SlideShare a Scribd company logo
1 of 21
City Council
September 17, 2013
Watering Frequency/Scheduling for City
Maintained Parks/Sports Fields, Santa Fe Golf
Course, and Fairmount Cemetery
Shane Kelton, Operations Director
Roger D. Havlak, Parks Superintendent
City of San Angelo
Watering Frequency/Scheduling
Purpose
• The purpose of this presentation is to receive direction
from City Council on irrigation practices of turf/trees for
City maintained parks/sports fields, Santa Fe Golf
Course, and Fairmount Cemetery as we move towards
and into Drought Level III of our current ordinance.
Watering Frequency/Scheduling
Areas for Discussion
1. Texas Bank Sports Complex
2. San Angelo Soccer Association
3. Class AA and A park sites (newly renovated or
constructed, highly visible, and most utilized parks)
• i.e. Visitor’s Center, Kid’s Kingdom, Kirby Park, etc.
4. Other park sites (Class B thru E sites)
• i.e. Bell Park, Brown Park, Harmon Park, etc.
5. Santa Fe Golf Course
6. Fairmount Cemetery
Watering Frequency/Scheduling
Reason for Supplemental Irrigation
• To sustain healthy landscapes and safe playing
surfaces for the enjoyment of our general public
• To minimize soil erosion and excessive weed
populations
• To avoid the replacement costs from plant injury/death
due to drought stress.
Watering Frequency/Scheduling
Current Status
• Parks Department maintains a total of 555 acres.
• 356 acres in parks; 199 acres in sports fields
• 292 acres (parks and sports fields) have viable irrigation systems
• 150 acres of the irrigated sites have both an underground irrigation
system and drip irrigation
• Drip irrigation only provided to newly established/planted trees, shrubs
and ornamental plants (i.e. Firefighter’s Memorial City Park)
• 173 acres are currently being irrigated
• i.e. Highly visible, most utilized, newly renovated/constructed sites
• Santa Fe Golf Course has 36 acres of irrigated turf/trees.
• Fairmount Cemetery has 57 acres of irrigated turf/trees.
Watering Frequency/Scheduling
Costs for Water
• Pay an average of $4.20 per 1,000 gallons
• Costs approximately $114 per acre for one inch of water
• Supplemental irrigation requirements range from 28 to 56
inches of water per year, depending on the quality desired and
amount of rainfall
• At 38 inches of water per year, cost is $4,332 per acre
• Texas Bank Sports Complex (55 acres) = $238,000/year
• Parks with viable irrigation systems (194 acres) = $840,000/year
• Santa Fe Golf Course (36 acres) = $156,000/year
• Fairmount Cemetery (57 acres) = $247,000/year
Watering Frequency/Scheduling
Costs for Water (cont.)
• Annual Budget for FY 2013-2014
• Texas Bank Sports Complex = $40,965
• Parks = $207,948
• Fairmount Cemetery = $15,115
• Only allows for 2 to 3 irrigations of one inch of water per year
**An obvious deficit exists in the water budget for all sites.
Watering Frequency/Scheduling
Current Tree Assessment
Location Total
Trees
Stressed
Trees
Dead
Trees
Parks/Sports Fields 3,438 398
(12%)
84
(2%)
Santa Fe Golf Course 352 34
(10%)
4
(1%)
Fairmount Cemetery 1,576 88
(6%)
42
(3%)
Watering Frequency/Scheduling
Firefighter’s Memorial City Park
(Irrigation system on)
Watering Frequency/Scheduling
Sunken Garden
(Irrigation system off)
Watering Frequency/Scheduling
Sunken Garden
(Irrigation system off)
Watering Frequency/Scheduling
Harmon Park
(Irrigation system off)
Watering Frequency/Scheduling
Harmon Park
(Irrigation system off)
Watering Frequency/Scheduling
Rio Concho Section D
(No viable irrigation system)
Watering Frequency/Scheduling
Issues related to irrigation and trees:
1. Water budget funding deficits
2. Funds for increasing drip or traditional irrigation systems
• Irrigation parts
• Labor for installation
• Future maintenance costs
• Labor for future maintenance
3. Limitations on changing current systems in place
4. Initial stress on trees from ditching during and
immediately following installation of systems
5. Increased amount of water used following installation
Options for trees along the north side of river:
1. Drip irrigation on every tree (parts and installation)
• Bid for Concho Street to 1st
Street = $154,612
• Bid for Golf Course (S. Abe Street to Beauregard Street) = $142,638
• Most expensive, but most efficient use of water
2. Quick-Coupler Connections
• Estimated costs for parts and installation = $1,440 per Quick-Coupler
• Physically move hoses from one tree to the next
• Expensive and labor intensive; lacks water use efficiency
3. Drip irrigation from 1,000 gallon tanks
• Utilizing 2 tanks, Labor Ready workers, and light duty City Staff
• 250 to 500 gallons per tree; approx. 4 to 8 trees/day
4. Utilize existing irrigation system from Concho St. to 1st
St.
• Estimated costs for repairs at golf course = $60,000 to $75,000
• Limits tree stress with no ditching, but less efficient use of water
• Future water and maintenance costs; labor issues
Watering Frequency/Scheduling
Quick-Coupler Connections
Watering Frequency/Scheduling
Two 1,000 gallon water tanks in use
Watering Frequency/Scheduling
Questions:
1. Do you want to continue irrigating City sites that are
currently receiving supplemental irrigation?
2. Do you want to increase or decrease the overall
number of irrigated sites?
3. If we enter into Drought Level III, do you want to
continue irrigating park systems, sports fields, Santa Fe
Golf Course, or Fairmount Cemetery?
4. What adjustments will be made for the deficits in the
water and maintenance budgets for all City sites?
Watering Frequency/Scheduling
Areas for Discussion
1. Texas Bank Sports Complex
2. San Angelo Soccer Association
3. Class AA and A park sites (newly renovated or
constructed, highly visible, and most utilized parks)
• i.e. Visitor’s Center, Kid’s Kingdom, Kirby Park, etc.
4. Other park sites (Class B thru E sites)
• i.e. Bell Park, Brown Park, Harmon Park, etc.
5. Santa Fe Golf Course
6. Fairmount Cemetery

More Related Content

What's hot

\\Utdc\Ut Users\Crichards\Desktop\Pro Green 2010
\\Utdc\Ut Users\Crichards\Desktop\Pro Green 2010\\Utdc\Ut Users\Crichards\Desktop\Pro Green 2010
\\Utdc\Ut Users\Crichards\Desktop\Pro Green 2010Town of Castle Rock
 
Efficient water management
Efficient water managementEfficient water management
Efficient water managementswadhinbarik
 
Integrated Groundwater/Surface Water Modelling to Assess Irrigation Demand an...
Integrated Groundwater/Surface Water Modelling to Assess Irrigation Demand an...Integrated Groundwater/Surface Water Modelling to Assess Irrigation Demand an...
Integrated Groundwater/Surface Water Modelling to Assess Irrigation Demand an...john Kassenaar
 
Introduction chapter `1
Introduction chapter `1Introduction chapter `1
Introduction chapter `1Vidhi Khokhani
 
IRJET- Assessment of Environmental Impacts during Operational Phase of a T...
IRJET- 	  Assessment of Environmental Impacts during Operational Phase of a T...IRJET- 	  Assessment of Environmental Impacts during Operational Phase of a T...
IRJET- Assessment of Environmental Impacts during Operational Phase of a T...IRJET Journal
 
Bundoora park on par for water saving
Bundoora park on par for water savingBundoora park on par for water saving
Bundoora park on par for water savingNEXTDC
 
Hazel Run: Upgrading Your Wastewater Treatment: You Have Choices
Hazel Run: Upgrading Your Wastewater Treatment: You Have ChoicesHazel Run: Upgrading Your Wastewater Treatment: You Have Choices
Hazel Run: Upgrading Your Wastewater Treatment: You Have Choicesdmalchow
 
Case Study No. 4-Design of Water Distribution System using Naugong spring as ...
Case Study No. 4-Design of Water Distribution System using Naugong spring as ...Case Study No. 4-Design of Water Distribution System using Naugong spring as ...
Case Study No. 4-Design of Water Distribution System using Naugong spring as ...haroldtaylor1113
 
Irrigationengineeringm1 120625051631-phpapp01
Irrigationengineeringm1 120625051631-phpapp01Irrigationengineeringm1 120625051631-phpapp01
Irrigationengineeringm1 120625051631-phpapp01kdh3kh
 
CLIMWAT and CROPWAT Model
CLIMWAT and CROPWAT ModelCLIMWAT and CROPWAT Model
CLIMWAT and CROPWAT ModelPawan Jeet
 
RHM for improved crop & pasture production
RHM for improved crop & pasture productionRHM for improved crop & pasture production
RHM for improved crop & pasture productionStephen Musimba
 
PCC_Greens_Ccommittee_Mtg_8_9_12
PCC_Greens_Ccommittee_Mtg_8_9_12PCC_Greens_Ccommittee_Mtg_8_9_12
PCC_Greens_Ccommittee_Mtg_8_9_12ssarro
 
Unit 3 ground water lect-5
Unit 3 ground water lect-5Unit 3 ground water lect-5
Unit 3 ground water lect-5DIPESH RAJPUT
 
DSD-SEA 2018 RIBASIM Applied For Subak Irrigation Schemes In Yeh Ho River Bas...
DSD-SEA 2018 RIBASIM Applied For Subak Irrigation Schemes In Yeh Ho River Bas...DSD-SEA 2018 RIBASIM Applied For Subak Irrigation Schemes In Yeh Ho River Bas...
DSD-SEA 2018 RIBASIM Applied For Subak Irrigation Schemes In Yeh Ho River Bas...Deltares
 
Wastewater Collection Construction Projects
Wastewater Collection Construction ProjectsWastewater Collection Construction Projects
Wastewater Collection Construction ProjectsCity of College Station
 

What's hot (19)

\\Utdc\Ut Users\Crichards\Desktop\Pro Green 2010
\\Utdc\Ut Users\Crichards\Desktop\Pro Green 2010\\Utdc\Ut Users\Crichards\Desktop\Pro Green 2010
\\Utdc\Ut Users\Crichards\Desktop\Pro Green 2010
 
Promoting conjunctive use of surface and groundwater: A case study from a maj...
Promoting conjunctive use of surface and groundwater: A case study from a maj...Promoting conjunctive use of surface and groundwater: A case study from a maj...
Promoting conjunctive use of surface and groundwater: A case study from a maj...
 
Efficient water management
Efficient water managementEfficient water management
Efficient water management
 
Integrated Groundwater/Surface Water Modelling to Assess Irrigation Demand an...
Integrated Groundwater/Surface Water Modelling to Assess Irrigation Demand an...Integrated Groundwater/Surface Water Modelling to Assess Irrigation Demand an...
Integrated Groundwater/Surface Water Modelling to Assess Irrigation Demand an...
 
Introduction to irrigation and hydrology
Introduction to irrigation and hydrologyIntroduction to irrigation and hydrology
Introduction to irrigation and hydrology
 
Introduction chapter `1
Introduction chapter `1Introduction chapter `1
Introduction chapter `1
 
Irrigation Engineering
Irrigation EngineeringIrrigation Engineering
Irrigation Engineering
 
IRJET- Assessment of Environmental Impacts during Operational Phase of a T...
IRJET- 	  Assessment of Environmental Impacts during Operational Phase of a T...IRJET- 	  Assessment of Environmental Impacts during Operational Phase of a T...
IRJET- Assessment of Environmental Impacts during Operational Phase of a T...
 
Best management practices verification
Best management practices verificationBest management practices verification
Best management practices verification
 
Bundoora park on par for water saving
Bundoora park on par for water savingBundoora park on par for water saving
Bundoora park on par for water saving
 
Hazel Run: Upgrading Your Wastewater Treatment: You Have Choices
Hazel Run: Upgrading Your Wastewater Treatment: You Have ChoicesHazel Run: Upgrading Your Wastewater Treatment: You Have Choices
Hazel Run: Upgrading Your Wastewater Treatment: You Have Choices
 
Case Study No. 4-Design of Water Distribution System using Naugong spring as ...
Case Study No. 4-Design of Water Distribution System using Naugong spring as ...Case Study No. 4-Design of Water Distribution System using Naugong spring as ...
Case Study No. 4-Design of Water Distribution System using Naugong spring as ...
 
Irrigationengineeringm1 120625051631-phpapp01
Irrigationengineeringm1 120625051631-phpapp01Irrigationengineeringm1 120625051631-phpapp01
Irrigationengineeringm1 120625051631-phpapp01
 
CLIMWAT and CROPWAT Model
CLIMWAT and CROPWAT ModelCLIMWAT and CROPWAT Model
CLIMWAT and CROPWAT Model
 
RHM for improved crop & pasture production
RHM for improved crop & pasture productionRHM for improved crop & pasture production
RHM for improved crop & pasture production
 
PCC_Greens_Ccommittee_Mtg_8_9_12
PCC_Greens_Ccommittee_Mtg_8_9_12PCC_Greens_Ccommittee_Mtg_8_9_12
PCC_Greens_Ccommittee_Mtg_8_9_12
 
Unit 3 ground water lect-5
Unit 3 ground water lect-5Unit 3 ground water lect-5
Unit 3 ground water lect-5
 
DSD-SEA 2018 RIBASIM Applied For Subak Irrigation Schemes In Yeh Ho River Bas...
DSD-SEA 2018 RIBASIM Applied For Subak Irrigation Schemes In Yeh Ho River Bas...DSD-SEA 2018 RIBASIM Applied For Subak Irrigation Schemes In Yeh Ho River Bas...
DSD-SEA 2018 RIBASIM Applied For Subak Irrigation Schemes In Yeh Ho River Bas...
 
Wastewater Collection Construction Projects
Wastewater Collection Construction ProjectsWastewater Collection Construction Projects
Wastewater Collection Construction Projects
 

Viewers also liked (7)

CC 5-21-13 planning
CC 5-21-13 planningCC 5-21-13 planning
CC 5-21-13 planning
 
May 21, 2013 Agenda packet
May 21, 2013 Agenda packetMay 21, 2013 Agenda packet
May 21, 2013 Agenda packet
 
City Council March 5, 2013 CIP discussion
City Council March 5, 2013 CIP discussion City Council March 5, 2013 CIP discussion
City Council March 5, 2013 CIP discussion
 
September 24, 2013 Special Meeting Agenda packet
September 24, 2013 Special Meeting Agenda packetSeptember 24, 2013 Special Meeting Agenda packet
September 24, 2013 Special Meeting Agenda packet
 
November 19, 2013 Agenda Packet
November 19, 2013 Agenda PacketNovember 19, 2013 Agenda Packet
November 19, 2013 Agenda Packet
 
Memo
MemoMemo
Memo
 
June 18, 2013 Agenda packet
June 18, 2013 Agenda packetJune 18, 2013 Agenda packet
June 18, 2013 Agenda packet
 

Similar to City council 9 17-13 watering of parks

ccwcd bond public meeting
 ccwcd bond public meeting ccwcd bond public meeting
ccwcd bond public meetingccwcd
 
Reducing Long-Term Rate Impacts Through Water Conservation, and Lessons Learn...
Reducing Long-Term Rate Impacts Through Water Conservation, and Lessons Learn...Reducing Long-Term Rate Impacts Through Water Conservation, and Lessons Learn...
Reducing Long-Term Rate Impacts Through Water Conservation, and Lessons Learn...Texas Living Waters Project
 
Pools, Abandonments, and Exhumation: Have We Reached Peak Pool?
Pools, Abandonments, and Exhumation: Have We Reached Peak Pool?Pools, Abandonments, and Exhumation: Have We Reached Peak Pool?
Pools, Abandonments, and Exhumation: Have We Reached Peak Pool?EMA-tucson
 
Texas Parks & Wildlife's Trail to Sustainability
Texas Parks & Wildlife's Trail to SustainabilityTexas Parks & Wildlife's Trail to Sustainability
Texas Parks & Wildlife's Trail to SustainabilityFMA Summits
 
Key factors, trends, and triggers in declining outdoor water demand in Arizona
Key factors, trends, and triggers in declining outdoor water demand in ArizonaKey factors, trends, and triggers in declining outdoor water demand in Arizona
Key factors, trends, and triggers in declining outdoor water demand in ArizonaEMA-tucson
 
Franklin DPW Water Presentation
Franklin DPW Water PresentationFranklin DPW Water Presentation
Franklin DPW Water PresentationFranklin Matters
 
Water Presentation - Jan 30, 2019
Water Presentation - Jan 30, 2019Water Presentation - Jan 30, 2019
Water Presentation - Jan 30, 2019Franklin Matters
 
2010 annual water quality report (1)
2010 annual water quality report (1)2010 annual water quality report (1)
2010 annual water quality report (1)Jason Yarborough
 
The Critical Link Between Aquifer Exemptions and teh Sustainability of Water ...
The Critical Link Between Aquifer Exemptions and teh Sustainability of Water ...The Critical Link Between Aquifer Exemptions and teh Sustainability of Water ...
The Critical Link Between Aquifer Exemptions and teh Sustainability of Water ...Dan Arthur
 
Final Presentation MAE188 Fall Quarter 2011
Final Presentation MAE188 Fall Quarter 2011Final Presentation MAE188 Fall Quarter 2011
Final Presentation MAE188 Fall Quarter 2011Andrea Mariani
 
(supplemental slides) to BIP Overview and Next Steps
(supplemental slides) to BIP Overview and Next Steps(supplemental slides) to BIP Overview and Next Steps
(supplemental slides) to BIP Overview and Next StepsWalter Davidson
 
Dead Run at Georgetown Pike Stream Restoration Community Meeting Oct 7, 2020
Dead Run at Georgetown Pike Stream Restoration Community Meeting Oct 7, 2020Dead Run at Georgetown Pike Stream Restoration Community Meeting Oct 7, 2020
Dead Run at Georgetown Pike Stream Restoration Community Meeting Oct 7, 2020Fairfax County
 

Similar to City council 9 17-13 watering of parks (20)

ccwcd bond public meeting
 ccwcd bond public meeting ccwcd bond public meeting
ccwcd bond public meeting
 
W02 palm beach par 3 golf course-schanen
W02 palm beach par 3 golf course-schanenW02 palm beach par 3 golf course-schanen
W02 palm beach par 3 golf course-schanen
 
Storm water treatment areas
Storm water treatment areasStorm water treatment areas
Storm water treatment areas
 
Water Conservation Update
Water Conservation UpdateWater Conservation Update
Water Conservation Update
 
Reducing Long-Term Rate Impacts Through Water Conservation, and Lessons Learn...
Reducing Long-Term Rate Impacts Through Water Conservation, and Lessons Learn...Reducing Long-Term Rate Impacts Through Water Conservation, and Lessons Learn...
Reducing Long-Term Rate Impacts Through Water Conservation, and Lessons Learn...
 
Water Reuse Coalition
Water Reuse CoalitionWater Reuse Coalition
Water Reuse Coalition
 
Pools, Abandonments, and Exhumation: Have We Reached Peak Pool?
Pools, Abandonments, and Exhumation: Have We Reached Peak Pool?Pools, Abandonments, and Exhumation: Have We Reached Peak Pool?
Pools, Abandonments, and Exhumation: Have We Reached Peak Pool?
 
Texas Parks & Wildlife's Trail to Sustainability
Texas Parks & Wildlife's Trail to SustainabilityTexas Parks & Wildlife's Trail to Sustainability
Texas Parks & Wildlife's Trail to Sustainability
 
Key factors, trends, and triggers in declining outdoor water demand in Arizona
Key factors, trends, and triggers in declining outdoor water demand in ArizonaKey factors, trends, and triggers in declining outdoor water demand in Arizona
Key factors, trends, and triggers in declining outdoor water demand in Arizona
 
Franklin DPW Water Presentation
Franklin DPW Water PresentationFranklin DPW Water Presentation
Franklin DPW Water Presentation
 
Water Presentation - Jan 30, 2019
Water Presentation - Jan 30, 2019Water Presentation - Jan 30, 2019
Water Presentation - Jan 30, 2019
 
Orange County's Groundwater Replenishment System Expansion, by Denis Bilodeau...
Orange County's Groundwater Replenishment System Expansion, by Denis Bilodeau...Orange County's Groundwater Replenishment System Expansion, by Denis Bilodeau...
Orange County's Groundwater Replenishment System Expansion, by Denis Bilodeau...
 
2010 annual water quality report (1)
2010 annual water quality report (1)2010 annual water quality report (1)
2010 annual water quality report (1)
 
Rainwater harvesting
Rainwater harvesting Rainwater harvesting
Rainwater harvesting
 
EXCITE: Wing Tam
EXCITE: Wing Tam EXCITE: Wing Tam
EXCITE: Wing Tam
 
The Critical Link Between Aquifer Exemptions and teh Sustainability of Water ...
The Critical Link Between Aquifer Exemptions and teh Sustainability of Water ...The Critical Link Between Aquifer Exemptions and teh Sustainability of Water ...
The Critical Link Between Aquifer Exemptions and teh Sustainability of Water ...
 
Final Presentation MAE188 Fall Quarter 2011
Final Presentation MAE188 Fall Quarter 2011Final Presentation MAE188 Fall Quarter 2011
Final Presentation MAE188 Fall Quarter 2011
 
(supplemental slides) to BIP Overview and Next Steps
(supplemental slides) to BIP Overview and Next Steps(supplemental slides) to BIP Overview and Next Steps
(supplemental slides) to BIP Overview and Next Steps
 
2013.05.21 public meeting_3
2013.05.21 public meeting_32013.05.21 public meeting_3
2013.05.21 public meeting_3
 
Dead Run at Georgetown Pike Stream Restoration Community Meeting Oct 7, 2020
Dead Run at Georgetown Pike Stream Restoration Community Meeting Oct 7, 2020Dead Run at Georgetown Pike Stream Restoration Community Meeting Oct 7, 2020
Dead Run at Georgetown Pike Stream Restoration Community Meeting Oct 7, 2020
 

More from City of San Angelo Texas

City council january 7, 2014 sidewalk agreement
City council january 7, 2014   sidewalk agreementCity council january 7, 2014   sidewalk agreement
City council january 7, 2014 sidewalk agreementCity of San Angelo Texas
 
City council january 7, 2014 bandits presentation
City council january 7, 2014   bandits presentationCity council january 7, 2014   bandits presentation
City council january 7, 2014 bandits presentationCity of San Angelo Texas
 
City council 12 17-13 downtown development plan
City council 12 17-13 downtown development planCity council 12 17-13 downtown development plan
City council 12 17-13 downtown development planCity of San Angelo Texas
 
City council 12 17-13 planning presentation
City council 12 17-13 planning presentationCity council 12 17-13 planning presentation
City council 12 17-13 planning presentationCity of San Angelo Texas
 
City council nov. 19, 2013 san angelo public housing authority
City council nov. 19, 2013   san angelo public housing  authorityCity council nov. 19, 2013   san angelo public housing  authority
City council nov. 19, 2013 san angelo public housing authorityCity of San Angelo Texas
 
City council nov. 19, 2013 cosadc budget presentation 11-19-13
City council nov. 19, 2013    cosadc budget presentation 11-19-13City council nov. 19, 2013    cosadc budget presentation 11-19-13
City council nov. 19, 2013 cosadc budget presentation 11-19-13City of San Angelo Texas
 
City council nov. 19, 2013 cosadc ballot language presentation
City council nov. 19, 2013    cosadc ballot language presentationCity council nov. 19, 2013    cosadc ballot language presentation
City council nov. 19, 2013 cosadc ballot language presentationCity of San Angelo Texas
 
San angelo city council 11 5-13 - west texas water partnership
San angelo city council 11 5-13 - west texas water partnershipSan angelo city council 11 5-13 - west texas water partnership
San angelo city council 11 5-13 - west texas water partnershipCity of San Angelo Texas
 
San angelo city council 11 5-13 - wastewater pilot
San angelo city council 11 5-13 - wastewater pilotSan angelo city council 11 5-13 - wastewater pilot
San angelo city council 11 5-13 - wastewater pilotCity of San Angelo Texas
 
San angelo city council 11 5-13 - solid waste collection and operation presen...
San angelo city council 11 5-13 - solid waste collection and operation presen...San angelo city council 11 5-13 - solid waste collection and operation presen...
San angelo city council 11 5-13 - solid waste collection and operation presen...City of San Angelo Texas
 
San angelo city council 11 5-13 - nasworthy presentation
San angelo city council 11 5-13 - nasworthy presentationSan angelo city council 11 5-13 - nasworthy presentation
San angelo city council 11 5-13 - nasworthy presentationCity of San Angelo Texas
 
San angelo city council 11 5-13 - economic development budget
San angelo city council 11 5-13 - economic development budgetSan angelo city council 11 5-13 - economic development budget
San angelo city council 11 5-13 - economic development budgetCity of San Angelo Texas
 
San angelo city council 11 5-13 - request for competitive sealed proposals
San angelo city council 11 5-13 -  request for competitive sealed proposalsSan angelo city council 11 5-13 -  request for competitive sealed proposals
San angelo city council 11 5-13 - request for competitive sealed proposalsCity of San Angelo Texas
 

More from City of San Angelo Texas (20)

February 4, 2014 Agenda Packet
February 4, 2014 Agenda PacketFebruary 4, 2014 Agenda Packet
February 4, 2014 Agenda Packet
 
January 21, 2014 Agenda packet
January 21, 2014 Agenda packetJanuary 21, 2014 Agenda packet
January 21, 2014 Agenda packet
 
City council january 7, 2014 sidewalk agreement
City council january 7, 2014   sidewalk agreementCity council january 7, 2014   sidewalk agreement
City council january 7, 2014 sidewalk agreement
 
City council january 7, 2014 bandits presentation
City council january 7, 2014   bandits presentationCity council january 7, 2014   bandits presentation
City council january 7, 2014 bandits presentation
 
City council january 7, 2014 river fest
City council january 7, 2014   river festCity council january 7, 2014   river fest
City council january 7, 2014 river fest
 
January 7, 2014 Agenda Packet
January 7, 2014 Agenda PacketJanuary 7, 2014 Agenda Packet
January 7, 2014 Agenda Packet
 
City council 12 17-13 downtown development plan
City council 12 17-13 downtown development planCity council 12 17-13 downtown development plan
City council 12 17-13 downtown development plan
 
City council 12 17-13 planning presentation
City council 12 17-13 planning presentationCity council 12 17-13 planning presentation
City council 12 17-13 planning presentation
 
December 17, 2013 Agenda Packet
December 17, 2013 Agenda PacketDecember 17, 2013 Agenda Packet
December 17, 2013 Agenda Packet
 
December 3, 2013 Agenda packet
December 3, 2013 Agenda packetDecember 3, 2013 Agenda packet
December 3, 2013 Agenda packet
 
City council nov. 19, 2013 san angelo public housing authority
City council nov. 19, 2013   san angelo public housing  authorityCity council nov. 19, 2013   san angelo public housing  authority
City council nov. 19, 2013 san angelo public housing authority
 
City council nov. 19, 2013 planning
City council nov. 19, 2013   planningCity council nov. 19, 2013   planning
City council nov. 19, 2013 planning
 
City council nov. 19, 2013 cosadc budget presentation 11-19-13
City council nov. 19, 2013    cosadc budget presentation 11-19-13City council nov. 19, 2013    cosadc budget presentation 11-19-13
City council nov. 19, 2013 cosadc budget presentation 11-19-13
 
City council nov. 19, 2013 cosadc ballot language presentation
City council nov. 19, 2013    cosadc ballot language presentationCity council nov. 19, 2013    cosadc ballot language presentation
City council nov. 19, 2013 cosadc ballot language presentation
 
San angelo city council 11 5-13 - west texas water partnership
San angelo city council 11 5-13 - west texas water partnershipSan angelo city council 11 5-13 - west texas water partnership
San angelo city council 11 5-13 - west texas water partnership
 
San angelo city council 11 5-13 - wastewater pilot
San angelo city council 11 5-13 - wastewater pilotSan angelo city council 11 5-13 - wastewater pilot
San angelo city council 11 5-13 - wastewater pilot
 
San angelo city council 11 5-13 - solid waste collection and operation presen...
San angelo city council 11 5-13 - solid waste collection and operation presen...San angelo city council 11 5-13 - solid waste collection and operation presen...
San angelo city council 11 5-13 - solid waste collection and operation presen...
 
San angelo city council 11 5-13 - nasworthy presentation
San angelo city council 11 5-13 - nasworthy presentationSan angelo city council 11 5-13 - nasworthy presentation
San angelo city council 11 5-13 - nasworthy presentation
 
San angelo city council 11 5-13 - economic development budget
San angelo city council 11 5-13 - economic development budgetSan angelo city council 11 5-13 - economic development budget
San angelo city council 11 5-13 - economic development budget
 
San angelo city council 11 5-13 - request for competitive sealed proposals
San angelo city council 11 5-13 -  request for competitive sealed proposalsSan angelo city council 11 5-13 -  request for competitive sealed proposals
San angelo city council 11 5-13 - request for competitive sealed proposals
 

Recently uploaded

Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizharallensay1
 
Cannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 UpdatedCannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 UpdatedCannaBusinessPlans
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1kcpayne
 
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTSJAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTSkajalroy875762
 
Nanded Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Nanded Call Girl Just Call 8084732287 Top Class Call Girl Service AvailableNanded Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Nanded Call Girl Just Call 8084732287 Top Class Call Girl Service Availablepr788182
 
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...pujan9679
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Adnet Communications
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwaitdaisycvs
 
Puri CALL GIRL ❤️8084732287❤️ CALL GIRLS IN ESCORT SERVICE WE ARW PROVIDING
Puri CALL GIRL ❤️8084732287❤️ CALL GIRLS IN ESCORT SERVICE WE ARW PROVIDINGPuri CALL GIRL ❤️8084732287❤️ CALL GIRLS IN ESCORT SERVICE WE ARW PROVIDING
Puri CALL GIRL ❤️8084732287❤️ CALL GIRLS IN ESCORT SERVICE WE ARW PROVIDINGpriyakumari801827
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting
 
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book nowGUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book nowkapoorjyoti4444
 
Cuttack Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Cuttack Call Girl Just Call 8084732287 Top Class Call Girl Service AvailableCuttack Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Cuttack Call Girl Just Call 8084732287 Top Class Call Girl Service Availablepr788182
 
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service AvailableNashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Availablepr788182
 
PARK STREET 💋 Call Girl 9827461493 Call Girls in Escort service book now
PARK STREET 💋 Call Girl 9827461493 Call Girls in  Escort service book nowPARK STREET 💋 Call Girl 9827461493 Call Girls in  Escort service book now
PARK STREET 💋 Call Girl 9827461493 Call Girls in Escort service book nowkapoorjyoti4444
 
obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...
obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...
obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...yulianti213969
 
KALYANI 💋 Call Girl 9827461493 Call Girls in Escort service book now
KALYANI 💋 Call Girl 9827461493 Call Girls in  Escort service book nowKALYANI 💋 Call Girl 9827461493 Call Girls in  Escort service book now
KALYANI 💋 Call Girl 9827461493 Call Girls in Escort service book nowkapoorjyoti4444
 
Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptxRoofing Contractor
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...daisycvs
 
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecZurliaSoop
 

Recently uploaded (20)

Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al MizharAl Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
Al Mizhar Dubai Escorts +971561403006 Escorts Service In Al Mizhar
 
Cannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 UpdatedCannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 Updated
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTSJAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
 
Nanded Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Nanded Call Girl Just Call 8084732287 Top Class Call Girl Service AvailableNanded Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Nanded Call Girl Just Call 8084732287 Top Class Call Girl Service Available
 
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
 
HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024
 
Puri CALL GIRL ❤️8084732287❤️ CALL GIRLS IN ESCORT SERVICE WE ARW PROVIDING
Puri CALL GIRL ❤️8084732287❤️ CALL GIRLS IN ESCORT SERVICE WE ARW PROVIDINGPuri CALL GIRL ❤️8084732287❤️ CALL GIRLS IN ESCORT SERVICE WE ARW PROVIDING
Puri CALL GIRL ❤️8084732287❤️ CALL GIRLS IN ESCORT SERVICE WE ARW PROVIDING
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book nowGUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
Cuttack Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Cuttack Call Girl Just Call 8084732287 Top Class Call Girl Service AvailableCuttack Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Cuttack Call Girl Just Call 8084732287 Top Class Call Girl Service Available
 
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service AvailableNashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
 
PARK STREET 💋 Call Girl 9827461493 Call Girls in Escort service book now
PARK STREET 💋 Call Girl 9827461493 Call Girls in  Escort service book nowPARK STREET 💋 Call Girl 9827461493 Call Girls in  Escort service book now
PARK STREET 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...
obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...
obat aborsi bandung wa 081336238223 jual obat aborsi cytotec asli di bandung9...
 
KALYANI 💋 Call Girl 9827461493 Call Girls in Escort service book now
KALYANI 💋 Call Girl 9827461493 Call Girls in  Escort service book nowKALYANI 💋 Call Girl 9827461493 Call Girls in  Escort service book now
KALYANI 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptx
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
 

City council 9 17-13 watering of parks

  • 2. Watering Frequency/Scheduling for City Maintained Parks/Sports Fields, Santa Fe Golf Course, and Fairmount Cemetery Shane Kelton, Operations Director Roger D. Havlak, Parks Superintendent City of San Angelo
  • 3. Watering Frequency/Scheduling Purpose • The purpose of this presentation is to receive direction from City Council on irrigation practices of turf/trees for City maintained parks/sports fields, Santa Fe Golf Course, and Fairmount Cemetery as we move towards and into Drought Level III of our current ordinance.
  • 4. Watering Frequency/Scheduling Areas for Discussion 1. Texas Bank Sports Complex 2. San Angelo Soccer Association 3. Class AA and A park sites (newly renovated or constructed, highly visible, and most utilized parks) • i.e. Visitor’s Center, Kid’s Kingdom, Kirby Park, etc. 4. Other park sites (Class B thru E sites) • i.e. Bell Park, Brown Park, Harmon Park, etc. 5. Santa Fe Golf Course 6. Fairmount Cemetery
  • 5. Watering Frequency/Scheduling Reason for Supplemental Irrigation • To sustain healthy landscapes and safe playing surfaces for the enjoyment of our general public • To minimize soil erosion and excessive weed populations • To avoid the replacement costs from plant injury/death due to drought stress.
  • 6. Watering Frequency/Scheduling Current Status • Parks Department maintains a total of 555 acres. • 356 acres in parks; 199 acres in sports fields • 292 acres (parks and sports fields) have viable irrigation systems • 150 acres of the irrigated sites have both an underground irrigation system and drip irrigation • Drip irrigation only provided to newly established/planted trees, shrubs and ornamental plants (i.e. Firefighter’s Memorial City Park) • 173 acres are currently being irrigated • i.e. Highly visible, most utilized, newly renovated/constructed sites • Santa Fe Golf Course has 36 acres of irrigated turf/trees. • Fairmount Cemetery has 57 acres of irrigated turf/trees.
  • 7. Watering Frequency/Scheduling Costs for Water • Pay an average of $4.20 per 1,000 gallons • Costs approximately $114 per acre for one inch of water • Supplemental irrigation requirements range from 28 to 56 inches of water per year, depending on the quality desired and amount of rainfall • At 38 inches of water per year, cost is $4,332 per acre • Texas Bank Sports Complex (55 acres) = $238,000/year • Parks with viable irrigation systems (194 acres) = $840,000/year • Santa Fe Golf Course (36 acres) = $156,000/year • Fairmount Cemetery (57 acres) = $247,000/year
  • 8. Watering Frequency/Scheduling Costs for Water (cont.) • Annual Budget for FY 2013-2014 • Texas Bank Sports Complex = $40,965 • Parks = $207,948 • Fairmount Cemetery = $15,115 • Only allows for 2 to 3 irrigations of one inch of water per year **An obvious deficit exists in the water budget for all sites.
  • 9. Watering Frequency/Scheduling Current Tree Assessment Location Total Trees Stressed Trees Dead Trees Parks/Sports Fields 3,438 398 (12%) 84 (2%) Santa Fe Golf Course 352 34 (10%) 4 (1%) Fairmount Cemetery 1,576 88 (6%) 42 (3%)
  • 10. Watering Frequency/Scheduling Firefighter’s Memorial City Park (Irrigation system on)
  • 15. Watering Frequency/Scheduling Rio Concho Section D (No viable irrigation system)
  • 16. Watering Frequency/Scheduling Issues related to irrigation and trees: 1. Water budget funding deficits 2. Funds for increasing drip or traditional irrigation systems • Irrigation parts • Labor for installation • Future maintenance costs • Labor for future maintenance 3. Limitations on changing current systems in place 4. Initial stress on trees from ditching during and immediately following installation of systems 5. Increased amount of water used following installation
  • 17. Options for trees along the north side of river: 1. Drip irrigation on every tree (parts and installation) • Bid for Concho Street to 1st Street = $154,612 • Bid for Golf Course (S. Abe Street to Beauregard Street) = $142,638 • Most expensive, but most efficient use of water 2. Quick-Coupler Connections • Estimated costs for parts and installation = $1,440 per Quick-Coupler • Physically move hoses from one tree to the next • Expensive and labor intensive; lacks water use efficiency 3. Drip irrigation from 1,000 gallon tanks • Utilizing 2 tanks, Labor Ready workers, and light duty City Staff • 250 to 500 gallons per tree; approx. 4 to 8 trees/day 4. Utilize existing irrigation system from Concho St. to 1st St. • Estimated costs for repairs at golf course = $60,000 to $75,000 • Limits tree stress with no ditching, but less efficient use of water • Future water and maintenance costs; labor issues
  • 19. Watering Frequency/Scheduling Two 1,000 gallon water tanks in use
  • 20. Watering Frequency/Scheduling Questions: 1. Do you want to continue irrigating City sites that are currently receiving supplemental irrigation? 2. Do you want to increase or decrease the overall number of irrigated sites? 3. If we enter into Drought Level III, do you want to continue irrigating park systems, sports fields, Santa Fe Golf Course, or Fairmount Cemetery? 4. What adjustments will be made for the deficits in the water and maintenance budgets for all City sites?
  • 21. Watering Frequency/Scheduling Areas for Discussion 1. Texas Bank Sports Complex 2. San Angelo Soccer Association 3. Class AA and A park sites (newly renovated or constructed, highly visible, and most utilized parks) • i.e. Visitor’s Center, Kid’s Kingdom, Kirby Park, etc. 4. Other park sites (Class B thru E sites) • i.e. Bell Park, Brown Park, Harmon Park, etc. 5. Santa Fe Golf Course 6. Fairmount Cemetery