SlideShare a Scribd company logo
1 of 25
Download to read offline
Introduced by Will Kempton, Director
California Department of Transportation
California’s Commitment

•   $9 billion down payment by voters

•   10 years/$100 million invested to plan route and
    complete Program-level EIR/EIS

•   $950 million committed to urban, intercity and
    commuter rail lines

•   Requirements for extensive oversight and fiscal
    controls
California’s High-Speed Train –
Unmatched Progress in the
U.S.
•   Program-level EIR/EIS completed for 800-mile
    system

•   Up to 220 MPH linking Southern California, the
    Central Valley and the San Francisco Bay Area

•   International peer review of design, engineering and
    operations analyses

•   Unprecedented collection of the world's leading
    experts
California’s High-Speed Train
The Need
•   Without a high-speed train to meet demand of 50 million
    Californians by 2035, the state would need:
    • 3000 miles of new freeway lanes
    • Five new airport runways
    • 90 new departure gates
•   High-speed train will meet the demand at half the cost

•   Creates 600,000 construction-related jobs

•   More than 320,000 direct and indirect permanent jobs
    by 2035
California’s High-Speed Train
Environmental Benefits
•   100% clean electric power

•   1/3rd the energy of airplanes

•   1/5th the energy of passenger cars

•   Reduced dependence on foreign oil by 12.7 million
    barrels a year

•   Greenhouse gases cut by 12 billion pounds a year
California’s High-Speed Train
Financial Benefits
•   Will return $150 billion -- about 3X value over system
    cost -- in next 40 years from

•   Requires no operating subsidies

•   Will generate over $2 billion in surplus revenues a year
    by 2035

•   Will leverage private investment through public-private
    partnerships
California’s High-Speed Train
Timeline
2010-2012
• Complete environmental process in Los Angeles/Anaheim to San
Francisco sections. Break ground on early project elements.

2015
•Begin demonstrating first prototype trainsets.

2018-2020
• Launch operation on San Francisco to Los Angeles/Anaheim segments.
High-Speed Train Target
Deliverables by 2012
•   Specific Projects within:
    • Los Angeles to Anaheim corridor

    • San Francisco to San Jose corridor

•   Rights of way / preparation for heavy maintenance facility
    in Central Valley

•   Pre-construction engineering
California’s Intercity Rail
Network
•   With nearly 5.6 million passengers, California’s current
    intercity network:
    • Home to the 2nd, 3rd, and 6th busiest intercity passenger rail
    corridors in the country
    • Comprises 20 percent of all Amtrak passengers
    • Represents nearly half of the total ridership of Amtrak’s
      state-supported intrastate, intercity services
    • Parallels congested interstates
    • Kept more than 500 million vehicle miles traveled off state roadways in
      2008
•   Provides both stand alone utility and connectivity and
    integration with the high-speed rail system
The California Commitment:
Financial Investment
•   Consistent funding has resulted in nation’s most
    successful program
• Nearly $2 billion in State capital invested to date—half in direct
investments in tracks and signals owned by freight railroads
• Ongoing investment program—bonds voted in November 2006 and
November 2008—including $9 billion for true high speed rail (200+ mph)
• Consistent operating support even during difficult economic times:
    • Since 1976, $880 million
    • In the 2008-09 year alone, $90 million
The California Commitment:
Planning
• California’s rail network reflects a long-range, coordinated planning
process
    • Corridor specific “Strategic Plans” — Long-term (20 year) vision of
    frequencies, running times, reliability, and amenities.
    Includes unconstrained cost estimates of capital and operational
    improvements to achieve vision.
    • State Rail Plan— Based on Corridor Strategic Plans and State
    Transportation Plan, a 10 year financially constrained plan of
    operational and capital improvements. Updated every two years.
    • State Transportation Improvement Program—Five year capital
    budget updated every two years.
    • Corridor Business Plans — Annual operational and capital plans.
The California Commitment:
Ready to Deliver!
•   Documented history of ability to deliver intercity rail
    projects-- $650 million since 2000

•   Projects identified and coordinated with freight railroad
    partners—priorities based on modeling

•   Master Construction and Maintenance Agreements in
    place with Freight Railroads and Commuter partners
The California Commitment:
Ready to Deliver!
•   “Track 1” projects developed and design completed.
    State-level environmental and permitting completed and
    projects being “NEPA-ized”

•   “Track 1” projects will offer immediate improvements to
    the existing system and enhance development of
    high-speed network

•   “Track 2” projects will further help development of
    California’s high speed rail system
The California Commitment


Ready to be the Federal Government’s
partner in improving the nation’s passenger
rail network!
California Hsr

More Related Content

What's hot

The Potential of Regional Power Sector Integration Gulf Cooperation Council C...
The Potential of Regional Power Sector Integration Gulf Cooperation Council C...The Potential of Regional Power Sector Integration Gulf Cooperation Council C...
The Potential of Regional Power Sector Integration Gulf Cooperation Council C...
Power System Operation
 
Rochelle Newsleader Sunday June 26th 2016
Rochelle Newsleader Sunday June 26th 2016Rochelle Newsleader Sunday June 26th 2016
Rochelle Newsleader Sunday June 26th 2016
Dan Westin
 
M I D W E S T H S R
M I D W E S T  H S RM I D W E S T  H S R
M I D W E S T H S R
anxora
 
Caltrain governance in age of electrification yoriko kishimoto
Caltrain governance in age of electrification  yoriko kishimotoCaltrain governance in age of electrification  yoriko kishimoto
Caltrain governance in age of electrification yoriko kishimoto
Adina Levin
 
Virginia's ARRA Intercity and High Speed Rail Program - Fall 2009
Virginia's ARRA Intercity and High Speed Rail Program - Fall 2009Virginia's ARRA Intercity and High Speed Rail Program - Fall 2009
Virginia's ARRA Intercity and High Speed Rail Program - Fall 2009
Marti Donley
 

What's hot (20)

DTPW's Rapid Transit Corridors Conceptual Financial Plan Proposal
DTPW's Rapid Transit Corridors Conceptual Financial Plan ProposalDTPW's Rapid Transit Corridors Conceptual Financial Plan Proposal
DTPW's Rapid Transit Corridors Conceptual Financial Plan Proposal
 
The Potential of Regional Power Sector Integration Gulf Cooperation Council C...
The Potential of Regional Power Sector Integration Gulf Cooperation Council C...The Potential of Regional Power Sector Integration Gulf Cooperation Council C...
The Potential of Regional Power Sector Integration Gulf Cooperation Council C...
 
Let's Take a Ride: 5 Largest U.S. Public Transit Systems
Let's Take a Ride: 5 Largest U.S. Public Transit SystemsLet's Take a Ride: 5 Largest U.S. Public Transit Systems
Let's Take a Ride: 5 Largest U.S. Public Transit Systems
 
196 Street Rail Overpass Plan
196 Street Rail Overpass Plan 196 Street Rail Overpass Plan
196 Street Rail Overpass Plan
 
Rochelle Newsleader Sunday June 26th 2016
Rochelle Newsleader Sunday June 26th 2016Rochelle Newsleader Sunday June 26th 2016
Rochelle Newsleader Sunday June 26th 2016
 
tribune article
tribune article tribune article
tribune article
 
64 Mufford Project Status - Dec 15, 2008
64 Mufford Project Status - Dec 15, 200864 Mufford Project Status - Dec 15, 2008
64 Mufford Project Status - Dec 15, 2008
 
Meeting Australia's 2025 Land Transport Challenges
Meeting Australia's 2025 Land Transport ChallengesMeeting Australia's 2025 Land Transport Challenges
Meeting Australia's 2025 Land Transport Challenges
 
Fixing America's Surface Transportation Act: Key Freight Highway Provisions
Fixing America's Surface Transportation Act: Key Freight Highway ProvisionsFixing America's Surface Transportation Act: Key Freight Highway Provisions
Fixing America's Surface Transportation Act: Key Freight Highway Provisions
 
M I D W E S T H S R
M I D W E S T  H S RM I D W E S T  H S R
M I D W E S T H S R
 
Caltrain governance in age of electrification yoriko kishimoto
Caltrain governance in age of electrification  yoriko kishimotoCaltrain governance in age of electrification  yoriko kishimoto
Caltrain governance in age of electrification yoriko kishimoto
 
Helder Preza - Luanda Urban Transit, 03/2011
Helder Preza - Luanda Urban Transit, 03/2011Helder Preza - Luanda Urban Transit, 03/2011
Helder Preza - Luanda Urban Transit, 03/2011
 
Virginia's ARRA Intercity and High Speed Rail Program - Fall 2009
Virginia's ARRA Intercity and High Speed Rail Program - Fall 2009Virginia's ARRA Intercity and High Speed Rail Program - Fall 2009
Virginia's ARRA Intercity and High Speed Rail Program - Fall 2009
 
Train Campaign rail pop up meeting 20180228 web
Train Campaign rail pop up meeting 20180228 webTrain Campaign rail pop up meeting 20180228 web
Train Campaign rail pop up meeting 20180228 web
 
Fixing America's Surface Transportation (FAST) Act
Fixing America's Surface Transportation (FAST) ActFixing America's Surface Transportation (FAST) Act
Fixing America's Surface Transportation (FAST) Act
 
Arlington County Transportation Funding 101
Arlington County Transportation Funding 101Arlington County Transportation Funding 101
Arlington County Transportation Funding 101
 
Bernadette kyova freight summit (fast act and freight)
Bernadette kyova freight summit (fast act and freight)Bernadette kyova freight summit (fast act and freight)
Bernadette kyova freight summit (fast act and freight)
 
Transit in the Charlotte Region
Transit in the Charlotte RegionTransit in the Charlotte Region
Transit in the Charlotte Region
 
RV 2015: Cleaner Transit, Healthier Communities: Climate Change Policies and ...
RV 2015: Cleaner Transit, Healthier Communities: Climate Change Policies and ...RV 2015: Cleaner Transit, Healthier Communities: Climate Change Policies and ...
RV 2015: Cleaner Transit, Healthier Communities: Climate Change Policies and ...
 
Virginians for High Speed Rail, July 2009
Virginians for High Speed Rail, July 2009Virginians for High Speed Rail, July 2009
Virginians for High Speed Rail, July 2009
 

Viewers also liked

South Central Corridor
South Central CorridorSouth Central Corridor
South Central Corridor
anxora
 
Arizona Ppp Review. Rbc Capital Markets
Arizona Ppp Review. Rbc Capital MarketsArizona Ppp Review. Rbc Capital Markets
Arizona Ppp Review. Rbc Capital Markets
anxora
 
Florida Hsr
Florida HsrFlorida Hsr
Florida Hsr
anxora
 
Federal Railroad Administration
Federal Railroad AdministrationFederal Railroad Administration
Federal Railroad Administration
anxora
 
Ohio Innovative Financing In Transportation
Ohio Innovative Financing In TransportationOhio Innovative Financing In Transportation
Ohio Innovative Financing In Transportation
anxora
 
Amtrak
AmtrakAmtrak
Amtrak
anxora
 

Viewers also liked (6)

South Central Corridor
South Central CorridorSouth Central Corridor
South Central Corridor
 
Arizona Ppp Review. Rbc Capital Markets
Arizona Ppp Review. Rbc Capital MarketsArizona Ppp Review. Rbc Capital Markets
Arizona Ppp Review. Rbc Capital Markets
 
Florida Hsr
Florida HsrFlorida Hsr
Florida Hsr
 
Federal Railroad Administration
Federal Railroad AdministrationFederal Railroad Administration
Federal Railroad Administration
 
Ohio Innovative Financing In Transportation
Ohio Innovative Financing In TransportationOhio Innovative Financing In Transportation
Ohio Innovative Financing In Transportation
 
Amtrak
AmtrakAmtrak
Amtrak
 

Similar to California Hsr

Robin Singh Freight Master Plan Seattle.pptx
Robin Singh Freight Master Plan Seattle.pptxRobin Singh Freight Master Plan Seattle.pptx
Robin Singh Freight Master Plan Seattle.pptx
RobinSingh912579
 
CSX Presentation; Rail Night
CSX Presentation; Rail NightCSX Presentation; Rail Night
CSX Presentation; Rail Night
Columbus Chamber
 
Sustainability in Brooklyn: Public Transportation
Sustainability in Brooklyn: Public TransportationSustainability in Brooklyn: Public Transportation
Sustainability in Brooklyn: Public Transportation
achudner
 

Similar to California Hsr (20)

Transportation California Funding Update
Transportation California Funding UpdateTransportation California Funding Update
Transportation California Funding Update
 
Robin Singh Freight Master Plan Seattle.pptx
Robin Singh Freight Master Plan Seattle.pptxRobin Singh Freight Master Plan Seattle.pptx
Robin Singh Freight Master Plan Seattle.pptx
 
RV 2015: How to Start: Project Funding Lessons and Strategies by Mark Linsenm...
RV 2015: How to Start: Project Funding Lessons and Strategies by Mark Linsenm...RV 2015: How to Start: Project Funding Lessons and Strategies by Mark Linsenm...
RV 2015: How to Start: Project Funding Lessons and Strategies by Mark Linsenm...
 
CSX Presentation; Rail Night
CSX Presentation; Rail NightCSX Presentation; Rail Night
CSX Presentation; Rail Night
 
Sustainability in Brooklyn: Public Transportation
Sustainability in Brooklyn: Public TransportationSustainability in Brooklyn: Public Transportation
Sustainability in Brooklyn: Public Transportation
 
The Infrastructure Investment and Jobs Act (IIJA)
The Infrastructure Investment and Jobs Act (IIJA)The Infrastructure Investment and Jobs Act (IIJA)
The Infrastructure Investment and Jobs Act (IIJA)
 
Governor’s Infrastructure Funding Plan
Governor’s Infrastructure Funding PlanGovernor’s Infrastructure Funding Plan
Governor’s Infrastructure Funding Plan
 
Securing America's Future Energy by Robbie Diamond
Securing America's Future Energy by Robbie Diamond Securing America's Future Energy by Robbie Diamond
Securing America's Future Energy by Robbie Diamond
 
How are Transit Systems doing across the Globe?
How are Transit Systems doing across the Globe?How are Transit Systems doing across the Globe?
How are Transit Systems doing across the Globe?
 
Department of Transportation Fiscal Year 2012 Budget Highlights
Department of Transportation Fiscal Year 2012 Budget HighlightsDepartment of Transportation Fiscal Year 2012 Budget Highlights
Department of Transportation Fiscal Year 2012 Budget Highlights
 
1 transportation vancouver island economic loss dec 02 2013
1 transportation  vancouver island economic loss dec 02 20131 transportation  vancouver island economic loss dec 02 2013
1 transportation vancouver island economic loss dec 02 2013
 
Infra on Roads
Infra on RoadsInfra on Roads
Infra on Roads
 
Alliance Reauthorization Recommendations … The Basics
Alliance Reauthorization Recommendations … The BasicsAlliance Reauthorization Recommendations … The Basics
Alliance Reauthorization Recommendations … The Basics
 
Alliance Reauthorization Recommendations … The Basics
Alliance Reauthorization Recommendations … The BasicsAlliance Reauthorization Recommendations … The Basics
Alliance Reauthorization Recommendations … The Basics
 
Caltrans District 8 Update for the CalAPA Spring Asphalt Conference 2024
Caltrans District 8 Update for the CalAPA Spring Asphalt Conference 2024Caltrans District 8 Update for the CalAPA Spring Asphalt Conference 2024
Caltrans District 8 Update for the CalAPA Spring Asphalt Conference 2024
 
Analyst breakfast: North American consultancy business - 19 March 2015
Analyst breakfast: North American consultancy business - 19 March 2015Analyst breakfast: North American consultancy business - 19 March 2015
Analyst breakfast: North American consultancy business - 19 March 2015
 
California High Speed Rail Project Overview
California High Speed Rail Project OverviewCalifornia High Speed Rail Project Overview
California High Speed Rail Project Overview
 
VTA 2016 Measure B Program Areas
VTA 2016 Measure B Program AreasVTA 2016 Measure B Program Areas
VTA 2016 Measure B Program Areas
 
ROUTES: USDOT’s New Rural Transportation Initiative
ROUTES: USDOT’s New Rural Transportation InitiativeROUTES: USDOT’s New Rural Transportation Initiative
ROUTES: USDOT’s New Rural Transportation Initiative
 
Reston Funding Plan
Reston Funding PlanReston Funding Plan
Reston Funding Plan
 

More from anxora

Infra ppp resources april 2012
Infra ppp resources april 2012Infra ppp resources april 2012
Infra ppp resources april 2012
anxora
 
Arizona P3 Workshop 092909
Arizona P3 Workshop 092909Arizona P3 Workshop 092909
Arizona P3 Workshop 092909
anxora
 
Dd P3 Wkshp Project Overview 0709
Dd P3 Wkshp Project Overview 0709Dd P3 Wkshp Project Overview 0709
Dd P3 Wkshp Project Overview 0709
anxora
 
Dd P3 Wkshp Procurement Schedule Key Issues 0709
Dd P3 Wkshp Procurement Schedule Key Issues 0709Dd P3 Wkshp Procurement Schedule Key Issues 0709
Dd P3 Wkshp Procurement Schedule Key Issues 0709
anxora
 
SCT Mexico
SCT MexicoSCT Mexico
SCT Mexico
anxora
 
Pacific Northwest
Pacific NorthwestPacific Northwest
Pacific Northwest
anxora
 
Gulf Coast Corridor Hsr
Gulf Coast Corridor HsrGulf Coast Corridor Hsr
Gulf Coast Corridor Hsr
anxora
 
Northeast Hsr
Northeast HsrNortheast Hsr
Northeast Hsr
anxora
 
Nt Ebrochure
Nt EbrochureNt Ebrochure
Nt Ebrochure
anxora
 

More from anxora (11)

Infra ppp resources april 2012
Infra ppp resources april 2012Infra ppp resources april 2012
Infra ppp resources april 2012
 
Infra k brazil infrastructure 30aug2010.
Infra k brazil infrastructure 30aug2010.Infra k brazil infrastructure 30aug2010.
Infra k brazil infrastructure 30aug2010.
 
Arizona P3 Workshop 092909
Arizona P3 Workshop 092909Arizona P3 Workshop 092909
Arizona P3 Workshop 092909
 
Dd P3 Wkshp Project Overview 0709
Dd P3 Wkshp Project Overview 0709Dd P3 Wkshp Project Overview 0709
Dd P3 Wkshp Project Overview 0709
 
Dd P3 Wkshp Procurement Schedule Key Issues 0709
Dd P3 Wkshp Procurement Schedule Key Issues 0709Dd P3 Wkshp Procurement Schedule Key Issues 0709
Dd P3 Wkshp Procurement Schedule Key Issues 0709
 
SCT Mexico
SCT MexicoSCT Mexico
SCT Mexico
 
Pacific Northwest
Pacific NorthwestPacific Northwest
Pacific Northwest
 
Gulf Coast Corridor Hsr
Gulf Coast Corridor HsrGulf Coast Corridor Hsr
Gulf Coast Corridor Hsr
 
Northeast Hsr
Northeast HsrNortheast Hsr
Northeast Hsr
 
Nt Ebrochure
Nt EbrochureNt Ebrochure
Nt Ebrochure
 
Lobbyist Presentation for PPP in the US
Lobbyist Presentation for PPP in the USLobbyist Presentation for PPP in the US
Lobbyist Presentation for PPP in the US
 

Recently uploaded

FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
dollysharma2066
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Anamikakaur10
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
lizamodels9
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
Abortion pills in Kuwait Cytotec pills in Kuwait
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
amitlee9823
 
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
lizamodels9
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 

Recently uploaded (20)

Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceEluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
JAYNAGAR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
JAYNAGAR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLJAYNAGAR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
JAYNAGAR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
Falcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in indiaFalcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in india
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
 
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
Russian Call Girls In Rajiv Chowk Gurgaon ❤️8448577510 ⊹Best Escorts Service ...
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 

California Hsr

  • 1. Introduced by Will Kempton, Director California Department of Transportation
  • 2.
  • 3.
  • 4. California’s Commitment • $9 billion down payment by voters • 10 years/$100 million invested to plan route and complete Program-level EIR/EIS • $950 million committed to urban, intercity and commuter rail lines • Requirements for extensive oversight and fiscal controls
  • 5. California’s High-Speed Train – Unmatched Progress in the U.S. • Program-level EIR/EIS completed for 800-mile system • Up to 220 MPH linking Southern California, the Central Valley and the San Francisco Bay Area • International peer review of design, engineering and operations analyses • Unprecedented collection of the world's leading experts
  • 6. California’s High-Speed Train The Need • Without a high-speed train to meet demand of 50 million Californians by 2035, the state would need: • 3000 miles of new freeway lanes • Five new airport runways • 90 new departure gates • High-speed train will meet the demand at half the cost • Creates 600,000 construction-related jobs • More than 320,000 direct and indirect permanent jobs by 2035
  • 7. California’s High-Speed Train Environmental Benefits • 100% clean electric power • 1/3rd the energy of airplanes • 1/5th the energy of passenger cars • Reduced dependence on foreign oil by 12.7 million barrels a year • Greenhouse gases cut by 12 billion pounds a year
  • 8. California’s High-Speed Train Financial Benefits • Will return $150 billion -- about 3X value over system cost -- in next 40 years from • Requires no operating subsidies • Will generate over $2 billion in surplus revenues a year by 2035 • Will leverage private investment through public-private partnerships
  • 9. California’s High-Speed Train Timeline 2010-2012 • Complete environmental process in Los Angeles/Anaheim to San Francisco sections. Break ground on early project elements. 2015 •Begin demonstrating first prototype trainsets. 2018-2020 • Launch operation on San Francisco to Los Angeles/Anaheim segments.
  • 10.
  • 11. High-Speed Train Target Deliverables by 2012 • Specific Projects within: • Los Angeles to Anaheim corridor • San Francisco to San Jose corridor • Rights of way / preparation for heavy maintenance facility in Central Valley • Pre-construction engineering
  • 12.
  • 13. California’s Intercity Rail Network • With nearly 5.6 million passengers, California’s current intercity network: • Home to the 2nd, 3rd, and 6th busiest intercity passenger rail corridors in the country • Comprises 20 percent of all Amtrak passengers • Represents nearly half of the total ridership of Amtrak’s state-supported intrastate, intercity services • Parallels congested interstates • Kept more than 500 million vehicle miles traveled off state roadways in 2008 • Provides both stand alone utility and connectivity and integration with the high-speed rail system
  • 14.
  • 15.
  • 16.
  • 17.
  • 18.
  • 19.
  • 20. The California Commitment: Financial Investment • Consistent funding has resulted in nation’s most successful program • Nearly $2 billion in State capital invested to date—half in direct investments in tracks and signals owned by freight railroads • Ongoing investment program—bonds voted in November 2006 and November 2008—including $9 billion for true high speed rail (200+ mph) • Consistent operating support even during difficult economic times: • Since 1976, $880 million • In the 2008-09 year alone, $90 million
  • 21. The California Commitment: Planning • California’s rail network reflects a long-range, coordinated planning process • Corridor specific “Strategic Plans” — Long-term (20 year) vision of frequencies, running times, reliability, and amenities. Includes unconstrained cost estimates of capital and operational improvements to achieve vision. • State Rail Plan— Based on Corridor Strategic Plans and State Transportation Plan, a 10 year financially constrained plan of operational and capital improvements. Updated every two years. • State Transportation Improvement Program—Five year capital budget updated every two years. • Corridor Business Plans — Annual operational and capital plans.
  • 22. The California Commitment: Ready to Deliver! • Documented history of ability to deliver intercity rail projects-- $650 million since 2000 • Projects identified and coordinated with freight railroad partners—priorities based on modeling • Master Construction and Maintenance Agreements in place with Freight Railroads and Commuter partners
  • 23. The California Commitment: Ready to Deliver! • “Track 1” projects developed and design completed. State-level environmental and permitting completed and projects being “NEPA-ized” • “Track 1” projects will offer immediate improvements to the existing system and enhance development of high-speed network • “Track 2” projects will further help development of California’s high speed rail system
  • 24. The California Commitment Ready to be the Federal Government’s partner in improving the nation’s passenger rail network!