SlideShare ist ein Scribd-Unternehmen logo
1 von 31
Considerations for Reserves Recovery Within
     the Heritage Montney Play, British Columbia




SPE#-149201-PP

Kelly Okuszko, P.Eng.
Mark Hayes, P. Geo.
PURPOSE

Study Focus:
 Report on Heritage Montney reservoir &
completion data to support technical learning and
encourage best practices

 data available online


Challenge:
 Grouping analogous wells to make “Apples to
Apples” comparisons

 Lack of flowing pressure data to analyze true
deliverability on rate restricted wells
Heritage Field

543,434 hectares                         Fort St John



As of June 2011:
                       Hudson’s Hope
669 producing wells,
1.3 bcf/d

                                        Dawson Creek
                             Chetwynd
Well Performance by spud year – all wells
                        120


                                                                                                                              Future improvements
                                                                                                                              to learning curve ?
                        100



                                                                                       HZ drilling, multi-stage fracs
                        80
Avg Daily rate e3m3/d




                                                                                                                                                                  2010
                        60
                                        Vertical drilling
                                                                                                                                                     2009
                                                                                                                2008
                        40
                                                                                       2007


                        20
                                                                           2006


                                         2005
                          0
                              2005-05



                                           2005-11



                                                       2006-05



                                                                 2006-11



                                                                             2007-05



                                                                                          2007-11



                                                                                                      2008-05



                                                                                                                    2008-11



                                                                                                                                 2009-05



                                                                                                                                           2009-11



                                                                                                                                                        2010-05



                                                                                                                                                                  2010-11
                                                                  2010       2009        2008       2007         2006         2005
Heritage Montney A
Major Operator areas

As of March 2011
12 Operators
Grouping the Data: “Apples to Apples” Comparisons


                       Sub Areas
                   (localized reservoir quality)




                   Well Placement
                      (Upper/Middle/Lower)




                On Production Year
                (technical learning & technology)




             Completion Technique
              (cased/openhole, frac fluid, HZ length)
Sub Areas within the Heritage Montney A Play




          46 wells
                            30 wells




                     85 wells
                                       54 wells




     59 wells


                       31 wells
                                                  224 wells




                     11 wells
GROUNDBIRCH   SUNDOWN    SUNRISE        PARKLAND   SWAN   DAWSON




                        Upper Montney




                        Lower Montney
Well Placement: Upper Montney Isopach



                             Thin <50 m




Thin <75 m




                     Thick >200 m



  25m contours
Well Placement: Lower Montney Isopach




                           Thick > 275m




Thin < 75m       Sundown

                                  Swan



  25m contours
Heritage
                     Condensate
                       Trend
Septimus



           Sunrise
Sub Areas: HZ Well Typecurve
Sub Areas within the Heritage Montney Play
Swan Upper Montney
                                                                   By On Prodn Year

                       7



                       6



                       5
Op Gas Rate (MMscfd)




                       4             2010 (6 wells) N2    11 fracs (↑), 1807m3 wtr (↑), 1108T sand (↑)


                       3


                                                      2008    (24 wells) N2 8 fracs (↑),1312m3 wtr (↑), 822T sand (↑)
                       2



                       1                                                     2007 (29 wells) CO2      7 fracs, 848m3 wtr, 673T sand


                       0
                               2009 (32 wells) N2   8 fracs,1112m3 wtr (↓), 763T sand (↓)
                           0            1000          2000           3000             4000          5000         6000          7000
                                                                Cumulative Gas Production (MMscf)
Swan – Montney
Reservoir Comparison                             c-56-A   c-3-H

                                 Upper Montney




                                 Lower Montney



                                   c-3-H




                                 c-56-A


  Blue – Upper Montney wells
  Purple – Lower Montney wells
Swan Lower Montney
                                                      By On Prodn Year

                       7



                       6
                               2011 (15 wells), 60% CO2/N2, 40% CO2, 9 fracs, 60% OH
                       5
Op Gas Rate (MMscfd)




                       4



                       3
                                        2010 (47 wells), 60% CO2, 40% N2 or Slickwater, 9 fracs (↑), 90% OH
                       2
                                          2009 (43 wells), CO2, 7 fracs (↓), 50% OH

                       1
                                                                            2008 (18 wells) CO2, 8 fracs (↑)

                                          2007 (7 wells) CO2, 7 fracs
                       0
                           0   1000         2000                 3000                  4000     5000           6000
                                                   Cumulative Gas Production (MMscf)
2011 Lower Montney
                                                           SWAN

                       10


                        9


                        8


                        7
                                               MURPHY 2011 (8 wells)
                                               CO2 /N2
Op Gas Rate (MMscfd)




                        6                      8 fracs, 2676m completed, 1199m3 wtr, 70% OH

                        5
                                                            ENCANA 2011 (7 wells)
                        4                                   CO2
                                                            12 fracs, 1641m completed, 2494m3 wtr, 40% OH

                        3


                        2             MURPHY 2010 (19 wells)
                                      CO2 (70%)
                                      9 fracs, 2676m completed, 1559m3 wtr, 70% OH         ENCANA 2010 (27 wells)
                        1
                                                                                           Mix of CO2, N2, slickwater
                                                                                           10 fracs, 1590m completed, 4165m3 wtr, 96% OH
                        0
                            0   200    400           600            800             1000         1200          1400          1600
                                                      Cumulative Gas Production (MMscf)
2011 Lower Montney
                                              Swan & Sundown
                       10


                        9


                        8


                        7
Op Gas Rate (MMscfd)




                        6                                                         SWAN - CO2/N2 (8 wells)
                                                                                  8 fracs, 2676m completed, 1199m3 wtr
                        5


                        4
                                                                         SUNDOWN - CO2/N2         (8 wells)
                                                                         13 fracs, 1525m completed (↓), 1114m3 wtr
                        3


                        2                                        SUNDOWN - CO2 (13 wells)
                                                     SUNDOWN - Slickwater          (4 wells)
                        1


                        0
                            0   100   200   300            400              500           600            700             800
                                             Cumulative Gas Production (MMscf)
Dawson Upper Montney
                                                                        By On Prodn Year

                                                                                                                           2007

                       10                                                                                                  2008

                                                                                                                           2009

                                                                                                                           2010
                        8
Op Gas Rate (MMscfd)




                                                    2009: Bigger CO2 Fracs, Higher Pump Rate
                        6                           10 fracs(↑), 1606m completed(↑), 1578m3 wtr(↑), 960T sand(↑), 1246m3
                                                    CO2(↑), 6m3/min(↑)



                        4
                                rate restricted                                ↑
                        2

                                                                 2007: 5 fracs, 1196m completed, 1298m3 wtr, 617T
                                                                 sand, 604m3 CO2, 2m3/min
                        0
                            0                 500             1000                 1500                  2000     2500            3000
                                                                     Cumulative Gas Production (MMscf)
Sunrise Upper Montney
                                                         By On Prodn Year

                       8
                                                                                                        2008

                       7                                                                                2009

                       6                                                                                2010
Op Gas Rate (MMscfd)




                       5


                       4
                                      New operators - learning curve and infrastructure
                       3


                       2


                       1


                       0
                           0   1000            2000                 3000                  4000   5000          6000
                                                      Cumulative Gas Production (MMscf)
Sunrise Upper Montney
                                                      2010 - By Operator

                       6


                               All slickwater, except ENCANA N2
                       5



                                               HURON          (4 wells) More water & sand, Higher pump rate
                       4
                                               Smaller completed interval
Op Gas Rate (MMscfd)




                       3



                                                                                   SHELL (19 wells)
                       2


                                                                                 ENCANA (17 wells)
                       1                    TOURMALINE             (6 wells)



                       0
                           0    200   400      600           800          1000       1200    1400     1600   1800
                                                     Cumulative Gas Production (MMscf)
Septimus Upper Montney
                                                      By On Prodn Year

                       8


                       7


                       6
                               2010   (17 wells)
                               100% slickwater
Op Gas Rate (MMscfd)




                       5


                       4
                                                                                2009    (7 wells)
                       3                                                        60% N2 (CNRL),
                                                                                40% slickwater (Crew)
                       2


                       1
                                                                               2008    (8 wells) 50% CO2,
                                                                               rest N2, CO2/N2 or slickwater
                       0
                           0   200          400          600             800             1000          1200    1400
                                                   Cumulative Gas Production (MMscf)
Septimus Upper Montney
                                              2010
                       8



                       7



                       6                                  CNRL (10 wells) 9 fracs, 1564m
                                                          completed, 6582m3 wtr, 963T
                                                          sand,10m3/min
Op Gas Rate (MMscfd)




                       5



                       4
                                                     Both slickwater
                                                     CNRL –↑ fracs, ↑ water, ↑ HZ
                       3



                       2
                                                       CREW(6 wells) 5 fracs, 1268m
                                                       completed, 4952m3 wtr, 1020T
                       1                               sand, 10.7m3/min

                       0
                           0   200    400                 600                   800   1000   1200
                                            Cumulative Gas Production (MMscf)
Observations


   Reservoir trumps completion

   Notable improvement in gas recovery:
        2010 Slickwater fracs (CNRL)
            Upper Montney at Septimus

        2011 Binary CO2/N2 fracs (Murphy)
            Lower Montney at Swan & Sundown

     More to come?


        Frac ≠ Frac ≠ Frac
OPEN FOR STUDY

 Heritage Montney Completions Database available online:
http://www.bcogc.ca/industryzone/forms/resourceconservation.aspx




Electronic submission of frac reports coming soon !
ACKNOWLEDGEMENTS

 BC Oil & Gas Commission
   Mark Hayes – Co-author, Petroleum Geologist
   Travis Mercure – Engineering Analysis
   Verna Kazakoff – Completions Analysis
   Richard Slocomb & Ron Stefik – Engineering Guidance

 Fekete Associates Inc.
  Harmony Software – generating typecurves

   Canadian Discovery Ltd.
    Frac Database – detailed frac data including costs

   Operators in Heritage Montney – Excel completions data
    CNRL
    Murphy
    Crew
    EnCana
    Shell
    Tourmaline
    Huron
    Storm
    ARC
Considerations for Reserves Recovery Within the
Heritage Montney Play, British Columbia
          More Information:

          Kelly Okuszko, P. Eng          Mark Hayes, P. Geo
          BC Oil and Gas Commission
          250-419-4433                   250-419-4431
          www.bcogc.ca
          Kelly.Okuszko@bcogc.ca      Mark.Hayes@bcogc.ca

          Nov. 2011

Weitere ähnliche Inhalte

Ähnlich wie Considerations for Reserves Recovery Within the Montney Play

Comms day sydney 2013 anz international capacity perspectives
Comms day sydney 2013 anz international capacity perspectivesComms day sydney 2013 anz international capacity perspectives
Comms day sydney 2013 anz international capacity perspectivesSCCLA
 
Calculation And Sensitivity Analysis Of The Infrastructure Leakage Index
Calculation And Sensitivity Analysis Of The Infrastructure Leakage IndexCalculation And Sensitivity Analysis Of The Infrastructure Leakage Index
Calculation And Sensitivity Analysis Of The Infrastructure Leakage IndexAaron Burton
 
newmont mining 6_Asia-Pacific_Overview_Indonesia_Final1
newmont mining 6_Asia-Pacific_Overview_Indonesia_Final1newmont mining 6_Asia-Pacific_Overview_Indonesia_Final1
newmont mining 6_Asia-Pacific_Overview_Indonesia_Final1finance37
 
newmont mining 6_Asia-Pacific_Overview_Indonesia_Final1
newmont mining 6_Asia-Pacific_Overview_Indonesia_Final1newmont mining 6_Asia-Pacific_Overview_Indonesia_Final1
newmont mining 6_Asia-Pacific_Overview_Indonesia_Final1finance37
 
01 edwin koot - solarplaza
01   edwin koot - solarplaza01   edwin koot - solarplaza
01 edwin koot - solarplazaLinea Trovata
 
SKF First-quarter result slide show
SKF First-quarter result slide showSKF First-quarter result slide show
SKF First-quarter result slide showSKF
 
Bill Grieser - Annual Meeting
Bill Grieser - Annual MeetingBill Grieser - Annual Meeting
Bill Grieser - Annual MeetingAIPRO
 
Global Mining Industry and its Project Pipelines
Global Mining Industry and its Project PipelinesGlobal Mining Industry and its Project Pipelines
Global Mining Industry and its Project PipelinesNo to mining in Palawan
 
CA potential effects on soil erosion for rainfed crops in the Lake Alaotra re...
CA potential effects on soil erosion for rainfed crops in the Lake Alaotra re...CA potential effects on soil erosion for rainfed crops in the Lake Alaotra re...
CA potential effects on soil erosion for rainfed crops in the Lake Alaotra re...Joanna Hicks
 

Ähnlich wie Considerations for Reserves Recovery Within the Montney Play (11)

Comms day sydney 2013 anz international capacity perspectives
Comms day sydney 2013 anz international capacity perspectivesComms day sydney 2013 anz international capacity perspectives
Comms day sydney 2013 anz international capacity perspectives
 
2013 02 28
2013 02 282013 02 28
2013 02 28
 
Orelogy - Austmine
Orelogy - AustmineOrelogy - Austmine
Orelogy - Austmine
 
Calculation And Sensitivity Analysis Of The Infrastructure Leakage Index
Calculation And Sensitivity Analysis Of The Infrastructure Leakage IndexCalculation And Sensitivity Analysis Of The Infrastructure Leakage Index
Calculation And Sensitivity Analysis Of The Infrastructure Leakage Index
 
newmont mining 6_Asia-Pacific_Overview_Indonesia_Final1
newmont mining 6_Asia-Pacific_Overview_Indonesia_Final1newmont mining 6_Asia-Pacific_Overview_Indonesia_Final1
newmont mining 6_Asia-Pacific_Overview_Indonesia_Final1
 
newmont mining 6_Asia-Pacific_Overview_Indonesia_Final1
newmont mining 6_Asia-Pacific_Overview_Indonesia_Final1newmont mining 6_Asia-Pacific_Overview_Indonesia_Final1
newmont mining 6_Asia-Pacific_Overview_Indonesia_Final1
 
01 edwin koot - solarplaza
01   edwin koot - solarplaza01   edwin koot - solarplaza
01 edwin koot - solarplaza
 
SKF First-quarter result slide show
SKF First-quarter result slide showSKF First-quarter result slide show
SKF First-quarter result slide show
 
Bill Grieser - Annual Meeting
Bill Grieser - Annual MeetingBill Grieser - Annual Meeting
Bill Grieser - Annual Meeting
 
Global Mining Industry and its Project Pipelines
Global Mining Industry and its Project PipelinesGlobal Mining Industry and its Project Pipelines
Global Mining Industry and its Project Pipelines
 
CA potential effects on soil erosion for rainfed crops in the Lake Alaotra re...
CA potential effects on soil erosion for rainfed crops in the Lake Alaotra re...CA potential effects on soil erosion for rainfed crops in the Lake Alaotra re...
CA potential effects on soil erosion for rainfed crops in the Lake Alaotra re...
 

Kürzlich hochgeladen

Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxthorishapillay1
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersSabitha Banu
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPCeline George
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designMIPLM
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPCeline George
 
Karra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxKarra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxAshokKarra1
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parentsnavabharathschool99
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for BeginnersSabitha Banu
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Q4 English4 Week3 PPT Melcnmg-based.pptx
Q4 English4 Week3 PPT Melcnmg-based.pptxQ4 English4 Week3 PPT Melcnmg-based.pptx
Q4 English4 Week3 PPT Melcnmg-based.pptxnelietumpap1
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Celine George
 
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYKayeClaireEstoconing
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONHumphrey A Beña
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Celine George
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatYousafMalik24
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4MiaBumagat1
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceSamikshaHamane
 

Kürzlich hochgeladen (20)

FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptxFINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptx
 
DATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginnersDATA STRUCTURE AND ALGORITHM for beginners
DATA STRUCTURE AND ALGORITHM for beginners
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERP
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-design
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERP
 
Karra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptxKarra SKD Conference Presentation Revised.pptx
Karra SKD Conference Presentation Revised.pptx
 
Choosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for ParentsChoosing the Right CBSE School A Comprehensive Guide for Parents
Choosing the Right CBSE School A Comprehensive Guide for Parents
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for Beginners
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
Q4 English4 Week3 PPT Melcnmg-based.pptx
Q4 English4 Week3 PPT Melcnmg-based.pptxQ4 English4 Week3 PPT Melcnmg-based.pptx
Q4 English4 Week3 PPT Melcnmg-based.pptx
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17
 
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptxYOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice great
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in Pharmacovigilance
 

Considerations for Reserves Recovery Within the Montney Play

  • 1. Considerations for Reserves Recovery Within the Heritage Montney Play, British Columbia SPE#-149201-PP Kelly Okuszko, P.Eng. Mark Hayes, P. Geo.
  • 2. PURPOSE Study Focus:  Report on Heritage Montney reservoir & completion data to support technical learning and encourage best practices  data available online Challenge:  Grouping analogous wells to make “Apples to Apples” comparisons  Lack of flowing pressure data to analyze true deliverability on rate restricted wells
  • 3. Heritage Field 543,434 hectares Fort St John As of June 2011: Hudson’s Hope 669 producing wells, 1.3 bcf/d Dawson Creek Chetwynd
  • 4. Well Performance by spud year – all wells 120 Future improvements to learning curve ? 100 HZ drilling, multi-stage fracs 80 Avg Daily rate e3m3/d 2010 60 Vertical drilling 2009 2008 40 2007 20 2006 2005 0 2005-05 2005-11 2006-05 2006-11 2007-05 2007-11 2008-05 2008-11 2009-05 2009-11 2010-05 2010-11 2010 2009 2008 2007 2006 2005
  • 5. Heritage Montney A Major Operator areas As of March 2011 12 Operators
  • 6. Grouping the Data: “Apples to Apples” Comparisons Sub Areas (localized reservoir quality) Well Placement (Upper/Middle/Lower) On Production Year (technical learning & technology) Completion Technique (cased/openhole, frac fluid, HZ length)
  • 7. Sub Areas within the Heritage Montney A Play 46 wells 30 wells 85 wells 54 wells 59 wells 31 wells 224 wells 11 wells
  • 8. GROUNDBIRCH SUNDOWN SUNRISE PARKLAND SWAN DAWSON Upper Montney Lower Montney
  • 9. Well Placement: Upper Montney Isopach Thin <50 m Thin <75 m Thick >200 m 25m contours
  • 10. Well Placement: Lower Montney Isopach Thick > 275m Thin < 75m Sundown Swan 25m contours
  • 11. Heritage Condensate Trend Septimus Sunrise
  • 12. Sub Areas: HZ Well Typecurve
  • 13. Sub Areas within the Heritage Montney Play
  • 14. Swan Upper Montney By On Prodn Year 7 6 5 Op Gas Rate (MMscfd) 4 2010 (6 wells) N2 11 fracs (↑), 1807m3 wtr (↑), 1108T sand (↑) 3 2008 (24 wells) N2 8 fracs (↑),1312m3 wtr (↑), 822T sand (↑) 2 1 2007 (29 wells) CO2 7 fracs, 848m3 wtr, 673T sand 0 2009 (32 wells) N2 8 fracs,1112m3 wtr (↓), 763T sand (↓) 0 1000 2000 3000 4000 5000 6000 7000 Cumulative Gas Production (MMscf)
  • 15. Swan – Montney Reservoir Comparison c-56-A c-3-H Upper Montney Lower Montney c-3-H c-56-A Blue – Upper Montney wells Purple – Lower Montney wells
  • 16. Swan Lower Montney By On Prodn Year 7 6 2011 (15 wells), 60% CO2/N2, 40% CO2, 9 fracs, 60% OH 5 Op Gas Rate (MMscfd) 4 3 2010 (47 wells), 60% CO2, 40% N2 or Slickwater, 9 fracs (↑), 90% OH 2 2009 (43 wells), CO2, 7 fracs (↓), 50% OH 1 2008 (18 wells) CO2, 8 fracs (↑) 2007 (7 wells) CO2, 7 fracs 0 0 1000 2000 3000 4000 5000 6000 Cumulative Gas Production (MMscf)
  • 17. 2011 Lower Montney SWAN 10 9 8 7 MURPHY 2011 (8 wells) CO2 /N2 Op Gas Rate (MMscfd) 6 8 fracs, 2676m completed, 1199m3 wtr, 70% OH 5 ENCANA 2011 (7 wells) 4 CO2 12 fracs, 1641m completed, 2494m3 wtr, 40% OH 3 2 MURPHY 2010 (19 wells) CO2 (70%) 9 fracs, 2676m completed, 1559m3 wtr, 70% OH ENCANA 2010 (27 wells) 1 Mix of CO2, N2, slickwater 10 fracs, 1590m completed, 4165m3 wtr, 96% OH 0 0 200 400 600 800 1000 1200 1400 1600 Cumulative Gas Production (MMscf)
  • 18.
  • 19. 2011 Lower Montney Swan & Sundown 10 9 8 7 Op Gas Rate (MMscfd) 6 SWAN - CO2/N2 (8 wells) 8 fracs, 2676m completed, 1199m3 wtr 5 4 SUNDOWN - CO2/N2 (8 wells) 13 fracs, 1525m completed (↓), 1114m3 wtr 3 2 SUNDOWN - CO2 (13 wells) SUNDOWN - Slickwater (4 wells) 1 0 0 100 200 300 400 500 600 700 800 Cumulative Gas Production (MMscf)
  • 20.
  • 21. Dawson Upper Montney By On Prodn Year 2007 10 2008 2009 2010 8 Op Gas Rate (MMscfd) 2009: Bigger CO2 Fracs, Higher Pump Rate 6 10 fracs(↑), 1606m completed(↑), 1578m3 wtr(↑), 960T sand(↑), 1246m3 CO2(↑), 6m3/min(↑) 4 rate restricted ↑ 2 2007: 5 fracs, 1196m completed, 1298m3 wtr, 617T sand, 604m3 CO2, 2m3/min 0 0 500 1000 1500 2000 2500 3000 Cumulative Gas Production (MMscf)
  • 22.
  • 23. Sunrise Upper Montney By On Prodn Year 8 2008 7 2009 6 2010 Op Gas Rate (MMscfd) 5 4 New operators - learning curve and infrastructure 3 2 1 0 0 1000 2000 3000 4000 5000 6000 Cumulative Gas Production (MMscf)
  • 24. Sunrise Upper Montney 2010 - By Operator 6 All slickwater, except ENCANA N2 5 HURON (4 wells) More water & sand, Higher pump rate 4 Smaller completed interval Op Gas Rate (MMscfd) 3 SHELL (19 wells) 2 ENCANA (17 wells) 1 TOURMALINE (6 wells) 0 0 200 400 600 800 1000 1200 1400 1600 1800 Cumulative Gas Production (MMscf)
  • 25.
  • 26. Septimus Upper Montney By On Prodn Year 8 7 6 2010 (17 wells) 100% slickwater Op Gas Rate (MMscfd) 5 4 2009 (7 wells) 3 60% N2 (CNRL), 40% slickwater (Crew) 2 1 2008 (8 wells) 50% CO2, rest N2, CO2/N2 or slickwater 0 0 200 400 600 800 1000 1200 1400 Cumulative Gas Production (MMscf)
  • 27. Septimus Upper Montney 2010 8 7 6 CNRL (10 wells) 9 fracs, 1564m completed, 6582m3 wtr, 963T sand,10m3/min Op Gas Rate (MMscfd) 5 4 Both slickwater CNRL –↑ fracs, ↑ water, ↑ HZ 3 2 CREW(6 wells) 5 fracs, 1268m completed, 4952m3 wtr, 1020T 1 sand, 10.7m3/min 0 0 200 400 600 800 1000 1200 Cumulative Gas Production (MMscf)
  • 28. Observations  Reservoir trumps completion  Notable improvement in gas recovery: 2010 Slickwater fracs (CNRL) Upper Montney at Septimus 2011 Binary CO2/N2 fracs (Murphy) Lower Montney at Swan & Sundown More to come? Frac ≠ Frac ≠ Frac
  • 29. OPEN FOR STUDY  Heritage Montney Completions Database available online: http://www.bcogc.ca/industryzone/forms/resourceconservation.aspx Electronic submission of frac reports coming soon !
  • 30. ACKNOWLEDGEMENTS  BC Oil & Gas Commission Mark Hayes – Co-author, Petroleum Geologist Travis Mercure – Engineering Analysis Verna Kazakoff – Completions Analysis Richard Slocomb & Ron Stefik – Engineering Guidance  Fekete Associates Inc. Harmony Software – generating typecurves  Canadian Discovery Ltd. Frac Database – detailed frac data including costs  Operators in Heritage Montney – Excel completions data CNRL Murphy Crew EnCana Shell Tourmaline Huron Storm ARC
  • 31. Considerations for Reserves Recovery Within the Heritage Montney Play, British Columbia More Information: Kelly Okuszko, P. Eng Mark Hayes, P. Geo BC Oil and Gas Commission 250-419-4433 250-419-4431 www.bcogc.ca Kelly.Okuszko@bcogc.ca Mark.Hayes@bcogc.ca Nov. 2011

Hinweis der Redaktion

  1. Compare typecurves by on production yearlook for improvements in recovery – relate back to completion techniques and reservoir quality/geology
  2. As of June 2011 – 669 wells on prodn, producing at 1.3 bcf/d, 30% of BC prodnHeritage field chosen for the study - Significant source of production and growth for BC-high HZ drilling density in recent years-impressive production results
  3. 2007 – switch from VT to HZ drilling, significant increase in prodn,Focus on normalizing the HZ data from 2007-2010 to look for improvements in gas recovery
  4. Each operator has its own strategy for developing the resourceOGC supports the technical learning curve by collecting and publishing public data
  5. Significant variations in reservoir quality across the field, need for sub areas
  6. 540 HZ wells in study – on production date between 2007 – 2011Today – discussing Swan, Sundown, Dawson, Sunrise &amp; Septimus
  7. Dawson – best reservoir qualtiyEncouraging 2011results in the Lower in Swan and Sundown2 prospective targets in the Upper Montney where it thickens to the west
  8. Upper – turquoise, Middle – orange
  9. Wells targeting the Lower Montney shown in PinkActivity focused in the turbidite channel in Swan and Sundown
  10. Green area – condensate rich areaPurple dots = wells with reported condensate production ratio of GT 1bbl/MMcfHi gas liquids content areas – Septimus and SunrisePurple contours CGR 0, 5bbl/MMCF and 10bbl/MMcfGreen areas are the C5+/C1to C4 ratios contoured
  11. All HZ wells from 2007-2010Dawson stands out, excellent reservoir quality (porosity)Beyond the limits of geology, how can the well placement &amp; completions improve production resultsWhich areas have made strides to increase recovery in past 4 years?Through innovation in frac fluid &amp; technique, other sub areas, and certain operators in particular, are making significant strides to improve their production
  12. Brief history on each (# of wells drilled, upper/lower, completion technique)Animate wells drilled by year?Animate with play trends – condensate, turbidite, pressure &amp; depth?
  13. Majority of wells Cased hole (~90%), remaining 10% Openhole in 2007, 2008, 20092007 – 29 wells on prdn, 7 fracs, 69% CO2, 94% Cased2008 – 24 wells, 8 fracs, 75% N2, 88% Cased2009 – 32 wells, 8 fracs, 63% N2, 91% Cased, step out drilling – see next slide2010 – 6 wells, 11 fracs, 83% N2, 100% Cased, back to good reservoir areaProdn increasing each year w/ bigger fracs, w/ except of 2009 – well locations, moving into areas of lower res quality
  14. Swan LowerBiggest concentration of Openhole completions among the subareasIncrease from 7-8 fracs in 2007/09 to 9 fracs in 2010/11Predominantly CO2 fracs in 2007,08,09 – moving towards CO2/N2 (~40%) in 2010/11Majority Openhole completions in 2010 (87%), 60% Openhole in 2011
  15. EnCana 2011 prodn profile flat at lower rate – need flowing pressures to understand full potential
  16. Prodn restricted, need flowing pressures to forecast ultimate recoverableSome of the best reservoir quality in Heritage so far. Mainly dry gas, no condensateMissing some data, predominantly CO2 fracs, 2 slickwater fracs in 2007All cased hole wellsIncreased fracs from 5 in 2007 to 11 in 2010Increased pump rate in 2009/10 from 2m3/min to 6m3/min
  17. Overall by year, doesn’t look to be improving.High liquidsLook another layer deeper, 4 different operators with different completion techniques2008 – 100% Shell, 50/50 CO2/N22009 – 63% Shell, 32% Huron, 5% Tourmaline2010 – EnCana, Huron, Shell &amp; Tourmaline
  18. Tourmaline – trouble initiating frac w/ perf&amp;plug method, switching to??Majority of wells Cased hole
  19. SeptimusChange in completion techniques from PolyCO2 to slickwater2008 – 50% CO2, rest different combinations of N2, CO2/N2, N2 slickwater w/ CO22009 – 57% N2 (CNRL), 43% slickwater (Crew) – operator specific2010 – all data set slickwater, but missing data
  20. Beyond the limits of geology, significant differences in recovery based on completion techniqueWe look forward to future improvements to gas recovery through innovative completion techniques.Very helpful to have completions data available when comparing well performance – otherwise not comparing “Apples to apples”
  21. All data from this study available online to encourage best practices for increased gas recovery.We are working towards electronic submission of frac reports to get data out to industry quicker.