Lefdal Mine Data Center - Sindre Kvalheim - Localhost - April 2010
1.
2.
3.
4. Ingvild Myhre
Leader
Christian Berg Morten Thorkildsen Ole Schanke Eikum Birger Nilsen
5. Cold fjord for cooling
Deep fjord for safe implementation of cables
Norway`s national fiber backbone already in place
Extreme access to green power.
Close to Norwegian Central harbour
Close to industry requiring hot water
Close to Stadtwind and Mehuken windparks
6. Lefdal mine is surrounded by green renewable
power production both from wind and water.
Lefdal mine will be able to buy 100% of its
power needs from renewable sources.
Access to green power in imidiate
surroundings:
• Mehuken Windmillls 1+2: 22,5 MW
• Åskora/Øksenelvane hydropower: ca 150 MW
To much power to transport out of the county:
Total production: 3 721 MW 13,6 TWh
Total usage 950 MW 7,1 TWh
Balance +2 770 MW +6,5 TWh