TRANSPORT HAULAGE 100 kph
100T+1000T ROLLING FRICTION
Design__ROAD____RAIL____SHIP.
NOW___572_______396______220
ANDY__152_______136______120
RATIO_.3.76_______2.91_____1.83
NET____376_______420______476
ADV___266¬¬¬_______.238______210
VDF____30_______.33.6______38.1 ANDY
VDF_____8________15_______25 NOW
….
HP___ROAD NOW___13,750 HP ;NEW__3,666 HP
HP___RAIL_ NOW____7,333 HP NEW__3,274 HP
HP___SHIP_ NOW____4,400 HP NEW__2,895 HP
1. BUSINESS PROPOSALS - ENERGY EFFICIENT
ANDY TECHNOLOGY DESIGN
ANDY ENGINE,
1/3 fuel for same HP Nor, Asp CER 2/3
ANDY BEARING / ANDY-X- DRIVE, JET
1/3 fuel for same Ton-HP 166 % Speed CER 2/3
1/5 fuel for same Ton-kmph 60 % HP CER 4/5
TON-KMPL
FUEL USED Lit/km/T = 1/ T-KMPL
CO2e EMIS g/km/T = 2325 / T-KMPL
COAL POWER PLANT
• FUEL:Any Fuel, ALL Fuels.Coal,Lignite,Crude Oil
Maize,Soya,LPG,CNG,Naphtha,Bio.F.,Agro Waste.
• No Fuel Preparation....Just Burnt RAW
1/3 FUEL for SAME POWER
COAL 100 kg / hour/MW against 300 kg
Fuel saved 200 kg*20*360/1000= 1440 T/MW/Yr
SAVED COST 200 $/T*1440= 288,000 $/MW/Yr
CER 200*2.33*20*360/1000= 3355 T/MW/Yr
NO BOILER, NO TURBINE. DIRECT ROTARY
COST US $ 1 Mn /MW VC 2 Mn$ 1 Yr