USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
Journal and report
1. NAME : RUSDIANTO
NIS/CLASS : 10097825/XI TP 3
ADDRESS : VILLAGE TLAJUNG Hick RT 01/12 KAB. BOGOR
SMK Muhammadiyah 1 Cileungsi
JL. No orchids. 86 Cileungsi district, Bogor Telp.8230985 Fax. 82480034
2. I. IDENTITY
Name : Rusdianto
Place/Date of birth : Bogor/ October 15, 1993
Gender : Male
Blood Type :B
NIS/Class/Progli : 10097825/XI TP 3
Name of Parent/guardian : Tugiman
Address : Rt.1/12 kp. Momonot Tlajung daughter
Hillbilly Mountain District No. 18
Bogor
Handphone/Telp : 087770063815
Cileungsi, December 11, 2011
Signature of student
COMPANY IDENTITY (DU / IN)
Name of DU / IN : PT. PAMA PERSADA NUSANTARA
Bid. / Type of Business : Industrial
Address : Jl. Kingdom Narogong km. 23, 8 tower scenic area of
industry
Name of leader : Personal Mr. Santoso
Name of supervisor : Mr. Suhadi
Pkl start date : October 11, 2010
Pkl completion date : December 11, 2010
3. APPROVAL SHEET
INDUSTRY WORKING PRACTICES
SMK MUHHAMMADIYAH 1 Cileungsi "TERAKREDETASI A"
CERTIFICATION SHEET BUSINESS / INDUSTRY
INDUSTRY WORKING PRACTICES
On this day Monday the 11th of October 2010, Has endorsed the book industry
journal reports of work practices (prakerin) above:
Name : Rusdianto
NIS / Class / Progli : 10097825/XI TP Engine 3/Teknic
The name Mentioned above to implement work practices in the industry:
Name of DU / IN : PT. PAMA PERSADA NUSANTARA
Address : Zone Tower Permai Bogor Km 23.8 Cileungsi
Start prakerin : On October 11, 2010
Done prakerin : December 11, 2010
Knowing the October 11, 2010
DU Leader / Supervisor DI industry
4. II. JOURNAL PRAKERIN
A. INTRODUCTION
The purpose of the preparation of journals and reports of students' activities During
the implementation of industry practices (prakerin) is to increase of the quality and
relevance of vocational high school Muhammadiyah 1 Cileungsi working with business
and industry That covers aspects of the development of moral character , knowledge,
skills, arts and health culture. The development of these aspects leads to the
improvement and development of life skille (life skills), the which is realized through
the achievement of the Standards of Competence.
Standard and Basic competence of industry work practices (prakerin) function
align school curriculum with business and industry, so That students can actualize and
develop themselves to the world of business and industry.
Industry practice for the students can Produce a superior personal character,
Abilities and ethics to get along, adaptability, initiative skills, ability to cooperate,
ability and skills to work in the company and or independent.
B. LEGAL BASIS
Implementation of industry practices (prakerin) PSG based on:
Pancasila and 1945 Constitution.
Law No.20 of RI TH.2003 about the national education system
GoI Peranturan Th.2005 19, of the National Education Standards.
Regulation 22 TH.2006 minister of national education, about the standard of
the ISI.
5. Regulation No.23 TH.2006 minister of national education, the Standard of
Competence Graduates (SKL).
Regulation of the Minister of National Education TH.2006 No.24, on the
implementation of the ISI standards and SKL on elementary and secondary
education units.
Decision No. Education Minister. 080? U/1993 of vocational curriculum as
follows,
"The implementation of education Carried out through two pathways (Link and
Match) of school education and special education schools.
C. PURPOSE
Destination industry working practices so That Learners have the following
capabilities:
1. Understanding and appreciate the business activities and industry.
2. Understanding the workplace culture (mental attitude and personality).
3. Understand and be Able to use equipment to business and industry.
4. Understanding the production process from raw materials to finished goods.
5. Understanding the administration / business and industry menegement.
6. Have the skills and independence to work and Trying.
7. Intertwining relationship the between the school faforable partner institutions.
8. The implementation of the learning process in business and industry.
9. Introduction and implementation of marketing for prospective graduate students.
6. D. INSTRUCTIONS FOR STUDENT USE
1. Students are required to read the entire journal is closely
2. Fill in the data / information in accordance with this question journalized
3. Standard practice in competency this journal
4. Prakerin always taken the time and always maintain the cleanliness of the
journal and this report
5. Reported after conducting prakerin
6. Following the oral examination prakerin
E. INSTRUCTIONS FOR USE OF SCHOOL COACH
1. Read and appreciate the entire contents of this journal
2. Guiding students in filling journals and this report
3. Establishing good relations with industry Mentors
4. Guiding the students before leaving prakerin
5. Students, monitor student progress in place prakerin
6. Resolving student problems together
7. Responsible or the make a report after students erection prakerin
7. F. COACH'S GUIDE FOR INDUSTRIAL USE
1. Working closely with school counselors and teachers in the
implementation of practice
2. Provide support to the implementation prakerin by Providing facilities and
material practices
3. Provide guidance and training in accordance with the needs of business
and industry
4. Provide an assessment to students prakerin tailored to the existing format
5. Together with the school signed certificate / recognition Abilities of
students
G. STUDENT Code PRAKERIN / PKL
1. Obeying the rules and regulations at the company / business and industry
2. Maintain and uphold the authority of, and Will not do the Things That can
destroy religion, schools and parents
3. And always try, to be disciplined, creative and Responsible adults
inofative
4. Well dressed, polite and respectful to everyone
8. 5. Giving Them know (permissions) to the coach industry, if Unable to
attend (sick)
6. Complete and sign with Their parents sign a statement
H. HOPE AFTER PRAKERIN
1. Have a noble character and Devotion to the Almighty GOD (Students can
Enhance the personality of the which include: accuracy, dexterity,
discipline, independence and responsibility)
2. Having insight into the world of industry and mental readiness to work
independently
3. Students can Improve Their standard of competence (life skill to have) a
better life skills
4. Studentscan Enhance creativity and initiative in learning, work and
community
10. III. Noted the company's organizational structure (owners & responsible
person)
11. CHAPTER I
INTRODUCTION
A. Company Background
PT. PAMA PERSADA NUSANTARA is a company engaged in the field of
non-oil mining contractor in Indonesia
That are used Sciences include:
1. Basic sciences include: Mathematics engineering, engineering physics,
computer programming language, materials engineering structural mechanics,
control and automation
2. Applied science include: CAD, welding equipment metal industry, machine
maintenance, safety
The problems faced by
Students explore the material in the company of heavy equipment manitenance
and engineering / modification unit. Will the unit be used continuously Damaged if
without treatment, so That a unit in the industry requires regular maintenance to be
done periodically to the unit is Damaged and Will not be an obstacle in the
production process within a company.
12. Purpose and objectives
1. The purpose of this report is students writes:
a. That the Various Study Often problems occur in the PT. Pama Persada
Nusantara, problems. That Often Happen to find a solution based on
science That have been studied are: engine maintenance
b. Apply the theoretical knowledge obtained paraktek That has been into a
real school.
c. Helping to find and solve technical and non technical issues in the use and
maintenance of heavy equipment in a corporate environment.
2. The purpose of this company is students writes:
a. Gain experience on the care units of heavy equipment in the company's
real, so students get a clearer picture about the Various Things about the
world of work is applicable.
b. Get a real picture and clearer understanding of the components inside the
unit That Is used with care.
13. B. Methods of practical work
The method is a way of working systematically to facilitate the
implementation of an activity in order to Achieve the specified goals.
The method used is:
1) Guidance
In this case, the method used to Convey materials mentor That growing
niche or learning materials to be oral and written and Mentors to the
praktikan work practice field.
2) Observation
"The method of observation is an observational research method (review)
field Carried out carefully before practice.“
3) Interview
"This method is a method of research interviews conducted by a
researcher to the speaker.“
4) Practice
"Method of practice is a method of research conducted by a real
implementation on the ground.“
14. C. Systematics
In this report, contains about treatments and how to repair, engineering and
modification on the job in general track in PT. PAMA PERSADA
NUSANTARA.
CHAPTER II
COMPANY OVERVIEW
A. History of company
PT. Pama Persada Nusantara (PAMA) was formed in 1989. PAMA derived
from heavy equipment rental division to its parent company PT United Tractor Tbk
is specialized heavy equipment sales and distributors. For many, many famous
brands Such as Komatsu and Nisan. Major shareholder of PT. Astra International
Tbk, one of the companies in Indonesia. PAMA is one herald mining contractor in
Indonesia, where Indonesia has a wealth not inferior to other nations. Against the
backdrop of a solid and constant desire to Improve Their professional and generate
customer satisfaction, PAMA has grown in Indonesia's mining industry, and
provides all the capabilities and services to clients and partners. PAMA is the
largest mining contractor in Indonesia, has done 40% of coal mining spread in parts
of Indonesia in 2003.
15. PAMA today operate with many mining regions in Kalimantan and
Sumatra, the scope of the projects handled include coal mining. Gold
mining, construction and removal of soil. Coal mining into business with the
majority of 140.68 million cubic meters of bada areas in the mine and Transported
in 2003.
In 2003, PAMA earn income above U.S. $ 320 million. PAMA assets includes
1028 units of heavy equipment and the number of employees 4316 people, in the
conduct of mining with Various conditions in Indonesia, PAMA has gained much
experience covers all the steps the which have been operating a fare study of
wealth, preproduction, development and production of regular mining construction.
PAMA has built a good relationship with his client. With the success of
operations in the construction and mining projects have been rewarded / reward
with an extension of negotiations on the repetition of the original mining contract is
a commitment to quality reporting PAMA perfect operational flexibility and
reliability.
PAMA attention to the importance of safety, health and the environment to
introduce the draft PAMA / good design and management system (PSMS) a, the
which is based on three design Accreditation international recognition, the
international ONV SEQ Rating System; National Occupatil Safety Association (
NOSA); AND Sut Africa Chamber of Mine-mine Safty Management System
(MSMS).
16. PAMA also apply seperty management system ISO 9001, ISO 14001, Gren Astra
company (AGC), siystems Management of safety and health (SMK3) PAMA
Mnagemen Human Resources (PHRM) PAMA production management system
(PPMs), Total Productive Mantenance (TPM), With a trainer / instructor with a good
and professional workers and full support from the parent company, PAMA Will
continue to expand on the overall planning to become a leading contractor in Southeast
Asia.
B. Vision and Mission
The vision and mission of the PT. Pama Persada Nusantara are as follows:
1. Company Vision
Being a mining contractor grade world with productivity, enggenering, safety and
environmental best.
2. Company Mission
a. Providing services with the operation of heavy equipment in the field of open and
mining overburden That enables subscriber to get the best return on the world stage
b. Provide opportunities for employees to develop their competence to measure in
objective
c. Providing the best MVA and EVA to shareholders.
d. Continually seeks to master the technology and engineering capabilities and
environmentally sound as well as human safety for the progress of the nation and the
State
17. IV. Take note of the manufacturing process (production) and or service
1. Unit at the Promontory Priuk pic: GL. Mekanik
Activity: mobilisai : Helper mechanical
Pic : Expedition
Welder
2. To in yards Cileungsi Activity: part-Genune
Activity : Check documents spb.c / ws / n-Local Part
Pic : Mechanics
Security
3. The unit Entered the parking lot 8. Running
Activity : Lower unit
Pic : Mechanical
Helper mechanical
4. Parking in accordance Activity status model
Activity : Set the distance units of the between unit + 15 m
Pic : Mechanical
5. Completeness and check the condition of the unit Pic-GL. Mechanical
Activity : Q.A.L
Unit condition Report
Recommended part
18. Pic : Fore -GL. mekanik UNIT READY
-Logistic
-ppc USE / SALE
Activity promotion repair cost analysis
-DEMO
ASIS
<$
6. The process of major & minor ripaire
Activity : Entrance bays
Cleaning the unit
Fabrication
Pic : GL.mekanik
Helper mechanical
Welder
19. 7. Running
Pic : GL.mekanik
Helper mechanical
8. Unit ready for use
Activity : Gtound test unit
Q.A.I
Performance + 80%
Pic : GL.mekanik
Helper mechanical
UNIT READY FORE
USE/SALE
>$
Activity : Promotion
Demo
20. V. Take note of the marketing process and marketing area
VI. Take note of the selection process or the hiring of employees
1. Identified there (identify Them)
2. Develop a position description (explanation of the development of
positions)
3. Identify the key selection criteria (to identify the key criteria)
4. Create the advertis-ment (making the advertisement)
5. Paper selection listiny short (forum / paper checks initial selection)
21. 6. Initial screening interview (interview)
7. Psicometric testing (pisicotes)
8. Assessment centers / simulation (removal and simulation)
9. Second / tehnical interview (interview techniques)
10. Reference checking (checking of certificate)
11. Offer (offer)
12. New employees (new hires)
4. Note safty equipment for the industry and carry out the work
Sefty shoes
Sefty helmet
Welding gloves
Masks
Ear plug
Ear Muff
22. 5. Take note of the steps in operation any or all of the machines used when
prakerin
Washing machine
P2h (checks, equipment, daily)
Prepaire hose to spray water
Hose that contain the flow of water put into washing machine
hose into the electrical panel legran
Turn on the washing machine are marked with green or start
To turn off the washing machine or simply press the red button off
6. Note raw materials and auxiliary materials used in industry
Auxiliary materials
WD 40 to remove the rust
Sandpaper
Thiner
Cat
Clean and remove rust on electric einer
23. A. Student Activities Report
VII. DAILY ACTIVITY REPORTS STUDENTS
competency/topic : Install Bottom Guard DZ 273
type of work : Track/ 12 October 2010
Description of activities
Install guard Botom d 375
A. Tools in use:
Handle 1 “
Socket 36
Short Pipe
Jack hidroulik
Cain blocks
Combination Lock 36
Belt
How it works:
Tie Belt Bottom Guard below, then associate cain blocks mounted on both
sides trackshue
Lift SLOWLY by turning the crank cain bloks second, after cainblok since
hydraulic lift used to help hold the Bottom Guard.
After the Bottom Guard lifted use the key combination for installing bolts 36.
To Bottom Guard held tight to use a socket 36 and the handle 1 "is already
connected to the pipe.
24. competency/topic : Water Refill 1100 pc & install
type of work : radiator hose frames Track/ 12 track/13October
2010
Description of Activity
Refill water radiator hose install pc 1100 & frames
A. Refill the radiator water
That tools are used
Gallon empty
How it works:
Check the radiator to be objec tanks filled with water
Use a gallon to fill the tank of the radiator
After Completing the water, cover with a rapid re-radiator's the make sure
the radiator cap tightly closed
B. Install hose frames
Tools used:
The key to pass 36
Container / bucket
25. How it works:
Remove the hose by using key frames pass36
Pour the used oil is in the frame That hose into the bucket
Attach the new hose using key frames pass 36
competency/topic :
Repair batrai cover 273 DZ
type of work :
track/14October 2010
Description of activities
Repair cover batrai DZ 273
Tools used:
Sandpaper
Sanpolac
Isamu (priming)
Scraps
Work Airways:
Putty using sanpolac dank Will cover the repair ape
Flatten the surface using sandpaper cover
After the flat surface of the cover, the cover painting by Isamu (priming)
and then, paint the cover by using a compressor.
26. competency/topic :
Install 273 DZ Bottom Guard
type of work :
Track / October 18, 2010
Description of Activity
Install 273 DZ Bottom Guard
Tools used:
Combination Lock 32
Socket 32
Handle 1 “
Tokrain
How it works:
Raise the Bottom Guard by using forklift
Then attach the bolts and tightened with a socket 32 and the handle to use
your 1 "and the combination lock 32
In order to use the bolts are securely attached tokrain and socket 32
27. competency/topic :
Cleaning trackling
type of work :
Track / October 19, 2010
Description of Activity
Cleaning trackling
Tools used:
Scraps
Katcher
How it works:
Clean trackling with using a scrap of land That Sticks
Spray trackling using katcher until clean.
28. competency/topic :
Repair cover 263 DZ
type of work :
Track / October 20, 2010
Description of Activity
DZ 263 Repair Cover
Tools used:
Sandpaper
Sanpolac Isamu (priming)
Scraps
How it works:
Putty Will cover the repair by using sanpolac and skarp
Flatten the surface using sandpaper
After the flat surface of the cover, the cover painting by Isamu
(priming)
Then paint the cover by using a compressor
29. competency/topic :
Cleaning trackling
type of work :
Track / 21-22 October 2010
Description of Activity
Cleaning trackling
Tools used:
Scraps
Katcher
How it works:
Clean trackling with using a scrap of land That Sticks
Spray trackling using katcher until clean.
30. competency/topic : Final checks DZ units
type of work : Track / 25 October to 1 November
2010
Description of activities
Final checks DZ units
A. Refill oil dozer units
Tools used:
Pumps
Jerry cans
How it works:
Open the lid dozer oil tank and pour the oil from the pump using the supplied
jerrycans
Clean the work area of oil spills by using Sawdust
B. Painting Dozer unit
Tools used:
Compressors
How it works:
Close the glass cabin units by using paper That Is not exposed to paint
Spray the unit to average Dozer and tidy.
31. competency/topic :
Remove install sprocket D-375 A
type of work :
Track / 03-04 November 2010
Description of Activity
Remove sprocket install D-375 A
Tools used:
Socket 46
Handle 1 “
Rechet
Power raint
Short Pipe
How it works:
A. Remove sprocket
Loosen the bolts are tight by using the power raint already connected with
a short pipe with a socket 46
After the bolt is loose for easy to use handles and sockets 46
32. competency/topic :
Cleaning trackling
type of work :
Track / November 5, 2010
Description of Activity
Cleaning Trackling
Tools used:
Scraps
Katcher
How it works:
Clean trackling with using a scrap of land That Sticks
Spray trackling using katcher to clean
33. competency/topic :
Install the cover undercarige
type of work :
Track / November 6, 2010
Description of Activity
Install cover undercarige
Tools used:
Combination Lock 30
Socket 30
Handle 1 “
How it works:
Attach the cover to undercarige already repaired
Replace the which the bolts 30 are provided using a combination lock 30
In order to use the bolts are securely attached socket 30 and handle 1 “
Painting undercarige up neatly
34. competency/topic :
Drain the transmission oil
type of work :
Track / November 10,2010
Description of activities
Drain transmission oil
Tools used:
Key L 5
Containers
Pumps
Sawdust
Stocks
How it works:
Remove the transmission oil cap and provided input into the bucket
Fill the tank using a transmission with new oil pump to taste
Clean the area of the former oil spills by using Sawdust and clean
cotton waste
35. competency/topic :
Removeinstall hose assy frame
type of work :
Track / November 11,2010
Description of Activity
Remove install hose assy frame
Tools used:
Combination Lock 36
How it works:
Remove the hose frame to be removed using the pass key 36
Then attach the new hose That frames have been made available using
pass key 36
competency/topic :
Dasboard INNERCABIN
type of work :
Track / 12-13 November 2010
Description of activities
Dasboard Innercabin
Tools used:
Stocks
Sekrap and Thinner
36. How it works:
Wipe the glass cabin with clean cotton waste if Necessary use paint
thinner to moisten the dust cloth and then clean the glass cabin
If there is old paint / rust scrap use and clean with dust cloth moistened
with paint thinner
competency/topic :
Repair cover undercarige
type of work :
Track /November 15 , 2010
Description of Activity
Reapir cover undercarige
Tools used:
Sandpaper
Sanpolac
Isamu priming
Spatula
Combination Lock 30 & 24
Socket 30 & 36
How it works:
Putty That Will undercarige repaired using sanpolac and putty knife
Flatten the surface using sandpaper cover
After the flat surface of the cover, the cover painting by Isamu
37. Then painting the cover with compressed
After the cover undercarige pairs nicely painted cover with a combination
lock to use your 30 & 36 and rechet
competency/topic :
Completed bolt cover enggine
type of work :
Track / November 16,2010
Description of Activity
Completed bolt cover undercarige
Tools used:
Combination Lock 19
Socket 19
Rechet
How it works:
Replace the bolt That Had been cleaned using a wire brush and container.
Tighten the lock bolt by using a combination of 19
In order to use the bolt is securely attached to the socket 19 and rechet.
38. competency/topic :
Install 273 DZ hidller
type of work :
Track / November 17,2010
Description of activity
Install 273 DZ hidller
Tools used:
Handle 1 “
Socket 30
Rechet
Tokraint extencaint ¾
How it works:
Attach hidller ready, to undecarige by using forklift
After hidller installed correctly, enter the bolts That have been cleaned
first, then
Tighten using the socket handle and advance to more easily use rechet to
tighten the bolts
After the bolts tight, use the function tokrain tighten bolts in accordance
with the size
39. competency/topic :
Painting Stand
type of work :
Track / 20-22 November 2010
Description of activity
Painting booth
Tools used:
Pilok
Duct Tape
Cater
Cat
Sekrap
How it works:
Clean the stand by using scrap until blended ago
Paint booths with red paint
After the paint is dry use the duct tape and cater for the load stand identity
and then use paint to paint the identity of the load pilok stand
40. competency/topic :
Install the sprocket 273 DZ
type of work :
Track / 23-24 september2010
Description of activity
Install sprocket 273 DZ
That tools are used:
Tokraint
Handle
Socket 36
How it works:
Attach tith frameundercarige sprocket to 36 and insert the supplied bolt
and tighten the bolt using a socket 36 and handle
After the bolt tight to fit a standard bolt mounted using tokrait and socket
36.
41. competency/topic :
Cleaning trackling
type of work :
Track / 25-26 November 2010
Description of Activity
Cleaning Trackling
Tools used:
Skap
Katcher
How it works:
Clean trackling by using a scrap of land That Sticks
Spray trackling by using katcher until clean.
42. competency/topic :
PSMS (painting workshop)
type of work :
Track /Novemeber 29 - December 1, 2010
Description of activities
PSMS (painting workshop)
Tools used:
Brush
How it works:
Mix the paint with a thiner then stirred with a flat
Painting workshop clean and tidy.
43. competency/topic :
Refill diesel units Dozer
type of work :
Track / 2-4 December 2010
Description of activities
Refill diesel units Dozer
Tools used:
Pumps
How it works:
Open the tank lid and fill with diesel fuel That has been provided
using the pump
Fill the tank if there is enough diesel fuel is spilled IMMEDIATELY
clean by using Sawdust That has been provided.
44. competency/topic :
Install the cover undercarige
type of work :
Track / 5-9 December 2010
Description of Activity
Install cover undercarige
Tools used:
Combination Lock 30
Socket 30
Handle 1 “
How it works:
Attach the cover to undercarige already repaired
Replace the which the bolts 30 are provided using a combination lock
30
In order to use the bolts are securely attached socket 30 and handle 1“
Painting undercarige up neatly
45. competency/topic :
Washing unit Dozer
type of work :
Track / 10-11 December 2010
Description of Activity
Washing unit Dozer
Tools used:
Scraps
Katcher
How it works:
Clean trackling with using a scrap of land That Sticks
Spray trackling using katcher until clean.
46. Format prakerin student assessment (PSG)
(Assessment by supervisor)
Name of company
Address
No aspect of the assessment value
a. Aspects of personality
1. Attitudes and behavior 80
2. Presence attendance / discipline 88
3. Initiative and creative ability 74
4. Motivation and responsibili 95
5. Mental readiness in working 85
47. b. Aspects of competence
1. Timeliness of work completed 85
2. Quality of work 80
3. Knowledge of 75
4. The timing of the prakerin 78
5. Knowledge of machining 85
6. Knowledge of production process 87
7. Read engineering drawings 85
8. The use of machining 80
9. Number of values 1007
The average value 82,85
Pass both the
48. I. IDENTITY
Name : Anggra Rivaldi
Place / Date of birth : Bekasi Augustus 22, 1994
Gender : Male
Blood Type :-
NIS / Class / progli : 10097662/XI TP 2
Name of parent / guardian : Arief sutandi
Address : Rt 02/05 kp. babakan, ds. Dayeuh
Kec. Cileungsi Kab. Bogor
No HP / Tel : 02126724528
Cileungsi, December 11, 2011
Signature of student
49. COMPANY IDENTITY (DU / IN)
Name of DU / IN : PT. PAMA PERSADA NUSANTARA
Bid. / Type of Business : Industrial
Address : Jln. Kingdom Narogong km.23, 8 tower
scenic area of industry
Tel / fax :
Name of leader : Personal Mr. Santoso
Name of supervisor : Mr. Samsudin
Pkl start date : 11 October 2010
Pkl completion date : December 11, 2010
51. CHAPTER II
COMPANY OVERVIEW
A. History of company
PT. Pama Persada Nusantara (PAMA) was formed in 1989. PAMA
derived from heavy equipment rental division to its parent company PT United
Tractor Tbk is specialized heavy equipment sales and distributors. For
many, many famous brands Such as Komatsu and Nisan. Major shareholder of
PT. Astra International Tbk, one of the companies in Indonesia.
PAMA is one herald mining contractor in Indonesia, where Indonesia has
a wealth not inferior to other nations. Against the backdrop of a solid and
constant desire to Improve Their professional and generate customer
satisfaction, PAMA has grown in Indonesia's mining industry, and provides all
the capabilities and services to clients and partners. PAMA is the largest
mining contractor in Indonesia, has done 40% of coal mining spread in parts of
Indonesia in 2003. PAMA today operate with many mining regions in
Kalimantan and Sumatra, the scope of the projects handled include coal
mining. Gold mining, construction and removal of soil. Coal mining into
business with the majority of 140.68 million cubic meters of bada areas in the
mine and Transported in 2003.
52. In 2003, PAMA earn income above U.S. $ 320 million. PAMA assets
includes 1028 units of heavy equipment and the number of employees 4316
people, in the conduct of mining with Various conditions in Indonesia, PAMA
has gained much experience covers all the steps the which have been operating
a fare study of wealth, preproduction, development and production of regular
mining construction. PAMA has built a good relationship with his client. With
the success of operations in the construction and mining projects have been
rewarded / reward with an extension of negotiations on the repetition of the
original mining contract is a commitment to quality reporting PAMA perfect
operational flexibility and reliability.
PAMA attention to the importance of safety, health and the environment to
introduce the draft PAMA / good design and management system (PSMS) a,
the which is based on three design Accreditation international recognition, the
international ONV SEQ Rating System; National Occupatil Safety Association
( NOSA); AND Sut Africa Chamber of Mine-mine Safty Management System
(MSMS). PAMA also apply seperty management system ISO 9001, ISO
14001, Gren Astra company (AGC), siystems Management of safety and
health (SMK3) PAMA Mnagemen Human Resources (PHRM) PAMA
production management system (PPMs), Total Productive Mantenance (TPM),
With a trainer / instructor with a good and professional workers and full
support from the parent company,
53. PAMA Will continue to expand on the overall planning to become a leading
contractor in Southeast Asia.
B. Vision and Mission
The vision and mission of the PT. Pama Persada Nusantara are as follows:
1. Company Vision
Being a mining contractor grade world with productivity, enggenering, safety
and environmental best.
2. Company Mission
a. Providing services with the operation of heavy equipment in the field of open
and mining overburden That enables subscriber to get the best return on the
world stage
b. Provide opportunities for employees to develop their competence to measure
in objective
c. Providing the best MVA and EVA to shareholders.
d. Continually seeks to master the technology and engineering capabilities and
environmentally sound as well as human safety for the progress of the nation
and the State
54. III. Noted the company's organizational structure (owners & responsible
person)
55. IV. Take note of the manufacturing process (production) and or service
1. Unit at the Promontory Priuk pic: GL. Mekanik
Activity : Mobilisai : - Helper mechanical
Pic : Expedition
welder
2. To in yards Cileungsi Activity: part-Genune
Activity : Check documents spb.c / ws / n-Local Part
Pic : Mechanics
security
3. The unit Entered the parking lot 8. Running
Activity : Lower unit
Pic : Mechanical
Helper mechanical
4. Parking in accordance Activity status model:
Activity : Set the distance units of the between unit + 15 m
Pic : Mechanical
56. 5. Completeness and check the condition of the unit Pic-GL. Mechanical
Activity : Q.A.L
Unit condition report
Recommended part
Pic : Fore - GL.mekanik UNIT READY
-Logistic - ppc USE / SALE
Activity promotion repair cost analysis
DEMO
ASIS
<$
57. 6. The process of major & minor ripaire
Activity : Entrance bayS
Cleaning the unit
Fabrication
Pic : GL.mekanik
Helper mechanical
welder
7. Running
Pic : GL.mekanik
Helper mechanical
8. Unit ready for use
Activity : Gtound test unit
Q.A.I
Performance + 80%
58. Pic : GL. Mekanik
Helper mechanical
UNIT READY FORE
USE / SALE
>$
Activity : Promotion
Demo
59. V. Take note of the marketing process and marketing area
60. VI. Take note of the selection process or the hiring of employees
1. Identified there (identify Them)
2. Develop a position description (explanation of the development of
positions)
3. Offer (offer)
4. Identify the key selection criteria (to identify the key criteria)
5. Create the advertis-ment (making the advertisement)
6. Paper selection listiny short (forum / paper checks initial selection)
7. Initial screening interview (interview)
8. Psicometric testing (pisicotes)
9. Assessment centers / simulation (removal and simulation)
10. Second / tehnical interview (interview techniques)
11. Reference checking (checking of certificate)
12. New employees (new hires)
4. Note safty equipment for the industry and carry out the work
Sefty shoes
Sefty helmet
61. Welding gloves
Masks
Ear plug
Ear Muff
5. Take note of the steps in operation any or all of the machines used when prakerin
Washing machine
P2h (checks, equipment, daily)
Prepaire hose to spray water
Hose that contain the flow of water put into washing machine
Put hose into the electrical panel legran
Turn on the washing machine are marked with green or start
To turn off the washing machine or simply press the red button off
6. Mencatat raw materials and auxiliary materials used in industry
Auxiliary materials
WD 40 to remove the rust
Sandpaper
Thiner
Cat
Clean and remove rust on electric einer
62. VII. DAILY ACTIVITY REPORTS STUDENTS
Student Activities Report
No. DAY / DATE TYPE OF ACTIVITY
1. 11-14 October 2010 : > p5m (talk five minutes)
> Cleaning grader
2. 15 October 2010 : > Cleaning blade
> Cleaning propeller of a pile of oil
> Open the hose auto lube
3. 16 October 2010 : > Break
> Cleaning system on the grader over 233 units
> Cleaning Minning plate
> Cleaning sap
4. 18 October 2010 : > 233 unit graders cabin cleaning
> Sand the cover unit 233 Grader
5. 19 October 2010 : > Clean the filter
> Sand the cover unit 233 Grader
63. 6. 20 Octobe, 2010 : > Cleaning the tandem
> Attach nipple grase
7. 21 October 2010 : > Cleaning and wrap it over breake
system demean plastic wrap
8. 22 October 2010 : > Sand the front as 233 units graders
9. 25 October 2010 : > Pump oil pump chain tandem
with Install the nuts
10. 26 October 2010 : > Replacing the wheel and tire unit 233 Grader
> Cleaning the glass cabin 233 unit graders
11. 27 October 2010 : > Cleaning the glass cabin unit 233 Grader
: > Suck the oil in 233 unit graders because
of leakages in sap / breaking system
12. 28 October 2010 : > Painting cabin units graders
> Sucking oil
> Grader unit 233
13. 01 November 2010 : > Cleaning air from red silicon tandem
> Cleaning the red rings on silicon
> Sand the tandem unit 233 Grader
> Sand tendem chain
64. 14. 2-4 November 2010 : > Placing and open tire unit 233 Grader
> Installing over breaking the system
15. 5 November 2010 : > Cleaning the glass cabin
16. 6 November 2010 : > Transmission oil change on a 233 unit graders
17. 8 November 2010 : > Put nuts guard fh 16
> Remove the site operator fh 16
18. 9 November 2010 : > Scrap skotlet fh 16
: > Fill the oil tendem 233 unit graders
19. 10 November 2010 : > Filling oil tendem
> Install the plate on the sap
: > Install tire Grader 233
: > Painting graders hose 233
20. 11 November 2010 : > Sand the chassis / cab fh 16
: > Support painting cabin fh 16
21. 12 November 2010 : > Cleaning covers fh 16
65. 22. 13 November 2010 : > Support graders painting cabin 266
> Clean the work area / bays
23. 14 November 2010 : > Sand the door Grader 266
> Cleaning the area
24. 15 November 2010 : > Rreleasing water separator / filter fh 16
> Painting the cover fh 16
25. 18 November 2010 : > Cleaning water separator FH 16
> Painting water separator fh 16
> Filling diesel water separator fh 16
> Cleaning the chain graders tendem 277
26. 19 November 2010 : > 266 painting door graders
27. 22 November 2010 : > 266 washing graders
28. 23 November 2010 : > 266 painting door graders
29. 24 November 2010 : > 266 washing graders
> Fix the cylinder riper
30. 25 November 2010 : > Rreplacing the valve WL
> Riper GR-fixing cylinder 266.
66. 31. 26 November 2010 : > Fixing cylinder 266 riper GR
32. 29 November 2010 : > Attach hose cylinder
> Clining area
33. 30 November - 3 December : > After finish the workshop area
> Support unit parking
34. 4 December 2010 : > Cannibal mud guard fh 16
35. 6 December 2010 : > Release the piping
> Releasing electrically ct
system (crane truck) 018
36. 8 December 2010 : > Moving cabin ct (truck crane) 018
37. 9 December 2010 : > Release unit of a crane truck covers 018
> Cleaning cabins ct (truck crane) 018
38. 10 December 2010 : > washing cabin ct (truck crane) 018
> washing cover (truck crane) 018
39. 11 December 2010 : > Washing engine ct (truck crane) 018
> Clening area ct (truck crane) 018
67. Format prakerin student assessment (PSG)
(Assessment by supervisor)
Name of company
Address
No aspect of the assessment Value
a. Aspects of personality
1. Attitudes and behavior 80
2. Presence attendance / discipline 80
3. Initiative and creative ability 75
4. Motivation and responsibility 75
5. Mental readiness in working 75
68. Value
b. Aspects of competence
1. Timeliness of work completed 75
2. Quality of work 75
3. Knowledge of safety 70
4. The timing of the prakerin 80
5. Knowledge of machining 75
6. Knowledge of production process 78
7. Read engineering drawings 70
8. The use of machining 70
Number of values the average value
Pass both the
69. IDENTITY
Name : WAHYUDIN
Place / Date of birth : Bogor December 12, 1993
Gender : Male
Blood Type :A
NIS / Class / progli : 10097857/XI tp 3
Name of parent / guardian : Nasan
Address : Kp. Walahir Rt. 07/ 04 Ds. Nambo Kec. Klapanunggal
No HP / Tel : 085714211271
Cileungsi, December 11, 2011
Signature of student
70. COMPANY IDENTITY (DU / IN)
Name of DU / IN : CV. RIZKY JAYA PERSADA
Bid. / Type of Business : -
Address : Jln. Pesantren Ds. Pasir angin Rt 01/05
Pasir angin, Cileungsi, Bogor
Tel / fak : (021) 82498741, 82498640
Name of leader : Mr. Waliyadi I Adnan. ST
Name of supervisor : Mr. Tony
Pkl start date : July 27, 2010
Pkl completion date : October 26, 2010
72. III. Noted the company's organizational structure (owners & responsible
person)
73. NOTE THE PREPARATION WORK AND K 3
1. Record the steps or preparatory work has not
Following the directives of the leadership of the company
Making planning what work will be done
Preparing sefty
2. Noting industrial machines that are used the following function
M / c Tool =) make the goods according to customer perrmintaan
(corresponding image)
M / c scrap =) make / take over the plate thickness of 1 mm
M / c milling =) Make goods according to customer demand
(corresponding image)
M / c grinding surface =) make the goods to be fine (go to precision
measurements)
Mic weld =) welding / connect between the plate
3. Take note of the following hand tools in the industry functions
Hand grinding machine (smooths rough objects)
Stingy (smooths rough objects)
Sandpaper (removing rust and dirt)
74. 4. Noting sefty equipment for the industry and carry out the work
Gloves (to avoid minor cuts / scrapes hand)
Masks (avoid dust)
Helmet (avoiding impact in the head)
Glass eyes (avoid dirt / dust)
Shoes (to protect feet)
5. Take note of the steps in operate any or all of the machines used when
prakerin Lathes
Reading working drawings
Preparation tool and the workpiece
Operation lathes
Put the material into a machine with a fast dibble
On the dial (should be straight)
Prepare a chisel
Turn the key on
75. 6. Record the raw materials and auxiliary materials used in industry
Material 400 ss
Material s 45 c
Material SKD 11
Material VCN
Material pvc
Material crethane
Material mc blue
Material credits 304 (stainless)
7. Take note of the manufacturing process (production) and or service
Machining of materials
The process of cutting
Lathe process
Milling process
Cnc process
76. 8. Notes the marketing process and marketing area
Costumer
PT. Yamaha
PT. VTE
PT. Sanyo
PT. Winteq
PT. Toyota t huso
9. Record the employee selection process or acceptance hires
Jobs - (notably, the Internet)
- (Directly in the test on the machine in their respective fields)
Interview salary + placementmachine 3 - month trial
Contract 1 year
AGENDA NOTE TO MAKE WORK
1. 27 Juli 2010 : > Grinding components gaspan
> Clean pvc news
77. 2. 28 July 2010 : > Attach the clamp bolts
> Paint the gutters 5 assy line 7
> Install cables
3. 29 July 2010 : > Grinding plate t-2
> Grinding pvc-news
> Install clamp bolt
4. 30 July 2010 : > Grinding plate
> Install adjuster-plate
> Install clamp bolt
5. 02 August 2010 : > Clean test jigli
> Painting the carrier
> Grinding plate
6. 03 August 2010 : > Cutting oil gaspan
> Pressing oil gaspan
7. 04 August 2010 : > Sand the bushing or ring
> Sand the pin
> Sand the shim ute
> Grinding oil gaspan
78. 8. 05 August 2010 : > Grinding oil containment secodry collector
> Clean the bushing / rings
9. 06 August 2010 : > Grinding components gaspan
> Welding components gaspan
> Lathe gaspan round d = 405
10. 09 August 2010 : > Sand the pin
> Welding components gaspan
> Sand the rounded gaspan d = 40510 August 2010
11. 10 August 2010 : > Drilled components gaspan
> Lathe gaspan round d = 405
12. 11 August 2010 : > Weld components gaspan
> Grinding carier
13. 12 August 2010 : > Sand component gaspan
> Grinding carier
> Cut pindal 13
14. 13 August 2010 : > Weld carier
> Grinding carier
79. 15. 16 August 2010 : > a lathe bushing or ring
> Sand the pin
16. 18 August 2010 : > Grinding carier
> Cut the plate (m / c cutt whell)
> Cut The Iron (M / C Cutt Whell)
> Grinding iron
17. 19 August 2010 : > a lathe bolts d = 9. 40
> Grinding plate
> Drill the plate d = 6
18. 20 August 2010 : > Cut the pvc (m / c jig saw)
> Drilled pvc (m / c drill)
19. 23 August 2010 : > Lathe bolts d = 9. 40
> Grinding plate t = 2
> Sand the plate t = 2
20. 24 August 2010 : > Install adjuster plate
> Lathe bolts d = 9. 40
21. 25 August 2010 : > a lathe bolts d = 9.40
> Sand the bushing / rings
22. 26 August 2010 : > Cut the plate t = 2
> Grinding plate t = 2
> Gluing acrylic saind bord
80. 23. 27 August 2010 : > a lathe bolts d = 9.40
> Pressing gaspan box
24. 30 August 2010 : > Gluing pvc news
> Grinding pvc news
> Clear pvc news
25. 31 August 2010 : > a lathe pin
> Improving the welding transformer 220
26. 01 September 2010 : > Repair welding transformer 220
> Improving the ac outlet
27. 02 september 2010 : > lathe bolts d = 9.40
> Cut round gaspan
28. 03 september 2010 : > Cut plate
> Grinding plate
> Drill the plate d = 10
29. 16 September 2010 : > to cut iron
> Grinding of iron
> Sand box gaspan
> Clean the box gaspan
81. 30. 17 september 2010 : > Sand the pin
> Sand box gaspan
31. 20 september 2010 : > Drilled pvc
> Sand box gaspan
32. 21 september 2010 : > Drilled pvc
> Sand box gaspan
33. 22 september 2010 : > Cut the iron
> Grinding of iron
> Cut the plate (m / c cutt whell)
> Grinding plate
34. 23 september 2010 : > Oil pressing gaspan
35. 24 september 2010 : > Gluing pvc news
> Grinding pvc news
> Cut the clear rubber
36. 27 September 2010 : > Gluing pvc news
: > Clear pvc news
37. 28 September 2010 : > Gluing pvc news
> Clear pvc news
> Cut the clear rubber
82. 38. 29 september 2010 : > Grinding oil gaspan
> Gaspan oil sand
> Filing pin
39. 30 september 2010 : > Gaspan oil sand
> Clean up oil gaspan
40. 01 october 2010 : > Sand component gaspan
> Pressing oil gaspan
> Filing pin
41. 04 october 2010 : > Install pvc
> Clean the grinding machine
42. 05 october 2010 : > Grinding oil gaspan
> Gaspan oil sand
> Drill carrier
43. 06 october 2010 : > Clean carrier
> Gaspan oil sand
> Lathe vacuum tank assy
44. 07 october 2010 : > Cleaning jig cover uder
> Clean the jig side cover 3
> Clean the jig sped meters
45. 08 october 2010 : > Cutting plate
> Grinding plate
> Sand the pin
83. 46. 13 October 2010 : > Cut pvc (m / c mosque s)
> Sand box gaspan
> Cut the plate
47. 14 october 2010 : > Cut pvc (m / c jig saw)
> Sand box gaspan
48. 15 October 2010 : > Gaspan sand box
> Cut the pin (m / c jig saw)
> Sand the pin (m / c lathe)
49. 18 october 2010 : > Grinding carier
> Help make the carrier
50. 19 October 2010 : > Helped make the carrier
>Grinding carier
> Gaspan oil sand
51. 20 October 2010 : > Helped improve the milling machine
> Grinding oil gaspan
> Gaspan oil sand
84. 52. 21 October 2010 : > Helped make the carrier
> Lathe pin
> Drilled pvc (m / c drill)
53. 25 october 2010 : > Cutting pin (m / c jig saw)
> Cut the pvc (m / c jig saw)
54. 26 October 2010 : > Cut pvc (m / c jig saw)
> Cut acrylic (m / c jig saw)
85. Format prakerin student assessment (PSG)
(Assessment by supervisor)
Name of company
Address
No aspect of the assessment value
a. Aspects of personality
1. Attitudes and behavior 92
2. Presence attendance / discipline 91
3. Initiative and creative ability 95
4. Motivation and responsibility 95
5. Mental readiness in working 95
86. b. Aspects of competence
1. Timeliness of work completed 90
2. Quality of work 90
3. Knowledge of safety 89
4. The timing of the prakerin 89
5. Knowledge of machining 89
6. Knowledge of production process 89
7. Read engineering drawings 89
8. The use of machining 82
9. Number of values 1.175
The average value
Pass both the