  Contents
  Progress Summary
  Product CE and Commercialisation
  Product Trials
  Projects
  Interim Results
  Outlook




ITM POWER | Final Results Presentation, 3020th Jan 2011
  ITM POWER | Interim Results Presentation July 2010
Summary of Successes


  A Year of Accreditation, Trials, Grants and Early Revenue
  2011 will be the transformational year
  •     Strong technology progress
  •     Game changing Fuel Cell performance
  •     5 products defined and launched
  •     HPac CE mark achieved
  •     3 product trial partners
  •     21 HOST trial partners
  •     £1m of grants from TSB, CT, YF and EPSRC
  •     Awareness campaign has been hugely successful




ITM POWER | Final Results Presentation, 3020th Jan 2011
  ITM POWER | Interim Results Presentation July 2010
Summary of Challenges


  A Year of Accreditation, Trials, Grants and Early Revenue
  Some key challenges to address
  •     Establish product longevity
  •     Fuel cell business model and long term partner
  •     Product manufacturing to cost and volume
  •     Product reliability in the field
  •     Product sales channels with healthy margins
  •     A small number of significant grants
  •     Awareness turned into revenue
  •     Adoption of hydrogen refuelling




ITM POWER | Final Results Presentation, 3020th Jan 2011
  ITM POWER | Interim Results Presentation July 2010
CE Marking Update




ITM POWER | Final Results Presentation, 3020th Jan 2011
  ITM POWER | Interim Results Presentation July 2010
CE Marking


  Strategy and Current Status
  Documented evidence of compliance to the relevant directives
  •  Prioritised HPac (>3,500 hours system operation)
  •  HBox and HFlame in a more rapid follow-on process
  •  Progress on HLab has been temporarily suspended to prioritise others



                             ISO                                CE Marking                    Sales          Timescale
                CAD       BoM Routing Procure             PED   MD     Atex   EMC   Trials   Pricing Channel
   HPac                                                                                                      Completed
   HBox                                                                                                       End of Q1
   HFLame                                                                                                     End of Q1
   HLab                                                                                                       End of Q2




ITM POWER | Final Results Presentation, 3020th Jan 2011
  ITM POWER | Interim Results Presentation July 2010
CE Marking


  New Universal Control System
  Documented evidence of compliance to the relevant directives
  •  Developed a new, compliant control system
  •  Can be used for all products to increase volume and reduce cost
  •  Significant cost reductions in production
  •  Option to part populate for less complex products
  •  Data logging and telemetry incorporated




ITM POWER | Final Results Presentation, 3020th Jan 2011
  ITM POWER | Interim Results Presentation July 2010
The CE Marking Process


  A Framework for CE Approval
  Have established good working relationships
  •   Hydrogen was new to most of the Notified Bodies
  •   Initially NoBo’s were slow to respond
  •   We have led the framework for compliance

     Product                      Relevant Directives

                     MachD           EMC          ATEX    PED

     HPac               X             X             X     X

     HLab               X             X             X

     HBox               X             X             X     X

     HFlame             X             X             X




ITM POWER | Final Results Presentation, 3020th Jan 2011
  ITM POWER | Interim Results Presentation July 2010
HPac Market Offering


  HPac10 Market Offering
  Available for sale at Hannover Messe in April
  •    Fuel cell labs
  •    Universities
  •    Hydrogen demonstration projects
  •    Small refuelling demonstrations




ITM POWER | Final Results Presentation, 3020th Jan 2011
  ITM POWER | Interim Results Presentation July 2010
HPac Market Offering


  HPac10 Manufacturing
  Partnership with Tharsus
  •   Well respected company
  •   Many blue chip partners
  •   From bespoke to batch production
  •   High volume capability
  •   Coherent manufacturing approach




ITM POWER | Final Results Presentation, 3020th Jan 2011
  ITM POWER | Interim Results Presentation July 2010
Product Trials




ITM POWER | Final Results Presentation, 3020th Jan 2011
  ITM POWER | Interim Results Presentation July 2010
Product Trials


  HPac | Birmingham University
  First product sale, first major trial
  •     Product Delivered
  •     Commissioning Jan
  •     On board telemetry
  •     Dedicated technician
  •     Integration with fuel cell lab
  •     Integration with vehicle refuelling




ITM POWER | Final Results Presentation, 3020th Jan 2011
  ITM POWER | Interim Results Presentation July 2010
Product Trials


  HBox PV | Glamorgan University
  First green hydrogen trial
  •     Verbally agreed, negotiating contract
  •     Delivery Q2
  •     Commissioning Q2
  •     Strategic relationship
  •     Spingboard to M4 corridor tenders
  •     On board telemetry




ITM POWER | Final Results Presentation, 3020th Jan 2011
  ITM POWER | Interim Results Presentation July 2010
Product Trials


  HFlame | Ametek Brazing Trial
  First niche flux-less brazing of refrigeration systems
  •     Portable flame generator
  •     High temperature thermal process
  •     Delivery Jan 31
  •     Trials during Q1




ITM POWER | Final Results Presentation, 3020th Jan 2011
  ITM POWER | Interim Results Presentation July 2010
HOST




ITM POWER | Final 9th December 2010
              3M Results Presentation, 30 July 2010
  ITM POWER | Interim Results Presentation 20th Jan 2011
     ITM POWER | Interim Results Presentation 20th Jan 2011
HOST | Phase One


  HOST | Phase One
  The Largest UK Cross-Sector Hydrogen Trial
  •     21 commercial trial partners
  •     Balanced across 7 major industrial sectors
  •     No further partners will be offered a free trial
  •     Conducted over a year long period
  •     Using a dedicated team
  •     Data comprehensively reported to partners
  •     Non confidential results will be published




ITM POWER | Final Results Presentation, 3020th Jan 2011
  ITM POWER | Interim Results Presentation July 2010
HOST | Partners


  Hydrogen on Site Trials
  Trials begin Q1 2011




ITM POWER | Final Results Presentation, 3020th Jan 2011
  ITM POWER | Interim Results Presentation July 2010
HOST | Opening


  Stansted Airport Opening
  On 8th March 2011 at the Hilton Hotel Stansted
  •     Register online
  •     250 visitor places
  •     150 already booked
  •     Presentations
  •     Partner display area
  •     Refuelling demonstration




ITM POWER | Final Results Presentation, 3020th Jan 2011
  ITM POWER | Interim Results Presentation July 2010
Funded Product Development Projects




ITM POWER | Final Results Presentation, 3020th Jan 2011
  ITM POWER | Interim Results Presentation July 2010
Funded Product Development Projects


  Next Energy | Home Refuelling
  Design stage complete | Final report submitted
  •   Further DoE funding sought
  •   Car companies very interested
  •   ITM’s reputation significantly enhanced
  •   High pressure electrolysis desirable


      200 Bar Prototype Stack




ITM POWER | Final Results Presentation, 3020th Jan 2011
  ITM POWER | Interim Results Presentation July 2010
Funded Product Development Projects


  CREO | Emissions Control
  Carbon Reduction by Emissions Optimisation
  •   On-board H2 dispensing to exhaust
  •   TSB funded project
  •   Led by Ford
  •   Strong partners
  •   A potential new product
  •   New website coming soon
  •   www.creoproject.com




ITM POWER | Final Results Presentation, 3020th Jan 2011
  ITM POWER | Interim Results Presentation July 2010
Fuel Cell Current Status




ITM POWER | Final Results Presentation, 3020th Jan 2011
  ITM POWER | Interim Results Presentation July 2010
Fuel Cell MEA Performance


  The Fuel Cell MEA
  A step change in fuel cell performance
  •     Outstanding power density | highest recorded
  •     Vast potential in applications with challenging weight and volume constraints
  •     Cost saving potential via miniaturisation


                                                                   Hydrogen & Oxygen at 30 psi




ITM POWER | Final Results Presentation, 3020th Jan 2011
  ITM POWER | Interim Results Presentation July 2010
Fuel Cell Development Path


  The Fuel Cell MEA
  Research and development challenges
  •     Early stage project to establish performance with air
  •     Characterise to industry protocols
  •     Target the automotive sector
  •     Seek end user partnerships
  •     Address new challenges presented by ultra high current density
  •     Funded by the Carbon Trust




ITM POWER | Final Results Presentation, 3020th Jan 2011
  ITM POWER | Interim Results Presentation July 2010
Hydrogen Refuelling | Market Developments




ITM POWER | FinalInterim Results Presentation th Jan 2011
     ITM POWER | Results Presentation, 30 July 2010
  ITM POWER | Interim Results Presentation 20 20th Jan 2011
              Open Day Presentation
Hydrogen Refuelling | Market Developments


  Oil Prices
  Oil and Gasoline Prices are Steadily Rising
  •     Crude oil approaching $100 a barrel
  •     The age of cheap oil is over




ITM POWER | Final Results Presentation, 3020th Jan 2011
  ITM POWER | Interim Results Presentation July 2010
Hydrogen Refuelling | Market Developments


  Japan, US & Germany Adopt Hydrogen
  Toyota, Honda and Nissan join forces to promote hydrogen
  •     Total of 100 hydrogen refuelling stations planned in Japan
  •     1000 refuelling stations in Germany in 4yrs ($2.6bn)
  •     150 planned in California (30 already built)




ITM POWER | Final Results Presentation, 3020th Jan 2011
  ITM POWER | Interim Results Presentation July 2010
Hydrogen Refuelling | Market Developments


  The Hydrogen Tide is Turning in the UK
  Energy storage for renewables is now linked to hydrogen
  •     Questions in the house from Charles Hendry
  •     David Willetts in presentations
  •     Kit Malthouse in The Times
  •     Bow Group paper
  •     ITM power now associated with renewable energy storage
  •     ITM featured in Boxing Day Sunday Times




ITM POWER | Final Results Presentation, 3020th Jan 2011
  ITM POWER | Interim Results Presentation July 2010
ITM Power plc
  Interim Results 20th Jan 2011




ITM POWER | Final Results Presentation, 3020th Jan 2011
  ITM POWER | InterimPresentation 15th Dec 2010 2010
              Board Results Presentation July
Interim Financial Results to 31 Oct 2010


  Financial Highlights

  •     Pre-tax loss down to £3.0m from £3.4m
  •     Period end cash balance £14.7m
  •     Cash burn in period £2.2m
  •     Investment in fixed assets £478k, including HFuel £343k




  H2 2011 Focus

  •     Maximise expenditure control
  •     Maximise automated transactions through integrated systems
  •     Optimise inventory and consolidated purchasing




ITM POWER | Final Results Presentation, 3020th Jan 2011
  ITM POWER | Interim Results Presentation July 2010
Grant Funding


  Grants to Year End 30 April 2011
  To develop commercial relationships and reduce burn rate
  •     Target £700k
  •     £1m achieved
  •     Targeting larger EU & US grants

   Grants Summary for Year End 30 April 2011
   Project                 Grant Body Committed Invoiced            Accrued     Total
   HydroGen               TSB            325,000   39,013             197,670   236,683
   HFuel                  TSB            338,000 120,291              201,709   322,000
   5kg Stack              YF             195,000 102,357               71,643   174,000
   Home Refueller         NE              60,000   25,604              34,396    60,000
   CREO                   TSB            247,000        0             110,000   110,000
   PhD's                  EPSRC           88,000        0                   0         0
   FC                     Carbon Trust   108,000        0             108,000   108,000
   TESS NHA               Business Link    3,761    3,761                         3,761
   TESS Hannover          Business Link    5,000                        5,000      5000
   Innovation Vouchers    Business Link    6,000    6,000                         6,000
   Totals                                   1,375,761     297,026     728,418 1,025,444



ITM POWER | Final Results Presentation, 3020th Jan 2011
  ITM POWER | Interim Results Presentation July 2010
Outlook


  •     Strong Technology Platform
  •     ISO accreditation
  •     Focused on products
  •     HPac CE mark achieved
  •     Three field trials
  •     21 commercial partners for HOST
  •     Strong cash position - £14.7m




ITM POWER | Final Results Presentation, 3020th Jan 2011
  ITM POWER | Interim Results Presentation July 2010

Weitere ähnliche Inhalte

Ähnlich wie ITM Power Interim Results Presentation for the Six months Ended 31st October 2010

ITM Power: Interim Results Jan 2012
ITM Power: Interim Results Jan 2012ITM Power: Interim Results Jan 2012
ITM Power: Interim Results Jan 2012Rebecca Markillie
 
Beautiful beijing esco report summary 9 nov 2015
Beautiful beijing esco report summary 9 nov 2015Beautiful beijing esco report summary 9 nov 2015
Beautiful beijing esco report summary 9 nov 2015Business Finland
 
XVI CONVEGNO EUROPEO A. Voigt - From the EU F-Gas rules to global action
XVI CONVEGNO EUROPEO A. Voigt - From the EU F-Gas rules to global actionXVI CONVEGNO EUROPEO A. Voigt - From the EU F-Gas rules to global action
XVI CONVEGNO EUROPEO A. Voigt - From the EU F-Gas rules to global actionCentro Studi Galileo
 
eno energy presentation.pdf
eno energy presentation.pdfeno energy presentation.pdf
eno energy presentation.pdfPericaNekic
 
New Renewable Energy Strategy UK - Adam Brown
New Renewable Energy Strategy UK - Adam BrownNew Renewable Energy Strategy UK - Adam Brown
New Renewable Energy Strategy UK - Adam Brownuktila
 
Cleaning up british industry
Cleaning up british industryCleaning up british industry
Cleaning up british industryBrian Worrall
 
Itm Hannover Presentation
Itm Hannover PresentationItm Hannover Presentation
Itm Hannover Presentationmetalysis
 
ITM Power Annual Report 2016
ITM Power Annual Report 2016ITM Power Annual Report 2016
ITM Power Annual Report 2016Rebecca Markillie
 
9569 ITM Annual Report 2016 2.3_Web
9569 ITM Annual Report 2016 2.3_Web9569 ITM Annual Report 2016 2.3_Web
9569 ITM Annual Report 2016 2.3_WebRebecca Markillie
 
Opportunities in the journey to ‘subsidy free’
Opportunities in the journey to ‘subsidy free’ Opportunities in the journey to ‘subsidy free’
Opportunities in the journey to ‘subsidy free’ StephenGeoMills
 
Financing Energy Optimization Projects
Financing Energy Optimization Projects Financing Energy Optimization Projects
Financing Energy Optimization Projects Avanceon
 
Test centre mongstad presentation may 2013
Test centre mongstad presentation may 2013Test centre mongstad presentation may 2013
Test centre mongstad presentation may 2013Global CCS Institute
 
Britain chp market
Britain chp marketBritain chp market
Britain chp marketguigu85c
 
Patrik Kolar, Head of Department B (LIFE and Horizon 2020 Energy, Environment...
Patrik Kolar, Head of Department B (LIFE and Horizon 2020 Energy, Environment...Patrik Kolar, Head of Department B (LIFE and Horizon 2020 Energy, Environment...
Patrik Kolar, Head of Department B (LIFE and Horizon 2020 Energy, Environment...ARC research group
 
Cement Australia - Energy Efficiency Opportunities Public Report 2010
Cement Australia - Energy Efficiency Opportunities Public Report 2010Cement Australia - Energy Efficiency Opportunities Public Report 2010
Cement Australia - Energy Efficiency Opportunities Public Report 2010girlfoster10
 

Ähnlich wie ITM Power Interim Results Presentation for the Six months Ended 31st October 2010 (20)

ITM Power: Interim Results Jan 2012
ITM Power: Interim Results Jan 2012ITM Power: Interim Results Jan 2012
ITM Power: Interim Results Jan 2012
 
ITACOIL Company Profile
ITACOIL Company ProfileITACOIL Company Profile
ITACOIL Company Profile
 
Beautiful beijing esco report summary 9 nov 2015
Beautiful beijing esco report summary 9 nov 2015Beautiful beijing esco report summary 9 nov 2015
Beautiful beijing esco report summary 9 nov 2015
 
XVI CONVEGNO EUROPEO A. Voigt - From the EU F-Gas rules to global action
XVI CONVEGNO EUROPEO A. Voigt - From the EU F-Gas rules to global actionXVI CONVEGNO EUROPEO A. Voigt - From the EU F-Gas rules to global action
XVI CONVEGNO EUROPEO A. Voigt - From the EU F-Gas rules to global action
 
eno energy presentation.pdf
eno energy presentation.pdfeno energy presentation.pdf
eno energy presentation.pdf
 
New Renewable Energy Strategy UK - Adam Brown
New Renewable Energy Strategy UK - Adam BrownNew Renewable Energy Strategy UK - Adam Brown
New Renewable Energy Strategy UK - Adam Brown
 
Cleaning up british industry
Cleaning up british industryCleaning up british industry
Cleaning up british industry
 
Itm Hannover Presentation
Itm Hannover PresentationItm Hannover Presentation
Itm Hannover Presentation
 
Sgcp14beckmanncp
Sgcp14beckmanncpSgcp14beckmanncp
Sgcp14beckmanncp
 
ITM Power Annual Report 2016
ITM Power Annual Report 2016ITM Power Annual Report 2016
ITM Power Annual Report 2016
 
9569 ITM Annual Report 2016 2.3_Web
9569 ITM Annual Report 2016 2.3_Web9569 ITM Annual Report 2016 2.3_Web
9569 ITM Annual Report 2016 2.3_Web
 
Sustaining energy performance
Sustaining energy performanceSustaining energy performance
Sustaining energy performance
 
Opportunities in the journey to ‘subsidy free’
Opportunities in the journey to ‘subsidy free’ Opportunities in the journey to ‘subsidy free’
Opportunities in the journey to ‘subsidy free’
 
Financing Energy Optimization Projects
Financing Energy Optimization Projects Financing Energy Optimization Projects
Financing Energy Optimization Projects
 
Test centre mongstad presentation may 2013
Test centre mongstad presentation may 2013Test centre mongstad presentation may 2013
Test centre mongstad presentation may 2013
 
Britain chp market
Britain chp marketBritain chp market
Britain chp market
 
2008-03-10 Power Service strategy
2008-03-10 Power Service strategy2008-03-10 Power Service strategy
2008-03-10 Power Service strategy
 
ITM Power Interim Report
ITM Power Interim ReportITM Power Interim Report
ITM Power Interim Report
 
Patrik Kolar, Head of Department B (LIFE and Horizon 2020 Energy, Environment...
Patrik Kolar, Head of Department B (LIFE and Horizon 2020 Energy, Environment...Patrik Kolar, Head of Department B (LIFE and Horizon 2020 Energy, Environment...
Patrik Kolar, Head of Department B (LIFE and Horizon 2020 Energy, Environment...
 
Cement Australia - Energy Efficiency Opportunities Public Report 2010
Cement Australia - Energy Efficiency Opportunities Public Report 2010Cement Australia - Energy Efficiency Opportunities Public Report 2010
Cement Australia - Energy Efficiency Opportunities Public Report 2010
 

Mehr von Rebecca Markillie

Company Update February 2017
Company Update February 2017Company Update February 2017
Company Update February 2017Rebecca Markillie
 
ITM Power: Solar Hydrogen Station
ITM Power: Solar Hydrogen StationITM Power: Solar Hydrogen Station
ITM Power: Solar Hydrogen StationRebecca Markillie
 
ITM Power: Solar Hydrogen Station
ITM Power: Solar Hydrogen StationITM Power: Solar Hydrogen Station
ITM Power: Solar Hydrogen StationRebecca Markillie
 
ITM Power Company Presentation
ITM Power Company PresentationITM Power Company Presentation
ITM Power Company PresentationRebecca Markillie
 
ITM Power Hydrogen Solutions/ Case Studies
ITM Power Hydrogen Solutions/ Case StudiesITM Power Hydrogen Solutions/ Case Studies
ITM Power Hydrogen Solutions/ Case StudiesRebecca Markillie
 
ITM Power: Mobilité HYDROGÈNE France
ITM Power: Mobilité HYDROGÈNE FranceITM Power: Mobilité HYDROGÈNE France
ITM Power: Mobilité HYDROGÈNE FranceRebecca Markillie
 
ITM Power Corporate Brochure
ITM Power Corporate BrochureITM Power Corporate Brochure
ITM Power Corporate BrochureRebecca Markillie
 
Power-to-gas storing renewable energy in the gas grid
Power-to-gas storing renewable energy in the gas gridPower-to-gas storing renewable energy in the gas grid
Power-to-gas storing renewable energy in the gas gridRebecca Markillie
 
Investing in Future Transport Presentation, City Hall
Investing in Future Transport Presentation, City HallInvesting in Future Transport Presentation, City Hall
Investing in Future Transport Presentation, City HallRebecca Markillie
 
London Hydrogen Partnership Stationary Hydrogen and FuelCell Showcase
London Hydrogen Partnership Stationary Hydrogen and FuelCell ShowcaseLondon Hydrogen Partnership Stationary Hydrogen and FuelCell Showcase
London Hydrogen Partnership Stationary Hydrogen and FuelCell ShowcaseRebecca Markillie
 
Energy Storage | Fuel Security , Presented at Energy Institute, London
Energy Storage | Fuel Security , Presented at Energy Institute, LondonEnergy Storage | Fuel Security , Presented at Energy Institute, London
Energy Storage | Fuel Security , Presented at Energy Institute, LondonRebecca Markillie
 
ITM Power Awareness Campaign
ITM Power Awareness CampaignITM Power Awareness Campaign
ITM Power Awareness CampaignRebecca Markillie
 

Mehr von Rebecca Markillie (14)

Company Update February 2017
Company Update February 2017Company Update February 2017
Company Update February 2017
 
ITM Power: Solar Hydrogen Station
ITM Power: Solar Hydrogen StationITM Power: Solar Hydrogen Station
ITM Power: Solar Hydrogen Station
 
ITM Power: Solar Hydrogen Station
ITM Power: Solar Hydrogen StationITM Power: Solar Hydrogen Station
ITM Power: Solar Hydrogen Station
 
NPL Opening 10th may
NPL Opening 10th mayNPL Opening 10th may
NPL Opening 10th may
 
Annual_Report_2015
Annual_Report_2015Annual_Report_2015
Annual_Report_2015
 
ITM Power Company Presentation
ITM Power Company PresentationITM Power Company Presentation
ITM Power Company Presentation
 
ITM Power Hydrogen Solutions/ Case Studies
ITM Power Hydrogen Solutions/ Case StudiesITM Power Hydrogen Solutions/ Case Studies
ITM Power Hydrogen Solutions/ Case Studies
 
ITM Power: Mobilité HYDROGÈNE France
ITM Power: Mobilité HYDROGÈNE FranceITM Power: Mobilité HYDROGÈNE France
ITM Power: Mobilité HYDROGÈNE France
 
ITM Power Corporate Brochure
ITM Power Corporate BrochureITM Power Corporate Brochure
ITM Power Corporate Brochure
 
Power-to-gas storing renewable energy in the gas grid
Power-to-gas storing renewable energy in the gas gridPower-to-gas storing renewable energy in the gas grid
Power-to-gas storing renewable energy in the gas grid
 
Investing in Future Transport Presentation, City Hall
Investing in Future Transport Presentation, City HallInvesting in Future Transport Presentation, City Hall
Investing in Future Transport Presentation, City Hall
 
London Hydrogen Partnership Stationary Hydrogen and FuelCell Showcase
London Hydrogen Partnership Stationary Hydrogen and FuelCell ShowcaseLondon Hydrogen Partnership Stationary Hydrogen and FuelCell Showcase
London Hydrogen Partnership Stationary Hydrogen and FuelCell Showcase
 
Energy Storage | Fuel Security , Presented at Energy Institute, London
Energy Storage | Fuel Security , Presented at Energy Institute, LondonEnergy Storage | Fuel Security , Presented at Energy Institute, London
Energy Storage | Fuel Security , Presented at Energy Institute, London
 
ITM Power Awareness Campaign
ITM Power Awareness CampaignITM Power Awareness Campaign
ITM Power Awareness Campaign
 

Kürzlich hochgeladen

The Future of Software Development - Devin AI Innovative Approach.pdf
The Future of Software Development - Devin AI Innovative Approach.pdfThe Future of Software Development - Devin AI Innovative Approach.pdf
The Future of Software Development - Devin AI Innovative Approach.pdfSeasiaInfotech2
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Mark Simos
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyAlfredo García Lavilla
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brandgvaughan
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Mattias Andersson
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...Fwdays
 
Story boards and shot lists for my a level piece
Story boards and shot lists for my a level pieceStory boards and shot lists for my a level piece
Story boards and shot lists for my a level piececharlottematthew16
 
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr LapshynFwdays
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxNavinnSomaal
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenHervé Boutemy
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupFlorian Wilhelm
 
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Wonjun Hwang
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationSafe Software
 
Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Manik S Magar
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Patryk Bandurski
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii SoldatenkoFwdays
 
Powerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time ClashPowerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time Clashcharlottematthew16
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr BaganFwdays
 

Kürzlich hochgeladen (20)

The Future of Software Development - Devin AI Innovative Approach.pdf
The Future of Software Development - Devin AI Innovative Approach.pdfThe Future of Software Development - Devin AI Innovative Approach.pdf
The Future of Software Development - Devin AI Innovative Approach.pdf
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
Commit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easyCommit 2024 - Secret Management made easy
Commit 2024 - Secret Management made easy
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brand
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
 
Story boards and shot lists for my a level piece
Story boards and shot lists for my a level pieceStory boards and shot lists for my a level piece
Story boards and shot lists for my a level piece
 
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
"Federated learning: out of reach no matter how close",Oleksandr Lapshyn
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptx
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache Maven
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project Setup
 
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
Bun (KitWorks Team Study 노별마루 발표 2024.4.22)
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
 
Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko
 
Powerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time ClashPowerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time Clash
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan
 

ITM Power Interim Results Presentation for the Six months Ended 31st October 2010

  • 1. ITM Power plc Interim Results Presentation, 20th Jan 2011 “With more than 500 Fuel Cell cars covering over 15m km and 90,000 refuellings the focus has now shifted from demonstration to planning commercial deployment” McKinsey & Company ITM POWER | Final Results Presentation, 3020th Jan 2011 ITM POWER | Interim Results Presentation July 2010
  • 2. ITM Power plc Interim Results Presentation, 20th Jan 2011 Contents Progress Summary Product CE and Commercialisation Product Trials Projects Interim Results Outlook ITM POWER | Final Results Presentation, 3020th Jan 2011 ITM POWER | Interim Results Presentation July 2010
  • 3. Summary of Successes A Year of Accreditation, Trials, Grants and Early Revenue 2011 will be the transformational year • Strong technology progress • Game changing Fuel Cell performance • 5 products defined and launched • HPac CE mark achieved • 3 product trial partners • 21 HOST trial partners • £1m of grants from TSB, CT, YF and EPSRC • Awareness campaign has been hugely successful ITM POWER | Final Results Presentation, 3020th Jan 2011 ITM POWER | Interim Results Presentation July 2010
  • 4. Summary of Challenges A Year of Accreditation, Trials, Grants and Early Revenue Some key challenges to address • Establish product longevity • Fuel cell business model and long term partner • Product manufacturing to cost and volume • Product reliability in the field • Product sales channels with healthy margins • A small number of significant grants • Awareness turned into revenue • Adoption of hydrogen refuelling ITM POWER | Final Results Presentation, 3020th Jan 2011 ITM POWER | Interim Results Presentation July 2010
  • 5. CE Marking Update ITM POWER | Final Results Presentation, 3020th Jan 2011 ITM POWER | Interim Results Presentation July 2010
  • 6. CE Marking Strategy and Current Status Documented evidence of compliance to the relevant directives • Prioritised HPac (>3,500 hours system operation) • HBox and HFlame in a more rapid follow-on process • Progress on HLab has been temporarily suspended to prioritise others ISO CE Marking Sales Timescale CAD BoM Routing Procure PED MD Atex EMC Trials Pricing Channel HPac Completed HBox End of Q1 HFLame End of Q1 HLab End of Q2 ITM POWER | Final Results Presentation, 3020th Jan 2011 ITM POWER | Interim Results Presentation July 2010
  • 7. CE Marking New Universal Control System Documented evidence of compliance to the relevant directives • Developed a new, compliant control system • Can be used for all products to increase volume and reduce cost • Significant cost reductions in production • Option to part populate for less complex products • Data logging and telemetry incorporated ITM POWER | Final Results Presentation, 3020th Jan 2011 ITM POWER | Interim Results Presentation July 2010
  • 8. The CE Marking Process A Framework for CE Approval Have established good working relationships • Hydrogen was new to most of the Notified Bodies • Initially NoBo’s were slow to respond • We have led the framework for compliance Product Relevant Directives MachD EMC ATEX PED HPac X X X X HLab X X X HBox X X X X HFlame X X X ITM POWER | Final Results Presentation, 3020th Jan 2011 ITM POWER | Interim Results Presentation July 2010
  • 9. HPac Market Offering HPac10 Market Offering Available for sale at Hannover Messe in April • Fuel cell labs • Universities • Hydrogen demonstration projects • Small refuelling demonstrations ITM POWER | Final Results Presentation, 3020th Jan 2011 ITM POWER | Interim Results Presentation July 2010
  • 10. HPac Market Offering HPac10 Manufacturing Partnership with Tharsus • Well respected company • Many blue chip partners • From bespoke to batch production • High volume capability • Coherent manufacturing approach ITM POWER | Final Results Presentation, 3020th Jan 2011 ITM POWER | Interim Results Presentation July 2010
  • 11. Product Trials ITM POWER | Final Results Presentation, 3020th Jan 2011 ITM POWER | Interim Results Presentation July 2010
  • 12. Product Trials HPac | Birmingham University First product sale, first major trial • Product Delivered • Commissioning Jan • On board telemetry • Dedicated technician • Integration with fuel cell lab • Integration with vehicle refuelling ITM POWER | Final Results Presentation, 3020th Jan 2011 ITM POWER | Interim Results Presentation July 2010
  • 13. Product Trials HBox PV | Glamorgan University First green hydrogen trial • Verbally agreed, negotiating contract • Delivery Q2 • Commissioning Q2 • Strategic relationship • Spingboard to M4 corridor tenders • On board telemetry ITM POWER | Final Results Presentation, 3020th Jan 2011 ITM POWER | Interim Results Presentation July 2010
  • 14. Product Trials HFlame | Ametek Brazing Trial First niche flux-less brazing of refrigeration systems • Portable flame generator • High temperature thermal process • Delivery Jan 31 • Trials during Q1 ITM POWER | Final Results Presentation, 3020th Jan 2011 ITM POWER | Interim Results Presentation July 2010
  • 15. HOST ITM POWER | Final 9th December 2010 3M Results Presentation, 30 July 2010 ITM POWER | Interim Results Presentation 20th Jan 2011 ITM POWER | Interim Results Presentation 20th Jan 2011
  • 16. HOST | Phase One HOST | Phase One The Largest UK Cross-Sector Hydrogen Trial • 21 commercial trial partners • Balanced across 7 major industrial sectors • No further partners will be offered a free trial • Conducted over a year long period • Using a dedicated team • Data comprehensively reported to partners • Non confidential results will be published ITM POWER | Final Results Presentation, 3020th Jan 2011 ITM POWER | Interim Results Presentation July 2010
  • 17. HOST | Partners Hydrogen on Site Trials Trials begin Q1 2011 ITM POWER | Final Results Presentation, 3020th Jan 2011 ITM POWER | Interim Results Presentation July 2010
  • 18. HOST | Opening Stansted Airport Opening On 8th March 2011 at the Hilton Hotel Stansted • Register online • 250 visitor places • 150 already booked • Presentations • Partner display area • Refuelling demonstration ITM POWER | Final Results Presentation, 3020th Jan 2011 ITM POWER | Interim Results Presentation July 2010
  • 19. Funded Product Development Projects ITM POWER | Final Results Presentation, 3020th Jan 2011 ITM POWER | Interim Results Presentation July 2010
  • 20. Funded Product Development Projects Next Energy | Home Refuelling Design stage complete | Final report submitted • Further DoE funding sought • Car companies very interested • ITM’s reputation significantly enhanced • High pressure electrolysis desirable 200 Bar Prototype Stack ITM POWER | Final Results Presentation, 3020th Jan 2011 ITM POWER | Interim Results Presentation July 2010
  • 21. Funded Product Development Projects CREO | Emissions Control Carbon Reduction by Emissions Optimisation • On-board H2 dispensing to exhaust • TSB funded project • Led by Ford • Strong partners • A potential new product • New website coming soon • www.creoproject.com ITM POWER | Final Results Presentation, 3020th Jan 2011 ITM POWER | Interim Results Presentation July 2010
  • 22. Fuel Cell Current Status ITM POWER | Final Results Presentation, 3020th Jan 2011 ITM POWER | Interim Results Presentation July 2010
  • 23. Fuel Cell MEA Performance The Fuel Cell MEA A step change in fuel cell performance • Outstanding power density | highest recorded • Vast potential in applications with challenging weight and volume constraints • Cost saving potential via miniaturisation Hydrogen & Oxygen at 30 psi ITM POWER | Final Results Presentation, 3020th Jan 2011 ITM POWER | Interim Results Presentation July 2010
  • 24. Fuel Cell Development Path The Fuel Cell MEA Research and development challenges • Early stage project to establish performance with air • Characterise to industry protocols • Target the automotive sector • Seek end user partnerships • Address new challenges presented by ultra high current density • Funded by the Carbon Trust ITM POWER | Final Results Presentation, 3020th Jan 2011 ITM POWER | Interim Results Presentation July 2010
  • 25. Hydrogen Refuelling | Market Developments ITM POWER | FinalInterim Results Presentation th Jan 2011 ITM POWER | Results Presentation, 30 July 2010 ITM POWER | Interim Results Presentation 20 20th Jan 2011 Open Day Presentation
  • 26. Hydrogen Refuelling | Market Developments Oil Prices Oil and Gasoline Prices are Steadily Rising • Crude oil approaching $100 a barrel • The age of cheap oil is over ITM POWER | Final Results Presentation, 3020th Jan 2011 ITM POWER | Interim Results Presentation July 2010
  • 27. Hydrogen Refuelling | Market Developments Japan, US & Germany Adopt Hydrogen Toyota, Honda and Nissan join forces to promote hydrogen • Total of 100 hydrogen refuelling stations planned in Japan • 1000 refuelling stations in Germany in 4yrs ($2.6bn) • 150 planned in California (30 already built) ITM POWER | Final Results Presentation, 3020th Jan 2011 ITM POWER | Interim Results Presentation July 2010
  • 28. Hydrogen Refuelling | Market Developments The Hydrogen Tide is Turning in the UK Energy storage for renewables is now linked to hydrogen • Questions in the house from Charles Hendry • David Willetts in presentations • Kit Malthouse in The Times • Bow Group paper • ITM power now associated with renewable energy storage • ITM featured in Boxing Day Sunday Times ITM POWER | Final Results Presentation, 3020th Jan 2011 ITM POWER | Interim Results Presentation July 2010
  • 29. ITM Power plc Interim Results 20th Jan 2011 ITM POWER | Final Results Presentation, 3020th Jan 2011 ITM POWER | InterimPresentation 15th Dec 2010 2010 Board Results Presentation July
  • 30. Interim Financial Results to 31 Oct 2010 Financial Highlights • Pre-tax loss down to £3.0m from £3.4m • Period end cash balance £14.7m • Cash burn in period £2.2m • Investment in fixed assets £478k, including HFuel £343k H2 2011 Focus • Maximise expenditure control • Maximise automated transactions through integrated systems • Optimise inventory and consolidated purchasing ITM POWER | Final Results Presentation, 3020th Jan 2011 ITM POWER | Interim Results Presentation July 2010
  • 31. Grant Funding Grants to Year End 30 April 2011 To develop commercial relationships and reduce burn rate • Target £700k • £1m achieved • Targeting larger EU & US grants Grants Summary for Year End 30 April 2011 Project Grant Body Committed Invoiced Accrued Total HydroGen TSB 325,000 39,013 197,670 236,683 HFuel TSB 338,000 120,291 201,709 322,000 5kg Stack YF 195,000 102,357 71,643 174,000 Home Refueller NE 60,000 25,604 34,396 60,000 CREO TSB 247,000 0 110,000 110,000 PhD's EPSRC 88,000 0 0 0 FC Carbon Trust 108,000 0 108,000 108,000 TESS NHA Business Link 3,761 3,761 3,761 TESS Hannover Business Link 5,000 5,000 5000 Innovation Vouchers Business Link 6,000 6,000 6,000 Totals 1,375,761 297,026 728,418 1,025,444 ITM POWER | Final Results Presentation, 3020th Jan 2011 ITM POWER | Interim Results Presentation July 2010
  • 32. Outlook • Strong Technology Platform • ISO accreditation • Focused on products • HPac CE mark achieved • Three field trials • 21 commercial partners for HOST • Strong cash position - £14.7m ITM POWER | Final Results Presentation, 3020th Jan 2011 ITM POWER | Interim Results Presentation July 2010