Technical Session # 3A
Topic : Process Safety Management in Design , Construction & Commissioning
Topic:
Process Safety
Management in
Design, Construction
& Commissioning
By:
Lalit K. Vijh
ED- Technical
Engineers India Limited
Technical Session # 3A
Topic : Process Safety Management in Design , Construction & Commissioning
MAJOR HAZARDS IN OIL INDUSTRY
Technical Session # 3A
Topic : Process Safety Management in Design , Construction & Commissioning
SAN JUANICO DISASTER PEMEX, MEXICO, 1984
BEFORE AFTER
Technical Session # 3A
Topic : Process Safety Management in Design , Construction & Commissioning
SAN JUANICO DISASTER, PEMEX, MEXICO, 1984
8” Pipe rupture occurred near the sphere
The Control Room operator tried to identify the cause of pressure fall but without success.
The release of LPG occurred for more than 5-10 minute
The gas cloud grew to cover a large area and ignited from a ignition by ground flare.
The VCE severely damaged the tank farm and resulted in LPG leak from other damaged tanks
Just 4 minutes later first tank underwent BLEVE.
Over the next hour, 12 separate BLEVE explosions were recorded.
The two largest BLEVE’s(from 2400 m3 spherical tanks) registered 5.0 seismic reading on R.S
The explosions destroyed the local town of San Juan Ixhuatepec.
Approximately 500-600 people killed and 5000-7000 others suffering severe burns.
Technical Session # 3A
Topic : Process Safety Management in Design , Construction & Commissioning
LESSONS LEARNED - SAN JUANICO DISASTER
Sitting of Major Hazard Installation
• The high death toll occurred because the housing was too near to the plant. At the time the plant was constructed the area
was underdeveloped, but over the years the built-up area had gradually crept up to the site.
Layout and Protection of large LPG Storages
• The total destruction of the facility occurred because there was a failure of the overall system of protection, which includes
layout, emergency isolation and water spray systems.
Gas Detection and Emergency Isolation
• One feature which might have averted the disaster is more effective gas detection and emergency isolation. The plant had
no gas detector system and probably as a consequence, emergency isolation was too late.
Technical Session # 3A
Topic : Process Safety Management in Design , Construction & Commissioning
LPG FIRE AT VALERO, MCKEE REFINERY, 2007
Technical Session # 3A
Topic : Process Safety Management in Design , Construction & Commissioning
LPG FIRE AT VALERO, MCKEE REFINERY
The propane release was likely caused by the freeze-related failure of high-pressure piping at a
control station that had not been in service for approximately 15 years.
The lack of remote isolation significantly increased the duration and size of the fire, resulting in
extensive damage to the Propane Deasphalting Unit, the main pipe rack, and an adjacent process
unit.
Flame impingement on a non-fireproofed structural support caused a pipe rack to
collapse, significantly increasing the size and duration of the fire, and led to the evacuation and
extended shutdown of the refinery.
The exposure of three one-ton chlorine containers to radiant heating from the fire led to the release
of approximately 2.5 tons of highly toxic chlorine.
A butane storage sphere was exposed to radiant heating that blistered its paint. The manual firewater
deluge valve for the butane sphere was located too close to the PDA unit and could not be opened
during the fire.
Technical Session # 3A
Topic : Process Safety Management in Design , Construction & Commissioning
JAIPUR FIRE ACCIDENT 2009
• 11 Dead
• Loss of ~ Rs.280 Crores
Technical Session # 3A
Topic : Process Safety Management in Design , Construction & Commissioning
EXPLOSION IN VENEZUELA'S LARGEST OIL REFINERY ON 25-08-2012
• 48 Dead (official figure)
• Initial Report indicate poor maintenance
as chief cause
Technical Session # 3A
Topic : Process Safety Management in Design , Construction & Commissioning
Source : Harry J. Toups LSU Department of Chemical Engineering ,SACHE 2003 Workshop
Mechanical
Operator Error
Unknown
Process Upsets
Natural Hazards
Design
Sabotage & Arson
0 10 20 30 40 50
44 %
22 %
12 %
11 %
5 %
5 %
1 %
CAUSE OF ACCIDENTS IN OIL INDUSTRY
Technical Session # 3A
Topic : Process Safety Management in Design , Construction & Commissioning
APPROACH FOR SAFETY IN PLANT DESIGN?
Eliminate or minimize hazards rather than control hazards
Don’t wait for a major accident to identify need to improve major hazard management.
Need to learn lessons from accidents but don’t rely on this approach
Manage risks via Foresight rather than Hindsight i.e. be proactive rather than reactive.
More a philosophy and way of thinking than a specific set of tools and methods applicable at all levels of design and
operation from conceptual design to plant operations
Technical Session # 3A
Topic : Process Safety Management in Design , Construction & Commissioning
INHERENT PASSIVE
ACTIVE PROCEDURAL
PROCESS SAFETY STRATEGIES
Technical Session # 3A
Topic : Process Safety Management in Design , Construction & Commissioning
• Eliminate or reduce the hazard by changing to a process or
materials which are non-hazardous or less hazardousINHERENT
• Minimize hazard using process or equipment design features
which reduce frequency or consequence without the active
functioning of any device
PASSIVE
PROCESS SAFETY STRATEGIES
Technical Session # 3A
Topic : Process Safety Management in Design , Construction & Commissioning
• Controls, safety interlocks, automatic shut down systems
• Multiple active elements : Sensors, Logic device, Control
element
ACTIVE
• Standard operating procedures, safety rules, emergency
response procedures, trainingPROCEDURAL
PROCESS SAFETY STRATEGIES
Technical Session # 3A
Topic : Process Safety Management in Design , Construction & Commissioning
HSE during Project Execution
• Environment Impact Assessment
• Environmental Baseline Survey
• Process Hazard Review
• Hazard Identification (HAZID)
Project Conceptualization Stage
• P&ID Review For Operational Safety
• HSE Plan & HSE Philosophy
• HAZOP & SIL Studies
• Fire, Explosion & Dispersion Analysis/ Consequence Analysis
• HSE Action Tracking Register & PHSER
Process Design Stage
• Plot Plan Review
• Plot Plan Review Through Plot Plan Risk Review Committee
• Quantitative Risk Assessment
• Detailed HAZOP & HAZOP Close Out Report
• Fire & Gas Safety System Review
• Cause & Effects/Safety Charts Review
• Preparation of HSE Dossier & PHSER
• Safety Manual & Operating Manual Preparation
Engineering Stage
• Safety Guidelines to Contractors
• Safety Monitoring through Dedicated Safety Engineers
• Safety Meetings
• Safety Performance Evaluation
Construction Stage
• Punch List Preparation
• Startup Formats
• Pre Startup Safety Audit
Commissioning Stage
Technical Session # 3A
Topic : Process Safety Management in Design , Construction & Commissioning
CONCEPTUAL DESIGN (Coarse HAZOP, What-if, Ranking)
SITE SELECTION (Rapid Risk Analysis, Environmental Impact Assessment)
PROCESS DESIGN (HAZOP, Safety Review, SIL)
ENGINEERING (Qualitative Risk Analysis, Plot Plan Review)
START-UP (Safety Audit, Emergency Plan)
RISK CONTROL DURING PROJECT STAGES
Technical Session # 3A
Topic : Process Safety Management in Design , Construction & Commissioning
SAFETY AT PLANNING STAGE
Prevention of accidents should be the goal
Design options (use of chemicals, technology etc)
Layout review (various locations and configurations)
Hazard Identification (HAZID)
Environment Impact Assessment
Environmental Baseline Survey
Technical Session # 3A
Topic : Process Safety Management in Design , Construction & Commissioning
HSE DURING ENGINEERING
Technical Session # 3A
Topic : Process Safety Management in Design , Construction & Commissioning
SAFETY AT DESIGN STAGE
Adequate Design suitable for operations:
HAZID (Hazard Identification)
HAZOP (Hazard and Operability Study)
HSEIA (Health Safety Environment Impact Assessment)
• COMAH (Control of Major Accidental Hazard), OHRA (Occupational Health Risk Assessment), EIA (Environment
Impact Assessment)
• HSECES (HSE Critical Equipment System), SCE/PS (Safety Critical Elements / Performance Standards)
• Fire Safety Assessment and Dispersion Analysis, QRA (Quantitative Risk Assessment)
• Noise Study, EERA (Escape, Evacuation and Rescue Analysis), Waste Management Plan
SIL (Safety Integrity Level)
ALARP Study (As Low As Reasonably Practicable)
Active and Passive Fire Protection System
Technical Session # 3A
Topic : Process Safety Management in Design , Construction & Commissioning
TYPICAL PROCESS SAFETY CODES & STANDARDS USED IN DESIGN
Some of the standards widely used by designers and operating companies are:
• American Petroleum Institute (API)
• American Society of Mechanical Engineers (ASME)
• National Fire Protection Association (NFPA)
• Oil Industry Safety Directorate (OISD) / Local Standards
• British Standard Institution (BSI)
• International Standard Organization (ISO)
• Static & Mobile Pressure Vessel (SMPV) Rules
• Petroleum Rules
• IBR regulation
Process Design and Hydrocarbon Services are complying to various OISD Standards
• OISD-STD-106 (Pressure Relief & Disposal System)
• OISD-STD-108 (Recommended Practices on Oil Storage and Handling)
• OISD-STD-116/117 (for Fire Protection)
• OISD-STD-118 (Layouts for Oil and Gas Installations)
• OISD-STD-144 (LPG Installations)
• OISD-STD-150 (for LPG Mounded Storage Facility)
• OISD-STD-152 (Safety instrumentation for process system in HC industry)
• OISD-STD-163 (Process Control Room Safety)
• OISD-STD-164 (Fire Proofing in Oil & Gas Industry)
• OISD-STD-194 (Standard for Storage And Handling of LNG)
• OISD-STD-197 (Guidelines for EIA)
Technical Session # 3A
Topic : Process Safety Management in Design , Construction & Commissioning
PROCESS DESIGN PHILOSOPHY
Selection of proper Material of Construction (MOC)
Selection of proper piping class, rating.
Selection of proper design conditions (Pressure, Temperature)
Selection of hold up volume
Conformity to various codes/ standards
Adherence to good design practice
Feed Back from previous jobs, Client, Engineering, Commissioning.
Technical Session # 3A
Topic : Process Safety Management in Design , Construction & Commissioning
PROCESS SAFETY PHILOSOPHY - LOPA
PROCESS
MITIGATION SYSTEM
OFFSITEEMERGENCY RESPONSE
ONSITE EMERGENCY RESPONSE
PREVENTION SYSTEM
CONTROL & MONITORING
Technical Session # 3A
Topic : Process Safety Management in Design , Construction & Commissioning
PROCESS SAFETY PHILOSOPHY
Pressure Venting provisions shall be in accordance with API RP 520 (Part 1 &2), API RP 521 Standards
Flare system is provided to safely dispose of the materials released from PSV in case of any malfunction of system
• Controlling case for refinery or petrochemical complexes are usually cooling water or power failure. Whenever there is
one cooling water system, cooling water failure loads for various units are added to calculate total flare load of the
complex.
• For a large complex with very high flare load for cooling water failure case, complex may be segregated in to two or
more cooling water systems and then flare load of one (controlling ) cooling water system may be considered for
further design
• Temperature profile of flare header (ISBL & OSBL) is essential in having optimum provision of expansion loops in
flare headers
Technical Session # 3A
Topic : Process Safety Management in Design , Construction & Commissioning
PROCESS SAFETY PHILOSOPHY : LAYOUT
Key considerations/ safety features for layout
• Separation of hazardous areas from non-hazardous areas
• Safe separation distances
• Adequate escape routes, safe access for operation and maintenance of equipment
• Main ignition sources should be grouped and located upstream prevailing wind.
• Emergency response teams to have clear access to all fire fighting equipment.
• Cable trays, pipe racks and escape routes shall be positioned such that risk of damage by pool fire or explosions is
minimized.
• Optimize availability of emergency services and main safety equipment under all foreseeable events.
Technical Session # 3A
Topic : Process Safety Management in Design , Construction & Commissioning
Process Safety PhilosophyHazardous Area Classification
• The hazardous area classification shall be performed in accordance with IP Model Code of Safe Practice Part 15.
• Based on the above code various areas shall be classified into zones and Electrical appliances shall be selected suitably.
The Emergency Shutdown system
• The Emergency Shutdown system shall be designed to fail-safe so that, in the event of loss of any of the controls to the
system, the shutdown valves shall fail closed and the blowdown valves fail open.
• The Emergency Shutdown system shall be reviewed in accordance with IEC 61508.
PRPROCESS SAFETY PHILOSOPHY
Technical Session # 3A
Topic : Process Safety Management in Design , Construction & Commissioning
Redundancy
Voting systems
Philosophy of alarms and trips
Emergency depressurization
Emergency shut down (ESD)
Safety valve
HIPPS – High Integrity Pressure Protection System
PROCESS SAFETY PHILOSOPHY - Instrumentation
Technical Session # 3A
Topic : Process Safety Management in Design , Construction & Commissioning
FIRE CONTROL AND MITIGATION– F&G Detection System
• The required functions/actions on fire and/or gas detection shall be developed during detail design
phase.
• The Fire and Gas Detection systems shall be designed and installed in accordance with NFPA and OISD
Standards.
• Detector locations shall be determined by means of case by case examination of the facilities layout and
may be placed either peripherally around the facilities, at suitable intervals or placed to cover areas with
a leak potential, or both.
The fire and gas (F&G) detection system is to provide an early
warning to personnel of the existence of a potentially dangerous
situation and to enable automatic initiation of remedial actions
• Gas detectors – H2, HC, H2S, Cl
• Fire detectors –Flame, Heat, Smoke
F&G Field Devices
Technical Session # 3A
Topic : Process Safety Management in Design , Construction & Commissioning
• The main objective of active fire protection is to:
• Provide cooling (Deluge System, Sprinkling System)
• Control the fire (ie., prevent it from spreading)
• Extinguishment of the fire incident (Fire Extinguishers, Foam System)
Active Fire Protection : A “dormant” system that needs to be activated in
order to perform its function.
• Fire Proofing/ Passive fire protection is a barrier or safeguard which provides protection against the
heat from a fire without additional intervention i.e. it performs its function without relying on
activation.
Passive Fire Protection : A system that performs its function without
relying on the requirement of activation
FIRE CONTROL AND MITIGATION – ACTIVE AND PASSIVE FIRE PROTECTION
Technical Session # 3A
Topic : Process Safety Management in Design , Construction & Commissioning
HSE DURING CONSTRUCTION
Technical Session # 3A
Topic : Process Safety Management in Design , Construction & Commissioning
SAFETY AT CONSTRUCTION STAGE
Setting of Project specific HSE objective and targets
Implementation of Project specific HSE Plan
Preparation and Implementation of ERP
Project HSE Review (PHSER for Construction)
Dedicated Warehouse /Procedures for storage of Materials and Hazardous substances
HSE Training, Inspection & audit
HIRA & Legal register and ensuring its compliance
Pre- Deployment Inspection and Certification for Mobilization of suitable and safe equipment
Technical Session # 3A
Topic : Process Safety Management in Design , Construction & Commissioning
Tools for Monitoring/Implementation of HSE at Sites
• HSE Specification
• HSE Plan
• HSE Procedures
• HSE Induction
• Hazard Identification & Risk Analysis (HIRA)/ Job
Safety Analysis (JSA)
• Tool Box Talks
• Mock Drills (Fire, Electrocution , Fall from height )
• HSE Inspection/ Walk-through
• HSE Meetings
• Road Safety & Movement of vehicles
• Fitness certificates for all Lifting tools & Tackles, Cranes
• HSE Permits Viz. Scaffolds, Confined space, Height
work, Excavation
• HSE Awareness/ Motivational Programs
• HSE Reporting including LTIFR, FAR
• Reporting of Near Miss Accidents & Corrective Actions
• Accident Investigations & Recommendations
• Analysis of Leading &Trailing Indicators
Technical Session # 3A
Topic : Process Safety Management in Design , Construction & Commissioning
• Legal compliance
• HSE Management System & Competence
• HSE Performance
Pre qualification &Selection
• General Terms & Condition
• Code of Conduct
Contractor Preparation
• HSE Plan & Organization
• Competence of Personnel
• Signing of code of conduct
Contract Award
• Kick of Meeting
• Medical Check up
Pre commencement & Mobilization
• HSE Training as per approved HSE Training MatrixContractors Orientation & Training
• Periodic evaluation
• HSE Review meeting
Managing the Contractors
• HSE Performance Records
Post Contract Evaluation
CONTRACTOR’s SAFETY MANAGEMENT PROCESS
Technical Session # 3A
Topic : Process Safety Management in Design , Construction & Commissioning
HSE DURING COMMISSIONING
Technical Session # 3A
Topic : Process Safety Management in Design , Construction & Commissioning
SAFETY AT PRECOMMISSIONING & COMMISSIONING AND HANDOVER
SIMOPS - Simultaneous Operation study for Planning and coordination
Multilayer Safety checks to meet Aggressive Schedule
Multi disciplinary trained manpower
Manuals, SOP & Checklists
Authorization & documentation for Changes, Bypass etc
Pre Start up Safety Review
HSE Action Tracking Register/ Formal HSE Close out Report
Project HSE Review (PHSER for Pre- Commissioning)
Lesson Learnt
Technical Session # 3A
Topic : Process Safety Management in Design , Construction & Commissioning
SUMMARY
Safety in design is of paramount importance for process safety management
Goal should be to prevent rather than control & mitigate hazards
Select inherently safe processes and Incorporate adequate active & passive safety features in design minimizing
dependence on human intervention
Select Process specifications/ design conditions, Materials to reflect normal as well as start up/ transient conditions
Ensure strict adherence to safety & design standard & codes during design/engineering/construction & commissioning
Carryout Safety Studies like RRA/ QRA, HAZID, HAZOP, SIL etc to ensure adequate safety features including control &
mitigation are built in design & to finalize location/ layout of facilities
Technical Session # 3A
Topic : Process Safety Management in Design , Construction & Commissioning
THANK YOU

Weitere ähnliche Inhalte

Was ist angesagt?

Asset Integrity Management
Asset Integrity ManagementAsset Integrity Management
Asset Integrity ManagementHafiz Atif
 
Process design for chemical engineers
Process design for chemical engineersProcess design for chemical engineers
Process design for chemical engineersAmanda Ribeiro
 
Precommisioning and commissioning updated
Precommisioning and commissioning updatedPrecommisioning and commissioning updated
Precommisioning and commissioning updatedPersonal Secret
 
Bow Tie methodology for Operational Safety & Risk Management
Bow Tie methodology for Operational Safety & Risk ManagementBow Tie methodology for Operational Safety & Risk Management
Bow Tie methodology for Operational Safety & Risk ManagementArthurGroot
 
Design for Overpressure and Underpressure Protection
Design for Overpressure and Underpressure ProtectionDesign for Overpressure and Underpressure Protection
Design for Overpressure and Underpressure ProtectionThapa Prakash (TA-1)
 
Contractor safety management system
Contractor safety management systemContractor safety management system
Contractor safety management systemgraha katiga
 
HEALT & SAFETY IN THE OIL & GAS INDUSTRY
HEALT & SAFETY IN THE OIL & GAS INDUSTRYHEALT & SAFETY IN THE OIL & GAS INDUSTRY
HEALT & SAFETY IN THE OIL & GAS INDUSTRYAlex TX
 
_Process_Safety_Management
_Process_Safety_Management_Process_Safety_Management
_Process_Safety_ManagementEssam Osmaan
 
Webinar | APM Best Practices - Effectively managing the safety lifecycle
Webinar | APM Best Practices - Effectively managing the safety lifecycleWebinar | APM Best Practices - Effectively managing the safety lifecycle
Webinar | APM Best Practices - Effectively managing the safety lifecycleStork
 
Introduction to PSM Online Interactive Training
Introduction to PSM Online Interactive TrainingIntroduction to PSM Online Interactive Training
Introduction to PSM Online Interactive TrainingJohn Kingsley
 
A real-world introduction to PSM’s 14 Elements
A real-world introduction to PSM’s 14 ElementsA real-world introduction to PSM’s 14 Elements
A real-world introduction to PSM’s 14 Elements360factors
 
PetroSync - Pre-Commissioning, Commissioning and Start-Up
PetroSync - Pre-Commissioning, Commissioning and Start-UpPetroSync - Pre-Commissioning, Commissioning and Start-Up
PetroSync - Pre-Commissioning, Commissioning and Start-UpPetroSync
 
Seminar- Process Safety Management_.pptx
Seminar- Process Safety Management_.pptxSeminar- Process Safety Management_.pptx
Seminar- Process Safety Management_.pptxMoonJ3
 
LOPA | Layer Of Protection Analysis | Gaurav Singh Rajput
LOPA | Layer Of Protection Analysis | Gaurav Singh RajputLOPA | Layer Of Protection Analysis | Gaurav Singh Rajput
LOPA | Layer Of Protection Analysis | Gaurav Singh RajputGaurav Singh Rajput
 
Critical Review of PSM In Petroleum Industry | Mr. Hirak Dutta, Executive Di...
Critical Review of  PSM In Petroleum Industry | Mr. Hirak Dutta, Executive Di...Critical Review of  PSM In Petroleum Industry | Mr. Hirak Dutta, Executive Di...
Critical Review of PSM In Petroleum Industry | Mr. Hirak Dutta, Executive Di...Cairn India Limited
 

Was ist angesagt? (20)

Asset Integrity Management
Asset Integrity ManagementAsset Integrity Management
Asset Integrity Management
 
Risk-Based Inspection (RBI) by aminul islam
Risk-Based Inspection (RBI) by aminul islamRisk-Based Inspection (RBI) by aminul islam
Risk-Based Inspection (RBI) by aminul islam
 
14 Tips for Process Safety Management
14 Tips for Process Safety Management14 Tips for Process Safety Management
14 Tips for Process Safety Management
 
Process design for chemical engineers
Process design for chemical engineersProcess design for chemical engineers
Process design for chemical engineers
 
Precommisioning and commissioning updated
Precommisioning and commissioning updatedPrecommisioning and commissioning updated
Precommisioning and commissioning updated
 
Bow Tie methodology for Operational Safety & Risk Management
Bow Tie methodology for Operational Safety & Risk ManagementBow Tie methodology for Operational Safety & Risk Management
Bow Tie methodology for Operational Safety & Risk Management
 
Presentation hazop introduction
Presentation hazop introductionPresentation hazop introduction
Presentation hazop introduction
 
Design for Overpressure and Underpressure Protection
Design for Overpressure and Underpressure ProtectionDesign for Overpressure and Underpressure Protection
Design for Overpressure and Underpressure Protection
 
Contractor safety management system
Contractor safety management systemContractor safety management system
Contractor safety management system
 
HEALT & SAFETY IN THE OIL & GAS INDUSTRY
HEALT & SAFETY IN THE OIL & GAS INDUSTRYHEALT & SAFETY IN THE OIL & GAS INDUSTRY
HEALT & SAFETY IN THE OIL & GAS INDUSTRY
 
_Process_Safety_Management
_Process_Safety_Management_Process_Safety_Management
_Process_Safety_Management
 
Webinar | APM Best Practices - Effectively managing the safety lifecycle
Webinar | APM Best Practices - Effectively managing the safety lifecycleWebinar | APM Best Practices - Effectively managing the safety lifecycle
Webinar | APM Best Practices - Effectively managing the safety lifecycle
 
Introduction to PSM Online Interactive Training
Introduction to PSM Online Interactive TrainingIntroduction to PSM Online Interactive Training
Introduction to PSM Online Interactive Training
 
A real-world introduction to PSM’s 14 Elements
A real-world introduction to PSM’s 14 ElementsA real-world introduction to PSM’s 14 Elements
A real-world introduction to PSM’s 14 Elements
 
PetroSync - Pre-Commissioning, Commissioning and Start-Up
PetroSync - Pre-Commissioning, Commissioning and Start-UpPetroSync - Pre-Commissioning, Commissioning and Start-Up
PetroSync - Pre-Commissioning, Commissioning and Start-Up
 
Seminar- Process Safety Management_.pptx
Seminar- Process Safety Management_.pptxSeminar- Process Safety Management_.pptx
Seminar- Process Safety Management_.pptx
 
management of change
management of changemanagement of change
management of change
 
Fire Risk Assessment.doc
Fire Risk Assessment.docFire Risk Assessment.doc
Fire Risk Assessment.doc
 
LOPA | Layer Of Protection Analysis | Gaurav Singh Rajput
LOPA | Layer Of Protection Analysis | Gaurav Singh RajputLOPA | Layer Of Protection Analysis | Gaurav Singh Rajput
LOPA | Layer Of Protection Analysis | Gaurav Singh Rajput
 
Critical Review of PSM In Petroleum Industry | Mr. Hirak Dutta, Executive Di...
Critical Review of  PSM In Petroleum Industry | Mr. Hirak Dutta, Executive Di...Critical Review of  PSM In Petroleum Industry | Mr. Hirak Dutta, Executive Di...
Critical Review of PSM In Petroleum Industry | Mr. Hirak Dutta, Executive Di...
 

Ähnlich wie Process Safety Management in Design, Construction & Commissioning | Lalit K. Vijh ED- Technical Engineers India Limited

GW Presentation for Horn Mountain.pdf
GW Presentation for Horn Mountain.pdfGW Presentation for Horn Mountain.pdf
GW Presentation for Horn Mountain.pdfCanadianHegemony
 
Evan Gritman Lewis
Evan Gritman LewisEvan Gritman Lewis
Evan Gritman LewisEvan Lewis
 
Discussing osha 1910 106 nfpa 30 and recent fire incidents of 2015 2016
Discussing osha 1910 106 nfpa 30 and recent fire incidents of 2015 2016Discussing osha 1910 106 nfpa 30 and recent fire incidents of 2015 2016
Discussing osha 1910 106 nfpa 30 and recent fire incidents of 2015 2016John Newquist
 
Mes presentation subsea reliability
Mes presentation  subsea reliability  Mes presentation  subsea reliability
Mes presentation subsea reliability Changiz Rezvani
 
Mes presentation subsea reliability
Mes presentation subsea reliability  Mes presentation subsea reliability
Mes presentation subsea reliability Changiz Rezvani
 
Mes presentation subsea reliability changiz
Mes presentation  subsea reliability changizMes presentation  subsea reliability changiz
Mes presentation subsea reliability changizChangiz Rezvani
 
Introduction to Process Flares
Introduction to Process FlaresIntroduction to Process Flares
Introduction to Process FlaresKarl Kolmetz
 
Design basis - PROCESS DESIGN FUNDAMENTALS
Design basis  - PROCESS DESIGN FUNDAMENTALSDesign basis  - PROCESS DESIGN FUNDAMENTALS
Design basis - PROCESS DESIGN FUNDAMENTALSiFluids Engineering
 
Design basis - PROCESS DESIGN FUNDAMENTALS
Design basis  - PROCESS DESIGN FUNDAMENTALSDesign basis  - PROCESS DESIGN FUNDAMENTALS
Design basis - PROCESS DESIGN FUNDAMENTALSiFluids Engineering
 
Jurg hauptli resume
Jurg hauptli resumeJurg hauptli resume
Jurg hauptli resumeJurg Hauptli
 
FDC Catalog (English)
FDC Catalog (English)FDC Catalog (English)
FDC Catalog (English)jehsan
 

Ähnlich wie Process Safety Management in Design, Construction & Commissioning | Lalit K. Vijh ED- Technical Engineers India Limited (20)

GW Presentation for Horn Mountain.pdf
GW Presentation for Horn Mountain.pdfGW Presentation for Horn Mountain.pdf
GW Presentation for Horn Mountain.pdf
 
Presentation_HealthWay
Presentation_HealthWayPresentation_HealthWay
Presentation_HealthWay
 
COMPL OF WORKS1
COMPL OF WORKS1COMPL OF WORKS1
COMPL OF WORKS1
 
Evan Gritman Lewis
Evan Gritman LewisEvan Gritman Lewis
Evan Gritman Lewis
 
Safety Concepts of Plant Design
Safety Concepts of Plant DesignSafety Concepts of Plant Design
Safety Concepts of Plant Design
 
Discussing osha 1910 106 nfpa 30 and recent fire incidents of 2015 2016
Discussing osha 1910 106 nfpa 30 and recent fire incidents of 2015 2016Discussing osha 1910 106 nfpa 30 and recent fire incidents of 2015 2016
Discussing osha 1910 106 nfpa 30 and recent fire incidents of 2015 2016
 
lecture 0.pdf
lecture 0.pdflecture 0.pdf
lecture 0.pdf
 
2009 Face Conference Energy Le Moine
2009 Face Conference Energy Le Moine2009 Face Conference Energy Le Moine
2009 Face Conference Energy Le Moine
 
Mes presentation subsea reliability
Mes presentation  subsea reliability  Mes presentation  subsea reliability
Mes presentation subsea reliability
 
Mes presentation subsea reliability
Mes presentation subsea reliability  Mes presentation subsea reliability
Mes presentation subsea reliability
 
Mes presentation subsea reliability changiz
Mes presentation  subsea reliability changizMes presentation  subsea reliability changiz
Mes presentation subsea reliability changiz
 
Introduction to Process Flares
Introduction to Process FlaresIntroduction to Process Flares
Introduction to Process Flares
 
BK2014
BK2014BK2014
BK2014
 
Training program for_urea_engineers_july_by ukh
Training program for_urea_engineers_july_by ukhTraining program for_urea_engineers_july_by ukh
Training program for_urea_engineers_july_by ukh
 
Dermarkar
DermarkarDermarkar
Dermarkar
 
Design basis - PROCESS DESIGN FUNDAMENTALS
Design basis  - PROCESS DESIGN FUNDAMENTALSDesign basis  - PROCESS DESIGN FUNDAMENTALS
Design basis - PROCESS DESIGN FUNDAMENTALS
 
Design basis - PROCESS DESIGN FUNDAMENTALS
Design basis  - PROCESS DESIGN FUNDAMENTALSDesign basis  - PROCESS DESIGN FUNDAMENTALS
Design basis - PROCESS DESIGN FUNDAMENTALS
 
Jurg hauptli resume
Jurg hauptli resumeJurg hauptli resume
Jurg hauptli resume
 
Compact Spring Supports Webinar
Compact Spring Supports WebinarCompact Spring Supports Webinar
Compact Spring Supports Webinar
 
FDC Catalog (English)
FDC Catalog (English)FDC Catalog (English)
FDC Catalog (English)
 

Mehr von Cairn India Limited

Cairn India | News Article: Upstream - Mr Elango P
Cairn India | News Article: Upstream -  Mr Elango P  Cairn India | News Article: Upstream -  Mr Elango P
Cairn India | News Article: Upstream - Mr Elango P Cairn India Limited
 
Cairn India | Sustainability Report 2013
Cairn India | Sustainability Report 2013Cairn India | Sustainability Report 2013
Cairn India | Sustainability Report 2013Cairn India Limited
 
Cairn India | Q2 Results | FY 2013-14
Cairn India | Q2 Results | FY 2013-14 Cairn India | Q2 Results | FY 2013-14
Cairn India | Q2 Results | FY 2013-14 Cairn India Limited
 
Cairn India - Corporate Presentation - September 2013
Cairn India - Corporate Presentation - September 2013Cairn India - Corporate Presentation - September 2013
Cairn India - Corporate Presentation - September 2013Cairn India Limited
 
Occupational health Strategy & Planning: Dr. Ramnik Parekh
Occupational health Strategy & Planning: Dr. Ramnik ParekhOccupational health Strategy & Planning: Dr. Ramnik Parekh
Occupational health Strategy & Planning: Dr. Ramnik ParekhCairn India Limited
 
Occupational Health & Safety in India - Framework and Challenges | Mr. Anup C...
Occupational Health & Safety in India - Framework and Challenges | Mr. Anup C...Occupational Health & Safety in India - Framework and Challenges | Mr. Anup C...
Occupational Health & Safety in India - Framework and Challenges | Mr. Anup C...Cairn India Limited
 
HEAT STRESS PREVENTION – A CASE STUDY | Dr. Divyang Shah, – Occupational Heal...
HEAT STRESS PREVENTION – A CASE STUDY | Dr. Divyang Shah, – Occupational Heal...HEAT STRESS PREVENTION – A CASE STUDY | Dr. Divyang Shah, – Occupational Heal...
HEAT STRESS PREVENTION – A CASE STUDY | Dr. Divyang Shah, – Occupational Heal...Cairn India Limited
 
North Sea Emergency Response Preparedness 25 Years On | Ms. Claire Forbes, Re...
North Sea Emergency Response Preparedness 25 Years On | Ms. Claire Forbes, Re...North Sea Emergency Response Preparedness 25 Years On | Ms. Claire Forbes, Re...
North Sea Emergency Response Preparedness 25 Years On | Ms. Claire Forbes, Re...Cairn India Limited
 
Organisational Resilience following a Major Disaster | Mr. David G. Broadbent...
Organisational Resilience following a Major Disaster | Mr. David G. Broadbent...Organisational Resilience following a Major Disaster | Mr. David G. Broadbent...
Organisational Resilience following a Major Disaster | Mr. David G. Broadbent...Cairn India Limited
 
Importance of Data Driven Decision Making in Enterprise Energy Management | D...
Importance of Data Driven Decision Making in Enterprise Energy Management | D...Importance of Data Driven Decision Making in Enterprise Energy Management | D...
Importance of Data Driven Decision Making in Enterprise Energy Management | D...Cairn India Limited
 
Co-processing in cement kiln Concepts and in Oil and Gas Sector | John Jones,...
Co-processing in cement kiln Concepts and in Oil and Gas Sector | John Jones,...Co-processing in cement kiln Concepts and in Oil and Gas Sector | John Jones,...
Co-processing in cement kiln Concepts and in Oil and Gas Sector | John Jones,...Cairn India Limited
 
Water Usage Optimization & Management for Hydraulic Fracturing | Dr. Chris Fr...
Water Usage Optimization & Management for Hydraulic Fracturing | Dr. Chris Fr...Water Usage Optimization & Management for Hydraulic Fracturing | Dr. Chris Fr...
Water Usage Optimization & Management for Hydraulic Fracturing | Dr. Chris Fr...Cairn India Limited
 
Health, Safety and Environment Aspects of Carbon dioxide Sequestration | By: ...
Health, Safety and Environment Aspects of Carbon dioxide Sequestration | By: ...Health, Safety and Environment Aspects of Carbon dioxide Sequestration | By: ...
Health, Safety and Environment Aspects of Carbon dioxide Sequestration | By: ...Cairn India Limited
 
Lessons from Texas City | Michael P. Broadribb, Baker Engineering & Risk Cons...
Lessons from Texas City | Michael P. Broadribb, Baker Engineering & Risk Cons...Lessons from Texas City | Michael P. Broadribb, Baker Engineering & Risk Cons...
Lessons from Texas City | Michael P. Broadribb, Baker Engineering & Risk Cons...Cairn India Limited
 
Improving Health, Safety and Environment Performance Analysis | Mark Weitner,...
Improving Health, Safety and Environment Performance Analysis | Mark Weitner,...Improving Health, Safety and Environment Performance Analysis | Mark Weitner,...
Improving Health, Safety and Environment Performance Analysis | Mark Weitner,...Cairn India Limited
 
The Continuing Challenges of Balancing Process Safety Management and Personal...
The Continuing Challenges of Balancing Process Safety Management and Personal...The Continuing Challenges of Balancing Process Safety Management and Personal...
The Continuing Challenges of Balancing Process Safety Management and Personal...Cairn India Limited
 
Competency Development – a paradigm shift | Alastair Shakeshaft, Director, B...
Competency Development  – a paradigm shift | Alastair Shakeshaft, Director, B...Competency Development  – a paradigm shift | Alastair Shakeshaft, Director, B...
Competency Development – a paradigm shift | Alastair Shakeshaft, Director, B...Cairn India Limited
 
Building the competence of your workforce | Teresa Budworth, Chief Executive,...
Building the competence of your workforce | Teresa Budworth, Chief Executive,...Building the competence of your workforce | Teresa Budworth, Chief Executive,...
Building the competence of your workforce | Teresa Budworth, Chief Executive,...Cairn India Limited
 
Sustainability in Cement Industry | Rakesh Bhargava, Chief Climate & Sustaina...
Sustainability in Cement Industry | Rakesh Bhargava, Chief Climate & Sustaina...Sustainability in Cement Industry | Rakesh Bhargava, Chief Climate & Sustaina...
Sustainability in Cement Industry | Rakesh Bhargava, Chief Climate & Sustaina...Cairn India Limited
 
Inclusive Growth – Is Sustainability the Answer ? | Dr. Yogendra Saxena, Tata...
Inclusive Growth – Is Sustainability the Answer ? | Dr. Yogendra Saxena, Tata...Inclusive Growth – Is Sustainability the Answer ? | Dr. Yogendra Saxena, Tata...
Inclusive Growth – Is Sustainability the Answer ? | Dr. Yogendra Saxena, Tata...Cairn India Limited
 

Mehr von Cairn India Limited (20)

Cairn India | News Article: Upstream - Mr Elango P
Cairn India | News Article: Upstream -  Mr Elango P  Cairn India | News Article: Upstream -  Mr Elango P
Cairn India | News Article: Upstream - Mr Elango P
 
Cairn India | Sustainability Report 2013
Cairn India | Sustainability Report 2013Cairn India | Sustainability Report 2013
Cairn India | Sustainability Report 2013
 
Cairn India | Q2 Results | FY 2013-14
Cairn India | Q2 Results | FY 2013-14 Cairn India | Q2 Results | FY 2013-14
Cairn India | Q2 Results | FY 2013-14
 
Cairn India - Corporate Presentation - September 2013
Cairn India - Corporate Presentation - September 2013Cairn India - Corporate Presentation - September 2013
Cairn India - Corporate Presentation - September 2013
 
Occupational health Strategy & Planning: Dr. Ramnik Parekh
Occupational health Strategy & Planning: Dr. Ramnik ParekhOccupational health Strategy & Planning: Dr. Ramnik Parekh
Occupational health Strategy & Planning: Dr. Ramnik Parekh
 
Occupational Health & Safety in India - Framework and Challenges | Mr. Anup C...
Occupational Health & Safety in India - Framework and Challenges | Mr. Anup C...Occupational Health & Safety in India - Framework and Challenges | Mr. Anup C...
Occupational Health & Safety in India - Framework and Challenges | Mr. Anup C...
 
HEAT STRESS PREVENTION – A CASE STUDY | Dr. Divyang Shah, – Occupational Heal...
HEAT STRESS PREVENTION – A CASE STUDY | Dr. Divyang Shah, – Occupational Heal...HEAT STRESS PREVENTION – A CASE STUDY | Dr. Divyang Shah, – Occupational Heal...
HEAT STRESS PREVENTION – A CASE STUDY | Dr. Divyang Shah, – Occupational Heal...
 
North Sea Emergency Response Preparedness 25 Years On | Ms. Claire Forbes, Re...
North Sea Emergency Response Preparedness 25 Years On | Ms. Claire Forbes, Re...North Sea Emergency Response Preparedness 25 Years On | Ms. Claire Forbes, Re...
North Sea Emergency Response Preparedness 25 Years On | Ms. Claire Forbes, Re...
 
Organisational Resilience following a Major Disaster | Mr. David G. Broadbent...
Organisational Resilience following a Major Disaster | Mr. David G. Broadbent...Organisational Resilience following a Major Disaster | Mr. David G. Broadbent...
Organisational Resilience following a Major Disaster | Mr. David G. Broadbent...
 
Importance of Data Driven Decision Making in Enterprise Energy Management | D...
Importance of Data Driven Decision Making in Enterprise Energy Management | D...Importance of Data Driven Decision Making in Enterprise Energy Management | D...
Importance of Data Driven Decision Making in Enterprise Energy Management | D...
 
Co-processing in cement kiln Concepts and in Oil and Gas Sector | John Jones,...
Co-processing in cement kiln Concepts and in Oil and Gas Sector | John Jones,...Co-processing in cement kiln Concepts and in Oil and Gas Sector | John Jones,...
Co-processing in cement kiln Concepts and in Oil and Gas Sector | John Jones,...
 
Water Usage Optimization & Management for Hydraulic Fracturing | Dr. Chris Fr...
Water Usage Optimization & Management for Hydraulic Fracturing | Dr. Chris Fr...Water Usage Optimization & Management for Hydraulic Fracturing | Dr. Chris Fr...
Water Usage Optimization & Management for Hydraulic Fracturing | Dr. Chris Fr...
 
Health, Safety and Environment Aspects of Carbon dioxide Sequestration | By: ...
Health, Safety and Environment Aspects of Carbon dioxide Sequestration | By: ...Health, Safety and Environment Aspects of Carbon dioxide Sequestration | By: ...
Health, Safety and Environment Aspects of Carbon dioxide Sequestration | By: ...
 
Lessons from Texas City | Michael P. Broadribb, Baker Engineering & Risk Cons...
Lessons from Texas City | Michael P. Broadribb, Baker Engineering & Risk Cons...Lessons from Texas City | Michael P. Broadribb, Baker Engineering & Risk Cons...
Lessons from Texas City | Michael P. Broadribb, Baker Engineering & Risk Cons...
 
Improving Health, Safety and Environment Performance Analysis | Mark Weitner,...
Improving Health, Safety and Environment Performance Analysis | Mark Weitner,...Improving Health, Safety and Environment Performance Analysis | Mark Weitner,...
Improving Health, Safety and Environment Performance Analysis | Mark Weitner,...
 
The Continuing Challenges of Balancing Process Safety Management and Personal...
The Continuing Challenges of Balancing Process Safety Management and Personal...The Continuing Challenges of Balancing Process Safety Management and Personal...
The Continuing Challenges of Balancing Process Safety Management and Personal...
 
Competency Development – a paradigm shift | Alastair Shakeshaft, Director, B...
Competency Development  – a paradigm shift | Alastair Shakeshaft, Director, B...Competency Development  – a paradigm shift | Alastair Shakeshaft, Director, B...
Competency Development – a paradigm shift | Alastair Shakeshaft, Director, B...
 
Building the competence of your workforce | Teresa Budworth, Chief Executive,...
Building the competence of your workforce | Teresa Budworth, Chief Executive,...Building the competence of your workforce | Teresa Budworth, Chief Executive,...
Building the competence of your workforce | Teresa Budworth, Chief Executive,...
 
Sustainability in Cement Industry | Rakesh Bhargava, Chief Climate & Sustaina...
Sustainability in Cement Industry | Rakesh Bhargava, Chief Climate & Sustaina...Sustainability in Cement Industry | Rakesh Bhargava, Chief Climate & Sustaina...
Sustainability in Cement Industry | Rakesh Bhargava, Chief Climate & Sustaina...
 
Inclusive Growth – Is Sustainability the Answer ? | Dr. Yogendra Saxena, Tata...
Inclusive Growth – Is Sustainability the Answer ? | Dr. Yogendra Saxena, Tata...Inclusive Growth – Is Sustainability the Answer ? | Dr. Yogendra Saxena, Tata...
Inclusive Growth – Is Sustainability the Answer ? | Dr. Yogendra Saxena, Tata...
 

Kürzlich hochgeladen

It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insightsseribangash
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurSuhani Kapoor
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdftbatkhuu1
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in managementchhavia330
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Roland Driesen
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Roomdivyansh0kumar0
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetDenis Gagné
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...noida100girls
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 

Kürzlich hochgeladen (20)

Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insights
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdf
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in management
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 

Process Safety Management in Design, Construction & Commissioning | Lalit K. Vijh ED- Technical Engineers India Limited

  • 1. Technical Session # 3A Topic : Process Safety Management in Design , Construction & Commissioning Topic: Process Safety Management in Design, Construction & Commissioning By: Lalit K. Vijh ED- Technical Engineers India Limited
  • 2. Technical Session # 3A Topic : Process Safety Management in Design , Construction & Commissioning MAJOR HAZARDS IN OIL INDUSTRY
  • 3. Technical Session # 3A Topic : Process Safety Management in Design , Construction & Commissioning SAN JUANICO DISASTER PEMEX, MEXICO, 1984 BEFORE AFTER
  • 4. Technical Session # 3A Topic : Process Safety Management in Design , Construction & Commissioning SAN JUANICO DISASTER, PEMEX, MEXICO, 1984 8” Pipe rupture occurred near the sphere The Control Room operator tried to identify the cause of pressure fall but without success. The release of LPG occurred for more than 5-10 minute The gas cloud grew to cover a large area and ignited from a ignition by ground flare. The VCE severely damaged the tank farm and resulted in LPG leak from other damaged tanks Just 4 minutes later first tank underwent BLEVE. Over the next hour, 12 separate BLEVE explosions were recorded. The two largest BLEVE’s(from 2400 m3 spherical tanks) registered 5.0 seismic reading on R.S The explosions destroyed the local town of San Juan Ixhuatepec. Approximately 500-600 people killed and 5000-7000 others suffering severe burns.
  • 5. Technical Session # 3A Topic : Process Safety Management in Design , Construction & Commissioning LESSONS LEARNED - SAN JUANICO DISASTER Sitting of Major Hazard Installation • The high death toll occurred because the housing was too near to the plant. At the time the plant was constructed the area was underdeveloped, but over the years the built-up area had gradually crept up to the site. Layout and Protection of large LPG Storages • The total destruction of the facility occurred because there was a failure of the overall system of protection, which includes layout, emergency isolation and water spray systems. Gas Detection and Emergency Isolation • One feature which might have averted the disaster is more effective gas detection and emergency isolation. The plant had no gas detector system and probably as a consequence, emergency isolation was too late.
  • 6. Technical Session # 3A Topic : Process Safety Management in Design , Construction & Commissioning LPG FIRE AT VALERO, MCKEE REFINERY, 2007
  • 7. Technical Session # 3A Topic : Process Safety Management in Design , Construction & Commissioning LPG FIRE AT VALERO, MCKEE REFINERY The propane release was likely caused by the freeze-related failure of high-pressure piping at a control station that had not been in service for approximately 15 years. The lack of remote isolation significantly increased the duration and size of the fire, resulting in extensive damage to the Propane Deasphalting Unit, the main pipe rack, and an adjacent process unit. Flame impingement on a non-fireproofed structural support caused a pipe rack to collapse, significantly increasing the size and duration of the fire, and led to the evacuation and extended shutdown of the refinery. The exposure of three one-ton chlorine containers to radiant heating from the fire led to the release of approximately 2.5 tons of highly toxic chlorine. A butane storage sphere was exposed to radiant heating that blistered its paint. The manual firewater deluge valve for the butane sphere was located too close to the PDA unit and could not be opened during the fire.
  • 8. Technical Session # 3A Topic : Process Safety Management in Design , Construction & Commissioning JAIPUR FIRE ACCIDENT 2009 • 11 Dead • Loss of ~ Rs.280 Crores
  • 9. Technical Session # 3A Topic : Process Safety Management in Design , Construction & Commissioning EXPLOSION IN VENEZUELA'S LARGEST OIL REFINERY ON 25-08-2012 • 48 Dead (official figure) • Initial Report indicate poor maintenance as chief cause
  • 10. Technical Session # 3A Topic : Process Safety Management in Design , Construction & Commissioning Source : Harry J. Toups LSU Department of Chemical Engineering ,SACHE 2003 Workshop Mechanical Operator Error Unknown Process Upsets Natural Hazards Design Sabotage & Arson 0 10 20 30 40 50 44 % 22 % 12 % 11 % 5 % 5 % 1 % CAUSE OF ACCIDENTS IN OIL INDUSTRY
  • 11. Technical Session # 3A Topic : Process Safety Management in Design , Construction & Commissioning APPROACH FOR SAFETY IN PLANT DESIGN? Eliminate or minimize hazards rather than control hazards Don’t wait for a major accident to identify need to improve major hazard management. Need to learn lessons from accidents but don’t rely on this approach Manage risks via Foresight rather than Hindsight i.e. be proactive rather than reactive. More a philosophy and way of thinking than a specific set of tools and methods applicable at all levels of design and operation from conceptual design to plant operations
  • 12. Technical Session # 3A Topic : Process Safety Management in Design , Construction & Commissioning INHERENT PASSIVE ACTIVE PROCEDURAL PROCESS SAFETY STRATEGIES
  • 13. Technical Session # 3A Topic : Process Safety Management in Design , Construction & Commissioning • Eliminate or reduce the hazard by changing to a process or materials which are non-hazardous or less hazardousINHERENT • Minimize hazard using process or equipment design features which reduce frequency or consequence without the active functioning of any device PASSIVE PROCESS SAFETY STRATEGIES
  • 14. Technical Session # 3A Topic : Process Safety Management in Design , Construction & Commissioning • Controls, safety interlocks, automatic shut down systems • Multiple active elements : Sensors, Logic device, Control element ACTIVE • Standard operating procedures, safety rules, emergency response procedures, trainingPROCEDURAL PROCESS SAFETY STRATEGIES
  • 15. Technical Session # 3A Topic : Process Safety Management in Design , Construction & Commissioning HSE during Project Execution • Environment Impact Assessment • Environmental Baseline Survey • Process Hazard Review • Hazard Identification (HAZID) Project Conceptualization Stage • P&ID Review For Operational Safety • HSE Plan & HSE Philosophy • HAZOP & SIL Studies • Fire, Explosion & Dispersion Analysis/ Consequence Analysis • HSE Action Tracking Register & PHSER Process Design Stage • Plot Plan Review • Plot Plan Review Through Plot Plan Risk Review Committee • Quantitative Risk Assessment • Detailed HAZOP & HAZOP Close Out Report • Fire & Gas Safety System Review • Cause & Effects/Safety Charts Review • Preparation of HSE Dossier & PHSER • Safety Manual & Operating Manual Preparation Engineering Stage • Safety Guidelines to Contractors • Safety Monitoring through Dedicated Safety Engineers • Safety Meetings • Safety Performance Evaluation Construction Stage • Punch List Preparation • Startup Formats • Pre Startup Safety Audit Commissioning Stage
  • 16. Technical Session # 3A Topic : Process Safety Management in Design , Construction & Commissioning CONCEPTUAL DESIGN (Coarse HAZOP, What-if, Ranking) SITE SELECTION (Rapid Risk Analysis, Environmental Impact Assessment) PROCESS DESIGN (HAZOP, Safety Review, SIL) ENGINEERING (Qualitative Risk Analysis, Plot Plan Review) START-UP (Safety Audit, Emergency Plan) RISK CONTROL DURING PROJECT STAGES
  • 17. Technical Session # 3A Topic : Process Safety Management in Design , Construction & Commissioning SAFETY AT PLANNING STAGE Prevention of accidents should be the goal Design options (use of chemicals, technology etc) Layout review (various locations and configurations) Hazard Identification (HAZID) Environment Impact Assessment Environmental Baseline Survey
  • 18. Technical Session # 3A Topic : Process Safety Management in Design , Construction & Commissioning HSE DURING ENGINEERING
  • 19. Technical Session # 3A Topic : Process Safety Management in Design , Construction & Commissioning SAFETY AT DESIGN STAGE Adequate Design suitable for operations: HAZID (Hazard Identification) HAZOP (Hazard and Operability Study) HSEIA (Health Safety Environment Impact Assessment) • COMAH (Control of Major Accidental Hazard), OHRA (Occupational Health Risk Assessment), EIA (Environment Impact Assessment) • HSECES (HSE Critical Equipment System), SCE/PS (Safety Critical Elements / Performance Standards) • Fire Safety Assessment and Dispersion Analysis, QRA (Quantitative Risk Assessment) • Noise Study, EERA (Escape, Evacuation and Rescue Analysis), Waste Management Plan SIL (Safety Integrity Level) ALARP Study (As Low As Reasonably Practicable) Active and Passive Fire Protection System
  • 20. Technical Session # 3A Topic : Process Safety Management in Design , Construction & Commissioning TYPICAL PROCESS SAFETY CODES & STANDARDS USED IN DESIGN Some of the standards widely used by designers and operating companies are: • American Petroleum Institute (API) • American Society of Mechanical Engineers (ASME) • National Fire Protection Association (NFPA) • Oil Industry Safety Directorate (OISD) / Local Standards • British Standard Institution (BSI) • International Standard Organization (ISO) • Static & Mobile Pressure Vessel (SMPV) Rules • Petroleum Rules • IBR regulation Process Design and Hydrocarbon Services are complying to various OISD Standards • OISD-STD-106 (Pressure Relief & Disposal System) • OISD-STD-108 (Recommended Practices on Oil Storage and Handling) • OISD-STD-116/117 (for Fire Protection) • OISD-STD-118 (Layouts for Oil and Gas Installations) • OISD-STD-144 (LPG Installations) • OISD-STD-150 (for LPG Mounded Storage Facility) • OISD-STD-152 (Safety instrumentation for process system in HC industry) • OISD-STD-163 (Process Control Room Safety) • OISD-STD-164 (Fire Proofing in Oil & Gas Industry) • OISD-STD-194 (Standard for Storage And Handling of LNG) • OISD-STD-197 (Guidelines for EIA)
  • 21. Technical Session # 3A Topic : Process Safety Management in Design , Construction & Commissioning PROCESS DESIGN PHILOSOPHY Selection of proper Material of Construction (MOC) Selection of proper piping class, rating. Selection of proper design conditions (Pressure, Temperature) Selection of hold up volume Conformity to various codes/ standards Adherence to good design practice Feed Back from previous jobs, Client, Engineering, Commissioning.
  • 22. Technical Session # 3A Topic : Process Safety Management in Design , Construction & Commissioning PROCESS SAFETY PHILOSOPHY - LOPA PROCESS MITIGATION SYSTEM OFFSITEEMERGENCY RESPONSE ONSITE EMERGENCY RESPONSE PREVENTION SYSTEM CONTROL & MONITORING
  • 23. Technical Session # 3A Topic : Process Safety Management in Design , Construction & Commissioning PROCESS SAFETY PHILOSOPHY Pressure Venting provisions shall be in accordance with API RP 520 (Part 1 &2), API RP 521 Standards Flare system is provided to safely dispose of the materials released from PSV in case of any malfunction of system • Controlling case for refinery or petrochemical complexes are usually cooling water or power failure. Whenever there is one cooling water system, cooling water failure loads for various units are added to calculate total flare load of the complex. • For a large complex with very high flare load for cooling water failure case, complex may be segregated in to two or more cooling water systems and then flare load of one (controlling ) cooling water system may be considered for further design • Temperature profile of flare header (ISBL & OSBL) is essential in having optimum provision of expansion loops in flare headers
  • 24. Technical Session # 3A Topic : Process Safety Management in Design , Construction & Commissioning PROCESS SAFETY PHILOSOPHY : LAYOUT Key considerations/ safety features for layout • Separation of hazardous areas from non-hazardous areas • Safe separation distances • Adequate escape routes, safe access for operation and maintenance of equipment • Main ignition sources should be grouped and located upstream prevailing wind. • Emergency response teams to have clear access to all fire fighting equipment. • Cable trays, pipe racks and escape routes shall be positioned such that risk of damage by pool fire or explosions is minimized. • Optimize availability of emergency services and main safety equipment under all foreseeable events.
  • 25. Technical Session # 3A Topic : Process Safety Management in Design , Construction & Commissioning Process Safety PhilosophyHazardous Area Classification • The hazardous area classification shall be performed in accordance with IP Model Code of Safe Practice Part 15. • Based on the above code various areas shall be classified into zones and Electrical appliances shall be selected suitably. The Emergency Shutdown system • The Emergency Shutdown system shall be designed to fail-safe so that, in the event of loss of any of the controls to the system, the shutdown valves shall fail closed and the blowdown valves fail open. • The Emergency Shutdown system shall be reviewed in accordance with IEC 61508. PRPROCESS SAFETY PHILOSOPHY
  • 26. Technical Session # 3A Topic : Process Safety Management in Design , Construction & Commissioning Redundancy Voting systems Philosophy of alarms and trips Emergency depressurization Emergency shut down (ESD) Safety valve HIPPS – High Integrity Pressure Protection System PROCESS SAFETY PHILOSOPHY - Instrumentation
  • 27. Technical Session # 3A Topic : Process Safety Management in Design , Construction & Commissioning FIRE CONTROL AND MITIGATION– F&G Detection System • The required functions/actions on fire and/or gas detection shall be developed during detail design phase. • The Fire and Gas Detection systems shall be designed and installed in accordance with NFPA and OISD Standards. • Detector locations shall be determined by means of case by case examination of the facilities layout and may be placed either peripherally around the facilities, at suitable intervals or placed to cover areas with a leak potential, or both. The fire and gas (F&G) detection system is to provide an early warning to personnel of the existence of a potentially dangerous situation and to enable automatic initiation of remedial actions • Gas detectors – H2, HC, H2S, Cl • Fire detectors –Flame, Heat, Smoke F&G Field Devices
  • 28. Technical Session # 3A Topic : Process Safety Management in Design , Construction & Commissioning • The main objective of active fire protection is to: • Provide cooling (Deluge System, Sprinkling System) • Control the fire (ie., prevent it from spreading) • Extinguishment of the fire incident (Fire Extinguishers, Foam System) Active Fire Protection : A “dormant” system that needs to be activated in order to perform its function. • Fire Proofing/ Passive fire protection is a barrier or safeguard which provides protection against the heat from a fire without additional intervention i.e. it performs its function without relying on activation. Passive Fire Protection : A system that performs its function without relying on the requirement of activation FIRE CONTROL AND MITIGATION – ACTIVE AND PASSIVE FIRE PROTECTION
  • 29. Technical Session # 3A Topic : Process Safety Management in Design , Construction & Commissioning HSE DURING CONSTRUCTION
  • 30. Technical Session # 3A Topic : Process Safety Management in Design , Construction & Commissioning SAFETY AT CONSTRUCTION STAGE Setting of Project specific HSE objective and targets Implementation of Project specific HSE Plan Preparation and Implementation of ERP Project HSE Review (PHSER for Construction) Dedicated Warehouse /Procedures for storage of Materials and Hazardous substances HSE Training, Inspection & audit HIRA & Legal register and ensuring its compliance Pre- Deployment Inspection and Certification for Mobilization of suitable and safe equipment
  • 31. Technical Session # 3A Topic : Process Safety Management in Design , Construction & Commissioning Tools for Monitoring/Implementation of HSE at Sites • HSE Specification • HSE Plan • HSE Procedures • HSE Induction • Hazard Identification & Risk Analysis (HIRA)/ Job Safety Analysis (JSA) • Tool Box Talks • Mock Drills (Fire, Electrocution , Fall from height ) • HSE Inspection/ Walk-through • HSE Meetings • Road Safety & Movement of vehicles • Fitness certificates for all Lifting tools & Tackles, Cranes • HSE Permits Viz. Scaffolds, Confined space, Height work, Excavation • HSE Awareness/ Motivational Programs • HSE Reporting including LTIFR, FAR • Reporting of Near Miss Accidents & Corrective Actions • Accident Investigations & Recommendations • Analysis of Leading &Trailing Indicators
  • 32. Technical Session # 3A Topic : Process Safety Management in Design , Construction & Commissioning • Legal compliance • HSE Management System & Competence • HSE Performance Pre qualification &Selection • General Terms & Condition • Code of Conduct Contractor Preparation • HSE Plan & Organization • Competence of Personnel • Signing of code of conduct Contract Award • Kick of Meeting • Medical Check up Pre commencement & Mobilization • HSE Training as per approved HSE Training MatrixContractors Orientation & Training • Periodic evaluation • HSE Review meeting Managing the Contractors • HSE Performance Records Post Contract Evaluation CONTRACTOR’s SAFETY MANAGEMENT PROCESS
  • 33. Technical Session # 3A Topic : Process Safety Management in Design , Construction & Commissioning HSE DURING COMMISSIONING
  • 34. Technical Session # 3A Topic : Process Safety Management in Design , Construction & Commissioning SAFETY AT PRECOMMISSIONING & COMMISSIONING AND HANDOVER SIMOPS - Simultaneous Operation study for Planning and coordination Multilayer Safety checks to meet Aggressive Schedule Multi disciplinary trained manpower Manuals, SOP & Checklists Authorization & documentation for Changes, Bypass etc Pre Start up Safety Review HSE Action Tracking Register/ Formal HSE Close out Report Project HSE Review (PHSER for Pre- Commissioning) Lesson Learnt
  • 35. Technical Session # 3A Topic : Process Safety Management in Design , Construction & Commissioning SUMMARY Safety in design is of paramount importance for process safety management Goal should be to prevent rather than control & mitigate hazards Select inherently safe processes and Incorporate adequate active & passive safety features in design minimizing dependence on human intervention Select Process specifications/ design conditions, Materials to reflect normal as well as start up/ transient conditions Ensure strict adherence to safety & design standard & codes during design/engineering/construction & commissioning Carryout Safety Studies like RRA/ QRA, HAZID, HAZOP, SIL etc to ensure adequate safety features including control & mitigation are built in design & to finalize location/ layout of facilities
  • 36. Technical Session # 3A Topic : Process Safety Management in Design , Construction & Commissioning THANK YOU