SlideShare ist ein Scribd-Unternehmen logo
1 von 10
MHS Sustainability Report‐2010 




 MHS SUSTAINABILITY
 Environmentally, Economically, Modularity,
 Reusability, Expandability, Relocatability,
 Renewability, Recyclability




 Reducing environmental impacts
 Making sustainability reality
  
 © www.modularhousingsystem.com

  




                                               10
MHS Sustainability Report‐2010 
 



                                                                                                     
 
This report includes information on our North American operations; and does not cover our 
joint venture operations. 
We invite you to browse our site and learn more about MHSs sustainability approach, programs 
and results. It’s a building system, invented and created for sustainable light residential 
construction with less environmental impact. 
Thank you for your interest in our company.  
Regards 
Tim Siahatgar, Assoc AIA, Inventor  




 
 
 
 
 
 
 
 
 
                                                                ©  MHS 
 
 
MHS Building System, Reducing environmental 
impacts across the system life cycle 
The Modular Housing System (MHS) was developed by Tim Siahatgar, architectural engineer 
and founder of Unique Structural Systems. www.modularhousingsystem.com. 
This post frame system is composed of MHS aluminum structural members connected by a 
patented, quickly‐connect bolt and clamp technology. Typically it is designed to be used with 
sandwich panels which fit within the unique channel configurations of the MHS aluminum 
framing members.        

                                                 
 US SYSTEMS| MHS | PO BOX 51478 | IRVINE |CA 92619| USA | +1‐877‐880‐5979 | FAX: +1‐949‐266‐8925 
                           Email: office@modularhousingsystem.com 
                                  Copyright © US SYSTEMS LLC
MHS Sustainability Report‐2010 
 



                                                                                                       
 
 
The growth of aluminum industry, advanced extrusion machinery, the characteristic and 
properties of aluminum as a material have led to evolutionary and innovative changes in 
building techniques, architectural and engineering projects. 
 
MHS works to foster effective collaboration between all the members of the MHS design and 
construction teams with the goal of using this technology in a cost‐effective way to meet each 
client’s particular needs. The MHS aluminum‐based system works ideally with standard SIPs or 
with metal‐skinned and hardwood SIPs as alternatives which require further finishing for wall 
covering and siding. While the twin grooves in the extruded aluminum framing members were 
designed to be fitted with almost any kind of panel, the strength of the SIP is preferred. Thus, 
walls can be assembled using a weather‐resistant panel on the exterior surface side of the 
framing component, such as sheet metal, foamed aluminum panel or even ferro‐cement panel. 
On the interior side the groove can be fitted with a hardwood dovetail board, cork, cloth‐
covered panel or simple drywall. Due to the fact that panels are set within the flanges of the 
channels at all four sides, issues or problems with panel connections are eliminated. 
 
In designing a modernist, pavilion home one eliminates this issue altogether by relying on 
window walls for most of the exterior, with light partitions and sliding panel screens inside. The 
ability of the MHS system to integrate smaller‐scale US Systems framing units’ means there is a 
ready method of integrating built‐in furnishings, an advantage in approaching the next stage of 
construction. 
Due to the unique properties of aluminum (among them its light weight) and the patented bolt‐
and‐clamp connections, the MHS system offers some degree of superiority over stick framing in 
resisting almost every hazard or disaster scenario. Among its attributes are green, recyclable 
components, true modular design versatility, high earthquake resistance and open architecture 
 
Perhaps the most innovated feature of MHS is its reuse and relocatability –precisely the feature 
that stud frame construction is lacking. With MHS one can freely and quickly disassemble, repair 
or modify, and then reassemble structures without causing any damage to the components and 
materials using little more than a few hand tools. Combined with the virtues of modular space 
frame geometry, this affords the system a flexibility, capability and economy impossible with 
other methods of construction. 
 

 

 

 

                                                  
 US SYSTEMS| MHS | PO BOX 51478 | IRVINE |CA 92619| USA | +1‐877‐880‐5979 | FAX: +1‐949‐266‐8925 
                           Email: office@modularhousingsystem.com 
                                  Copyright © US SYSTEMS LLC
MHS Sustainability Report‐2010 
 



                                                                                                     
 
Why MHS Building Systems Reduces Environmental Impact: 

 
    A. Designed for Environment 
       a. Standard components allows to meet a modular design 
       b. Dimensionally modular, Speed on architectural design and site assembly 
          reducing time and energy. 
       c. Conformance with international environmental expectations and green 
          criteria increases materials and energy efficiency 
       d. Reusable resources and Recycled contents are used 
       e.  Designed for easy assembly, disassembly and recycling 
       f. Sustainable Structure design strategies, accept on‐site renewable power 
          system as well as green roof products. 
           
    B. Choose of Materials  
       a. Use of renewable resources 
       b. Reduction in the number of different material types used in construction. 
       c. Reduction in product size uses fewer resources 
       d. Recycled materials are used in finishing, interior products 
       e. Restricted substances are reduced or eliminated 
           
    C. Durability 
       a. Another important feature of aluminum buildings is that they are very 
          sturdy. MHS aluminum framed buildings are heat‐resistant and are strong 
          enough to withstand climatic changes. 
       b.  Due to the unique properties of aluminum (among them its light weight) and 
          the patented bolt‐and‐clamp connections, the MHS system offers some 
          degree of superiority over stick framing in resisting almost every hazard or 
          disaster scenario. Among its attributes are green, recyclable components, 
          true modular design versatility, high earthquake resistance and open 
          architecture.  
           
    D. Manufacturing 
       a. Prefabrication of elements, accessories in quality controlled environmental 
          typically saves energy and helps precise product assembly on the site. 
       b. Efficient fabrication reduces emissions and waste. 
       c. Building code approval, product certification and certified inspectors helps in 
          establishing effective environmental construction processes. 
                                                 
 US SYSTEMS| MHS | PO BOX 51478 | IRVINE |CA 92619| USA | +1‐877‐880‐5979 | FAX: +1‐949‐266‐8925 
                           Email: office@modularhousingsystem.com 
                                  Copyright © US SYSTEMS LLC
MHS Sustainability Report‐2010 
 



                                                                                                     
 
            
            
    E. Distribution 
       a. Lighter building products decrease CO2 emissions and transportation impacts 
           and costs 
       b. Reduced number of the system components, standard dimensions help in 
           package design increases the number of products per pallet, reducing 
           product transport environmental burden. Transportation by sea allows for 
           more efficient shipments with lower environmental impact. 
       c. MHS regional fabricator licensee, distributor, JV partnership and using local 
           manufacturing plants reducing MHS building system environmental impacts. 
            
    F. Use of System 
       a. Efficient architectural modular design decrease energy consumption 
       b. Multi‐functional building system reduce energy and materials use. 
       c. Environmental product features reduce total cost of construction. 
       d. Higher R values and thermal performance reduces system energy use. 
       e. MHS building envelope and its construction system help fossil fuel reduction 
           in saving consistent temperature in the building. 
            
    G. End‐of‐life 
       a. MHS manufacturing offers a variety of structure purchase back options, 
           including, re‐locate, donation, leasing, trade‐in, reuse on new project and 
           recycling. 
       b. Material selection and identification increase value at end‐of‐life and 
           facilitate recycling 
       c. Design features increase ease of disassembly, recycling and material reuse 
            
            
            
            
            
            
            
            
 
 
 

                                                 
 US SYSTEMS| MHS | PO BOX 51478 | IRVINE |CA 92619| USA | +1‐877‐880‐5979 | FAX: +1‐949‐266‐8925 
                           Email: office@modularhousingsystem.com 
                                  Copyright © US SYSTEMS LLC
MHS Sustainability Report‐2010 
 



                                                                                                     
 
The Questionnaires:  
SUSTAINABILITY: RENEWABLE RESOURCES 
    1.   Measures the manufacturer has taken to minimize energy usage in the production. 
        
       a. Production of MHS aluminum extrusions used much less energy than steel and 
           concrete building elements. Aluminum profile’s weight is almost 3 times less than 
           steel, compare using of energy for producing, packaging, transportation, structure 
           erection, installation, equipments and labor time for steel or concrete building. 
       b. MHS aluminum extrusions from Billets to final fabrications take less than 5 kilowatt 
           hours of electricity. 
       c. Developing and collecting renewable and reusable natural resources and use for 
           building structure is a sustainable investment and help energy consumption 
           performance as well as environmental and economy business practice. 
       d. MHS building envelope and its construction methods help fossil fuel reduction in 
           saving consistent temperature in the building. 
       e. Sustainable Structure design strategies, accept on‐site renewable power system 
           structure as well as green roof products. 

 
    2.  Embodied energy study of the product from extraction of raw material through 
       production and assembly. Include an estimate for the total number of MJ (mega 
       joules) required per kg of finished products. 
        
       a. Aluminum extracted from Bauxite, The reserves of Bauxite is about 25 billion metric 
           tons and will be good enough to use like steel as a Structural Building Framing for 
           few century even without recycling the aluminum again. While it’s true that making 
           aluminum from Bauxite takes large amounts of electricity, For example, processing 1 
           kg of aluminum from ore requires 15.55 kilowatt hours of electricity ( 56 MJ). 
           Consequently, aluminum refining is profitable only where energy is inexpensive. 
           However the industries try to use of reusable energy to produce aluminum cheaper 
           and there are equally large amounts of aluminum that has already been produced. 
           Most of the Aluminum extruder, manufacturing purchase directly aluminum billets 
           from the sources. 
            
       b. Creating new aluminum from old metal requires only 3% of the energy needed to 
           create the aluminum in the first place. Recycled aluminum can be recycled again, 
           and again save all these vast quantities of resources and energy. Recycling 
           aluminum saves energy, the environment and resources.  
        

                                                 
 US SYSTEMS| MHS | PO BOX 51478 | IRVINE |CA 92619| USA | +1‐877‐880‐5979 | FAX: +1‐949‐266‐8925 
                           Email: office@modularhousingsystem.com 
                                  Copyright © US SYSTEMS LLC
MHS Sustainability Report‐2010 
 



                                                                                                      
 
              
     
    SUSTAINABILITY: RECYCLING 
            
     3. The manufacturer's policy and program to facilitate the recycling or reuse of its 
        product by accepting product returns at the end of their useful life. 
           a. MHS Aluminum framing is 100% reusable and recyclable without any loss of its 
           natural qualities. Recovery of the metal via recycling has become an important facet 
           of the aluminum industry. 
           b. MHS standard sandwich insulated prefabricated panel in filled with the framing 
           can be reusable over and over by modifying and using with other projects. 

     SUSTAINABILITY: MATERIAL REUSE 
         
     4. The possibility of direct reuse of the product disassembly. 
           a. MHS Aluminum framing is 100% reusable and recyclable without any loss of its 
           natural qualities. Recovery of the metal via recycling has become an important facet 
           of the aluminum industry. 
           b. MHS modular aluminum extrusions and its accessories could be use at any time 
           during or after 100 years with the similar projects or using by other industries like 
           Exhibit, store fixture, furniture, pavilion and partition fabricator. 
           c. MHS standard sandwich insulated prefabricated panel in filled within the 
           framing can be reuse over and over by modifying or repair for other projects. 
 
     PERFORMANCE: INSTALLATION 
     5. Special procedures and precautions to be used while handling and installing the 
        product. 
           a. Installation will be done based on the project assembly instruction manual and 
           safety procedures step by step, using simple construction tools and equipments.  
           b. MHS component’s installation advantages not only reduce the noise with quick 
           assembly almost 1/3 of traditional building, it is a dust free construction system and 
           save overall installation energy and building costs. MHS building system developed 
           healthy environment by using safe building framing components at the project 
           construction site. 
           c. MHS pre‐engineered components (Framing and panels) based on the project’s 
           shop drawing fabricated on the MHS prefab local plant and ship to the site for 
           assembly.   

                                                  
 US SYSTEMS| MHS | PO BOX 51478 | IRVINE |CA 92619| USA | +1‐877‐880‐5979 | FAX: +1‐949‐266‐8925 
                           Email: office@modularhousingsystem.com 
                                  Copyright © US SYSTEMS LLC
MHS Sustainability Report‐2010 
 



                                                                                                       
 
 

    6. Energy requirements for installation of the product. 
           a.  Light weight building structure use less energy 
           b.  Less labor and equipment for Assembly 
           c.  Speed of Constriction 
           d. Less transportation of building components, means less use of energy 
           e. Limited components, less energy used for component’s fabrication, less labor 
           for installation. Compare it to Steel and concrete construction. 
           f. No use of heavy equipment, 12 feet MHS extrusion framing member can carry 
           just with one worker for assembly on the building site. Compare it with re‐
           placement of one steel I beam at the job site. 
           g. MHS Aluminum framing is reusable product by itself that means after lifetime 
           period still Easy to assemble up to tolerance of 1/8” by unskilled worker, unlike steel 
           and wood stud construction.   
            
    7.  Identify accessories, such as fasteners, sealers, and adhesives that are nontoxic (or 
       less toxic than industry standard), energy efficient, 
           a. MHS framing accessories are mechanical locking and bolting connections and 
           using typical fasteners with 100% nontoxic materials. 
           b. Using small amount of certified organic sealant, EPS foam injection for the joint 
           used between the panels and extrusions. 
           c.  Approved certified Grace Water resistive barrier  and flashing tape will be used 
           on the exterior facing over OSB/EPS or FSIP panels.  
                 
        
     PERFORMANCE: CONSTRUCTION WASTE  

     
    8. Product disposal after end of life, stipulate preferred method and restrictions that 
       might apply. 
          a. There are no disposable items found in the MHS building framing disassembly 
          process. All elements are 100% recyclable, renewable or reusable. 
          b. MHS manufacturing offers a variety of structure purchase back options, 
          including, re‐locate, donation, leasing, trade‐in, reuse on new project and recycling. 
          c. Materials selection and identification increase value at end‐of‐life and facilitate 
          recycling. 
          d. Design features increase ease of disassembly, recycling and material reuse 
 

    9. The environmental impact of the product as a waste material. 

                                                  
 US SYSTEMS| MHS | PO BOX 51478 | IRVINE |CA 92619| USA | +1‐877‐880‐5979 | FAX: +1‐949‐266‐8925 
                           Email: office@modularhousingsystem.com 
                                  Copyright © US SYSTEMS LLC
MHS Sustainability Report‐2010 
 



                                                                                                         
 
            a. No waste: If a traditional building is to be constructed on site, tons of waste is to 
            be expected. 
            b. In case of MHS buildings, this is not the case. Prefabricated components building 
            engineered at the MHS fabrication facility in accordance with pre‐decided 
            dimensions and completely recyclable material guarantee that there is no residual 
            waste. 
            c. Compared to Traditional Residential structures the environmental impacts of a 
            MHS structure is reduced to zero waste materials even after end of the life cycle of a 
            product. 
            d. Reducing environmental impacts across the product life cycle, Design for 
            Environment, Choose of Materials, Manufacturing, Durability, Distribution, System 
            Use, End of the life 
         
    PERFORMANCE: MAINTENANCE 
     
    10. The recommended cleaning & maintenance procedures for the product. 
           a. Exposed Anodized Aluminum Framing is easy to clean with the water, thinner 
           and alcohol and it is maintenance free for long time.  
           b. Sip panel cover with the cladding base on project architectural design and third 
           party product instructions. 
 
    11. Are replacement parts available? If yes, can replacement parts be installed in the 
        field? 
             a. All MHS elements, accessories, standard panels available for place of order 24 
             hour s a day through our MHS distribution worldwide. 
             b. Structural members, parts replacement, addition and expansion can be installed 
             in the filed by certified MHS licensee technician or a local licensed contractor.  
              
     
    PERFORMANCE: OPERATION 
     
    12. Estimated amount of energy in KWhr required operating the product when new, after 
        five years and ten years. 
              a. Purchasing energy for all new MHS local fabrication facility and new MHS 
            buildings shall be reduced to:  
            40% in 2010  
            30% in 2015  
            20% in 2020  
            10% in 2025 

                                                  
 US SYSTEMS| MHS | PO BOX 51478 | IRVINE |CA 92619| USA | +1‐877‐880‐5979 | FAX: +1‐949‐266‐8925 
                           Email: office@modularhousingsystem.com 
                                  Copyright © US SYSTEMS LLC
MHS Sustainability Report‐2010 
 



                                                                                                       
 
             b. Estimate of amount of energy are not available at this time, MHS fabrication 
            facility intent to use renewable energy to fabricate its prefabricated building 
            structure components. 
             c. MHS prefab fabrication will be establish for local production using MHS building 
            system technology and intent to help local economy to produce sustainable 
            prefabricated building components for the region projects with lower cost and 
            sustainability.  
 
    13. The certifications the manufacturer or the product hold 
           a. Code Compliance. MHS Aluminum framing is tested and analysis in according of 
           the international code standards (IBC, UBC, ASCE 7‐05, Aluminum Design Manual). 
           Its non‐combustibility and high strength allow its use in buildings up to 3‐story high 
           with shear wall.  www.modularhousingsystem.com 
           b.  California and Los Angeles building codes general approval  LARR‐25703L‐12‐08  
           c. Abu Dhabi,   Building code approval #1142‐ 2008, #452‐ 2009 
           d. Approval test reports‐ Certified Smith Emery Laboratory, Los Angeles (reference 
           MHS QC manual) 
           e. Structural analysis approval by certified structural engineering group, California.  
           f. We are continuing with our research and development including more testing, 
           approval with third parties for better performance of MHS green construction 
           methodology globally. 
           g. MHS is eager to introduce the MHS system for quality residential and 
           commercial projects worldwide. 
            
            
            
            
            
            
            
            




                                                  
 US SYSTEMS| MHS | PO BOX 51478 | IRVINE |CA 92619| USA | +1‐877‐880‐5979 | FAX: +1‐949‐266‐8925 
                           Email: office@modularhousingsystem.com 
                                  Copyright © US SYSTEMS LLC

Weitere ähnliche Inhalte

Was ist angesagt?

Modular Construction Advancements
Modular Construction AdvancementsModular Construction Advancements
Modular Construction AdvancementsAkhil Saxena
 
Modular building seminar REPORT 2
Modular building seminar REPORT 2Modular building seminar REPORT 2
Modular building seminar REPORT 2Sabik Np
 
Overview of Modular Construction
Overview of Modular ConstructionOverview of Modular Construction
Overview of Modular ConstructionRusty Williams
 
Modern Building Codes: Keeping Pace with the Wood Revolution
Modern Building Codes: Keeping Pace with the Wood RevolutionModern Building Codes: Keeping Pace with the Wood Revolution
Modern Building Codes: Keeping Pace with the Wood RevolutionThink Wood
 
Shipping Container Architecture
Shipping Container Architecture Shipping Container Architecture
Shipping Container Architecture Nicholas Socrates
 
Modular Buildings:Misconception-vs-Truth
Modular Buildings:Misconception-vs-TruthModular Buildings:Misconception-vs-Truth
Modular Buildings:Misconception-vs-TruthM SPACE
 
Roofing System Selection
Roofing System SelectionRoofing System Selection
Roofing System SelectionTony Loup
 
PREFABRICATION AND MODULAR COORDINATION
PREFABRICATION AND MODULAR COORDINATIONPREFABRICATION AND MODULAR COORDINATION
PREFABRICATION AND MODULAR COORDINATIONsreestr18
 
Think Wood - Taller Wood Buildings are Possible and Happening Infographic
Think Wood - Taller Wood Buildings are Possible and Happening InfographicThink Wood - Taller Wood Buildings are Possible and Happening Infographic
Think Wood - Taller Wood Buildings are Possible and Happening InfographicThink Wood
 
Mid-Rise Wood Construction
Mid-Rise Wood ConstructionMid-Rise Wood Construction
Mid-Rise Wood ConstructionThink Wood
 
Off-site and on -site modern method of construction
Off-site and on -site modern method of constructionOff-site and on -site modern method of construction
Off-site and on -site modern method of constructionANNA REBECCA PRASAD
 
Prefabricated Modular Buildings
Prefabricated Modular BuildingsPrefabricated Modular Buildings
Prefabricated Modular Buildingsbusiness-plan
 
Survey of international tall wood buildings 2015 re think wood presentation
Survey of international tall wood buildings 2015 re think wood presentationSurvey of international tall wood buildings 2015 re think wood presentation
Survey of international tall wood buildings 2015 re think wood presentationThink Wood
 
Modular/Prefab Architectural Design Seminar
Modular/Prefab Architectural Design SeminarModular/Prefab Architectural Design Seminar
Modular/Prefab Architectural Design Seminarasaphouse
 
Capitalizing on modular construction as the next frontier for innovation
Capitalizing on modular construction as the  next frontier for innovationCapitalizing on modular construction as the  next frontier for innovation
Capitalizing on modular construction as the next frontier for innovationSJVijay
 

Was ist angesagt? (20)

Modular Construction Advancements
Modular Construction AdvancementsModular Construction Advancements
Modular Construction Advancements
 
Modular building seminar REPORT 2
Modular building seminar REPORT 2Modular building seminar REPORT 2
Modular building seminar REPORT 2
 
Modular construction ppt
Modular construction pptModular construction ppt
Modular construction ppt
 
Overview of Modular Construction
Overview of Modular ConstructionOverview of Modular Construction
Overview of Modular Construction
 
076 Modular Construction
076 Modular Construction076 Modular Construction
076 Modular Construction
 
Modern Building Codes: Keeping Pace with the Wood Revolution
Modern Building Codes: Keeping Pace with the Wood RevolutionModern Building Codes: Keeping Pace with the Wood Revolution
Modern Building Codes: Keeping Pace with the Wood Revolution
 
Shipping Container Architecture
Shipping Container Architecture Shipping Container Architecture
Shipping Container Architecture
 
Modular Buildings:Misconception-vs-Truth
Modular Buildings:Misconception-vs-TruthModular Buildings:Misconception-vs-Truth
Modular Buildings:Misconception-vs-Truth
 
Modular housing/building
Modular housing/buildingModular housing/building
Modular housing/building
 
Roofing System Selection
Roofing System SelectionRoofing System Selection
Roofing System Selection
 
PREFABRICATION AND MODULAR COORDINATION
PREFABRICATION AND MODULAR COORDINATIONPREFABRICATION AND MODULAR COORDINATION
PREFABRICATION AND MODULAR COORDINATION
 
Think Wood - Taller Wood Buildings are Possible and Happening Infographic
Think Wood - Taller Wood Buildings are Possible and Happening InfographicThink Wood - Taller Wood Buildings are Possible and Happening Infographic
Think Wood - Taller Wood Buildings are Possible and Happening Infographic
 
CBS, handout, green 4p
CBS, handout, green   4pCBS, handout, green   4p
CBS, handout, green 4p
 
Mid-Rise Wood Construction
Mid-Rise Wood ConstructionMid-Rise Wood Construction
Mid-Rise Wood Construction
 
Off-site and on -site modern method of construction
Off-site and on -site modern method of constructionOff-site and on -site modern method of construction
Off-site and on -site modern method of construction
 
Modular Construction
Modular ConstructionModular Construction
Modular Construction
 
Prefabricated Modular Buildings
Prefabricated Modular BuildingsPrefabricated Modular Buildings
Prefabricated Modular Buildings
 
Survey of international tall wood buildings 2015 re think wood presentation
Survey of international tall wood buildings 2015 re think wood presentationSurvey of international tall wood buildings 2015 re think wood presentation
Survey of international tall wood buildings 2015 re think wood presentation
 
Modular/Prefab Architectural Design Seminar
Modular/Prefab Architectural Design SeminarModular/Prefab Architectural Design Seminar
Modular/Prefab Architectural Design Seminar
 
Capitalizing on modular construction as the next frontier for innovation
Capitalizing on modular construction as the  next frontier for innovationCapitalizing on modular construction as the  next frontier for innovation
Capitalizing on modular construction as the next frontier for innovation
 

Andere mochten auch

Andere mochten auch (10)

The Malaysian Government Interopersbility Framework For Open Source Software ...
The Malaysian Government Interopersbility Framework For Open Source Software ...The Malaysian Government Interopersbility Framework For Open Source Software ...
The Malaysian Government Interopersbility Framework For Open Source Software ...
 
MHS Motives 2012
MHS Motives 2012MHS Motives 2012
MHS Motives 2012
 
Ibm green expo
Ibm green expoIbm green expo
Ibm green expo
 
Case Study
Case StudyCase Study
Case Study
 
Resource Positive Architecture
Resource Positive ArchitectureResource Positive Architecture
Resource Positive Architecture
 
Green Modular Homes
Green Modular Homes Green Modular Homes
Green Modular Homes
 
Modular 2.0
Modular 2.0Modular 2.0
Modular 2.0
 
Sustainable Building Design with Shipping Containers
Sustainable Building Design with Shipping ContainersSustainable Building Design with Shipping Containers
Sustainable Building Design with Shipping Containers
 
Smart city
Smart citySmart city
Smart city
 
Green technology
Green technologyGreen technology
Green technology
 

Ähnlich wie MHS Sustainability Report

Graded unit Civil engineering Presentation
Graded unit Civil engineering PresentationGraded unit Civil engineering Presentation
Graded unit Civil engineering PresentationTehmas Saeed
 
المحاضرة 155 بعنوان التصميم البيئى فى الاجواء الحارة
المحاضرة 155 بعنوان التصميم البيئى فى الاجواء الحارةالمحاضرة 155 بعنوان التصميم البيئى فى الاجواء الحارة
المحاضرة 155 بعنوان التصميم البيئى فى الاجواء الحارةEgyptian Engineers Association
 
IRJET- Design of Modular Housing
IRJET-  	  Design of Modular HousingIRJET-  	  Design of Modular Housing
IRJET- Design of Modular HousingIRJET Journal
 
Bendable concrete web_41708
Bendable concrete web_41708Bendable concrete web_41708
Bendable concrete web_41708Mohammed Ashraf
 
LEED Components of Boomerang Building
LEED Components of Boomerang BuildingLEED Components of Boomerang Building
LEED Components of Boomerang BuildingBeth Wilson
 
COMPARATIVE STUDY OF SUSTAINABLE MATERIALS FOR REPLACEMENT OF STEEL REINFORCE...
COMPARATIVE STUDY OF SUSTAINABLE MATERIALS FOR REPLACEMENT OF STEEL REINFORCE...COMPARATIVE STUDY OF SUSTAINABLE MATERIALS FOR REPLACEMENT OF STEEL REINFORCE...
COMPARATIVE STUDY OF SUSTAINABLE MATERIALS FOR REPLACEMENT OF STEEL REINFORCE...IRJET Journal
 
What Is A Sustainable Viewing Platform?
What Is A Sustainable Viewing Platform?What Is A Sustainable Viewing Platform?
What Is A Sustainable Viewing Platform?CarebCustoms
 
Advance section properties_for_students
Advance section properties_for_studentsAdvance section properties_for_students
Advance section properties_for_studentsChhay Teng
 
Unit5 design for_x
Unit5 design for_xUnit5 design for_x
Unit5 design for_xAtul Joshi
 
Advanced Design Methods - Sustainable design presentation
Advanced Design Methods - Sustainable design presentationAdvanced Design Methods - Sustainable design presentation
Advanced Design Methods - Sustainable design presentationKerrie Noble
 

Ähnlich wie MHS Sustainability Report (20)

Ananka
AnankaAnanka
Ananka
 
Ananka
AnankaAnanka
Ananka
 
Ananka
AnankaAnanka
Ananka
 
Ananka
AnankaAnanka
Ananka
 
GREEN BUILDING
GREEN BUILDINGGREEN BUILDING
GREEN BUILDING
 
NRC _Green Intelligent Buildings
NRC _Green Intelligent BuildingsNRC _Green Intelligent Buildings
NRC _Green Intelligent Buildings
 
Graded unit Civil engineering Presentation
Graded unit Civil engineering PresentationGraded unit Civil engineering Presentation
Graded unit Civil engineering Presentation
 
المحاضرة 155 بعنوان التصميم البيئى فى الاجواء الحارة
المحاضرة 155 بعنوان التصميم البيئى فى الاجواء الحارةالمحاضرة 155 بعنوان التصميم البيئى فى الاجواء الحارة
المحاضرة 155 بعنوان التصميم البيئى فى الاجواء الحارة
 
IRJET- Design of Modular Housing
IRJET-  	  Design of Modular HousingIRJET-  	  Design of Modular Housing
IRJET- Design of Modular Housing
 
Bendable concrete web_41708
Bendable concrete web_41708Bendable concrete web_41708
Bendable concrete web_41708
 
LEED Components of Boomerang Building
LEED Components of Boomerang BuildingLEED Components of Boomerang Building
LEED Components of Boomerang Building
 
COMPARATIVE STUDY OF SUSTAINABLE MATERIALS FOR REPLACEMENT OF STEEL REINFORCE...
COMPARATIVE STUDY OF SUSTAINABLE MATERIALS FOR REPLACEMENT OF STEEL REINFORCE...COMPARATIVE STUDY OF SUSTAINABLE MATERIALS FOR REPLACEMENT OF STEEL REINFORCE...
COMPARATIVE STUDY OF SUSTAINABLE MATERIALS FOR REPLACEMENT OF STEEL REINFORCE...
 
Group 3 sustainablity
Group 3 sustainablityGroup 3 sustainablity
Group 3 sustainablity
 
What Is A Sustainable Viewing Platform?
What Is A Sustainable Viewing Platform?What Is A Sustainable Viewing Platform?
What Is A Sustainable Viewing Platform?
 
Advance section properties_for_students
Advance section properties_for_studentsAdvance section properties_for_students
Advance section properties_for_students
 
Ubs business details pdf
Ubs business details pdfUbs business details pdf
Ubs business details pdf
 
1) UBS full Details PDF
1) UBS full Details PDF1) UBS full Details PDF
1) UBS full Details PDF
 
Unit5 design for_x
Unit5 design for_xUnit5 design for_x
Unit5 design for_x
 
Advanced Design Methods - Sustainable design presentation
Advanced Design Methods - Sustainable design presentationAdvanced Design Methods - Sustainable design presentation
Advanced Design Methods - Sustainable design presentation
 
Think Differently About the Cost of Your Building.
Think Differently About the Cost of Your Building.Think Differently About the Cost of Your Building.
Think Differently About the Cost of Your Building.
 

MHS Sustainability Report

  • 1. MHS Sustainability Report‐2010  MHS SUSTAINABILITY Environmentally, Economically, Modularity, Reusability, Expandability, Relocatability, Renewability, Recyclability Reducing environmental impacts Making sustainability reality   © www.modularhousingsystem.com   10
  • 2. MHS Sustainability Report‐2010        This report includes information on our North American operations; and does not cover our  joint venture operations.  We invite you to browse our site and learn more about MHSs sustainability approach, programs  and results. It’s a building system, invented and created for sustainable light residential  construction with less environmental impact.  Thank you for your interest in our company.   Regards  Tim Siahatgar, Assoc AIA, Inventor                                                    ©  MHS      MHS Building System, Reducing environmental  impacts across the system life cycle  The Modular Housing System (MHS) was developed by Tim Siahatgar, architectural engineer  and founder of Unique Structural Systems. www.modularhousingsystem.com.  This post frame system is composed of MHS aluminum structural members connected by a  patented, quickly‐connect bolt and clamp technology. Typically it is designed to be used with  sandwich panels which fit within the unique channel configurations of the MHS aluminum  framing members.            US SYSTEMS| MHS | PO BOX 51478 | IRVINE |CA 92619| USA | +1‐877‐880‐5979 | FAX: +1‐949‐266‐8925  Email: office@modularhousingsystem.com  Copyright © US SYSTEMS LLC
  • 3. MHS Sustainability Report‐2010          The growth of aluminum industry, advanced extrusion machinery, the characteristic and  properties of aluminum as a material have led to evolutionary and innovative changes in  building techniques, architectural and engineering projects.    MHS works to foster effective collaboration between all the members of the MHS design and  construction teams with the goal of using this technology in a cost‐effective way to meet each  client’s particular needs. The MHS aluminum‐based system works ideally with standard SIPs or  with metal‐skinned and hardwood SIPs as alternatives which require further finishing for wall  covering and siding. While the twin grooves in the extruded aluminum framing members were  designed to be fitted with almost any kind of panel, the strength of the SIP is preferred. Thus,  walls can be assembled using a weather‐resistant panel on the exterior surface side of the  framing component, such as sheet metal, foamed aluminum panel or even ferro‐cement panel.  On the interior side the groove can be fitted with a hardwood dovetail board, cork, cloth‐ covered panel or simple drywall. Due to the fact that panels are set within the flanges of the  channels at all four sides, issues or problems with panel connections are eliminated.    In designing a modernist, pavilion home one eliminates this issue altogether by relying on  window walls for most of the exterior, with light partitions and sliding panel screens inside. The  ability of the MHS system to integrate smaller‐scale US Systems framing units’ means there is a  ready method of integrating built‐in furnishings, an advantage in approaching the next stage of  construction.  Due to the unique properties of aluminum (among them its light weight) and the patented bolt‐ and‐clamp connections, the MHS system offers some degree of superiority over stick framing in  resisting almost every hazard or disaster scenario. Among its attributes are green, recyclable  components, true modular design versatility, high earthquake resistance and open architecture    Perhaps the most innovated feature of MHS is its reuse and relocatability –precisely the feature  that stud frame construction is lacking. With MHS one can freely and quickly disassemble, repair  or modify, and then reassemble structures without causing any damage to the components and  materials using little more than a few hand tools. Combined with the virtues of modular space  frame geometry, this affords the system a flexibility, capability and economy impossible with  other methods of construction.             US SYSTEMS| MHS | PO BOX 51478 | IRVINE |CA 92619| USA | +1‐877‐880‐5979 | FAX: +1‐949‐266‐8925  Email: office@modularhousingsystem.com  Copyright © US SYSTEMS LLC
  • 4. MHS Sustainability Report‐2010        Why MHS Building Systems Reduces Environmental Impact:    A. Designed for Environment  a. Standard components allows to meet a modular design  b. Dimensionally modular, Speed on architectural design and site assembly  reducing time and energy.  c. Conformance with international environmental expectations and green  criteria increases materials and energy efficiency  d. Reusable resources and Recycled contents are used  e.  Designed for easy assembly, disassembly and recycling  f. Sustainable Structure design strategies, accept on‐site renewable power  system as well as green roof products.    B. Choose of Materials   a. Use of renewable resources  b. Reduction in the number of different material types used in construction.  c. Reduction in product size uses fewer resources  d. Recycled materials are used in finishing, interior products  e. Restricted substances are reduced or eliminated    C. Durability  a. Another important feature of aluminum buildings is that they are very  sturdy. MHS aluminum framed buildings are heat‐resistant and are strong  enough to withstand climatic changes.  b.  Due to the unique properties of aluminum (among them its light weight) and  the patented bolt‐and‐clamp connections, the MHS system offers some  degree of superiority over stick framing in resisting almost every hazard or  disaster scenario. Among its attributes are green, recyclable components,  true modular design versatility, high earthquake resistance and open  architecture.     D. Manufacturing  a. Prefabrication of elements, accessories in quality controlled environmental  typically saves energy and helps precise product assembly on the site.  b. Efficient fabrication reduces emissions and waste.  c. Building code approval, product certification and certified inspectors helps in  establishing effective environmental construction processes.     US SYSTEMS| MHS | PO BOX 51478 | IRVINE |CA 92619| USA | +1‐877‐880‐5979 | FAX: +1‐949‐266‐8925  Email: office@modularhousingsystem.com  Copyright © US SYSTEMS LLC
  • 5. MHS Sustainability Report‐2010            E. Distribution  a. Lighter building products decrease CO2 emissions and transportation impacts  and costs  b. Reduced number of the system components, standard dimensions help in  package design increases the number of products per pallet, reducing  product transport environmental burden. Transportation by sea allows for  more efficient shipments with lower environmental impact.  c. MHS regional fabricator licensee, distributor, JV partnership and using local  manufacturing plants reducing MHS building system environmental impacts.    F. Use of System  a. Efficient architectural modular design decrease energy consumption  b. Multi‐functional building system reduce energy and materials use.  c. Environmental product features reduce total cost of construction.  d. Higher R values and thermal performance reduces system energy use.  e. MHS building envelope and its construction system help fossil fuel reduction  in saving consistent temperature in the building.    G. End‐of‐life  a. MHS manufacturing offers a variety of structure purchase back options,  including, re‐locate, donation, leasing, trade‐in, reuse on new project and  recycling.  b. Material selection and identification increase value at end‐of‐life and  facilitate recycling  c. Design features increase ease of disassembly, recycling and material reuse                           US SYSTEMS| MHS | PO BOX 51478 | IRVINE |CA 92619| USA | +1‐877‐880‐5979 | FAX: +1‐949‐266‐8925  Email: office@modularhousingsystem.com  Copyright © US SYSTEMS LLC
  • 6. MHS Sustainability Report‐2010        The Questionnaires:   SUSTAINABILITY: RENEWABLE RESOURCES  1.   Measures the manufacturer has taken to minimize energy usage in the production.    a. Production of MHS aluminum extrusions used much less energy than steel and  concrete building elements. Aluminum profile’s weight is almost 3 times less than  steel, compare using of energy for producing, packaging, transportation, structure  erection, installation, equipments and labor time for steel or concrete building.  b. MHS aluminum extrusions from Billets to final fabrications take less than 5 kilowatt  hours of electricity.  c. Developing and collecting renewable and reusable natural resources and use for  building structure is a sustainable investment and help energy consumption  performance as well as environmental and economy business practice.  d. MHS building envelope and its construction methods help fossil fuel reduction in  saving consistent temperature in the building.  e. Sustainable Structure design strategies, accept on‐site renewable power system  structure as well as green roof products.    2.  Embodied energy study of the product from extraction of raw material through  production and assembly. Include an estimate for the total number of MJ (mega  joules) required per kg of finished products.    a. Aluminum extracted from Bauxite, The reserves of Bauxite is about 25 billion metric  tons and will be good enough to use like steel as a Structural Building Framing for  few century even without recycling the aluminum again. While it’s true that making  aluminum from Bauxite takes large amounts of electricity, For example, processing 1  kg of aluminum from ore requires 15.55 kilowatt hours of electricity ( 56 MJ).  Consequently, aluminum refining is profitable only where energy is inexpensive.  However the industries try to use of reusable energy to produce aluminum cheaper  and there are equally large amounts of aluminum that has already been produced.  Most of the Aluminum extruder, manufacturing purchase directly aluminum billets  from the sources.    b. Creating new aluminum from old metal requires only 3% of the energy needed to  create the aluminum in the first place. Recycled aluminum can be recycled again,  and again save all these vast quantities of resources and energy. Recycling  aluminum saves energy, the environment and resources.        US SYSTEMS| MHS | PO BOX 51478 | IRVINE |CA 92619| USA | +1‐877‐880‐5979 | FAX: +1‐949‐266‐8925  Email: office@modularhousingsystem.com  Copyright © US SYSTEMS LLC
  • 7. MHS Sustainability Report‐2010            SUSTAINABILITY: RECYCLING    3. The manufacturer's policy and program to facilitate the recycling or reuse of its  product by accepting product returns at the end of their useful life.  a. MHS Aluminum framing is 100% reusable and recyclable without any loss of its  natural qualities. Recovery of the metal via recycling has become an important facet  of the aluminum industry.  b. MHS standard sandwich insulated prefabricated panel in filled with the framing  can be reusable over and over by modifying and using with other projects.  SUSTAINABILITY: MATERIAL REUSE    4. The possibility of direct reuse of the product disassembly.  a. MHS Aluminum framing is 100% reusable and recyclable without any loss of its  natural qualities. Recovery of the metal via recycling has become an important facet  of the aluminum industry.  b. MHS modular aluminum extrusions and its accessories could be use at any time  during or after 100 years with the similar projects or using by other industries like  Exhibit, store fixture, furniture, pavilion and partition fabricator.  c. MHS standard sandwich insulated prefabricated panel in filled within the  framing can be reuse over and over by modifying or repair for other projects.    PERFORMANCE: INSTALLATION  5. Special procedures and precautions to be used while handling and installing the  product.  a. Installation will be done based on the project assembly instruction manual and  safety procedures step by step, using simple construction tools and equipments.   b. MHS component’s installation advantages not only reduce the noise with quick  assembly almost 1/3 of traditional building, it is a dust free construction system and  save overall installation energy and building costs. MHS building system developed  healthy environment by using safe building framing components at the project  construction site.  c. MHS pre‐engineered components (Framing and panels) based on the project’s  shop drawing fabricated on the MHS prefab local plant and ship to the site for  assembly.       US SYSTEMS| MHS | PO BOX 51478 | IRVINE |CA 92619| USA | +1‐877‐880‐5979 | FAX: +1‐949‐266‐8925  Email: office@modularhousingsystem.com  Copyright © US SYSTEMS LLC
  • 8. MHS Sustainability Report‐2010          6. Energy requirements for installation of the product.  a.  Light weight building structure use less energy  b.  Less labor and equipment for Assembly  c.  Speed of Constriction  d. Less transportation of building components, means less use of energy  e. Limited components, less energy used for component’s fabrication, less labor  for installation. Compare it to Steel and concrete construction.  f. No use of heavy equipment, 12 feet MHS extrusion framing member can carry  just with one worker for assembly on the building site. Compare it with re‐ placement of one steel I beam at the job site.  g. MHS Aluminum framing is reusable product by itself that means after lifetime  period still Easy to assemble up to tolerance of 1/8” by unskilled worker, unlike steel  and wood stud construction.      7.  Identify accessories, such as fasteners, sealers, and adhesives that are nontoxic (or  less toxic than industry standard), energy efficient,  a. MHS framing accessories are mechanical locking and bolting connections and  using typical fasteners with 100% nontoxic materials.  b. Using small amount of certified organic sealant, EPS foam injection for the joint  used between the panels and extrusions.  c.  Approved certified Grace Water resistive barrier  and flashing tape will be used  on the exterior facing over OSB/EPS or FSIP panels.            PERFORMANCE: CONSTRUCTION WASTE     8. Product disposal after end of life, stipulate preferred method and restrictions that  might apply.  a. There are no disposable items found in the MHS building framing disassembly  process. All elements are 100% recyclable, renewable or reusable.  b. MHS manufacturing offers a variety of structure purchase back options,  including, re‐locate, donation, leasing, trade‐in, reuse on new project and recycling.  c. Materials selection and identification increase value at end‐of‐life and facilitate  recycling.  d. Design features increase ease of disassembly, recycling and material reuse    9. The environmental impact of the product as a waste material.     US SYSTEMS| MHS | PO BOX 51478 | IRVINE |CA 92619| USA | +1‐877‐880‐5979 | FAX: +1‐949‐266‐8925  Email: office@modularhousingsystem.com  Copyright © US SYSTEMS LLC
  • 9. MHS Sustainability Report‐2010        a. No waste: If a traditional building is to be constructed on site, tons of waste is to  be expected.  b. In case of MHS buildings, this is not the case. Prefabricated components building  engineered at the MHS fabrication facility in accordance with pre‐decided  dimensions and completely recyclable material guarantee that there is no residual  waste.  c. Compared to Traditional Residential structures the environmental impacts of a  MHS structure is reduced to zero waste materials even after end of the life cycle of a  product.  d. Reducing environmental impacts across the product life cycle, Design for  Environment, Choose of Materials, Manufacturing, Durability, Distribution, System  Use, End of the life    PERFORMANCE: MAINTENANCE    10. The recommended cleaning & maintenance procedures for the product.  a. Exposed Anodized Aluminum Framing is easy to clean with the water, thinner  and alcohol and it is maintenance free for long time.   b. Sip panel cover with the cladding base on project architectural design and third  party product instructions.    11. Are replacement parts available? If yes, can replacement parts be installed in the  field?  a. All MHS elements, accessories, standard panels available for place of order 24  hour s a day through our MHS distribution worldwide.  b. Structural members, parts replacement, addition and expansion can be installed  in the filed by certified MHS licensee technician or a local licensed contractor.       PERFORMANCE: OPERATION    12. Estimated amount of energy in KWhr required operating the product when new, after  five years and ten years.  a. Purchasing energy for all new MHS local fabrication facility and new MHS  buildings shall be reduced to:   40% in 2010   30% in 2015   20% in 2020   10% in 2025     US SYSTEMS| MHS | PO BOX 51478 | IRVINE |CA 92619| USA | +1‐877‐880‐5979 | FAX: +1‐949‐266‐8925  Email: office@modularhousingsystem.com  Copyright © US SYSTEMS LLC
  • 10. MHS Sustainability Report‐2010        b. Estimate of amount of energy are not available at this time, MHS fabrication  facility intent to use renewable energy to fabricate its prefabricated building  structure components.  c. MHS prefab fabrication will be establish for local production using MHS building  system technology and intent to help local economy to produce sustainable  prefabricated building components for the region projects with lower cost and  sustainability.     13. The certifications the manufacturer or the product hold  a. Code Compliance. MHS Aluminum framing is tested and analysis in according of  the international code standards (IBC, UBC, ASCE 7‐05, Aluminum Design Manual).  Its non‐combustibility and high strength allow its use in buildings up to 3‐story high  with shear wall.  www.modularhousingsystem.com  b.  California and Los Angeles building codes general approval  LARR‐25703L‐12‐08   c. Abu Dhabi,   Building code approval #1142‐ 2008, #452‐ 2009  d. Approval test reports‐ Certified Smith Emery Laboratory, Los Angeles (reference  MHS QC manual)  e. Structural analysis approval by certified structural engineering group, California.   f. We are continuing with our research and development including more testing,  approval with third parties for better performance of MHS green construction  methodology globally.  g. MHS is eager to introduce the MHS system for quality residential and  commercial projects worldwide.                     US SYSTEMS| MHS | PO BOX 51478 | IRVINE |CA 92619| USA | +1‐877‐880‐5979 | FAX: +1‐949‐266‐8925  Email: office@modularhousingsystem.com  Copyright © US SYSTEMS LLC