This document provides updates on various building projects that utilized the Astec coating system. It describes 10 projects of varying sizes from 49,000 square feet to 364,200 square feet. For each project, it identifies the client, dealer/contractor, type of building, and sometimes includes before and after photos showing the improvement from the Astec coating. The updates demonstrate how the coating system was used on roofs, walls and other building components to waterproof surfaces and improve conditions.
Axa Assurance Maroc - Insurer Innovation Award 2024
Astec Project Updates
1. PROJECT
UPDATE
Commodore Condominiums
Honolulu, HI
Photos Taken : August. 27, 2001
Project completed—1995
2. Client: Couch Distributing Dealer: Dinyari Construction
Watsonville, CA Project:: 49,000 square feet
Before project
commencement
During project -
After waterproofing of seams and
before ceramic finish coats
Completed project
3. Client: Minute Maid (Cold Storage) Dealer: Florida Exterior Coatings
Auburndale, Florida Project: 82,825 sq. ft. side walls
All chalking and surface
oxidation is removed and
primed with ASTEC #4000
Surface Conditioner
FINISH COAT
BEING APPLIED
BEFORE
AFTER
BEFORE
AFTER
AFTER
AFTER
4. Client: Neo-Plan Dealer: CCI-Commercial Roofing
Brownsville, TX Project Square Footage:
Roof-239,367 , Walls 66,473 = Total of 305,840
5. Client: Ernest N. Morial Convention Center Dealer: Continental Roofing
New Orleans, LA Project: 364,200 square feet
6. Client: Port of Pensacola Dealer: Gulf Coast Thermal Coatings
Pensacola, Florida Project:: 88,825 sq. ft. Roof & Side walls
II
7. Pro-Line Boats
Crystal River, FL
Sept. 2000
The Pro-Line Boat manufacturing facility in West-
Central Florida was plagued with numerous leaks.
The main culprit was a roof sprinkling system used
in an attempt to cool the fiberglass fabrication
building.
This large pumping system was used
to pump large amounts of water to the
roof. This created rust and corrosion
problems as well as compounding the
leaking roof problem.
Roof had several roof fans that could
not be used. The movement of air
would have been a production and
health problem from fiberglass fibers
blowing around. The roof fans were re-
moved. The roof also has many sky-
lights.
Another one of three buildings the were
treated with the Astec System
Temperatures inside the fabricating building
were sometimes near 100 degrees.
8. Pro-Line Boats
Pg.2
All horizontal and vertical seams were repaired as
needed and sealed. Skylights were sealed. Roof top
fans were removed and new metal installed.
Employees said they could feel an immediate drop
in the inside temperature as the coating was being
applied.
Aerial view of the fiberglass
fabricating building
Arrows indicate the three buildings receiving the
Astec System. Pro-Line has since asked for a bid
on their other facilities (Do nzi) in south Florida.
9. Client:: Queen of Peace Church Dealer: George Taylor Thermal Coatings
Ocala, Florida Project:: 35,000 Sq. Ft Sidewalls
11. Client: Washington Square Center Dealer: Thermacoat
Denver, Colorado Project: 14,000 sq. ft. side wall
ASTEC was specified as the finish
system for this new construction.
AFTER
AFTER