Advantages to Roundabouts
  •Improved Vehicle Safety
     • Both fewer crashes, and fewer injury crashes
  •Reduced wait time
     • Roundabouts have less traffic delay that
       comparable light-controlled intersections
  •Environmental impact
     • Reduced air pollution, oil and car debris runoff
Disadvantages to Roundabouts

 • Bicycle & Pedestrian Safety Problems
    • Increased accidents involving bicycles &
    pedestrians
 • Capital Cost
    • New roundabouts cost around $500,000 for
    construction
    • Additional costs for land acquisition, road curves
    to slow entering traffic, illumination, and signage.
Site Analysis: Minimum Site Requirements for
    Constructing a Roundabout

  •   Central island > 100 ft diameter

  •   < 4% grade across intersection

  •   < 4% grade for all approaches

  •   Clear line of site 50 ft. from approach intersections

  •   Approach flaring 130 ft. from intersection
Site Analysis: Private Property Take

   •   Alternatives 1-2: 11,500 sq. feet

   •   Alternatives 3-4: 57,820 sq. feet
Site Analysis: Hillside Removal
   2000000
              Roundabout Footprint      Approaches & Line of Sight
   1800000


   1600000


   1400000


   1200000


   1000000

 Cubic Feet
    800000


    600000


    400000


    200000


          0
                                 Alternative 1-2                     Alternative 3-4
Stakeholder Analysis: City of Powell
•   Supportive of any solutions ODOT is willing to
    provide since the road is slipping into river
•   Will not be pleased if congestion is lessened
    because of its impact on downtown Powell.
Stakeholder Analysis: Delaware County
•   Prefer a method that best facilitates traffic
    from Columbus to Delaware County and enables
    future growth in the area.
•   Economic activity is important to the area.
Stakeholder Analysis: Scenic Rivers
•   Concerned construction’s potential impact on:
    •   Wildlife
    •   River health
    •   Aesthetics


•   Preference would be absolutely no impacts on
    the Olentangy River
Stakeholder Analysis:
Friends of the Lower Olentangy River Watershed

 •   Distressed that construction would harm the
     “good part” of the river
     •   The Olentangy is “Exceptional Warm Water Habitat”
         at the intersection


 •   Preferred Alternatives 3-4 if necessary
Stakeholder Analysis: Homeowners’ Association
 •   According to the homeowners’ association,
     property owners in the area are concerned
     about:
     •   Property rights
     •   Traffic issues
     •   The green aesthetic of the area
 •   Regrading for the roundabout would cut into
     residential lots and require driveways to be
     rebuilt
Environmental Consequences
 •   Homeowners are concerned about the greenery
     and the extent to which roundabout construction
     would “scar the land”
 •   Homeowners are divided:
     •   Some would like to see congestion eased
     •   Some like the congestion because it keeps traffic slow
     •   All value the forested character of the area and would
         not support a solution that would change that
         character
Stakeholder Analysis:
Regional Planning: MORPC
•   200 roadway projects under review in the region
•   MORPC Engineers considered a roundabout too
    expensive
•   Excessive development has been a problem in
    the area
•   Conflict between ODOT and Powell over
    development too close to the river
Stakeholder Analysis: ODOT
•   Considering 5 alternatives, none of which is a
    roundabout
•   Contact person for project was unwilling to
    comment specifically regarding a roundabout
Environmental Consequences
•   Removal of riparian vegetation
    •   Removal of organic material
    •   Increased erosion potential around river
    •   Implications for species survival/dominance
•   Disruption of mussel beds and other species
•   Ground water flow impacts
•   River water quality
    •   Siltation of river
    •   Acidification of river water during construction
•   Increased imperviousness
    •   Stormwater runoff implications
Environmental Consequences
•   Very high quality section of the Olentangy River
    at this site
•   Meets Exceptional Warm Water Habitat (EWWH)
    criteria
    •   “Unusual and exceptional” assemblages of organisms
    •   High diversity of species, including endangered
        mussels
•   Pristine water quality
Consequence Mitigation Techniques
•   Potential environmental benefit of increased shade from
    bridge to offset less tree cover
•   Relocation of mussels and other valuable species
•   Designate additional riparian conservation sites within
    watershed
•   Use center of roundabout as rain garden to mitigate
    increase in impervious surface
•   Exceptional quality of river and surrounding habitat at
    this site makes the potential for comparable mitigation
    unlikely
Conclusions
 •   Roundabouts generally meet many 315/750
     intersection needs
     •   Traffic management, increased safety, improved air
         quality
 •   However, intersection lacks physical suitability
     for roundabout needs
     •   Lack of space
     •   Grade
     •   Proximity of river
 •   Prohibitive economic and environmental costs
Conclusions
 •   Lessons learned for transportation planning
     •   Problems with building close to river and other
         environmentally valuable sites
     •   Importance of multi-modal transportation options
     •   Connection between land use, growth, and
         transportation
Conclusions
 •   Future Recommendations
     •   Limit need for this and other vulnerable roads
     •   Factor in projected commercial and residential
         growth/decline in transportation planning projects
     •   Factor in energy, time, and other commuting costs
         for greater Delaware County area
     •   Assemble stakeholders early in project planning
         process to achieve community buy-in

Weitere ähnliche Inhalte

Was ist angesagt?

Types of intersection of road and design parameters of road intersection
Types of intersection of road and design parameters of road intersectionTypes of intersection of road and design parameters of road intersection
Types of intersection of road and design parameters of road intersectionwaiseee
 
Balintawak Interchange in Metro Manila
Balintawak Interchange in Metro ManilaBalintawak Interchange in Metro Manila
Balintawak Interchange in Metro Manilaharoldtaylor1113
 
Importance and Classification of Road
Importance and Classification of RoadImportance and Classification of Road
Importance and Classification of RoadShrikant Ingale
 
Designing the highway 2
Designing the highway 2Designing the highway 2
Designing the highway 2Rron de Guzman
 
Continuous Flow Intersection
Continuous Flow IntersectionContinuous Flow Intersection
Continuous Flow Intersectionpankaj kumar
 
Roundabouts for Traffic Engineering ~ Athens GA
Roundabouts for Traffic Engineering ~ Athens GARoundabouts for Traffic Engineering ~ Athens GA
Roundabouts for Traffic Engineering ~ Athens GAWilliams and Associates
 
FCDOT: Rolling Road Widening from Fullerton Road to Delong Drive-Apr.19, 2012
FCDOT: Rolling Road Widening from Fullerton Road to Delong Drive-Apr.19, 2012FCDOT: Rolling Road Widening from Fullerton Road to Delong Drive-Apr.19, 2012
FCDOT: Rolling Road Widening from Fullerton Road to Delong Drive-Apr.19, 2012Fairfax County
 
FCDOT: Rolling Road Widening from Fullerton Road to Delong Drive-Oct. 27, 2011
FCDOT: Rolling Road Widening from Fullerton Road to Delong Drive-Oct. 27, 2011FCDOT: Rolling Road Widening from Fullerton Road to Delong Drive-Oct. 27, 2011
FCDOT: Rolling Road Widening from Fullerton Road to Delong Drive-Oct. 27, 2011Fairfax County
 
Location controls and highway classification
Location controls and highway classificationLocation controls and highway classification
Location controls and highway classificationRana Ibrahim
 
Road types and Road networks
Road types and Road networksRoad types and Road networks
Road types and Road networksSwapnil Joshi
 
Intersections & Interchanges ( Highway Engineering Dr. Sherif El-Badawy )
Intersections & Interchanges ( Highway Engineering Dr. Sherif El-Badawy )Intersections & Interchanges ( Highway Engineering Dr. Sherif El-Badawy )
Intersections & Interchanges ( Highway Engineering Dr. Sherif El-Badawy )Hossam Shafiq I
 
1. classification of urban roads 28 jun
1. classification of urban roads 28 jun1. classification of urban roads 28 jun
1. classification of urban roads 28 junPrathamesh Kulkarni
 
Introduction to transportation engineering
Introduction to transportation engineeringIntroduction to transportation engineering
Introduction to transportation engineeringCivil Zone
 

Was ist angesagt? (20)

Types of intersection of road and design parameters of road intersection
Types of intersection of road and design parameters of road intersectionTypes of intersection of road and design parameters of road intersection
Types of intersection of road and design parameters of road intersection
 
Balintawak Interchange in Metro Manila
Balintawak Interchange in Metro ManilaBalintawak Interchange in Metro Manila
Balintawak Interchange in Metro Manila
 
Intersection,types
Intersection,typesIntersection,types
Intersection,types
 
Importance and Classification of Road
Importance and Classification of RoadImportance and Classification of Road
Importance and Classification of Road
 
Urban roads
Urban roadsUrban roads
Urban roads
 
Designing the highway 2
Designing the highway 2Designing the highway 2
Designing the highway 2
 
Continuous Flow Intersection
Continuous Flow IntersectionContinuous Flow Intersection
Continuous Flow Intersection
 
Roundabouts for Traffic Engineering ~ Athens GA
Roundabouts for Traffic Engineering ~ Athens GARoundabouts for Traffic Engineering ~ Athens GA
Roundabouts for Traffic Engineering ~ Athens GA
 
Widening of curve
Widening of curveWidening of curve
Widening of curve
 
FCDOT: Rolling Road Widening from Fullerton Road to Delong Drive-Apr.19, 2012
FCDOT: Rolling Road Widening from Fullerton Road to Delong Drive-Apr.19, 2012FCDOT: Rolling Road Widening from Fullerton Road to Delong Drive-Apr.19, 2012
FCDOT: Rolling Road Widening from Fullerton Road to Delong Drive-Apr.19, 2012
 
FCDOT: Rolling Road Widening from Fullerton Road to Delong Drive-Oct. 27, 2011
FCDOT: Rolling Road Widening from Fullerton Road to Delong Drive-Oct. 27, 2011FCDOT: Rolling Road Widening from Fullerton Road to Delong Drive-Oct. 27, 2011
FCDOT: Rolling Road Widening from Fullerton Road to Delong Drive-Oct. 27, 2011
 
Road patten
Road pattenRoad patten
Road patten
 
Location controls and highway classification
Location controls and highway classificationLocation controls and highway classification
Location controls and highway classification
 
Intersection designs ppt
Intersection designs pptIntersection designs ppt
Intersection designs ppt
 
Road types and Road networks
Road types and Road networksRoad types and Road networks
Road types and Road networks
 
Intersections
IntersectionsIntersections
Intersections
 
Intersections & Interchanges ( Highway Engineering Dr. Sherif El-Badawy )
Intersections & Interchanges ( Highway Engineering Dr. Sherif El-Badawy )Intersections & Interchanges ( Highway Engineering Dr. Sherif El-Badawy )
Intersections & Interchanges ( Highway Engineering Dr. Sherif El-Badawy )
 
1. classification of urban roads 28 jun
1. classification of urban roads 28 jun1. classification of urban roads 28 jun
1. classification of urban roads 28 jun
 
Introduction to transportation engineering
Introduction to transportation engineeringIntroduction to transportation engineering
Introduction to transportation engineering
 
Group 5 1
Group 5 1Group 5 1
Group 5 1
 

Andere mochten auch

Traffic circles & roundabouts
Traffic circles & roundaboutsTraffic circles & roundabouts
Traffic circles & roundaboutsTHECITYALLIANCE
 
New Residential Project in Powai by Lake Riviera
New Residential Project in Powai by Lake RivieraNew Residential Project in Powai by Lake Riviera
New Residential Project in Powai by Lake RivieraJennifer Johner
 
Climate Change by Green Yatra
Climate Change by  Green YatraClimate Change by  Green Yatra
Climate Change by Green YatraGreen Yatra
 
FWHA Roundabout Presentation 8 18 2009
FWHA Roundabout Presentation  8 18 2009FWHA Roundabout Presentation  8 18 2009
FWHA Roundabout Presentation 8 18 2009guest25d44f
 
Evs powai lake ppt
Evs powai lake ppt Evs powai lake ppt
Evs powai lake ppt Anush Shenoy
 
Lec 12 Capacity Analysis (Transportation Engineering Dr.Lina Shbeeb)
Lec 12 Capacity Analysis (Transportation Engineering Dr.Lina Shbeeb)Lec 12 Capacity Analysis (Transportation Engineering Dr.Lina Shbeeb)
Lec 12 Capacity Analysis (Transportation Engineering Dr.Lina Shbeeb)Hossam Shafiq I
 
Roundabouts on the road to sustainability
Roundabouts on the road to sustainabilityRoundabouts on the road to sustainability
Roundabouts on the road to sustainabilityJill Berberich
 
Queuing theory and traffic flow analysis
Queuing theory and traffic flow analysisQueuing theory and traffic flow analysis
Queuing theory and traffic flow analysisReymond Dy
 
Rectangular tank example_latest
Rectangular tank example_latestRectangular tank example_latest
Rectangular tank example_latestVedachalam Mani
 
Introduction to queueing theory
Introduction to queueing theoryIntroduction to queueing theory
Introduction to queueing theoryPresi
 
Stanley park case study
Stanley park case studyStanley park case study
Stanley park case studytarabosch
 
Lodhi (or Lodi) Garden - New Delhi... popular tourist place for greenery lovers
Lodhi (or Lodi) Garden - New Delhi... popular tourist place for greenery loversLodhi (or Lodi) Garden - New Delhi... popular tourist place for greenery lovers
Lodhi (or Lodi) Garden - New Delhi... popular tourist place for greenery loversAmit Ranjan
 

Andere mochten auch (20)

Traffic circles & roundabouts
Traffic circles & roundaboutsTraffic circles & roundabouts
Traffic circles & roundabouts
 
Porozni asfalt
Porozni asfaltPorozni asfalt
Porozni asfalt
 
Park design
Park designPark design
Park design
 
New Residential Project in Powai by Lake Riviera
New Residential Project in Powai by Lake RivieraNew Residential Project in Powai by Lake Riviera
New Residential Project in Powai by Lake Riviera
 
516 Queuing
516 Queuing516 Queuing
516 Queuing
 
P1
P1P1
P1
 
Climate Change by Green Yatra
Climate Change by  Green YatraClimate Change by  Green Yatra
Climate Change by Green Yatra
 
FWHA Roundabout Presentation 8 18 2009
FWHA Roundabout Presentation  8 18 2009FWHA Roundabout Presentation  8 18 2009
FWHA Roundabout Presentation 8 18 2009
 
Evs powai lake ppt
Evs powai lake ppt Evs powai lake ppt
Evs powai lake ppt
 
Lec 12 Capacity Analysis (Transportation Engineering Dr.Lina Shbeeb)
Lec 12 Capacity Analysis (Transportation Engineering Dr.Lina Shbeeb)Lec 12 Capacity Analysis (Transportation Engineering Dr.Lina Shbeeb)
Lec 12 Capacity Analysis (Transportation Engineering Dr.Lina Shbeeb)
 
Roundabouts on the road to sustainability
Roundabouts on the road to sustainabilityRoundabouts on the road to sustainability
Roundabouts on the road to sustainability
 
Queuing theory and traffic flow analysis
Queuing theory and traffic flow analysisQueuing theory and traffic flow analysis
Queuing theory and traffic flow analysis
 
Traffic Flow
Traffic FlowTraffic Flow
Traffic Flow
 
Rectangular tank example_latest
Rectangular tank example_latestRectangular tank example_latest
Rectangular tank example_latest
 
IUCAA
IUCAAIUCAA
IUCAA
 
Introduction to queueing theory
Introduction to queueing theoryIntroduction to queueing theory
Introduction to queueing theory
 
Stanley park case study
Stanley park case studyStanley park case study
Stanley park case study
 
QUEUING THEORY
QUEUING THEORY QUEUING THEORY
QUEUING THEORY
 
Lodhi (or Lodi) Garden - New Delhi... popular tourist place for greenery lovers
Lodhi (or Lodi) Garden - New Delhi... popular tourist place for greenery loversLodhi (or Lodi) Garden - New Delhi... popular tourist place for greenery lovers
Lodhi (or Lodi) Garden - New Delhi... popular tourist place for greenery lovers
 
Queuing theory
Queuing theoryQueuing theory
Queuing theory
 

Ähnlich wie Roundabout feasibility analysis

LMPP Final Presentation_FINAL1
LMPP Final Presentation_FINAL1LMPP Final Presentation_FINAL1
LMPP Final Presentation_FINAL1Theodore McNeal
 
Dead Run Segment One Stream Restoration Project
Dead Run Segment One Stream Restoration ProjectDead Run Segment One Stream Restoration Project
Dead Run Segment One Stream Restoration ProjectFairfax County
 
Investigation for bridge construction
Investigation for bridge constructionInvestigation for bridge construction
Investigation for bridge constructionMadujith Sagara
 
Huntington Levee Community Meeting
Huntington Levee Community MeetingHuntington Levee Community Meeting
Huntington Levee Community MeetingFairfax County
 
Highway drainage system and how it works
Highway drainage system and how it worksHighway drainage system and how it works
Highway drainage system and how it worksRana Ibrahim
 
Pmev site charette 12feb2011_abbr
Pmev site charette 12feb2011_abbrPmev site charette 12feb2011_abbr
Pmev site charette 12feb2011_abbrsustainabilityjane
 
Sandra Manning Jones Trees on the River Uck
Sandra Manning Jones Trees on the River UckSandra Manning Jones Trees on the River Uck
Sandra Manning Jones Trees on the River Uckobjectiveassociates
 
Paynes Prairie Sheetflow Restoration - FSA Presentation
Paynes Prairie Sheetflow Restoration - FSA PresentationPaynes Prairie Sheetflow Restoration - FSA Presentation
Paynes Prairie Sheetflow Restoration - FSA PresentationJones Edmunds
 
Southwestern Energy Presentation - Hydraulic Fracturing
Southwestern Energy Presentation - Hydraulic FracturingSouthwestern Energy Presentation - Hydraulic Fracturing
Southwestern Energy Presentation - Hydraulic Fracturingnorthamericanrses
 
June 2014 hf operations (handout-na student summit)
June 2014   hf operations (handout-na student summit)June 2014   hf operations (handout-na student summit)
June 2014 hf operations (handout-na student summit)Shifali Gupta
 
Streets and parking design
Streets and parking designStreets and parking design
Streets and parking designwaseem khan
 
Little Pimmit Run at Chesterbrook Stream Restoration Project and Little Pimmi...
Little Pimmit Run at Chesterbrook Stream Restoration Project and Little Pimmi...Little Pimmit Run at Chesterbrook Stream Restoration Project and Little Pimmi...
Little Pimmit Run at Chesterbrook Stream Restoration Project and Little Pimmi...Fairfax County
 
Little Pimmit Run at Chesterbrook Road Stream Restoration and Sanitary Reali...
 Little Pimmit Run at Chesterbrook Road Stream Restoration and Sanitary Reali... Little Pimmit Run at Chesterbrook Road Stream Restoration and Sanitary Reali...
Little Pimmit Run at Chesterbrook Road Stream Restoration and Sanitary Reali...Fairfax County
 
Long Branch at Arlington Boulevard and Robin Ridge Court - Concept Design and...
Long Branch at Arlington Boulevard and Robin Ridge Court - Concept Design and...Long Branch at Arlington Boulevard and Robin Ridge Court - Concept Design and...
Long Branch at Arlington Boulevard and Robin Ridge Court - Concept Design and...Fairfax County
 

Ähnlich wie Roundabout feasibility analysis (20)

Fairhill/MLK pre-construction public meeting 3-25-2015
Fairhill/MLK pre-construction public meeting 3-25-2015Fairhill/MLK pre-construction public meeting 3-25-2015
Fairhill/MLK pre-construction public meeting 3-25-2015
 
Kestrel pres feb 13, 13
Kestrel pres feb 13, 13Kestrel pres feb 13, 13
Kestrel pres feb 13, 13
 
LMPP Final Presentation_FINAL1
LMPP Final Presentation_FINAL1LMPP Final Presentation_FINAL1
LMPP Final Presentation_FINAL1
 
W02 palm beach par 3 golf course-schanen
W02 palm beach par 3 golf course-schanenW02 palm beach par 3 golf course-schanen
W02 palm beach par 3 golf course-schanen
 
Dead Run Segment One Stream Restoration Project
Dead Run Segment One Stream Restoration ProjectDead Run Segment One Stream Restoration Project
Dead Run Segment One Stream Restoration Project
 
Investigation for bridge construction
Investigation for bridge constructionInvestigation for bridge construction
Investigation for bridge construction
 
Huntington Levee Community Meeting
Huntington Levee Community MeetingHuntington Levee Community Meeting
Huntington Levee Community Meeting
 
Highway drainage system and how it works
Highway drainage system and how it worksHighway drainage system and how it works
Highway drainage system and how it works
 
Pmev site charette 12feb2011_abbr
Pmev site charette 12feb2011_abbrPmev site charette 12feb2011_abbr
Pmev site charette 12feb2011_abbr
 
Lawrence Park PIC 3 slides
Lawrence Park PIC 3 slidesLawrence Park PIC 3 slides
Lawrence Park PIC 3 slides
 
Sandra Manning Jones Trees on the River Uck
Sandra Manning Jones Trees on the River UckSandra Manning Jones Trees on the River Uck
Sandra Manning Jones Trees on the River Uck
 
Paynes Prairie Sheetflow Restoration - FSA Presentation
Paynes Prairie Sheetflow Restoration - FSA PresentationPaynes Prairie Sheetflow Restoration - FSA Presentation
Paynes Prairie Sheetflow Restoration - FSA Presentation
 
Southwestern Energy Presentation - Hydraulic Fracturing
Southwestern Energy Presentation - Hydraulic FracturingSouthwestern Energy Presentation - Hydraulic Fracturing
Southwestern Energy Presentation - Hydraulic Fracturing
 
June 2014 hf operations (handout-na student summit)
June 2014   hf operations (handout-na student summit)June 2014   hf operations (handout-na student summit)
June 2014 hf operations (handout-na student summit)
 
Streets and parking design
Streets and parking designStreets and parking design
Streets and parking design
 
Little Pimmit Run at Chesterbrook Stream Restoration Project and Little Pimmi...
Little Pimmit Run at Chesterbrook Stream Restoration Project and Little Pimmi...Little Pimmit Run at Chesterbrook Stream Restoration Project and Little Pimmi...
Little Pimmit Run at Chesterbrook Stream Restoration Project and Little Pimmi...
 
Little Pimmit Run at Chesterbrook Road Stream Restoration and Sanitary Reali...
 Little Pimmit Run at Chesterbrook Road Stream Restoration and Sanitary Reali... Little Pimmit Run at Chesterbrook Road Stream Restoration and Sanitary Reali...
Little Pimmit Run at Chesterbrook Road Stream Restoration and Sanitary Reali...
 
Road Salt Reduction Initiatives in the Adirondacks
Road Salt Reduction Initiatives in the AdirondacksRoad Salt Reduction Initiatives in the Adirondacks
Road Salt Reduction Initiatives in the Adirondacks
 
Long Branch at Arlington Boulevard and Robin Ridge Court - Concept Design and...
Long Branch at Arlington Boulevard and Robin Ridge Court - Concept Design and...Long Branch at Arlington Boulevard and Robin Ridge Court - Concept Design and...
Long Branch at Arlington Boulevard and Robin Ridge Court - Concept Design and...
 
East Don Trail - Design Concepts
East Don Trail - Design ConceptsEast Don Trail - Design Concepts
East Don Trail - Design Concepts
 

Mehr von Anna McCreery

When and How Do Movements Matter? The Complex Effects of the Air Quality Mov...
When and How Do Movements Matter?  The Complex Effects of the Air Quality Mov...When and How Do Movements Matter?  The Complex Effects of the Air Quality Mov...
When and How Do Movements Matter? The Complex Effects of the Air Quality Mov...Anna McCreery
 
House Parties for Energy Efficiency: Outcomes of Community Organizing for Ene...
House Parties for Energy Efficiency: Outcomes of Community Organizing for Ene...House Parties for Energy Efficiency: Outcomes of Community Organizing for Ene...
House Parties for Energy Efficiency: Outcomes of Community Organizing for Ene...Anna McCreery
 
Transportation Ecoefficiency and Economic Structure: Six case studies of occu...
Transportation Ecoefficiency and Economic Structure: Six case studies of occu...Transportation Ecoefficiency and Economic Structure: Six case studies of occu...
Transportation Ecoefficiency and Economic Structure: Six case studies of occu...Anna McCreery
 
Transportation Ecoefficiency: Social and Political Drivers in U.S. Metropolit...
Transportation Ecoefficiency: Social and Political Drivers in U.S. Metropolit...Transportation Ecoefficiency: Social and Political Drivers in U.S. Metropolit...
Transportation Ecoefficiency: Social and Political Drivers in U.S. Metropolit...Anna McCreery
 
Do Social Movements Matter?
Do Social Movements Matter? Do Social Movements Matter?
Do Social Movements Matter? Anna McCreery
 
NiSource Conflict Analysis
NiSource Conflict AnalysisNiSource Conflict Analysis
NiSource Conflict AnalysisAnna McCreery
 
Transportation Ecoefficiency: Social and Political Forces for Change in U.S. ...
Transportation Ecoefficiency: Social and Political Forces for Change in U.S. ...Transportation Ecoefficiency: Social and Political Forces for Change in U.S. ...
Transportation Ecoefficiency: Social and Political Forces for Change in U.S. ...Anna McCreery
 
Urban Transportation Ecoefficiency: Social and Political Forces for Change in...
Urban Transportation Ecoefficiency: Social and Political Forces for Change in...Urban Transportation Ecoefficiency: Social and Political Forces for Change in...
Urban Transportation Ecoefficiency: Social and Political Forces for Change in...Anna McCreery
 
Development Potential: The Joint Influence of High Population Growth and a ...
Development Potential:  The Joint Influence of High Population Growth  and a ...Development Potential:  The Joint Influence of High Population Growth  and a ...
Development Potential: The Joint Influence of High Population Growth and a ...Anna McCreery
 
Political Drivers of Air Pollution in the U.S.: A Time-Series Analysis (1959-...
Political Drivers of Air Pollution in the U.S.: A Time-Series Analysis (1959-...Political Drivers of Air Pollution in the U.S.: A Time-Series Analysis (1959-...
Political Drivers of Air Pollution in the U.S.: A Time-Series Analysis (1959-...Anna McCreery
 
Political and Economic Theories of Environmental Impact: An empirical test of...
Political and Economic Theories of Environmental Impact: An empirical test of...Political and Economic Theories of Environmental Impact: An empirical test of...
Political and Economic Theories of Environmental Impact: An empirical test of...Anna McCreery
 
Transportation Ecoefficiency: Quantitative Measurement of Urban Transportatio...
Transportation Ecoefficiency: Quantitative Measurement of Urban Transportatio...Transportation Ecoefficiency: Quantitative Measurement of Urban Transportatio...
Transportation Ecoefficiency: Quantitative Measurement of Urban Transportatio...Anna McCreery
 

Mehr von Anna McCreery (14)

When and How Do Movements Matter? The Complex Effects of the Air Quality Mov...
When and How Do Movements Matter?  The Complex Effects of the Air Quality Mov...When and How Do Movements Matter?  The Complex Effects of the Air Quality Mov...
When and How Do Movements Matter? The Complex Effects of the Air Quality Mov...
 
House Parties for Energy Efficiency: Outcomes of Community Organizing for Ene...
House Parties for Energy Efficiency: Outcomes of Community Organizing for Ene...House Parties for Energy Efficiency: Outcomes of Community Organizing for Ene...
House Parties for Energy Efficiency: Outcomes of Community Organizing for Ene...
 
Transportation Ecoefficiency and Economic Structure: Six case studies of occu...
Transportation Ecoefficiency and Economic Structure: Six case studies of occu...Transportation Ecoefficiency and Economic Structure: Six case studies of occu...
Transportation Ecoefficiency and Economic Structure: Six case studies of occu...
 
Transportation Ecoefficiency: Social and Political Drivers in U.S. Metropolit...
Transportation Ecoefficiency: Social and Political Drivers in U.S. Metropolit...Transportation Ecoefficiency: Social and Political Drivers in U.S. Metropolit...
Transportation Ecoefficiency: Social and Political Drivers in U.S. Metropolit...
 
Columbus TE Score
Columbus TE ScoreColumbus TE Score
Columbus TE Score
 
Do Social Movements Matter?
Do Social Movements Matter? Do Social Movements Matter?
Do Social Movements Matter?
 
Transportation map
Transportation mapTransportation map
Transportation map
 
NiSource Conflict Analysis
NiSource Conflict AnalysisNiSource Conflict Analysis
NiSource Conflict Analysis
 
Transportation Ecoefficiency: Social and Political Forces for Change in U.S. ...
Transportation Ecoefficiency: Social and Political Forces for Change in U.S. ...Transportation Ecoefficiency: Social and Political Forces for Change in U.S. ...
Transportation Ecoefficiency: Social and Political Forces for Change in U.S. ...
 
Urban Transportation Ecoefficiency: Social and Political Forces for Change in...
Urban Transportation Ecoefficiency: Social and Political Forces for Change in...Urban Transportation Ecoefficiency: Social and Political Forces for Change in...
Urban Transportation Ecoefficiency: Social and Political Forces for Change in...
 
Development Potential: The Joint Influence of High Population Growth and a ...
Development Potential:  The Joint Influence of High Population Growth  and a ...Development Potential:  The Joint Influence of High Population Growth  and a ...
Development Potential: The Joint Influence of High Population Growth and a ...
 
Political Drivers of Air Pollution in the U.S.: A Time-Series Analysis (1959-...
Political Drivers of Air Pollution in the U.S.: A Time-Series Analysis (1959-...Political Drivers of Air Pollution in the U.S.: A Time-Series Analysis (1959-...
Political Drivers of Air Pollution in the U.S.: A Time-Series Analysis (1959-...
 
Political and Economic Theories of Environmental Impact: An empirical test of...
Political and Economic Theories of Environmental Impact: An empirical test of...Political and Economic Theories of Environmental Impact: An empirical test of...
Political and Economic Theories of Environmental Impact: An empirical test of...
 
Transportation Ecoefficiency: Quantitative Measurement of Urban Transportatio...
Transportation Ecoefficiency: Quantitative Measurement of Urban Transportatio...Transportation Ecoefficiency: Quantitative Measurement of Urban Transportatio...
Transportation Ecoefficiency: Quantitative Measurement of Urban Transportatio...
 

Kürzlich hochgeladen

The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxLoriGlavin3
 
React JS; all concepts. Contains React Features, JSX, functional & Class comp...
React JS; all concepts. Contains React Features, JSX, functional & Class comp...React JS; all concepts. Contains React Features, JSX, functional & Class comp...
React JS; all concepts. Contains React Features, JSX, functional & Class comp...Karmanjay Verma
 
A Framework for Development in the AI Age
A Framework for Development in the AI AgeA Framework for Development in the AI Age
A Framework for Development in the AI AgeCprime
 
Microservices, Docker deploy and Microservices source code in C#
Microservices, Docker deploy and Microservices source code in C#Microservices, Docker deploy and Microservices source code in C#
Microservices, Docker deploy and Microservices source code in C#Karmanjay Verma
 
So einfach geht modernes Roaming fuer Notes und Nomad.pdf
So einfach geht modernes Roaming fuer Notes und Nomad.pdfSo einfach geht modernes Roaming fuer Notes und Nomad.pdf
So einfach geht modernes Roaming fuer Notes und Nomad.pdfpanagenda
 
MuleSoft Online Meetup Group - B2B Crash Course: Release SparkNotes
MuleSoft Online Meetup Group - B2B Crash Course: Release SparkNotesMuleSoft Online Meetup Group - B2B Crash Course: Release SparkNotes
MuleSoft Online Meetup Group - B2B Crash Course: Release SparkNotesManik S Magar
 
[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality Assurance[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality AssuranceInflectra
 
Genislab builds better products and faster go-to-market with Lean project man...
Genislab builds better products and faster go-to-market with Lean project man...Genislab builds better products and faster go-to-market with Lean project man...
Genislab builds better products and faster go-to-market with Lean project man...Farhan Tariq
 
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyesHow to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyesThousandEyes
 
Connecting the Dots for Information Discovery.pdf
Connecting the Dots for Information Discovery.pdfConnecting the Dots for Information Discovery.pdf
Connecting the Dots for Information Discovery.pdfNeo4j
 
Zeshan Sattar- Assessing the skill requirements and industry expectations for...
Zeshan Sattar- Assessing the skill requirements and industry expectations for...Zeshan Sattar- Assessing the skill requirements and industry expectations for...
Zeshan Sattar- Assessing the skill requirements and industry expectations for...itnewsafrica
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxLoriGlavin3
 
Email Marketing Automation for Bonterra Impact Management (fka Social Solutio...
Email Marketing Automation for Bonterra Impact Management (fka Social Solutio...Email Marketing Automation for Bonterra Impact Management (fka Social Solutio...
Email Marketing Automation for Bonterra Impact Management (fka Social Solutio...Jeffrey Haguewood
 
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxDigital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxLoriGlavin3
 
Generative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdfGenerative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdfIngrid Airi González
 
A Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software DevelopersA Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software DevelopersNicole Novielli
 
QCon London: Mastering long-running processes in modern architectures
QCon London: Mastering long-running processes in modern architecturesQCon London: Mastering long-running processes in modern architectures
QCon London: Mastering long-running processes in modern architecturesBernd Ruecker
 
Bridging Between CAD & GIS: 6 Ways to Automate Your Data Integration
Bridging Between CAD & GIS:  6 Ways to Automate Your Data IntegrationBridging Between CAD & GIS:  6 Ways to Automate Your Data Integration
Bridging Between CAD & GIS: 6 Ways to Automate Your Data Integrationmarketing932765
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxLoriGlavin3
 
Generative AI - Gitex v1Generative AI - Gitex v1.pptx
Generative AI - Gitex v1Generative AI - Gitex v1.pptxGenerative AI - Gitex v1Generative AI - Gitex v1.pptx
Generative AI - Gitex v1Generative AI - Gitex v1.pptxfnnc6jmgwh
 

Kürzlich hochgeladen (20)

The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptx
 
React JS; all concepts. Contains React Features, JSX, functional & Class comp...
React JS; all concepts. Contains React Features, JSX, functional & Class comp...React JS; all concepts. Contains React Features, JSX, functional & Class comp...
React JS; all concepts. Contains React Features, JSX, functional & Class comp...
 
A Framework for Development in the AI Age
A Framework for Development in the AI AgeA Framework for Development in the AI Age
A Framework for Development in the AI Age
 
Microservices, Docker deploy and Microservices source code in C#
Microservices, Docker deploy and Microservices source code in C#Microservices, Docker deploy and Microservices source code in C#
Microservices, Docker deploy and Microservices source code in C#
 
So einfach geht modernes Roaming fuer Notes und Nomad.pdf
So einfach geht modernes Roaming fuer Notes und Nomad.pdfSo einfach geht modernes Roaming fuer Notes und Nomad.pdf
So einfach geht modernes Roaming fuer Notes und Nomad.pdf
 
MuleSoft Online Meetup Group - B2B Crash Course: Release SparkNotes
MuleSoft Online Meetup Group - B2B Crash Course: Release SparkNotesMuleSoft Online Meetup Group - B2B Crash Course: Release SparkNotes
MuleSoft Online Meetup Group - B2B Crash Course: Release SparkNotes
 
[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality Assurance[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality Assurance
 
Genislab builds better products and faster go-to-market with Lean project man...
Genislab builds better products and faster go-to-market with Lean project man...Genislab builds better products and faster go-to-market with Lean project man...
Genislab builds better products and faster go-to-market with Lean project man...
 
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyesHow to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
 
Connecting the Dots for Information Discovery.pdf
Connecting the Dots for Information Discovery.pdfConnecting the Dots for Information Discovery.pdf
Connecting the Dots for Information Discovery.pdf
 
Zeshan Sattar- Assessing the skill requirements and industry expectations for...
Zeshan Sattar- Assessing the skill requirements and industry expectations for...Zeshan Sattar- Assessing the skill requirements and industry expectations for...
Zeshan Sattar- Assessing the skill requirements and industry expectations for...
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
 
Email Marketing Automation for Bonterra Impact Management (fka Social Solutio...
Email Marketing Automation for Bonterra Impact Management (fka Social Solutio...Email Marketing Automation for Bonterra Impact Management (fka Social Solutio...
Email Marketing Automation for Bonterra Impact Management (fka Social Solutio...
 
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxDigital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
 
Generative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdfGenerative Artificial Intelligence: How generative AI works.pdf
Generative Artificial Intelligence: How generative AI works.pdf
 
A Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software DevelopersA Journey Into the Emotions of Software Developers
A Journey Into the Emotions of Software Developers
 
QCon London: Mastering long-running processes in modern architectures
QCon London: Mastering long-running processes in modern architecturesQCon London: Mastering long-running processes in modern architectures
QCon London: Mastering long-running processes in modern architectures
 
Bridging Between CAD & GIS: 6 Ways to Automate Your Data Integration
Bridging Between CAD & GIS:  6 Ways to Automate Your Data IntegrationBridging Between CAD & GIS:  6 Ways to Automate Your Data Integration
Bridging Between CAD & GIS: 6 Ways to Automate Your Data Integration
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
 
Generative AI - Gitex v1Generative AI - Gitex v1.pptx
Generative AI - Gitex v1Generative AI - Gitex v1.pptxGenerative AI - Gitex v1Generative AI - Gitex v1.pptx
Generative AI - Gitex v1Generative AI - Gitex v1.pptx
 

Roundabout feasibility analysis

  • 1. State Routes 315 and 750: A Roundabout Approach to a Solution Ian Ausprey. Ariel Godwin. Amanda King. Stephen Mayer. Anna McCreery.
  • 2.
  • 3. Advantages to Roundabouts •Improved Vehicle Safety • Both fewer crashes, and fewer injury crashes •Reduced wait time • Roundabouts have less traffic delay that comparable light-controlled intersections •Environmental impact • Reduced air pollution, oil and car debris runoff
  • 4. Disadvantages to Roundabouts • Bicycle & Pedestrian Safety Problems • Increased accidents involving bicycles & pedestrians • Capital Cost • New roundabouts cost around $500,000 for construction • Additional costs for land acquisition, road curves to slow entering traffic, illumination, and signage.
  • 5. Site Analysis: Minimum Site Requirements for Constructing a Roundabout • Central island > 100 ft diameter • < 4% grade across intersection • < 4% grade for all approaches • Clear line of site 50 ft. from approach intersections • Approach flaring 130 ft. from intersection
  • 6.
  • 7.
  • 8.
  • 9.
  • 10.
  • 11. Site Analysis: Private Property Take • Alternatives 1-2: 11,500 sq. feet • Alternatives 3-4: 57,820 sq. feet
  • 12. Site Analysis: Hillside Removal 2000000 Roundabout Footprint Approaches & Line of Sight 1800000 1600000 1400000 1200000 1000000 Cubic Feet 800000 600000 400000 200000 0 Alternative 1-2 Alternative 3-4
  • 13. Stakeholder Analysis: City of Powell • Supportive of any solutions ODOT is willing to provide since the road is slipping into river • Will not be pleased if congestion is lessened because of its impact on downtown Powell.
  • 14. Stakeholder Analysis: Delaware County • Prefer a method that best facilitates traffic from Columbus to Delaware County and enables future growth in the area. • Economic activity is important to the area.
  • 15. Stakeholder Analysis: Scenic Rivers • Concerned construction’s potential impact on: • Wildlife • River health • Aesthetics • Preference would be absolutely no impacts on the Olentangy River
  • 16. Stakeholder Analysis: Friends of the Lower Olentangy River Watershed • Distressed that construction would harm the “good part” of the river • The Olentangy is “Exceptional Warm Water Habitat” at the intersection • Preferred Alternatives 3-4 if necessary
  • 17. Stakeholder Analysis: Homeowners’ Association • According to the homeowners’ association, property owners in the area are concerned about: • Property rights • Traffic issues • The green aesthetic of the area • Regrading for the roundabout would cut into residential lots and require driveways to be rebuilt
  • 18. Environmental Consequences • Homeowners are concerned about the greenery and the extent to which roundabout construction would “scar the land” • Homeowners are divided: • Some would like to see congestion eased • Some like the congestion because it keeps traffic slow • All value the forested character of the area and would not support a solution that would change that character
  • 19. Stakeholder Analysis: Regional Planning: MORPC • 200 roadway projects under review in the region • MORPC Engineers considered a roundabout too expensive • Excessive development has been a problem in the area • Conflict between ODOT and Powell over development too close to the river
  • 20. Stakeholder Analysis: ODOT • Considering 5 alternatives, none of which is a roundabout • Contact person for project was unwilling to comment specifically regarding a roundabout
  • 21. Environmental Consequences • Removal of riparian vegetation • Removal of organic material • Increased erosion potential around river • Implications for species survival/dominance • Disruption of mussel beds and other species • Ground water flow impacts • River water quality • Siltation of river • Acidification of river water during construction • Increased imperviousness • Stormwater runoff implications
  • 22. Environmental Consequences • Very high quality section of the Olentangy River at this site • Meets Exceptional Warm Water Habitat (EWWH) criteria • “Unusual and exceptional” assemblages of organisms • High diversity of species, including endangered mussels • Pristine water quality
  • 23. Consequence Mitigation Techniques • Potential environmental benefit of increased shade from bridge to offset less tree cover • Relocation of mussels and other valuable species • Designate additional riparian conservation sites within watershed • Use center of roundabout as rain garden to mitigate increase in impervious surface • Exceptional quality of river and surrounding habitat at this site makes the potential for comparable mitigation unlikely
  • 24. Conclusions • Roundabouts generally meet many 315/750 intersection needs • Traffic management, increased safety, improved air quality • However, intersection lacks physical suitability for roundabout needs • Lack of space • Grade • Proximity of river • Prohibitive economic and environmental costs
  • 25. Conclusions • Lessons learned for transportation planning • Problems with building close to river and other environmentally valuable sites • Importance of multi-modal transportation options • Connection between land use, growth, and transportation
  • 26. Conclusions • Future Recommendations • Limit need for this and other vulnerable roads • Factor in projected commercial and residential growth/decline in transportation planning projects • Factor in energy, time, and other commuting costs for greater Delaware County area • Assemble stakeholders early in project planning process to achieve community buy-in