Managed pressure drilling systems. Multilateral wells.
Coiled tubing underbalanced drilling.

Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.


* geophysical well logging
* under reaming following multistage underbalanced
drilling
* cement plug placing
* emergency and fishing operations
* selection criteria for well bore candidates
* job planning and risk analysis
* CT ground equipment
* coiled tubing pipes
* coiled tubing machinery (capillary units, injectors,
reels etc.)
* equipment for flow control and completion (drilling
motors, drilling jars, intensifiers, reamers, Collars,
etc.)
* high tech drilling bits
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.


Nitrogen equipment application for coiled tubing
drilling

*
*
*
*
*
*

gas liquid mixtures
nitrogen compressor stations
pumping units
vaporiser systems for CT
continuous circulation systems and agitators
management and control systems

Separation systems for drilling fluids
*
*
*
*
*

centrifuges
hydrocyclones
shakers
pumps
management and control
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Geophysical well logging
-

Schlumberger brothers, Conrad and Marcel, are
credited with inventing electrical well-logs.

-

On September 5, 1927, the first “well-logA” was
created in a small village named Pechelbroon in
France.

-

In 1931, the first SP (spontaneous potential) log
was recorded. Discovered when the
galvanometer began “wiggling” even though no
current was being applied.

-

The SP effect was produced naturally by the
borehole mud at the boundaries of permeable
beds. By simultaneously recording SP and
resistivity, loggers could distinguish between
permeable oil-bearing beds Managedimpermeable
and pressure drilling systems.
Multilateral wells. Coiled tubing
nonproducing beds.
underbalanced drilling.
Types of Logs
a) Gamma Ray
b) SP (spontaneous potential)
c) Resistivity (Induction)
d) Sonic
e) Density/Neutron
f) Caliper

Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
a) Gamma Ray






The gamma ray measures the natural
radioactivity of the rocks, and does not
measure any hydrocarbon or water
present within the rocks.
Shales: radioactive
potassium is a common
component, and because
of their cation
exchange capacity,
uranium and thorium
are often absorbed as
well.
Therefore, very often
shales will display
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
The scale for GR is in API (American
Petroleum Institute) and runs from 0125 units. There are often 10 divisions
in a GR log, so each division
represents 12.5 units.
 Typical distinction between between a
sandstone/limestone and shale occurs
between 50-60 units.
 Often, very clean sandstones or
carbonates will display values within
the 20 units range.


Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
b) SP (Spontaneous
Potential)
The SP log records the electric
potential between an electrode pulled
up a hole and a reference electrode at
the surface.
 This potenital exists because of the
electrochemical differences between
the waters within the formation and
the drilling mud.
 The potenital is measured in millivolts
on a relative scale only since the
absolute value depends on the
properties of the drilling mud.


Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
In shaly sections, the maximum SP response
to the right can be used to define a “shale
line”.
 Deflections of the SP log from this line
indicates zones of permeable lithologies with
interstitial fluids containing salinities differing
from the drilling fluid.
 SP logs are good indicators of lithology where
sandstones are permeable and water
saturated.
 However, if the lithologies are filled with fresh
water, the SP can become suppressed or
even reversed. Also, they are poor in areas
where the permeabilities are very low,
sandstones are tighly cemented or the
interval is completely bitumen pressure drilling systems.
Managed saturated (ieMultilateral wells. Coiled tubing
oil sands).
underbalanced drilling.

c) Resistivity (Induction)
Resistivity logs record the resistance of
interstitial fluids to the flow of an electric
current, either transmitted directly to the
rock through an electrode, or
magnetically induced deeper into the
formation from the hole.
 Therefore, the measure the ability of
rocks to conduct electrical currents and
are scaled in units of ohm-meters.
 On most modern logs, there will be three
curves, each measuring the resistance of
section to the flow of electricity.


Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Porous formations filled with salt water (which
is very common) have very low resistivities
(often only ranging from 1-10 ohms-meter).
 Formations that contain oil/gas generally
have much higher resisitivities (often ranging
from 10-500 ohms-meter).
 With regards to the three lines, the one we
are most interested in is the one marked
“deep”. This is because this curve looks into
the formation at a depth of six meters (or
greater), thereby representing the portion of
the formation most unlikely undisturbed by
the drilling process.
 One must be careful of “extremely” high
values, as they will often represent zones of
either anhydrite or other non-porous intervals.
Managed pressure drilling systems.


Multilateral wells. Coiled tubing
underbalanced drilling.
d) Sonic






Sonic logs (or acoustic) measure the
porosity of the rock. Hence, they
measure the travel time of an elastic
wave through a formation (measured in
∆T- microseconds per meter).
Intervals containing greater pore space
will result in greater travel time and vice
versa for non-porous sections.
Must be used in combination with other
logs, particularly gamma rays and
resistivity, thereby allowing one to better
understand the reservoir petrophysics.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
e) Density/Neutron
Density logs measure the bulk electron
density of the formation, and is measured in
kilograms per cubic meter (gm/cm3 or kg/m3).
 Thus, the density tool emits gamma radiation
which is scattered back to a detector in
amounts proportional to the electron density
of the formation. The higher the gamma ray
reflected, the greater the porosity of the rock.
 Electron density is directly related to the
density of the formation (except in
evaporates) and amount of density of
interstitial fluids.
 Helpful in distinguishing lithologies, especially
between dolomite (2.85 kg/m3) and limestone
(2.71 kg/m3


Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Neutron Logs measure the amounts of
hydrogen present in the water atoms of a
rock, and can be used to measure porosity.
This is done by bombarding the the formation
with neutrons, and determing how many
become “captured” by the hydrogen nuclei.
 Because shales have high amounts of water,
the neutron log will read quite high porositiesthus it must be used in conjunction with GR
logs.
 However, porosities recorded in shale-free
sections are a reasonable estimate of the
Managed pressure drilling systems.
pore spaces that could produce water.
Multilateral wells. Coiled tubing


underbalanced drilling.
It is very common to see both neutron
and density logs recorded on the
same section, and are often shown as
an overlay on a common scale
(calibrated for either sandstones or
limestone’s).
 This overlay allows for better
opportunity of distinguishing lithologies
and making better estimates of the
true porosity.
* When natural gas is present, there
becomes a big spread (or crossing) of
the two logs, known as the “gas


Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
f) Caliper
Caliper Logs record the diameter of
the hole. It is very useful in relaying
information about the quality of the
hole and hence reliability of the other
logs.
 An example includes a large hole
where dissolution, caving or falling of
the rock wall occurred, leading to
errors in other log responses.
 Most caliper logs are run with GR logs
and typically will remain constant
throughout


Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Underbalanced drilling
Though not as common as
overbalanced drilling, underbalanced
drilling is achieved when the pressure
exerted on the well is less than or
equal to that of the reservoir.
 Performed with a light-weight drilling
mud that applies less pressure than
formation pressure, underbalanced
drilling prevents formation damage
that can occur during conventional, or
overbalanced drilling processes.


Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.


The negative differential pressure
obtained during underbalanced drilling
between the reservoir and the
wellbore encourages production of
formation fluids and gases. In contrast
to conventional drilling, flow from the
reservoir is driven into the wellbore
during underbalanced drilling, rather
than away from it.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.


Although initially more costly,
underbalanced drilling, also known as
managed-pressure drilling, reduces
common conventional drilling problems,
such as lost circulation, differential
sticking, minimal drilling rates and
formation damage. Additionally,
underbalanced drilling extends the life
of the drill bit because the drilling gases
cool the bit while quickly removing
cuttings.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
To establish pressure control, a rotating
control head with a rotating inner seal
assembly is used in conjunction with the
rotating table. An important factor to
successful underbalanced drilling, drilling and
completion operations must remain
underbalanced at all times during operations.
To accomplish this, pre-planning and onsite
engineering are critical to the success of
underbalanced drilling procedures.
 Typically used for only a section of the entire
drilling process, underbalanced drilling
cannot be used in most shale environments
Managed pressure drilling systems.


Multilateral wells. Coiled tubing
underbalanced drilling.
Underbalance Gases


Gases used for underbalance include
air, nitrogen and natural gas.
Although it is not typical, if natural gas
is recovered from the well, it can be
reinjected into the well to establish
underbalance, resulting in the most
cost-effective solution for
underbalanced drilling.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.


Commonly used in under balance
operations, nitrogen is preferred for its
somewhat low cost of generation,
scale of control and minimal potential
for downhole fires. While pure
nitrogen can be purchased, it is costprohibitive. Therefore, nitrogen is
more commonly produced onsite with
a membrane unit, resulting in a 95%
level of purity.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Underbalance Techniques




There are four main techniques to
achieve underbalance, including
using light weight drilling fluids, gas
injection down the drill pipe, gas injection
through a parasite string and foam
injection.
Using lightweight drilling fluids, such as
fresh water, diesel and lease crude, is
the simplest way to reduce wellbore
pressure. A negative for this approach is
that in most reservoirs the pressure in
the wellbore cannot be reduced enough
to achieve under balance.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.


The method of injecting gas down the
drillpipe involves adding air or nitrogen
to the drilling fluid that is pumped directly
down the drillpipe. Advantages to this
technique include improved penetration,
decreased amount of gas required, and
that the wellbore does not have to be
designed specifically for underbalanced
drilling. On the other hand,
disadvantages include the risk of
overbalance conditions during shut-in
and the requirement of rare MWD tools.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.


In performing the gas injection via
parasite string, a second pipe is run
outside of the intermediate casing.
While the cost of drilling increases, as
does the time it takes, this technique
applies constant bottom hole pressure
and requires no operational
differences or unique MWD systems.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.


A less common underbalanced
application, nitrogen foam is less
damaging to reserves that exhibit water
sensitivities. While the margin of safety is
increased using foams, the additional
nitrogen needed to generate stable foam
makes this technique cost prohibitive.
Additionally, there are temperature limits
to using foam in underbalanced drilling,
limiting using the technique to wells
measuring less than 12,000 feet deep.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Cement Plugs
Cement slurry design.
– Cement type and additives.
• API class
• Extenders, shrinkage, gas control, fluid loss
control, formation and pipe adherence, spacers.
• Volumes and excesses.
• Placement method.
– Location identification,
– Depth control,
– Spotting method (bailer, circulation, etc.),
– Contamination control,
– Testing requirements.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Cement Plug Placement
Balanced method.
• Modified balanced method.
• Displacement from surface.
• Two plug circulation.
• Grouting – various.
• Mechanical assistance.

Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Setting a cement plug
Not as easy as it may seem
• Position of the end of tubing (EOT)
may not correspond to where the plug
is actually set.
• What are the considerations of setting
a
cement plug in mud?
• Effect of fluid loss and cross flow on
setting an effective cement plug?
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Setting Cement Plugs
A near 100% reliable system if cross flow
can
be stopped.
• Most cement plugs fail because of cross
flow,
density and viscosity mismatch, or failure
to
“break” the fluid momentum.
• Full plug method described and field
tested in SPE 11415 (published in SPE
JPT Nov 1984, pp 1897-1904) and SPE
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Cement Plug Failure
Many cement plugs fail for the same 4 reasons:
1. Cross flow cuts channels into the plug.
2. Cement is higher density that the mud – cement
falls through the mud. Mud contamination of the
cement may keep it from setting.
3. The mud is much lower viscosity than the
cement
slurry – cement falls through the mud
4. The open ended tubing produces a high
momentum energy condition that the mud cannot
stop – thus cement falls through the mud.
The result of the last three is that the cement is
spread out along the hole andManaged pressure drilling systems.
a plug is never
Multilateral wells. Coiled tubing
formed.
underbalanced drilling.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
How?
1. Use a simple tubing end plug with circulation to the side
and
upward but not downward.
2. Spot a heavily gelled bentonite pill below the cement plug
depth. Pill thickness of 500- 800 ft (152- 244 m).
3. Use a custom spacer to separate the pill and the cement
slurry.
4. Use a viscous, thixotropic cement with setting time equal to
the job time plus ½ hr. Plug thickness of 300 to 600 ft (91 to
183 m)
5. Rotate the centralized tubing (do not reciprocate) during
placement and gently withdraw at the end of the pumping.
6. WOC = 4 hrs for every 1 hour of pump time.
Full details and field tests in SPE 11415.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Reasons for Cement Plug
Failures
• Contamination of the cement slurry
with
drilling mud during or immediately after
placement.
• Failure to place a viscous pill to stop
downward movement of cement slurry.
• Inaccurate knowledge of volumes
required.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
General Requirements
• Onshore – 10 ft (3 m) plug on top of
the well and casing cut 3 ft (1m) below
the ground surface.
• Mud between plugs (9.5 lb/gal).
• Plug thickness minimum of 100 ft, plus
10% for each 1000 ft of zone.

Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Procedures
• Remove salvageable equipment.
– NORM scale present? Leave the pipe in
the well?
– What pipe is needed for a barrier? How
effective?
• Set, at minimum, plugs required by
regulations.
Don’t hesitate to go beyond requirements.
• Test to limits required.
• Cap and identify as specified.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Isolation of Open Hole
• Cement Plug 100ft (30m) above and
below lower-most shoe in open hole.
• Cement retainer 50 to 100 ft (15 to
30m)
above the shoe. Cement 100 ft (30m)
below shoe and 50 ft (15m) of cement
on top.
• Tested to 15,000 lbs load or 1000 psi.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Isolation of Perforations
• Cement Plug 100ft (30m) above and
below
perfs (or to next plug).
• Cement retainer 50 to 100 ft (15 to 30m)
above the perfs. Cement 100 ft (30m)
below
shoe and 50 ft (15m) of cement on top.
• Permanent bridge plug within 150 ft
(45m) of perfs with 50 ft (15m) of cement
on top.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Isolation of lap joints or liner tops
• Cement Plug 100ft (30m) above and
below liner top (or to next plug).
• Cement retainer or permanent bridge
plug 50 ft (15m) above the liner with
50 ft (15m) of cement on top.
• Cement plug 200 ft (60m) long within
100 ft (30m) of liner.

Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Finding and Repairing Channels
in Cement
Channels in cement occur from many causes:
– Lack of effective pipe centralization,
– Inadequate mud conditioning prior to cementing,
– Ineffective cement displacement design and/or
execution,
– Excess free water in the cement, especially in a
deviated
hole (usually a cement mixing problem).
– Excessive fluid loss from the cement slurry (generally
results in low cement top),
– Gas influx before the cement sets,
– Cement shrinkage,
– Etc.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Identifying Channels in Cement
Sheath
Numerous logging methods:
– CBL and segmented CBL tools that
scan around the wellbore,
– Borax logging, Carbon-Oxygen logs,
Sonic tools, etc.
• Plug and packers with perforating.

Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Repair of Channels - Cement
Squeezes
Types (some names anyway)
– Block squeeze
– Cement Packer
– Suicide squeeze
– Breakdown squeeze
– Running and Walking squeezes
– Hesitation squeeze
• What is used depends on both what is
needed and the experience of the
operator.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Surface Plug
On-Shore – depends on local
regulations.
• Offshore – cement plug 150 ft (45m)
long
within 150 ft (45m) of mud line. Placed
in the smallest string of casing that
extends to the mud line.

Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Testing of Plugs
Location of the first plug below the
surface
plug shall be verified.
– Pipe weight of 15,000 lbs on cement
plug, cement retainer, or bridge plug.
– Pump pressure of 1,000 psi with
maximum 10% drop in 15 minutes.

Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Risk evaluation
Risk & unwanted incidents ranking
 Systems in place


• Report incidents and near miss
• Analyse material
• Look for trends

Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Risk definition



Risk=Practicable*Consequence
Risk to
 Personel
 Environment
 Material

Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Mapping of HSE & risks


Register incidents: Positive and
negative

Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Cause assesment
• Direct causes vs underlying causes
• Cause perspective
– Human
– Technical
– Organisational

• 5 Whys technique
– Look for underlying causes
– Eliminate root of the problem

Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
HSE analyse
QRA: Quantity Risk Assesment
QRM: Qualitative Risk Matrix
Safe job analysis – Chemical
analysis
Risk assesment promt card

Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Risk reduction
ALARP: As Low As Reasonable
Practicable
 BAT: Best Available Technology
 Precation principles
 Substitution principles


Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Barriers – swiss cheese
model
The Barriere Concept
BARRIERS;
Technical,
Qualifications,
Procedures
etc.

INITIATING
INITIATING
CAUSE
CAUSE

ACCIDENT/
ACCIDENT/
LOSS
LOSS
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
We are all responsible for managing
HSE
Barrier 1 – HSE Policy & Leadership
Hazard/
Risk

Barrier 2 – Planning

I was responsible for
planning the
operations safely

Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Barrier 1 – HSE Policy & Leadership

Hazard/
Risk

Barrier 2 – Planning
Barrier 3 – Supervision

I turned a blind eye to
some of the crew not
following all the
procedures as we had
limited time to do the job

I was responsible
for supervising the
maintenance work

Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Barrier 1 – HSE Policy & Leadership

Hazard/
Risk

Barrier 2 – Planning
Barrier 3 – Supervision
Barrier 4 – Procedures

I didn’t work safely
and took short-cut
to get the job done

Accident

I was responsible
completing the work
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
We all have a part to play
Mngt Team

Finance/Accounting

Visible leadership
promotes HSE
culture …..

Resources allocated
for effective
implementation

Resource budgets
effectively tracked
and managed

Maintenance
Maintain equipment and
ensure that operational
integrity is maintained

SJA team

Legal
Legal requirements
of projects identified
and complied with

Hazards identified
and risk mngt plans
implemented
Drilling

HR
Competencies required
for job are clearly
identified

IT/ Data/
Graphics

Systems to control and
securely store HSE
critical information

Risk management integrated
to drilling programme
HSE dept

Contract

Ensure that Company are
Guidance and
given the means to perform
advisory support Managed pressure drilling systems.
the job safely and efficiently
Multilateral wells. Coiled tubing
provided to
underbalanced drilling.
operations
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
How Does Fishing Work?




There are a number of problems that can
occur while drilling a well. Whether a drill
string breaks and falls to the bottom of
the wellbore or a bit breaks, accidents
happen. Even pipe or a tool can fall from
the rig floor into the bottom of the well.
This stray equipment that has fallen into
the well is referred to as fishor junk, and
regular drill bits cannot drill through it.
Should a fish fall into a well, fishing is
required to remove it.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Fishing tools

Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
In order to perform fishing on a well, drilling
must be shelved and special fishing tools
employed. Each tool is specially crafted to
perform a specific function, or retrieve a
certain type of fish. Most fishing tools are
screwed into the end of a fishing string,
similar to drillpipe, and lowered into the well.
 There are two options to recover lost pipe.
The first is a spear, which fits within the pipe
and then grips the pipe from the inside. On
the other hand, an overshoot may be
employed, and this tool surrounds the pipe
and grips it from the outside to carry it up the
wellbore.


Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
When a fish is difficult to grip, a washover
pipe or washpipe is used. Made of largediameter pipe with a cutting surface at the tip,
washpipe is run in the well and then the cutting
edge grinds the fish to a smooth surface. Then
drilling fluids are pumped into the well to remove
debris, and another tool is used to retrieve the
remaining fish.
 Sometimes, a junk mill and boot basket are
used to retrieve fish from the wellbore. In this
instance, a junk mill is lowered into the well and
rotated to grind the fish into smaller pieces. A
boot basket, also known as a junk basket, is then
lowered into the well. Drilling fluid is pumped into
the well, and the ground parts of the fish are
Managed pressure drilling systems.
raised into the basket and then towells. Coiled tubing by
the surface
Multilateral
the boot basket.
underbalanced drilling.



In order to recover casing that has
collapsed within the well or irregularly
shaped fish, a tapered mill reamer can
be used. Permanent and magnetic
magnets are employed to reclaim
magnetic fish, and a wireline
spear uses hooks and barb to clasp
broken wireline. Additionally, an
explosive might be detonated within the
well to break the fish up into smaller
pieces, and then a tool such as a junk
bucket is used to retrieve the smaller
items.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.


When a fishing professional is unable
to determine which fishing tool might
work best to retrieve the fish,
an impression block is used to get
an impression of the fish and allow the
professional to know with what exactly
he or she is dealing.

Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.


Fishing a well may take days to
complete, and during this time, drilling
cannot occur, although the operator is
still responsible for drilling fees. Some
drilling contractors offer fishing
insurance, making operators not
responsible for rig fees during fishing
operations.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Statoil records first successful North
Sea HP/HT coiled tubing milling job
Telemetry proves critical for intervention at
Kvitebjoern on Norwegian continental shelf
 Statoil learned valuable lessons during the
planning and execution of a high
pressure/high-temperature (HP/HT) coiled
tubing milling job on the Norwegian
continental shelf (NCS) in the North Sea at
Kvitebjørn field.
 Kvitebjørn is a Statoil-operated gas and
condensate field in block 34/11 with a
reservoir at about 4,000 m (13,120 ft) with
pressure of 770 bar (11,168 psi) and
Managed pressure drilling systems.
temperature of 160º C (320º F). Coiled tubing
Multilateral wells.


underbalanced drilling.


Well 34/11-A-9 T2 was drilled as a gas producer
and during the final completion phase, it was not
possible through pressure cycling to open the
HP/HT isolation ball valve set in the 9 7/8-in. liner
at 6,245.7 m (20,486 ft) MD/3,795.8 m (12,450 ft)
TVD. After several failed attempts with wireline
using mechanical override tools, it was decided
to punch above it to allow well production
passing the outside of the valve through the
annulus between 9 7/8-in. liner and the 5½-in. tail
pipe. However, the production performance was
poor. A feasibility study evaluated ways to open
or mill out the valve with the objective to improve
the production characteristics and to allow
access for future production logging.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.




The decision was to mill the stuck-closed
isolation ball valve using coiled tubing
(CT). Statoil had not performed any
HP/HT CT operations and the available
experience was limited.
To minimize uncertainty relating to depth
determination during milling, a telemetry
system ran at its operational pressure
and temperature limits to provide realtime casing collar locator (CCL) readings
in addition to downhole pressure and
temperature data.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
The Super 13% chrome, 110 Kpsi yield isolation ball
valve was stuck closed at a deviation of 57.8º. Its ID
when open is 4.25-in with a drift ID = 4.151 in. The
EOF seating nipple at 6,223 m (20,411 ft) MD from the
rig kelly bushing was ID = 4.31 in., which represents
the minimum wellbore restriction from surface down to
the ball valve depth.
 The 34/11-A-9 T2 well is in the Statfjord formation with
the top of perforations at 4,313 m (14,147 ft) TVD. The
original prognosed reservoir pressure was 770 +45/-14
bar (11,168 + 653/-203 psi) and the downhole
temperature at reservoir was 160º C. The shut-in
wellhead pressure was 571 bar (8,282 psi) in March
2011. The expected downhole temperature at the ball
valve was 145º C (293º F). The H2S and
CO2 concentrations in the produced gas were less than
5 ppm and a concentration of 3.477 mol %, respectively.


Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
A feasibility study including an onshore milling
test evaluated the possibility of milling the
isolation ball valve with an electrical mill
assembly run on mono-conductor wireline cable.
The report concluded with large uncertainty
regarding the number of bailer runs necessary to
remove debris above the valve and reach milling
depth, as well as the lifetime for the electrical
milling equipment at the very high downhole
temperature. Based on this study and the low
estimated likelihood of success (30 -- 40%), the
Kvitebjørn license decided not to proceed with
the wireline alternative.
 New feasibility studies evaluated using CT, rigassisted snubbing, and the rig for opening or
Managed pressure drilling systems.
milling out the isolation ball valve.wells. Coiled tubing
Multilateral


underbalanced drilling.
Wellbore schematic.

Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
The CT alternative seemed to be feasible since
similar jobs were performed at lower temperature
and shallower depths, but the 15K psi well
control equipment and CT string design would
have to be specified and sourced specifically for
the job.
 The main drawbacks for the rig-assisted
snubbing were the drilling crew's rig-assisted
snubbing experience, rig-assisted snubbing
personnel experience, ram-to-ram stripping
experience, and HP/HT well conditions.
 For the rig alternative, the main risks were gas
migration to the surface in addition to more time
and cost relating to killing the well.


Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Well control stack as built

Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.


It was decided that the primary
method to be further evaluated and
developed for removal of the ball valve
restriction from the well would be CT,
the secondary method would be rigassisted snubbing and the final
method would be to use the rig.

Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Concept selection
During the concept selection phase, the
recommended method for deploying CT to
remove the isolation ball valve from the
wellbore consisted of the following steps:
 Pre-CT job "pump and bleed“
operation. Displacing the wellbore from the
current gas by repeatedly bullheading 1.044
sg 40/60% MEG/fresh water from the kill wing
valve of the christmas tree and bleeding the
gas that migrates to surface. The aim of this
"pump and bleed" step was to reduce the
surface shut-in wellhead pressure (SIWHP)
to the minimum before running the CT. This
had advantages in safety and operations.


Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.


CT drift and cleanout run(s). The well was producing
intermittently for few months through punched holes
above the closed ball valve. It was suspected that fill
and debris might have settled above the ball valve with
the 11.5-m (38-ft) interval between the punched holes
and top of the ball valve being particularly vulnerable.
Offshore crane capacity limits and the long CT string
needed to reach the ball valve at 6,245.7 m (20,492 ft)
MD RKB, the maximum CT string size that could be
shipped in one piece was 2- in. OD. The well
completion from surface to approximately the ball valve
depth was 7 in., 35 lb/ft tubing with a 6-in. ID.
Therefore, it was impossible to generate enough
turbulence in the annulus between the tubing and CT to
lift any fill or debris when run in hole (RIH) with the
milling bottom hole assembly (BHA) to mill the ball
valve. It was decided to RIH first with a with venturi jet
junk basket (VJJB) to drift and clean out the wellbore to
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
the top of the ball valve.
underbalanced drilling.


CT milling run(s). This was the ultimate run to achieve the
job objective and mill the ball valve. The motor needed to
provide enough torque to mill through the ball valve. In
addition, its operating pump rate should be achievable
through the specially designed 2-in. CT string. A yard test and
a successful milling job of a similar ball valve in a well
operated by Shell in the British section of the North Sea were
on record. The mill was a 4.1-in. OD dome profile ball mill run
with a hydraulically (pump rate) operated shifting tool and an
anti-stall tool. All lessons learned during this Shell job were
taken into account for this Kvitebjørn CT project. The mill was
designed and tested to mill through the ball valve material.
The mill size for this Kvitebjørn job was decided to be 4-in.
OD to deploy the milling BHA through the 41⁄16-in. 15K psi
CT BOP. This mill size is big enough to allow later production
logging tools to run through the milled hole. This critical
detailed planning phase took approximately five months. It
consisted of organizing several meetings and coordinating
between different departments, disciplines, and third parties.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Offshore execution


The job went as planned. The CT job
was carried out through the drilling rig.
The ball valve was successfully milled
and drifted with the 4-in mill and the
access to the lower wellbore was
regained.

Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
CT equipment layout on pipe
deck.

Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.




No serious HSE & Q incidents were
reported during this first HP/HT CT job in
Statoil and the Norwegian continental
shelf with a high operating factor of
96.2%.
The total job duration was 31.6 days with
equipment rig up including "pump and
bleed" of 10.9 days; one VJJB clean up
run and three milling runs totaling 9.1
days; extra production test and one extra
drift run with VJJB through and below the
milled ball valve, 6.1 days; and
equipment rig down and back load, 5.5
days.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Operational risk analysis
An operational risk analysis log sheet and
risk register covering the different steps of the
operation was elaborated during detailed
planning. This was important because this
was the first HP/HT CT operation in Statoil
and in the NCS.
 The risk assessment involved representatives
from all concerned disciplines within Statoil,
including reservoir, well intervention, drilling
and production, plus Statoil discipline
advisors for CT, well intervention, well
integrity, HP/HT, and well control, as well as
third-parties representatives for CT services
and the rig contractor.


Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.




The probability and the potential impact
for each initial risk were assessed using
a standard risk tolerance matrix.
Prevention and mitigation actions were
identified for each risk with the objective
of reducing the probability and/or the
potential impact of the corresponding
risk.
This resulted in a detailed operational
risk register including 41 identified
hazards and 84 risk prevention and/or
mitigation measures that were
implemented during the planning and
execution phases.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
This risk register was subdivided into 11 sections as
following:
 1. Mobilization and demobilization
2. Spotting and equipment rig up
3. "Pump and bleed" operation
4. VJJB drift and cleanout run(s)
5. Milling run(s)
6. Well control stack up
7. BHAs
8. Fluids
9. Contingency scenarios
10. Rig down equipment
11. Simultaneous contingency situations
in A-9 T2 and a second well.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Lessons learned
There were a number of lessons learned on this project.
They key lessons are described below.
 Telemetry tool performance. The telemetry tool
provided valuable CCL data to correlate the depth down
to the ball valve. The telemetry tool failed in three of
four runs at a bottomhole temperature around 145ºC
(293º F). However, the CCL logging signal failed after
the initial depth correlation. The telemetry tool was
running properly for its first few hours of exposure under
extreme downhole pressure and temperature conditions
before it failed. It was a known and accepted risk prior
to operation that the tool might fail if exposed to
downhole conditions close to or above its operational
specifications of 8,000 psi/150º C (55 MPa/305º F) for a
prolonged time. It could be concluded from the data that
the telemetry tool operated properly up to 564 bar
(8,180 psi) and 146º C (295º F) before failure.


Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.


Equipment availability. The equipment
availability for this special and non-frequent
HP/HT CT job was a challenge. Early
planning and ordering of some critical
equipment was vital, especially knowing the
day rate of the drilling derrick to be used. This
critical equipment included both CT strings,
the gas tested 71⁄16-in./15K psi gate valve,
the safety head handler, the gas-tested
christmas tree crossover, and the 21⁄16-in
15K psi gas tested gate valves. Weekly
meetings to review critical items were held
with the CT contractor. The need for long lead
items was identified early in the project, and
Managed for drilling systems.
Statoil issued purchase orderspressure relevant
Multilateral wells. Coiled tubing
equipment.
underbalanced drilling.
Site surveys. Three site surveys were
carried out by Statoil and CT
contractor representatives to avoid
conflict with platform interfaces, and to
identify any limitations or special
requirements.
 Personnel HP/HT training. Two fullday sessions of CT awareness and
HP/HT seminars were organized and
presented by the CT contractor to all
involved personnel before the job start
up.


Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Bleed off procedure. The bleed off needed to avoid
explosive decompression of well control equipment
elastomers was not provided by the CT contractor.
Rather, the local platform best practice used during
wireline operations was followed during this CT job. For
future CT HP/HT operations, the bleed off procedure
should be based on recommendations from the original
equipment manufacturer for standard and high-pressure
well conditions, respectively.
 Pump and bleed operation. Liquid losses into
formation were experienced during the "pump and
bleed" phase and it was not possible to reduce the
WHP. It was decided to abort the pump and bleed
operation and to start running in the well while
circulating through the CT. This alternative was
effective in reducing the WHP.


Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.


CT weight simulations. A drag
reduction by 25% (from 0.24 to 0.18)
was observed when displacing the
wellbore with metal-to-metal friction
reducer while RIH from 4,200 m
(13,776 ft) MD RKB to the ball valve.
Data proves that the actual CT RIH
and pick up weights were within the
operating limit at 80% yield of CT
string material.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.


Milling through the ball valve. It was difficult to control
the weight on bit (WOB) at 6,245 m (20,484 ft) MD
while pumping 40/60% MEG/fresh water at 400 l/m
pump rate and at 340 to 375 bar (4,931 to 5,439 psi) CT
circulation pressure. During the first milling run, the
WOB was set down gradually but the motor stalled 15
times. The first milling BHA was pulled to surface for
inspection. During the second milling run, milling was
carried out with patience for longer periods without
increasing the WOB. Vibration and an anti-stall tool
was expected to provide sufficient WOB. The top part of
the ball valve was milled during the second run in
approximately 12 hours and the bottom part in an
additional 12 hours. The experience gained from the
first milling run was used to optimize the milling
parameters of the second and third milling runs, and
succeeded to break through the ball valve with the 4-in.
mill at the end.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.


Confirmed milled ball valve. A 3D
multi-finger caliper log was run on
wireline two months after the CT
milling job to investigate the wellbore
status, particularly the milled ball valve
area. The ball valve was confirmed to
be milled out with a minimum ID of
3.97 in. at 6,245.7 m MD.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Conclusion


This CT project represents an excellent
reference for future HP/HT CT operations for
Statoil in Norway and worldwide. The job
execution was performed as planned and in
compliance with the relevant industry
standards and local regulations. The stuck
closed isolation ball valve was successfully
milled and drifted with the 4-in. dome profile
mill. No serious HSE&Q incidents were
reported during this first HP/HT CT job in the
Norwegian continental shelf, which had a
high operating factor of 96.2%. Valuable
lessons learned from the planning and
execution phases of this challenging
Managed pressure drilling systems.
operation should be useful in future similar
HP/HT CT applications. Multilateral wells. Coiled tubing
underbalanced drilling.
Coil tubing equipment


Hydra Rig Trailer mounted 2” CT unit,
two trailer design, 22,000 feet reel
capacity, 80,000 lbs. pull injector and
50 ton crane

Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.


Hydra Rig 6100 CT Injector with
tubing straightener and leveling lift
bale

Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.


Offshore 1¼” CT Unit

Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.


Hydra Rig Trailer Mounted Sichuan
CTU



Hydra Rig Trailer Mounted CTU and
pumper on location in Turkestan

Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.


Hydra Rig Intermediate size trailermounted CTU with crane, 635 injector

Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.


Hydra Rig’s new 55,000 sq. ft. final
assembly and CTU maintenance
facility

Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.


CTD horizontal re-entry project, with NOV Hydra Rig coiled
tubing unit, nitrogen unit, and NOV Rolligon pumping unit.
Also utilized are NOV Texas Oil Tools BOPs and NOV CTES
DAS system.

Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.


Hydra Rig Mini Coil Drop In Drum

Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.


Hydra Rig Mini Coil 420C Injector
Head

Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.


Hydra Rig Mini Coil Unit

Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Snubbing Units
NOV Hydra Rig Snubbing Units have earned a reputation
worldwide for high performance and versatility in the field.
Rig-up is fast due to lightweight, compact design and the
elimination of the need to “kill” the well.
NOV Hydra Rig Snubbing Units are engineered to work on
any pressure well, with pipe sized up to 8s”, and pulls up
to 600,000 lbs.
With over 200 units manufactured, our snubbing units are
the industry standard.

Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Coring and drilling

Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.


Hydraulic fracturing

Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.


Shaker

Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Communications and safety
issues
The Piper Alpha Disaster
In 1988 Britain suffered one of the
worst industrial disasters when the
Piper Alpha oil Platform was
destroyed by fire and gas
explosion, resulting in 167
fatalities. The disaster caused
significant changes to the manner
in which safety was regulated and
managed in the UK offshore oil
industry.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Events in the disaster


The Piper Alpha platform was operated by Occidental
Petroleum (Caledonia) Ltd. and located 110 miles
notheast of Aberdeen



The platform produced oil and gas and was linked to
the installations Tartan, Claymore and MCP01 by
subsea pipelines



On July 6, 1988, dayshift workers had removed a safety
release for a consendate pump that was not being used
and replaced it with a blank flange



Several hours later the night shift operations team
experienced a problem with a second consendate pump
and restarted the first pump, unaware of the the safety
valve had been removed
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.


Around 10:00 pm there was an explosion on the
production deck of the platform which was caused the
ignition of a cloud of gas consendate leaking from the
temporary flange



The fire spread rapidly and was followed by a number
of smaller explosion



At around 10:20 pm a major explosion was followed by
the ruptering of a pipeline carrying gas to the Piper
Alpha platform from the nearby Texaco Tartan platform



The next few hours an intense high-pressure gas fire
raged, punctuated by a series of major explosions that
served to hasten the structural collapse of the platform
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.





Most of the emergency systems on the platform, including the
fire water system, failed to come into operations
Of the 226 persons onboard the installation only 61 survived
The great majority of the of the survivors escaped by jumping
into the sea, some from as 175 feet (approx. 54 m)

Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Piper Alpha in flames

Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Crisis Management at Piper
Alpha


The explosion on the Piper Alpha that led to
the disaster was not devasting. We shall
never know, but it probably would have killed
only a small number of men



There was a number of critisim related to the
performance of the OIM on both Piper Alpha,
Claymore and Tartan platforms



These platforms were linked together by
pipelines and if the hydrocarbons from these
platforms had been stopped earlier, the
situation on Piper might have deterioated less
rapidly
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.


On the evening of the crisis the platforms OIM was at
his cabin



In the control room at 9:55 pm a series of low gas
alarms was registered followed by a single high gas
alarm and a suddenly explosion



The stand by boat sent out a mayday call



By 10:05 several minutes after the explosion the OIM
arrived in the radio room wearing a survival suit and
instructed the radio operator to send out a mayday



The OIM left without giving further instructions or stating
his intentions
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.


A few seconds later he ran into the radio room and told the
operator that area outside was on fire and that it should be
broadcasted that the platform was being abandoned



By this time people had started to muster in the
accomodation area an were waiting further instructions



Some of the emergency response teams made attempts to
tackle the fires or to effect rescues, but these were
uncoordinated and ineffective efforts in a desperate situation



By 10:20 pm 22 surviors had abandoned the platform – many
who had been working outside such as divers



Where people had mustered no one was in charge or giving
instructions and there was confusion
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.


A second major explosion because of gas coming into the the
Piper from Tartan caused a massive high-pressure gas fire on
the platform



By 10:50 pm the structure of the platform was beginning to
collapse and gas fires were raging



The OIM and the majority of his crew died onboard as a result
of smoke inhalation



The report afterwards showed that the OIM took no initiative
in an attempt to save life but in his defense several
psychological factors could explain the OIM`s inadequate
leadership and poor decision making



He was under considerable stress and had not been properly
trained and smoke inhalation can effect cognitive functioning
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
The Claymore Platform

Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Crisis Management at
Claymore


However what was more suprising revealing serious
weaknesses in the oil industry`s provision for offshore
crisis management, was that the two other OIM`s on
duty from the linked platforms also failed to take
appropriate decisions



The Claymore platform situated 22 miles from Piper
needed to shut down the oil production to prevent it
from flowing towards the Piper platform



At 10:05 pm the Claymore OIM was told that there had
been a mayday on Piper due to fire and explosion



An attempt to contact Piper was unsuccessful and on
the secong mayday from Piper he sent a standy vessel
without shutting down the oil production
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.


The operating superintendent at Claymore asked
the OIM if he could shut down the oil production.
The OIM refused this



The OIM at Claymore then called his manager in
Aberdeen. They knew that Pipers oil had been
shutdown. But as the pipeline pressure was
stable the OIM decided to continue the
production



10:30 they have heard that the fire on Piper was
spreading, and the operating superintendent
again asked the OIM to shut down oil production.
This was refused because he wanted to maintain
the production
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.


During a later phonecall the OIM made
to the Production Manager the operating
superintendent shouted that there had
been an explosion on the Piper. The
Production Manager in Aberdeen asked
them to shut down immediately when he
found out that they were still operating



The Production Manager was suprised
that they were still operating and
instructed both Claymore and Tartan to
shut down production
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Illustration of the Oil field

Piper Alpha
Claymore

Tartan
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
The Tartan Platform

Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Crisis Management on Tartan


Texaco`s Tartan was located 12 miles southwest of Piper and
also needed to shut down gas and oil production in the event
of an serious emergency on Piper



10:05 pm the OIM at Tartan heard mayday from Piper Alpha



The OIM could not see any flames so he did not shut down
the production but instructed his production supervisor to
monitor the gas pressure on the pipeline to Piper



Production was maintained on Tartan in the belief that Piper
was still producing (no telephone contact was possible)



10:25 the production supervisor was informed of a large
explosion on Piper. This explosion was in fact caused by the
hydrocarbons from Tartan
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.


The emergency control was finally shut down and it took 5-10
minutes before the Tartan OIM asked for their gas line to be
depressurized and for the oil production to be shut down

Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Conclusion


The Piper Alpha disaster demonstrated the need for proper
training for the responsibility in this kind of position



This is just one of many crisis that have highlighted the need
for organizations to competent to deal with major crisis



Crisis Management is primarily dependent on the decisionmaking of those in key command positions, at strategic,
tactical and operational levels



The immediate cause of the accident was due to
communication problems relating to shift handover and
Permit to Work procedures



This crisis also shows the importancy of good organizational
communication and information routines
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
What if...
There had been a proper shifthandover, proper marking of the safety
valve that wasn`t functioning, or
proper Permit to Work for this shift at
the Piper Alpha?
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.
Managed pressure drilling systems.
Multilateral wells. Coiled tubing
underbalanced drilling.

Weitere ähnliche Inhalte

Was ist angesagt?

Control of ground water in excavations_Advanced Construction Technology (Seme...
Control of ground water in excavations_Advanced Construction Technology (Seme...Control of ground water in excavations_Advanced Construction Technology (Seme...
Control of ground water in excavations_Advanced Construction Technology (Seme...A Makwana
 
Chapter 4 control of ground water in excavations
Chapter 4 control of ground water in excavationsChapter 4 control of ground water in excavations
Chapter 4 control of ground water in excavationsKHUSHBU SHAH
 
Well Control and Well Monitoring Systems
Well Control and Well Monitoring SystemsWell Control and Well Monitoring Systems
Well Control and Well Monitoring SystemsAFATous
 
Exploratory Drilling
Exploratory Drilling Exploratory Drilling
Exploratory Drilling BIT Sindri
 
050218 chapter 7 spillways and energy dissipators
050218 chapter 7 spillways and energy dissipators050218 chapter 7 spillways and energy dissipators
050218 chapter 7 spillways and energy dissipatorsBinu Karki
 
Presentation on well point system
Presentation on well point systemPresentation on well point system
Presentation on well point systemAnshuman Tyagi
 
Well completion.
Well completion.Well completion.
Well completion.Mawa James
 
Control Seepage Thought Earth Dams
Control Seepage Thought Earth DamsControl Seepage Thought Earth Dams
Control Seepage Thought Earth DamsAhmed Mansor
 
Introduction to Drilling Engineering
Introduction to Drilling EngineeringIntroduction to Drilling Engineering
Introduction to Drilling EngineeringM.T.H Group
 

Was ist angesagt? (20)

Control of ground water in excavations_Advanced Construction Technology (Seme...
Control of ground water in excavations_Advanced Construction Technology (Seme...Control of ground water in excavations_Advanced Construction Technology (Seme...
Control of ground water in excavations_Advanced Construction Technology (Seme...
 
Chapter 4 control of ground water in excavations
Chapter 4 control of ground water in excavationsChapter 4 control of ground water in excavations
Chapter 4 control of ground water in excavations
 
Principles of well logging and formation evaluation m.m.badawy
Principles of well logging and formation evaluation m.m.badawyPrinciples of well logging and formation evaluation m.m.badawy
Principles of well logging and formation evaluation m.m.badawy
 
Casing design
Casing designCasing design
Casing design
 
Well Control and Well Monitoring Systems
Well Control and Well Monitoring SystemsWell Control and Well Monitoring Systems
Well Control and Well Monitoring Systems
 
Exploratory Drilling
Exploratory Drilling Exploratory Drilling
Exploratory Drilling
 
Offshore operation
Offshore operationOffshore operation
Offshore operation
 
Unit2 hbn
Unit2 hbnUnit2 hbn
Unit2 hbn
 
050218 chapter 7 spillways and energy dissipators
050218 chapter 7 spillways and energy dissipators050218 chapter 7 spillways and energy dissipators
050218 chapter 7 spillways and energy dissipators
 
Mine dewatering techniques
Mine dewatering techniquesMine dewatering techniques
Mine dewatering techniques
 
Presentation on well point system
Presentation on well point systemPresentation on well point system
Presentation on well point system
 
Type of rig
Type of rigType of rig
Type of rig
 
Well completion.
Well completion.Well completion.
Well completion.
 
Dewatering techniques
Dewatering techniquesDewatering techniques
Dewatering techniques
 
Drilling methods
Drilling methodsDrilling methods
Drilling methods
 
Control Seepage Thought Earth Dams
Control Seepage Thought Earth DamsControl Seepage Thought Earth Dams
Control Seepage Thought Earth Dams
 
Introduction to Drilling Engineering
Introduction to Drilling EngineeringIntroduction to Drilling Engineering
Introduction to Drilling Engineering
 
Dewatering
DewateringDewatering
Dewatering
 
ogee design
ogee designogee design
ogee design
 
Basics of drilling 1
Basics of drilling 1Basics of drilling 1
Basics of drilling 1
 

Andere mochten auch

Onderzoeksrapport acrs v3.0_definitief
Onderzoeksrapport acrs v3.0_definitiefOnderzoeksrapport acrs v3.0_definitief
Onderzoeksrapport acrs v3.0_definitiefrloggen
 
Como hacer un plan de negocios
Como hacer un plan de negociosComo hacer un plan de negocios
Como hacer un plan de negociosXPINNERPablo
 
Evidence: Describing my kitchen. ENGLISH DOT WORKS 2. SENA.
Evidence: Describing my kitchen. ENGLISH DOT WORKS 2. SENA.Evidence: Describing my kitchen. ENGLISH DOT WORKS 2. SENA.
Evidence: Describing my kitchen. ENGLISH DOT WORKS 2. SENA... ..
 
Estrategias competitivas básicas
Estrategias competitivas básicasEstrategias competitivas básicas
Estrategias competitivas básicasLarryJimenez
 
2. describing cities and places. ENGLISH DOT WORKS 2. SENA. semana 4 acitivda...
2. describing cities and places. ENGLISH DOT WORKS 2. SENA. semana 4 acitivda...2. describing cities and places. ENGLISH DOT WORKS 2. SENA. semana 4 acitivda...
2. describing cities and places. ENGLISH DOT WORKS 2. SENA. semana 4 acitivda..... ..
 
3.Evidence: Getting to Bogota.ENGLISH DOT WORKS 2. SENA.semana 4 actividad 3.
3.Evidence: Getting to Bogota.ENGLISH DOT WORKS 2. SENA.semana 4 actividad 3.3.Evidence: Getting to Bogota.ENGLISH DOT WORKS 2. SENA.semana 4 actividad 3.
3.Evidence: Getting to Bogota.ENGLISH DOT WORKS 2. SENA.semana 4 actividad 3... ..
 
Evidence: Going to the restaurant . ENGLISH DOT WORKS 2. SENA.
Evidence: Going to the restaurant . ENGLISH DOT WORKS 2. SENA.Evidence: Going to the restaurant . ENGLISH DOT WORKS 2. SENA.
Evidence: Going to the restaurant . ENGLISH DOT WORKS 2. SENA... ..
 
Evidence: I can’t believe it.ENGLISH DOT WORKS 2. semana 3 actividad 1.SENA.
Evidence: I can’t believe it.ENGLISH DOT WORKS 2. semana 3 actividad 1.SENA.Evidence: I can’t believe it.ENGLISH DOT WORKS 2. semana 3 actividad 1.SENA.
Evidence: I can’t believe it.ENGLISH DOT WORKS 2. semana 3 actividad 1.SENA... ..
 
Evidence: Memorable moments.ENGLISH DOT WORKS 2. SENA. semana 2 actividad 2.
Evidence: Memorable moments.ENGLISH DOT WORKS 2. SENA. semana 2 actividad 2.Evidence: Memorable moments.ENGLISH DOT WORKS 2. SENA. semana 2 actividad 2.
Evidence: Memorable moments.ENGLISH DOT WORKS 2. SENA. semana 2 actividad 2... ..
 
Evidence: Planning my trip. ENGLISH DOT WORKS 2. SENA. semana 4 actividad 1.
Evidence: Planning my trip. ENGLISH DOT WORKS 2. SENA. semana 4 actividad 1.Evidence: Planning my trip. ENGLISH DOT WORKS 2. SENA. semana 4 actividad 1.
Evidence: Planning my trip. ENGLISH DOT WORKS 2. SENA. semana 4 actividad 1... ..
 
3. Your next holiday destination ACTIVIDAD 3 SEMANA 3 ENGLISH DOT WORKS 2.
3. Your next holiday destination ACTIVIDAD 3 SEMANA 3 ENGLISH DOT WORKS 2.3. Your next holiday destination ACTIVIDAD 3 SEMANA 3 ENGLISH DOT WORKS 2.
3. Your next holiday destination ACTIVIDAD 3 SEMANA 3 ENGLISH DOT WORKS 2... ..
 
Evidence: What did I do yesterday?.ENGLISH DOT WORKS 2. SENA. SEMANA 2 ACTIVI...
Evidence: What did I do yesterday?.ENGLISH DOT WORKS 2. SENA. SEMANA 2 ACTIVI...Evidence: What did I do yesterday?.ENGLISH DOT WORKS 2. SENA. SEMANA 2 ACTIVI...
Evidence: What did I do yesterday?.ENGLISH DOT WORKS 2. SENA. SEMANA 2 ACTIVI..... ..
 
Modelo para la conformación de una agenda digital en las instituciones de edu...
Modelo para la conformación de una agenda digital en las instituciones de edu...Modelo para la conformación de una agenda digital en las instituciones de edu...
Modelo para la conformación de una agenda digital en las instituciones de edu...Academia de Ingeniería de México
 
Primer Paquete Económico 2017 Zacatecas (2/9)
Primer Paquete Económico 2017 Zacatecas (2/9)Primer Paquete Económico 2017 Zacatecas (2/9)
Primer Paquete Económico 2017 Zacatecas (2/9)Zacatecas TresPuntoCero
 
Gfpi f-019 guia de aprendizaje 01 tda orientar fpi
Gfpi f-019 guia de aprendizaje 01 tda orientar fpiGfpi f-019 guia de aprendizaje 01 tda orientar fpi
Gfpi f-019 guia de aprendizaje 01 tda orientar fpilisbet bravo
 
De Reis van de Heldin december 2015
De Reis van de Heldin december 2015De Reis van de Heldin december 2015
De Reis van de Heldin december 2015Peter de Kuster
 
El emprendedor y el empresario profesional cert
El emprendedor y el empresario profesional certEl emprendedor y el empresario profesional cert
El emprendedor y el empresario profesional certMaestros Online
 

Andere mochten auch (20)

PMP Sonora Saludable 2010 2015
PMP Sonora Saludable 2010   2015  PMP Sonora Saludable 2010   2015
PMP Sonora Saludable 2010 2015
 
Onderzoeksrapport acrs v3.0_definitief
Onderzoeksrapport acrs v3.0_definitiefOnderzoeksrapport acrs v3.0_definitief
Onderzoeksrapport acrs v3.0_definitief
 
Como hacer un plan de negocios
Como hacer un plan de negociosComo hacer un plan de negocios
Como hacer un plan de negocios
 
Evidence: Describing my kitchen. ENGLISH DOT WORKS 2. SENA.
Evidence: Describing my kitchen. ENGLISH DOT WORKS 2. SENA.Evidence: Describing my kitchen. ENGLISH DOT WORKS 2. SENA.
Evidence: Describing my kitchen. ENGLISH DOT WORKS 2. SENA.
 
Estrategias competitivas básicas
Estrategias competitivas básicasEstrategias competitivas básicas
Estrategias competitivas básicas
 
Rodriguez alvarez
Rodriguez alvarezRodriguez alvarez
Rodriguez alvarez
 
2. describing cities and places. ENGLISH DOT WORKS 2. SENA. semana 4 acitivda...
2. describing cities and places. ENGLISH DOT WORKS 2. SENA. semana 4 acitivda...2. describing cities and places. ENGLISH DOT WORKS 2. SENA. semana 4 acitivda...
2. describing cities and places. ENGLISH DOT WORKS 2. SENA. semana 4 acitivda...
 
3.Evidence: Getting to Bogota.ENGLISH DOT WORKS 2. SENA.semana 4 actividad 3.
3.Evidence: Getting to Bogota.ENGLISH DOT WORKS 2. SENA.semana 4 actividad 3.3.Evidence: Getting to Bogota.ENGLISH DOT WORKS 2. SENA.semana 4 actividad 3.
3.Evidence: Getting to Bogota.ENGLISH DOT WORKS 2. SENA.semana 4 actividad 3.
 
Evidence: Going to the restaurant . ENGLISH DOT WORKS 2. SENA.
Evidence: Going to the restaurant . ENGLISH DOT WORKS 2. SENA.Evidence: Going to the restaurant . ENGLISH DOT WORKS 2. SENA.
Evidence: Going to the restaurant . ENGLISH DOT WORKS 2. SENA.
 
Evidence: I can’t believe it.ENGLISH DOT WORKS 2. semana 3 actividad 1.SENA.
Evidence: I can’t believe it.ENGLISH DOT WORKS 2. semana 3 actividad 1.SENA.Evidence: I can’t believe it.ENGLISH DOT WORKS 2. semana 3 actividad 1.SENA.
Evidence: I can’t believe it.ENGLISH DOT WORKS 2. semana 3 actividad 1.SENA.
 
Evidence: Memorable moments.ENGLISH DOT WORKS 2. SENA. semana 2 actividad 2.
Evidence: Memorable moments.ENGLISH DOT WORKS 2. SENA. semana 2 actividad 2.Evidence: Memorable moments.ENGLISH DOT WORKS 2. SENA. semana 2 actividad 2.
Evidence: Memorable moments.ENGLISH DOT WORKS 2. SENA. semana 2 actividad 2.
 
Evidence: Planning my trip. ENGLISH DOT WORKS 2. SENA. semana 4 actividad 1.
Evidence: Planning my trip. ENGLISH DOT WORKS 2. SENA. semana 4 actividad 1.Evidence: Planning my trip. ENGLISH DOT WORKS 2. SENA. semana 4 actividad 1.
Evidence: Planning my trip. ENGLISH DOT WORKS 2. SENA. semana 4 actividad 1.
 
3. Your next holiday destination ACTIVIDAD 3 SEMANA 3 ENGLISH DOT WORKS 2.
3. Your next holiday destination ACTIVIDAD 3 SEMANA 3 ENGLISH DOT WORKS 2.3. Your next holiday destination ACTIVIDAD 3 SEMANA 3 ENGLISH DOT WORKS 2.
3. Your next holiday destination ACTIVIDAD 3 SEMANA 3 ENGLISH DOT WORKS 2.
 
Evidence: What did I do yesterday?.ENGLISH DOT WORKS 2. SENA. SEMANA 2 ACTIVI...
Evidence: What did I do yesterday?.ENGLISH DOT WORKS 2. SENA. SEMANA 2 ACTIVI...Evidence: What did I do yesterday?.ENGLISH DOT WORKS 2. SENA. SEMANA 2 ACTIVI...
Evidence: What did I do yesterday?.ENGLISH DOT WORKS 2. SENA. SEMANA 2 ACTIVI...
 
Modelo para la conformación de una agenda digital en las instituciones de edu...
Modelo para la conformación de una agenda digital en las instituciones de edu...Modelo para la conformación de una agenda digital en las instituciones de edu...
Modelo para la conformación de una agenda digital en las instituciones de edu...
 
Primer Paquete Económico 2017 Zacatecas (2/9)
Primer Paquete Económico 2017 Zacatecas (2/9)Primer Paquete Económico 2017 Zacatecas (2/9)
Primer Paquete Económico 2017 Zacatecas (2/9)
 
Gfpi f-019 guia de aprendizaje 01 tda orientar fpi
Gfpi f-019 guia de aprendizaje 01 tda orientar fpiGfpi f-019 guia de aprendizaje 01 tda orientar fpi
Gfpi f-019 guia de aprendizaje 01 tda orientar fpi
 
De Reis van de Heldin december 2015
De Reis van de Heldin december 2015De Reis van de Heldin december 2015
De Reis van de Heldin december 2015
 
Relatietips
RelatietipsRelatietips
Relatietips
 
El emprendedor y el empresario profesional cert
El emprendedor y el empresario profesional certEl emprendedor y el empresario profesional cert
El emprendedor y el empresario profesional cert
 

Ähnlich wie Sigve Hamilton Aspelund: Coiled tubing underbalanced drilling

Ähnlich wie Sigve Hamilton Aspelund: Coiled tubing underbalanced drilling (20)

4196644.ppt
4196644.ppt4196644.ppt
4196644.ppt
 
Well logging
Well loggingWell logging
Well logging
 
formation evaluation
formation evaluationformation evaluation
formation evaluation
 
well-logging-70544856.docx
well-logging-70544856.docxwell-logging-70544856.docx
well-logging-70544856.docx
 
Well logging
Well loggingWell logging
Well logging
 
subsurface[1].pptx
subsurface[1].pptxsubsurface[1].pptx
subsurface[1].pptx
 
Subsurface geophysical methods
Subsurface geophysical methodsSubsurface geophysical methods
Subsurface geophysical methods
 
Well logging
Well loggingWell logging
Well logging
 
Classification of logs
Classification of logsClassification of logs
Classification of logs
 
Well lod ,well Testing and mud logging Ghulam Abbas Abbasi
Well lod ,well Testing and mud logging Ghulam Abbas AbbasiWell lod ,well Testing and mud logging Ghulam Abbas Abbasi
Well lod ,well Testing and mud logging Ghulam Abbas Abbasi
 
Interpreting geophysical well logs
Interpreting geophysical well logsInterpreting geophysical well logs
Interpreting geophysical well logs
 
subsurface investigation of ground water
subsurface investigation of ground watersubsurface investigation of ground water
subsurface investigation of ground water
 
Formation evaluation
Formation evaluationFormation evaluation
Formation evaluation
 
Fundamentals of Petroleum Engineering Module 5
Fundamentals of Petroleum Engineering Module 5Fundamentals of Petroleum Engineering Module 5
Fundamentals of Petroleum Engineering Module 5
 
Well logging
Well loggingWell logging
Well logging
 
formation evaluation for reservoir engineering
formation evaluation for reservoir engineeringformation evaluation for reservoir engineering
formation evaluation for reservoir engineering
 
Well logging
Well loggingWell logging
Well logging
 
Well log _the_bore_hole_image_
Well log _the_bore_hole_image_Well log _the_bore_hole_image_
Well log _the_bore_hole_image_
 
Geophysical well logging
Geophysical well loggingGeophysical well logging
Geophysical well logging
 
Well logs
Well logsWell logs
Well logs
 

Mehr von Sigve Hamilton Aspelund

20210521 curriculum vitae sigve hamilton aspelund 1
20210521 curriculum vitae sigve hamilton aspelund 120210521 curriculum vitae sigve hamilton aspelund 1
20210521 curriculum vitae sigve hamilton aspelund 1Sigve Hamilton Aspelund
 
Omregnet karakterer fra numeriske til bokstavkakterer Sigve Hamilton Aspelund
Omregnet karakterer fra numeriske til bokstavkakterer Sigve Hamilton AspelundOmregnet karakterer fra numeriske til bokstavkakterer Sigve Hamilton Aspelund
Omregnet karakterer fra numeriske til bokstavkakterer Sigve Hamilton AspelundSigve Hamilton Aspelund
 
MOU your company or name and Aquinas & Sigve Hamilton Aspelund
MOU your company or name and Aquinas & Sigve Hamilton AspelundMOU your company or name and Aquinas & Sigve Hamilton Aspelund
MOU your company or name and Aquinas & Sigve Hamilton AspelundSigve Hamilton Aspelund
 
Sigve Hamilton Aspelund: Eksamen i HMS-ledelse
Sigve Hamilton Aspelund: Eksamen i HMS-ledelseSigve Hamilton Aspelund: Eksamen i HMS-ledelse
Sigve Hamilton Aspelund: Eksamen i HMS-ledelseSigve Hamilton Aspelund
 
A training proposal - Aquinas Oilfield Services and Sigve Hamilton Aspelund
A training proposal - Aquinas Oilfield Services and Sigve Hamilton AspelundA training proposal - Aquinas Oilfield Services and Sigve Hamilton Aspelund
A training proposal - Aquinas Oilfield Services and Sigve Hamilton AspelundSigve Hamilton Aspelund
 
Cv sigve hamilton aspelund linkedin 102019
Cv sigve hamilton aspelund linkedin 102019Cv sigve hamilton aspelund linkedin 102019
Cv sigve hamilton aspelund linkedin 102019Sigve Hamilton Aspelund
 
Sedimentology Lecture 6. shelves & turbidites
Sedimentology Lecture 6. shelves & turbiditesSedimentology Lecture 6. shelves & turbidites
Sedimentology Lecture 6. shelves & turbiditesSigve Hamilton Aspelund
 
Sedimentology Lecture 5. techniques of sedimentary logging
Sedimentology Lecture 5. techniques of sedimentary loggingSedimentology Lecture 5. techniques of sedimentary logging
Sedimentology Lecture 5. techniques of sedimentary loggingSigve Hamilton Aspelund
 
Sedimentology Lecture 4. concept of sedimentary facies, association and proce...
Sedimentology Lecture 4. concept of sedimentary facies, association and proce...Sedimentology Lecture 4. concept of sedimentary facies, association and proce...
Sedimentology Lecture 4. concept of sedimentary facies, association and proce...Sigve Hamilton Aspelund
 
Sedimentology Lecture 3. transitional depositional systems
Sedimentology Lecture 3. transitional depositional systemsSedimentology Lecture 3. transitional depositional systems
Sedimentology Lecture 3. transitional depositional systemsSigve Hamilton Aspelund
 
Sedimentology Lecture 2. continental depositional systems
Sedimentology Lecture 2. continental depositional systemsSedimentology Lecture 2. continental depositional systems
Sedimentology Lecture 2. continental depositional systemsSigve Hamilton Aspelund
 

Mehr von Sigve Hamilton Aspelund (20)

Project_2_Group_C_5.pdf
Project_2_Group_C_5.pdfProject_2_Group_C_5.pdf
Project_2_Group_C_5.pdf
 
Legorapport 2217
Legorapport 2217Legorapport 2217
Legorapport 2217
 
20210521 curriculum vitae sigve hamilton aspelund 1
20210521 curriculum vitae sigve hamilton aspelund 120210521 curriculum vitae sigve hamilton aspelund 1
20210521 curriculum vitae sigve hamilton aspelund 1
 
Omregnet karakterer fra numeriske til bokstavkakterer Sigve Hamilton Aspelund
Omregnet karakterer fra numeriske til bokstavkakterer Sigve Hamilton AspelundOmregnet karakterer fra numeriske til bokstavkakterer Sigve Hamilton Aspelund
Omregnet karakterer fra numeriske til bokstavkakterer Sigve Hamilton Aspelund
 
062021 CV Sigve Hamilton Aspelund
062021 CV Sigve Hamilton Aspelund062021 CV Sigve Hamilton Aspelund
062021 CV Sigve Hamilton Aspelund
 
Conference summary and outcomes final
Conference summary and outcomes finalConference summary and outcomes final
Conference summary and outcomes final
 
MOU your company or name and Aquinas & Sigve Hamilton Aspelund
MOU your company or name and Aquinas & Sigve Hamilton AspelundMOU your company or name and Aquinas & Sigve Hamilton Aspelund
MOU your company or name and Aquinas & Sigve Hamilton Aspelund
 
Sigve Hamilton Aspelund: Eksamen i HMS-ledelse
Sigve Hamilton Aspelund: Eksamen i HMS-ledelseSigve Hamilton Aspelund: Eksamen i HMS-ledelse
Sigve Hamilton Aspelund: Eksamen i HMS-ledelse
 
022021 cv sigve hamilton aspelund
022021 cv sigve hamilton aspelund022021 cv sigve hamilton aspelund
022021 cv sigve hamilton aspelund
 
122020 CV Sigve Hamilton Aspelund Norsk
122020 CV Sigve Hamilton Aspelund Norsk122020 CV Sigve Hamilton Aspelund Norsk
122020 CV Sigve Hamilton Aspelund Norsk
 
A training proposal - Aquinas Oilfield Services and Sigve Hamilton Aspelund
A training proposal - Aquinas Oilfield Services and Sigve Hamilton AspelundA training proposal - Aquinas Oilfield Services and Sigve Hamilton Aspelund
A training proposal - Aquinas Oilfield Services and Sigve Hamilton Aspelund
 
112020 cv sigve hamilton aspelund
112020 cv sigve hamilton aspelund112020 cv sigve hamilton aspelund
112020 cv sigve hamilton aspelund
 
CV sigve hamilton aspelund 2020 01
CV sigve hamilton aspelund 2020 01CV sigve hamilton aspelund 2020 01
CV sigve hamilton aspelund 2020 01
 
Cv sigve hamilton aspelund 122019
Cv sigve hamilton aspelund 122019Cv sigve hamilton aspelund 122019
Cv sigve hamilton aspelund 122019
 
Cv sigve hamilton aspelund linkedin 102019
Cv sigve hamilton aspelund linkedin 102019Cv sigve hamilton aspelund linkedin 102019
Cv sigve hamilton aspelund linkedin 102019
 
Sedimentology Lecture 6. shelves & turbidites
Sedimentology Lecture 6. shelves & turbiditesSedimentology Lecture 6. shelves & turbidites
Sedimentology Lecture 6. shelves & turbidites
 
Sedimentology Lecture 5. techniques of sedimentary logging
Sedimentology Lecture 5. techniques of sedimentary loggingSedimentology Lecture 5. techniques of sedimentary logging
Sedimentology Lecture 5. techniques of sedimentary logging
 
Sedimentology Lecture 4. concept of sedimentary facies, association and proce...
Sedimentology Lecture 4. concept of sedimentary facies, association and proce...Sedimentology Lecture 4. concept of sedimentary facies, association and proce...
Sedimentology Lecture 4. concept of sedimentary facies, association and proce...
 
Sedimentology Lecture 3. transitional depositional systems
Sedimentology Lecture 3. transitional depositional systemsSedimentology Lecture 3. transitional depositional systems
Sedimentology Lecture 3. transitional depositional systems
 
Sedimentology Lecture 2. continental depositional systems
Sedimentology Lecture 2. continental depositional systemsSedimentology Lecture 2. continental depositional systems
Sedimentology Lecture 2. continental depositional systems
 

Kürzlich hochgeladen

TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024Adnet Communications
 
Planetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in LifePlanetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in LifeBhavana Pujan Kendra
 
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...SOFTTECHHUB
 
14680-51-4.pdf Good quality CAS Good quality CAS
14680-51-4.pdf  Good  quality CAS Good  quality CAS14680-51-4.pdf  Good  quality CAS Good  quality CAS
14680-51-4.pdf Good quality CAS Good quality CAScathy664059
 
Excvation Safety for safety officers reference
Excvation Safety for safety officers referenceExcvation Safety for safety officers reference
Excvation Safety for safety officers referencessuser2c065e
 
WSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfWSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfJamesConcepcion7
 
Unveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic ExperiencesUnveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic ExperiencesDoe Paoro
 
EUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersEUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersPeter Horsten
 
Appkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxAppkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxappkodes
 
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdfGUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdfDanny Diep To
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFChandresh Chudasama
 
Environmental Impact Of Rotary Screw Compressors
Environmental Impact Of Rotary Screw CompressorsEnvironmental Impact Of Rotary Screw Compressors
Environmental Impact Of Rotary Screw Compressorselgieurope
 
Effective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold JewelryEffective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold JewelryWhittensFineJewelry1
 
20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdfChris Skinner
 
NAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors DataNAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
Data Analytics Strategy Toolkit and Templates
Data Analytics Strategy Toolkit and TemplatesData Analytics Strategy Toolkit and Templates
Data Analytics Strategy Toolkit and TemplatesAurelien Domont, MBA
 
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...ssuserf63bd7
 
Onemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
Onemonitar Android Spy App Features: Explore Advanced Monitoring CapabilitiesOnemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
Onemonitar Android Spy App Features: Explore Advanced Monitoring CapabilitiesOne Monitar
 
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdftrending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdfMintel Group
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdfShaun Heinrichs
 

Kürzlich hochgeladen (20)

TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024
 
Planetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in LifePlanetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in Life
 
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
 
14680-51-4.pdf Good quality CAS Good quality CAS
14680-51-4.pdf  Good  quality CAS Good  quality CAS14680-51-4.pdf  Good  quality CAS Good  quality CAS
14680-51-4.pdf Good quality CAS Good quality CAS
 
Excvation Safety for safety officers reference
Excvation Safety for safety officers referenceExcvation Safety for safety officers reference
Excvation Safety for safety officers reference
 
WSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfWSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdf
 
Unveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic ExperiencesUnveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic Experiences
 
EUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersEUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exporters
 
Appkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxAppkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptx
 
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdfGUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDF
 
Environmental Impact Of Rotary Screw Compressors
Environmental Impact Of Rotary Screw CompressorsEnvironmental Impact Of Rotary Screw Compressors
Environmental Impact Of Rotary Screw Compressors
 
Effective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold JewelryEffective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold Jewelry
 
20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf
 
NAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors DataNAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors Data
 
Data Analytics Strategy Toolkit and Templates
Data Analytics Strategy Toolkit and TemplatesData Analytics Strategy Toolkit and Templates
Data Analytics Strategy Toolkit and Templates
 
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
Horngren’s Financial & Managerial Accounting, 7th edition by Miller-Nobles so...
 
Onemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
Onemonitar Android Spy App Features: Explore Advanced Monitoring CapabilitiesOnemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
Onemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
 
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdftrending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf
 

Sigve Hamilton Aspelund: Coiled tubing underbalanced drilling

  • 1. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 2.  * geophysical well logging * under reaming following multistage underbalanced drilling * cement plug placing * emergency and fishing operations * selection criteria for well bore candidates * job planning and risk analysis * CT ground equipment * coiled tubing pipes * coiled tubing machinery (capillary units, injectors, reels etc.) * equipment for flow control and completion (drilling motors, drilling jars, intensifiers, reamers, Collars, etc.) * high tech drilling bits Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 3.  Nitrogen equipment application for coiled tubing drilling * * * * * * gas liquid mixtures nitrogen compressor stations pumping units vaporiser systems for CT continuous circulation systems and agitators management and control systems Separation systems for drilling fluids * * * * * centrifuges hydrocyclones shakers pumps management and control Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 4. Geophysical well logging - Schlumberger brothers, Conrad and Marcel, are credited with inventing electrical well-logs. - On September 5, 1927, the first “well-logA” was created in a small village named Pechelbroon in France. - In 1931, the first SP (spontaneous potential) log was recorded. Discovered when the galvanometer began “wiggling” even though no current was being applied. - The SP effect was produced naturally by the borehole mud at the boundaries of permeable beds. By simultaneously recording SP and resistivity, loggers could distinguish between permeable oil-bearing beds Managedimpermeable and pressure drilling systems. Multilateral wells. Coiled tubing nonproducing beds. underbalanced drilling.
  • 5. Types of Logs a) Gamma Ray b) SP (spontaneous potential) c) Resistivity (Induction) d) Sonic e) Density/Neutron f) Caliper Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 6. a) Gamma Ray    The gamma ray measures the natural radioactivity of the rocks, and does not measure any hydrocarbon or water present within the rocks. Shales: radioactive potassium is a common component, and because of their cation exchange capacity, uranium and thorium are often absorbed as well. Therefore, very often shales will display Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 7. The scale for GR is in API (American Petroleum Institute) and runs from 0125 units. There are often 10 divisions in a GR log, so each division represents 12.5 units.  Typical distinction between between a sandstone/limestone and shale occurs between 50-60 units.  Often, very clean sandstones or carbonates will display values within the 20 units range.  Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 8. b) SP (Spontaneous Potential) The SP log records the electric potential between an electrode pulled up a hole and a reference electrode at the surface.  This potenital exists because of the electrochemical differences between the waters within the formation and the drilling mud.  The potenital is measured in millivolts on a relative scale only since the absolute value depends on the properties of the drilling mud.  Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 9. In shaly sections, the maximum SP response to the right can be used to define a “shale line”.  Deflections of the SP log from this line indicates zones of permeable lithologies with interstitial fluids containing salinities differing from the drilling fluid.  SP logs are good indicators of lithology where sandstones are permeable and water saturated.  However, if the lithologies are filled with fresh water, the SP can become suppressed or even reversed. Also, they are poor in areas where the permeabilities are very low, sandstones are tighly cemented or the interval is completely bitumen pressure drilling systems. Managed saturated (ieMultilateral wells. Coiled tubing oil sands). underbalanced drilling. 
  • 10. c) Resistivity (Induction) Resistivity logs record the resistance of interstitial fluids to the flow of an electric current, either transmitted directly to the rock through an electrode, or magnetically induced deeper into the formation from the hole.  Therefore, the measure the ability of rocks to conduct electrical currents and are scaled in units of ohm-meters.  On most modern logs, there will be three curves, each measuring the resistance of section to the flow of electricity.  Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 11. Porous formations filled with salt water (which is very common) have very low resistivities (often only ranging from 1-10 ohms-meter).  Formations that contain oil/gas generally have much higher resisitivities (often ranging from 10-500 ohms-meter).  With regards to the three lines, the one we are most interested in is the one marked “deep”. This is because this curve looks into the formation at a depth of six meters (or greater), thereby representing the portion of the formation most unlikely undisturbed by the drilling process.  One must be careful of “extremely” high values, as they will often represent zones of either anhydrite or other non-porous intervals. Managed pressure drilling systems.  Multilateral wells. Coiled tubing underbalanced drilling.
  • 12. d) Sonic    Sonic logs (or acoustic) measure the porosity of the rock. Hence, they measure the travel time of an elastic wave through a formation (measured in ∆T- microseconds per meter). Intervals containing greater pore space will result in greater travel time and vice versa for non-porous sections. Must be used in combination with other logs, particularly gamma rays and resistivity, thereby allowing one to better understand the reservoir petrophysics. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 13. e) Density/Neutron Density logs measure the bulk electron density of the formation, and is measured in kilograms per cubic meter (gm/cm3 or kg/m3).  Thus, the density tool emits gamma radiation which is scattered back to a detector in amounts proportional to the electron density of the formation. The higher the gamma ray reflected, the greater the porosity of the rock.  Electron density is directly related to the density of the formation (except in evaporates) and amount of density of interstitial fluids.  Helpful in distinguishing lithologies, especially between dolomite (2.85 kg/m3) and limestone (2.71 kg/m3  Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 14. Neutron Logs measure the amounts of hydrogen present in the water atoms of a rock, and can be used to measure porosity. This is done by bombarding the the formation with neutrons, and determing how many become “captured” by the hydrogen nuclei.  Because shales have high amounts of water, the neutron log will read quite high porositiesthus it must be used in conjunction with GR logs.  However, porosities recorded in shale-free sections are a reasonable estimate of the Managed pressure drilling systems. pore spaces that could produce water. Multilateral wells. Coiled tubing  underbalanced drilling.
  • 15. It is very common to see both neutron and density logs recorded on the same section, and are often shown as an overlay on a common scale (calibrated for either sandstones or limestone’s).  This overlay allows for better opportunity of distinguishing lithologies and making better estimates of the true porosity. * When natural gas is present, there becomes a big spread (or crossing) of the two logs, known as the “gas  Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 16. f) Caliper Caliper Logs record the diameter of the hole. It is very useful in relaying information about the quality of the hole and hence reliability of the other logs.  An example includes a large hole where dissolution, caving or falling of the rock wall occurred, leading to errors in other log responses.  Most caliper logs are run with GR logs and typically will remain constant throughout  Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 17. Underbalanced drilling Though not as common as overbalanced drilling, underbalanced drilling is achieved when the pressure exerted on the well is less than or equal to that of the reservoir.  Performed with a light-weight drilling mud that applies less pressure than formation pressure, underbalanced drilling prevents formation damage that can occur during conventional, or overbalanced drilling processes.  Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 18.  The negative differential pressure obtained during underbalanced drilling between the reservoir and the wellbore encourages production of formation fluids and gases. In contrast to conventional drilling, flow from the reservoir is driven into the wellbore during underbalanced drilling, rather than away from it. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 19. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 20.  Although initially more costly, underbalanced drilling, also known as managed-pressure drilling, reduces common conventional drilling problems, such as lost circulation, differential sticking, minimal drilling rates and formation damage. Additionally, underbalanced drilling extends the life of the drill bit because the drilling gases cool the bit while quickly removing cuttings. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 21. To establish pressure control, a rotating control head with a rotating inner seal assembly is used in conjunction with the rotating table. An important factor to successful underbalanced drilling, drilling and completion operations must remain underbalanced at all times during operations. To accomplish this, pre-planning and onsite engineering are critical to the success of underbalanced drilling procedures.  Typically used for only a section of the entire drilling process, underbalanced drilling cannot be used in most shale environments Managed pressure drilling systems.  Multilateral wells. Coiled tubing underbalanced drilling.
  • 22. Underbalance Gases  Gases used for underbalance include air, nitrogen and natural gas. Although it is not typical, if natural gas is recovered from the well, it can be reinjected into the well to establish underbalance, resulting in the most cost-effective solution for underbalanced drilling. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 23.  Commonly used in under balance operations, nitrogen is preferred for its somewhat low cost of generation, scale of control and minimal potential for downhole fires. While pure nitrogen can be purchased, it is costprohibitive. Therefore, nitrogen is more commonly produced onsite with a membrane unit, resulting in a 95% level of purity. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 24. Underbalance Techniques   There are four main techniques to achieve underbalance, including using light weight drilling fluids, gas injection down the drill pipe, gas injection through a parasite string and foam injection. Using lightweight drilling fluids, such as fresh water, diesel and lease crude, is the simplest way to reduce wellbore pressure. A negative for this approach is that in most reservoirs the pressure in the wellbore cannot be reduced enough to achieve under balance. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 25.  The method of injecting gas down the drillpipe involves adding air or nitrogen to the drilling fluid that is pumped directly down the drillpipe. Advantages to this technique include improved penetration, decreased amount of gas required, and that the wellbore does not have to be designed specifically for underbalanced drilling. On the other hand, disadvantages include the risk of overbalance conditions during shut-in and the requirement of rare MWD tools. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 26.  In performing the gas injection via parasite string, a second pipe is run outside of the intermediate casing. While the cost of drilling increases, as does the time it takes, this technique applies constant bottom hole pressure and requires no operational differences or unique MWD systems. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 27.  A less common underbalanced application, nitrogen foam is less damaging to reserves that exhibit water sensitivities. While the margin of safety is increased using foams, the additional nitrogen needed to generate stable foam makes this technique cost prohibitive. Additionally, there are temperature limits to using foam in underbalanced drilling, limiting using the technique to wells measuring less than 12,000 feet deep. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 28. Cement Plugs Cement slurry design. – Cement type and additives. • API class • Extenders, shrinkage, gas control, fluid loss control, formation and pipe adherence, spacers. • Volumes and excesses. • Placement method. – Location identification, – Depth control, – Spotting method (bailer, circulation, etc.), – Contamination control, – Testing requirements. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 29. Cement Plug Placement Balanced method. • Modified balanced method. • Displacement from surface. • Two plug circulation. • Grouting – various. • Mechanical assistance. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 30. Setting a cement plug Not as easy as it may seem • Position of the end of tubing (EOT) may not correspond to where the plug is actually set. • What are the considerations of setting a cement plug in mud? • Effect of fluid loss and cross flow on setting an effective cement plug? Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 31. Setting Cement Plugs A near 100% reliable system if cross flow can be stopped. • Most cement plugs fail because of cross flow, density and viscosity mismatch, or failure to “break” the fluid momentum. • Full plug method described and field tested in SPE 11415 (published in SPE JPT Nov 1984, pp 1897-1904) and SPE Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 32. Cement Plug Failure Many cement plugs fail for the same 4 reasons: 1. Cross flow cuts channels into the plug. 2. Cement is higher density that the mud – cement falls through the mud. Mud contamination of the cement may keep it from setting. 3. The mud is much lower viscosity than the cement slurry – cement falls through the mud 4. The open ended tubing produces a high momentum energy condition that the mud cannot stop – thus cement falls through the mud. The result of the last three is that the cement is spread out along the hole andManaged pressure drilling systems. a plug is never Multilateral wells. Coiled tubing formed. underbalanced drilling.
  • 33. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 34. How? 1. Use a simple tubing end plug with circulation to the side and upward but not downward. 2. Spot a heavily gelled bentonite pill below the cement plug depth. Pill thickness of 500- 800 ft (152- 244 m). 3. Use a custom spacer to separate the pill and the cement slurry. 4. Use a viscous, thixotropic cement with setting time equal to the job time plus ½ hr. Plug thickness of 300 to 600 ft (91 to 183 m) 5. Rotate the centralized tubing (do not reciprocate) during placement and gently withdraw at the end of the pumping. 6. WOC = 4 hrs for every 1 hour of pump time. Full details and field tests in SPE 11415. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 35. Reasons for Cement Plug Failures • Contamination of the cement slurry with drilling mud during or immediately after placement. • Failure to place a viscous pill to stop downward movement of cement slurry. • Inaccurate knowledge of volumes required. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 36. General Requirements • Onshore – 10 ft (3 m) plug on top of the well and casing cut 3 ft (1m) below the ground surface. • Mud between plugs (9.5 lb/gal). • Plug thickness minimum of 100 ft, plus 10% for each 1000 ft of zone. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 37. Procedures • Remove salvageable equipment. – NORM scale present? Leave the pipe in the well? – What pipe is needed for a barrier? How effective? • Set, at minimum, plugs required by regulations. Don’t hesitate to go beyond requirements. • Test to limits required. • Cap and identify as specified. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 38. Isolation of Open Hole • Cement Plug 100ft (30m) above and below lower-most shoe in open hole. • Cement retainer 50 to 100 ft (15 to 30m) above the shoe. Cement 100 ft (30m) below shoe and 50 ft (15m) of cement on top. • Tested to 15,000 lbs load or 1000 psi. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 39. Isolation of Perforations • Cement Plug 100ft (30m) above and below perfs (or to next plug). • Cement retainer 50 to 100 ft (15 to 30m) above the perfs. Cement 100 ft (30m) below shoe and 50 ft (15m) of cement on top. • Permanent bridge plug within 150 ft (45m) of perfs with 50 ft (15m) of cement on top. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 40. Isolation of lap joints or liner tops • Cement Plug 100ft (30m) above and below liner top (or to next plug). • Cement retainer or permanent bridge plug 50 ft (15m) above the liner with 50 ft (15m) of cement on top. • Cement plug 200 ft (60m) long within 100 ft (30m) of liner. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 41. Finding and Repairing Channels in Cement Channels in cement occur from many causes: – Lack of effective pipe centralization, – Inadequate mud conditioning prior to cementing, – Ineffective cement displacement design and/or execution, – Excess free water in the cement, especially in a deviated hole (usually a cement mixing problem). – Excessive fluid loss from the cement slurry (generally results in low cement top), – Gas influx before the cement sets, – Cement shrinkage, – Etc. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 42. Identifying Channels in Cement Sheath Numerous logging methods: – CBL and segmented CBL tools that scan around the wellbore, – Borax logging, Carbon-Oxygen logs, Sonic tools, etc. • Plug and packers with perforating. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 43. Repair of Channels - Cement Squeezes Types (some names anyway) – Block squeeze – Cement Packer – Suicide squeeze – Breakdown squeeze – Running and Walking squeezes – Hesitation squeeze • What is used depends on both what is needed and the experience of the operator. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 44. Surface Plug On-Shore – depends on local regulations. • Offshore – cement plug 150 ft (45m) long within 150 ft (45m) of mud line. Placed in the smallest string of casing that extends to the mud line. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 45. Testing of Plugs Location of the first plug below the surface plug shall be verified. – Pipe weight of 15,000 lbs on cement plug, cement retainer, or bridge plug. – Pump pressure of 1,000 psi with maximum 10% drop in 15 minutes. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 46. Risk evaluation Risk & unwanted incidents ranking  Systems in place  • Report incidents and near miss • Analyse material • Look for trends Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 47. Risk definition   Risk=Practicable*Consequence Risk to  Personel  Environment  Material Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 48. Mapping of HSE & risks  Register incidents: Positive and negative Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 49. Cause assesment • Direct causes vs underlying causes • Cause perspective – Human – Technical – Organisational • 5 Whys technique – Look for underlying causes – Eliminate root of the problem Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 50. HSE analyse QRA: Quantity Risk Assesment QRM: Qualitative Risk Matrix Safe job analysis – Chemical analysis Risk assesment promt card Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 51. Risk reduction ALARP: As Low As Reasonable Practicable  BAT: Best Available Technology  Precation principles  Substitution principles  Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 52. Barriers – swiss cheese model The Barriere Concept BARRIERS; Technical, Qualifications, Procedures etc. INITIATING INITIATING CAUSE CAUSE ACCIDENT/ ACCIDENT/ LOSS LOSS Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 53. We are all responsible for managing HSE Barrier 1 – HSE Policy & Leadership Hazard/ Risk Barrier 2 – Planning I was responsible for planning the operations safely Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 54. Barrier 1 – HSE Policy & Leadership Hazard/ Risk Barrier 2 – Planning Barrier 3 – Supervision I turned a blind eye to some of the crew not following all the procedures as we had limited time to do the job I was responsible for supervising the maintenance work Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 55. Barrier 1 – HSE Policy & Leadership Hazard/ Risk Barrier 2 – Planning Barrier 3 – Supervision Barrier 4 – Procedures I didn’t work safely and took short-cut to get the job done Accident I was responsible completing the work Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 56. We all have a part to play Mngt Team Finance/Accounting Visible leadership promotes HSE culture ….. Resources allocated for effective implementation Resource budgets effectively tracked and managed Maintenance Maintain equipment and ensure that operational integrity is maintained SJA team Legal Legal requirements of projects identified and complied with Hazards identified and risk mngt plans implemented Drilling HR Competencies required for job are clearly identified IT/ Data/ Graphics Systems to control and securely store HSE critical information Risk management integrated to drilling programme HSE dept Contract Ensure that Company are Guidance and given the means to perform advisory support Managed pressure drilling systems. the job safely and efficiently Multilateral wells. Coiled tubing provided to underbalanced drilling. operations
  • 57. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 58. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 59. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 60. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 61. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 62. How Does Fishing Work?   There are a number of problems that can occur while drilling a well. Whether a drill string breaks and falls to the bottom of the wellbore or a bit breaks, accidents happen. Even pipe or a tool can fall from the rig floor into the bottom of the well. This stray equipment that has fallen into the well is referred to as fishor junk, and regular drill bits cannot drill through it. Should a fish fall into a well, fishing is required to remove it. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 63. Fishing tools Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 64. In order to perform fishing on a well, drilling must be shelved and special fishing tools employed. Each tool is specially crafted to perform a specific function, or retrieve a certain type of fish. Most fishing tools are screwed into the end of a fishing string, similar to drillpipe, and lowered into the well.  There are two options to recover lost pipe. The first is a spear, which fits within the pipe and then grips the pipe from the inside. On the other hand, an overshoot may be employed, and this tool surrounds the pipe and grips it from the outside to carry it up the wellbore.  Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 65. When a fish is difficult to grip, a washover pipe or washpipe is used. Made of largediameter pipe with a cutting surface at the tip, washpipe is run in the well and then the cutting edge grinds the fish to a smooth surface. Then drilling fluids are pumped into the well to remove debris, and another tool is used to retrieve the remaining fish.  Sometimes, a junk mill and boot basket are used to retrieve fish from the wellbore. In this instance, a junk mill is lowered into the well and rotated to grind the fish into smaller pieces. A boot basket, also known as a junk basket, is then lowered into the well. Drilling fluid is pumped into the well, and the ground parts of the fish are Managed pressure drilling systems. raised into the basket and then towells. Coiled tubing by the surface Multilateral the boot basket. underbalanced drilling. 
  • 66.  In order to recover casing that has collapsed within the well or irregularly shaped fish, a tapered mill reamer can be used. Permanent and magnetic magnets are employed to reclaim magnetic fish, and a wireline spear uses hooks and barb to clasp broken wireline. Additionally, an explosive might be detonated within the well to break the fish up into smaller pieces, and then a tool such as a junk bucket is used to retrieve the smaller items. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 67.  When a fishing professional is unable to determine which fishing tool might work best to retrieve the fish, an impression block is used to get an impression of the fish and allow the professional to know with what exactly he or she is dealing. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 68.  Fishing a well may take days to complete, and during this time, drilling cannot occur, although the operator is still responsible for drilling fees. Some drilling contractors offer fishing insurance, making operators not responsible for rig fees during fishing operations. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 69. Statoil records first successful North Sea HP/HT coiled tubing milling job Telemetry proves critical for intervention at Kvitebjoern on Norwegian continental shelf  Statoil learned valuable lessons during the planning and execution of a high pressure/high-temperature (HP/HT) coiled tubing milling job on the Norwegian continental shelf (NCS) in the North Sea at Kvitebjørn field.  Kvitebjørn is a Statoil-operated gas and condensate field in block 34/11 with a reservoir at about 4,000 m (13,120 ft) with pressure of 770 bar (11,168 psi) and Managed pressure drilling systems. temperature of 160º C (320º F). Coiled tubing Multilateral wells.  underbalanced drilling.
  • 70.  Well 34/11-A-9 T2 was drilled as a gas producer and during the final completion phase, it was not possible through pressure cycling to open the HP/HT isolation ball valve set in the 9 7/8-in. liner at 6,245.7 m (20,486 ft) MD/3,795.8 m (12,450 ft) TVD. After several failed attempts with wireline using mechanical override tools, it was decided to punch above it to allow well production passing the outside of the valve through the annulus between 9 7/8-in. liner and the 5½-in. tail pipe. However, the production performance was poor. A feasibility study evaluated ways to open or mill out the valve with the objective to improve the production characteristics and to allow access for future production logging. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 71.   The decision was to mill the stuck-closed isolation ball valve using coiled tubing (CT). Statoil had not performed any HP/HT CT operations and the available experience was limited. To minimize uncertainty relating to depth determination during milling, a telemetry system ran at its operational pressure and temperature limits to provide realtime casing collar locator (CCL) readings in addition to downhole pressure and temperature data. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 72. The Super 13% chrome, 110 Kpsi yield isolation ball valve was stuck closed at a deviation of 57.8º. Its ID when open is 4.25-in with a drift ID = 4.151 in. The EOF seating nipple at 6,223 m (20,411 ft) MD from the rig kelly bushing was ID = 4.31 in., which represents the minimum wellbore restriction from surface down to the ball valve depth.  The 34/11-A-9 T2 well is in the Statfjord formation with the top of perforations at 4,313 m (14,147 ft) TVD. The original prognosed reservoir pressure was 770 +45/-14 bar (11,168 + 653/-203 psi) and the downhole temperature at reservoir was 160º C. The shut-in wellhead pressure was 571 bar (8,282 psi) in March 2011. The expected downhole temperature at the ball valve was 145º C (293º F). The H2S and CO2 concentrations in the produced gas were less than 5 ppm and a concentration of 3.477 mol %, respectively.  Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 73. A feasibility study including an onshore milling test evaluated the possibility of milling the isolation ball valve with an electrical mill assembly run on mono-conductor wireline cable. The report concluded with large uncertainty regarding the number of bailer runs necessary to remove debris above the valve and reach milling depth, as well as the lifetime for the electrical milling equipment at the very high downhole temperature. Based on this study and the low estimated likelihood of success (30 -- 40%), the Kvitebjørn license decided not to proceed with the wireline alternative.  New feasibility studies evaluated using CT, rigassisted snubbing, and the rig for opening or Managed pressure drilling systems. milling out the isolation ball valve.wells. Coiled tubing Multilateral  underbalanced drilling.
  • 74. Wellbore schematic. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 75. The CT alternative seemed to be feasible since similar jobs were performed at lower temperature and shallower depths, but the 15K psi well control equipment and CT string design would have to be specified and sourced specifically for the job.  The main drawbacks for the rig-assisted snubbing were the drilling crew's rig-assisted snubbing experience, rig-assisted snubbing personnel experience, ram-to-ram stripping experience, and HP/HT well conditions.  For the rig alternative, the main risks were gas migration to the surface in addition to more time and cost relating to killing the well.  Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 76. Well control stack as built Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 77.  It was decided that the primary method to be further evaluated and developed for removal of the ball valve restriction from the well would be CT, the secondary method would be rigassisted snubbing and the final method would be to use the rig. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 78. Concept selection During the concept selection phase, the recommended method for deploying CT to remove the isolation ball valve from the wellbore consisted of the following steps:  Pre-CT job "pump and bleed“ operation. Displacing the wellbore from the current gas by repeatedly bullheading 1.044 sg 40/60% MEG/fresh water from the kill wing valve of the christmas tree and bleeding the gas that migrates to surface. The aim of this "pump and bleed" step was to reduce the surface shut-in wellhead pressure (SIWHP) to the minimum before running the CT. This had advantages in safety and operations.  Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 79.  CT drift and cleanout run(s). The well was producing intermittently for few months through punched holes above the closed ball valve. It was suspected that fill and debris might have settled above the ball valve with the 11.5-m (38-ft) interval between the punched holes and top of the ball valve being particularly vulnerable. Offshore crane capacity limits and the long CT string needed to reach the ball valve at 6,245.7 m (20,492 ft) MD RKB, the maximum CT string size that could be shipped in one piece was 2- in. OD. The well completion from surface to approximately the ball valve depth was 7 in., 35 lb/ft tubing with a 6-in. ID. Therefore, it was impossible to generate enough turbulence in the annulus between the tubing and CT to lift any fill or debris when run in hole (RIH) with the milling bottom hole assembly (BHA) to mill the ball valve. It was decided to RIH first with a with venturi jet junk basket (VJJB) to drift and clean out the wellbore to Managed pressure drilling systems. Multilateral wells. Coiled tubing the top of the ball valve. underbalanced drilling.
  • 80.  CT milling run(s). This was the ultimate run to achieve the job objective and mill the ball valve. The motor needed to provide enough torque to mill through the ball valve. In addition, its operating pump rate should be achievable through the specially designed 2-in. CT string. A yard test and a successful milling job of a similar ball valve in a well operated by Shell in the British section of the North Sea were on record. The mill was a 4.1-in. OD dome profile ball mill run with a hydraulically (pump rate) operated shifting tool and an anti-stall tool. All lessons learned during this Shell job were taken into account for this Kvitebjørn CT project. The mill was designed and tested to mill through the ball valve material. The mill size for this Kvitebjørn job was decided to be 4-in. OD to deploy the milling BHA through the 41⁄16-in. 15K psi CT BOP. This mill size is big enough to allow later production logging tools to run through the milled hole. This critical detailed planning phase took approximately five months. It consisted of organizing several meetings and coordinating between different departments, disciplines, and third parties. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 81. Offshore execution  The job went as planned. The CT job was carried out through the drilling rig. The ball valve was successfully milled and drifted with the 4-in mill and the access to the lower wellbore was regained. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 82. CT equipment layout on pipe deck. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 83.   No serious HSE & Q incidents were reported during this first HP/HT CT job in Statoil and the Norwegian continental shelf with a high operating factor of 96.2%. The total job duration was 31.6 days with equipment rig up including "pump and bleed" of 10.9 days; one VJJB clean up run and three milling runs totaling 9.1 days; extra production test and one extra drift run with VJJB through and below the milled ball valve, 6.1 days; and equipment rig down and back load, 5.5 days. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 84. Operational risk analysis An operational risk analysis log sheet and risk register covering the different steps of the operation was elaborated during detailed planning. This was important because this was the first HP/HT CT operation in Statoil and in the NCS.  The risk assessment involved representatives from all concerned disciplines within Statoil, including reservoir, well intervention, drilling and production, plus Statoil discipline advisors for CT, well intervention, well integrity, HP/HT, and well control, as well as third-parties representatives for CT services and the rig contractor.  Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 85.   The probability and the potential impact for each initial risk were assessed using a standard risk tolerance matrix. Prevention and mitigation actions were identified for each risk with the objective of reducing the probability and/or the potential impact of the corresponding risk. This resulted in a detailed operational risk register including 41 identified hazards and 84 risk prevention and/or mitigation measures that were implemented during the planning and execution phases. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 86. This risk register was subdivided into 11 sections as following:  1. Mobilization and demobilization 2. Spotting and equipment rig up 3. "Pump and bleed" operation 4. VJJB drift and cleanout run(s) 5. Milling run(s) 6. Well control stack up 7. BHAs 8. Fluids 9. Contingency scenarios 10. Rig down equipment 11. Simultaneous contingency situations in A-9 T2 and a second well. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 87. Lessons learned There were a number of lessons learned on this project. They key lessons are described below.  Telemetry tool performance. The telemetry tool provided valuable CCL data to correlate the depth down to the ball valve. The telemetry tool failed in three of four runs at a bottomhole temperature around 145ºC (293º F). However, the CCL logging signal failed after the initial depth correlation. The telemetry tool was running properly for its first few hours of exposure under extreme downhole pressure and temperature conditions before it failed. It was a known and accepted risk prior to operation that the tool might fail if exposed to downhole conditions close to or above its operational specifications of 8,000 psi/150º C (55 MPa/305º F) for a prolonged time. It could be concluded from the data that the telemetry tool operated properly up to 564 bar (8,180 psi) and 146º C (295º F) before failure.  Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 88.  Equipment availability. The equipment availability for this special and non-frequent HP/HT CT job was a challenge. Early planning and ordering of some critical equipment was vital, especially knowing the day rate of the drilling derrick to be used. This critical equipment included both CT strings, the gas tested 71⁄16-in./15K psi gate valve, the safety head handler, the gas-tested christmas tree crossover, and the 21⁄16-in 15K psi gas tested gate valves. Weekly meetings to review critical items were held with the CT contractor. The need for long lead items was identified early in the project, and Managed for drilling systems. Statoil issued purchase orderspressure relevant Multilateral wells. Coiled tubing equipment. underbalanced drilling.
  • 89. Site surveys. Three site surveys were carried out by Statoil and CT contractor representatives to avoid conflict with platform interfaces, and to identify any limitations or special requirements.  Personnel HP/HT training. Two fullday sessions of CT awareness and HP/HT seminars were organized and presented by the CT contractor to all involved personnel before the job start up.  Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 90. Bleed off procedure. The bleed off needed to avoid explosive decompression of well control equipment elastomers was not provided by the CT contractor. Rather, the local platform best practice used during wireline operations was followed during this CT job. For future CT HP/HT operations, the bleed off procedure should be based on recommendations from the original equipment manufacturer for standard and high-pressure well conditions, respectively.  Pump and bleed operation. Liquid losses into formation were experienced during the "pump and bleed" phase and it was not possible to reduce the WHP. It was decided to abort the pump and bleed operation and to start running in the well while circulating through the CT. This alternative was effective in reducing the WHP.  Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 91.  CT weight simulations. A drag reduction by 25% (from 0.24 to 0.18) was observed when displacing the wellbore with metal-to-metal friction reducer while RIH from 4,200 m (13,776 ft) MD RKB to the ball valve. Data proves that the actual CT RIH and pick up weights were within the operating limit at 80% yield of CT string material. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 92.  Milling through the ball valve. It was difficult to control the weight on bit (WOB) at 6,245 m (20,484 ft) MD while pumping 40/60% MEG/fresh water at 400 l/m pump rate and at 340 to 375 bar (4,931 to 5,439 psi) CT circulation pressure. During the first milling run, the WOB was set down gradually but the motor stalled 15 times. The first milling BHA was pulled to surface for inspection. During the second milling run, milling was carried out with patience for longer periods without increasing the WOB. Vibration and an anti-stall tool was expected to provide sufficient WOB. The top part of the ball valve was milled during the second run in approximately 12 hours and the bottom part in an additional 12 hours. The experience gained from the first milling run was used to optimize the milling parameters of the second and third milling runs, and succeeded to break through the ball valve with the 4-in. mill at the end. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 93.  Confirmed milled ball valve. A 3D multi-finger caliper log was run on wireline two months after the CT milling job to investigate the wellbore status, particularly the milled ball valve area. The ball valve was confirmed to be milled out with a minimum ID of 3.97 in. at 6,245.7 m MD. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 94. Conclusion  This CT project represents an excellent reference for future HP/HT CT operations for Statoil in Norway and worldwide. The job execution was performed as planned and in compliance with the relevant industry standards and local regulations. The stuck closed isolation ball valve was successfully milled and drifted with the 4-in. dome profile mill. No serious HSE&Q incidents were reported during this first HP/HT CT job in the Norwegian continental shelf, which had a high operating factor of 96.2%. Valuable lessons learned from the planning and execution phases of this challenging Managed pressure drilling systems. operation should be useful in future similar HP/HT CT applications. Multilateral wells. Coiled tubing underbalanced drilling.
  • 95. Coil tubing equipment  Hydra Rig Trailer mounted 2” CT unit, two trailer design, 22,000 feet reel capacity, 80,000 lbs. pull injector and 50 ton crane Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 96.  Hydra Rig 6100 CT Injector with tubing straightener and leveling lift bale Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 97.  Offshore 1¼” CT Unit Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 98.  Hydra Rig Trailer Mounted Sichuan CTU  Hydra Rig Trailer Mounted CTU and pumper on location in Turkestan Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 99.  Hydra Rig Intermediate size trailermounted CTU with crane, 635 injector Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 100.  Hydra Rig’s new 55,000 sq. ft. final assembly and CTU maintenance facility Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 101.  CTD horizontal re-entry project, with NOV Hydra Rig coiled tubing unit, nitrogen unit, and NOV Rolligon pumping unit. Also utilized are NOV Texas Oil Tools BOPs and NOV CTES DAS system. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 102.  Hydra Rig Mini Coil Drop In Drum Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 103.  Hydra Rig Mini Coil 420C Injector Head Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 104.  Hydra Rig Mini Coil Unit Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 105. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 106. Snubbing Units NOV Hydra Rig Snubbing Units have earned a reputation worldwide for high performance and versatility in the field. Rig-up is fast due to lightweight, compact design and the elimination of the need to “kill” the well. NOV Hydra Rig Snubbing Units are engineered to work on any pressure well, with pipe sized up to 8s”, and pulls up to 600,000 lbs. With over 200 units manufactured, our snubbing units are the industry standard. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 107. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 108. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 109. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 110. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 111. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 112. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 113. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 114. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 115. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 116. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 117. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 118. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 119. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 120. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 121. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 122. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 123. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 124. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 125. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 126. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 127. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 128. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 129. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 130. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 131. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 132. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 133. Coring and drilling Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 134. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 135. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 136. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 137. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 138. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 139. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 140. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 141.  Hydraulic fracturing Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 142. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 143. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 144. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 145. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 146. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 147. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 148. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 149. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 150. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 151. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 152. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 153. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 154. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 155. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 156. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 157. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 158. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 159.  Shaker Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 160. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 161. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 162. Communications and safety issues The Piper Alpha Disaster In 1988 Britain suffered one of the worst industrial disasters when the Piper Alpha oil Platform was destroyed by fire and gas explosion, resulting in 167 fatalities. The disaster caused significant changes to the manner in which safety was regulated and managed in the UK offshore oil industry. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 163. Events in the disaster  The Piper Alpha platform was operated by Occidental Petroleum (Caledonia) Ltd. and located 110 miles notheast of Aberdeen  The platform produced oil and gas and was linked to the installations Tartan, Claymore and MCP01 by subsea pipelines  On July 6, 1988, dayshift workers had removed a safety release for a consendate pump that was not being used and replaced it with a blank flange  Several hours later the night shift operations team experienced a problem with a second consendate pump and restarted the first pump, unaware of the the safety valve had been removed Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 164.  Around 10:00 pm there was an explosion on the production deck of the platform which was caused the ignition of a cloud of gas consendate leaking from the temporary flange  The fire spread rapidly and was followed by a number of smaller explosion  At around 10:20 pm a major explosion was followed by the ruptering of a pipeline carrying gas to the Piper Alpha platform from the nearby Texaco Tartan platform  The next few hours an intense high-pressure gas fire raged, punctuated by a series of major explosions that served to hasten the structural collapse of the platform Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 165.    Most of the emergency systems on the platform, including the fire water system, failed to come into operations Of the 226 persons onboard the installation only 61 survived The great majority of the of the survivors escaped by jumping into the sea, some from as 175 feet (approx. 54 m) Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 166. Piper Alpha in flames Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 167. Crisis Management at Piper Alpha  The explosion on the Piper Alpha that led to the disaster was not devasting. We shall never know, but it probably would have killed only a small number of men  There was a number of critisim related to the performance of the OIM on both Piper Alpha, Claymore and Tartan platforms  These platforms were linked together by pipelines and if the hydrocarbons from these platforms had been stopped earlier, the situation on Piper might have deterioated less rapidly Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 168.  On the evening of the crisis the platforms OIM was at his cabin  In the control room at 9:55 pm a series of low gas alarms was registered followed by a single high gas alarm and a suddenly explosion  The stand by boat sent out a mayday call  By 10:05 several minutes after the explosion the OIM arrived in the radio room wearing a survival suit and instructed the radio operator to send out a mayday  The OIM left without giving further instructions or stating his intentions Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 169.  A few seconds later he ran into the radio room and told the operator that area outside was on fire and that it should be broadcasted that the platform was being abandoned  By this time people had started to muster in the accomodation area an were waiting further instructions  Some of the emergency response teams made attempts to tackle the fires or to effect rescues, but these were uncoordinated and ineffective efforts in a desperate situation  By 10:20 pm 22 surviors had abandoned the platform – many who had been working outside such as divers  Where people had mustered no one was in charge or giving instructions and there was confusion Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 170.  A second major explosion because of gas coming into the the Piper from Tartan caused a massive high-pressure gas fire on the platform  By 10:50 pm the structure of the platform was beginning to collapse and gas fires were raging  The OIM and the majority of his crew died onboard as a result of smoke inhalation  The report afterwards showed that the OIM took no initiative in an attempt to save life but in his defense several psychological factors could explain the OIM`s inadequate leadership and poor decision making  He was under considerable stress and had not been properly trained and smoke inhalation can effect cognitive functioning Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 171. The Claymore Platform Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 172. Crisis Management at Claymore  However what was more suprising revealing serious weaknesses in the oil industry`s provision for offshore crisis management, was that the two other OIM`s on duty from the linked platforms also failed to take appropriate decisions  The Claymore platform situated 22 miles from Piper needed to shut down the oil production to prevent it from flowing towards the Piper platform  At 10:05 pm the Claymore OIM was told that there had been a mayday on Piper due to fire and explosion  An attempt to contact Piper was unsuccessful and on the secong mayday from Piper he sent a standy vessel without shutting down the oil production Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 173.  The operating superintendent at Claymore asked the OIM if he could shut down the oil production. The OIM refused this  The OIM at Claymore then called his manager in Aberdeen. They knew that Pipers oil had been shutdown. But as the pipeline pressure was stable the OIM decided to continue the production  10:30 they have heard that the fire on Piper was spreading, and the operating superintendent again asked the OIM to shut down oil production. This was refused because he wanted to maintain the production Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 174.  During a later phonecall the OIM made to the Production Manager the operating superintendent shouted that there had been an explosion on the Piper. The Production Manager in Aberdeen asked them to shut down immediately when he found out that they were still operating  The Production Manager was suprised that they were still operating and instructed both Claymore and Tartan to shut down production Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 175. Illustration of the Oil field Piper Alpha Claymore Tartan Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 176. The Tartan Platform Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 177. Crisis Management on Tartan  Texaco`s Tartan was located 12 miles southwest of Piper and also needed to shut down gas and oil production in the event of an serious emergency on Piper  10:05 pm the OIM at Tartan heard mayday from Piper Alpha  The OIM could not see any flames so he did not shut down the production but instructed his production supervisor to monitor the gas pressure on the pipeline to Piper  Production was maintained on Tartan in the belief that Piper was still producing (no telephone contact was possible)  10:25 the production supervisor was informed of a large explosion on Piper. This explosion was in fact caused by the hydrocarbons from Tartan Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 178.  The emergency control was finally shut down and it took 5-10 minutes before the Tartan OIM asked for their gas line to be depressurized and for the oil production to be shut down Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 179. Conclusion  The Piper Alpha disaster demonstrated the need for proper training for the responsibility in this kind of position  This is just one of many crisis that have highlighted the need for organizations to competent to deal with major crisis  Crisis Management is primarily dependent on the decisionmaking of those in key command positions, at strategic, tactical and operational levels  The immediate cause of the accident was due to communication problems relating to shift handover and Permit to Work procedures  This crisis also shows the importancy of good organizational communication and information routines Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 180. What if... There had been a proper shifthandover, proper marking of the safety valve that wasn`t functioning, or proper Permit to Work for this shift at the Piper Alpha? Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 181. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 182. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 183. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.
  • 184. Managed pressure drilling systems. Multilateral wells. Coiled tubing underbalanced drilling.