Structural study Mep study Y. Cambicci (*) Study period: 2001-2002 Construction details General contractor: Construction period: Construction status: postponed Short description of project-services New Surgeries, Central Sterilise Department, Intensive Care Department and administration building for a General Hospital in Thessaloniki. Google metrics Buildings surface: 5.800m2 Plot size: m2 Mep budget: 5.600.000 € (*) co-designer 33% for planning
  • 52. Cambicci+Associates page 52 E . D . a n d B l o o d D o n a t i o n C e n t r e a t I p p o k r a t e i o H o s p i t a l i n T h e s s a l o n i k i , G r e e c e Project owner DEPANOM SA Project design parties Project management J&P AVAX SA Architectural study METE SYSM SA Structural study METE SYSM SA Mep study Y. Cambicci (*) Study period: 2004 Construction details General contractor: J&P-AVAX SΑ Construction period: 2004-2006 Construction status: in operation Short description of project-services Reconstruction of existing building for emer- gency department and making of a new build- ing for blood donation center. Google metrics Buildings surface: 2.500m2 Plot size: m2 Mep budget: 1.100.000 € (*) co-designer 33% for planning
  • 53. Company profile 2012 page 53 out of 129 SSShhhoooppppppiiinnnggg mmmaaallllllsss &&& RRReeetttaaaiiilll ssstttooorrreeesss
  • 54. Cambicci+Associates page 54 S h o p p i n g C e n t e r a t X a n t h i , G r e e c e Project owner ALPHA RETAIL PARKS SA Project design parties Project management Leonidas Athanasiadis Architectural study archigraph architecture_interiors Structural study Statoras Mep study Cambicci+Associates Study period: 2010 Construction details General contractor: ZINON ATHANASIADIS SA Construction period: 2009-2010 Construction status: in operation Short description of project-services New Shopping Center Flamingo in Xanthi. Google metrics Buildings surface: 18.500m2 Plot size: 80.000m2 Mep budget: 2.200.000 €
  • 55. Company profile 2012 page 55 out of 129 H y p e r m a r k e t a t X a n t h i , G r e e c e Project owner PRAKTIKER HELLAS ΑΕ Project design parties Project management Leonidas Athanasiadis Architectural study archigraph architecture_interiors Structural study Statoras Mep study Cambicci+Associates Study period: 2010 Construction details General contractor: ZINON ATHANASIADIS SA Construction period: 2009-2010 Construction status: in operation Short description of project-services Hypermarket in Flamingo Shopping Center in Xanthi. The fire study was inspected and ap- proved by VdS. Google metrics Buildings surface: 4.500m2 Plot size: 5.500m2 Mep budget: 1.200.000 €
  • 56. Cambicci+Associates page 56 E a s t T h e s s a l o n i k i S h o p p i n g C e n t e r Project owner ΦΑΜ ΑΕ Project design parties Development, Project & Construction management Alexander Kalatzis Architectural study S.Suchomel-Τ.Kalatzis-Μ.kalatzis Structural study G.Papargyris-A.Kardoula & Associates Mep study Cambicci+Associates Study period: 2009 Construction details General contractor: ΜΑΚΤ SΑ Construction period: 2009-2010 Construction status: in operation Short description of project-services New Shopping Center East Plazza in eastern Thessaloniki. Google metrics Buildings surface: 9.300m2 Plot size: 30.000m2 Mep budget: 1.800.000 €
  • 57. Company profile 2012 page 57 out of 129 E a s t T h e s s a l o n i k i H y p e r m a r k e t Project owner SATURN-MEDIA MARKT ΑΕ Project design parties Project management MAKT SA-LDK SΑ Interior Architectural study LDK ΑΕ Mep study LDK SΑ - Cambicci+Associates Mep construction supervision LDK SΑ - Cambicci+Associates Study period: 2009 Construction details General contractor: ΜΑΚΤ SA Construction period: 2009-2010 Construction status: in operation Short description of project-services Fire safety construction study and MEP super- vision in Saturn Hypermarket in east Thessalo- niki. Google metrics Buildings surface: 6.400m2 Plot size: m2 Mep budget: 1.400.000 €
  • 58. Cambicci+Associates page 58 W e s t T h e s s a l o n i k i H y p e r m a r k e t Project owner HELLINIKI ETERIA IDIOKATASKEVON SA Project design parties Project management ECC Engineering Construction Consulting SA Architectural study archigraph architecture_interiors Structural study Statoras Mep study Cambicci+Associates Study period: 2009 Construction details General contractor: Construction period: Construction status: under development Short description of project-services Mep study for making of a new hypermarket in Western Thessaloniki. Google metrics Buildings surface: 10.300m2 Plot size: 49.000m2 Mep budget: 1.600.000 €
  • 59. Company profile 2012 page 59 out of 129 H y p e r m a r k e t i n T i r a n a , A l b a n i a Project owner Megatek ShA Project design parties Project management Dionis Teqja Architectural study archigraph architecture_interiors Structural study Statoras Mep study Cambicci+Associates Study period: 2007 Construction details General contractor: ZAlba SA Construction period: 2008-2009 Construction status: in operation Short description of project-services Retail & Whole Sale Building for MEGATEK ShA and new office bulding for DIONIS TEQJA Companies in Tirana-Durred Highway in Alba- nia. Google metrics Buildings surface: 25.200m2 Plot size: 75.000m2 Mep budget: 2.600.000 €
  • 60. Cambicci+Associates page 60 H y p e r m a r k e t i n L a r i s s a , G r e e c e Project owner HELLINIKI ETERIA IDIOKATASKEVON SA Project design parties Project management Focal Project Managers Architectural study archigraph architecture_interiors Structural study Statoras Initial mep study Α.Koutsikos SA Mep construction study Cambicci+Associates Study period: 2008-2009 Construction details General contractor: ZINON ATHANASIADIS SA Construction period: 2009 Construction status: in operation Short description of project-services Modofications in construction study for a new hypermarket in Larissa Greece. Google metrics Buildings surface: 7.900m2 Plot size: 38.000m2 Mep budget: 1.400.000 €
  • 61. Company profile 2012 page 61 out of 129 H y p e r m a r k e t i n V o l o s , G r e e c e Project owner MAKRO Cash & Carry SA Project design parties Project management John Ninos Architectural study & construction supervision archigraph architecture_interiors Structural study & construction supervision Statoras Mep study & construction supervision Cambicci+Associates Study period: 2007 Construction details Gen. contractor:ΑRΧΙΚΟΝ SA-ANAPLASEON SA Construction period: 2008 Construction status: in operation Short description of project-services Mep Study and construction supervision for a new makro hypermarket in Volos, Greece. Google metrics Buildings surface: 4.200m2 Plot size: 29.000m2 Mep budget: 1.000.000 €
  • 62. Cambicci+Associates page 62 H y p e r m a r k e t i n V e r i a , G r e e c e Project owner Kalpakis Panagiotis Co Project design parties Initial Architectural study A.Sidiropoulos Construction Architectural study Κ.Papastergiou Structural study S.Diamantopoulos Mep study & construction supervision Cambicci+Associates Study period: 2007 Construction details General contractor: EGERSIS Limited Construction period: 2007-2008 Construction status: in operation Short description of project-services New factory and sales center for Kalpakis De- sign Company in Veria, Greece. Google metrics Buildings surface: 5.800m2 Plot size: 5.200m2 Mep budget: 1.500.000 €
  • 63. Company profile 2012 page 63 out of 129 H y p e r m a r k e t i n X a n t h i , G r e e c e Project owner MAKRO Cash & Carry SA Project design parties Project management Leonidas Athanasiadis Architectural study & construction supervision archigraph architecture_interiors Structural study & construction supervision Statoras Mep study & construction supervision Cambicci+Associates Study period: 2006-2007 Construction details General contractor: ZINON ATHANASIADIS SA Construction period: 2008 Construction status: in operation Short description of project-services Mep Study and construction supervision for a new makro hypermarket in Xanthi, Greece Google metrics Buildings surface: 4.200m2 Plot size: 22.800m2 Mep budget: 1.000.000 €
  • 64. Cambicci+Associates page 64 S h o p p i n g c e n t e r i n T h e s s a l o n i k i , G r e e c e Project owner Carrefour Hellas SA Project design parties Development, Project & Cosntruction management MAKT SA – Alexander Kalatzis Architectural construction supervision S.Vergopoulos, N.Dimtsas Structural construction supervision G.Papargyris Mep construction supervision Cambicci+Associates Study period: 1998-1999 Construction details General contractor: ZINON ATHANASIADIS SA Construction period: 1999-2000 Construction status: in operation Short description of project-services MAKEDONIA Major Shopping Center in Thessa- loniki. In the center exists Carrefour Hyper- market, Cinema Complex, Shopping Mall, and Recreational area building. Google metrics Buildings surface: 35.000m2 Plot size: 140.000m2 Mep budget: 4.800.000 €
  • 65. Company profile 2012 page 65 out of 129 W e s t T h e s s a l o n i k i H y p e r m a r k e t Project owner MAKRO Cash & Carry SA Project design parties Project management Leonidas Athanasiadis Architectural study & construction supervision archigraph architecture_interiors Structural study & construction supervision Statoras Mep study & construction supervision Cambicci+Associates Study period: 2004 Construction details General contractor: ZINON ATHANASIADIS SA Construction period: 2004-2005 Construction status: in operation Short description of project-services Mep Study and construction supervision for a new makro hypermarket in Western Thessalo- niki Area, Greece. Google metrics Buildings surface: 4.200m2 Plot size: 22.000m2 Mep budget: 1.000.000 €
  • 66. Cambicci+Associates page 66 E a s t T h e s s a l o n i k i E l e c t r i c a l H y p e r m a r k e t Project owner ΤΑΚ AE Project design parties Development, Project & Construction management MAKT SA - Alexander kalatzis Architectural study Μ.Kalatzis-Τ.Kalatzi-S.Suchomel Structural study & construction supervision G.Papargyris Mep construction supervision Cambicci+Associates Study period: 2005 Construction details General contractor: ΜΑΚΤ SΑ Construction period: 2004-2005 Construction status: in operation Short description of project-services Mep construction supervision for a new hyper- market in Thessaloniki. Google metrics Buildings surface: 7.200m2 Plot size: 17.500m2 Mep budget: 900.000 €
  • 67. Company profile 2012 page 67 out of 129 H y p e r m a r k e t i n T h e s s a l o n i k i , G r e e c e Project owner Diagonios SA Project design parties Project management Architectural study A.N Tombazis & Associates Architects- P.Makridis+Associates Structural study Ι.Poulios Mep study Y. Cambicci (*) Study period: 2000 Construction details General contractor: DIAGONIOS SA Construction period: 2001 Construction status: in operation Short description of project-services New Shopping center EUROTECH for building materials stores in eastern Thessaloniki area. Google metrics Buildings surface: 8.000m2 Plot size: 20.000m2 Mep budget: 1.300.000 € (*) co-designer 33% for planning
  • 68. Cambicci+Associates page 68 D u t y F r e e S h o p s i n B o r d e r S t a t i o n s Project owner Hellenic Duty Free Shops SA Project design parties Project management Architectural study POLIS SA, G.Vlahos Structural study Concept SA Mep study Y. Cambicci (*) Study period: 2004 Construction details General contractor: Construction period: Construction status: in operation Short description of project-services New stores for Hellenic Duty Free Shops in Greece Border Stations at Kakavia, Promahona Rhodes Airport and Katakolo port (construction postponed). Google 1 2 3 4 5 metrics Buildings surface: 5.000m2 Plot size: m2 Mep budget: 650.000 € (*) co-designer 33% for planning
  • 69. Company profile 2012 page 69 out of 129       RRReeecccrrreeeaaatttiiiooonnn
  • 70. Cambicci+Associates page 70 R e s t a u r a n t i n T h e s s a l o n i k i , G r e e c e Project owner Clochard Restaurant Project design parties Project management Architectural study & construction supervision P.Makridis+Associates SA Structural study Mep study & construction supervision Cambicci+Associates Study period: 2007 Construction details General contractor: Construction period: 2008 Construction status: in operation Short description of project-services Restaurant reconstruction in Thessaloniki cen- ter. Google metrics Buildings surface: m2 Plot size: m2 Mep budget: €
  • 71. Company profile 2012 page 71 out of 129 C a f é & R e s t a u r a n t i n T i r a n a , A l b a n i a Project owner Albanian restaurants Sha Project design parties Project management Vivartia TD-Goodys Architectural study archigraph architecture_interiors Structural study Mep study Cambicci+Associates Study period: 2007 Construction details General contractor: Construction period: : Construction status: postponed Short description of project-services Goodys & Flocafé stores in MEGATEK shopping center in Tirana Albania. Google metrics Buildings surface: 800m2 Plot size: m2 Mep budget: 250.000 €
  • 72. Cambicci+Associates page 72 This page was intentionally left blank
  • 73. Company profile 2012 page 73 out of 129 SSSpppooorrrtttsss
  • 74. Cambicci+Associates page 74 R e n o v a t i o n o f T o u m p a a r e a i n T h e s s a l o n i k i , G r e e c e Project owner Municipality of Thessaloniki Project design parties Project management Thessaloniki Organisation Architectural study A.Panos M.Papadakis Architects, DEKATHLON SA Structural study Concept Engineers Mep study Y. Cambicci (*) Study period: 2004 Construction details General contractor: Construction period: 2005-2008 Construction status: in operation Short description of project-services Open swimming pool, new cultural center, in Alana tis Toumpas area of Thessaloniki. Google metrics Buildings surface: 7.200m2 Plot size: 33.000m2 Mep budget: 2.700.000 € (*) co-designer 33% for planning
  • 75. Company profile 2012 page 75 out of 129 I n d o o r s w i m m i n g p o o l f a c i l i t y i n V e r i a , G r e e c e Project owner Municipality of Veria Project design parties Project management Evripos SA Architectural study PETRA SINERGATIKI Consulting Engineers Structural study Concept Consulting Engineers Mep study Y. Cambicci (*) Study period: 2006 Construction details General contractor: EVRIPOS SA Construction period: Construction status: postponed Short description of project-services New major indoor swimming pool facility in Veria sports center. Google metrics Buildings surface: 11.000m2 Plot size: 28.000m2 Mep budget: 2.200.000 € (*) co-designer 33% for planning
  • 76. Cambicci+Associates page 76 A r t i f i c i a l l a k e s c o m p l e x i n K a l a m a r i a , T h e s s a l o n i k i Project owner Municipality of Kalamaria Project design parties Project management Municipality of Kalamaria TD Architectural study Stamatis Koukopoulos Structural study Mep study Cambicci+Associates Study period: 1999 Construction details General contractor: Construction period: Construction status: cancelled Short description of project-services Outdoor major swimming pool and icetrack in Kalamaria, Thessaloniki, Greece. Google metrics Buildings surface: 3.500m2 Plot size: 19.000m2 Mep budget: 1.200.000 €
  • 77. Company profile 2012 page 77 out of 129 HHHooouuusssiiinnnggg
  • 78. Cambicci+Associates page 78 V I P V i l l a i n P e f k o c h o r i H a l k i d i k i , G r e e c e Project owner Project design parties Project management ΜΜΤ SA Architectural study & construction supervision Peter Schellinger Ε.Tzekakis, N.Manou-Andreadis R.Papadakis, D.Aristotelidis Structural study Ι.Poulios Mep study & construction supervision Cambicci+Associates Study period: 2011 Construction details General contractor: Construction period: 2011-ongoing Construction status: under construction Short description of project-services VIP Villas complex in Pefkochori Halikidiki, Greece. Google metrics Buildings surface: 700m2 Plot size: 16.000m2 Mep budget: 1.000.000 €
  • 79. Company profile 2012 page 79 out of 129 T w o c o u n t r y v i l l a s a t S k i a t h o s I s l a n d , G r e e c e Project owner Project design parties Project management P.Makridis+Associates SA Architectural study & construction supervision P.Makridis+Associates SA Petros Makridis Thodoris Makridis Eleana Makridis Structural study Mep study & construction supervision Cambicci+Associates Study period: 2010 Construction details General contractor: Construction period: 2012 Construction status: under construction Short description of project-services Two country villas in Skiathos town area. Google Μετρητικά στοιχεία Buildings surface: 220m2 Plot size: 4.000m2 Mep budget: €
  • 80. Cambicci+Associates page 80 O f f i c e s & H o u s e s C o m p l e x i n M e t a x o u r g i o A t h e n s , G r e e c e Project owner GEK SA Project design parties Project management Architectural study Tsigarida Architects Structural study Α.Xenos Mep study Cambicci+Associates Study period: 2006 Construction details General contractor: Construction period: Construction status: Short description of project-services 1st prize in architectural contest in Metaxourgeio area in Athens, Greece metrics Buildings surface: m2 Plot size: m2 Mep budget: €
  • 81. Company profile 2012 page 81 out of 129 V i l l a i n M o l i v o s , L e s v o s I s l a n d , G r e e c e Project owner Project design parties Project management Architectural study Tsigarida Architects Structural study Mep study Cambicci+Associates Study period: 1999 Construction details General contractor: Construction period: Construction status: Short description of project-services Country Villa at Molivos in Lesvos Island, Greece. Google Μετρητικά στοιχεία έργου Buildings surface: 150m2 Plot size: 4.000m2 Mep budget: €
  • 82. Cambicci+Associates page 82 V i l l a i n P o t i d a i a H a l k i d i k i , G r e e c e Project owner Project design parties Project management Architectural study archigraph architecture_interiors Structural study Statoras Mep study Cambicci+Associates Study period: 2009 Construction details General contractor: Construction period: Construction status: in operation Short description of project-services A seaside villa in Halkidiki, Greece Google metrics Buildings surface: m2 Plot size: m2 Mep budget: €
  • 83. Company profile 2012 page 83 out of 129 P l a g i a r i S . O . S . v i l l a g e f o r o r p h a n c h i l d r e n i n T h e s s a l o n i k i , G r e e c e Project owner SOS Village for Northern Greece Project design parties Project management Architectural study P.Makridis+Associates Structural study Mep study Y. Cambicci (*) Study period: 1999 Construction details General contractor: Construction period: Construction status: in operation Short description of project-services MEP Study for a full village construction, com- posed of houses, main multipurpose building, sports areas, roads and infrastructure. Google metrics Buildings surface: 4.000m2 Plot size: 13.000m2 Mep budget: 1.100.000 € (*) co-designer 33% for planning
  • 84. Cambicci+Associates page 84 P r e s s V i l l a g e f o r A t h e n s O l y m p i c G a m e s i n M a r o u s i A t h e n s , G r e e c e Project owner Municipality of Amarousion Project design parties Project management Architectural study Structural study Mep study Y. Cambicci (*) Study period: 1999 Construction details General contractor: Construction period: Construction status: in operation Short description of project-services Complete mep study for village buildings made for the Olympic Games. Google metrics Buildings surface: 8.000m2 Plot size: 30.000m2 Mep budget: € (*) co-designer 50% for planning
  • 85. Company profile 2012 page 85 out of 129 UUUrrrbbbaaannn
  • 86. Cambicci+Associates page 86 W h i t e T o w e r s q u a r e r e n o v a t i o n i n T h e s s a l o n i k i , G r e e c e Project owner Municipality of Thessaloniki Project design parties Project management Architectural study Tsigarida Architects Mep study Y. Cambicci (*) Lighting design Duillio Passariello Li-Dac Philips Study period: 2005 Construction details General contractor: Construction period: Construction status: in operation Short description of project-services Mep study for the square of White tower, sym- bol of the city of Thessaloniki. Google metrics Buildings surface: 100m2 Plot size: 18.000m2 Mep budget: 500.000 € (*) co-designer 33% for planning
  • 87. Company profile 2012 page 87 out of 129 K e f a l a r i s p r i n g s a r e a i n D r a m a , G r e e c e Project owner DEPOS SΑ Project design parties Project management DEPOS SA Architectural study George Triantafyllidis Structural study Mep study Y. Cambicci (*) Study period: 2005 Construction details General contractor: Construction period: Construction status: in operation Short description of project-services Google metrics Buildings surface: 500m2 Plot size: 16.000m2 Mep budget: 900.000 € (*) co-designer 50% for planning
  • 88. Cambicci+Associates page 88 H e l l e n i c g a r d e n i n g a r d e n i n g E X P O i n C h i n a Project owner HELEXPO SA Project design parties Project management HELEXPO SA Architectural study P.Nikiforidis, B.Cuomo Structural study Maria Stefanouri Mep study Y. Cambicci (*) Study period: 2006 Construction details General contractor: Construction period: Construction status: in operation Short description of project-services A garden for Shen Yang China International Hogricultural Exposition 2006. Google metrics Buildings surface: m2 Plot size: 1.200m2 Mep budget: € (*) co-designer 50% for planning
  • 89. Company profile 2012 page 89 out of 129 R e f u r b i s h m e n t o f t h e n e w p r o m e n a d e o f T h e s s a l o n i k i , G r e e c e Project owner Municipality of Thessaloniki Project design parties Architectural study P.Nikiforidis, B.Cuomo, Atelier R.Castro-S.Denissof Structural study I.Lavasas-M.Stefanouri Plants & trees arrangement study Iloriki Mep study Y. Cambicci (*) Study period: 2006 Construction details General contractor: SIDIRODROMIKA ERGA SA Construction period: phase A+B: 2006-2008 Phase C: 2011-ongoing Construction status: 50% in operation 50% under construction Short description of project-services Full renovation of Thessaloniki promenade. Google metrics Buildings surface: m2 Plot size: 280.000m2 Mep budget: 6.000.000 € (*) co-designer 33% for planning
  • 90. Cambicci+Associates page 90 This page was intentionally left blank
  • 91. Company profile 2012 page 91 out of 129 IIInnnddduuussstttrrriiiaaalll OOOiiilll &&& GGGaaasss iiinnnssstttaaallllllaaatttiiiooonnnsss
  • 92. Cambicci+Associates page 92 E l e c t r i c a l s y s t e m s m a n u f a c t u r i n g f a c t o r y i n K a l o h o r i , T h e s s a l o n i k i , G r e e c e Project owner SIAFARAS ELECTRICAL SYSTEMS SA Project design parties Architectural study archigraph architecture_interiors Structural study Statoras Mep study Cambicci+Associates Energy study Energy Technologies ΕΝΤΕ Study period: 2008-2009 Construction details General contractor: FRIGOSTAHL SΑ Construction period: 2010-2011 Construction status: under construction Short description of project-services Expansion of existing factory in Thessaloniki Google metrics Buildings surface: 4.200m2 Plot size: 10.000m2 Mep budget: 800.000 €
  • 93. Company profile 2012 page 93 out of 129 N e w f a c t o r y - m i l l i n S i n d o s i n d u s t r i a l a r e a , G r e e c e Project owner E.DI.V.E. SA (Allatini Mill) Project design parties Project management Architectural study P.Makridis+Associates Structural study Mep study Y.Cambicci (*) Study period: 1995-1998 Construction details Gen. contractor: ΕLLINIKI TECHNODOMIKI SA ΤΕΚ THESSALONIKI SΑ Construction period: 1997-1998 Construction status: in operation Short description of project-services Mep study & supervision for a new factory in Sindos area. Google metrics Buildings surface: 9.100m2 Plot size: 33.000m2 Mep budget: 1.200.000 € (*) co-designer 33% for planning
  • 94. Cambicci+Associates page 94 C a r r e p a i r d e p o t Project owner Municipality of Thessaloniki Project design parties Project management ΑΡΧΙΤΕΧ SA Architectural study Anthi Katsika Structural study Parisis Mpillias Mep study Y.Cambicci (*) Study period: 2004 Construction details General contractor: ARXITEX SA Construction period: 2004 Construction status: in operation Short description of project-services New car repair depot for Thessaloniki munici- pality. Google metrics Buildings surface: 5.300m2 Plot size: 4.700m2 Mep budget: 900.000 € (*) co-designer 50% for planning
  • 95. Company profile 2012 page 95 out of 129 F i s h e r y p r o c e s s i n g f a c t o r y i n K a v a l a i n d u s t r i a l a r e a , G r e e c e Project owner TRIFONIDIS SA Project design parties Project management Architectural study archigraph architecture_interiors Structural study G.Papargyris-A.Kardoula Mep study Y.Cambicci (*) Study period: 2002 Construction details General contractor: ZINON ATHANASIADIS SA Construction period: 2003 Construction status: in operation Short description of project-services New factory in Kavala area. Google metrics υ Buildings surface: 3.200m2 Plot size: 12.000m2 Mep budget: 500.000 € (*) co-designer 50% for planning
  • 96. Cambicci+Associates page 96 F u r n i t u r e f a c t o r y i n K a v a l a r i , T h e s s a l o n i k i , G r e e c e Project owner N.KARAPIPERIDIS-S.PARITSIS Co Project design parties Project management Architectural study archigraph architecture_interiors Structural study G.Papargyris-A.Kardoula Mep study Y.Cambicci (*) Study period: 2003 Construction details General contractor: Construction period: 2003 Construction status: in operation Short description of project-services New factory in Langadas area. Google metrics Buildings surface: 1.500m2 Plot size: 7.000m2 Mep budget: 200.000 €
  • 97. Company profile 2012 page 97 out of 129 N e w m e a t f a c t o r y i n F l o r i n a , G r e e c e Project owner VASILEIOS SAVVOPOULOS SA Project design parties Project management Leonidas Athanasiadis Architectural study archigraph architecture_interiors Structural study G.Papargyris-A.Kardoula Mep study Y.Cambicci (*) Study period: 1997 Construction details General contractor: ZINON ATHANASIADIS SA Construction period: 1997 Construction status: in operation Short description of project-services New factory in Florina area. Google metrics Buildings surface: 2.000m2 Plot size: 8.000m2 Mep budget: 500.000 € (*) co-designer 33% for planning
  • 98. Cambicci+Associates page 98 This page was intentionally left blank
  • 99. Company profile 2012 page 99 out of 129 IIInnnfffrrraaassstttrrruuuccctttuuurrreee
  • 100. Cambicci+Associates page 100 P o t i d a i a n e w H i g h w a y B r i d g e i n H a l k i d i k i , G r e e c e Project owner EGNATIA ODOS SA Project design parties Project management HELLINIKI TECHNODOMIKI SA Συγκοινωνιακή μελέτη GEOGNOSI SA Structural study VSL Systems AE Mep study Y.Cambicci (*) Study period: 2001 Construction details Gen. contractor: ELLINIKI TECHNODOMIKI SA Construction period: 2001 Construction status: in operation Short description of project-services New potidaia bridge with connecting highway in Halkidiki. Google metrics Buildings surface: m2 Plot size: m2 Mep budget: € (*) co-designer 50% for planning
  • 101. Company profile 2012 page 101 out of 129 C u t & C o v e r u n d e r g r o u n d t u n n e l i n T h e s s a l o n i k i - M i c h a n i o n a A v e n u e Project owner Region of Central Makedonia Project design parties Project management Συγκοινωνιακή μελέτη DIKTYO SA Structural study ΜΕΤΕ SYSM SA Mep study Y.Cambicci (*) Study period: 2002 Construction details General contractor: Construction period: Construction status: postponed Short description of project-services Preliminary mep study for a 3 lanes carriage- way tunnel, 314m long, in MAKEDONIA Airport area. Google metrics Buildings surface: m2 Plot size: m2 Mep budget: 3.000.000 € (*) co-designer 50% for planning
  • 102. Cambicci+Associates page 102 W a t e r t r e a t m e n t f a s c i l i t y f o r K o z a n i i n d u s t r i a l a r e a Project owner Prefecture of Kozani Project design parties Project management ENCO Co Χημικοτεχνική μελέτη ENCO Co Structural study Kostas Chatzis Mep study Cambicci+Associates Study period: 2008 Construction details General contractor: ITHAKI SA-MESOGEOS SA Construction period: 2008 Construction status: in operation Short description of project-services Renovation and expansion of water treatment fascility center for an industrial area. Google metrics Buildings surface: m2 Plot size: m2 Mep budget: 500.000 €
  • 103. Company profile 2012 page 103 out of 129 W a t e r t r e a t m e n t f a s c i l i t y f o r A m y n t a i o , G r e e c e Project owner Municipality of Amyntaio Project design parties Project management ENCO CO Chemical study ENCO CO Structural study Kostas Chatzis Mep study Cambicci+Associates Study period: 2007 Construction details General contractor: DISTILOS SA Construction period: 2007 Construction status: in operation Short description of project-services Renovation and expansion of water treatment fascility center. Google metrics Buildings surface: m2 Plot size: m2 Mep budget: 650.000 €
  • 104. Cambicci+Associates page 104 I r r i g a t i o n n e t w o r k o f M e s s i a n i , K o z a n i s , G r e e c e Project owner Prefecture of Kozani Project design parties Project management Anaptixiaki Kozanis Hydraulic study Horotechniki SA Structural study Akis Mystakidis Mep study Y.Cambicci (*) Study period: 1998 Construction details General contractor: Construction period: Construction status: in operation Short description of project-services Pump stations for irrigation networks. Google metrics Buildings surface: m2 Plot size: m2 Mep budget: € (*) co-designer 33% for planning
  • 105. Company profile 2012 page 105 out of 129 ΕΕΕnnneeerrrgggyyy
  • 106. Cambicci+Associates page 106 T o w n H a l l o f P y l a i a Project owner Municipality of Pylaia Project design parties Architectural study K.Antoniou,E.Kastro,E.Disli,N.Barbari Structural study K.Anastasiadis, P.Panetsos Mep study Y. Cambicci (*) Mep study advisor Dr K.Pattas AUTh Proffessor Study period: 1994-1996 Construction details General contractor: Construction period: 1997-2000 Construction status: in operation Short description of project-services The first office building with geo-thermal ex- changers in Greece with Water to water Sourse Heat Pumps in coordination with the Mechani- cal Department of A.U.Th. Google (*) co-designer 33% for planning
  • 107. Company profile 2012 page 107 out of 129 T w o V i l l a s i n T h e r m i , G r e e c e Project owner Project design parties Architectural study Structural study Mep study Y. Cambicci (*) Geothermie systems advisor I.Mpousgolitis Study period: 2004 Construction details General contractor: Construction period: Construction status: in operation Short description of project-services Two villas with sophisticated water to water heat pumps network and geothermal exchang- ers. Google (*) co-designer 50% for planning
  • 108. Cambicci+Associates page 108 R e s i d e n t i a l P h o t o v o l t a i c s y s t e m s d e s i g n Project owner Project design parties Photovoltaic system study Cambicci+Associates Study period: 2010-ongoing Short description of project-services Connected residential photovoltaic systems in northern and central Greece Systems installed power: 5 up to 10 kWp each Total installed power: 165kWp System status: in operation
  • 109. Company profile 2012 page 109 out of 129 M a j o r p h o t o v o l t a i c s y s t e m s Project owner Project design parties Photovoltaic system study Cambicci+Associates Study period: 2011-ongoing Short description of project-services Connected photovoltaic systems, on rooftops and ground in northern and central Greece Systems installed power: 100 έως 2.000 kWp Total installed power: 2.400kWp System status: in various construction phases
  • 110. Cambicci+Associates page 110 This page was intentionally left blank
  • 111. Company profile 2012 page 111 out of 129 SSSeeecccuuurrriiitttyyy
  • 112. Cambicci+Associates page 112 B a n k o f G r e e c e B u i l d i n g i n T h e s s a l o n i k i , G r e e c e Project owner Bank of Greece SA Project design parties Construction manager Decathlon SA, D.Papazoglou Architectural study & construction supervision P.Nikiforidis–B.Cuomo ΤΥ ΤτΕ: BoG TD: E.Dalaklis-P.Panagakis Structural study and construction supervision Μ.Stefanouri–P.Zervas-G.Nikolaidis ΤΥ BoG TD: Ν.Vrontisis-G.Papadatos Mep study and construction supervision Y. Cambicci BoG TD:Κ.Dimitrakopoulos-Κ.Grigoropoulos Study period: 2004-2006 Construction details General contractor: DOMOTECHNIKI SA Construction period: 2007-2009 Construction status: in operation Systems description Sophisticated security systems including intru- sion control, central access control systems, closed circuit television networks, perimeter alarm systems, fully interconnected. Google
  • 113. Company profile 2012 page 113 out of 129 P o l i c e A d m i n i s t r a t i o n B u i l d i n g i n K o z a n i , G r e e c e MINISTRY OF INTERNAL AFFAIRS – HELLENIC POLICE DEPARTMENT Project design parties Project management KED SA Architectural study 406 Studies group, Vasileios Pappas Structural study I.Mavrakis and Associates SA Safety & Security study Cambicci+Associates Study period: 2008-2009 Construction details General contractor: ANDREADIS ZISIADIS SA Construction period: 2009-ongoing Construction status: under construction Short description of project-services Sophisticated security systems including intru- sion control, central access control systems, closed circuit television systems and risk anal- ysis study. Google
  • 114. Cambicci+Associates page 114 V I P V i l l a i n N o r t h e r n G r e e c e Ιδιώτης VIP πελάτης Project design parties Safety & security study Cambicci+Associates Study period: 2011 Short description of project-services Risk analysis study for the safety measures in VIP Villa in Northern Greece.
  • 115. Company profile 2012 page 115 out of 129 PPPrrrooojjjeeecccttt mmmaaannnaaagggeeemmmeeennnttt
  • 116. Cambicci+Associates page 116 This page was intentionally left blank
  • 117. Company profile 2012 page 117 out of 129 Project management services for the protection and upgrade of the suburban forest Seih-sou, in Thessaloniki, Greece. Project owner Region of Central Makedonia Project design parties Project management OMICRON E.P.E. CONSORTIUM, I.Iosifidis, Y.Cambicci, Services period: 2006-2009 Google
  • 118. Cambicci+Associates page 118 This page was intentionally left blank
  • 119. Company profile 2012 page 119 out of 129 ΟΟΟrrrgggaaannniiisssaaatttiiiooonnn Our office has the following depertments: Administration Mechanological & Plumbing Studies Electrical Studies Energy Studies Industrial Studies Lighting Design Security Studies And Renewable energy systems studies We have offices also in: • Alexandroupolis fir Thrace Projects • Larissa for Thessaly projects • Athens•
  • 120. Cambicci+Associates page 120 This page was intentionally left blank
  • 121. Company profile 2012 page 121 out of 129 QQQuuuaaallliiifffiiicccaaatttiiiooonnnsss –––dddiiippplllooommmaaasss fffrrrooommm pppuuubbbllliiiccc ssseeeccctttooorrr ppprrrooojjjeeeccctttsss Our office is equipped (as is necessary by Greek legislation) with a diploma for Public Sector projects in the following categories of Stud- ies: Mechanical-Electrical-Electronic Studies: Class C Diploma (Category 09) Environmental Studies: Class A Diploma (Category 27) Engineers who cooperate with our office have Diplomas in other categories. EEEnnneeerrrgggyyy iiinnnssspppeeeccctttiiiooonnn DDDiiippplllooommmaaasss The following engineers in our organization have been certified as Energy Inspectors: Yerasimo Cambicci (Class Β)
  • 122. Cambicci+Associates page 122 This page was intentionally left blank
  • 123. Company profile 2012 page 123 out of 129 CCCuuurrrrrriiicccuuullluuummm vvviiitttaaaeee
  • 124. Cambicci+Associates page 124 1. General Data Last Name: Cambicci First Name: Yerasimo Father’s name: Stylianos Year of birth: 1968 Place of birth: Xanthi, Greece Specialty: Diploma Mechanical Engineer A.U.TH. TCG No: 62405 Greek Public Works Degree (According to Greek Law 716/77) Number: 11263 Headquarters: Thessaloniki Valid thrued: 21.05.2008 Studies Categories: Category No 9: Degree Level C (MEP Studies) Category No 27: Degree Level A (Enviromental Studies) 2. Studies High School Degree Year of Graduation: 1985 Grade: Excellent High School: Xanthi 1st High School Mechanical Engineer Degree Year of Graduation: 1992 Grade: Good Thesis: Thermal Simulation of Artificial Water Tanks Thesis Grade: Excellent University: Aristoteleio University of Thessaloniki
  • 125. Company profile 2012 page 125 out of 129 3. Seminars Engineers & Personal Computers Carrier: TCG East Makedonia Section Period: 1992 Air Pollution Carrier: Energy Department- Section of Mechanical Engineers Polytechnic School - A.U.TH. Period: 1992 Ιnstallation Βus Compact Course Carrier: Siemens Training Center, Regensburg, Germany Period: 1997 Education In Lighting Carrier: Lightolier, USA Period: 2002 Lighting Technology Carrier: Rensesealer Polytechnic Institute, New York, USA Period: 2007 4. Foreign Languages English Diploma: First Certificate in English Institute: University of Cambridge
  • 126. Cambicci+Associates page 126 5. Work Experience 5.1 Employer: North Aegean Petrol Company (NAPC) Kavala, Greece Position: Production Engineer Period: 1987 Duties: Monitoring of the petrol deposit and supervision of drilling repair works 5.2 Employer: Private & Public Works in Greece Office Gerasimos Kampitsis + Associates Position: MEP Design Engineer Period: 1993-Today Duties: MEP Design & Construction Supervision, as follows: • Mechanical Electrical & Plumbing Installations design, for Buildings, Urban and infrastructure projects. • Lighting Design Projects • Supervision of the above studies at the construction phase. • Environmental Studies • Project Consultant • Project Management 6. Main Research Work 6.1 Research Program: New Pilaia Mayor Office – Energy Analysis Study Carrier: Pylaia Municipality, Polytechnic School of AUTH Position: Researcher Responsible Professor: Dr Konstantinos Pattas Period: 1994-1995 Project: Ground Source Heat Pumps
  • 127. Company profile 2012 page 127 out of 129 6.2 Research Program: New Media Mass Medium Carrier: A.U.TH. Position: Researcher Period: 2003 Project: Preliminary Report of New Building MEP Installations Study 6.3 Research Program: Expansion of Pedagogigs Building Carrier: A.U.TH. Position: Researcher Period: 2004 Project: Preliminary Report of New Building MEP Installations Study 6.4 Research Program: Fire Safety Installations in Law School Building Carrier: A.U.TH. Position: Researcher Responsible Professor: Dr Nikolaos Kyriakis Period: 2006 Project: Fire Safety Installations execution study 7. Conventions Urban Nightscape 2006, Hellenic Illumination Committee, September 2006, Goulandris Museum, Athens 8. Publications Heating System for a Baby Farm, Designing for Hygiene and Security. D.Mpozis, P.Kikidis, Y.Cambicci, D.Giannaraki, Ktirio magazine, Issue 166, 2004.
  • 128. Cambicci+Associates page 128 9. Member of TCG: Technical Chamber of Greece PSDMH: Hellenic Union of Dipl. Mechanical & Electrical Engineers SMHBE: Union of Northern Greece Mechanical & Electrical Engineers SMEDEKEM Union of Central Makedonia Public Projects Designers HIC: Hellenic Illumination Commitee ΕΙΒΑ/KNX: European Installation Bus Association (EIBA/KNX Partner). IESNA: Illuminating Engineering Society of North America. ASHRAE: American Society Of Heating Refrigerating and Air Conditioning, Hellenic Section Thessaloniki 2012 Γon behalf of Cambicci+Associates Yerasimo Cambicci Dipl.Mechanical Engineer AUTh
  • 129. Company profile 2012 page 129 out of 129 CCCooonnntttaaacccttt Postal Address: 10 Riga Feraiou & Filikis Eterias, 6th floor P.C. GR-555 35 Pylaia, Thessaloniki Greece Phones & Fax: Tel: +30 2310 850 800 +30 2310 262 106 +30 6970 985 805 Fax:+30 2310 850 865 Internet Address: Email: info@cambicci.eu Site: www.cambicci.eu (.com .gr) Skype: cambicci Facebook: Cambicci+Associates LinkedIn: Yerasimo Cambicci Driving Instructions Think before you print.