Abstract of this Talk
This talk on Configuration Engineering (= Configuration Management for
Platform development) will discuss challenges, solution approaches and
engineering experiences in invitro-diagnostic (IVD) product development.
CE is an emerging discipline in various industries (such as medical devices,
automotive, avionics/ space, …) which has developed from Configuration
Management practices for single products. Further, examples presented
will highlight the underlying CE concepts as well as address tool issues
including observed benefits over the introduction.
2016-02-20Page 3 HC xxx – xxx
Unrestricted © Siemens Healthcare GmbH, 2016 HOOD05162002380020
Table of Contents
Business pressures, Configuration Engineering overview 6-122
Goals, Siemens Healthcare Laboratory Diagnostics 3-51
Appendix 24-275
Page
Challenges, approaches, engineering practices 13-213
Key takeaways 224
2016-02-20Page 4 HC xxx – xxx
Unrestricted © Siemens Healthcare GmbH, 2016 HOOD05162002380020
Goals of this Presentation
 Goals,
Siemens LD
 Business
pressures,
CE overview
 Challenges,
approaches,
engineering
practices
 Key
takeaways
 Appendix
 Provide an overview
on configuration
management
challenges for
platforms and its
solutions in a practical
context.
 Share engineering
practices and
benefits observed.
2016-02-20Page 5 HC xxx – xxx
Unrestricted © Siemens Healthcare GmbH, 2016 HOOD05162002380020
Siemens Healthcare Laboratory Diagnostics
A Global Leader in Key Market Segments
Largest Installed Base of Analytical Automation
Chemistry
Diagnostics ITLab Automation Molecular Point of Care
Hematology Hemostasis Immunoassay
 Goals,
Siemens LD
 Business
pressures,
CE overview
 Challenges,
approaches,
engineering
practices
 Key
takeaways
 Appendix
2016-02-20Page 6 HC xxx – xxx
Unrestricted © Siemens Healthcare GmbH, 2016 HOOD05162002380020
Business Pressures for IVD Product Development
Need to
industrialize
product
development
Cost down
Product
variety
Cycle time
down
Complexity
growth
Configuration
Engineering
Platform-based
development
Focus of this talk
ALM
PLM
 Goals,
Siemens LD
 Business
pressures,
CE overview
 Challenges,
approaches,
engineering
practices
 Key
takeaways
 Appendix
2016-02-20Page 7 HC xxx – xxx
Unrestricted © Siemens Healthcare GmbH, 2016 HOOD05162002380020
Providing Context “An Invitro-Diagnostic Instrument” …
A lab
instrument is a
highly complex
mechatronics-
based system:
hardware,
software,
firmware
producing test
results.
 Goals,
Siemens LD
 Business
pressures,
CE overview
 Challenges,
approaches,
engineering
practices
 Key
takeaways
 Appendix
2016-02-20Page 8 HC xxx – xxx
Unrestricted © Siemens Healthcare GmbH, 2016 HOOD05162002380020
Configuration Management Defined
A disciplined, efficient workflow for evolving a product including its data
and associated procedural information from cradle to grave with
increasing precision and maturity.
Controlled
Input(s):
Product Needs:
 Feature/ function
 Problem reports
 Enhancements
 …
Product data:
 Product structure
 Product configuration
 Product documentation
 Design data
 …
Output(s):
New approved product
data:
 Product structures
 Product configurations
 Product documentation
 Design data
 …
Change history:
 Audit/ traceability
 Verification
 …
 Goals,
Siemens LD
 Business
pressures,
CE overview
 Challenges,
approaches,
engineering
practices
 Key
takeaways
 Appendix
2016-02-20Page 9 HC xxx – xxx
Unrestricted © Siemens Healthcare GmbH, 2016 HOOD05162002380020
Impact of Variety in IVD Product Development
 Infinite variety is not manageable (cost, timeline,
quality, …)
 Variety in product development needs to be
consciously managed.
Evolving discipline: Configuration Engineering
= Variant Management (what) + Configuration
Management (how)
 Goals,
Siemens LD
 Business
pressures,
CE overview
 Challenges,
approaches,
engineering
practices
 Key
takeaways
 Appendix
2016-02-20Page 10 HC xxx – xxx
Unrestricted © Siemens Healthcare GmbH, 2016 HOOD05162002380020
Concept End-to-End Configuration Engineering Workflow
(1)
 Goals,
Siemens LD
 Business
pressures,
CE overview
 Challenges,
approaches,
engineering
practices
 Key
takeaways
 Appendix
Coordinate
and assess
Product Data
Setup
(1&2)
Establish
initial eBOM
structure
(3)
Plan track,
and review
and Track
product
release
(4, 5, & 6)
Configuration
Build
Management
(7)
Configuration
Change
Management
(8, 9, 10)
Prototype
Modification
Management
(11,12)
2016-02-20Page 11 HC xxx – xxx
Unrestricted © Siemens Healthcare GmbH, 2016 HOOD05162002380020
Concept End-to-End Configuration Engineering Workflow
(2)
(per PDP phase gates)
 gBOM
eBOM
mBOM
Feature 1 Feature 2 Feature 3 Feature N
 Goals,
Siemens LD
 Business
pressures,
CE overview
 Challenges,
approaches,
engineering
practices
 Key
takeaways
 Appendix
2016-02-20Page 12 HC xxx – xxx
Unrestricted © Siemens Healthcare GmbH, 2016 HOOD05162002380020
Concept End-to-End Configuration Engineering Workflow
(3)
eBOM
 gBOM
Feature 1 Feature 2 Feature 3 Feature N
 Goals,
Siemens LD
 Business
pressures,
CE overview
 Challenges,
approaches,
engineering
practices
 Key
takeaways
 Appendix
2016-02-20Page 13 HC xxx – xxx
Unrestricted © Siemens Healthcare GmbH, 2016 HOOD05162002380020
Concept End-to-End Configuration Engineering Workflow
(4)
 Goals,
Siemens LD
 Business
pressures,
CE overview
 Challenges,
approaches,
engineering
practices
 Key
takeaways
 Appendix
2016-02-20Page 14 HC xxx – xxx
Unrestricted © Siemens Healthcare GmbH, 2016 HOOD05162002380020
Structure of the Challenges, Approaches, Engineering
Practices Employed
1 Managing product
variants
How do I structure, assess
and control product
variability?
2 Structure an efficient
and reliable change
management workflow
What is the best approach
for executing change
management?
3 Managing changes
across engineering
disciplines
What do you do to manage
and control product data
across development
projects?
4 Coordinating design
changes across
Engineering and
Manufacturing
How do I consistently
synchronize Engineering
and Manufacturing to
become faster and less
costly?
 Goals,
Siemens LD
 Business
pressures,
CE overview
 Challenges,
approaches,
engineering
practices
 Key
takeaways
 Appendix
2016-02-20Page 15 HC xxx – xxx
Unrestricted © Siemens Healthcare GmbH, 2016 HOOD05162002380020
Structure of the Challenges, Approaches, Engineering
Practices Employed (2)
Coordinate
and assess
Product Data
Setup
(1&2)
Establish
initial eBOM
structure
(3)
Plan track,
and review
and Track
product
release
(4, 5, & 6)
Configuration
Build
Management
(7)
Configuration
Change
Management
(8, 9, 10)
Prototype
Modification
Management
(11,12)
Product
Variants
1
Manage change across disciplines
Efficient change management workflow
2
3
Coordinate change beyond
Engineering
4
 Goals,
Siemens LD
 Business
pressures,
CE overview
 Challenges,
approaches,
engineering
practices
 Key
takeaways
 Appendix
2016-02-20Page 16 HC xxx – xxx
Unrestricted © Siemens Healthcare GmbH, 2016 HOOD05162002380020
Structure of Selected Challenges, Approach & Engineering
Practices
Challenge, define a solution strategy
For each solution strategy, share ideas on
engineering practices
Illustrate benefits with supporting data
Challenge Approach
Engineering
Practice
 Goals,
Siemens LD
 Business
pressures,
CE overview
 Challenges,
approaches,
engineering
practices
 Key
takeaways
 Appendix
2016-02-20Page 17 HC xxx – xxx
Unrestricted © Siemens Healthcare GmbH, 2016 HOOD05162002380020
Solution Strategy Map for Configuration Engineering
# Challenge Approach Engineering Practice
1 Manage product
variants
 Provide transparency on variation
points in product structure
 Proactively manage variation points
in a configuration model
 Generic platform
product structure
 Modular product
architecture
 Frontend configuration
engineering
2 Structure efficient
and reliable change
management
workflow
Deploy end-to-end change management
workflow to provide always accurate,
actionable data (as automated as
possible)
Standardized change
management workflow
3 Manage change
across engineering
disciplines
Integration of product and configuration
data, change can be synchronized
accurately across discipline
Integrated cross discipline
change management
4 Coordinate change
Beyond Engineering
Enable manufacturing to obtain accurate
engineering data to plan & execute
Manufacturing
Synchronized data
exchange of engineering to
manufacturing product data
 Goals,
Siemens LD
 Business
pressures,
CE overview
 Challenges,
approaches,
engineering
practices
 Key
takeaways
 Appendix
2016-02-20Page 18 HC xxx – xxx
Unrestricted © Siemens Healthcare GmbH, 2016 HOOD05162002380020
Manage Product Variants (1)
 Explicit modeling of a generic product structure
defining commonality & variability
 Consistently manage variation points in a product and
a configuration model for product variants over time.
 Automate creation and update of product &
configuration model using PLM tool(s).
Approach: Frontend Configuration Engineering
Benefits
 Explicit modeling of product variants provides precision
for product scope.
 Improve design speed and reuse supporting a modular
product architecture.
 Enabler for a configure to order manufacturing model.
Customer needs drive
product variants
 Goals,
Siemens LD
 Business
pressures,
CE overview
 Challenges,
approaches,
engineering
practices
 Key
takeaways
 Appendix
2016-02-20Page 19 HC xxx – xxx
Unrestricted © Siemens Healthcare GmbH, 2016 HOOD05162002380020
Structure Efficient & Reliable Change Management
Workflow (1)
 End-to-end bill of material handling (from a
generic BOM, engineering BOM to a
manufacturing BOM.
 Handling of BOM baselines according to the
level of design maturity and product lifecycle
Approach: Standardized change management workflow
Benefits
 Accurate controlled changes in a single
product data repository.
 Reduced change cycle time with less
defects.
 Increased engineering productivity
 Audit proof documentation needed for
medical devices.
Change management workflow
needs to cover different phases of
lifecycle.
gBOM eBOM mBOM
 Goals,
Siemens LD
 Business
pressures,
CE overview
 Challenges,
approaches,
engineering
practices
 Key
takeaways
 Appendix
2016-02-20Page 20 HC xxx – xxx
Unrestricted © Siemens Healthcare GmbH, 2016 HOOD05162002380020
Structure Efficient & Reliable Change Management
Workflow (2)
 Workflow supported change management
integrated for hardware, software and
firmware.
Approach: Standardized change management workflow
Benefits
 Synchronize an emerging change with
prototype configuration data.
 Change requests are integrated with
emerging problem reports and/or
enhancements.
 Automation support for processing of change
requests (pre-defined, templated, internal
quality checks).
For use in simple to more
complex change requests
 Goals,
Siemens LD
 Business
pressures,
CE overview
 Challenges,
approaches,
engineering
practices
 Key
takeaways
 Appendix
2016-02-20Page 21 HC xxx – xxx
Unrestricted © Siemens Healthcare GmbH, 2016 HOOD05162002380020
Managing Change Across Disciplines
 Integrated ALM/PLM tool provides
access to product data by engineering
disciplines, changes are synchronized
quickly across disciplines.
Approach: Cross-discipline change management workflow
Benefits
 Open access to prototype configuration data
for all disciplines (HW, SW, FW).
 Knowledge on design changes are
systematically captured and are made
retrievable.
 Reduced errors, rework by having all product
data in a single database.
Sample for an integrated
change in a sub-system
 Goals,
Siemens LD
 Business
pressures,
CE overview
 Challenges,
approaches,
engineering
practices
 Key
takeaways
 Appendix
2016-02-20Page 22 HC xxx – xxx
Unrestricted © Siemens Healthcare GmbH, 2016 HOOD05162002380020
Managing Change Across Disciplines
 Apply concept of continuous integration
of upgrades into instrument prototypes
(similar to software).
 Interface between ALM/PLM tool chain
to MRP system allows synchronization
and transparency for design changes.
Approach: Collaborating on Change Beyond Engineering
Benefits
 Instrument prototype generation matures
earlier by means of controlled
deployment of upgrades.
 Synchronization of eBOM and mBOM
structures, traceability.
Design changes are identified early
and are continuously integrated
 Goals,
Siemens LD
 Business
pressures,
CE overview
 Challenges,
approaches,
engineering
practices
 Key
takeaways
 Appendix
2016-02-20Page 23 HC xxx – xxx
Unrestricted © Siemens Healthcare GmbH, 2016 HOOD05162002380020
Key Takeaways: Establishing Configuration Engineering in
Your Organization
 Lay out an end-to-end vision for where CE can add value and
has to lead the path.
 Development of CE needs diverse engineering perspectives
along the product development lifecycle (up- and down-stream).
 For a multi-disciplinary domain such as IVD, select a ALM/ PLM
tool-chain which allows as many stakeholders as possible to
collaborate within the same workspace.
 CE based on my own experiences needs to grow over time
delivering short-term gains to build credibility while keeping the
grand vision in place.
What you need to consider when developing CE
 Goals,
Siemens LD
 Business
pressures,
CE overview
 Challenges,
approaches,
engineering
practices
 Key
takeaways
 Appendix
2016-02-20Page 24 HC xxx – xxx
Unrestricted © Siemens Healthcare GmbH, 2016 HOOD05162002380020
Appendix
 Reference documents
 Contact details Arnold Rudorfer
 Goals,
Siemens LD
 Business
pressures,
CE overview
 Challenges,
approaches,
engineering
practices
 Key
takeaways
 Appendix
2016-02-20Page 25 HC xxx – xxx
Unrestricted © Siemens Healthcare GmbH, 2016 HOOD05162002380020
Reference Documents
 Arnold Rudorfer, Alexander Evers: Configuration
Engineering workflow, August 2015
 Siemens Healthcare Laboratory Diagnostics:
Company overview, 2016
 Goals,
Siemens LD
 Business
pressures,
CE overview
 Challenges,
approaches,
engineering
practices
 Key
takeaways
 Appendix
2016-02-20Page 26 HC xxx – xxx
Unrestricted © Siemens Healthcare GmbH, 2016 HOOD05162002380020
Contact Details Arnold Rudorfer
Arnold Rudorfer is a Senior Engineering Leader Instrument
Development at Siemens Healthcare Laboratory Diagnostics. He has
more than twenty years systems development experience with a focus
on medical devices and enterprise platforms. His research interests
include requirements and systems engineering, organizational change
management, software technologies, innovation- and business
strategy. Mr. Rudorfer holds an MS in software engineering and
business administration from the University of Technology Graz,
Austria. Further, he is a INOCSE member and PMP/MSP certified.
Siemens Healthcare Laboratory Diagnostics
62 Flanders Bartley Road
Flanders, NJ, 07836
Cell: +1 609 954 2384
E-Mail: arnold.rudorfer@siemens.com

Weitere ähnliche Inhalte

Was ist angesagt?

Phase gate review development model august 8 2017 - dave litwiller
Phase gate review development model   august 8 2017 - dave litwillerPhase gate review development model   august 8 2017 - dave litwiller
Phase gate review development model august 8 2017 - dave litwillerDave Litwiller
 
Wpf Resume Formal Eng Current Design 5
Wpf Resume Formal Eng Current Design 5Wpf Resume Formal Eng Current Design 5
Wpf Resume Formal Eng Current Design 5WarrenFaeth
 
Enhancing the Software Effort Prediction Accuracy using Reduced Number of Cos...
Enhancing the Software Effort Prediction Accuracy using Reduced Number of Cos...Enhancing the Software Effort Prediction Accuracy using Reduced Number of Cos...
Enhancing the Software Effort Prediction Accuracy using Reduced Number of Cos...IRJET Journal
 
Approach to Technology Transfer
Approach to Technology TransferApproach to Technology Transfer
Approach to Technology TransferProPharma Group
 
Technology Tranfer models
Technology Tranfer modelsTechnology Tranfer models
Technology Tranfer modelsPritam Kolge
 
Product development process
Product development processProduct development process
Product development processHimanshu Sood
 
Gulfstream Mfg Eng Resume
Gulfstream Mfg Eng ResumeGulfstream Mfg Eng Resume
Gulfstream Mfg Eng ResumeGary Schaffer
 
Architecture presentation 8
Architecture presentation 8Architecture presentation 8
Architecture presentation 8Anoush Ghamsari
 
EFFICIENCY OF SOFTWARE DEVELOPMENT AFTER IMPROVEMENTS IN REQUIREMENTS ENGINEE...
EFFICIENCY OF SOFTWARE DEVELOPMENT AFTER IMPROVEMENTS IN REQUIREMENTS ENGINEE...EFFICIENCY OF SOFTWARE DEVELOPMENT AFTER IMPROVEMENTS IN REQUIREMENTS ENGINEE...
EFFICIENCY OF SOFTWARE DEVELOPMENT AFTER IMPROVEMENTS IN REQUIREMENTS ENGINEE...ijseajournal
 
C10 project management
C10 project managementC10 project management
C10 project managementhakimizaki
 
Six Sigma DMADV Approach for Conceptual Design Synthesis of Car Dashboard
Six Sigma DMADV Approach for Conceptual Design Synthesis of Car DashboardSix Sigma DMADV Approach for Conceptual Design Synthesis of Car Dashboard
Six Sigma DMADV Approach for Conceptual Design Synthesis of Car DashboardJayesh Sarode
 
Implementation framework for_plm_a_case_study_in_t
Implementation framework for_plm_a_case_study_in_tImplementation framework for_plm_a_case_study_in_t
Implementation framework for_plm_a_case_study_in_t17TUME122MITHUNM
 

Was ist angesagt? (18)

141210_SBryerResume
141210_SBryerResume141210_SBryerResume
141210_SBryerResume
 
160401 sbryer resume
160401   sbryer resume160401   sbryer resume
160401 sbryer resume
 
Phase gate review development model august 8 2017 - dave litwiller
Phase gate review development model   august 8 2017 - dave litwillerPhase gate review development model   august 8 2017 - dave litwiller
Phase gate review development model august 8 2017 - dave litwiller
 
Wpf Resume Formal Eng Current Design 5
Wpf Resume Formal Eng Current Design 5Wpf Resume Formal Eng Current Design 5
Wpf Resume Formal Eng Current Design 5
 
Enhancing the Software Effort Prediction Accuracy using Reduced Number of Cos...
Enhancing the Software Effort Prediction Accuracy using Reduced Number of Cos...Enhancing the Software Effort Prediction Accuracy using Reduced Number of Cos...
Enhancing the Software Effort Prediction Accuracy using Reduced Number of Cos...
 
Approach to Technology Transfer
Approach to Technology TransferApproach to Technology Transfer
Approach to Technology Transfer
 
4213ijsea01 (1)
4213ijsea01 (1)4213ijsea01 (1)
4213ijsea01 (1)
 
Technology Tranfer models
Technology Tranfer modelsTechnology Tranfer models
Technology Tranfer models
 
1
11
1
 
Product development process
Product development processProduct development process
Product development process
 
Iarjset n core tech 8
Iarjset n core tech 8Iarjset n core tech 8
Iarjset n core tech 8
 
Gulfstream Mfg Eng Resume
Gulfstream Mfg Eng ResumeGulfstream Mfg Eng Resume
Gulfstream Mfg Eng Resume
 
Architecture presentation 8
Architecture presentation 8Architecture presentation 8
Architecture presentation 8
 
EFFICIENCY OF SOFTWARE DEVELOPMENT AFTER IMPROVEMENTS IN REQUIREMENTS ENGINEE...
EFFICIENCY OF SOFTWARE DEVELOPMENT AFTER IMPROVEMENTS IN REQUIREMENTS ENGINEE...EFFICIENCY OF SOFTWARE DEVELOPMENT AFTER IMPROVEMENTS IN REQUIREMENTS ENGINEE...
EFFICIENCY OF SOFTWARE DEVELOPMENT AFTER IMPROVEMENTS IN REQUIREMENTS ENGINEE...
 
C10 project management
C10 project managementC10 project management
C10 project management
 
Six Sigma DMADV Approach for Conceptual Design Synthesis of Car Dashboard
Six Sigma DMADV Approach for Conceptual Design Synthesis of Car DashboardSix Sigma DMADV Approach for Conceptual Design Synthesis of Car Dashboard
Six Sigma DMADV Approach for Conceptual Design Synthesis of Car Dashboard
 
Implementation framework for_plm_a_case_study_in_t
Implementation framework for_plm_a_case_study_in_tImplementation framework for_plm_a_case_study_in_t
Implementation framework for_plm_a_case_study_in_t
 
20100121 03 - Présentation CMMi Valeo
20100121 03 - Présentation CMMi Valeo20100121 03 - Présentation CMMi Valeo
20100121 03 - Présentation CMMi Valeo
 

Andere mochten auch

Medical devices; architect hiv ag:ab combo assay
Medical devices; architect hiv ag:ab combo assayMedical devices; architect hiv ag:ab combo assay
Medical devices; architect hiv ag:ab combo assaymjavan2001
 
2015 12 02_optiwind_optimization-operations-maintenance-offshore-wind-farms-k...
2015 12 02_optiwind_optimization-operations-maintenance-offshore-wind-farms-k...2015 12 02_optiwind_optimization-operations-maintenance-offshore-wind-farms-k...
2015 12 02_optiwind_optimization-operations-maintenance-offshore-wind-farms-k...Sirris
 
2015 12-02-optiwind-offshore-wind-turbine-modelling-lms-samsef-siemens
2015 12-02-optiwind-offshore-wind-turbine-modelling-lms-samsef-siemens2015 12-02-optiwind-offshore-wind-turbine-modelling-lms-samsef-siemens
2015 12-02-optiwind-offshore-wind-turbine-modelling-lms-samsef-siemensSirris
 
Wind Technicians competence framework SIEMENS
Wind Technicians competence framework SIEMENSWind Technicians competence framework SIEMENS
Wind Technicians competence framework SIEMENSFrank Emil Moen
 
New Trends in Wind Turbine
New Trends in Wind TurbineNew Trends in Wind Turbine
New Trends in Wind TurbinePaul Keisch
 
Practices and Challenges in Applying Mesoscale Data to Air Quality Analyses
 Practices and Challenges in Applying Mesoscale Data to Air Quality Analyses  Practices and Challenges in Applying Mesoscale Data to Air Quality Analyses
Practices and Challenges in Applying Mesoscale Data to Air Quality Analyses BREEZE Software
 
Siemens: Optimized concepts for loading & installing offshore wind turbines
Siemens: Optimized concepts for loading & installing offshore wind turbinesSiemens: Optimized concepts for loading & installing offshore wind turbines
Siemens: Optimized concepts for loading & installing offshore wind turbinesTorben Haagh
 
Fremtidige perspektiver og udfordringer for GenVind
Fremtidige perspektiver og udfordringer for GenVindFremtidige perspektiver og udfordringer for GenVind
Fremtidige perspektiver og udfordringer for GenVindPlastindustrien
 
Digital_Twin_GUC_IE _AvinashMisra_&_AvinashNeema
Digital_Twin_GUC_IE _AvinashMisra_&_AvinashNeemaDigital_Twin_GUC_IE _AvinashMisra_&_AvinashNeema
Digital_Twin_GUC_IE _AvinashMisra_&_AvinashNeemaAvinash Misra
 
Overview of Wind Energy
Overview of Wind EnergyOverview of Wind Energy
Overview of Wind EnergyJerilene
 
Cleaning validation a complete know how
Cleaning validation a complete know howCleaning validation a complete know how
Cleaning validation a complete know howSambhujyoti Das
 

Andere mochten auch (17)

Medical devices; architect hiv ag:ab combo assay
Medical devices; architect hiv ag:ab combo assayMedical devices; architect hiv ag:ab combo assay
Medical devices; architect hiv ag:ab combo assay
 
2015 12 02_optiwind_optimization-operations-maintenance-offshore-wind-farms-k...
2015 12 02_optiwind_optimization-operations-maintenance-offshore-wind-farms-k...2015 12 02_optiwind_optimization-operations-maintenance-offshore-wind-farms-k...
2015 12 02_optiwind_optimization-operations-maintenance-offshore-wind-farms-k...
 
2015 12-02-optiwind-offshore-wind-turbine-modelling-lms-samsef-siemens
2015 12-02-optiwind-offshore-wind-turbine-modelling-lms-samsef-siemens2015 12-02-optiwind-offshore-wind-turbine-modelling-lms-samsef-siemens
2015 12-02-optiwind-offshore-wind-turbine-modelling-lms-samsef-siemens
 
Wind Technicians competence framework SIEMENS
Wind Technicians competence framework SIEMENSWind Technicians competence framework SIEMENS
Wind Technicians competence framework SIEMENS
 
3 diagnostic
3 diagnostic3 diagnostic
3 diagnostic
 
New Trends in Wind Turbine
New Trends in Wind TurbineNew Trends in Wind Turbine
New Trends in Wind Turbine
 
Practices and Challenges in Applying Mesoscale Data to Air Quality Analyses
 Practices and Challenges in Applying Mesoscale Data to Air Quality Analyses  Practices and Challenges in Applying Mesoscale Data to Air Quality Analyses
Practices and Challenges in Applying Mesoscale Data to Air Quality Analyses
 
Siemens: Optimized concepts for loading & installing offshore wind turbines
Siemens: Optimized concepts for loading & installing offshore wind turbinesSiemens: Optimized concepts for loading & installing offshore wind turbines
Siemens: Optimized concepts for loading & installing offshore wind turbines
 
Fremtidige perspektiver og udfordringer for GenVind
Fremtidige perspektiver og udfordringer for GenVindFremtidige perspektiver og udfordringer for GenVind
Fremtidige perspektiver og udfordringer for GenVind
 
Presentation diagnostics
Presentation diagnosticsPresentation diagnostics
Presentation diagnostics
 
Digital_Twin_GUC_IE _AvinashMisra_&_AvinashNeema
Digital_Twin_GUC_IE _AvinashMisra_&_AvinashNeemaDigital_Twin_GUC_IE _AvinashMisra_&_AvinashNeema
Digital_Twin_GUC_IE _AvinashMisra_&_AvinashNeema
 
Sandia 2014 Wind Turbine Blade Workshop- Zayas
Sandia 2014 Wind Turbine Blade Workshop- ZayasSandia 2014 Wind Turbine Blade Workshop- Zayas
Sandia 2014 Wind Turbine Blade Workshop- Zayas
 
Immunoassay
ImmunoassayImmunoassay
Immunoassay
 
Overview of Wind Energy
Overview of Wind EnergyOverview of Wind Energy
Overview of Wind Energy
 
Fichas gusto
Fichas gustoFichas gusto
Fichas gusto
 
Chemiluminescence
ChemiluminescenceChemiluminescence
Chemiluminescence
 
Cleaning validation a complete know how
Cleaning validation a complete know howCleaning validation a complete know how
Cleaning validation a complete know how
 

Ähnlich wie Nih ce-presentation-05272016(for approval)

E4 e automotive_designrelease_v15-3
E4 e automotive_designrelease_v15-3E4 e automotive_designrelease_v15-3
E4 e automotive_designrelease_v15-3AIMFirst
 
Product Design and Development.ppt
Product Design and Development.pptProduct Design and Development.ppt
Product Design and Development.pptZeeshanRasheed42
 
1 s2.0-s2351978920320436-main
1 s2.0-s2351978920320436-main1 s2.0-s2351978920320436-main
1 s2.0-s2351978920320436-mainBelalKAIBA
 
Product Life Cycle Management
Product Life Cycle ManagementProduct Life Cycle Management
Product Life Cycle Managementchaitanya122
 
Data-Driven Value Generation. Is it Possible?
Data-Driven Value Generation. Is it Possible?Data-Driven Value Generation. Is it Possible?
Data-Driven Value Generation. Is it Possible?M2M Alliance e.V.
 
2_SoftwareEngineeringLifecycle.ppt
2_SoftwareEngineeringLifecycle.ppt2_SoftwareEngineeringLifecycle.ppt
2_SoftwareEngineeringLifecycle.pptDheerajMehlawat2
 
Krontime overview may2013_en-ali_accio10
Krontime overview may2013_en-ali_accio10Krontime overview may2013_en-ali_accio10
Krontime overview may2013_en-ali_accio10Gokcin
 
Beyond PLM enabling Live Engineering - Digital Engineer 2016
Beyond PLM enabling Live Engineering - Digital Engineer 2016Beyond PLM enabling Live Engineering - Digital Engineer 2016
Beyond PLM enabling Live Engineering - Digital Engineer 2016John McNiff
 
Teknologix e4 e mtd webinar presentation
Teknologix e4 e mtd webinar presentationTeknologix e4 e mtd webinar presentation
Teknologix e4 e mtd webinar presentationAIMFirst
 
MRC PTC: Creo Simulate Customers Testinmonials
MRC PTC: Creo Simulate Customers TestinmonialsMRC PTC: Creo Simulate Customers Testinmonials
MRC PTC: Creo Simulate Customers TestinmonialsMattSHoyt
 
Jay Portfolio - Engineering Manager
Jay Portfolio - Engineering ManagerJay Portfolio - Engineering Manager
Jay Portfolio - Engineering Managerjaymehta2
 
Data Management For Automated Production
Data Management For Automated Production Data Management For Automated Production
Data Management For Automated Production Ching Kok Pang
 
Examination into it & competitive strategies within construction
Examination into it & competitive strategies within constructionExamination into it & competitive strategies within construction
Examination into it & competitive strategies within constructionsai0513
 
Presentation on concurrent engineering
Presentation on concurrent engineeringPresentation on concurrent engineering
Presentation on concurrent engineeringFaleSh ShaRma
 

Ähnlich wie Nih ce-presentation-05272016(for approval) (20)

E4 e automotive_designrelease_v15-3
E4 e automotive_designrelease_v15-3E4 e automotive_designrelease_v15-3
E4 e automotive_designrelease_v15-3
 
Product Design and Development.ppt
Product Design and Development.pptProduct Design and Development.ppt
Product Design and Development.ppt
 
1 s2.0-s2351978920320436-main
1 s2.0-s2351978920320436-main1 s2.0-s2351978920320436-main
1 s2.0-s2351978920320436-main
 
Product Life Cycle Management
Product Life Cycle ManagementProduct Life Cycle Management
Product Life Cycle Management
 
Data-Driven Value Generation. Is it Possible?
Data-Driven Value Generation. Is it Possible?Data-Driven Value Generation. Is it Possible?
Data-Driven Value Generation. Is it Possible?
 
2_SoftwareEngineeringLifecycle.ppt
2_SoftwareEngineeringLifecycle.ppt2_SoftwareEngineeringLifecycle.ppt
2_SoftwareEngineeringLifecycle.ppt
 
Krontime overview may2013_en-ali_accio10
Krontime overview may2013_en-ali_accio10Krontime overview may2013_en-ali_accio10
Krontime overview may2013_en-ali_accio10
 
Shaktikumar_Potdar
Shaktikumar_PotdarShaktikumar_Potdar
Shaktikumar_Potdar
 
CAD/CAM Lecture #5
CAD/CAM Lecture #5CAD/CAM Lecture #5
CAD/CAM Lecture #5
 
Beyond PLM enabling Live Engineering - Digital Engineer 2016
Beyond PLM enabling Live Engineering - Digital Engineer 2016Beyond PLM enabling Live Engineering - Digital Engineer 2016
Beyond PLM enabling Live Engineering - Digital Engineer 2016
 
Sasmos Report
Sasmos ReportSasmos Report
Sasmos Report
 
Kate Resume-7Page
Kate Resume-7PageKate Resume-7Page
Kate Resume-7Page
 
Teknologix e4 e mtd webinar presentation
Teknologix e4 e mtd webinar presentationTeknologix e4 e mtd webinar presentation
Teknologix e4 e mtd webinar presentation
 
MRC PTC: Creo Simulate Customers Testinmonials
MRC PTC: Creo Simulate Customers TestinmonialsMRC PTC: Creo Simulate Customers Testinmonials
MRC PTC: Creo Simulate Customers Testinmonials
 
Jay Portfolio - Engineering Manager
Jay Portfolio - Engineering ManagerJay Portfolio - Engineering Manager
Jay Portfolio - Engineering Manager
 
En Portfolio Caps 2009
En Portfolio Caps 2009En Portfolio Caps 2009
En Portfolio Caps 2009
 
Data Management For Automated Production
Data Management For Automated Production Data Management For Automated Production
Data Management For Automated Production
 
Examination into it & competitive strategies within construction
Examination into it & competitive strategies within constructionExamination into it & competitive strategies within construction
Examination into it & competitive strategies within construction
 
Presentation on concurrent engineering
Presentation on concurrent engineeringPresentation on concurrent engineering
Presentation on concurrent engineering
 
Resume Rac
Resume RacResume Rac
Resume Rac
 

Mehr von Arnold Rudorfer

Ein Requirements Engineering Referenzmodell
Ein Requirements Engineering ReferenzmodellEin Requirements Engineering Referenzmodell
Ein Requirements Engineering ReferenzmodellArnold Rudorfer
 
People And Project Management Issues In Highly Time Pressured Rapid Prototypi...
People And Project Management Issues In Highly Time Pressured Rapid Prototypi...People And Project Management Issues In Highly Time Pressured Rapid Prototypi...
People And Project Management Issues In Highly Time Pressured Rapid Prototypi...Arnold Rudorfer
 
Scr Position Paper For Chi 04 Workshop
Scr Position Paper For Chi 04 WorkshopScr Position Paper For Chi 04 Workshop
Scr Position Paper For Chi 04 WorkshopArnold Rudorfer
 
Quality Re Pres Ebert Rudorfer Med Conf2011 V5
Quality Re Pres Ebert Rudorfer Med Conf2011 V5Quality Re Pres Ebert Rudorfer Med Conf2011 V5
Quality Re Pres Ebert Rudorfer Med Conf2011 V5Arnold Rudorfer
 
Quality Re Pres Ebert Rudorfer Med Conf2011 V4
Quality Re Pres Ebert Rudorfer Med Conf2011 V4Quality Re Pres Ebert Rudorfer Med Conf2011 V4
Quality Re Pres Ebert Rudorfer Med Conf2011 V4Arnold Rudorfer
 
201108 qz systematisches_re
201108 qz systematisches_re201108 qz systematisches_re
201108 qz systematisches_reArnold Rudorfer
 
Lean Re Pres Rudorfer Vector Forum V1
Lean Re Pres Rudorfer Vector Forum V1Lean Re Pres Rudorfer Vector Forum V1
Lean Re Pres Rudorfer Vector Forum V1Arnold Rudorfer
 
Lean Re Pres Rudorfer Vector Forum V1
Lean Re Pres Rudorfer Vector Forum V1Lean Re Pres Rudorfer Vector Forum V1
Lean Re Pres Rudorfer Vector Forum V1Arnold Rudorfer
 
Visure Solutions Keynote06222009 V3
Visure Solutions Keynote06222009 V3Visure Solutions Keynote06222009 V3
Visure Solutions Keynote06222009 V3Arnold Rudorfer
 
Incose Sweden Model Management01292011 V8
Incose Sweden Model Management01292011 V8Incose Sweden Model Management01292011 V8
Incose Sweden Model Management01292011 V8Arnold Rudorfer
 
Qz Req Eng Ebert Rudorfer 2011 V3
Qz Req Eng Ebert Rudorfer 2011 V3Qz Req Eng Ebert Rudorfer 2011 V3
Qz Req Eng Ebert Rudorfer 2011 V3Arnold Rudorfer
 
Lean Re Pres Ebert Rudorfer Re Conf2011 V8
Lean Re Pres Ebert Rudorfer Re Conf2011 V8Lean Re Pres Ebert Rudorfer Re Conf2011 V8
Lean Re Pres Ebert Rudorfer Re Conf2011 V8Arnold Rudorfer
 
SYNGO TFS Program InfoTeam Keynote
SYNGO TFS Program InfoTeam KeynoteSYNGO TFS Program InfoTeam Keynote
SYNGO TFS Program InfoTeam KeynoteArnold Rudorfer
 
MedConf 2009 Requirements Engineeering Rudorfer-Ebert
MedConf 2009 Requirements Engineeering Rudorfer-EbertMedConf 2009 Requirements Engineeering Rudorfer-Ebert
MedConf 2009 Requirements Engineeering Rudorfer-EbertArnold Rudorfer
 

Mehr von Arnold Rudorfer (18)

Ein Requirements Engineering Referenzmodell
Ein Requirements Engineering ReferenzmodellEin Requirements Engineering Referenzmodell
Ein Requirements Engineering Referenzmodell
 
People And Project Management Issues In Highly Time Pressured Rapid Prototypi...
People And Project Management Issues In Highly Time Pressured Rapid Prototypi...People And Project Management Issues In Highly Time Pressured Rapid Prototypi...
People And Project Management Issues In Highly Time Pressured Rapid Prototypi...
 
Scr Position Paper For Chi 04 Workshop
Scr Position Paper For Chi 04 WorkshopScr Position Paper For Chi 04 Workshop
Scr Position Paper For Chi 04 Workshop
 
S5rud
S5rudS5rud
S5rud
 
Reconf2012 V4
Reconf2012 V4Reconf2012 V4
Reconf2012 V4
 
Quality Re Pres Ebert Rudorfer Med Conf2011 V5
Quality Re Pres Ebert Rudorfer Med Conf2011 V5Quality Re Pres Ebert Rudorfer Med Conf2011 V5
Quality Re Pres Ebert Rudorfer Med Conf2011 V5
 
Quality Re Pres Ebert Rudorfer Med Conf2011 V4
Quality Re Pres Ebert Rudorfer Med Conf2011 V4Quality Re Pres Ebert Rudorfer Med Conf2011 V4
Quality Re Pres Ebert Rudorfer Med Conf2011 V4
 
201108 qz systematisches_re
201108 qz systematisches_re201108 qz systematisches_re
201108 qz systematisches_re
 
Lean Re Pres Rudorfer Vector Forum V1
Lean Re Pres Rudorfer Vector Forum V1Lean Re Pres Rudorfer Vector Forum V1
Lean Re Pres Rudorfer Vector Forum V1
 
Scrum Med02232011 V4
Scrum Med02232011 V4Scrum Med02232011 V4
Scrum Med02232011 V4
 
Lean Re Pres Rudorfer Vector Forum V1
Lean Re Pres Rudorfer Vector Forum V1Lean Re Pres Rudorfer Vector Forum V1
Lean Re Pres Rudorfer Vector Forum V1
 
Visure Solutions Keynote06222009 V3
Visure Solutions Keynote06222009 V3Visure Solutions Keynote06222009 V3
Visure Solutions Keynote06222009 V3
 
Incose Sweden Model Management01292011 V8
Incose Sweden Model Management01292011 V8Incose Sweden Model Management01292011 V8
Incose Sweden Model Management01292011 V8
 
Refsq 2011 03 29 V3
Refsq 2011 03 29 V3Refsq 2011 03 29 V3
Refsq 2011 03 29 V3
 
Qz Req Eng Ebert Rudorfer 2011 V3
Qz Req Eng Ebert Rudorfer 2011 V3Qz Req Eng Ebert Rudorfer 2011 V3
Qz Req Eng Ebert Rudorfer 2011 V3
 
Lean Re Pres Ebert Rudorfer Re Conf2011 V8
Lean Re Pres Ebert Rudorfer Re Conf2011 V8Lean Re Pres Ebert Rudorfer Re Conf2011 V8
Lean Re Pres Ebert Rudorfer Re Conf2011 V8
 
SYNGO TFS Program InfoTeam Keynote
SYNGO TFS Program InfoTeam KeynoteSYNGO TFS Program InfoTeam Keynote
SYNGO TFS Program InfoTeam Keynote
 
MedConf 2009 Requirements Engineeering Rudorfer-Ebert
MedConf 2009 Requirements Engineeering Rudorfer-EbertMedConf 2009 Requirements Engineeering Rudorfer-Ebert
MedConf 2009 Requirements Engineeering Rudorfer-Ebert
 

Kürzlich hochgeladen

(办理学位证)多伦多大学毕业证成绩单原版一比一
(办理学位证)多伦多大学毕业证成绩单原版一比一(办理学位证)多伦多大学毕业证成绩单原版一比一
(办理学位证)多伦多大学毕业证成绩单原版一比一C SSS
 
定制(Salford学位证)索尔福德大学毕业证成绩单原版一比一
定制(Salford学位证)索尔福德大学毕业证成绩单原版一比一定制(Salford学位证)索尔福德大学毕业证成绩单原版一比一
定制(Salford学位证)索尔福德大学毕业证成绩单原版一比一ss ss
 
Call Girls Delhi {Rohini} 9711199012 high profile service
Call Girls Delhi {Rohini} 9711199012 high profile serviceCall Girls Delhi {Rohini} 9711199012 high profile service
Call Girls Delhi {Rohini} 9711199012 high profile servicerehmti665
 
Vip Udupi Call Girls 7001305949 WhatsApp Number 24x7 Best Services
Vip Udupi Call Girls 7001305949 WhatsApp Number 24x7 Best ServicesVip Udupi Call Girls 7001305949 WhatsApp Number 24x7 Best Services
Vip Udupi Call Girls 7001305949 WhatsApp Number 24x7 Best Servicesnajka9823
 
Dubai Call Girls O525547819 Spring Break Fast Call Girls Dubai
Dubai Call Girls O525547819 Spring Break Fast Call Girls DubaiDubai Call Girls O525547819 Spring Break Fast Call Girls Dubai
Dubai Call Girls O525547819 Spring Break Fast Call Girls Dubaikojalkojal131
 
5S - House keeping (Seiri, Seiton, Seiso, Seiketsu, Shitsuke)
5S - House keeping (Seiri, Seiton, Seiso, Seiketsu, Shitsuke)5S - House keeping (Seiri, Seiton, Seiso, Seiketsu, Shitsuke)
5S - House keeping (Seiri, Seiton, Seiso, Seiketsu, Shitsuke)861c7ca49a02
 
办理(CSU毕业证书)澳洲查理斯特大学毕业证成绩单原版一比一
办理(CSU毕业证书)澳洲查理斯特大学毕业证成绩单原版一比一办理(CSU毕业证书)澳洲查理斯特大学毕业证成绩单原版一比一
办理(CSU毕业证书)澳洲查理斯特大学毕业证成绩单原版一比一diploma 1
 
(办理学位证)加州州立大学北岭分校毕业证成绩单原版一比一
(办理学位证)加州州立大学北岭分校毕业证成绩单原版一比一(办理学位证)加州州立大学北岭分校毕业证成绩单原版一比一
(办理学位证)加州州立大学北岭分校毕业证成绩单原版一比一Fi sss
 
(办理学位证)韩国汉阳大学毕业证成绩单原版一比一
(办理学位证)韩国汉阳大学毕业证成绩单原版一比一(办理学位证)韩国汉阳大学毕业证成绩单原版一比一
(办理学位证)韩国汉阳大学毕业证成绩单原版一比一C SSS
 
Erfurt FH学位证,埃尔福特应用技术大学毕业证书1:1制作
Erfurt FH学位证,埃尔福特应用技术大学毕业证书1:1制作Erfurt FH学位证,埃尔福特应用技术大学毕业证书1:1制作
Erfurt FH学位证,埃尔福特应用技术大学毕业证书1:1制作f3774p8b
 
定制(RHUL学位证)伦敦大学皇家霍洛威学院毕业证成绩单原版一比一
定制(RHUL学位证)伦敦大学皇家霍洛威学院毕业证成绩单原版一比一定制(RHUL学位证)伦敦大学皇家霍洛威学院毕业证成绩单原版一比一
定制(RHUL学位证)伦敦大学皇家霍洛威学院毕业证成绩单原版一比一ss ss
 
NO1 Qualified Best Black Magic Specialist Near Me Spiritual Healer Powerful L...
NO1 Qualified Best Black Magic Specialist Near Me Spiritual Healer Powerful L...NO1 Qualified Best Black Magic Specialist Near Me Spiritual Healer Powerful L...
NO1 Qualified Best Black Magic Specialist Near Me Spiritual Healer Powerful L...Amil baba
 
原版1:1复刻斯坦福大学毕业证Stanford毕业证留信学历认证
原版1:1复刻斯坦福大学毕业证Stanford毕业证留信学历认证原版1:1复刻斯坦福大学毕业证Stanford毕业证留信学历认证
原版1:1复刻斯坦福大学毕业证Stanford毕业证留信学历认证gwhohjj
 
NO1 WorldWide kala jadu Love Marriage Black Magic Punjab Powerful Black Magic...
NO1 WorldWide kala jadu Love Marriage Black Magic Punjab Powerful Black Magic...NO1 WorldWide kala jadu Love Marriage Black Magic Punjab Powerful Black Magic...
NO1 WorldWide kala jadu Love Marriage Black Magic Punjab Powerful Black Magic...Amil baba
 
定制(UI学位证)爱达荷大学毕业证成绩单原版一比一
定制(UI学位证)爱达荷大学毕业证成绩单原版一比一定制(UI学位证)爱达荷大学毕业证成绩单原版一比一
定制(UI学位证)爱达荷大学毕业证成绩单原版一比一ss ss
 
the cOMPUTER SYSTEM - computer hardware servicing.pptx
the cOMPUTER SYSTEM - computer hardware servicing.pptxthe cOMPUTER SYSTEM - computer hardware servicing.pptx
the cOMPUTER SYSTEM - computer hardware servicing.pptxLeaMaePahinagGarciaV
 
萨斯喀彻温大学毕业证学位证成绩单-购买流程
萨斯喀彻温大学毕业证学位证成绩单-购买流程萨斯喀彻温大学毕业证学位证成绩单-购买流程
萨斯喀彻温大学毕业证学位证成绩单-购买流程1k98h0e1
 
Hifi Defence Colony Call Girls Service WhatsApp -> 9999965857 Available 24x7 ...
Hifi Defence Colony Call Girls Service WhatsApp -> 9999965857 Available 24x7 ...Hifi Defence Colony Call Girls Service WhatsApp -> 9999965857 Available 24x7 ...
Hifi Defence Colony Call Girls Service WhatsApp -> 9999965857 Available 24x7 ...srsj9000
 

Kürzlich hochgeladen (20)

(办理学位证)多伦多大学毕业证成绩单原版一比一
(办理学位证)多伦多大学毕业证成绩单原版一比一(办理学位证)多伦多大学毕业证成绩单原版一比一
(办理学位证)多伦多大学毕业证成绩单原版一比一
 
定制(Salford学位证)索尔福德大学毕业证成绩单原版一比一
定制(Salford学位证)索尔福德大学毕业证成绩单原版一比一定制(Salford学位证)索尔福德大学毕业证成绩单原版一比一
定制(Salford学位证)索尔福德大学毕业证成绩单原版一比一
 
Call Girls Delhi {Rohini} 9711199012 high profile service
Call Girls Delhi {Rohini} 9711199012 high profile serviceCall Girls Delhi {Rohini} 9711199012 high profile service
Call Girls Delhi {Rohini} 9711199012 high profile service
 
Vip Udupi Call Girls 7001305949 WhatsApp Number 24x7 Best Services
Vip Udupi Call Girls 7001305949 WhatsApp Number 24x7 Best ServicesVip Udupi Call Girls 7001305949 WhatsApp Number 24x7 Best Services
Vip Udupi Call Girls 7001305949 WhatsApp Number 24x7 Best Services
 
Dubai Call Girls O525547819 Spring Break Fast Call Girls Dubai
Dubai Call Girls O525547819 Spring Break Fast Call Girls DubaiDubai Call Girls O525547819 Spring Break Fast Call Girls Dubai
Dubai Call Girls O525547819 Spring Break Fast Call Girls Dubai
 
5S - House keeping (Seiri, Seiton, Seiso, Seiketsu, Shitsuke)
5S - House keeping (Seiri, Seiton, Seiso, Seiketsu, Shitsuke)5S - House keeping (Seiri, Seiton, Seiso, Seiketsu, Shitsuke)
5S - House keeping (Seiri, Seiton, Seiso, Seiketsu, Shitsuke)
 
办理(CSU毕业证书)澳洲查理斯特大学毕业证成绩单原版一比一
办理(CSU毕业证书)澳洲查理斯特大学毕业证成绩单原版一比一办理(CSU毕业证书)澳洲查理斯特大学毕业证成绩单原版一比一
办理(CSU毕业证书)澳洲查理斯特大学毕业证成绩单原版一比一
 
(办理学位证)加州州立大学北岭分校毕业证成绩单原版一比一
(办理学位证)加州州立大学北岭分校毕业证成绩单原版一比一(办理学位证)加州州立大学北岭分校毕业证成绩单原版一比一
(办理学位证)加州州立大学北岭分校毕业证成绩单原版一比一
 
(办理学位证)韩国汉阳大学毕业证成绩单原版一比一
(办理学位证)韩国汉阳大学毕业证成绩单原版一比一(办理学位证)韩国汉阳大学毕业证成绩单原版一比一
(办理学位证)韩国汉阳大学毕业证成绩单原版一比一
 
Erfurt FH学位证,埃尔福特应用技术大学毕业证书1:1制作
Erfurt FH学位证,埃尔福特应用技术大学毕业证书1:1制作Erfurt FH学位证,埃尔福特应用技术大学毕业证书1:1制作
Erfurt FH学位证,埃尔福特应用技术大学毕业证书1:1制作
 
定制(RHUL学位证)伦敦大学皇家霍洛威学院毕业证成绩单原版一比一
定制(RHUL学位证)伦敦大学皇家霍洛威学院毕业证成绩单原版一比一定制(RHUL学位证)伦敦大学皇家霍洛威学院毕业证成绩单原版一比一
定制(RHUL学位证)伦敦大学皇家霍洛威学院毕业证成绩单原版一比一
 
young call girls in Khanpur,🔝 9953056974 🔝 escort Service
young call girls in  Khanpur,🔝 9953056974 🔝 escort Serviceyoung call girls in  Khanpur,🔝 9953056974 🔝 escort Service
young call girls in Khanpur,🔝 9953056974 🔝 escort Service
 
NO1 Qualified Best Black Magic Specialist Near Me Spiritual Healer Powerful L...
NO1 Qualified Best Black Magic Specialist Near Me Spiritual Healer Powerful L...NO1 Qualified Best Black Magic Specialist Near Me Spiritual Healer Powerful L...
NO1 Qualified Best Black Magic Specialist Near Me Spiritual Healer Powerful L...
 
young call girls in Gtb Nagar,🔝 9953056974 🔝 escort Service
young call girls in Gtb Nagar,🔝 9953056974 🔝 escort Serviceyoung call girls in Gtb Nagar,🔝 9953056974 🔝 escort Service
young call girls in Gtb Nagar,🔝 9953056974 🔝 escort Service
 
原版1:1复刻斯坦福大学毕业证Stanford毕业证留信学历认证
原版1:1复刻斯坦福大学毕业证Stanford毕业证留信学历认证原版1:1复刻斯坦福大学毕业证Stanford毕业证留信学历认证
原版1:1复刻斯坦福大学毕业证Stanford毕业证留信学历认证
 
NO1 WorldWide kala jadu Love Marriage Black Magic Punjab Powerful Black Magic...
NO1 WorldWide kala jadu Love Marriage Black Magic Punjab Powerful Black Magic...NO1 WorldWide kala jadu Love Marriage Black Magic Punjab Powerful Black Magic...
NO1 WorldWide kala jadu Love Marriage Black Magic Punjab Powerful Black Magic...
 
定制(UI学位证)爱达荷大学毕业证成绩单原版一比一
定制(UI学位证)爱达荷大学毕业证成绩单原版一比一定制(UI学位证)爱达荷大学毕业证成绩单原版一比一
定制(UI学位证)爱达荷大学毕业证成绩单原版一比一
 
the cOMPUTER SYSTEM - computer hardware servicing.pptx
the cOMPUTER SYSTEM - computer hardware servicing.pptxthe cOMPUTER SYSTEM - computer hardware servicing.pptx
the cOMPUTER SYSTEM - computer hardware servicing.pptx
 
萨斯喀彻温大学毕业证学位证成绩单-购买流程
萨斯喀彻温大学毕业证学位证成绩单-购买流程萨斯喀彻温大学毕业证学位证成绩单-购买流程
萨斯喀彻温大学毕业证学位证成绩单-购买流程
 
Hifi Defence Colony Call Girls Service WhatsApp -> 9999965857 Available 24x7 ...
Hifi Defence Colony Call Girls Service WhatsApp -> 9999965857 Available 24x7 ...Hifi Defence Colony Call Girls Service WhatsApp -> 9999965857 Available 24x7 ...
Hifi Defence Colony Call Girls Service WhatsApp -> 9999965857 Available 24x7 ...
 

Nih ce-presentation-05272016(for approval)

  • 1. Unrestricted © Siemens Healthcare GmbH, 2016 Configuration Engineering for Invitro- Diagnostic (IVD) Product Development Prepared for National Institute of Health Author: Arnold Rudorfer Date: May 27, 2016 Status: 1st draft
  • 2. 2016-02-20Page 2 HC xxx – xxx Unrestricted © Siemens Healthcare GmbH, 2016 HOOD05162002380020 Abstract of this Talk This talk on Configuration Engineering (= Configuration Management for Platform development) will discuss challenges, solution approaches and engineering experiences in invitro-diagnostic (IVD) product development. CE is an emerging discipline in various industries (such as medical devices, automotive, avionics/ space, …) which has developed from Configuration Management practices for single products. Further, examples presented will highlight the underlying CE concepts as well as address tool issues including observed benefits over the introduction.
  • 3. 2016-02-20Page 3 HC xxx – xxx Unrestricted © Siemens Healthcare GmbH, 2016 HOOD05162002380020 Table of Contents Business pressures, Configuration Engineering overview 6-122 Goals, Siemens Healthcare Laboratory Diagnostics 3-51 Appendix 24-275 Page Challenges, approaches, engineering practices 13-213 Key takeaways 224
  • 4. 2016-02-20Page 4 HC xxx – xxx Unrestricted © Siemens Healthcare GmbH, 2016 HOOD05162002380020 Goals of this Presentation  Goals, Siemens LD  Business pressures, CE overview  Challenges, approaches, engineering practices  Key takeaways  Appendix  Provide an overview on configuration management challenges for platforms and its solutions in a practical context.  Share engineering practices and benefits observed.
  • 5. 2016-02-20Page 5 HC xxx – xxx Unrestricted © Siemens Healthcare GmbH, 2016 HOOD05162002380020 Siemens Healthcare Laboratory Diagnostics A Global Leader in Key Market Segments Largest Installed Base of Analytical Automation Chemistry Diagnostics ITLab Automation Molecular Point of Care Hematology Hemostasis Immunoassay  Goals, Siemens LD  Business pressures, CE overview  Challenges, approaches, engineering practices  Key takeaways  Appendix
  • 6. 2016-02-20Page 6 HC xxx – xxx Unrestricted © Siemens Healthcare GmbH, 2016 HOOD05162002380020 Business Pressures for IVD Product Development Need to industrialize product development Cost down Product variety Cycle time down Complexity growth Configuration Engineering Platform-based development Focus of this talk ALM PLM  Goals, Siemens LD  Business pressures, CE overview  Challenges, approaches, engineering practices  Key takeaways  Appendix
  • 7. 2016-02-20Page 7 HC xxx – xxx Unrestricted © Siemens Healthcare GmbH, 2016 HOOD05162002380020 Providing Context “An Invitro-Diagnostic Instrument” … A lab instrument is a highly complex mechatronics- based system: hardware, software, firmware producing test results.  Goals, Siemens LD  Business pressures, CE overview  Challenges, approaches, engineering practices  Key takeaways  Appendix
  • 8. 2016-02-20Page 8 HC xxx – xxx Unrestricted © Siemens Healthcare GmbH, 2016 HOOD05162002380020 Configuration Management Defined A disciplined, efficient workflow for evolving a product including its data and associated procedural information from cradle to grave with increasing precision and maturity. Controlled Input(s): Product Needs:  Feature/ function  Problem reports  Enhancements  … Product data:  Product structure  Product configuration  Product documentation  Design data  … Output(s): New approved product data:  Product structures  Product configurations  Product documentation  Design data  … Change history:  Audit/ traceability  Verification  …  Goals, Siemens LD  Business pressures, CE overview  Challenges, approaches, engineering practices  Key takeaways  Appendix
  • 9. 2016-02-20Page 9 HC xxx – xxx Unrestricted © Siemens Healthcare GmbH, 2016 HOOD05162002380020 Impact of Variety in IVD Product Development  Infinite variety is not manageable (cost, timeline, quality, …)  Variety in product development needs to be consciously managed. Evolving discipline: Configuration Engineering = Variant Management (what) + Configuration Management (how)  Goals, Siemens LD  Business pressures, CE overview  Challenges, approaches, engineering practices  Key takeaways  Appendix
  • 10. 2016-02-20Page 10 HC xxx – xxx Unrestricted © Siemens Healthcare GmbH, 2016 HOOD05162002380020 Concept End-to-End Configuration Engineering Workflow (1)  Goals, Siemens LD  Business pressures, CE overview  Challenges, approaches, engineering practices  Key takeaways  Appendix Coordinate and assess Product Data Setup (1&2) Establish initial eBOM structure (3) Plan track, and review and Track product release (4, 5, & 6) Configuration Build Management (7) Configuration Change Management (8, 9, 10) Prototype Modification Management (11,12)
  • 11. 2016-02-20Page 11 HC xxx – xxx Unrestricted © Siemens Healthcare GmbH, 2016 HOOD05162002380020 Concept End-to-End Configuration Engineering Workflow (2) (per PDP phase gates)  gBOM eBOM mBOM Feature 1 Feature 2 Feature 3 Feature N  Goals, Siemens LD  Business pressures, CE overview  Challenges, approaches, engineering practices  Key takeaways  Appendix
  • 12. 2016-02-20Page 12 HC xxx – xxx Unrestricted © Siemens Healthcare GmbH, 2016 HOOD05162002380020 Concept End-to-End Configuration Engineering Workflow (3) eBOM  gBOM Feature 1 Feature 2 Feature 3 Feature N  Goals, Siemens LD  Business pressures, CE overview  Challenges, approaches, engineering practices  Key takeaways  Appendix
  • 13. 2016-02-20Page 13 HC xxx – xxx Unrestricted © Siemens Healthcare GmbH, 2016 HOOD05162002380020 Concept End-to-End Configuration Engineering Workflow (4)  Goals, Siemens LD  Business pressures, CE overview  Challenges, approaches, engineering practices  Key takeaways  Appendix
  • 14. 2016-02-20Page 14 HC xxx – xxx Unrestricted © Siemens Healthcare GmbH, 2016 HOOD05162002380020 Structure of the Challenges, Approaches, Engineering Practices Employed 1 Managing product variants How do I structure, assess and control product variability? 2 Structure an efficient and reliable change management workflow What is the best approach for executing change management? 3 Managing changes across engineering disciplines What do you do to manage and control product data across development projects? 4 Coordinating design changes across Engineering and Manufacturing How do I consistently synchronize Engineering and Manufacturing to become faster and less costly?  Goals, Siemens LD  Business pressures, CE overview  Challenges, approaches, engineering practices  Key takeaways  Appendix
  • 15. 2016-02-20Page 15 HC xxx – xxx Unrestricted © Siemens Healthcare GmbH, 2016 HOOD05162002380020 Structure of the Challenges, Approaches, Engineering Practices Employed (2) Coordinate and assess Product Data Setup (1&2) Establish initial eBOM structure (3) Plan track, and review and Track product release (4, 5, & 6) Configuration Build Management (7) Configuration Change Management (8, 9, 10) Prototype Modification Management (11,12) Product Variants 1 Manage change across disciplines Efficient change management workflow 2 3 Coordinate change beyond Engineering 4  Goals, Siemens LD  Business pressures, CE overview  Challenges, approaches, engineering practices  Key takeaways  Appendix
  • 16. 2016-02-20Page 16 HC xxx – xxx Unrestricted © Siemens Healthcare GmbH, 2016 HOOD05162002380020 Structure of Selected Challenges, Approach & Engineering Practices Challenge, define a solution strategy For each solution strategy, share ideas on engineering practices Illustrate benefits with supporting data Challenge Approach Engineering Practice  Goals, Siemens LD  Business pressures, CE overview  Challenges, approaches, engineering practices  Key takeaways  Appendix
  • 17. 2016-02-20Page 17 HC xxx – xxx Unrestricted © Siemens Healthcare GmbH, 2016 HOOD05162002380020 Solution Strategy Map for Configuration Engineering # Challenge Approach Engineering Practice 1 Manage product variants  Provide transparency on variation points in product structure  Proactively manage variation points in a configuration model  Generic platform product structure  Modular product architecture  Frontend configuration engineering 2 Structure efficient and reliable change management workflow Deploy end-to-end change management workflow to provide always accurate, actionable data (as automated as possible) Standardized change management workflow 3 Manage change across engineering disciplines Integration of product and configuration data, change can be synchronized accurately across discipline Integrated cross discipline change management 4 Coordinate change Beyond Engineering Enable manufacturing to obtain accurate engineering data to plan & execute Manufacturing Synchronized data exchange of engineering to manufacturing product data  Goals, Siemens LD  Business pressures, CE overview  Challenges, approaches, engineering practices  Key takeaways  Appendix
  • 18. 2016-02-20Page 18 HC xxx – xxx Unrestricted © Siemens Healthcare GmbH, 2016 HOOD05162002380020 Manage Product Variants (1)  Explicit modeling of a generic product structure defining commonality & variability  Consistently manage variation points in a product and a configuration model for product variants over time.  Automate creation and update of product & configuration model using PLM tool(s). Approach: Frontend Configuration Engineering Benefits  Explicit modeling of product variants provides precision for product scope.  Improve design speed and reuse supporting a modular product architecture.  Enabler for a configure to order manufacturing model. Customer needs drive product variants  Goals, Siemens LD  Business pressures, CE overview  Challenges, approaches, engineering practices  Key takeaways  Appendix
  • 19. 2016-02-20Page 19 HC xxx – xxx Unrestricted © Siemens Healthcare GmbH, 2016 HOOD05162002380020 Structure Efficient & Reliable Change Management Workflow (1)  End-to-end bill of material handling (from a generic BOM, engineering BOM to a manufacturing BOM.  Handling of BOM baselines according to the level of design maturity and product lifecycle Approach: Standardized change management workflow Benefits  Accurate controlled changes in a single product data repository.  Reduced change cycle time with less defects.  Increased engineering productivity  Audit proof documentation needed for medical devices. Change management workflow needs to cover different phases of lifecycle. gBOM eBOM mBOM  Goals, Siemens LD  Business pressures, CE overview  Challenges, approaches, engineering practices  Key takeaways  Appendix
  • 20. 2016-02-20Page 20 HC xxx – xxx Unrestricted © Siemens Healthcare GmbH, 2016 HOOD05162002380020 Structure Efficient & Reliable Change Management Workflow (2)  Workflow supported change management integrated for hardware, software and firmware. Approach: Standardized change management workflow Benefits  Synchronize an emerging change with prototype configuration data.  Change requests are integrated with emerging problem reports and/or enhancements.  Automation support for processing of change requests (pre-defined, templated, internal quality checks). For use in simple to more complex change requests  Goals, Siemens LD  Business pressures, CE overview  Challenges, approaches, engineering practices  Key takeaways  Appendix
  • 21. 2016-02-20Page 21 HC xxx – xxx Unrestricted © Siemens Healthcare GmbH, 2016 HOOD05162002380020 Managing Change Across Disciplines  Integrated ALM/PLM tool provides access to product data by engineering disciplines, changes are synchronized quickly across disciplines. Approach: Cross-discipline change management workflow Benefits  Open access to prototype configuration data for all disciplines (HW, SW, FW).  Knowledge on design changes are systematically captured and are made retrievable.  Reduced errors, rework by having all product data in a single database. Sample for an integrated change in a sub-system  Goals, Siemens LD  Business pressures, CE overview  Challenges, approaches, engineering practices  Key takeaways  Appendix
  • 22. 2016-02-20Page 22 HC xxx – xxx Unrestricted © Siemens Healthcare GmbH, 2016 HOOD05162002380020 Managing Change Across Disciplines  Apply concept of continuous integration of upgrades into instrument prototypes (similar to software).  Interface between ALM/PLM tool chain to MRP system allows synchronization and transparency for design changes. Approach: Collaborating on Change Beyond Engineering Benefits  Instrument prototype generation matures earlier by means of controlled deployment of upgrades.  Synchronization of eBOM and mBOM structures, traceability. Design changes are identified early and are continuously integrated  Goals, Siemens LD  Business pressures, CE overview  Challenges, approaches, engineering practices  Key takeaways  Appendix
  • 23. 2016-02-20Page 23 HC xxx – xxx Unrestricted © Siemens Healthcare GmbH, 2016 HOOD05162002380020 Key Takeaways: Establishing Configuration Engineering in Your Organization  Lay out an end-to-end vision for where CE can add value and has to lead the path.  Development of CE needs diverse engineering perspectives along the product development lifecycle (up- and down-stream).  For a multi-disciplinary domain such as IVD, select a ALM/ PLM tool-chain which allows as many stakeholders as possible to collaborate within the same workspace.  CE based on my own experiences needs to grow over time delivering short-term gains to build credibility while keeping the grand vision in place. What you need to consider when developing CE  Goals, Siemens LD  Business pressures, CE overview  Challenges, approaches, engineering practices  Key takeaways  Appendix
  • 24. 2016-02-20Page 24 HC xxx – xxx Unrestricted © Siemens Healthcare GmbH, 2016 HOOD05162002380020 Appendix  Reference documents  Contact details Arnold Rudorfer  Goals, Siemens LD  Business pressures, CE overview  Challenges, approaches, engineering practices  Key takeaways  Appendix
  • 25. 2016-02-20Page 25 HC xxx – xxx Unrestricted © Siemens Healthcare GmbH, 2016 HOOD05162002380020 Reference Documents  Arnold Rudorfer, Alexander Evers: Configuration Engineering workflow, August 2015  Siemens Healthcare Laboratory Diagnostics: Company overview, 2016  Goals, Siemens LD  Business pressures, CE overview  Challenges, approaches, engineering practices  Key takeaways  Appendix
  • 26. 2016-02-20Page 26 HC xxx – xxx Unrestricted © Siemens Healthcare GmbH, 2016 HOOD05162002380020 Contact Details Arnold Rudorfer Arnold Rudorfer is a Senior Engineering Leader Instrument Development at Siemens Healthcare Laboratory Diagnostics. He has more than twenty years systems development experience with a focus on medical devices and enterprise platforms. His research interests include requirements and systems engineering, organizational change management, software technologies, innovation- and business strategy. Mr. Rudorfer holds an MS in software engineering and business administration from the University of Technology Graz, Austria. Further, he is a INOCSE member and PMP/MSP certified. Siemens Healthcare Laboratory Diagnostics 62 Flanders Bartley Road Flanders, NJ, 07836 Cell: +1 609 954 2384 E-Mail: arnold.rudorfer@siemens.com