SlideShare ist ein Scribd-Unternehmen logo

Weitere ähnliche Inhalte

Was ist angesagt? (19)

1200 10
1200 101200 10
1200 10
 
2770 1
2770 12770 1
2770 1
 
1200 8
1200 81200 8
1200 8
 
1200 13
1200 131200 13
1200 13
 
1200 7
1200 71200 7
1200 7
 
1200 14
1200 141200 14
1200 14
 
1200 2
1200 21200 2
1200 2
 
2974 4
2974 42974 4
2974 4
 
2174
21742174
2174
 
1200 4
1200 41200 4
1200 4
 
1200 3
1200 31200 3
1200 3
 
875 1
875 1875 1
875 1
 
1200 5
1200 51200 5
1200 5
 
6923
69236923
6923
 
432 1
432 1432 1
432 1
 
4101 2
4101 24101 2
4101 2
 
7436 2
7436 27436 2
7436 2
 
1200 27
1200 271200 27
1200 27
 
7251
72517251
7251
 

Andere mochten auch (20)

2185 3
2185 32185 3
2185 3
 
6512
65126512
6512
 
2386 3
2386 32386 3
2386 3
 
7246
72467246
7246
 
2010 bm
2010 bm2010 bm
2010 bm
 
5878 5
5878 55878 5
5878 5
 
2010 es
2010 es2010 es
2010 es
 
Force Tools Catalogue
Force Tools CatalogueForce Tools Catalogue
Force Tools Catalogue
 
Motor
MotorMotor
Motor
 
Force special0809
Force special0809Force special0809
Force special0809
 
Force additional2008
Force additional2008Force additional2008
Force additional2008
 
Stantards, ISO(INTERNATIONAL STANTARD ORGANAIZATION),BSI(Bureau of Indian Sta...
Stantards, ISO(INTERNATIONAL STANTARD ORGANAIZATION),BSI(Bureau of Indian Sta...Stantards, ISO(INTERNATIONAL STANTARD ORGANAIZATION),BSI(Bureau of Indian Sta...
Stantards, ISO(INTERNATIONAL STANTARD ORGANAIZATION),BSI(Bureau of Indian Sta...
 
Iso
IsoIso
Iso
 
Bureau of Indian Standards(BIS)
Bureau of Indian Standards(BIS)Bureau of Indian Standards(BIS)
Bureau of Indian Standards(BIS)
 
BIS
BISBIS
BIS
 
BIS and ISO
BIS and ISOBIS and ISO
BIS and ISO
 
Bureau of Indian Standards
Bureau of Indian StandardsBureau of Indian Standards
Bureau of Indian Standards
 
A simple guide to understanding iso standards
A simple guide to understanding iso standardsA simple guide to understanding iso standards
A simple guide to understanding iso standards
 
Introduction to iso 9001
Introduction to iso 9001 Introduction to iso 9001
Introduction to iso 9001
 
The new ISO 9001:2015
The new ISO 9001:2015The new ISO 9001:2015
The new ISO 9001:2015
 

Ähnlich wie 1200 4 (20)

1200 3
1200 31200 3
1200 3
 
1200 2
1200 21200 2
1200 2
 
1200 5
1200 51200 5
1200 5
 
2950 1
2950 12950 1
2950 1
 
2911 1 2
2911 1 22911 1 2
2911 1 2
 
2572
25722572
2572
 
IS 1200_1974_RF 2007_PART 2_CONCRETE WORK.pdf
IS 1200_1974_RF 2007_PART 2_CONCRETE WORK.pdfIS 1200_1974_RF 2007_PART 2_CONCRETE WORK.pdf
IS 1200_1974_RF 2007_PART 2_CONCRETE WORK.pdf
 
1200 5
1200 51200 5
1200 5
 
2911 1 3
2911 1 32911 1 3
2911 1 3
 
Sp 34-1987 handbook on reinforcement and detailing
Sp 34-1987 handbook on reinforcement and detailingSp 34-1987 handbook on reinforcement and detailing
Sp 34-1987 handbook on reinforcement and detailing
 
Sp34 str detailing
Sp34     str detailingSp34     str detailing
Sp34 str detailing
 
2911 1 1
2911 1 12911 1 1
2911 1 1
 
3370 2
3370 23370 2
3370 2
 
6509
65096509
6509
 
2502
25022502
2502
 
1237
12371237
1237
 
2514
25142514
2514
 
4880 5
4880 54880 5
4880 5
 
1893
18931893
1893
 
2911 1 4
2911 1 42911 1 4
2911 1 4
 

Mehr von Boopathi Yoganathan (20)

28-5.21 Company Profile of Pyrmaid structural consultant.pptx
28-5.21 Company Profile of Pyrmaid structural consultant.pptx28-5.21 Company Profile of Pyrmaid structural consultant.pptx
28-5.21 Company Profile of Pyrmaid structural consultant.pptx
 
Front page upto content new
Front page upto content newFront page upto content new
Front page upto content new
 
Book report new
Book report newBook report new
Book report new
 
Fem
FemFem
Fem
 
Exopy injection
Exopy injectionExopy injection
Exopy injection
 
Embedded
EmbeddedEmbedded
Embedded
 
Earthquakes seminar
Earthquakes seminarEarthquakes seminar
Earthquakes seminar
 
10302
1030210302
10302
 
10297
1029710297
10297
 
9527 1
9527 19527 1
9527 1
 
9459
94599459
9459
 
9456
94569456
9456
 
9429
94299429
9429
 
9417
94179417
9417
 
7873
78737873
7873
 
7563
75637563
7563
 
7500
75007500
7500
 
7436 1
7436 17436 1
7436 1
 
7245
72457245
7245
 
7242
72427242
7242
 

Kürzlich hochgeladen

Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfTechSoup
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptxmary850239
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designMIPLM
 
Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptxSherlyMaeNeri
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPCeline George
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Celine George
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxthorishapillay1
 
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSGRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSJoshuaGantuangco2
 
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...Postal Advocate Inc.
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4MiaBumagat1
 
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfAMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfphamnguyenenglishnb
 
Karra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxKarra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxAshokKarra1
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Mark Reed
 
Grade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxGrade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxChelloAnnAsuncion2
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxHumphrey A Beña
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONHumphrey A Beña
 
Science 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptxScience 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptxMaryGraceBautista27
 

Kürzlich hochgeladen (20)

OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
 
Raw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptxRaw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptx
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-design
 
Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptx
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERP
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptx
 
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSGRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
 
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4
 
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfAMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
 
Karra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxKarra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptx
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)
 
Grade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxGrade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptx
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
 
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptxYOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
 
Science 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptxScience 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptx
 

1200 4

  • 1. lS*l2OO(PartlV)-197& Indian Standard ( Reaffii 1992 ) METHOD OF MEASUREMENT OF BUILDING AND CIVIL ENGINEERING WORKS PART IV STONE MASONRY ( Third Revision1 ThirdReprint MAY 1993 UDC 69.003.12:'693.1 @ Co/@& 1976 BUREAU OF INDIAN STANDARDS MANAKBHAVAN,9 BAHADUR SHAH ZAFAR MARG NEwDf!LM11alo2 G-3 Novembsr 1976 ( Reaffirmed 1997 )
  • 2. ISr1200(PartIV)- 1976 Indian Standard METHOD OF MEASUREMENT OF BUILDING AND CIVIL ENGINEERING WORKS PART IV STONE MASONRY ( Third Revision ) Civil Works Measurement Sectional Committee, BDC 44 Chairman Representing SHRI S. R. NAIR Engineer-in-Chief’s Branch, Army Headquarters Members SHRI R. S. MURTHY ( Alfemate to Shri S. R. Nair ) SHRI N. P. ACRARYY~ The Commissioner for the Port of Calcutta, Calcutta SHRI K. D. ARGOT Engineers India Limited, New Delhi SHRI T. V. SITARA~I ( Alternate ) SHRI B.’ G. BALJEKAR Hindustan Steel Works Construction Ltd, Calcutta SHRI .I. Du~ar RAJ ( Alternate 1 SHRI P. L: BHASIN . CIIIEF ENGINEER ( R&B ) ‘Institution of Surveyors, New Delhi Public Works Department, Government of Andhra Pradesh, Hyderabad SUPERINTENDING ENGINEER ( P&D ) ( Alternate ) SHRI R. K. CHOUDHRY SHRI I. P. PURI ( Alfemate ) SHRI W. J. DaCADIa SHRI v. B. DESAI DIHECTOR, IRI DIRECTOR ( RITES & COSTS ) DEPUTY DIRECTOR ( RATES & COSTS ) ( Alternate ) EXECUTIVE ENGINEER ( PLlNNING & DESIGNS), NORTHERN RAILWAY SHRI P. N. G.4~1 SHRI G. V. HINGORaNI SHRI G. K_ G. IYEXGAR SHRI M. L. JAIN SITRI S. L. KATRURIA Bhakra Management Board, Nangal Township Bombay Port Trust, Bombay Hindustan Construction Co Ltd, Bombay Irrigation Department, Government of Uttar Pradesh, -Roorkee Central Water Commission, New Delhi Ministry of Railways Institution of Engineers ( India ), Calcutta Gammon India Ltd, Bombay Heavy Engineering Corporation Ltd, Ranchi The National Industrial Development Corporation Ltd, New Delhi Ministry of Shipping & Transport ( Roads Wing ) 1SHRI V. SIVAGURU ( Alternate, ( Continuedon page 2 @ Copyright 1976 BUREAU OF INDIAN STANDARDS This publication is protected under the Indian Copyright Act ( XIV of 1957 ) and reproduction in whole or in part by any means except with written permission of the publisher shall’ be deemed to be an infringement of copyright under the said Act.
  • 3. xst1200(Part IV)- 1976 (Confinuedfrompage1 ) Members Representing SHRI H. K. Knos~_a Irrigation Department, Government of Haryana, Chandigarh SHRI S. K. KOQEKAR National Buildings Organization, New Delhi ASSISTANT DIRECTOR ( SR ) ( Alternate ) SHRI V. D. LONDHE Concrete Association of India, Bombay SKRI N. C. DUGGAL ( Alternate ) SRRI K. K. MADHOK Builders* Association of India, Bombay SHRI DATTA S. MALIK Indian Institute of Architects, Bombay PROF M. K. GODBOLE ( Alfernate ) SHRI C. B. PATEL M. N. Dastur & Co Private Ltd, Calcutta &RI B. C. PATEL ( Alternate ) SRRI K. G. SALVI Hindustan Housing Factory Ltd, New Delhi SHRI S. K. CHATTERJI c Alfemate ) Public Works Denartment. Government. of.SURI P. V. SATHE Maharashtra, Bombay ’ Banaras Hindu University, Varanasi Hindustan Steel Ltd, Ranchi Central Public Works Department, New Delhi DR R. B. SINCH SHRI S. SRINIVASAN SUPERINTENDING SURVEYOIX OF WORKS ( AVIATION ) SURVEYOR OF WORKS ( I ) ATTACHED TO SSW ( AVIATION ) ( Alternate) Central Public Works Department, New DelhiSLTEFUNTENDINCJ SURVEYOR OF WORKS ( I ) SURVEYOR OF WORKS ( I ) ATTACHED TO SSW ( I ) ( Alternate ) SHRI D. AJITHA SIMHA, Director General, IS1 ( J&-o@& Member ) Director ( Civ Engg ) Secretary SHRI K. M. MATHUR Deputy Director ( Civ Engg ), ISI 2
  • 4. IS: lZOO(PartIV)-1976 Indian Standard METHOD OF MEASURE.MENT OF BUILDING AND CIVIL ENGINEERING WORKS PART IV STONE MASONRY ( Third Revisfon ) 0. FOREWORD 0.1This Indian Standard ( Part IV ) ( Third Revision ) was adopted by the Indian Standards Institution on 26 August 1976, after the draft finalized by the Civil Works Measurement Sectional Committee had been approved by the Civil Engineering Division Council. 0.2 Measurement occupies a very important place in planning and execution of any civil engineering work from the time of first estimates to final completion and settlement of payments for the project. Methods followed for measurement are not uniform and considerable differences exist between practices followed by one construction agency and another and also between various Central and State Government departments. While it is recognized that each system of measuiement has to be specifically related to the administrative and financial organizations. within the department responsible for work, a unification of, the various systems at technical level has been accepted as very desirable, specially as it permits a wider circle of operation for civil en.gineering contractors and eliminates ambiguities and misunderstandings arising out of inadequate understanding of various systems followed. 0.3 Among the various civil engineering items, measurement of building was first to be taken up for standardization and this standard having provisions relating to all building works, was first published in 1958 a nd was revised in 1964 and 1970. 0.4 In the course of usage df this standard by various construction. agencies in the country, several clarifications and suggestions for ‘modifications were received and as a result of study, *the Sectional Committee decided that its scope, besides being applicable to buildings should be expanded so as to cover civil engineering works like industrial and river valley project. works. 3
  • 5. IS : 1200 ( Part IV )-1976 0.5 Since various trades are not related to one another, the Sectional Committee decided that method of measurement for each trade as given in IS : 1200-1964* be issued separately as a different part, which will be helpful to specific users in various trades. This part covering method of measurement of stone masonry applicable to buildings as well as civil -engineering works was, therefore, issued as a second revision in 1970. 0.6 In the course of use of this standard in the past five years, based on suggestions received, certain amendments were issued to this standard by the Sectional Committee and the third revision has been prepared so as to incorporate such amendments. ,0.7 For the purpose of deciding whether a particular requirement of this standard is complied with, the final value, observed or calculated, expressing the results of a measurement, shall be rounded off in accord- ance with IS : 2-1960t. The number of significant places ‘retained in rounded off value should be the same as that of the specified value in this standard. 1. SCOPE 1.1 This standard ( Part IV) covers method of measurement of stone masonry in buildings and civil engineering works. ‘2. GENERAL 2.1 Clubbing of Items - Items may be clubbed together provided that break-up of clubbed items is on the basis of detailed descriptions of items as stated in this standard. 2.2 Booking of Dimensions - In booking dimensions, the order shall be consistent and generally in the sequence of length, breadth or width and height or depth or thickness. ~2.3 Measurements - All work shall be measured net in the decimal system, below: as fixed in its place, unless otherwise stated herein, as given a) Dimensions shall be measured to the nearest 0.01 m. b) Areas shall be worked out to the nearest 0.01 m2, and c) Cubic contents shall be worked out to the nearest 0.01 ms. 2.4 Description of Item - Description of each item shall, unless otherwise stated, be held to include, conveyance, delivery, handling, unloading, storing, waste, returning of packings, scaffolding, tools and tackle, as necessary. *Method of measurement of building works ( revised ). tRules for rounding off numerical values ( ~euised).
  • 6. IS : 1200 (Part IV ) - 1976 2.5 Waste - All measurements of cutting shall, unless otherwise stated, be deemed to include consequent waste. 2.6 Deduction - Where minimum area is defined for deduction of an opening, void, or both, such area shall refer only to opening or void within the space measured. 2.7 Work to be Measured Separately - Work executed in the following conditions shall be measured separately: a) Work in or under water, b) Work in liquid mud, c) Work in or under foul positions, d) Work interrupted by tides, and e) Work in snow. 2.7.1 Levels of high and low water tides, where these occur, shall be stated. 2.7.2 Where springs requiring pumping are encountered, dewatering shall be measured against a separate specific provision made for the purpose [see 2.7 of IS : 1200 ( Part I )-1974” 1. 2.8 Bills of Quantities - Items of work shall fully describe materials. and workmanship, and accurately represent the work to be executed. 2.9 Measurement in Stages - Work shall be measured in the following categories in convenient stages stating height or depth: a) Below ground/datum line, and b) Above ground/datum line. NOTE - Ground/datum line shall be specified in each case. 3. WALLING 3.1 Type of stone, kind of walling and mix of mortar shall be described: Item of general walling shall be deemed to include the following: a) Bond stones; b) Raking out joints for plastering or for pointing, done as a separate process or finishing joints flush as work proceeds; c) Preparing top of existing wall and the like for raising; d) Rough cutting and waste for forming gables, cores of arches, splays at eaves and the like and all rolrgh cutting in the body of walling; *Method of measurement of building and civil engineering works: Part I Earthwork ( tlzirdrevision). 5
  • 7. 3S : 1200 (Part IV) - 1976 e) Leaving holes for pipes and similar items; f) Building-in holdfasts, air bricks, fixing bricks, etc; g) Bedding wall plates, lintels, sills, roof tiles, corrugated sheets, etc, in or on walls, if not covered in respective trade; h) Building-in ends of joists, beams, lintels, etc, and making good; and j) Forming openings and flues for which no deduction is made ( see 4.3 ). 3.1.1 Random or uncoursed rubble walling brought up to courses shall he measured separately stating minimum and maximum heights of courses. 3.1.2 In case of coursed work, height of course shall be stated, if regularly diminished, it shall be so described stating maximum and minimum heights of .courses. 3.1.3 Stone walling circular on plan to a mean radius net exceeding 6 m shall be measured separately and shall include all cutting and waste and templates. 3.1.4 Stone walling circular on plan to a mean radius exceeding 6 m shall be measured net and included with general walling. 3.1.5 The following classes of work shall be included with general walling: a) Footings; b) Battered stone masonry ( measured net ). Battered surfaces shall, however, be measured separately in square metres as an extra- over; c) Eaves ‘or beam filling, no deduction being made for joists, rafters, etc; d) Stone walling in chimney breasts, chimney stacks; smoke or air flues; and e) Pilasters. 4. MEASUREMENT 4.1 Except where otherwise stated, stone masonry generally shall be measured in cubic metres and face work in square metres. 6
  • 8. IS : 1200 ( Part IV ) - 1976 4.2 No a) b) c) d) e) deduction or addition shall be made for the following: Ends of dissimilar materials (that is, joists, beams, lintels, posts, girders, rafters, purlins, trusses, corbels, steps, etc ) up to O-1 ma in section; Openings up to 0’1 m2 in area ( see Note ); Wall plates, bed plates, and bearing of slabs, CHAJJAS and the like, where thickness does not exceed 10 cm and bearing does not extend over the full thickness of wall; Cement concrete blocks for holdfasts, holding-down bolts and the like; and Iron fixtures such as wall ties, pipes up to 300 mm diameter and holdfasts of doors and windows. NATE - In calculating area of an opening, any separate lintel or sill shall be in- cluded with the size of the opening but end portions of lintel shall be excluded [ SPI4.2 (a) ] and extra width of rebated reveals, if any, shall also be excluded. 4.3 Fireplaces, Chimneys, etc - Stone walling in chimney breasts, chimney stacks, with smoke or air flue(s) not exceeding 0’20 m* each in sectional area shall be measured as solid, and no extra measurement shall be taken for pargetting and coring such flue(s). Where flue(s) exceed 0.20 rnZ in sectional area, deduction shall be made for the same and pargetting and coring flue(s) shall be measured in running metres stating size(s) of flue(s). Aperture for fireplace. shall not be deducted and no extra labour shall be measured for splaying of jambs and throating. 4.4 Pillars/Columns - Pillars/columns shall be fully described and measured in cubic metres. These shall be measured in the following categories: a) Rectangular or polygonal on plan; b) Curved on plan to any radius; and c) Any other type. NOTE - Rectangular pill&r/column shall mean a detached masonry portion such that its breadth does not exceed 3 times its thickness and thickness itself does not exceed 60 cm. 5. STONE NOGGING 5.1 Stone nogging shall be measured in square metres, stating thickness of wall and shall include face work to both sides. Dimensions shall be measured overall. 7
  • 9. IS t 1200 (Part IV)-1976 5.1.1 Timber work shall be measured separately [ see IS : 1200 ( Part XXI )-1973*]. 6. STONE MASONRY IN ARCHES AND VAULTS 6.1 Stone workinrough arches and vaults shall be described and measured separately and shall include centering fcr spans up to 2 m. For spans exceeding 2 m, centering shall be measured separately [see IS : 1200 (Part V )-1972t 1. 6.1.1 Facings to arches shall be measured separately. 7. UNDERPINNING 7.1 Stone walling in underpinning shall be measured separately and an item for extra labour and material in wedging up on top of underpinning with thin slabs or slates shall be measured in square metres ( as length multiplied by width of top course ). 8. LEVELLING UP 8.1 Levelling up of uncoursed random walling for damp-proof courses, band courses, and the like shall be measured separately in square metres and the material such as concrete or mortar to be used in levelling up shall be described. 9. FACINGS 9.1 If facing stones are the same as those used in body of walling, additional work involved in dressing stones shall be described as ‘extra- over ’ walling. 9.1.1 If stones are to be dressed on beds and joints, it shall be so stated. 9.1.2 If facing stones are different from those used in body of walling, facings may be stated as ‘stone and labour in facing’. Type of such facing and average bed shall be described, and bonders, if any, shall also be described and number per square metre stated. Bonding to stone walling and to brick work shall be measured separately. 9.1.3 In case of circular facings, not exceeding 6 m radius on plan, radius shall be stated. Circular facings exceeding 6 m radius on plan shall be included with general facing. *Method of measurement of building and civil engineering works: Part XXI Wood- work and joinery. tMethod of measurement of building and civil engineering works: Part V Formwork. 8
  • 10. IS : 1200(Part IV) - 1976 10. ARCHES IN FACINGS 10.1Dressing to arches in faced work shall be measured in square metres, measured on face and exposed soffit; rise of arch and width of soffit shall be stated and joints described. In case of arches in random rubble, cutting of skewbacks and over and under arches shall be included with the item. Cutting over arches, skewbacks, etc, in superior type of facework shall be measured separately in running metres. II. ANGLES IN FACINGS 11.1External angles in facings shall be measured in running metres and if quoin stones are larger than general facing stones, their average size shall be stated. If edge margins of quoin stones are drafted, this shall be described stating width of drafting. 11.1.1Squints, birds-mouths, splayed or rounded angles and the like shall each be measured separately in running metres stating width of splay or girth of rounded angle. 11.1.2 Squints, birds-mouths and external and internal angles to battered facings shall each be measured separately in running metres; if quoin stones to battered facings have horizontal joints, these shall be so described. 12. CHASES, REBATES, ETC 12.1 Cutting chases, rebates, throatings, grooves, etc, in walling shall be measured in running metres stating girth and classified according to girth as follows except in case of throating which shall be measured separately: a) Not exceeding 10 cm in girth, and b) Exceeding 10 cm but not exceeding 20 cm in girth. 12.1.1 Chases, rebate, etc, exceeding 20 cm ingirth, shall be measured in square metres ( girth multiplied by length ). 13. CUTTING HOLES 13.1 Cutting holes through walling and making good shall be measured per centimetre of depth of cutting and shall be classified as follows: a) Holes not exceeding 400 cm’ in area;.and b) Holes exceeding 400 cm2 and not exceeding O-1 m2 in area. 14. CUTTING OPENINGS 14.1 Cutting openings exceeding 0.1 m2 in area shall be measured in cubic meties. 9
  • 11. IS : 1266 ( Part IV ) - 1976 15. TOOTHING AND BONDING 15.1 Where new walls .are bonded to existing walls, an- item of labour and material in cutting, toothing and bonding shall be measured in square metres of surface in contact with new work only. Spacing and size of toothings required to be cut in the existing work shall be described. 16. DRESSED STONEWORK 16.1 Stonework as in sills, steps, string courses, cornices, columns, caps, copings, lintels, etc, shall each be measured in cubic metres. Type of dressing shall be described and measured in square metres as extra-over. 16.2 Dressed stonework as in CHAJJtlS, JALLIES, shelves and the like shall be described as measured in square metres ( inclusive of bearing ). 16.3 Each stone shall be measured as smallest rectangular block from which finished dressed stone can be worked. 17. ADDITIONAL LABOUR IN DRESSED STONEWORK 17.1 The following labours shall be measured separately in square metr es when exceeding 10 cm in girth or width and in running metrej if not exceeding 10 cm in girth or width, unless included in the main item: a) Sunk work to faces, beds and joints as in arches, voussoirs and key blocks, splays, batters, weatherings, etc; and b) Moulded work as in cornices ( girth of moulding measured). 17.2 The following labours shall be measured separately in running metres, when not exceeding 10 cm in width or girth, unless included in the main item: a) Chamfers, arrises, or splays not exceeding 1.5 cm in width; b) Chamfers, arrises, or splays exceeding 1’5 cm but not exceeding 10 cm in width; c) Rounded bullnoze-angles or mouldings or hollow angles; d) Rebates, grooves ( square, hollow or dove-tailed ) in facework; e) Rebates, grooves ( square, hollow or dove-tailed ) for joints, tongues of sills, etc; and f) Cutting chisel drafted margin. 17.3 Drilling or cutting holes shall be enumerated stating diameter of hole and its depth. 17.4 Cutting rectangular or dove-tailed mortice in dressed stones shall be enumerated stating size in cubic centimetres; and running with cement or lead shall be described. 10
  • 12. IS t 1200 (Part IV) - 1976 18. STOPS, MITRES, ETC 18.1 Stops, mitres and returned ends shall be described and enumerated. 19. FIGURES, LETTERS, ETC 19.1 Curved figures, letters, etc, shall be described and enumerated stating dimensions. 20. BOULDER WORK 20.1 Boulder work shall be measured in cubic. metres stating size of boulders and classified as follows: a) Boulder filling dry hand-packed, b) Boulder walling dry, and c) Boulder walling in mortar stating mix of mortar. 11
  • 13. BUREAU OF INDIAN STANDARDS Heedquarters : Manak Bhavan, 9 Bahadur Shah Zafar Marg. NEW DELHI 110002 Telephones : 331 01 31 Telegrams : ~8n8k8WIsth8 331 13 75 (Common to all Offii) Regional Offices : Central : Manak Bhavan, 9, Bahadur Shah Zafaf Marg. NEW DELHI 110002 l Eastern : l/14 C.I.T. Scheme VII M, V.I.P. Road, Maniktola. CALCUTTA 700054 Northern : SC0 445-446, Sector 35-C, CHANDIGARH 160036 Southern : t W&tern C.I.T. Campus, IV Cross Road, MADRAS 600113 : Manakalaya, E9 MIDC. Marol. Andheri (East), BOMBAY 400093 6rnch Offices : ‘Pushpak’, Nurmohamed Shaikh Marg. Khanpur, AHMADABAD 38fJODl r Peenya Industrial Area, 1st Stage, Bangalore-Tumkur Road, BANGALORE 560058 Gangotri Complex, 5th Floor, Bhadbhada Road. T.T. Nagar, BHOPAL 462003 Plot No. B2/83, Lewis Road, BHUBANESHWAR 751002 Kalai Kathir Building, 6/48-A Avanasi Road, COIMBATORE 641037 Quality Marking Centre. N.H. IV, N.I.T., FARIDABAD 121001 Savitri Complex, 116 G. T. Road, GHAZIABAD 201001 53/5 Ward No. 29. R.G. Barua Road. 5th By-lane, GUWAHATI 781003 5-8-56C L. N. Gupta Marg, ( Nampally Station Road ) HYDERABAD 500001 R14 Yudhister Marg. C Scheme, JAIPUR 302005 117/418 B Sarvodaya Nagar, KANPUR’208005 Plot No. A-9, House No. 561/63. Sindhu Nagar, Kanpur RoaO. LUCKNOW 226005 Patlipuha Industrial Estate, PATNA 800013 District Industries Centre Complex. Bagh-e-Ali Meidan. SRINAGAR 190011 T. C. No. 14/1421’, University P. 0.. Palayam. THIRUVANANTHAPURAM 695034 inspection Offices (With Sale Point) : Pushpanjali. First Floor, 205-A West High Court Road. Shankar Nagar Square, NAGPUR 440010 Institution of Engineers (India) Building, 1332 Shivaji Nagar. PUNE 411005 ‘Sales Office Calcutta is at 5 Chowringhee Approach, P. 0. Princep Street, CALCUTTA t Sales Office is at Novelty Chambers, Grant Rord. eOMBAY ~A~~;L~~~c8 is at Unity Building. Narasimheraja Square, Tel8phone i 331 01 31 3:; ;e3 :: 21843 41 2916 6 32 92 95 26348 394966 5s 40 2l 53627 2 67 06 B-71 19 96 33177 231083 6 34 71 216970 65507 62305 62104 62 61 71 62435 276800 99 65 28 22 39 71 Reprography Unit, BIS New Delhi. India