Questions we will cover today:
 • What is ISO 9001?
 • What does a company need to do to Register to
 ISO 9001?
 • What are the requirements?
 – Section 4 – General Requirements
 – Section 5 – Management Responsibility
 – Section 6 – Resource Management
 – Section 7 – Product Realization
 – Section 8 - Measurement, Analysis & Improvement
 • What are our next steps?
The Process Model
               Process Model
               Quality Management System(QMS)
                            Continual Improvement
  C                    Management Responsibilities                        C
  U                                                                       U
  S                                                                       S
  T   Resource Management                         Measurement, Analysis   T
  O                                               and Improvement         O
  M                                                                       M
  E                                                                       E
                            Product Realization                           R
  R
The Process Model
 This example of the process model is included in the
    standard.
   The five clauses are all found on the process model.
   Management Responsibility, Measurement Analysis
    and Improvement,
   Product Realization and Resource Management
    make a cycle.
   The most important input to this cycle is customer
    requirements.
   The output of the cycle is customer satisfaction and
    continual improvement
   of the quality system.
   The standard has been organized around this model
General Requirements
 The organization will establish, document,
 implement, maintain and continually improve a
 Quality Management System (QMS)
 – This is where we find the requirement to identify
 processes that need to be controlled, and
 determine how they interrelate
 – The organization must also determine how to
 control any outsourced processes
General Requirements
   This is where we find the requirement to:
   • identify processes that need to be controlled, and
   • determine how they interrelate.
   Steps that need to be taken are:
   •Identify the processes needed for the QMS
   •Determine the sequence and interaction of these processes
   •Determine criteria and methods required to ensure the effective
    operation and
   control of these processes
   •Ensure the availability of information necessary to support the
    operation and
   monitoring of these processes
   •Measure, monitor and analyze these processes and implement action
    necessary to
   achieve planned results and continual improvement
   This section does not address the documentation of the processes
Design and Development
 Your procedure must outline your system
 including:
 – Design and Development planning
 – Design and Development inputs
 – Design and Development outputs
 – Design and Development review
 – Design and Development verification
 – Design and Development validation
 – Control of Design and Development changes
Design and Development
   Your procedure will have a section for each of the items listed on the slide.
   You will need to state what your process is for each of these sections, and
   what your records are.
   For design, it is good to establish a process where the plan becomes the
   outline for the project. It will identify responsibilities, what the inputs are,
   what the timeline is, who needs to be involved in design review, guidelines
   for when to hold design review meetings, how the verification and validation
   will take place.
   Verification is checking to see if the design output meets design input.
   Validation is checking to see if the design performs what it was intended to.
Purchasing
   Purchasing Information
   – Purchasing documents need to identify all
   the requirements relevant to what you are
   purchasing. For example:
   • Quality requirements
   • Identification of the item: specifications,
   catalogue number or other ID
   • Any required class or grade of product
   • Quantities and delivery dates
Purchasing
 This clause refers to the information that you
  put on your PO or other
 purchase documents. The standard is more
  specific what quality
 requirements you put on, and asks for the
  following where appropriate:
 •Requirements for approval of product
 •Requirements for qualification of personnel
 •Quality Management Systems requirements
Improvement
 • Establish a corrective action procedure
 that includes:
 – Identifying nonconformities with the quality
 system, product, processes
 – Handling customer complaints
 – Identifying root cause, action to take to
 prevent reoccurrence
 – Implementing the action and following up
 to determine effectiveness of the action
 – Record results of corrective action
Purchasing
   Corrective action is for investigating problems that have occurred, and taking
   action to prevent reoccurrence.
   You must investigate root cause, what really made this happen? What can
   we do to prevent it from happening again?
   After you have implemented this idea, follow-up to make sure it worked. Is
   the problem still happening? Or has it been prevented from happening again.
   Record the problem, the root cause, the action taken, the effectiveness of
   the action, and the actual results of the corrective action.
   The results of the corrective action is what actually happened after the
   corrective or preventive action was implemented. Did the problem occur
   again? Were you able to see measurable improvement? If so, how much?
   What date did the problem disappear?
   Record the results that you observed when following up on the corrective
Next Steps
 • Determine timeline for implementation
 • Perform Gap Analysis Review how your
 existing quality system fits into ISO
 9001:2008 format
 • Put together an implementation plan
 and timeline
 • Identify a Registrar
Next Steps
 Each organization will have its own way to
  approach the implementation



Performing a gap analysis of
your current system versus the
requirements of
the Standard will give you a task
list to work from to plan your
implementation project.
Next Steps
 A good next step would be to identify and process
    map your key processes.
   The information you get from your Gap, combined
    with the process map and
   list of key processes should give you a good idea of
    what you will need to do
   to implement the standard. Then you can build a
    Gantt chart for the project,
   outlining the task you need to do and the documents
    you will need to get into
   place.

Weitere ähnliche Inhalte

Was ist angesagt?

Quality Slides
Quality SlidesQuality Slides
Quality Slides
RobbieA
 
Quality definition
Quality  definitionQuality  definition
Quality definition
Mohit Singla
 

Was ist angesagt? (20)

principle of six sigma
principle of six sigmaprinciple of six sigma
principle of six sigma
 
ISO 9001:2015 Documentation Requirements
ISO 9001:2015 Documentation RequirementsISO 9001:2015 Documentation Requirements
ISO 9001:2015 Documentation Requirements
 
Quality
QualityQuality
Quality
 
Quality Awareness Session.pptx
Quality Awareness Session.pptxQuality Awareness Session.pptx
Quality Awareness Session.pptx
 
Quality Management System awareness for all
Quality Management System awareness for all Quality Management System awareness for all
Quality Management System awareness for all
 
Quality & Quality tools
Quality & Quality toolsQuality & Quality tools
Quality & Quality tools
 
TQM chapter # 1 - Joel E Ross
TQM chapter # 1 - Joel E RossTQM chapter # 1 - Joel E Ross
TQM chapter # 1 - Joel E Ross
 
Quality and Operational Excellence
Quality and Operational ExcellenceQuality and Operational Excellence
Quality and Operational Excellence
 
GBP AFH Quality Awareness
GBP AFH Quality AwarenessGBP AFH Quality Awareness
GBP AFH Quality Awareness
 
Cost of quality
Cost of qualityCost of quality
Cost of quality
 
ISO 9001: 2015 QUALITY MANAGEMENT SYSTEMS
ISO 9001: 2015 QUALITY MANAGEMENT SYSTEMSISO 9001: 2015 QUALITY MANAGEMENT SYSTEMS
ISO 9001: 2015 QUALITY MANAGEMENT SYSTEMS
 
TQM Chapter # 7 - Joel E. Ross
TQM Chapter # 7 - Joel E. RossTQM Chapter # 7 - Joel E. Ross
TQM Chapter # 7 - Joel E. Ross
 
Customer focus ,types and customers perceptions
Customer focus ,types and customers perceptionsCustomer focus ,types and customers perceptions
Customer focus ,types and customers perceptions
 
Cost of quality
Cost of qualityCost of quality
Cost of quality
 
Quality Slides
Quality SlidesQuality Slides
Quality Slides
 
Quality Management
Quality ManagementQuality Management
Quality Management
 
Quality management systems (QMS)
Quality management systems (QMS)Quality management systems (QMS)
Quality management systems (QMS)
 
Six Sigma the best ppt
Six Sigma the best pptSix Sigma the best ppt
Six Sigma the best ppt
 
Quality definition
Quality  definitionQuality  definition
Quality definition
 
Quality Management System PowerPoint Presentation Slides
Quality Management System PowerPoint Presentation Slides Quality Management System PowerPoint Presentation Slides
Quality Management System PowerPoint Presentation Slides
 

Andere mochten auch

Total quality management 1 .pps
Total quality management 1 .ppsTotal quality management 1 .pps
Total quality management 1 .pps
harshavardhanan
 

Andere mochten auch (13)

IND Application Process and Best Practices
IND Application Process and Best PracticesIND Application Process and Best Practices
IND Application Process and Best Practices
 
Good manufacturing practice (GMP)
Good manufacturing practice (GMP)Good manufacturing practice (GMP)
Good manufacturing practice (GMP)
 
Quality Management Systems Potential LLC Brochure
Quality Management Systems Potential LLC BrochureQuality Management Systems Potential LLC Brochure
Quality Management Systems Potential LLC Brochure
 
Supplier Selection
Supplier SelectionSupplier Selection
Supplier Selection
 
Quality & compliance excellence in pharmaceuticals
Quality & compliance excellence in pharmaceuticalsQuality & compliance excellence in pharmaceuticals
Quality & compliance excellence in pharmaceuticals
 
Reg & Qa GMP
Reg & Qa GMPReg & Qa GMP
Reg & Qa GMP
 
INDs: When Required and Contents
INDs: When Required and ContentsINDs: When Required and Contents
INDs: When Required and Contents
 
Quality management systems for medical, pharmaceutical,
Quality management systems for medical, pharmaceutical,Quality management systems for medical, pharmaceutical,
Quality management systems for medical, pharmaceutical,
 
Quality Management System of Coca-Cola
Quality Management System of Coca-ColaQuality Management System of Coca-Cola
Quality Management System of Coca-Cola
 
Quality Management Systems in different industries - from ISO 9001 to cGxP
Quality Management Systems in different industries - from ISO 9001 to cGxPQuality Management Systems in different industries - from ISO 9001 to cGxP
Quality Management Systems in different industries - from ISO 9001 to cGxP
 
Total quality management 1 .pps
Total quality management 1 .ppsTotal quality management 1 .pps
Total quality management 1 .pps
 
QUALITY ASSURANCE
QUALITY ASSURANCEQUALITY ASSURANCE
QUALITY ASSURANCE
 
Total quality management (tqm)ادارة الجودة الشاملة
Total quality management (tqm)ادارة الجودة الشاملةTotal quality management (tqm)ادارة الجودة الشاملة
Total quality management (tqm)ادارة الجودة الشاملة
 

Ähnlich wie Quality Management Systems

Business Excellence Through QMS
Business Excellence Through QMSBusiness Excellence Through QMS
Business Excellence Through QMS
Arefin Khan
 
Quality management system process
Quality management system processQuality management system process
Quality management system process
selinasimpson331
 
Implementation of quality management system
Implementation of quality management systemImplementation of quality management system
Implementation of quality management system
selinasimpson2301
 
Implementing quality management system
Implementing quality management systemImplementing quality management system
Implementing quality management system
selinasimpson341
 

Ähnlich wie Quality Management Systems (20)

Iso 9001 2008 qms
Iso 9001 2008 qmsIso 9001 2008 qms
Iso 9001 2008 qms
 
9001
90019001
9001
 
ISO 9001 Quality Management Systems: Implementation and Integration
ISO 9001 Quality Management Systems: Implementation and IntegrationISO 9001 Quality Management Systems: Implementation and Integration
ISO 9001 Quality Management Systems: Implementation and Integration
 
Project Quality - Chapter 1.pptx
Project Quality - Chapter 1.pptxProject Quality - Chapter 1.pptx
Project Quality - Chapter 1.pptx
 
qms.pptx
qms.pptxqms.pptx
qms.pptx
 
part Chem- industrial quality management
part Chem- industrial quality managementpart Chem- industrial quality management
part Chem- industrial quality management
 
Quality management
Quality managementQuality management
Quality management
 
Business Excellence Through QMS
Business Excellence Through QMSBusiness Excellence Through QMS
Business Excellence Through QMS
 
Quality management system process
Quality management system processQuality management system process
Quality management system process
 
QMS - Quality Management System - Internal Quality Auditor - ISO 9001:2008
QMS - Quality Management System - Internal Quality Auditor - ISO 9001:2008QMS - Quality Management System - Internal Quality Auditor - ISO 9001:2008
QMS - Quality Management System - Internal Quality Auditor - ISO 9001:2008
 
Introduction to ISO 9001-2008
Introduction to ISO 9001-2008Introduction to ISO 9001-2008
Introduction to ISO 9001-2008
 
Quality Management
Quality ManagementQuality Management
Quality Management
 
Implementation of quality management system
Implementation of quality management systemImplementation of quality management system
Implementation of quality management system
 
Implementing quality management system
Implementing quality management systemImplementing quality management system
Implementing quality management system
 
Project quality management
Project quality managementProject quality management
Project quality management
 
Performance Measurement
Performance MeasurementPerformance Measurement
Performance Measurement
 
Qms for iso_9001_2015
Qms for iso_9001_2015Qms for iso_9001_2015
Qms for iso_9001_2015
 
ISO 9001 2015 Overview presentation
ISO 9001 2015 Overview presentation ISO 9001 2015 Overview presentation
ISO 9001 2015 Overview presentation
 
Six sigma
Six sigmaSix sigma
Six sigma
 
Quality Management
Quality ManagementQuality Management
Quality Management
 

Mehr von The Bulgarian Association of Regional Development Agencies (BARDA)

Mehr von The Bulgarian Association of Regional Development Agencies (BARDA) (13)

Системи за управление на качеството
Системи за управление на качествотоСистеми за управление на качеството
Системи за управление на качеството
 
Системи за управление на качеството
Системи за управление на качествотоСистеми за управление на качеството
Системи за управление на качеството
 
Социален маркетинг
Социален маркетингСоциален маркетинг
Социален маркетинг
 
Финансиране на социални предприятия
Финансиране на социални предприятияФинансиране на социални предприятия
Финансиране на социални предприятия
 
СОЦИАЛНО СЧЕТОВОДСТВО И СОЦИАЛЕН ОДИТ
СОЦИАЛНО СЧЕТОВОДСТВО И СОЦИАЛЕН ОДИТСОЦИАЛНО СЧЕТОВОДСТВО И СОЦИАЛЕН ОДИТ
СОЦИАЛНО СЧЕТОВОДСТВО И СОЦИАЛЕН ОДИТ
 
Маркетингово проучване
Маркетингово проучванеМаркетингово проучване
Маркетингово проучване
 
Управление на отношенията с клиенти
Управление на отношенията с клиентиУправление на отношенията с клиенти
Управление на отношенията с клиенти
 
Капиталово бюджетиране
Капиталово бюджетиранеКапиталово бюджетиране
Капиталово бюджетиране
 
Development of Social Enterprises in Bulgaria
Development of Social Enterprises in BulgariaDevelopment of Social Enterprises in Bulgaria
Development of Social Enterprises in Bulgaria
 
INNOVATIVE SOCIAL ENTERPRISE DEVELOPMENT NETWORK (ISEDE-NET)
INNOVATIVE SOCIAL ENTERPRISE DEVELOPMENT NETWORK (ISEDE-NET)INNOVATIVE SOCIAL ENTERPRISE DEVELOPMENT NETWORK (ISEDE-NET)
INNOVATIVE SOCIAL ENTERPRISE DEVELOPMENT NETWORK (ISEDE-NET)
 
Проект ISEDE NET
Проект ISEDE NET Проект ISEDE NET
Проект ISEDE NET
 
УПРАВЛЕНИЕ НА ЧОВЕШКИТЕ РЕСУРСИ
УПРАВЛЕНИЕ НА ЧОВЕШКИТЕ РЕСУРСИУПРАВЛЕНИЕ НА ЧОВЕШКИТЕ РЕСУРСИ
УПРАВЛЕНИЕ НА ЧОВЕШКИТЕ РЕСУРСИ
 
Бизнес план - основни насоки
Бизнес план - основни насокиБизнес план - основни насоки
Бизнес план - основни насоки
 

Kürzlich hochgeladen

Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
ZurliaSoop
 
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in OmanMifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
instagramfab782445
 

Kürzlich hochgeladen (20)

Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business Potential
 
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
 
BeMetals Investor Presentation_May 3, 2024.pdf
BeMetals Investor Presentation_May 3, 2024.pdfBeMetals Investor Presentation_May 3, 2024.pdf
BeMetals Investor Presentation_May 3, 2024.pdf
 
Falcon Invoice Discounting: Aviate Your Cash Flow Challenges
Falcon Invoice Discounting: Aviate Your Cash Flow ChallengesFalcon Invoice Discounting: Aviate Your Cash Flow Challenges
Falcon Invoice Discounting: Aviate Your Cash Flow Challenges
 
Power point presentation on enterprise performance management
Power point presentation on enterprise performance managementPower point presentation on enterprise performance management
Power point presentation on enterprise performance management
 
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
 
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NSCROSS CULTURAL NEGOTIATION BY PANMISEM NS
CROSS CULTURAL NEGOTIATION BY PANMISEM NS
 
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All TimeCall 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
Call 7737669865 Vadodara Call Girls Service at your Door Step Available All Time
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Buy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail AccountsBuy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail Accounts
 
Over the Top (OTT) Market Size & Growth Outlook 2024-2030
Over the Top (OTT) Market Size & Growth Outlook 2024-2030Over the Top (OTT) Market Size & Growth Outlook 2024-2030
Over the Top (OTT) Market Size & Growth Outlook 2024-2030
 
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdfTVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
TVB_The Vietnam Believer Newsletter_May 6th, 2024_ENVol. 006.pdf
 
New 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck TemplateNew 2024 Cannabis Edibles Investor Pitch Deck Template
New 2024 Cannabis Edibles Investor Pitch Deck Template
 
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in OmanMifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
Mifepristone Available in Muscat +918761049707^^ €€ Buy Abortion Pills in Oman
 
Cannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 UpdatedCannabis Legalization World Map: 2024 Updated
Cannabis Legalization World Map: 2024 Updated
 
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
 

Quality Management Systems

  • 1. Quality Management Systems Introduction .
  • 2. Questions we will cover today:  • What is ISO 9001?  • What does a company need to do to Register to  ISO 9001?  • What are the requirements?  – Section 4 – General Requirements  – Section 5 – Management Responsibility  – Section 6 – Resource Management  – Section 7 – Product Realization  – Section 8 - Measurement, Analysis & Improvement  • What are our next steps?
  • 3. The Process Model Process Model Quality Management System(QMS) Continual Improvement C Management Responsibilities C U U S S T Resource Management Measurement, Analysis T O and Improvement O M M E E Product Realization R R
  • 4. The Process Model  This example of the process model is included in the standard.  The five clauses are all found on the process model.  Management Responsibility, Measurement Analysis and Improvement,  Product Realization and Resource Management make a cycle.  The most important input to this cycle is customer requirements.  The output of the cycle is customer satisfaction and continual improvement  of the quality system.  The standard has been organized around this model
  • 5. General Requirements  The organization will establish, document,  implement, maintain and continually improve a  Quality Management System (QMS)  – This is where we find the requirement to identify  processes that need to be controlled, and  determine how they interrelate  – The organization must also determine how to  control any outsourced processes
  • 6. General Requirements  This is where we find the requirement to:  • identify processes that need to be controlled, and  • determine how they interrelate.  Steps that need to be taken are:  •Identify the processes needed for the QMS  •Determine the sequence and interaction of these processes  •Determine criteria and methods required to ensure the effective operation and  control of these processes  •Ensure the availability of information necessary to support the operation and  monitoring of these processes  •Measure, monitor and analyze these processes and implement action necessary to  achieve planned results and continual improvement  This section does not address the documentation of the processes
  • 7. Design and Development  Your procedure must outline your system  including:  – Design and Development planning  – Design and Development inputs  – Design and Development outputs  – Design and Development review  – Design and Development verification  – Design and Development validation  – Control of Design and Development changes
  • 8. Design and Development  Your procedure will have a section for each of the items listed on the slide.  You will need to state what your process is for each of these sections, and  what your records are.  For design, it is good to establish a process where the plan becomes the  outline for the project. It will identify responsibilities, what the inputs are,  what the timeline is, who needs to be involved in design review, guidelines  for when to hold design review meetings, how the verification and validation  will take place.  Verification is checking to see if the design output meets design input.  Validation is checking to see if the design performs what it was intended to.
  • 9. Purchasing  Purchasing Information  – Purchasing documents need to identify all  the requirements relevant to what you are  purchasing. For example:  • Quality requirements  • Identification of the item: specifications,  catalogue number or other ID  • Any required class or grade of product  • Quantities and delivery dates
  • 10. Purchasing  This clause refers to the information that you put on your PO or other  purchase documents. The standard is more specific what quality  requirements you put on, and asks for the following where appropriate:  •Requirements for approval of product  •Requirements for qualification of personnel  •Quality Management Systems requirements
  • 11. Improvement  • Establish a corrective action procedure  that includes:  – Identifying nonconformities with the quality  system, product, processes  – Handling customer complaints  – Identifying root cause, action to take to  prevent reoccurrence  – Implementing the action and following up  to determine effectiveness of the action  – Record results of corrective action
  • 12. Purchasing  Corrective action is for investigating problems that have occurred, and taking  action to prevent reoccurrence.  You must investigate root cause, what really made this happen? What can  we do to prevent it from happening again?  After you have implemented this idea, follow-up to make sure it worked. Is  the problem still happening? Or has it been prevented from happening again.  Record the problem, the root cause, the action taken, the effectiveness of  the action, and the actual results of the corrective action.  The results of the corrective action is what actually happened after the  corrective or preventive action was implemented. Did the problem occur  again? Were you able to see measurable improvement? If so, how much?  What date did the problem disappear?  Record the results that you observed when following up on the corrective
  • 13. Next Steps  • Determine timeline for implementation  • Perform Gap Analysis Review how your  existing quality system fits into ISO  9001:2008 format  • Put together an implementation plan  and timeline  • Identify a Registrar
  • 14. Next Steps  Each organization will have its own way to approach the implementation Performing a gap analysis of your current system versus the requirements of the Standard will give you a task list to work from to plan your implementation project.
  • 15. Next Steps  A good next step would be to identify and process map your key processes.  The information you get from your Gap, combined with the process map and  list of key processes should give you a good idea of what you will need to do  to implement the standard. Then you can build a Gantt chart for the project,  outlining the task you need to do and the documents you will need to get into  place.