SlideShare ist ein Scribd-Unternehmen logo
1 von 3
Hafiz Usman Siddiq
B.S Electronics & Communication Engineer
Cell: +92-333-6732278
Email: usmansiddiq1@hotmail.com
CNIC: 33202-9923083-9
274 Block A, Satellite Town Jhang Sadar
PERSONAL PROFILE
As a self-motivated my focus is always to see each project work I undertake to an expected end.
PERSONAL DETAIL
Date of Birth: November 16, 1990 Gender: Male
Nationality: Pakistani Marital Status: Single
Languages: English, Urdu, Punjabi Domicile: Jhang
QUALIFICATION
 University of Lahore (2010-2014) 3.21/4.00
B.S Electronics & Communication Engineering
 Faran College Jhang (2006-2008) B+
F.S.c Pre-Engineering
 Faran High School, Jhang (2004-2006) A+
Matriculation
SEMESTER PROJECTS
1. Production of Electricity by using Bike Engine
2. Production of Electricity by using cycle and car generator DC 12V.
3. Home automation using GSM module
ELECTIVE SUBJECTS
1. Wireless Communication
2. Power SystemAnalysis
3. Computer Networks
4. Data Communication
___________________________________________________________________________________________
PROFESSIONAL EXPERIENCE
Crescent Al-Hadeed (05thMay2015 To Till Now)
Position: Assistant Engineer Electrical
Specialization: Electronics (PLC)
Industry: Steel Mill
Duration: May 2015 till Now
Job Description:
Erection Planning & Execution
ET Furnace 12Ton,C.C.M6/11,Water Complex, V.C.B, Mitsubishi Generator1290
KVA, Atlas Capco Compressor,
PLC System Allen Bradley, Siemens, Vipa HMI
Working Areas:
 Installation and Commissioning of Schneider VCB Switch gear
Specifications Of 750KVA, 6000KVA, 3500KVA, 50KVA and Incomer.
 Installation and Commissioning of 6000KVA, 3500KVA, 50KVA,
750KVA Transformer.
 Installation and Commissioning of LT Panels EPCS Switch Gear.
 Installation and Commissioning of 1.29 MW Mitsubishi generator.
 Installation and Commissioning of Compressor (Capacity of 10Bar) by
ATLAS CAPCO.
 Installation and Commissioning of PLC panel of furnace along with
Sintering Panel 0.6MW and Melting Panel 5MW Panel
(ELECTROTHERM).
 Installation and Commissioning of Vibro feeder with Siemens PLC.
 Installation and Commissioning of C.C.M with team of CONCAST.(PLC
Allen Bradley).
 Maintain Vipa PLC system of Furnace and trouble shoot problems by
Simatic manager.
 Maintain Allen Bradley PLC system of CCM and troubleshoot problems by
RS Logix 5000.
 Maintain the protections of Transformers with V.C.B.
 Installation and commissioning of Air Pollution Control System (Blower,
Vibrators, Rotary valves , Conveyor) .
 Installation and commissioning of Scrap Shearing Unit (Bonfiglioli).
Shakarganj Foods Products Ltd(24thFeb2014 To 30thApril2015)
Position: Maintenance & Reliability Engineer
Specialization: Maintenance & Repair (Facilities & Machinery)
Industry: Foods & Beverages
Duration: February 2014 till Now
Job Description:
Maintenance Planning & Execution
Preventive Maintenance Implementation
Leading Maintenance Team
Pneumatic System Maintenance and Control
PLMS System
Working Areas:
Installation and Commissioning of TBA 19, Straw and Shrink M/Cs
Installation and Commissioning of A3 Speed Machine
Installation and Commissioning of Cap30 Flex
Installation and Commissioning Of Helix30
Working as a TPMS coordinator
Maintenance of Tetra Pak Filling Machines
Maintenance of Rotary Equipment’s, Pumps, Compressor, Chiller
Installation of the PLMS System and retrieve data on daily and weekly basis.
TRAININGS
1. Operational Training of TBA 19 Filling Machine.
2. Operational Training of A3 Speed Filling Machine.
3. Operational Training Of HC23 Machine.
4. Safety and Fire Fighting
5. ISO 9001:2008
6. HACCP
7. Halal
COURSES AND INTERNSHIPS
1. Completed internship From NATIONAL TELECOM CORPORATION (NTC) For 3 Months.
SOFTWARE SKILLS
1. MS Office (Word, excel, PowerPoint) 3. AutoCAD
2. Pro-engineering 4. Programming C,C++,
5. MCITP Networking
SKILLS
1. Excellent communication skills in written and spoken English.
2. Excellent attention to detail and good organizational skills.
3. Ability to lead and work with Team.
Reference will be provided on demand.

Weitere ähnliche Inhalte

Ähnlich wie Electronics Engineer Resume (20)

gulfam hussain cv
gulfam hussain cvgulfam hussain cv
gulfam hussain cv
 
Control system Engineer
Control system EngineerControl system Engineer
Control system Engineer
 
Commissioning Engineer
Commissioning EngineerCommissioning Engineer
Commissioning Engineer
 
ASHIQ.CV.
ASHIQ.CV.ASHIQ.CV.
ASHIQ.CV.
 
Muhammad Faisal
Muhammad Faisal Muhammad Faisal
Muhammad Faisal
 
Muhammad Faisal
Muhammad FaisalMuhammad Faisal
Muhammad Faisal
 
HATIM_HASSAN_ALI--CV (1)
HATIM_HASSAN_ALI--CV (1)HATIM_HASSAN_ALI--CV (1)
HATIM_HASSAN_ALI--CV (1)
 
Resume-Rajesh_02-08-2016
Resume-Rajesh_02-08-2016Resume-Rajesh_02-08-2016
Resume-Rajesh_02-08-2016
 
Updated My CV pdf
Updated My CV  pdfUpdated My CV  pdf
Updated My CV pdf
 
M.Atif's CV
M.Atif's CVM.Atif's CV
M.Atif's CV
 
Khlau Rev0 150701
Khlau Rev0 150701Khlau Rev0 150701
Khlau Rev0 150701
 
Hammad CV
Hammad CVHammad CV
Hammad CV
 
Rehan_Afzal_new[1] 2-2 (2)
Rehan_Afzal_new[1] 2-2 (2)Rehan_Afzal_new[1] 2-2 (2)
Rehan_Afzal_new[1] 2-2 (2)
 
Ahmed_C.V
Ahmed_C.VAhmed_C.V
Ahmed_C.V
 
Mohamed Shawky Ashour CV
Mohamed Shawky Ashour CVMohamed Shawky Ashour CV
Mohamed Shawky Ashour CV
 
Mohamed Shawky Ashour CV
Mohamed Shawky Ashour CVMohamed Shawky Ashour CV
Mohamed Shawky Ashour CV
 
usama(new) CV
usama(new) CVusama(new) CV
usama(new) CV
 
Eng Ramadan Elwan
Eng Ramadan ElwanEng Ramadan Elwan
Eng Ramadan Elwan
 
bernie final cv update
bernie final cv updatebernie final cv update
bernie final cv update
 
Frank cv
Frank cvFrank cv
Frank cv
 

Electronics Engineer Resume

  • 1. Hafiz Usman Siddiq B.S Electronics & Communication Engineer Cell: +92-333-6732278 Email: usmansiddiq1@hotmail.com CNIC: 33202-9923083-9 274 Block A, Satellite Town Jhang Sadar PERSONAL PROFILE As a self-motivated my focus is always to see each project work I undertake to an expected end. PERSONAL DETAIL Date of Birth: November 16, 1990 Gender: Male Nationality: Pakistani Marital Status: Single Languages: English, Urdu, Punjabi Domicile: Jhang QUALIFICATION  University of Lahore (2010-2014) 3.21/4.00 B.S Electronics & Communication Engineering  Faran College Jhang (2006-2008) B+ F.S.c Pre-Engineering  Faran High School, Jhang (2004-2006) A+ Matriculation SEMESTER PROJECTS 1. Production of Electricity by using Bike Engine 2. Production of Electricity by using cycle and car generator DC 12V. 3. Home automation using GSM module ELECTIVE SUBJECTS 1. Wireless Communication 2. Power SystemAnalysis 3. Computer Networks 4. Data Communication ___________________________________________________________________________________________ PROFESSIONAL EXPERIENCE Crescent Al-Hadeed (05thMay2015 To Till Now) Position: Assistant Engineer Electrical Specialization: Electronics (PLC) Industry: Steel Mill Duration: May 2015 till Now Job Description: Erection Planning & Execution ET Furnace 12Ton,C.C.M6/11,Water Complex, V.C.B, Mitsubishi Generator1290 KVA, Atlas Capco Compressor, PLC System Allen Bradley, Siemens, Vipa HMI Working Areas:  Installation and Commissioning of Schneider VCB Switch gear Specifications Of 750KVA, 6000KVA, 3500KVA, 50KVA and Incomer.  Installation and Commissioning of 6000KVA, 3500KVA, 50KVA, 750KVA Transformer.  Installation and Commissioning of LT Panels EPCS Switch Gear.  Installation and Commissioning of 1.29 MW Mitsubishi generator.
  • 2.  Installation and Commissioning of Compressor (Capacity of 10Bar) by ATLAS CAPCO.  Installation and Commissioning of PLC panel of furnace along with Sintering Panel 0.6MW and Melting Panel 5MW Panel (ELECTROTHERM).  Installation and Commissioning of Vibro feeder with Siemens PLC.  Installation and Commissioning of C.C.M with team of CONCAST.(PLC Allen Bradley).  Maintain Vipa PLC system of Furnace and trouble shoot problems by Simatic manager.  Maintain Allen Bradley PLC system of CCM and troubleshoot problems by RS Logix 5000.  Maintain the protections of Transformers with V.C.B.  Installation and commissioning of Air Pollution Control System (Blower, Vibrators, Rotary valves , Conveyor) .  Installation and commissioning of Scrap Shearing Unit (Bonfiglioli). Shakarganj Foods Products Ltd(24thFeb2014 To 30thApril2015) Position: Maintenance & Reliability Engineer Specialization: Maintenance & Repair (Facilities & Machinery) Industry: Foods & Beverages Duration: February 2014 till Now Job Description: Maintenance Planning & Execution Preventive Maintenance Implementation Leading Maintenance Team Pneumatic System Maintenance and Control PLMS System Working Areas: Installation and Commissioning of TBA 19, Straw and Shrink M/Cs Installation and Commissioning of A3 Speed Machine Installation and Commissioning of Cap30 Flex Installation and Commissioning Of Helix30 Working as a TPMS coordinator Maintenance of Tetra Pak Filling Machines Maintenance of Rotary Equipment’s, Pumps, Compressor, Chiller Installation of the PLMS System and retrieve data on daily and weekly basis. TRAININGS 1. Operational Training of TBA 19 Filling Machine. 2. Operational Training of A3 Speed Filling Machine. 3. Operational Training Of HC23 Machine. 4. Safety and Fire Fighting 5. ISO 9001:2008 6. HACCP 7. Halal COURSES AND INTERNSHIPS 1. Completed internship From NATIONAL TELECOM CORPORATION (NTC) For 3 Months. SOFTWARE SKILLS 1. MS Office (Word, excel, PowerPoint) 3. AutoCAD 2. Pro-engineering 4. Programming C,C++, 5. MCITP Networking
  • 3. SKILLS 1. Excellent communication skills in written and spoken English. 2. Excellent attention to detail and good organizational skills. 3. Ability to lead and work with Team. Reference will be provided on demand.