OMS 605                            1


                Pro-Coat at HAL,Inc.




           A Case Study Write-up for the OMS 605 W-12 Term
           University of Michigan- Ross School of Business


Aniruddha Srinath     Rehan Syed       Sam Beck       Yue Ma
OMS 605                                                                                                        2

                  The layout                                                                  Calculate for Practical Worst Case (PWC)
                                                                                         Batch Size          60
                                                                                         Hours/Day         19.5
                                                                                                      Process Std Dev
                                                                                                      or Load Process Conveyor Number
                                                                                          Machine      Time     Time    Trip Time      of                                     Setup     Rate      Time
                                                                                            Name       (min)    (min)     (min)     Machines   MTTF      MTTR       Avail     Time     (p/day)    (min)
                                                                                         Clean1            0.33       0          15        1        80          4      0.95        0       3377      36.5
                                                                                         Coat1             0.33       0          15        1        80          4      0.95        0       3377      36.5
                                                                                         Coat2             0.33       0          15        1        80          4      0.95        0       3377      36.5
                                                                                         Expose             103      10      -             5       300          4      0.99       10       3065     114.5
                                                                                         Develop           0.33       0        2.67        1       300          3      0.99        0       3510      22.7
                                                                                         Inspect            0.5     0.5      -             2     -         -           1.00        0       4680       0.5
                                                                                         Bake              0.33       0         100        1       300          3      0.99        0       3510     121.0
                                                                                         MI                 161      64      -             8     -         -           1.00        0       3488     161.0
                                                                                         Touchup              9       0      -             1     -         -           1.00        0       7800       9.0
                                                                                                                                                                                                      538


                                                                                                Critical Process is Expose:-Critical Bottleneck = 2879/day
                                                                                                Raw Process time= T0= 546 min= 546/(60*24)= 0.47 day

                                                                                                Critical WIP= Critical bottleneck x Raw process time
                                                                                                            W 0=       2879 x 0.47= 1353
           The Numbers- At a glance
                                                                                                Critical WIP=W= 1500 (as stated in the class slide)
           Process Std Dev
           or Load Process Conveyor Number                                                                TH= w(w+W0-1)*rb= 1500/(1500+1343-1)*2879= 1520
 Machine    Time     Time Trip Time      of                                     Setup               However, Ken is only getting an average of around 1200 per day.
   Name     (min)    (min)   (min)    Machines   MTTF      MTTR       Avail     Time
Clean1          0.33       0       15        1        80          4      0.95        0
Coat1           0.33       0       15        1        80          4      0.95        0
Coat2           0.33       0       15        1        80          4      0.95        0
Expose           103      10   -             5       300          4      0.99       10
Develop         0.33       0     2.67        1       300          3      0.99        0
Inspect          0.5     0.5   -             2     -         -           1.00        0
Bake            0.33       0      100        1       300          3      0.99        0
MI               161      64   -             8     -         -           1.00        0
Touchup            9       0   -             1     -         -           1.00        0

Note:-                                                                                                                              Present- TH= 304, WIP=1353
-Consider Clean1, Coat1 & Coat2 together as part of a single equipment .
  For the equipment, consider the data of the conveyor
- The exposing is done in batches (jobs, as per the problem) and the time
   is for the batch size.
- The same analogy holds for touch up also.


                        Aniruddha Srinath                               Rehan Syed                               Sam Beck                                 Yue Ma
OMS 605                                                                                                                     3

              Analysis of the 1200 Throughput situation
 VUT Calculator  Wallace J. Hopp and Mark L. Spearman, 2000                      Load           CCC             Expose           Load           Develop       Inspect       Load            Bake            MI                Touchup
 MEASURE:                                                              STATION:             1                 2            3                4              5              6               7              8              9                 10
 Arrival Rate (parts/hr)                                    ra                        154.000           141.680      130.346          119.918        110.325        101.499          93.379    85.90837659    79.03570646        72.71284995
 Arrival CV                                                   ca 2                        0.000           0.000            0.468          0.632         0.357         0.358           0.473    0.460693456         0.7623802     0.739929982
 Natural Process Time (hr)                                     t0                         0.006           0.750            0.029          0.006         0.045         0.008           0.006           1.667             0.045           0.003
 Natural Process SCV                                          c0 2                        0.000           0.000            0.423          0.000        0.423          1.000           0.000           0.000          0.158             0.000
 Number of Machines                                            m                              1             180                5              1      180.000              2               2         180.000              8                 1
 MTTF (hr)                                                    mf                             80           26.66              300            300          300            200             200             300            200               200
 MTTR (hr)                                                    mr                              0               4               10              0            3              0               0               3              0                 0
 Availability                                                  A                          1.000           0.870            0.968          1.000        0.990          1.000           1.000     0.99009901               1                 1
 Effective Process Time (failures only)                       te'                         0.006           0.863            0.030          0.006        0.045          0.008           0.006    1.683333333    0.044722222             0.0025
 Eff Process SCV (failures only)                              c e2 '                      0.000           1.210        22.245             0.000         1.745         1.000           0.000    0.035290658    0.158018595                  0
 Batch Size                                                    k                              1               1            60                 1             1             1               1              1             60                 60
 Setup Time (hr)                                               ts                         0.000           0.000         0.250             0.000         0.000         0.000           0.000              0              0                  0
 Setup Time SCV                                               cs 2                      0.000             0.000            0.000        0.000          0.000          0.000           0.000              0              0                   0
 Arrival Rate of Batches                                     ra /k                    154.000           141.680            2.172      119.918        110.325        101.499          93.379    85.90837659    1.317261774        1.211880832
 Eff Batch Process Time (failures+setups)               te = kt0 /A+ts                  0.006             0.863            2.024        0.006          0.045          0.008           0.006    1.683333333    2.683333333                0.15
 Eff Batch Process Time Var (failures+setups)   k*s0 2 /A2 + 2mr(1-A)kt0 /A+ss 2          0.000           0.900            1.167          0.000         0.004         0.000           0.000             0.1   0.018962963                  0
 Eff Process SCV (failures+setups)                            c e2                        0.000           1.210            0.285          0.000         1.745         1.000           0.000    0.035290658    0.002633643                  0
 Utilization                                                   u                          0.924           0.679            0.879          0.660         0.028         0.423           0.257    0.803402411    0.441831553        0.181782125
 Departure SCV                                                c d2                      0.000             0.468        0.632            0.357          0.358          0.473           0.461      0.7623802    0.739929982        0.715479187
 Yield                                                         y                        0.920             0.920        0.920            0.920          0.920          0.920           0.920          0.920          0.920              0.920
 Final Departure Rate                                        ra *y                    141.680           130.346      119.918          110.325        101.499         93.379          85.908    79.03570646    72.71284995        66.89582195
 Final Departure SCV                                      ycd2 +(1-y)                   0.080             0.511        0.662            0.409          0.409          0.515           0.504    0.781389784    0.760735583        0.738240852
 Utilization                                                  u                         0.924             0.679        0.879            0.660          0.028          0.423           0.257    0.803402411    0.441831553        0.181782125
 Throughput                                                  TH                       141.680           130.346      119.918          110.325        101.499         93.379          85.908    79.03570646    72.71284995        66.89582195
 Queue Time (hr)                                             CTq                        0.000             0.000        0.920            0.003          0.000          0.001           0.000    0.000228062    0.016261241        0.012329177
 Cycle Time (hr)                                            CTq+te                      0.006             0.863        2.944            0.009          0.045          0.010           0.006    1.683561396    2.699594574        0.162329177
 Cumulative Cycle Time (hr)                            S i (CTq(i)+te(i))                 0.006           0.869            3.813          3.821         3.866         3.876           3.882    5.565253056     8.26484763        8.427176808
 WIP in Queue (jobs)                                        ra CTq                        0.000           0.001      119.930              0.404         0.000         0.143           0.011    0.019592463    1.285218674        0.896489625
 WIP (jobs)                                                 ra CT                         0.924         122.204      383.735              1.063         4.959         0.989           0.525    144.6320264    213.3643644        11.80341712
 Cumulative WIP (jobs)                                  S i (ra (i)CT(i))               0.924        123.128         506.863          507.926        512.885        513.874      514.399           769.876          1010.453         1210.68
 Throughput per day                                                                  2762.760       2541.739        2338.400         2151.328       1979.222       1820.884     1675.213         1541.196          1417.901        1304.469


    ASSUMPTIONS
1. Current arrival rate is 154 as that is the rate required to produce 3000 with no yield loss.
2. Accordingly, our initial yield rate is 92% to get us closer to the daily throughput of 1200
3. The starving and blocking at the expose bottleneck brings down the 1304 projected throughput to the 1200 throughput given in the case.
4. Cleaning, Coat 1, and Coat 2 are cominable into one conveyer
5. Conveyers can be models as the loader and belt
6. The parallel servers in the belt is equal to the capacity of the loader, which is 180 in this case.




                                   Aniruddha Srinath                                          Rehan Syed                                           Sam Beck                                   Yue Ma
OMS 605                                                      4
                                        T
 Options to work out


                 TH=1304, CT=8.42 hrs, WIP=1211


                                                                                          TH=1353, CT=9.1 hrs, WIP=1500




   1. Increase working hours                                                                     2. Cut MTTR of BN by half
   6. Add operator to BN                                                                         3. Cut set-up time of BN
   7. Have someone working BN processes during breaks                                            4. Maximise use of BN process
   & shift changes                                                                               5. Decrease Std variation of process time




-Reducing variability decreases utilization.
-However, that alone does not increase throughput.
-We need lesser WIP in order to achieve greater throughput at the
same utilization level.
-However, we also need to expand capacity significantly (like adding another
expose machine) in order to really reach 3000 units.                                                     `
-This will require a huge cost investment as well as a large expansion in the
building.
-We want to try the other options mentioned above.




                        Aniruddha Srinath                           Rehan Syed                Sam Beck                     Yue Ma
OMS 605                                                                                                               5

1. Increase Working Hours to 21 hours- Get .5 hours by making members in each shift work 10 minutes overtime (during shift change)
   We can have workers from less utilized areas take a break when the line is running and ask them to work on the bottlenecks during breaks

Increase the cycle time
VUT Calculator  Wallace J. Hopp and Mark L. Spearman, 2000                      Load           CCC             Expose           Load           Develop       Inspect       Load            Bake            MI             Touchup
MEASURE:                                                              STATION:             1                 2            3                4              5              6            7                 8              9              10
Arrival Rate (parts/hr)                                    ra                        165.846           152.578      140.372          129.142        118.811        109.306      100.562       92.51671325    85.11537619      78.3061461
Arrival CV                                                   ca 2                        0.000           0.000            0.543          0.666         0.330         0.331           0.469    0.455976946    0.809392828     0.772712072
Natural Process Time (hr)                                     t0                         0.006           0.750            0.029          0.006         0.045         0.008           0.006           1.667          0.045           0.003
Natural Process SCV                                          c0 2                        0.000           0.000            0.423          0.000        0.423          1.000           0.000           0.000          0.158          0.000
Number of Machines                                            m                              1             180                5              1      180.000              2               2         180.000              8              1
MTTF (hr)                                                    mf                             80           26.66              300            300          300            200             200             300            200            200
MTTR (hr)                                                    mr                              0               4               10              0            3              0               0               3              0              0
Availability                                                  A                          1.000           0.870            0.968          1.000        0.990          1.000           1.000     0.99009901               1              1
Effective Process Time (failures only)                       te'                         0.006           0.863            0.030          0.006        0.045          0.008           0.006    1.683333333    0.044722222          0.0025
Eff Process SCV (failures only)                              c e2 '                      0.000           1.210        22.245             0.000         1.745         1.000           0.000    0.035290658    0.158018595               0
Batch Size                                                    k                              1               1            60                 1             1             1               1              1             60              60
Setup Time (hr)                                               ts                         0.000           0.000         0.250             0.000         0.000         0.000           0.000              0              0               0
Setup Time SCV                                               cs 2                      0.000             0.000            0.000        0.000          0.000          0.000        0.000                 0              0                0
Arrival Rate of Batches                                     ra /k                    165.846           152.578            2.340      129.142        118.811        109.306      100.562       92.51671325    1.418589603     1.305102435
Eff Batch Process Time (failures+setups)               te = kt0 /A+ts                  0.006             0.863            2.024        0.006          0.045          0.008        0.006       1.683333333    2.683333333             0.15
Eff Batch Process Time Var (failures+setups)   k*s0 2 /A2 + 2mr(1-A)kt0 /A+ss 2          0.000           0.900            1.167          0.000         0.004         0.000           0.000             0.1   0.018962963               0
Eff Process SCV (failures+setups)                            c e2                        0.000           1.210            0.285          0.000         1.745         1.000           0.000    0.035290658    0.002633643               0
Utilization                                                   u                          0.995           0.731            0.947          0.710         0.030         0.455           0.277    0.865202596    0.475818596     0.195765365
Departure SCV                                                c d2                      0.000             0.543        0.666            0.330          0.331          0.469           0.456    0.809392828    0.772712072     0.743098594
Yield                                                         y                        0.920             0.920        0.920            0.920          0.920          0.920           0.920          0.920          0.920           0.920
Final Departure Rate                                        ra *y                    152.578           140.372      129.142          118.811        109.306        100.562          92.517    85.11537619     78.3061461     72.04165441
Final Departure SCV                                      ycd2 +(1-y)                   0.080             0.579        0.693            0.384          0.384          0.512           0.499    0.824641402    0.790895107     0.763650707
Utilization                                                  u                         0.995             0.731        0.947            0.710          0.030          0.455           0.277    0.865202596    0.475818596     0.195765365
Throughput                                                  TH                       152.578           140.372      129.142          118.811        109.306        100.562          92.517    85.11537619     78.3061461     72.04165441
Queue Time (hr)                                             CTq                        0.000             0.000        2.763            0.004          0.000          0.002           0.000    0.001253058    0.023372309     0.014106915
Cycle Time (hr)                                            CTq+te                      0.006             0.863        4.787            0.010          0.045          0.010           0.006    1.684586391    2.706705642     0.164106915
Cumulative Cycle Time (hr)                            S i (CTq(i)+te(i))                 0.006           0.869            5.656          5.666         5.711         5.721           5.726    7.411039918    10.11774556     10.28185247
WIP in Queue (jobs)                                        ra CTq                        0.000           0.006      387.913              0.580         0.000         0.178           0.014     0.11592882     1.98934286     1.104658142
WIP (jobs)                                                 ra CT                         0.995         131.609      672.011              1.290         5.340         1.089           0.567    155.8523961     230.382269     12.85058006
Cumulative WIP (jobs)                                  S i (ra (i)CT(i))               0.995        132.604         804.615          805.905        811.245        812.334      812.901       968.7535676    1199.135837     1211.986417
Throughput per day                                                                  2975.280       2737.258        2518.277         2316.815       2131.470       1960.952     1804.076         1659.750       1526.970        1404.812



                                                                                                        Cumulative Change
                                                                                                        WIP         1211            0% Change
                                                                                                        TH          1404            8% Increase




                                  Aniruddha Srinath                                         Rehan Syed                                       Sam Beck                                  Yue Ma
OMS 605                                                                                        6
2. Add workers to the expose process. In the previous step, we had shown the number of machines in expose as 5 as we were having
people from other processes pitch to complete the expose process. Increasing manpower here would create a more robust process.
 Add operators for expose- it is not increasing throughput but is improving my process
 VUT Calculator  Wallace J. Hopp and Mark L. Spearman, 2000                   Load        CCC         Expose      Load        Develop     Inspect     Load        Bake        MI          Touchup
 MEASURE:                                                            STATION:             1           2           3           4           5           6           7           8           9         10
 Arrival Rate (parts/hr)                                      ra                    165.846     152.578     140.372     129.142     118.811     109.306     100.562 92.51671325 85.11537619 78.3061461
 Arrival CV                                                   ca 2                    0.000      0.000      0.543      0.666       0.330      0.331       0.469   0.455976946 0.809392828 0.772712072
 Natural Process Time (hr)                                     t0                     0.006      0.750      0.029      0.006       0.045      0.008       0.006          1.667       0.045       0.003
 Natural Process SCV                                          c0 2                    0.000      0.000      0.423      0.000       0.423      1.000       0.000        0.000       0.158            0.000
 Number of Machines                                            m                          1        180          5          1     180.000          2           2      180.000           8                1
 MTTF (hr)                                                    mf                         80      26.66        300        300         300        200         200          300         200              200
 MTTR (hr)                                                    mr                          0          4         10          0           3          0           0            3           0                0
 Availability                                                  A                      1.000      0.870      0.968      1.000       0.990      1.000       1.000 0.99009901             1                1
 Effective Process Time (failures only)                       te'                     0.006      0.863      0.030      0.006       0.045      0.008       0.006 1.683333333 0.044722222            0.0025
 Eff Process SCV (failures only)                              c e2 '                  0.000      1.210     22.245      0.000       1.745      1.000       0.000 0.035290658 0.158018595                 0
 Batch Size                                                    k                          1          1         60          1           1          1           1           1          60                60
 Setup Time (hr)                                               ts                     0.000      0.000      0.250      0.000       0.000      0.000       0.000           0           0                 0
 Setup Time SCV                                               cs 2                    0.000      0.000      0.000      0.000       0.000      0.000       0.000             0           0            0
 Arrival Rate of Batches                                     ra /k                  165.846    152.578      2.340    129.142     118.811    109.306     100.562   92.51671325 1.418589603 1.305102435
 Eff Batch Process Time (failures+setups)               te = kt0 /A+ts                0.006      0.863      2.024      0.006       0.045      0.008       0.006   1.683333333 2.683333333         0.15
 Eff Batch Process Time Var (failures+setups)   k*s0 2 /A2 + 2mr(1-A)kt0 /A+ss 2      0.000      0.900      1.167      0.000       0.004      0.000       0.000           0.1 0.018962963              0
                                                                 2
 Eff Process SCV (failures+setups)                            ce                      0.000      1.210      0.285      0.000       1.745      1.000       0.000   0.035290658 0.002633643           0
 Utilization                                                   u                      0.995      0.731      0.947      0.710       0.030      0.455       0.277   0.865202596 0.475818596 0.195765365
 Departure SCV                                                c d2                    0.000      0.543      0.666      0.330       0.331      0.469       0.456   0.809392828 0.772712072 0.743098594
 Yield                                                         y                      0.920      0.920      0.920      0.920       0.920      0.920       0.920         0.920       0.920       0.920
 Final Departure Rate                                        ra *y                  152.578    140.372    129.142    118.811     109.306    100.562      92.517   85.11537619 78.3061461 72.04165441
 Final Departure SCV                                      ycd2 +(1-y)                 0.080      0.579      0.693      0.384       0.384      0.512       0.499   0.824641402   0.790895107   0.763650707
 Utilization                                                  u                       0.995      0.731      0.947      0.710       0.030      0.455       0.277   0.865202596   0.475818596   0.195765365
 Throughput                                                  TH                     152.578    140.372    129.142    118.811     109.306    100.562      92.517   85.11537619    78.3061461   72.04165441
 Queue Time (hr)                                             CTq                      0.000      0.000      2.763      0.004       0.000      0.002       0.000   0.001253058   0.023372309   0.014106915
 Cycle Time (hr)                                            CTq+te                    0.006      0.863      4.787      0.010       0.045      0.010       0.006   1.684586391   2.706705642   0.164106915
 Cumulative Cycle Time (hr)                            S i (CTq(i)+te(i))             0.006      0.869      5.656      5.666       5.711      5.721       5.726   7.411039918 10.11774556 10.28185247
 WIP in Queue (jobs)                                        ra CTq                    0.000      0.006    387.913      0.580       0.000      0.178       0.014    0.11592882    1.98934286 1.104658142
 WIP (jobs)                                                 ra CT                     0.995    131.609    672.011      1.290       5.340      1.089       0.567   155.8523961    230.382269 12.85058006
 Cumulative WIP (jobs)                                  S i (ra (i)CT(i))             0.995    132.604    804.615    805.905     811.245    812.334     812.901   968.7535676 1199.135837 1211.986417
 Throughput per day                                                                2975.280   2737.258   2518.277   2316.815    2131.470   1960.952    1804.076     1659.750    1526.970    1404.812


                                                                                        Cumulative Change
                                                                                        WIP       1211      0% Change
                                                                                        TH        1404      8% Increase



                               Aniruddha Srinath                                         Rehan Syed                            Sam Beck                      Yue Ma
OMS 605                                                                                                          7
3. Reduce set-up & repair time through out the line- This is decreasing my WIP

Reduce set up time & repair time
VUT Calculator  Wallace J. Hopp and Mark L. Spearman, 2000                      Load           CCC             Expose           Load           Develop       Inspect       Load            Bake         MI          Touchup
MEASURE:                                                              STATION:             1                 2            3                4              5              6            7                 8           9           10
Arrival Rate (parts/hr)                                    ra                        165.846           152.578      140.372          129.142        118.811        109.306      100.562       92.51671325 85.11537619   78.3061461
Arrival CV                                                   ca 2                        0.000           0.000            0.444          0.558         0.276         0.277           0.427    0.416611768 0.794256567 0.761002711
Natural Process Time (hr)                                     t0                         0.006           0.750            0.029          0.006         0.045         0.008           0.006           1.667       0.045       0.003
Natural Process SCV                                          c0 2                        0.000           0.000            0.423          0.000        0.423          1.000           0.000           0.000        0.158        0.000
Number of Machines                                            m                              1             180                5              1      180.000              2               2         180.000            8            1
MTTF (hr)                                                    mf                             80           26.66              300            300          300            200             200             300          200          200
MTTR (hr)                                                    mr                              0               2                5              0           1.5             0               0              1.5           0            0
Availability                                                  A                          1.000           0.930            0.984          1.000        0.995          1.000           1.000    0.995024876             1            1
Effective Process Time (failures only)                       te'                         0.006           0.806            0.029          0.006        0.045          0.008           0.006           1.675 0.044722222        0.0025
Eff Process SCV (failures only)                              c e2 '                      0.000           0.346            6.059          0.000         0.757         1.000           0.000    0.008910671 0.158018595             0
Batch Size                                                    k                              1               1               60              1             1             1               1              1          60            60
Setup Time (hr)                                               ts                         0.000           0.000            0.125          0.000         0.000         0.000           0.000              0           0             0
Setup Time SCV                                               cs 2                      0.000             0.000            0.000        0.000          0.000          0.000        0.000                  0           0           0
Arrival Rate of Batches                                     ra /k                    165.846           152.578            2.340      129.142        118.811        109.306      100.562       92.51671325 1.418589603 1.305102435
Eff Batch Process Time (failures+setups)               te = kt0 /A+ts                  0.006             0.806            1.870        0.006          0.045          0.008        0.006              1.675 2.683333333        0.15
Eff Batch Process Time Var (failures+setups)   k*s0 2 /A2 + 2mr(1-A)kt0 /A+ss 2          0.000           0.225            0.308          0.000         0.002         0.000           0.000          0.025 0.018962963             0
Eff Process SCV (failures+setups)                            c e2                        0.000           0.346            0.088          0.000         0.757         1.000           0.000    0.008910671 0.002633643           0
Utilization                                                   u                          0.995           0.683            0.875          0.710         0.030         0.455           0.277    0.860919415 0.475818596 0.195765365
Departure SCV                                                c d2                      0.000             0.444        0.558            0.276          0.277          0.427           0.417    0.794256567 0.761002711 0.731837984
Yield                                                         y                        0.920             0.920        0.920            0.920          0.920          0.920           0.920          0.920       0.920       0.920
Final Departure Rate                                        ra *y                    152.578           140.372      129.142          118.811        109.306        100.562          92.517    85.11537619  78.3061461 72.04165441
Final Departure SCV                                      ycd2 +(1-y)                   0.080             0.489        0.593            0.334          0.335          0.473           0.463    0.810716042 0.780122494 0.753290945
Utilization                                                  u                         0.995             0.683        0.875            0.710          0.030          0.455           0.277    0.860919415 0.475818596 0.195765365
Throughput                                                  TH                       152.578           140.372      129.142          118.811        109.306        100.562          92.517    85.11537619  78.3061461 72.04165441
Queue Time (hr)                                             CTq                        0.000             0.000        0.574            0.004          0.000          0.002           0.000    0.000957157 0.022936646 0.013893145
Cycle Time (hr)                                            CTq+te                      0.006             0.806        2.444            0.009          0.045          0.010           0.006    1.675957157  2.70626998 0.163893145
Cumulative Cycle Time (hr)                            S i (CTq(i)+te(i))                 0.006           0.812            3.256          3.266         3.310         3.320           3.326    5.001815286 7.708085266     7.87197841
WIP in Queue (jobs)                                        ra CTq                        0.000           0.000       80.547              0.485         0.000         0.171           0.013    0.088552977 1.952261294 1.087918606
WIP (jobs)                                                 ra CT                         0.995         123.019      343.082              1.196         5.314         1.082           0.566    155.0540477 230.3451874 12.83384052
Cumulative WIP (jobs)                                  S i (ra (i)CT(i))               0.995        124.014         467.096          468.292        473.605        474.687      475.253       630.3067463 860.6519337 873.4857743
Throughput per day                                                                  2975.280       2737.258        2518.277         2316.815       2131.470       1960.952     1804.076         1659.750    1526.970    1404.812

                                                                                           Cumulative Change
                                                                                           WIP             874       28% Change
                                                                                           TH             1404        8% Increase




                                  Aniruddha Srinath                                         Rehan Syed                                       Sam Beck                                  Yue Ma
OMS 605                                                                                                           8
4. Increase the yield to 94%. This increases my throughput but also requires me to further reduce my BN set-up time

 Increase yield & also reduce expose set up time
 VUT Calculator  Wallace J. Hopp and Mark L. Spearman, 2000                      Load           CCC             Expose            Load           Develop       Inspect       Load           Bake           MI          Touchup
 MEASURE:                                                              STATION:             1                 2            3                 4              5              6            7                8             9          10
 Arrival Rate (parts/hr)                                    ra                        165.846           155.895      146.542           137.749        129.484        121.715      114.412      107.5475149    101.094664 95.02898412
 Arrival CV                                                   ca 2                        0.000           0.000            0.464           0.547         0.233         0.234          0.431    0.417161598 0.916188957 0.732581723
 Natural Process Time (hr)                                     t0                         0.006           0.750            0.029           0.006         0.045         0.008          0.006           1.667       0.045       0.003
 Natural Process SCV                                          c0 2                        0.000           0.000            0.423           0.000        0.423          1.000          0.000           0.000        0.158         0.000
 Number of Machines                                            m                              1             180                 5              1      180.000              2              2         182.000            6             1
 MTTF (hr)                                                    mf                             80           26.66              300             300          300            200            200             300          200           200
 MTTR (hr)                                                    mr                              0               2               2.5              0           1.5             0              0              1.5           0             0
 Availability                                                  A                          1.000           0.930            0.992           1.000        0.995          1.000          1.000    0.995024876             1             1
 Effective Process Time (failures only)                       te'                         0.006           0.806            0.029           0.006        0.045          0.008          0.006           1.675 0.044722222         0.0025
 Eff Process SCV (failures only)                              c e2 '                      0.000           0.346            1.855           0.000         0.757         1.000          0.000    0.008910671 0.158018595              0
 Batch Size                                                    k                              1               1               60               1             1             1              1              1          60             60
 Setup Time (hr)                                               ts                         0.000           0.000            0.125           0.000         0.000         0.000          0.000              0           0              0
 Setup Time SCV                                               cs 2                      0.000             0.000            0.000         0.000          0.000          0.000        0.000                 0           0           0
 Arrival Rate of Batches                                     ra /k                    165.846           155.895            2.442       137.749        129.484        121.715      114.412      107.5475149 1.684911066 1.583816402
 Eff Batch Process Time (failures+setups)               te = kt0 /A+ts                  0.006             0.806            1.856         0.006          0.045          0.008        0.006             1.675 2.683333333        0.15
 Eff Batch Process Time Var (failures+setups)   k*s0 2 /A2 + 2mr(1-A)kt0 /A+ss 2          0.000           0.225            0.093           0.000         0.002         0.000          0.000          0.025 0.018962963              0
 Eff Process SCV (failures+setups)                            c e2                        0.000           0.346            0.027           0.000         0.757         1.000          0.000    0.008910671 0.002633643               0
 Utilization                                                   u                          0.995           0.698            0.907           0.758         0.032         0.507          0.315    0.989791689 0.753529671      0.23757246
 Departure SCV                                                c d2                      0.000             0.464        0.547             0.233          0.234          0.431        0.417      0.916188957 0.732581723 0.691234317
 Yield                                                         y                        0.940             0.940        0.940             0.940          0.940          0.940        0.940            0.940       0.940       0.940
 Final Departure Rate                                        ra *y                    155.895           146.542      137.749           129.484        121.715        114.412      107.548       101.094664 95.02898412 89.32724508
 Final Departure SCV                                      ycd2 +(1-y)                   0.060             0.496        0.574             0.279          0.280          0.465        0.452      0.921217619    0.74862682   0.709760258
 Utilization                                                  u                         0.995             0.698        0.907             0.758          0.032          0.507        0.315      0.989791689   0.753529671    0.23757246
 Throughput                                                  TH                       155.895           146.542      137.749           129.484        121.715        114.412      107.548       101.094664   95.02898412   89.32724508
 Queue Time (hr)                                             CTq                        0.000             0.000        0.766             0.005          0.000          0.002        0.000      0.159458224   0.383717576   0.017120438
 Cycle Time (hr)                                            CTq+te                      0.006             0.806        2.622             0.010          0.045          0.010        0.006      1.834458224   3.067050909   0.167120438
 Cumulative Cycle Time (hr)                            S i (CTq(i)+te(i))                 0.006           0.812            3.434           3.444         3.489         3.499          3.505     5.33933991    8.40639082 8.573511257
 WIP in Queue (jobs)                                        ra CTq                        0.000           0.001      112.218               0.647         0.000         0.237          0.019    17.14933575 38.79179941  1.6269378
 WIP (jobs)                                                 ra CT                         0.995         125.693      384.195               1.405         5.791         1.252          0.648    197.2914231 310.062481 15.88128542
 Cumulative WIP (jobs)                                  S i (ra (i)CT(i))               0.995        126.689         510.884           512.289        518.080        519.331      519.979      717.2703172 1027.332798 1043.214084
 Throughput per day                                                                  3039.960       2857.562        2686.109          2524.942       2373.446       2231.039     2097.177        1971.346    1853.065    1741.881



                                                                                            Cumulative Change
                                                                                            WIP           1043        14% Change
                                                                                            TH            1741        34% Increase




                               Aniruddha Srinath                                            Rehan Syed                                         Sam Beck                                 Yue Ma
OMS 605                                                                9

   In Conclusion, but in need of further action




                                            TH & WIP condition
                                            after implementation
                                            of proposals 1~4




                                                 Initial TH & WIP
                                                 condition




- After carrying out 4 changes in the HAL procoat line, we have been able to take our TH, WIP situation closer to the Best Case Line
- However, we have concluded that we are still not able to meet Ken's requirement of 3000 boards a day.
- We have worked on the WIP front, reducing the WIP to the best extent possible.
- If Ken and Mr Petitto still insist on the 3000 figure, they need to make significant investments in equipment (like the Expose equipment)
   and building, as well as increasing manpower, which is a business stand-off.



                     Aniruddha Srinath                         Rehan Syed                   Sam Beck                   Yue Ma
OMS 605                           10




THANK YOU FOR THE INITIATION INTO THE FACTORY PHYSICS CULT !




    Aniruddha Srinath    Rehan Syed      Sam Beck      Yue Ma

Weitere ähnliche Inhalte

Andere mochten auch

Andere mochten auch (9)

Lista chequeo ambiente_trabajo
Lista chequeo ambiente_trabajoLista chequeo ambiente_trabajo
Lista chequeo ambiente_trabajo
 
Amc Clinical
Amc ClinicalAmc Clinical
Amc Clinical
 
O fengshui como aprender feng shui
O fengshui   como aprender feng shuiO fengshui   como aprender feng shui
O fengshui como aprender feng shui
 
Manufacturing strategy
Manufacturing strategyManufacturing strategy
Manufacturing strategy
 
Tips para elaborar un club de revista
Tips para elaborar un club de revistaTips para elaborar un club de revista
Tips para elaborar un club de revista
 
Nationalist Movements
Nationalist MovementsNationalist Movements
Nationalist Movements
 
Stage gate process
Stage gate processStage gate process
Stage gate process
 
A teoria ética de kant
A teoria ética de kantA teoria ética de kant
A teoria ética de kant
 
Insuficiencia renal cronica y aguda
Insuficiencia renal cronica y agudaInsuficiencia renal cronica y aguda
Insuficiencia renal cronica y aguda
 

Ähnlich wie Operations & Manufacturing Strategies

VaR of Operational Risk
VaR of Operational RiskVaR of Operational Risk
VaR of Operational RiskRahmat Mulyana
 
SPICE MODEL of RURG8060 , TC=150degree (Professional Model) in SPICE PARK
SPICE MODEL of RURG8060 , TC=150degree (Professional Model) in SPICE PARKSPICE MODEL of RURG8060 , TC=150degree (Professional Model) in SPICE PARK
SPICE MODEL of RURG8060 , TC=150degree (Professional Model) in SPICE PARKTsuyoshi Horigome
 
SPICE MODEL of PBYR10100 (Standard Model) in SPICE PARK
SPICE MODEL of PBYR10100 (Standard Model) in SPICE PARKSPICE MODEL of PBYR10100 (Standard Model) in SPICE PARK
SPICE MODEL of PBYR10100 (Standard Model) in SPICE PARKTsuyoshi Horigome
 
ioDrive de benchmarking 2011 1209_zem_distribution
ioDrive de benchmarking 2011 1209_zem_distributionioDrive de benchmarking 2011 1209_zem_distribution
ioDrive de benchmarking 2011 1209_zem_distributionMasahito Zembutsu
 
SPICE MODEL of 1SS397 (Standard Model)
SPICE MODEL of 1SS397 (Standard Model)SPICE MODEL of 1SS397 (Standard Model)
SPICE MODEL of 1SS397 (Standard Model)Tsuyoshi Horigome
 
SPICE MODEL of FMLG14S (Professional Model) in SPICE PARK
SPICE MODEL of FMLG14S (Professional Model) in SPICE PARKSPICE MODEL of FMLG14S (Professional Model) in SPICE PARK
SPICE MODEL of FMLG14S (Professional Model) in SPICE PARKTsuyoshi Horigome
 
SPICE MODEL of 1SS397 (Professional Model)
SPICE MODEL of 1SS397 (Professional Model)SPICE MODEL of 1SS397 (Professional Model)
SPICE MODEL of 1SS397 (Professional Model)Tsuyoshi Horigome
 
Free SPICE Model of FML-G14S in SPICE PARK
Free SPICE Model of FML-G14S in SPICE PARKFree SPICE Model of FML-G14S in SPICE PARK
Free SPICE Model of FML-G14S in SPICE PARKTsuyoshi Horigome
 
Free SPICE Model of FML-G14S in SPICE PARK
Free SPICE Model of FML-G14S in SPICE PARKFree SPICE Model of FML-G14S in SPICE PARK
Free SPICE Model of FML-G14S in SPICE PARKTsuyoshi Horigome
 
Performance and Availability Tradeoffs in Replicated File Systems
Performance and Availability Tradeoffs in Replicated File SystemsPerformance and Availability Tradeoffs in Replicated File Systems
Performance and Availability Tradeoffs in Replicated File Systemspeterhoneyman
 
SPICE MODEL of 1SS412 (Standard Model) in SPICE PARK
SPICE MODEL of 1SS412 (Standard Model) in SPICE PARKSPICE MODEL of 1SS412 (Standard Model) in SPICE PARK
SPICE MODEL of 1SS412 (Standard Model) in SPICE PARKTsuyoshi Horigome
 
SPICE MODEL of HN2S03FE (Standard Model) in SPICE PARK
SPICE MODEL of HN2S03FE (Standard Model) in SPICE PARKSPICE MODEL of HN2S03FE (Standard Model) in SPICE PARK
SPICE MODEL of HN2S03FE (Standard Model) in SPICE PARKTsuyoshi Horigome
 
SPICE MODEL of FML-G14S (Professional Model) in SPICE PARK
SPICE MODEL of FML-G14S (Professional Model) in SPICE PARKSPICE MODEL of FML-G14S (Professional Model) in SPICE PARK
SPICE MODEL of FML-G14S (Professional Model) in SPICE PARKTsuyoshi Horigome
 
Jag Trasgo Helsinki091002
Jag Trasgo Helsinki091002Jag Trasgo Helsinki091002
Jag Trasgo Helsinki091002Miguel Morales
 
Free SPICE Model of 1SS397 (Professional) in SPICE PARK
Free SPICE Model of 1SS397 (Professional) in SPICE PARKFree SPICE Model of 1SS397 (Professional) in SPICE PARK
Free SPICE Model of 1SS397 (Professional) in SPICE PARKTsuyoshi Horigome
 

Ähnlich wie Operations & Manufacturing Strategies (20)

VaR of Operational Risk
VaR of Operational RiskVaR of Operational Risk
VaR of Operational Risk
 
SPICE MODEL of RURG8060 , TC=150degree (Professional Model) in SPICE PARK
SPICE MODEL of RURG8060 , TC=150degree (Professional Model) in SPICE PARKSPICE MODEL of RURG8060 , TC=150degree (Professional Model) in SPICE PARK
SPICE MODEL of RURG8060 , TC=150degree (Professional Model) in SPICE PARK
 
SPICE MODEL of PBYR10100 (Standard Model) in SPICE PARK
SPICE MODEL of PBYR10100 (Standard Model) in SPICE PARKSPICE MODEL of PBYR10100 (Standard Model) in SPICE PARK
SPICE MODEL of PBYR10100 (Standard Model) in SPICE PARK
 
Khx3200ak2 2g
Khx3200ak2 2gKhx3200ak2 2g
Khx3200ak2 2g
 
Ib.2009
Ib.2009Ib.2009
Ib.2009
 
ioDrive de benchmarking 2011 1209_zem_distribution
ioDrive de benchmarking 2011 1209_zem_distributionioDrive de benchmarking 2011 1209_zem_distribution
ioDrive de benchmarking 2011 1209_zem_distribution
 
SPICE MODEL of 1SS397 (Standard Model)
SPICE MODEL of 1SS397 (Standard Model)SPICE MODEL of 1SS397 (Standard Model)
SPICE MODEL of 1SS397 (Standard Model)
 
SPICE MODEL of FMLG14S (Professional Model) in SPICE PARK
SPICE MODEL of FMLG14S (Professional Model) in SPICE PARKSPICE MODEL of FMLG14S (Professional Model) in SPICE PARK
SPICE MODEL of FMLG14S (Professional Model) in SPICE PARK
 
Moving Early Stage Technologies
Moving Early Stage TechnologiesMoving Early Stage Technologies
Moving Early Stage Technologies
 
SPICE MODEL of 1SS397 (Professional Model)
SPICE MODEL of 1SS397 (Professional Model)SPICE MODEL of 1SS397 (Professional Model)
SPICE MODEL of 1SS397 (Professional Model)
 
Free SPICE Model of FML-G14S in SPICE PARK
Free SPICE Model of FML-G14S in SPICE PARKFree SPICE Model of FML-G14S in SPICE PARK
Free SPICE Model of FML-G14S in SPICE PARK
 
Free SPICE Model of FML-G14S in SPICE PARK
Free SPICE Model of FML-G14S in SPICE PARKFree SPICE Model of FML-G14S in SPICE PARK
Free SPICE Model of FML-G14S in SPICE PARK
 
Performance and Availability Tradeoffs in Replicated File Systems
Performance and Availability Tradeoffs in Replicated File SystemsPerformance and Availability Tradeoffs in Replicated File Systems
Performance and Availability Tradeoffs in Replicated File Systems
 
Ib.2008
Ib.2008Ib.2008
Ib.2008
 
SPICE MODEL of 1SS412 (Standard Model) in SPICE PARK
SPICE MODEL of 1SS412 (Standard Model) in SPICE PARKSPICE MODEL of 1SS412 (Standard Model) in SPICE PARK
SPICE MODEL of 1SS412 (Standard Model) in SPICE PARK
 
SPICE MODEL of HN2S03FE (Standard Model) in SPICE PARK
SPICE MODEL of HN2S03FE (Standard Model) in SPICE PARKSPICE MODEL of HN2S03FE (Standard Model) in SPICE PARK
SPICE MODEL of HN2S03FE (Standard Model) in SPICE PARK
 
SPICE MODEL of FML-G14S (Professional Model) in SPICE PARK
SPICE MODEL of FML-G14S (Professional Model) in SPICE PARKSPICE MODEL of FML-G14S (Professional Model) in SPICE PARK
SPICE MODEL of FML-G14S (Professional Model) in SPICE PARK
 
Jag Trasgo Helsinki091002
Jag Trasgo Helsinki091002Jag Trasgo Helsinki091002
Jag Trasgo Helsinki091002
 
Report
ReportReport
Report
 
Free SPICE Model of 1SS397 (Professional) in SPICE PARK
Free SPICE Model of 1SS397 (Professional) in SPICE PARKFree SPICE Model of 1SS397 (Professional) in SPICE PARK
Free SPICE Model of 1SS397 (Professional) in SPICE PARK
 

Mehr von Aniruddha Mysore Srinath

Mehr von Aniruddha Mysore Srinath (9)

Fall 2012- Global Manufacturing
Fall 2012- Global ManufacturingFall 2012- Global Manufacturing
Fall 2012- Global Manufacturing
 
Fall 2012- Clean Tech Enterpreneurship
Fall 2012- Clean Tech EnterpreneurshipFall 2012- Clean Tech Enterpreneurship
Fall 2012- Clean Tech Enterpreneurship
 
Critical Path Methods- Prezi
Critical Path Methods- PreziCritical Path Methods- Prezi
Critical Path Methods- Prezi
 
Fall 2012- Design for Manufacturing
Fall 2012- Design for ManufacturingFall 2012- Design for Manufacturing
Fall 2012- Design for Manufacturing
 
Design for Six Sigma
Design for Six SigmaDesign for Six Sigma
Design for Six Sigma
 
Analyzing start-ups in the water treatment space
Analyzing start-ups in the water treatment spaceAnalyzing start-ups in the water treatment space
Analyzing start-ups in the water treatment space
 
Analyzing start-ups in the water treatment space
Analyzing start-ups in the water treatment spaceAnalyzing start-ups in the water treatment space
Analyzing start-ups in the water treatment space
 
Analyzing water treatment start-ups
Analyzing water treatment start-upsAnalyzing water treatment start-ups
Analyzing water treatment start-ups
 
Lean Program Engineering Project
Lean Program Engineering ProjectLean Program Engineering Project
Lean Program Engineering Project
 

Kürzlich hochgeladen

The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...Operational Excellence Consulting
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...ssuserf63bd7
 
8447779800, Low rate Call girls in Dwarka mor Delhi NCR
8447779800, Low rate Call girls in Dwarka mor Delhi NCR8447779800, Low rate Call girls in Dwarka mor Delhi NCR
8447779800, Low rate Call girls in Dwarka mor Delhi NCRashishs7044
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfrichard876048
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024Adnet Communications
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxFinancial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxsaniyaimamuddin
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMintel Group
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFChandresh Chudasama
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Americas Got Grants
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
Appkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxAppkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxappkodes
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxmbikashkanyari
 

Kürzlich hochgeladen (20)

The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...
 
8447779800, Low rate Call girls in Dwarka mor Delhi NCR
8447779800, Low rate Call girls in Dwarka mor Delhi NCR8447779800, Low rate Call girls in Dwarka mor Delhi NCR
8447779800, Low rate Call girls in Dwarka mor Delhi NCR
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdf
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxFinancial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 Edition
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDF
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
Appkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxAppkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptx
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
 

Operations & Manufacturing Strategies

  • 1. OMS 605 1 Pro-Coat at HAL,Inc. A Case Study Write-up for the OMS 605 W-12 Term University of Michigan- Ross School of Business Aniruddha Srinath Rehan Syed Sam Beck Yue Ma
  • 2. OMS 605 2 The layout Calculate for Practical Worst Case (PWC) Batch Size 60 Hours/Day 19.5 Process Std Dev or Load Process Conveyor Number Machine Time Time Trip Time of Setup Rate Time Name (min) (min) (min) Machines MTTF MTTR Avail Time (p/day) (min) Clean1 0.33 0 15 1 80 4 0.95 0 3377 36.5 Coat1 0.33 0 15 1 80 4 0.95 0 3377 36.5 Coat2 0.33 0 15 1 80 4 0.95 0 3377 36.5 Expose 103 10 - 5 300 4 0.99 10 3065 114.5 Develop 0.33 0 2.67 1 300 3 0.99 0 3510 22.7 Inspect 0.5 0.5 - 2 - - 1.00 0 4680 0.5 Bake 0.33 0 100 1 300 3 0.99 0 3510 121.0 MI 161 64 - 8 - - 1.00 0 3488 161.0 Touchup 9 0 - 1 - - 1.00 0 7800 9.0 538 Critical Process is Expose:-Critical Bottleneck = 2879/day Raw Process time= T0= 546 min= 546/(60*24)= 0.47 day Critical WIP= Critical bottleneck x Raw process time W 0= 2879 x 0.47= 1353 The Numbers- At a glance Critical WIP=W= 1500 (as stated in the class slide) Process Std Dev or Load Process Conveyor Number TH= w(w+W0-1)*rb= 1500/(1500+1343-1)*2879= 1520 Machine Time Time Trip Time of Setup However, Ken is only getting an average of around 1200 per day. Name (min) (min) (min) Machines MTTF MTTR Avail Time Clean1 0.33 0 15 1 80 4 0.95 0 Coat1 0.33 0 15 1 80 4 0.95 0 Coat2 0.33 0 15 1 80 4 0.95 0 Expose 103 10 - 5 300 4 0.99 10 Develop 0.33 0 2.67 1 300 3 0.99 0 Inspect 0.5 0.5 - 2 - - 1.00 0 Bake 0.33 0 100 1 300 3 0.99 0 MI 161 64 - 8 - - 1.00 0 Touchup 9 0 - 1 - - 1.00 0 Note:- Present- TH= 304, WIP=1353 -Consider Clean1, Coat1 & Coat2 together as part of a single equipment . For the equipment, consider the data of the conveyor - The exposing is done in batches (jobs, as per the problem) and the time is for the batch size. - The same analogy holds for touch up also. Aniruddha Srinath Rehan Syed Sam Beck Yue Ma
  • 3. OMS 605 3 Analysis of the 1200 Throughput situation VUT Calculator  Wallace J. Hopp and Mark L. Spearman, 2000 Load CCC Expose Load Develop Inspect Load Bake MI Touchup MEASURE: STATION: 1 2 3 4 5 6 7 8 9 10 Arrival Rate (parts/hr) ra 154.000 141.680 130.346 119.918 110.325 101.499 93.379 85.90837659 79.03570646 72.71284995 Arrival CV ca 2 0.000 0.000 0.468 0.632 0.357 0.358 0.473 0.460693456 0.7623802 0.739929982 Natural Process Time (hr) t0 0.006 0.750 0.029 0.006 0.045 0.008 0.006 1.667 0.045 0.003 Natural Process SCV c0 2 0.000 0.000 0.423 0.000 0.423 1.000 0.000 0.000 0.158 0.000 Number of Machines m 1 180 5 1 180.000 2 2 180.000 8 1 MTTF (hr) mf 80 26.66 300 300 300 200 200 300 200 200 MTTR (hr) mr 0 4 10 0 3 0 0 3 0 0 Availability A 1.000 0.870 0.968 1.000 0.990 1.000 1.000 0.99009901 1 1 Effective Process Time (failures only) te' 0.006 0.863 0.030 0.006 0.045 0.008 0.006 1.683333333 0.044722222 0.0025 Eff Process SCV (failures only) c e2 ' 0.000 1.210 22.245 0.000 1.745 1.000 0.000 0.035290658 0.158018595 0 Batch Size k 1 1 60 1 1 1 1 1 60 60 Setup Time (hr) ts 0.000 0.000 0.250 0.000 0.000 0.000 0.000 0 0 0 Setup Time SCV cs 2 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 Arrival Rate of Batches ra /k 154.000 141.680 2.172 119.918 110.325 101.499 93.379 85.90837659 1.317261774 1.211880832 Eff Batch Process Time (failures+setups) te = kt0 /A+ts 0.006 0.863 2.024 0.006 0.045 0.008 0.006 1.683333333 2.683333333 0.15 Eff Batch Process Time Var (failures+setups) k*s0 2 /A2 + 2mr(1-A)kt0 /A+ss 2 0.000 0.900 1.167 0.000 0.004 0.000 0.000 0.1 0.018962963 0 Eff Process SCV (failures+setups) c e2 0.000 1.210 0.285 0.000 1.745 1.000 0.000 0.035290658 0.002633643 0 Utilization u 0.924 0.679 0.879 0.660 0.028 0.423 0.257 0.803402411 0.441831553 0.181782125 Departure SCV c d2 0.000 0.468 0.632 0.357 0.358 0.473 0.461 0.7623802 0.739929982 0.715479187 Yield y 0.920 0.920 0.920 0.920 0.920 0.920 0.920 0.920 0.920 0.920 Final Departure Rate ra *y 141.680 130.346 119.918 110.325 101.499 93.379 85.908 79.03570646 72.71284995 66.89582195 Final Departure SCV ycd2 +(1-y) 0.080 0.511 0.662 0.409 0.409 0.515 0.504 0.781389784 0.760735583 0.738240852 Utilization u 0.924 0.679 0.879 0.660 0.028 0.423 0.257 0.803402411 0.441831553 0.181782125 Throughput TH 141.680 130.346 119.918 110.325 101.499 93.379 85.908 79.03570646 72.71284995 66.89582195 Queue Time (hr) CTq 0.000 0.000 0.920 0.003 0.000 0.001 0.000 0.000228062 0.016261241 0.012329177 Cycle Time (hr) CTq+te 0.006 0.863 2.944 0.009 0.045 0.010 0.006 1.683561396 2.699594574 0.162329177 Cumulative Cycle Time (hr) S i (CTq(i)+te(i)) 0.006 0.869 3.813 3.821 3.866 3.876 3.882 5.565253056 8.26484763 8.427176808 WIP in Queue (jobs) ra CTq 0.000 0.001 119.930 0.404 0.000 0.143 0.011 0.019592463 1.285218674 0.896489625 WIP (jobs) ra CT 0.924 122.204 383.735 1.063 4.959 0.989 0.525 144.6320264 213.3643644 11.80341712 Cumulative WIP (jobs) S i (ra (i)CT(i)) 0.924 123.128 506.863 507.926 512.885 513.874 514.399 769.876 1010.453 1210.68 Throughput per day 2762.760 2541.739 2338.400 2151.328 1979.222 1820.884 1675.213 1541.196 1417.901 1304.469 ASSUMPTIONS 1. Current arrival rate is 154 as that is the rate required to produce 3000 with no yield loss. 2. Accordingly, our initial yield rate is 92% to get us closer to the daily throughput of 1200 3. The starving and blocking at the expose bottleneck brings down the 1304 projected throughput to the 1200 throughput given in the case. 4. Cleaning, Coat 1, and Coat 2 are cominable into one conveyer 5. Conveyers can be models as the loader and belt 6. The parallel servers in the belt is equal to the capacity of the loader, which is 180 in this case. Aniruddha Srinath Rehan Syed Sam Beck Yue Ma
  • 4. OMS 605 4 T Options to work out TH=1304, CT=8.42 hrs, WIP=1211 TH=1353, CT=9.1 hrs, WIP=1500 1. Increase working hours 2. Cut MTTR of BN by half 6. Add operator to BN 3. Cut set-up time of BN 7. Have someone working BN processes during breaks 4. Maximise use of BN process & shift changes 5. Decrease Std variation of process time -Reducing variability decreases utilization. -However, that alone does not increase throughput. -We need lesser WIP in order to achieve greater throughput at the same utilization level. -However, we also need to expand capacity significantly (like adding another expose machine) in order to really reach 3000 units. ` -This will require a huge cost investment as well as a large expansion in the building. -We want to try the other options mentioned above. Aniruddha Srinath Rehan Syed Sam Beck Yue Ma
  • 5. OMS 605 5 1. Increase Working Hours to 21 hours- Get .5 hours by making members in each shift work 10 minutes overtime (during shift change) We can have workers from less utilized areas take a break when the line is running and ask them to work on the bottlenecks during breaks Increase the cycle time VUT Calculator  Wallace J. Hopp and Mark L. Spearman, 2000 Load CCC Expose Load Develop Inspect Load Bake MI Touchup MEASURE: STATION: 1 2 3 4 5 6 7 8 9 10 Arrival Rate (parts/hr) ra 165.846 152.578 140.372 129.142 118.811 109.306 100.562 92.51671325 85.11537619 78.3061461 Arrival CV ca 2 0.000 0.000 0.543 0.666 0.330 0.331 0.469 0.455976946 0.809392828 0.772712072 Natural Process Time (hr) t0 0.006 0.750 0.029 0.006 0.045 0.008 0.006 1.667 0.045 0.003 Natural Process SCV c0 2 0.000 0.000 0.423 0.000 0.423 1.000 0.000 0.000 0.158 0.000 Number of Machines m 1 180 5 1 180.000 2 2 180.000 8 1 MTTF (hr) mf 80 26.66 300 300 300 200 200 300 200 200 MTTR (hr) mr 0 4 10 0 3 0 0 3 0 0 Availability A 1.000 0.870 0.968 1.000 0.990 1.000 1.000 0.99009901 1 1 Effective Process Time (failures only) te' 0.006 0.863 0.030 0.006 0.045 0.008 0.006 1.683333333 0.044722222 0.0025 Eff Process SCV (failures only) c e2 ' 0.000 1.210 22.245 0.000 1.745 1.000 0.000 0.035290658 0.158018595 0 Batch Size k 1 1 60 1 1 1 1 1 60 60 Setup Time (hr) ts 0.000 0.000 0.250 0.000 0.000 0.000 0.000 0 0 0 Setup Time SCV cs 2 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 Arrival Rate of Batches ra /k 165.846 152.578 2.340 129.142 118.811 109.306 100.562 92.51671325 1.418589603 1.305102435 Eff Batch Process Time (failures+setups) te = kt0 /A+ts 0.006 0.863 2.024 0.006 0.045 0.008 0.006 1.683333333 2.683333333 0.15 Eff Batch Process Time Var (failures+setups) k*s0 2 /A2 + 2mr(1-A)kt0 /A+ss 2 0.000 0.900 1.167 0.000 0.004 0.000 0.000 0.1 0.018962963 0 Eff Process SCV (failures+setups) c e2 0.000 1.210 0.285 0.000 1.745 1.000 0.000 0.035290658 0.002633643 0 Utilization u 0.995 0.731 0.947 0.710 0.030 0.455 0.277 0.865202596 0.475818596 0.195765365 Departure SCV c d2 0.000 0.543 0.666 0.330 0.331 0.469 0.456 0.809392828 0.772712072 0.743098594 Yield y 0.920 0.920 0.920 0.920 0.920 0.920 0.920 0.920 0.920 0.920 Final Departure Rate ra *y 152.578 140.372 129.142 118.811 109.306 100.562 92.517 85.11537619 78.3061461 72.04165441 Final Departure SCV ycd2 +(1-y) 0.080 0.579 0.693 0.384 0.384 0.512 0.499 0.824641402 0.790895107 0.763650707 Utilization u 0.995 0.731 0.947 0.710 0.030 0.455 0.277 0.865202596 0.475818596 0.195765365 Throughput TH 152.578 140.372 129.142 118.811 109.306 100.562 92.517 85.11537619 78.3061461 72.04165441 Queue Time (hr) CTq 0.000 0.000 2.763 0.004 0.000 0.002 0.000 0.001253058 0.023372309 0.014106915 Cycle Time (hr) CTq+te 0.006 0.863 4.787 0.010 0.045 0.010 0.006 1.684586391 2.706705642 0.164106915 Cumulative Cycle Time (hr) S i (CTq(i)+te(i)) 0.006 0.869 5.656 5.666 5.711 5.721 5.726 7.411039918 10.11774556 10.28185247 WIP in Queue (jobs) ra CTq 0.000 0.006 387.913 0.580 0.000 0.178 0.014 0.11592882 1.98934286 1.104658142 WIP (jobs) ra CT 0.995 131.609 672.011 1.290 5.340 1.089 0.567 155.8523961 230.382269 12.85058006 Cumulative WIP (jobs) S i (ra (i)CT(i)) 0.995 132.604 804.615 805.905 811.245 812.334 812.901 968.7535676 1199.135837 1211.986417 Throughput per day 2975.280 2737.258 2518.277 2316.815 2131.470 1960.952 1804.076 1659.750 1526.970 1404.812 Cumulative Change WIP 1211 0% Change TH 1404 8% Increase Aniruddha Srinath Rehan Syed Sam Beck Yue Ma
  • 6. OMS 605 6 2. Add workers to the expose process. In the previous step, we had shown the number of machines in expose as 5 as we were having people from other processes pitch to complete the expose process. Increasing manpower here would create a more robust process. Add operators for expose- it is not increasing throughput but is improving my process VUT Calculator  Wallace J. Hopp and Mark L. Spearman, 2000 Load CCC Expose Load Develop Inspect Load Bake MI Touchup MEASURE: STATION: 1 2 3 4 5 6 7 8 9 10 Arrival Rate (parts/hr) ra 165.846 152.578 140.372 129.142 118.811 109.306 100.562 92.51671325 85.11537619 78.3061461 Arrival CV ca 2 0.000 0.000 0.543 0.666 0.330 0.331 0.469 0.455976946 0.809392828 0.772712072 Natural Process Time (hr) t0 0.006 0.750 0.029 0.006 0.045 0.008 0.006 1.667 0.045 0.003 Natural Process SCV c0 2 0.000 0.000 0.423 0.000 0.423 1.000 0.000 0.000 0.158 0.000 Number of Machines m 1 180 5 1 180.000 2 2 180.000 8 1 MTTF (hr) mf 80 26.66 300 300 300 200 200 300 200 200 MTTR (hr) mr 0 4 10 0 3 0 0 3 0 0 Availability A 1.000 0.870 0.968 1.000 0.990 1.000 1.000 0.99009901 1 1 Effective Process Time (failures only) te' 0.006 0.863 0.030 0.006 0.045 0.008 0.006 1.683333333 0.044722222 0.0025 Eff Process SCV (failures only) c e2 ' 0.000 1.210 22.245 0.000 1.745 1.000 0.000 0.035290658 0.158018595 0 Batch Size k 1 1 60 1 1 1 1 1 60 60 Setup Time (hr) ts 0.000 0.000 0.250 0.000 0.000 0.000 0.000 0 0 0 Setup Time SCV cs 2 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 Arrival Rate of Batches ra /k 165.846 152.578 2.340 129.142 118.811 109.306 100.562 92.51671325 1.418589603 1.305102435 Eff Batch Process Time (failures+setups) te = kt0 /A+ts 0.006 0.863 2.024 0.006 0.045 0.008 0.006 1.683333333 2.683333333 0.15 Eff Batch Process Time Var (failures+setups) k*s0 2 /A2 + 2mr(1-A)kt0 /A+ss 2 0.000 0.900 1.167 0.000 0.004 0.000 0.000 0.1 0.018962963 0 2 Eff Process SCV (failures+setups) ce 0.000 1.210 0.285 0.000 1.745 1.000 0.000 0.035290658 0.002633643 0 Utilization u 0.995 0.731 0.947 0.710 0.030 0.455 0.277 0.865202596 0.475818596 0.195765365 Departure SCV c d2 0.000 0.543 0.666 0.330 0.331 0.469 0.456 0.809392828 0.772712072 0.743098594 Yield y 0.920 0.920 0.920 0.920 0.920 0.920 0.920 0.920 0.920 0.920 Final Departure Rate ra *y 152.578 140.372 129.142 118.811 109.306 100.562 92.517 85.11537619 78.3061461 72.04165441 Final Departure SCV ycd2 +(1-y) 0.080 0.579 0.693 0.384 0.384 0.512 0.499 0.824641402 0.790895107 0.763650707 Utilization u 0.995 0.731 0.947 0.710 0.030 0.455 0.277 0.865202596 0.475818596 0.195765365 Throughput TH 152.578 140.372 129.142 118.811 109.306 100.562 92.517 85.11537619 78.3061461 72.04165441 Queue Time (hr) CTq 0.000 0.000 2.763 0.004 0.000 0.002 0.000 0.001253058 0.023372309 0.014106915 Cycle Time (hr) CTq+te 0.006 0.863 4.787 0.010 0.045 0.010 0.006 1.684586391 2.706705642 0.164106915 Cumulative Cycle Time (hr) S i (CTq(i)+te(i)) 0.006 0.869 5.656 5.666 5.711 5.721 5.726 7.411039918 10.11774556 10.28185247 WIP in Queue (jobs) ra CTq 0.000 0.006 387.913 0.580 0.000 0.178 0.014 0.11592882 1.98934286 1.104658142 WIP (jobs) ra CT 0.995 131.609 672.011 1.290 5.340 1.089 0.567 155.8523961 230.382269 12.85058006 Cumulative WIP (jobs) S i (ra (i)CT(i)) 0.995 132.604 804.615 805.905 811.245 812.334 812.901 968.7535676 1199.135837 1211.986417 Throughput per day 2975.280 2737.258 2518.277 2316.815 2131.470 1960.952 1804.076 1659.750 1526.970 1404.812 Cumulative Change WIP 1211 0% Change TH 1404 8% Increase Aniruddha Srinath Rehan Syed Sam Beck Yue Ma
  • 7. OMS 605 7 3. Reduce set-up & repair time through out the line- This is decreasing my WIP Reduce set up time & repair time VUT Calculator  Wallace J. Hopp and Mark L. Spearman, 2000 Load CCC Expose Load Develop Inspect Load Bake MI Touchup MEASURE: STATION: 1 2 3 4 5 6 7 8 9 10 Arrival Rate (parts/hr) ra 165.846 152.578 140.372 129.142 118.811 109.306 100.562 92.51671325 85.11537619 78.3061461 Arrival CV ca 2 0.000 0.000 0.444 0.558 0.276 0.277 0.427 0.416611768 0.794256567 0.761002711 Natural Process Time (hr) t0 0.006 0.750 0.029 0.006 0.045 0.008 0.006 1.667 0.045 0.003 Natural Process SCV c0 2 0.000 0.000 0.423 0.000 0.423 1.000 0.000 0.000 0.158 0.000 Number of Machines m 1 180 5 1 180.000 2 2 180.000 8 1 MTTF (hr) mf 80 26.66 300 300 300 200 200 300 200 200 MTTR (hr) mr 0 2 5 0 1.5 0 0 1.5 0 0 Availability A 1.000 0.930 0.984 1.000 0.995 1.000 1.000 0.995024876 1 1 Effective Process Time (failures only) te' 0.006 0.806 0.029 0.006 0.045 0.008 0.006 1.675 0.044722222 0.0025 Eff Process SCV (failures only) c e2 ' 0.000 0.346 6.059 0.000 0.757 1.000 0.000 0.008910671 0.158018595 0 Batch Size k 1 1 60 1 1 1 1 1 60 60 Setup Time (hr) ts 0.000 0.000 0.125 0.000 0.000 0.000 0.000 0 0 0 Setup Time SCV cs 2 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 Arrival Rate of Batches ra /k 165.846 152.578 2.340 129.142 118.811 109.306 100.562 92.51671325 1.418589603 1.305102435 Eff Batch Process Time (failures+setups) te = kt0 /A+ts 0.006 0.806 1.870 0.006 0.045 0.008 0.006 1.675 2.683333333 0.15 Eff Batch Process Time Var (failures+setups) k*s0 2 /A2 + 2mr(1-A)kt0 /A+ss 2 0.000 0.225 0.308 0.000 0.002 0.000 0.000 0.025 0.018962963 0 Eff Process SCV (failures+setups) c e2 0.000 0.346 0.088 0.000 0.757 1.000 0.000 0.008910671 0.002633643 0 Utilization u 0.995 0.683 0.875 0.710 0.030 0.455 0.277 0.860919415 0.475818596 0.195765365 Departure SCV c d2 0.000 0.444 0.558 0.276 0.277 0.427 0.417 0.794256567 0.761002711 0.731837984 Yield y 0.920 0.920 0.920 0.920 0.920 0.920 0.920 0.920 0.920 0.920 Final Departure Rate ra *y 152.578 140.372 129.142 118.811 109.306 100.562 92.517 85.11537619 78.3061461 72.04165441 Final Departure SCV ycd2 +(1-y) 0.080 0.489 0.593 0.334 0.335 0.473 0.463 0.810716042 0.780122494 0.753290945 Utilization u 0.995 0.683 0.875 0.710 0.030 0.455 0.277 0.860919415 0.475818596 0.195765365 Throughput TH 152.578 140.372 129.142 118.811 109.306 100.562 92.517 85.11537619 78.3061461 72.04165441 Queue Time (hr) CTq 0.000 0.000 0.574 0.004 0.000 0.002 0.000 0.000957157 0.022936646 0.013893145 Cycle Time (hr) CTq+te 0.006 0.806 2.444 0.009 0.045 0.010 0.006 1.675957157 2.70626998 0.163893145 Cumulative Cycle Time (hr) S i (CTq(i)+te(i)) 0.006 0.812 3.256 3.266 3.310 3.320 3.326 5.001815286 7.708085266 7.87197841 WIP in Queue (jobs) ra CTq 0.000 0.000 80.547 0.485 0.000 0.171 0.013 0.088552977 1.952261294 1.087918606 WIP (jobs) ra CT 0.995 123.019 343.082 1.196 5.314 1.082 0.566 155.0540477 230.3451874 12.83384052 Cumulative WIP (jobs) S i (ra (i)CT(i)) 0.995 124.014 467.096 468.292 473.605 474.687 475.253 630.3067463 860.6519337 873.4857743 Throughput per day 2975.280 2737.258 2518.277 2316.815 2131.470 1960.952 1804.076 1659.750 1526.970 1404.812 Cumulative Change WIP 874 28% Change TH 1404 8% Increase Aniruddha Srinath Rehan Syed Sam Beck Yue Ma
  • 8. OMS 605 8 4. Increase the yield to 94%. This increases my throughput but also requires me to further reduce my BN set-up time Increase yield & also reduce expose set up time VUT Calculator  Wallace J. Hopp and Mark L. Spearman, 2000 Load CCC Expose Load Develop Inspect Load Bake MI Touchup MEASURE: STATION: 1 2 3 4 5 6 7 8 9 10 Arrival Rate (parts/hr) ra 165.846 155.895 146.542 137.749 129.484 121.715 114.412 107.5475149 101.094664 95.02898412 Arrival CV ca 2 0.000 0.000 0.464 0.547 0.233 0.234 0.431 0.417161598 0.916188957 0.732581723 Natural Process Time (hr) t0 0.006 0.750 0.029 0.006 0.045 0.008 0.006 1.667 0.045 0.003 Natural Process SCV c0 2 0.000 0.000 0.423 0.000 0.423 1.000 0.000 0.000 0.158 0.000 Number of Machines m 1 180 5 1 180.000 2 2 182.000 6 1 MTTF (hr) mf 80 26.66 300 300 300 200 200 300 200 200 MTTR (hr) mr 0 2 2.5 0 1.5 0 0 1.5 0 0 Availability A 1.000 0.930 0.992 1.000 0.995 1.000 1.000 0.995024876 1 1 Effective Process Time (failures only) te' 0.006 0.806 0.029 0.006 0.045 0.008 0.006 1.675 0.044722222 0.0025 Eff Process SCV (failures only) c e2 ' 0.000 0.346 1.855 0.000 0.757 1.000 0.000 0.008910671 0.158018595 0 Batch Size k 1 1 60 1 1 1 1 1 60 60 Setup Time (hr) ts 0.000 0.000 0.125 0.000 0.000 0.000 0.000 0 0 0 Setup Time SCV cs 2 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 Arrival Rate of Batches ra /k 165.846 155.895 2.442 137.749 129.484 121.715 114.412 107.5475149 1.684911066 1.583816402 Eff Batch Process Time (failures+setups) te = kt0 /A+ts 0.006 0.806 1.856 0.006 0.045 0.008 0.006 1.675 2.683333333 0.15 Eff Batch Process Time Var (failures+setups) k*s0 2 /A2 + 2mr(1-A)kt0 /A+ss 2 0.000 0.225 0.093 0.000 0.002 0.000 0.000 0.025 0.018962963 0 Eff Process SCV (failures+setups) c e2 0.000 0.346 0.027 0.000 0.757 1.000 0.000 0.008910671 0.002633643 0 Utilization u 0.995 0.698 0.907 0.758 0.032 0.507 0.315 0.989791689 0.753529671 0.23757246 Departure SCV c d2 0.000 0.464 0.547 0.233 0.234 0.431 0.417 0.916188957 0.732581723 0.691234317 Yield y 0.940 0.940 0.940 0.940 0.940 0.940 0.940 0.940 0.940 0.940 Final Departure Rate ra *y 155.895 146.542 137.749 129.484 121.715 114.412 107.548 101.094664 95.02898412 89.32724508 Final Departure SCV ycd2 +(1-y) 0.060 0.496 0.574 0.279 0.280 0.465 0.452 0.921217619 0.74862682 0.709760258 Utilization u 0.995 0.698 0.907 0.758 0.032 0.507 0.315 0.989791689 0.753529671 0.23757246 Throughput TH 155.895 146.542 137.749 129.484 121.715 114.412 107.548 101.094664 95.02898412 89.32724508 Queue Time (hr) CTq 0.000 0.000 0.766 0.005 0.000 0.002 0.000 0.159458224 0.383717576 0.017120438 Cycle Time (hr) CTq+te 0.006 0.806 2.622 0.010 0.045 0.010 0.006 1.834458224 3.067050909 0.167120438 Cumulative Cycle Time (hr) S i (CTq(i)+te(i)) 0.006 0.812 3.434 3.444 3.489 3.499 3.505 5.33933991 8.40639082 8.573511257 WIP in Queue (jobs) ra CTq 0.000 0.001 112.218 0.647 0.000 0.237 0.019 17.14933575 38.79179941 1.6269378 WIP (jobs) ra CT 0.995 125.693 384.195 1.405 5.791 1.252 0.648 197.2914231 310.062481 15.88128542 Cumulative WIP (jobs) S i (ra (i)CT(i)) 0.995 126.689 510.884 512.289 518.080 519.331 519.979 717.2703172 1027.332798 1043.214084 Throughput per day 3039.960 2857.562 2686.109 2524.942 2373.446 2231.039 2097.177 1971.346 1853.065 1741.881 Cumulative Change WIP 1043 14% Change TH 1741 34% Increase Aniruddha Srinath Rehan Syed Sam Beck Yue Ma
  • 9. OMS 605 9 In Conclusion, but in need of further action TH & WIP condition after implementation of proposals 1~4 Initial TH & WIP condition - After carrying out 4 changes in the HAL procoat line, we have been able to take our TH, WIP situation closer to the Best Case Line - However, we have concluded that we are still not able to meet Ken's requirement of 3000 boards a day. - We have worked on the WIP front, reducing the WIP to the best extent possible. - If Ken and Mr Petitto still insist on the 3000 figure, they need to make significant investments in equipment (like the Expose equipment) and building, as well as increasing manpower, which is a business stand-off. Aniruddha Srinath Rehan Syed Sam Beck Yue Ma
  • 10. OMS 605 10 THANK YOU FOR THE INITIATION INTO THE FACTORY PHYSICS CULT ! Aniruddha Srinath Rehan Syed Sam Beck Yue Ma