10. waterfall
phase-gate
68% of
IT projects fail
concept ideation
design
pro
du
cti
on
http://www.flickr.
com/photos/cluczkow/8650038393/
http://www.techrepublic.com/blog/tech-decisionmaker/study-68-percent-of-it-projects-fail/661/
27. user stories @ pacemaker
1_ brainstorm
2_ write down user stories (with acceptance criteria)
3_ prioritize in function of value
4_ start coding
5_ make a Minimum Viable Product that allows
you to test your hypothesis
44. scrum limitations:
_ a lot of meetings -> overhead
_ when a project turnover is 4 weeks, use 2 sprints?
_ 3 columns: no room for mapping the complex value
chain
46. kanban advantages:
_ no timeboxes self emergent meetings
-> less overhead
_ no fixed sprint length
_ multiple columns:
-> room for mapping the complex value chain
_ no burndown (velocity) measurement
-> WIP limits & lead time
62. A culture hack is the minimal, artful
intervention which, if successful, influences the
culture of an organisation by making use of the
crack. A hack consists of activities creating
events that have the potential to change a
prevalent idea or assumption, e.g. by
introducing narratives telling a different truth.
http://bizculturehackers.com/a-culture-hack-is/