SlideShare ist ein Scribd-Unternehmen logo
1 von 90
NAME      : RUSDIANTO
NIS/CLASS : 10097825/XI TP 3
ADDRESS : VILLAGE TLAJUNG Hick RT 01/12 KAB. BOGOR

                    SMK Muhammadiyah 1 Cileungsi
 JL. No orchids. 86 Cileungsi district, Bogor Telp.8230985 Fax. 82480034
I.   IDENTITY
     Name                        : Rusdianto
     Place/Date of birth         : Bogor/ October 15, 1993
     Gender                      : Male
     Blood Type                  :B
     NIS/Class/Progli            : 10097825/XI TP 3
     Name of Parent/guardian     : Tugiman
     Address                     : Rt.1/12 kp. Momonot Tlajung daughter
                                   Hillbilly Mountain District No. 18
                                   Bogor
     Handphone/Telp              : 087770063815
     Cileungsi, December 11, 2011

                                                                          Signature of student

     COMPANY IDENTITY (DU / IN)
     Name of DU / IN         : PT. PAMA PERSADA NUSANTARA
     Bid. / Type of Business : Industrial
     Address                 : Jl. Kingdom Narogong km. 23, 8 tower scenic area of
                               industry
     Name of leader          : Personal Mr. Santoso
     Name of supervisor      : Mr. Suhadi
     Pkl start date          : October 11, 2010
     Pkl completion date     : December 11, 2010
APPROVAL SHEET
              INDUSTRY WORKING PRACTICES
      SMK MUHHAMMADIYAH 1 Cileungsi "TERAKREDETASI A"

               CERTIFICATION SHEET BUSINESS / INDUSTRY
                    INDUSTRY WORKING PRACTICES


On this day Monday the 11th of October 2010, Has endorsed the book industry
journal reports of work practices (prakerin) above:
    Name                             : Rusdianto
    NIS / Class / Progli             : 10097825/XI TP Engine 3/Teknic

The name Mentioned above to implement work practices in the industry:
   Name of DU / IN : PT. PAMA PERSADA NUSANTARA
   Address              : Zone Tower Permai Bogor Km 23.8 Cileungsi
   Start prakerin       : On October 11, 2010
   Done prakerin        : December 11, 2010

Knowing the October 11, 2010
DU Leader / Supervisor DI industry
II.   JOURNAL PRAKERIN
A. INTRODUCTION
     The purpose of the preparation of journals and reports of students' activities During
the implementation of industry practices (prakerin) is to increase of the quality and
relevance of vocational high school Muhammadiyah 1 Cileungsi working with business
and industry That covers aspects of the development of moral character , knowledge,
skills, arts and health culture. The development of these aspects leads to the
improvement and development of life skille (life skills), the which is realized through
the achievement of the Standards of Competence.
     Standard and Basic competence of industry work practices (prakerin) function
align school curriculum with business and industry, so That students can actualize and
develop themselves to the world of business and industry.
     Industry practice for the students can Produce a superior personal character,
Abilities and ethics to get along, adaptability, initiative skills, ability to cooperate,
ability and skills to work in the company and or independent.

B.    LEGAL BASIS
      Implementation of industry practices (prakerin) PSG based on:
         Pancasila and 1945 Constitution.
         Law No.20 of RI TH.2003 about the national education system
         GoI Peranturan Th.2005 19, of the National Education Standards.
         Regulation 22 TH.2006 minister of national education, about the standard of
          the ISI.
   Regulation No.23 TH.2006 minister of national education, the Standard of
         Competence Graduates (SKL).
        Regulation of the Minister of National Education TH.2006 No.24, on the
         implementation of the ISI standards and SKL on elementary and secondary
         education units.
        Decision No. Education Minister. 080? U/1993 of vocational curriculum as
         follows,
          "The implementation of education Carried out through two pathways (Link and
         Match) of school education and special education schools.

C.  PURPOSE
    Destination industry working practices so That Learners have the following
capabilities:
    1. Understanding and appreciate the business activities and industry.
    2. Understanding the workplace culture (mental attitude and personality).
    3. Understand and be Able to use equipment to business and industry.
    4. Understanding the production process from raw materials to finished goods.
    5. Understanding the administration / business and industry menegement.
    6. Have the skills and independence to work and Trying.
    7. Intertwining relationship the between the school faforable partner institutions.
    8. The implementation of the learning process in business and industry.
    9. Introduction and implementation of marketing for prospective graduate students.
D. INSTRUCTIONS FOR STUDENT USE
  1.   Students are required to read the entire journal is closely
  2.   Fill in the data / information in accordance with this question journalized
  3.   Standard practice in competency this journal
  4.   Prakerin always taken the time and always maintain the cleanliness of the
       journal and this report
  5.   Reported after conducting prakerin
  6.   Following the oral examination prakerin

E. INSTRUCTIONS FOR USE OF SCHOOL COACH
  1.   Read and appreciate the entire contents of this journal
  2.   Guiding students in filling journals and this report
  3.   Establishing good relations with industry Mentors
  4.   Guiding the students before leaving prakerin
  5.   Students, monitor student progress in place prakerin
  6.   Resolving student problems together
  7.   Responsible or the make a report after students erection prakerin
F.   COACH'S GUIDE FOR INDUSTRIAL USE
     1. Working closely with school counselors and teachers in the
        implementation of practice
     2. Provide support to the implementation prakerin by Providing facilities and
        material practices
     3. Provide guidance and training in accordance with the needs of business
        and industry
     4. Provide an assessment to students prakerin tailored to the existing format
     5. Together with the school signed certificate / recognition Abilities of
        students

G. STUDENT Code PRAKERIN / PKL
     1.   Obeying the rules and regulations at the company / business and industry
     2.   Maintain and uphold the authority of, and Will not do the Things That can
          destroy religion, schools and parents
     3.   And always try, to be disciplined, creative and Responsible adults
          inofative
     4.   Well dressed, polite and respectful to everyone
5.   Giving Them know (permissions) to the coach industry, if Unable to
       attend (sick)
  6.   Complete and sign with Their parents sign a statement

H. HOPE AFTER PRAKERIN
  1.   Have a noble character and Devotion to the Almighty GOD (Students can
       Enhance the personality of the which include: accuracy, dexterity,
       discipline, independence and responsibility)
  2.   Having insight into the world of industry and mental readiness to work
       independently
  3.   Students can Improve Their standard of competence (life skill to have) a
       better life skills
  4.   Studentscan Enhance creativity and initiative in learning, work and
       community
   STUDENT COUNTER
III. Noted the company's organizational structure (owners & responsible
   person)
CHAPTER I
INTRODUCTION

A. Company Background
    PT. PAMA PERSADA NUSANTARA is a company engaged in the field of
    non-oil mining contractor in Indonesia

That are used Sciences include:
1. Basic sciences include: Mathematics engineering, engineering physics,
   computer programming language, materials engineering structural mechanics,
   control and automation
2. Applied science include: CAD, welding equipment metal industry, machine
   maintenance, safety

The problems faced by
    Students explore the material in the company of heavy equipment manitenance
and engineering / modification unit. Will the unit be used continuously Damaged if
without treatment, so That a unit in the industry requires regular maintenance to be
done periodically to the unit is Damaged and Will not be an obstacle in the
production process within a company.
Purpose and objectives
1. The purpose of this report is students writes:
   a. That the Various Study Often problems occur in the PT. Pama Persada
       Nusantara, problems. That Often Happen to find a solution based on
       science That have been studied are: engine maintenance
   b. Apply the theoretical knowledge obtained paraktek That has been into a
       real school.
   c. Helping to find and solve technical and non technical issues in the use and
       maintenance of heavy equipment in a corporate environment.
2. The purpose of this company is students writes:
   a. Gain experience on the care units of heavy equipment in the company's
       real, so students get a clearer picture about the Various Things about the
       world of work is applicable.
   b. Get a real picture and clearer understanding of the components inside the
       unit That Is used with care.
B.   Methods of practical work
     The method is a way of working systematically to facilitate the
     implementation of an activity in order to Achieve the specified goals.
     The method used is:
     1) Guidance
         In this case, the method used to Convey materials mentor That growing
         niche or learning materials to be oral and written and Mentors to the
         praktikan work practice field.
     2) Observation
         "The method of observation is an observational research method (review)
         field Carried out carefully before practice.“
     3) Interview
         "This method is a method of research interviews conducted by a
         researcher to the speaker.“
     4) Practice
         "Method of practice is a method of research conducted by a real
         implementation on the ground.“
C. Systematics
    In this report, contains about treatments and how to repair, engineering and
    modification on the job in general track in PT. PAMA PERSADA
    NUSANTARA.


CHAPTER II
COMPANY OVERVIEW

A. History of company
     PT. Pama Persada Nusantara (PAMA) was formed in 1989. PAMA derived
from heavy equipment rental division to its parent company PT United Tractor Tbk
is specialized heavy equipment sales and distributors. For many, many famous
brands Such as Komatsu and Nisan. Major shareholder of PT. Astra International
Tbk, one of the companies in Indonesia. PAMA is one herald mining contractor in
Indonesia, where Indonesia has a wealth not inferior to other nations. Against the
backdrop of a solid and constant desire to Improve Their professional and generate
customer satisfaction, PAMA has grown in Indonesia's mining industry, and
provides all the capabilities and services to clients and partners. PAMA is the
largest mining contractor in Indonesia, has done 40% of coal mining spread in parts
of Indonesia in 2003.
PAMA today operate with many mining regions in Kalimantan and
Sumatra, the scope of the projects handled include coal mining. Gold
mining, construction and removal of soil. Coal mining into business with the
majority of 140.68 million cubic meters of bada areas in the mine and Transported
in 2003.
     In 2003, PAMA earn income above U.S. $ 320 million. PAMA assets includes
1028 units of heavy equipment and the number of employees 4316 people, in the
conduct of mining with Various conditions in Indonesia, PAMA has gained much
experience covers all the steps the which have been operating a fare study of
wealth, preproduction, development and production of regular mining construction.
     PAMA has built a good relationship with his client. With the success of
operations in the construction and mining projects have been rewarded / reward
with an extension of negotiations on the repetition of the original mining contract is
a commitment to quality reporting PAMA perfect operational flexibility and
reliability.
     PAMA attention to the importance of safety, health and the environment to
introduce the draft PAMA / good design and management system (PSMS) a, the
which is based on three design Accreditation international recognition, the
international ONV SEQ Rating System; National Occupatil Safety Association (
NOSA); AND Sut Africa Chamber of Mine-mine Safty Management System
(MSMS).
PAMA also apply seperty management system ISO 9001, ISO 14001, Gren Astra
company (AGC), siystems Management of safety and health (SMK3) PAMA
Mnagemen Human Resources (PHRM) PAMA production management system
(PPMs), Total Productive Mantenance (TPM), With a trainer / instructor with a good
and professional workers and full support from the parent company, PAMA Will
continue to expand on the overall planning to become a leading contractor in Southeast
Asia.

B.   Vision and Mission
     The vision and mission of the PT. Pama Persada Nusantara are as follows:
1.   Company Vision
     Being a mining contractor grade world with productivity, enggenering, safety and
     environmental best.
2.   Company Mission
     a.   Providing services with the operation of heavy equipment in the field of open and
          mining overburden That enables subscriber to get the best return on the world stage
     b.   Provide opportunities for employees to develop their competence to measure in
          objective
     c.   Providing the best MVA and EVA to shareholders.
     d.   Continually seeks to master the technology and engineering capabilities and
          environmentally sound as well as human safety for the progress of the nation and the
          State
IV. Take note of the manufacturing process (production) and or service
    1. Unit at the Promontory Priuk pic: GL. Mekanik
         Activity: mobilisai        : Helper mechanical
         Pic                        : Expedition
                                      Welder
    2.   To in yards Cileungsi Activity: part-Genune
         Activity          : Check documents spb.c / ws / n-Local Part
         Pic               : Mechanics
                              Security
    3.   The unit Entered the parking lot 8. Running
         Activity          : Lower unit
         Pic               : Mechanical
                             Helper mechanical
    4.   Parking in accordance Activity status model
         Activity          : Set the distance units of the between unit + 15 m
         Pic               : Mechanical
    5.   Completeness and check the condition of the unit Pic-GL. Mechanical
         Activity          : Q.A.L
                             Unit condition Report
                             Recommended part
Pic              : Fore -GL. mekanik UNIT READY
                               -Logistic
                               -ppc USE / SALE



              Activity promotion repair cost analysis
              -DEMO



                                 ASIS

                                  <$


6.   The process of major & minor ripaire
     Activity         : Entrance bays
                        Cleaning the unit
                        Fabrication
     Pic              : GL.mekanik
                        Helper mechanical
                        Welder
7.   Running
     Pic               : GL.mekanik
                         Helper mechanical
8.   Unit ready for use
     Activity          : Gtound test unit
                         Q.A.I
                         Performance + 80%
     Pic               : GL.mekanik
                         Helper mechanical




                      UNIT READY FORE
                            USE/SALE
                                >$
     Activity         : Promotion
                        Demo
V. Take note of the marketing process and marketing area




VI. Take note of the selection process or the hiring of employees
    1.   Identified there (identify Them)
    2.   Develop a position description (explanation of the development of
         positions)
    3.   Identify the key selection criteria (to identify the key criteria)
    4.   Create the advertis-ment (making the advertisement)
    5.   Paper selection listiny short (forum / paper checks initial selection)
6.  Initial screening interview (interview)
     7. Psicometric testing (pisicotes)
     8. Assessment centers / simulation (removal and simulation)
     9. Second / tehnical interview (interview techniques)
     10. Reference checking (checking of certificate)
     11. Offer (offer)
     12. New employees (new hires)


4.   Note safty equipment for the industry and carry out the work
      Sefty shoes
      Sefty helmet
      Welding gloves
      Masks
      Ear plug
      Ear Muff
5.   Take note of the steps in operation any or all of the machines used when
     prakerin
     Washing machine
      P2h (checks, equipment, daily)
        Prepaire hose to spray water
        Hose that contain the flow of water put into washing machine
        hose into the electrical panel legran
        Turn on the washing machine are marked with green or start
        To turn off the washing machine or simply press the red button off

6.   Note raw materials and auxiliary materials used in industry
      Auxiliary materials
      WD 40 to remove the rust
      Sandpaper
      Thiner
      Cat
      Clean and remove rust on electric einer
A.   Student Activities Report
VII. DAILY ACTIVITY REPORTS STUDENTS
         competency/topic : Install Bottom Guard DZ 273
         type of work     : Track/ 12 October 2010

     Description of activities
     Install guard Botom d 375
     A. Tools in use:
      Handle 1 “
      Socket 36
      Short Pipe
      Jack hidroulik
      Cain blocks
      Combination Lock 36
      Belt
     How it works:
        Tie Belt Bottom Guard below, then associate cain blocks mounted on both
         sides trackshue
        Lift SLOWLY by turning the crank cain bloks second, after cainblok since
         hydraulic lift used to help hold the Bottom Guard.
        After the Bottom Guard lifted use the key combination for installing bolts 36.
        To Bottom Guard held tight to use a socket 36 and the handle 1 "is already
         connected to the pipe.
competency/topic : Water Refill 1100 pc & install
  type of work         : radiator hose frames Track/ 12 track/13October
                         2010
Description of Activity
Refill water radiator hose install pc 1100 & frames
A. Refill the radiator water
That tools are used
 Gallon empty
How it works:
 Check the radiator to be objec tanks filled with water
 Use a gallon to fill the tank of the radiator
 After Completing the water, cover with a rapid re-radiator's the make sure
    the radiator cap tightly closed
B. Install hose frames
Tools used:
 The key to pass 36
 Container / bucket
How it works:
   Remove the hose by using key frames pass36
   Pour the used oil is in the frame That hose into the bucket
   Attach the new hose using key frames pass 36

 competency/topic :
                    Repair batrai cover 273 DZ
 type of work     :
                    track/14October 2010

Description of activities
Repair cover batrai DZ 273
Tools used:
 Sandpaper
 Sanpolac
 Isamu (priming)
 Scraps
Work Airways:
 Putty using sanpolac dank Will cover the repair ape
 Flatten the surface using sandpaper cover
 After the flat surface of the cover, the cover painting by Isamu (priming)
    and then, paint the cover by using a compressor.
competency/topic :
                   Install 273 DZ Bottom Guard
type of work     :
                   Track / October 18, 2010


Description of Activity
Install 273 DZ Bottom Guard
Tools used:
 Combination Lock 32
 Socket 32
 Handle 1 “
 Tokrain
How it works:
 Raise the Bottom Guard by using forklift
 Then attach the bolts and tightened with a socket 32 ​and the handle to use
     your 1 "and the combination lock 32
 In order to use the bolts are securely attached tokrain and socket 32
competency/topic :
                    Cleaning trackling
 type of work     :
                    Track / October 19, 2010
Description of Activity
Cleaning trackling
Tools used:
 Scraps
 Katcher
How it works:
 Clean trackling with using a scrap of land That Sticks
 Spray trackling using katcher until clean.
competency/topic :
                   Repair cover 263 DZ
type of work     :
                   Track / October 20, 2010

Description of Activity
DZ 263 Repair Cover
Tools used:
 Sandpaper
 Sanpolac Isamu (priming)
 Scraps
How it works:
 Putty Will cover the repair by using sanpolac and skarp
 Flatten the surface using sandpaper
 After the flat surface of the cover, the cover painting by Isamu
    (priming)
 Then paint the cover by using a compressor
competency/topic :
                   Cleaning trackling
type of work     :
                   Track / 21-22 October 2010

Description of Activity
Cleaning trackling
Tools used:
 Scraps
 Katcher
How it works:
 Clean trackling with using a scrap of land That Sticks
 Spray trackling using katcher until clean.
competency/topic : Final checks DZ units
type of work     : Track / 25 October to 1 November
                   2010
Description of activities
Final checks DZ units
A. Refill oil dozer units
Tools used:
 Pumps
 Jerry cans
How it works:
 Open the lid dozer oil tank and pour the oil from the pump using the supplied
     jerrycans
 Clean the work area of ​oil spills by using Sawdust
B. Painting Dozer unit
Tools used:
 Compressors
How it works:
 Close the glass cabin units by using paper That Is not exposed to paint
 Spray the unit to average Dozer and tidy.
competency/topic :
                   Remove install sprocket D-375 A
type of work     :
                   Track / 03-04 November 2010

Description of Activity
Remove sprocket install D-375 A
Tools used:
 Socket 46
 Handle 1 “
 Rechet
 Power raint
 Short Pipe
How it works:
A. Remove sprocket
 Loosen the bolts are tight by using the power raint already connected with
    a short pipe with a socket 46
 After the bolt is loose for easy to use handles and sockets 46
competency/topic :
                         Cleaning trackling
 type of work     :
                         Track / November 5, 2010

Description of Activity
Cleaning Trackling
Tools used:
 Scraps
 Katcher
How it works:
 Clean trackling with using a scrap of land That Sticks
 Spray trackling using katcher to clean
competency/topic :
                        Install the cover undercarige
 type of work     :
                        Track / November 6, 2010


Description of Activity
Install cover undercarige
Tools used:
 Combination Lock 30
 Socket 30
 Handle 1 “
How it works:
 Attach the cover to undercarige already repaired
 Replace the which the bolts 30 are provided using a combination lock 30
 In order to use the bolts are securely attached socket 30 and handle 1 “
 Painting undercarige up neatly
competency/topic :
                     Drain the transmission oil
type of work     :
                     Track / November 10,2010


Description of activities
Drain transmission oil
Tools used:
 Key L 5
 Containers
 Pumps
 Sawdust
 Stocks
How it works:
 Remove the transmission oil cap and provided input into the bucket
 Fill the tank using a transmission with new oil pump to taste
 Clean the area of ​the former oil spills by using Sawdust and clean
    cotton waste
competency/topic :
                            Removeinstall hose assy frame
 type of work     :
                            Track / November 11,2010
Description of Activity
Remove install hose assy frame
Tools used:
 Combination Lock 36
How it works:
 Remove the hose frame to be removed using the pass key 36
 Then attach the new hose That frames have been made available using
    pass key 36
   competency/topic :
                             Dasboard INNERCABIN
   type of work     :
                             Track / 12-13 November 2010

Description of activities
Dasboard Innercabin
Tools used:
 Stocks
 Sekrap and Thinner
How it works:
 Wipe the glass cabin with clean cotton waste if Necessary use paint
   thinner to moisten the dust cloth and then clean the glass cabin
 If there is old paint / rust scrap use and clean with dust cloth moistened
   with paint thinner
 competency/topic :
                         Repair cover undercarige
 type of work     :
                         Track /November 15 , 2010
Description of Activity
Reapir cover undercarige
Tools used:
 Sandpaper
 Sanpolac
 Isamu priming
 Spatula
 Combination Lock 30 & 24
 Socket 30 & 36
How it works:
Putty That Will undercarige repaired using sanpolac and putty knife
 Flatten the surface using sandpaper cover
 After the flat surface of the cover, the cover painting by Isamu
   Then painting the cover with compressed
   After the cover undercarige pairs nicely painted cover with a combination
    lock to use your 30 & 36 and rechet

 competency/topic :
                        Completed bolt cover enggine
 type of work     :
                        Track / November 16,2010

Description of Activity
Completed bolt cover undercarige
Tools used:
 Combination Lock 19
 Socket 19
 Rechet
How it works:
 Replace the bolt That Had been cleaned using a wire brush and container.
 Tighten the lock bolt by using a combination of 19
 In order to use the bolt is securely attached to the socket 19 and rechet.
competency/topic :
                        Install 273 DZ hidller
type of work     :
                        Track / November 17,2010

Description of activity
Install 273 DZ hidller
Tools used:
 Handle 1 “
 Socket 30
 Rechet
 Tokraint extencaint ¾
How it works:
 Attach hidller ready, to undecarige by using forklift
 After hidller installed correctly, enter the bolts That have been cleaned
     first, then
 Tighten using the socket handle and advance to more easily use rechet to
     tighten the bolts
 After the bolts tight, use the function tokrain tighten bolts in accordance
     with the size
competency/topic :
                         Painting Stand
type of work     :
                         Track / 20-22 November 2010

Description of activity
Painting booth
Tools used:
 Pilok
 Duct Tape
 Cater
 Cat
 Sekrap
How it works:
 Clean the stand by using scrap until blended ago
 Paint booths with red paint
 After the paint is dry use the duct tape and cater for the load stand identity
    and then use paint to paint the identity of the load pilok stand
competency/topic :
                        Install the sprocket 273 DZ
type of work     :
                        Track / 23-24 september2010

Description of activity
Install sprocket 273 DZ
That tools are used:
 Tokraint
 Handle
 Socket 36
How it works:
 Attach tith frameundercarige sprocket to 36 and insert the supplied bolt
     and tighten the bolt using a socket 36 and handle
 After the bolt tight to fit a standard bolt mounted using tokrait and socket
     36.
competency/topic :
                       Cleaning trackling
type of work     :
                       Track / 25-26 November 2010


Description of Activity
Cleaning Trackling
Tools used:
 Skap
 Katcher
How it works:
 Clean trackling by using a scrap of land That Sticks
 Spray trackling by using katcher until clean.
competency/topic :
                        PSMS (painting workshop)
type of work     :
                        Track /Novemeber 29 - December 1, 2010


Description of activities
PSMS (painting workshop)
Tools used:
 Brush
How it works:
 Mix the paint with a thiner then stirred with a flat
 Painting workshop clean and tidy.
competency/topic :
                   Refill diesel units Dozer
type of work     :
                   Track / 2-4 December 2010

Description of activities
Refill diesel units Dozer
Tools used:
 Pumps
How it works:
 Open the tank lid and fill with diesel fuel That has been provided
    using the pump
 Fill the tank if there is enough diesel fuel is spilled IMMEDIATELY
    clean by using Sawdust That has been provided.
competency/topic :
                       Install the cover undercarige
type of work     :
                       Track / 5-9 December 2010

Description of Activity
Install cover undercarige
Tools used:
 Combination Lock 30
 Socket 30
 Handle 1 “
How it works:
 Attach the cover to undercarige already repaired
 Replace the which the bolts 30 are provided using a combination lock
     30
 In order to use the bolts are securely attached socket 30 and handle 1“
 Painting undercarige up neatly
competency/topic :
                       Washing unit Dozer
type of work     :
                       Track / 10-11 December 2010

Description of Activity
Washing unit Dozer
Tools used:
 Scraps
 Katcher
How it works:
 Clean trackling with using a scrap of land That Sticks
 Spray trackling using katcher until clean.
Format prakerin student assessment (PSG)
(Assessment by supervisor)
Name of company
Address

No aspect of the assessment                value

a.   Aspects of personality
     1. Attitudes and behavior             80
     2. Presence attendance / discipline   88
     3. Initiative and creative ability    74
     4. Motivation and responsibili        95
     5. Mental readiness in working        85
b.   Aspects of competence
     1. Timeliness of work completed      85
     2. Quality of work                   80
     3. Knowledge of                      75
     4. The timing of the prakerin        78
     5. Knowledge of machining            85
     6. Knowledge of production process   87
     7. Read engineering drawings         85
     8. The use of machining              80
     9. Number of values                  1007

     The average value                    82,85
     Pass both the
I.   IDENTITY
     Name                           : Anggra Rivaldi
     Place / Date of birth          : Bekasi Augustus 22, 1994
     Gender                         : Male
     Blood Type                     :-
     NIS / Class / progli           : 10097662/XI TP 2
     Name of parent / guardian      : Arief sutandi
     Address                        : Rt 02/05 kp. babakan, ds. Dayeuh
                                      Kec. Cileungsi Kab. Bogor
     No HP / Tel                    : 02126724528
     Cileungsi, December 11, 2011

                                                              Signature of student
COMPANY IDENTITY (DU / IN)
  Name of DU / IN         : PT. PAMA PERSADA NUSANTARA
  Bid. / Type of Business : Industrial
  Address                 : Jln. Kingdom Narogong km.23, 8 tower
                            scenic area of ​industry
  Tel / fax               :
  Name of leader          : Personal Mr. Santoso
  Name of supervisor      : Mr. Samsudin
  Pkl start date          : 11 October 2010
  Pkl completion date     : December 11, 2010
   STUDENT COUNTER
CHAPTER II
COMPANY OVERVIEW
  A.   History of company
       PT. Pama Persada Nusantara (PAMA) was formed in 1989. PAMA
  derived from heavy equipment rental division to its parent company PT United
  Tractor Tbk is specialized heavy equipment sales and distributors. For
  many, many famous brands Such as Komatsu and Nisan. Major shareholder of
  PT. Astra International Tbk, one of the companies in Indonesia.
       PAMA is one herald mining contractor in Indonesia, where Indonesia has
  a wealth not inferior to other nations. Against the backdrop of a solid and
  constant desire to Improve Their professional and generate customer
  satisfaction, PAMA has grown in Indonesia's mining industry, and provides all
  the capabilities and services to clients and partners. PAMA is the largest
  mining contractor in Indonesia, has done 40% of coal mining spread in parts of
  Indonesia in 2003. PAMA today operate with many mining regions in
  Kalimantan and Sumatra, the scope of the projects handled include coal
  mining. Gold mining, construction and removal of soil. Coal mining into
  business with the majority of 140.68 million cubic meters of bada areas in the
  mine and Transported in 2003.
In 2003, PAMA earn income above U.S. $ 320 million. PAMA assets
includes 1028 units of heavy equipment and the number of employees 4316
people, in the conduct of mining with Various conditions in Indonesia, PAMA
has gained much experience covers all the steps the which have been operating
a fare study of wealth, preproduction, development and production of regular
mining construction. PAMA has built a good relationship with his client. With
the success of operations in the construction and mining projects have been
rewarded / reward with an extension of negotiations on the repetition of the
original mining contract is a commitment to quality reporting PAMA perfect
operational flexibility and reliability.
     PAMA attention to the importance of safety, health and the environment to
introduce the draft PAMA / good design and management system (PSMS) a,
the which is based on three design Accreditation international recognition, the
international ONV SEQ Rating System; National Occupatil Safety Association
( NOSA); AND Sut Africa Chamber of Mine-mine Safty Management System
(MSMS). PAMA also apply seperty management system ISO 9001, ISO
14001, Gren Astra company (AGC), siystems Management of safety and
health (SMK3) PAMA Mnagemen Human Resources (PHRM) PAMA
production management system (PPMs), Total Productive Mantenance (TPM),
With a trainer / instructor with a good and professional workers and full
support from the parent company,
PAMA Will continue to expand on the overall planning to become a leading
     contractor in Southeast Asia.

B. Vision and Mission
     The vision and mission of the PT. Pama Persada Nusantara are as follows:
1.   Company Vision
     Being a mining contractor grade world with productivity, enggenering, safety
     and environmental best.

2.   Company Mission
a.   Providing services with the operation of heavy equipment in the field of open
     and mining overburden That enables subscriber to get the best return on the
     world stage
b.   Provide opportunities for employees to develop their competence to measure
     in objective
c.   Providing the best MVA and EVA to shareholders.
d.   Continually seeks to master the technology and engineering capabilities and
     environmentally sound as well as human safety for the progress of the nation
     and the State
III. Noted the company's organizational structure (owners & responsible
   person)
IV. Take note of the manufacturing process (production) and or service
   1.    Unit at the Promontory Priuk pic: GL. Mekanik
         Activity          : Mobilisai        : - Helper mechanical
         Pic               : Expedition
                             welder
    2.   To in yards Cileungsi Activity: part-Genune
         Activity          : Check documents spb.c / ws / n-Local Part
         Pic               : Mechanics
                             security
    3.   The unit Entered the parking lot 8. Running
         Activity          : Lower unit
         Pic               : Mechanical
                             Helper mechanical
    4.   Parking in accordance Activity status model:
         Activity          : Set the distance units of the between unit + 15 m
         Pic               : Mechanical
5.   Completeness and check the condition of the unit Pic-GL. Mechanical
     Activity        : Q.A.L
                       Unit condition report
                       Recommended part
     Pic             : Fore - GL.mekanik UNIT READY
                       -Logistic - ppc USE / SALE




             Activity promotion repair cost analysis
             DEMO




                              ASIS

                                <$
6.   The process of major & minor ripaire
     Activity             : Entrance bayS
                            Cleaning the unit
                            Fabrication
     Pic                  : GL.mekanik
                            Helper mechanical
                            welder
7.   Running
     Pic                  : GL.mekanik
                            Helper mechanical
8.   Unit ready for use
     Activity             : Gtound test unit
                            Q.A.I
                            Performance + 80%
Pic           : GL. Mekanik
                Helper mechanical




           UNIT READY FORE
               USE / SALE
                   >$

Activity      : Promotion
                Demo
V. Take note of the marketing process and marketing area
VI. Take note of the selection process or the hiring of employees
     1.  Identified there (identify Them)
     2. Develop a position description (explanation of the development of
         positions)
     3. Offer (offer)
     4. Identify the key selection criteria (to identify the key criteria)
     5. Create the advertis-ment (making the advertisement)
     6. Paper selection listiny short (forum / paper checks initial selection)
     7. Initial screening interview (interview)
     8. Psicometric testing (pisicotes)
     9. Assessment centers / simulation (removal and simulation)
     10. Second / tehnical interview (interview techniques)
     11. Reference checking (checking of certificate)
     12. New employees (new hires)


4.    Note safty equipment for the industry and carry out the work
      Sefty shoes
      Sefty helmet
   Welding gloves
        Masks
        Ear plug
        Ear Muff

5.   Take note of the steps in operation any or all of the machines used when prakerin
        Washing machine
        P2h (checks, equipment, daily)
        Prepaire hose to spray water
        Hose that contain the flow of water put into washing machine
        Put hose into the electrical panel legran
        Turn on the washing machine are marked with green or start
        To turn off the washing machine or simply press the red button off

6.   Mencatat raw materials and auxiliary materials used in industry
       Auxiliary materials
       WD 40 to remove the rust
       Sandpaper
        Thiner
       Cat
       Clean and remove rust on electric einer
VII. DAILY ACTIVITY REPORTS STUDENTS


Student Activities Report
No. DAY / DATE TYPE OF ACTIVITY
1. 11-14 October 2010 : > p5m (talk five minutes)
                            > Cleaning grader
2. 15 October 2010        : > Cleaning blade
                            > Cleaning propeller of a pile of oil
                            > Open the hose auto lube
3. 16 October 2010        : > Break
                            > Cleaning system on the grader over 233 units
                            > Cleaning Minning plate
                            > Cleaning sap
4. 18 October 2010        : > 233 unit graders cabin cleaning
                            > Sand the cover unit 233 Grader
5. 19 October 2010        : > Clean the filter
                            > Sand the cover unit 233 Grader
6.   20 Octobe, 2010   : > Cleaning the tandem
                         > Attach nipple grase
7.   21 October 2010   : > Cleaning and wrap it over breake
                            system demean plastic wrap
8.   22 October 2010   : > Sand the front as 233 units graders
9.   25 October 2010   : > Pump oil pump chain tandem
                           with Install the nuts
10. 26 October 2010    : > Replacing the wheel and tire unit 233 Grader
                         > Cleaning the glass cabin 233 unit graders
11. 27 October 2010    : > Cleaning the glass cabin unit 233 Grader
                       : > Suck the oil in 233 unit graders because
                           of leakages in sap / breaking system
12. 28 October 2010    : > Painting cabin units graders
                         > Sucking oil
                         > Grader unit 233
13. 01 November 2010   : > Cleaning air from red silicon tandem
                         > Cleaning the red rings on silicon
                         > Sand the tandem unit 233 Grader
                         > Sand tendem chain
14. 2-4 November 2010 : > Placing and open tire unit 233 Grader
                           > Installing over breaking the system
15. 5 November 2010      : > Cleaning the glass cabin
16. 6 November 2010      : > Transmission oil change on a 233 unit graders
17. 8 November 2010      : > Put nuts guard fh 16
                           > Remove the site operator fh 16
18. 9 November 2010      : > Scrap skotlet fh 16
                         : > Fill the oil tendem 233 unit graders
19. 10 November 2010     : > Filling oil tendem
                           > Install the plate on the sap
                         : > Install tire Grader 233
                         : > Painting graders hose 233
20. 11 November 2010     : > Sand the chassis / cab fh 16
                         : > Support painting cabin fh 16
21. 12 November 2010     : > Cleaning covers fh 16
22. 13 November 2010   : > Support graders painting cabin 266
                         > Clean the work area / bays
23. 14 November 2010   : > Sand the door Grader 266
                         > Cleaning the area
24. 15 November 2010   : > Rreleasing water separator / filter fh 16
                         > Painting the cover fh 16
25. 18 November 2010   : > Cleaning water separator FH 16
                         > Painting water separator fh 16
                         > Filling diesel water separator fh 16
                         > Cleaning the chain graders tendem 277
26. 19 November 2010   : > 266 painting door graders
27. 22 November 2010   : > 266 washing graders
28. 23 November 2010   : > 266 painting door graders
29. 24 November 2010   : > 266 washing graders
                         > Fix the cylinder riper
30. 25 November 2010   : > Rreplacing the valve WL
                         > Riper GR-fixing cylinder 266.
31. 26 November 2010           : > Fixing cylinder 266 riper GR
32. 29 November 2010           : > Attach hose cylinder
                                 > Clining area
33. 30 November - 3 December   : > After finish the workshop area
                                 > Support unit parking
34. 4 December 2010            : > Cannibal mud guard fh 16
35. 6 December 2010            : > Release the piping
                                 > Releasing electrically ct
                                   system (crane truck) 018
36. 8 December 2010            : > Moving cabin ct (truck crane) 018
37. 9 December 2010            : > Release unit of a crane truck covers 018
                                 > Cleaning cabins ct (truck crane) 018
38. 10 December 2010           : > washing cabin ct (truck crane) 018
                                 > washing cover (truck crane) 018
39. 11 December 2010           : > Washing engine ct (truck crane) 018
                                 > Clening area ct (truck crane) 018
Format prakerin student assessment (PSG)
(Assessment by supervisor)
Name of company
Address

No aspect of the assessment                Value

a.   Aspects of personality
1.   Attitudes and behavior                80
2.   Presence attendance / discipline      80
3.   Initiative and creative ability       75
4.   Motivation and responsibility         75
5.   Mental readiness in working           75
Value
b.   Aspects of competence
     1. Timeliness of work completed      75
     2. Quality of work                   75
     3. Knowledge of safety               70
     4. The timing of the prakerin        80
     5. Knowledge of machining            75
     6. Knowledge of production process   78
     7. Read engineering drawings         70
     8. The use of machining              70

Number of values the average value
Pass both the
IDENTITY
Name                      : WAHYUDIN
Place / Date of birth     : Bogor December 12, 1993
Gender                    : Male
Blood Type                :A
NIS / Class / progli      : 10097857/XI tp 3
Name of parent / guardian : Nasan
Address                   : Kp. Walahir Rt. 07/ 04 Ds. Nambo Kec. Klapanunggal
No HP / Tel               : 085714211271
Cileungsi, December 11, 2011

                                                           Signature of student
COMPANY IDENTITY (DU / IN)
Name of DU / IN         : CV. RIZKY JAYA PERSADA
Bid. / Type of Business : -
Address                 : Jln. Pesantren Ds. Pasir angin Rt 01/05
                           Pasir angin, Cileungsi, Bogor
Tel / fak               : (021) 82498741, 82498640
Name of leader          : Mr. Waliyadi I Adnan. ST
Name of supervisor      : Mr. Tony
Pkl start date          : July 27, 2010
Pkl completion date     : October 26, 2010
Student Counter
III. Noted the company's organizational structure (owners & responsible
   person)
    NOTE THE PREPARATION WORK AND K 3

1.   Record the steps or preparatory work has not
      Following the directives of the leadership of the company
      Making planning what work will be done
      Preparing sefty
2.   Noting industrial machines that are used the following function
      M / c Tool =) make the goods according to customer perrmintaan
         (corresponding image)
      M / c scrap =) make / take over the plate thickness of 1 mm
      M / c milling =) Make goods according to customer demand
         (corresponding image)
      M / c grinding surface =) make the goods to be fine (go to precision
         measurements)
      Mic weld =) welding / connect between the plate
3.   Take note of the following hand tools in the industry functions
      Hand grinding machine (smooths rough objects)
      Stingy (smooths rough objects)
      Sandpaper (removing rust and dirt)
4.   Noting sefty equipment for the industry and carry out the work
      Gloves (to avoid minor cuts / scrapes hand)
      Masks (avoid dust)
      Helmet (avoiding impact in the head)
      Glass eyes (avoid dirt / dust)
      Shoes (to protect feet)


5.   Take note of the steps in operate any or all of the machines used when
     prakerin  Lathes
      Reading working drawings
      Preparation tool and the workpiece
      Operation lathes
      Put the material into a machine with a fast dibble
      On the dial (should be straight)
      Prepare a chisel
      Turn the key on
6.   Record the raw materials and auxiliary materials used in industry
      Material 400 ss
      Material s 45 c
      Material SKD 11
      Material VCN
      Material pvc
      Material crethane
      Material mc blue
      Material credits 304 (stainless)


7.   Take note of the manufacturing process (production) and or service
      Machining of materials
      The process of cutting
      Lathe process
      Milling process
      Cnc process
8.   Notes the marketing process and marketing area
     Costumer
      PT. Yamaha
      PT. VTE
      PT. Sanyo
      PT. Winteq
      PT. Toyota t huso


9.  Record the employee selection process or acceptance hires
    Jobs         - (notably, the Internet)
                 - (Directly in the test on the machine in their respective fields)
    Interview salary + placementmachine 3 - month trial
Contract 1 year

AGENDA NOTE TO MAKE WORK
1. 27 Juli 2010  : > Grinding components gaspan
                   > Clean pvc news
2.   28 July 2010     : > Attach the clamp bolts
                        > Paint the gutters 5 assy line 7
                        > Install cables
3.   29 July 2010     : > Grinding plate t-2
                        > Grinding pvc-news
                        > Install clamp bolt
4.   30 July 2010     : > Grinding plate
                        > Install adjuster-plate
                        > Install clamp bolt
5.   02 August 2010   : > Clean test jigli
                        > Painting the carrier
                        > Grinding plate
6.   03 August 2010   : > Cutting oil gaspan
                        > Pressing oil gaspan
7.   04 August 2010   : > Sand the bushing or ring
                        > Sand the pin
                        > Sand the shim ute
                        > Grinding oil gaspan
8.   05 August 2010   : > Grinding oil containment secodry collector
                        > Clean the bushing / rings
9.   06 August 2010   : > Grinding components gaspan
                        > Welding components gaspan
                        > Lathe gaspan round d = 405
10. 09 August 2010    : > Sand the pin
                        > Welding components gaspan
                        > Sand the rounded gaspan d = 40510 August 2010
11. 10 August 2010    : > Drilled components gaspan
                        > Lathe gaspan round d = 405
12. 11 August 2010    : > Weld components gaspan
                        > Grinding carier
13. 12 August 2010    : > Sand component gaspan
                        > Grinding carier
                        > Cut pindal 13
14. 13 August 2010    : > Weld carier
                        > Grinding carier
15. 16 August 2010   : > a lathe bushing or ring
                       > Sand the pin
16. 18 August 2010   : > Grinding carier
                       > Cut the plate (m / c cutt whell)
                       > Cut The Iron (M / C Cutt Whell)
                       > Grinding iron
17. 19 August 2010   : > a lathe bolts d = 9. 40
                       > Grinding plate
                       > Drill the plate d = 6
18. 20 August 2010   : > Cut the pvc (m / c jig saw)
                       > Drilled pvc (m / c drill)
19. 23 August 2010   : > Lathe bolts d = 9. 40
                       > Grinding plate t = 2
                       > Sand the plate t = 2
20. 24 August 2010   : > Install adjuster plate
                       > Lathe bolts d = 9. 40
21. 25 August 2010   : > a lathe bolts d = 9.40
                       > Sand the bushing / rings
22. 26 August 2010   : > Cut the plate t = 2
                       > Grinding plate t = 2
                       > Gluing acrylic saind bord
23. 27 August 2010      : > a lathe bolts d = 9.40
                          > Pressing gaspan box
24. 30 August 2010      : > Gluing pvc news
                          > Grinding pvc news
                          > Clear pvc news
25. 31 August 2010      : > a lathe pin
                          > Improving the welding transformer 220
26. 01 September 2010   : > Repair welding transformer 220
                          > Improving the ac outlet
27. 02 september 2010   : > lathe bolts d = 9.40
                          > Cut round gaspan
28. 03 september 2010   : > Cut plate
                          > Grinding plate
                          > Drill the plate d = 10
29. 16 September 2010   : > to cut iron
                          > Grinding of iron
                          > Sand box gaspan
                          > Clean the box gaspan
30. 17 september 2010   : > Sand the pin
                          > Sand box gaspan
31. 20 september 2010   : > Drilled pvc
                          > Sand box gaspan
32. 21 september 2010   : > Drilled pvc
                          > Sand box gaspan
33. 22 september 2010   : > Cut the iron
                          > Grinding of iron
                          > Cut the plate (m / c cutt whell)
                          > Grinding plate
34. 23 september 2010   : > Oil pressing gaspan
35. 24 september 2010   : > Gluing pvc news
                          > Grinding pvc news
                          > Cut the clear rubber
36. 27 September 2010   : > Gluing pvc news
                        : > Clear pvc news
37. 28 September 2010   : > Gluing pvc news
                          > Clear pvc news
                          > Cut the clear rubber
38. 29 september 2010   : > Grinding oil gaspan
                          > Gaspan oil sand
                          > Filing pin
39. 30 september 2010   : > Gaspan oil sand
                          > Clean up oil gaspan
40. 01 october 2010     : > Sand component gaspan
                          > Pressing oil gaspan
                          > Filing pin
41. 04 october 2010     : > Install pvc
                          > Clean the grinding machine
42. 05 october 2010     : > Grinding oil gaspan
                          > Gaspan oil sand
                          > Drill carrier
43. 06 october 2010     : > Clean carrier
                          > Gaspan oil sand
                          > Lathe vacuum tank assy
44. 07 october 2010     : > Cleaning jig cover uder
                          > Clean the jig side cover 3
                          > Clean the jig sped meters
45. 08 october 2010     : > Cutting plate
                          > Grinding plate
                          > Sand the pin
46. 13 October 2010   : > Cut pvc (m / c mosque s)
                        > Sand box gaspan
                        > Cut the plate
47. 14 october 2010   : > Cut pvc (m / c jig saw)
                        > Sand box gaspan
48. 15 October 2010   : > Gaspan sand box
                        > Cut the pin (m / c jig saw)
                        > Sand the pin (m / c lathe)
49. 18 october 2010   : > Grinding carier
                        > Help make the carrier
50. 19 October 2010   : > Helped make the carrier
                        >Grinding carier
                        > Gaspan oil sand
51. 20 October 2010   : > Helped improve the milling machine
                        > Grinding oil gaspan
                        > Gaspan oil sand
52. 21 October 2010   : > Helped make the carrier
                        > Lathe pin
                        > Drilled pvc (m / c drill)
53. 25 october 2010   : > Cutting pin (m / c jig saw)
                        > Cut the pvc (m / c jig saw)
54. 26 October 2010   : > Cut pvc (m / c jig saw)
                        > Cut acrylic (m / c jig saw)
Format prakerin student assessment (PSG)
(Assessment by supervisor)
Name of company
Address

No aspect of the assessment                value

a.   Aspects of personality
1.   Attitudes and behavior                92
2.   Presence attendance / discipline      91
3.   Initiative and creative ability       95
4.   Motivation and responsibility         95
5.   Mental readiness in working           95
b.   Aspects of competence
     1. Timeliness of work completed      90
     2. Quality of work                   90
     3. Knowledge of safety               89
     4. The timing of the prakerin        89
     5. Knowledge of machining            89
     6. Knowledge of production process   89
     7. Read engineering drawings         89
     8. The use of machining              82
     9. Number of values                  1.175

The average value
Pass both the
Journal and report
Journal and report
Journal and report
Journal and report

Weitere ähnliche Inhalte

Ähnlich wie Journal and report

A Review of Professional Practices for Computer Sciences Students in Academics
A Review of Professional Practices for Computer Sciences  Students in AcademicsA Review of Professional Practices for Computer Sciences  Students in Academics
A Review of Professional Practices for Computer Sciences Students in Academicssyedhamza71
 
IC2-Entrepreneurship-Course-Syllabus.pdf
IC2-Entrepreneurship-Course-Syllabus.pdfIC2-Entrepreneurship-Course-Syllabus.pdf
IC2-Entrepreneurship-Course-Syllabus.pdfmaevycrook09
 
Mendoza Chavaria Valeria Business Portfolio.docx
Mendoza Chavaria Valeria Business Portfolio.docxMendoza Chavaria Valeria Business Portfolio.docx
Mendoza Chavaria Valeria Business Portfolio.docxValeria Mendoza Chavarria
 
EDC SLIDES PRESENTATION PRINCIPAL ON WEDNESDAY.pptx
EDC SLIDES PRESENTATION PRINCIPAL ON WEDNESDAY.pptxEDC SLIDES PRESENTATION PRINCIPAL ON WEDNESDAY.pptx
EDC SLIDES PRESENTATION PRINCIPAL ON WEDNESDAY.pptxgnans Kgnanshek
 
Final report
Final reportFinal report
Final reportAMSADO
 
Leadership and Management CIPD UK Assignment Sheet
Leadership and Management CIPD UK Assignment SheetLeadership and Management CIPD UK Assignment Sheet
Leadership and Management CIPD UK Assignment SheetRodzidah Mohd Rodzi
 
An Organisation study at HIGHTEMP FURNACES LTD, BANGALORE
An Organisation study at HIGHTEMP FURNACES LTD, BANGALOREAn Organisation study at HIGHTEMP FURNACES LTD, BANGALORE
An Organisation study at HIGHTEMP FURNACES LTD, BANGALORERahul G
 
Report shruti singh
Report  shruti singhReport  shruti singh
Report shruti singhShruti Singh
 
00 WTW Materi Corpu Nov2022 (1).pdf
00 WTW Materi Corpu Nov2022 (1).pdf00 WTW Materi Corpu Nov2022 (1).pdf
00 WTW Materi Corpu Nov2022 (1).pdfnasrulhakiki
 
1206885522_Modified.docx
1206885522_Modified.docx1206885522_Modified.docx
1206885522_Modified.docxParulJain778984
 
MUHAMMAD IZAR BIN MOHAMED PERAI ( IN PROGRESS NEW)
MUHAMMAD IZAR BIN MOHAMED PERAI ( IN PROGRESS NEW)MUHAMMAD IZAR BIN MOHAMED PERAI ( IN PROGRESS NEW)
MUHAMMAD IZAR BIN MOHAMED PERAI ( IN PROGRESS NEW)izar1602
 
Interview with a Teacher- ED215
Interview with a Teacher- ED215Interview with a Teacher- ED215
Interview with a Teacher- ED215WelvyneAmante1
 
37_Enterprenurship.pdf
37_Enterprenurship.pdf37_Enterprenurship.pdf
37_Enterprenurship.pdfVamsi kumar
 
Ramirez Ana Business I Portfolio
Ramirez Ana Business I PortfolioRamirez Ana Business I Portfolio
Ramirez Ana Business I PortfolioErika Vca
 
Teaching Design Strategies in Higher Education
Teaching Design Strategies in Higher EducationTeaching Design Strategies in Higher Education
Teaching Design Strategies in Higher Educationijtsrd
 
Juan Tanguil Porfolio
Juan Tanguil Porfolio Juan Tanguil Porfolio
Juan Tanguil Porfolio Juanpy Ta-Chi
 
TLE10_HE_BeautyNailCareServices_Q1_M3_ApplyHandTreatment_v3.doc
TLE10_HE_BeautyNailCareServices_Q1_M3_ApplyHandTreatment_v3.docTLE10_HE_BeautyNailCareServices_Q1_M3_ApplyHandTreatment_v3.doc
TLE10_HE_BeautyNailCareServices_Q1_M3_ApplyHandTreatment_v3.docSelwynOXIMAR
 

Ähnlich wie Journal and report (20)

CREDENTIALS.pptx
CREDENTIALS.pptxCREDENTIALS.pptx
CREDENTIALS.pptx
 
A Review of Professional Practices for Computer Sciences Students in Academics
A Review of Professional Practices for Computer Sciences  Students in AcademicsA Review of Professional Practices for Computer Sciences  Students in Academics
A Review of Professional Practices for Computer Sciences Students in Academics
 
IC2-Entrepreneurship-Course-Syllabus.pdf
IC2-Entrepreneurship-Course-Syllabus.pdfIC2-Entrepreneurship-Course-Syllabus.pdf
IC2-Entrepreneurship-Course-Syllabus.pdf
 
Aicte internship policy
Aicte internship policyAicte internship policy
Aicte internship policy
 
Mendoza Chavaria Valeria Business Portfolio.docx
Mendoza Chavaria Valeria Business Portfolio.docxMendoza Chavaria Valeria Business Portfolio.docx
Mendoza Chavaria Valeria Business Portfolio.docx
 
EDC SLIDES PRESENTATION PRINCIPAL ON WEDNESDAY.pptx
EDC SLIDES PRESENTATION PRINCIPAL ON WEDNESDAY.pptxEDC SLIDES PRESENTATION PRINCIPAL ON WEDNESDAY.pptx
EDC SLIDES PRESENTATION PRINCIPAL ON WEDNESDAY.pptx
 
Final report
Final reportFinal report
Final report
 
SYLLABUS-EDUC-202.doc
SYLLABUS-EDUC-202.docSYLLABUS-EDUC-202.doc
SYLLABUS-EDUC-202.doc
 
Leadership and Management CIPD UK Assignment Sheet
Leadership and Management CIPD UK Assignment SheetLeadership and Management CIPD UK Assignment Sheet
Leadership and Management CIPD UK Assignment Sheet
 
An Organisation study at HIGHTEMP FURNACES LTD, BANGALORE
An Organisation study at HIGHTEMP FURNACES LTD, BANGALOREAn Organisation study at HIGHTEMP FURNACES LTD, BANGALORE
An Organisation study at HIGHTEMP FURNACES LTD, BANGALORE
 
Report shruti singh
Report  shruti singhReport  shruti singh
Report shruti singh
 
00 WTW Materi Corpu Nov2022 (1).pdf
00 WTW Materi Corpu Nov2022 (1).pdf00 WTW Materi Corpu Nov2022 (1).pdf
00 WTW Materi Corpu Nov2022 (1).pdf
 
1206885522_Modified.docx
1206885522_Modified.docx1206885522_Modified.docx
1206885522_Modified.docx
 
MUHAMMAD IZAR BIN MOHAMED PERAI ( IN PROGRESS NEW)
MUHAMMAD IZAR BIN MOHAMED PERAI ( IN PROGRESS NEW)MUHAMMAD IZAR BIN MOHAMED PERAI ( IN PROGRESS NEW)
MUHAMMAD IZAR BIN MOHAMED PERAI ( IN PROGRESS NEW)
 
Interview with a Teacher- ED215
Interview with a Teacher- ED215Interview with a Teacher- ED215
Interview with a Teacher- ED215
 
37_Enterprenurship.pdf
37_Enterprenurship.pdf37_Enterprenurship.pdf
37_Enterprenurship.pdf
 
Ramirez Ana Business I Portfolio
Ramirez Ana Business I PortfolioRamirez Ana Business I Portfolio
Ramirez Ana Business I Portfolio
 
Teaching Design Strategies in Higher Education
Teaching Design Strategies in Higher EducationTeaching Design Strategies in Higher Education
Teaching Design Strategies in Higher Education
 
Juan Tanguil Porfolio
Juan Tanguil Porfolio Juan Tanguil Porfolio
Juan Tanguil Porfolio
 
TLE10_HE_BeautyNailCareServices_Q1_M3_ApplyHandTreatment_v3.doc
TLE10_HE_BeautyNailCareServices_Q1_M3_ApplyHandTreatment_v3.docTLE10_HE_BeautyNailCareServices_Q1_M3_ApplyHandTreatment_v3.doc
TLE10_HE_BeautyNailCareServices_Q1_M3_ApplyHandTreatment_v3.doc
 

Kürzlich hochgeladen

Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management systemChristalin Nelson
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4MiaBumagat1
 
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYKayeClaireEstoconing
 
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Seán Kennedy
 
Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Celine George
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfTechSoup
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatYousafMalik24
 
FILIPINO PSYCHology sikolohiyang pilipino
FILIPINO PSYCHology sikolohiyang pilipinoFILIPINO PSYCHology sikolohiyang pilipino
FILIPINO PSYCHology sikolohiyang pilipinojohnmickonozaleda
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designMIPLM
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Celine George
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxiammrhaywood
 
ACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfSpandanaRallapalli
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPCeline George
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfJemuel Francisco
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptxmary850239
 
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...Postal Advocate Inc.
 

Kürzlich hochgeladen (20)

LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptxLEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
LEFT_ON_C'N_ PRELIMS_EL_DORADO_2024.pptx
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management system
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4
 
Raw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptxRaw materials used in Herbal Cosmetics.pptx
Raw materials used in Herbal Cosmetics.pptx
 
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
 
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...
 
Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17Difference Between Search & Browse Methods in Odoo 17
Difference Between Search & Browse Methods in Odoo 17
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice great
 
FILIPINO PSYCHology sikolohiyang pilipino
FILIPINO PSYCHology sikolohiyang pilipinoFILIPINO PSYCHology sikolohiyang pilipino
FILIPINO PSYCHology sikolohiyang pilipino
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-design
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
 
ACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdfACC 2024 Chronicles. Cardiology. Exam.pdf
ACC 2024 Chronicles. Cardiology. Exam.pdf
 
How to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERPHow to do quick user assign in kanban in Odoo 17 ERP
How to do quick user assign in kanban in Odoo 17 ERP
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
 
4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx4.16.24 21st Century Movements for Black Lives.pptx
4.16.24 21st Century Movements for Black Lives.pptx
 
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptxYOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
 
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptxFINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
 
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
 

Journal and report

  • 1. NAME : RUSDIANTO NIS/CLASS : 10097825/XI TP 3 ADDRESS : VILLAGE TLAJUNG Hick RT 01/12 KAB. BOGOR SMK Muhammadiyah 1 Cileungsi JL. No orchids. 86 Cileungsi district, Bogor Telp.8230985 Fax. 82480034
  • 2. I. IDENTITY Name : Rusdianto Place/Date of birth : Bogor/ October 15, 1993 Gender : Male Blood Type :B NIS/Class/Progli : 10097825/XI TP 3 Name of Parent/guardian : Tugiman Address : Rt.1/12 kp. Momonot Tlajung daughter Hillbilly Mountain District No. 18 Bogor Handphone/Telp : 087770063815 Cileungsi, December 11, 2011 Signature of student COMPANY IDENTITY (DU / IN) Name of DU / IN : PT. PAMA PERSADA NUSANTARA Bid. / Type of Business : Industrial Address : Jl. Kingdom Narogong km. 23, 8 tower scenic area of industry Name of leader : Personal Mr. Santoso Name of supervisor : Mr. Suhadi Pkl start date : October 11, 2010 Pkl completion date : December 11, 2010
  • 3. APPROVAL SHEET INDUSTRY WORKING PRACTICES SMK MUHHAMMADIYAH 1 Cileungsi "TERAKREDETASI A" CERTIFICATION SHEET BUSINESS / INDUSTRY INDUSTRY WORKING PRACTICES On this day Monday the 11th of October 2010, Has endorsed the book industry journal reports of work practices (prakerin) above: Name : Rusdianto NIS / Class / Progli : 10097825/XI TP Engine 3/Teknic The name Mentioned above to implement work practices in the industry: Name of DU / IN : PT. PAMA PERSADA NUSANTARA Address : Zone Tower Permai Bogor Km 23.8 Cileungsi Start prakerin : On October 11, 2010 Done prakerin : December 11, 2010 Knowing the October 11, 2010 DU Leader / Supervisor DI industry
  • 4. II. JOURNAL PRAKERIN A. INTRODUCTION The purpose of the preparation of journals and reports of students' activities During the implementation of industry practices (prakerin) is to increase of the quality and relevance of vocational high school Muhammadiyah 1 Cileungsi working with business and industry That covers aspects of the development of moral character , knowledge, skills, arts and health culture. The development of these aspects leads to the improvement and development of life skille (life skills), the which is realized through the achievement of the Standards of Competence. Standard and Basic competence of industry work practices (prakerin) function align school curriculum with business and industry, so That students can actualize and develop themselves to the world of business and industry. Industry practice for the students can Produce a superior personal character, Abilities and ethics to get along, adaptability, initiative skills, ability to cooperate, ability and skills to work in the company and or independent. B. LEGAL BASIS Implementation of industry practices (prakerin) PSG based on:  Pancasila and 1945 Constitution.  Law No.20 of RI TH.2003 about the national education system  GoI Peranturan Th.2005 19, of the National Education Standards.  Regulation 22 TH.2006 minister of national education, about the standard of the ISI.
  • 5. Regulation No.23 TH.2006 minister of national education, the Standard of Competence Graduates (SKL).  Regulation of the Minister of National Education TH.2006 No.24, on the implementation of the ISI standards and SKL on elementary and secondary education units.  Decision No. Education Minister. 080? U/1993 of vocational curriculum as follows, "The implementation of education Carried out through two pathways (Link and Match) of school education and special education schools. C. PURPOSE Destination industry working practices so That Learners have the following capabilities: 1. Understanding and appreciate the business activities and industry. 2. Understanding the workplace culture (mental attitude and personality). 3. Understand and be Able to use equipment to business and industry. 4. Understanding the production process from raw materials to finished goods. 5. Understanding the administration / business and industry menegement. 6. Have the skills and independence to work and Trying. 7. Intertwining relationship the between the school faforable partner institutions. 8. The implementation of the learning process in business and industry. 9. Introduction and implementation of marketing for prospective graduate students.
  • 6. D. INSTRUCTIONS FOR STUDENT USE 1. Students are required to read the entire journal is closely 2. Fill in the data / information in accordance with this question journalized 3. Standard practice in competency this journal 4. Prakerin always taken the time and always maintain the cleanliness of the journal and this report 5. Reported after conducting prakerin 6. Following the oral examination prakerin E. INSTRUCTIONS FOR USE OF SCHOOL COACH 1. Read and appreciate the entire contents of this journal 2. Guiding students in filling journals and this report 3. Establishing good relations with industry Mentors 4. Guiding the students before leaving prakerin 5. Students, monitor student progress in place prakerin 6. Resolving student problems together 7. Responsible or the make a report after students erection prakerin
  • 7. F. COACH'S GUIDE FOR INDUSTRIAL USE 1. Working closely with school counselors and teachers in the implementation of practice 2. Provide support to the implementation prakerin by Providing facilities and material practices 3. Provide guidance and training in accordance with the needs of business and industry 4. Provide an assessment to students prakerin tailored to the existing format 5. Together with the school signed certificate / recognition Abilities of students G. STUDENT Code PRAKERIN / PKL 1. Obeying the rules and regulations at the company / business and industry 2. Maintain and uphold the authority of, and Will not do the Things That can destroy religion, schools and parents 3. And always try, to be disciplined, creative and Responsible adults inofative 4. Well dressed, polite and respectful to everyone
  • 8. 5. Giving Them know (permissions) to the coach industry, if Unable to attend (sick) 6. Complete and sign with Their parents sign a statement H. HOPE AFTER PRAKERIN 1. Have a noble character and Devotion to the Almighty GOD (Students can Enhance the personality of the which include: accuracy, dexterity, discipline, independence and responsibility) 2. Having insight into the world of industry and mental readiness to work independently 3. Students can Improve Their standard of competence (life skill to have) a better life skills 4. Studentscan Enhance creativity and initiative in learning, work and community
  • 9. STUDENT COUNTER
  • 10. III. Noted the company's organizational structure (owners & responsible person)
  • 11. CHAPTER I INTRODUCTION A. Company Background PT. PAMA PERSADA NUSANTARA is a company engaged in the field of non-oil mining contractor in Indonesia That are used Sciences include: 1. Basic sciences include: Mathematics engineering, engineering physics, computer programming language, materials engineering structural mechanics, control and automation 2. Applied science include: CAD, welding equipment metal industry, machine maintenance, safety The problems faced by Students explore the material in the company of heavy equipment manitenance and engineering / modification unit. Will the unit be used continuously Damaged if without treatment, so That a unit in the industry requires regular maintenance to be done periodically to the unit is Damaged and Will not be an obstacle in the production process within a company.
  • 12. Purpose and objectives 1. The purpose of this report is students writes: a. That the Various Study Often problems occur in the PT. Pama Persada Nusantara, problems. That Often Happen to find a solution based on science That have been studied are: engine maintenance b. Apply the theoretical knowledge obtained paraktek That has been into a real school. c. Helping to find and solve technical and non technical issues in the use and maintenance of heavy equipment in a corporate environment. 2. The purpose of this company is students writes: a. Gain experience on the care units of heavy equipment in the company's real, so students get a clearer picture about the Various Things about the world of work is applicable. b. Get a real picture and clearer understanding of the components inside the unit That Is used with care.
  • 13. B. Methods of practical work The method is a way of working systematically to facilitate the implementation of an activity in order to Achieve the specified goals. The method used is: 1) Guidance In this case, the method used to Convey materials mentor That growing niche or learning materials to be oral and written and Mentors to the praktikan work practice field. 2) Observation "The method of observation is an observational research method (review) field Carried out carefully before practice.“ 3) Interview "This method is a method of research interviews conducted by a researcher to the speaker.“ 4) Practice "Method of practice is a method of research conducted by a real implementation on the ground.“
  • 14. C. Systematics In this report, contains about treatments and how to repair, engineering and modification on the job in general track in PT. PAMA PERSADA NUSANTARA. CHAPTER II COMPANY OVERVIEW A. History of company PT. Pama Persada Nusantara (PAMA) was formed in 1989. PAMA derived from heavy equipment rental division to its parent company PT United Tractor Tbk is specialized heavy equipment sales and distributors. For many, many famous brands Such as Komatsu and Nisan. Major shareholder of PT. Astra International Tbk, one of the companies in Indonesia. PAMA is one herald mining contractor in Indonesia, where Indonesia has a wealth not inferior to other nations. Against the backdrop of a solid and constant desire to Improve Their professional and generate customer satisfaction, PAMA has grown in Indonesia's mining industry, and provides all the capabilities and services to clients and partners. PAMA is the largest mining contractor in Indonesia, has done 40% of coal mining spread in parts of Indonesia in 2003.
  • 15. PAMA today operate with many mining regions in Kalimantan and Sumatra, the scope of the projects handled include coal mining. Gold mining, construction and removal of soil. Coal mining into business with the majority of 140.68 million cubic meters of bada areas in the mine and Transported in 2003. In 2003, PAMA earn income above U.S. $ 320 million. PAMA assets includes 1028 units of heavy equipment and the number of employees 4316 people, in the conduct of mining with Various conditions in Indonesia, PAMA has gained much experience covers all the steps the which have been operating a fare study of wealth, preproduction, development and production of regular mining construction. PAMA has built a good relationship with his client. With the success of operations in the construction and mining projects have been rewarded / reward with an extension of negotiations on the repetition of the original mining contract is a commitment to quality reporting PAMA perfect operational flexibility and reliability. PAMA attention to the importance of safety, health and the environment to introduce the draft PAMA / good design and management system (PSMS) a, the which is based on three design Accreditation international recognition, the international ONV SEQ Rating System; National Occupatil Safety Association ( NOSA); AND Sut Africa Chamber of Mine-mine Safty Management System (MSMS).
  • 16. PAMA also apply seperty management system ISO 9001, ISO 14001, Gren Astra company (AGC), siystems Management of safety and health (SMK3) PAMA Mnagemen Human Resources (PHRM) PAMA production management system (PPMs), Total Productive Mantenance (TPM), With a trainer / instructor with a good and professional workers and full support from the parent company, PAMA Will continue to expand on the overall planning to become a leading contractor in Southeast Asia. B. Vision and Mission The vision and mission of the PT. Pama Persada Nusantara are as follows: 1. Company Vision Being a mining contractor grade world with productivity, enggenering, safety and environmental best. 2. Company Mission a. Providing services with the operation of heavy equipment in the field of open and mining overburden That enables subscriber to get the best return on the world stage b. Provide opportunities for employees to develop their competence to measure in objective c. Providing the best MVA and EVA to shareholders. d. Continually seeks to master the technology and engineering capabilities and environmentally sound as well as human safety for the progress of the nation and the State
  • 17. IV. Take note of the manufacturing process (production) and or service 1. Unit at the Promontory Priuk pic: GL. Mekanik Activity: mobilisai : Helper mechanical Pic : Expedition Welder 2. To in yards Cileungsi Activity: part-Genune Activity : Check documents spb.c / ws / n-Local Part Pic : Mechanics Security 3. The unit Entered the parking lot 8. Running Activity : Lower unit Pic : Mechanical Helper mechanical 4. Parking in accordance Activity status model Activity : Set the distance units of the between unit + 15 m Pic : Mechanical 5. Completeness and check the condition of the unit Pic-GL. Mechanical Activity : Q.A.L Unit condition Report Recommended part
  • 18. Pic : Fore -GL. mekanik UNIT READY -Logistic -ppc USE / SALE Activity promotion repair cost analysis -DEMO ASIS <$ 6. The process of major & minor ripaire Activity : Entrance bays Cleaning the unit Fabrication Pic : GL.mekanik Helper mechanical Welder
  • 19. 7. Running Pic : GL.mekanik Helper mechanical 8. Unit ready for use Activity : Gtound test unit Q.A.I Performance + 80% Pic : GL.mekanik Helper mechanical UNIT READY FORE USE/SALE >$ Activity : Promotion Demo
  • 20. V. Take note of the marketing process and marketing area VI. Take note of the selection process or the hiring of employees 1. Identified there (identify Them) 2. Develop a position description (explanation of the development of positions) 3. Identify the key selection criteria (to identify the key criteria) 4. Create the advertis-ment (making the advertisement) 5. Paper selection listiny short (forum / paper checks initial selection)
  • 21. 6. Initial screening interview (interview) 7. Psicometric testing (pisicotes) 8. Assessment centers / simulation (removal and simulation) 9. Second / tehnical interview (interview techniques) 10. Reference checking (checking of certificate) 11. Offer (offer) 12. New employees (new hires) 4. Note safty equipment for the industry and carry out the work  Sefty shoes  Sefty helmet  Welding gloves  Masks  Ear plug  Ear Muff
  • 22. 5. Take note of the steps in operation any or all of the machines used when prakerin Washing machine  P2h (checks, equipment, daily)  Prepaire hose to spray water  Hose that contain the flow of water put into washing machine  hose into the electrical panel legran  Turn on the washing machine are marked with green or start  To turn off the washing machine or simply press the red button off 6. Note raw materials and auxiliary materials used in industry  Auxiliary materials  WD 40 to remove the rust  Sandpaper  Thiner  Cat  Clean and remove rust on electric einer
  • 23. A. Student Activities Report VII. DAILY ACTIVITY REPORTS STUDENTS competency/topic : Install Bottom Guard DZ 273 type of work : Track/ 12 October 2010 Description of activities Install guard Botom d 375 A. Tools in use:  Handle 1 “  Socket 36  Short Pipe  Jack hidroulik  Cain blocks  Combination Lock 36  Belt How it works:  Tie Belt Bottom Guard below, then associate cain blocks mounted on both sides trackshue  Lift SLOWLY by turning the crank cain bloks second, after cainblok since hydraulic lift used to help hold the Bottom Guard.  After the Bottom Guard lifted use the key combination for installing bolts 36.  To Bottom Guard held tight to use a socket 36 and the handle 1 "is already connected to the pipe.
  • 24. competency/topic : Water Refill 1100 pc & install type of work : radiator hose frames Track/ 12 track/13October 2010 Description of Activity Refill water radiator hose install pc 1100 & frames A. Refill the radiator water That tools are used  Gallon empty How it works:  Check the radiator to be objec tanks filled with water  Use a gallon to fill the tank of the radiator  After Completing the water, cover with a rapid re-radiator's the make sure the radiator cap tightly closed B. Install hose frames Tools used:  The key to pass 36  Container / bucket
  • 25. How it works:  Remove the hose by using key frames pass36  Pour the used oil is in the frame That hose into the bucket  Attach the new hose using key frames pass 36 competency/topic : Repair batrai cover 273 DZ type of work : track/14October 2010 Description of activities Repair cover batrai DZ 273 Tools used:  Sandpaper  Sanpolac  Isamu (priming)  Scraps Work Airways:  Putty using sanpolac dank Will cover the repair ape  Flatten the surface using sandpaper cover  After the flat surface of the cover, the cover painting by Isamu (priming) and then, paint the cover by using a compressor.
  • 26. competency/topic : Install 273 DZ Bottom Guard type of work : Track / October 18, 2010 Description of Activity Install 273 DZ Bottom Guard Tools used:  Combination Lock 32  Socket 32  Handle 1 “  Tokrain How it works:  Raise the Bottom Guard by using forklift  Then attach the bolts and tightened with a socket 32 ​and the handle to use your 1 "and the combination lock 32  In order to use the bolts are securely attached tokrain and socket 32
  • 27. competency/topic : Cleaning trackling type of work : Track / October 19, 2010 Description of Activity Cleaning trackling Tools used:  Scraps  Katcher How it works:  Clean trackling with using a scrap of land That Sticks  Spray trackling using katcher until clean.
  • 28. competency/topic : Repair cover 263 DZ type of work : Track / October 20, 2010 Description of Activity DZ 263 Repair Cover Tools used:  Sandpaper  Sanpolac Isamu (priming)  Scraps How it works:  Putty Will cover the repair by using sanpolac and skarp  Flatten the surface using sandpaper  After the flat surface of the cover, the cover painting by Isamu (priming)  Then paint the cover by using a compressor
  • 29. competency/topic : Cleaning trackling type of work : Track / 21-22 October 2010 Description of Activity Cleaning trackling Tools used:  Scraps  Katcher How it works:  Clean trackling with using a scrap of land That Sticks  Spray trackling using katcher until clean.
  • 30. competency/topic : Final checks DZ units type of work : Track / 25 October to 1 November 2010 Description of activities Final checks DZ units A. Refill oil dozer units Tools used:  Pumps  Jerry cans How it works:  Open the lid dozer oil tank and pour the oil from the pump using the supplied jerrycans  Clean the work area of ​oil spills by using Sawdust B. Painting Dozer unit Tools used:  Compressors How it works:  Close the glass cabin units by using paper That Is not exposed to paint  Spray the unit to average Dozer and tidy.
  • 31. competency/topic : Remove install sprocket D-375 A type of work : Track / 03-04 November 2010 Description of Activity Remove sprocket install D-375 A Tools used:  Socket 46  Handle 1 “  Rechet  Power raint  Short Pipe How it works: A. Remove sprocket  Loosen the bolts are tight by using the power raint already connected with a short pipe with a socket 46  After the bolt is loose for easy to use handles and sockets 46
  • 32. competency/topic : Cleaning trackling type of work : Track / November 5, 2010 Description of Activity Cleaning Trackling Tools used:  Scraps  Katcher How it works:  Clean trackling with using a scrap of land That Sticks  Spray trackling using katcher to clean
  • 33. competency/topic : Install the cover undercarige type of work : Track / November 6, 2010 Description of Activity Install cover undercarige Tools used:  Combination Lock 30  Socket 30  Handle 1 “ How it works:  Attach the cover to undercarige already repaired  Replace the which the bolts 30 are provided using a combination lock 30  In order to use the bolts are securely attached socket 30 and handle 1 “  Painting undercarige up neatly
  • 34. competency/topic : Drain the transmission oil type of work : Track / November 10,2010 Description of activities Drain transmission oil Tools used:  Key L 5  Containers  Pumps  Sawdust  Stocks How it works:  Remove the transmission oil cap and provided input into the bucket  Fill the tank using a transmission with new oil pump to taste  Clean the area of ​the former oil spills by using Sawdust and clean cotton waste
  • 35. competency/topic : Removeinstall hose assy frame type of work : Track / November 11,2010 Description of Activity Remove install hose assy frame Tools used:  Combination Lock 36 How it works:  Remove the hose frame to be removed using the pass key 36  Then attach the new hose That frames have been made available using pass key 36 competency/topic : Dasboard INNERCABIN type of work : Track / 12-13 November 2010 Description of activities Dasboard Innercabin Tools used:  Stocks  Sekrap and Thinner
  • 36. How it works:  Wipe the glass cabin with clean cotton waste if Necessary use paint thinner to moisten the dust cloth and then clean the glass cabin  If there is old paint / rust scrap use and clean with dust cloth moistened with paint thinner competency/topic : Repair cover undercarige type of work : Track /November 15 , 2010 Description of Activity Reapir cover undercarige Tools used:  Sandpaper  Sanpolac  Isamu priming  Spatula  Combination Lock 30 & 24  Socket 30 & 36 How it works: Putty That Will undercarige repaired using sanpolac and putty knife  Flatten the surface using sandpaper cover  After the flat surface of the cover, the cover painting by Isamu
  • 37. Then painting the cover with compressed  After the cover undercarige pairs nicely painted cover with a combination lock to use your 30 & 36 and rechet competency/topic : Completed bolt cover enggine type of work : Track / November 16,2010 Description of Activity Completed bolt cover undercarige Tools used:  Combination Lock 19  Socket 19  Rechet How it works:  Replace the bolt That Had been cleaned using a wire brush and container.  Tighten the lock bolt by using a combination of 19  In order to use the bolt is securely attached to the socket 19 and rechet.
  • 38. competency/topic : Install 273 DZ hidller type of work : Track / November 17,2010 Description of activity Install 273 DZ hidller Tools used:  Handle 1 “  Socket 30  Rechet  Tokraint extencaint ¾ How it works:  Attach hidller ready, to undecarige by using forklift  After hidller installed correctly, enter the bolts That have been cleaned first, then  Tighten using the socket handle and advance to more easily use rechet to tighten the bolts  After the bolts tight, use the function tokrain tighten bolts in accordance with the size
  • 39. competency/topic : Painting Stand type of work : Track / 20-22 November 2010 Description of activity Painting booth Tools used:  Pilok  Duct Tape  Cater  Cat  Sekrap How it works:  Clean the stand by using scrap until blended ago  Paint booths with red paint  After the paint is dry use the duct tape and cater for the load stand identity and then use paint to paint the identity of the load pilok stand
  • 40. competency/topic : Install the sprocket 273 DZ type of work : Track / 23-24 september2010 Description of activity Install sprocket 273 DZ That tools are used:  Tokraint  Handle  Socket 36 How it works:  Attach tith frameundercarige sprocket to 36 and insert the supplied bolt and tighten the bolt using a socket 36 and handle  After the bolt tight to fit a standard bolt mounted using tokrait and socket 36.
  • 41. competency/topic : Cleaning trackling type of work : Track / 25-26 November 2010 Description of Activity Cleaning Trackling Tools used:  Skap  Katcher How it works:  Clean trackling by using a scrap of land That Sticks  Spray trackling by using katcher until clean.
  • 42. competency/topic : PSMS (painting workshop) type of work : Track /Novemeber 29 - December 1, 2010 Description of activities PSMS (painting workshop) Tools used:  Brush How it works:  Mix the paint with a thiner then stirred with a flat  Painting workshop clean and tidy.
  • 43. competency/topic : Refill diesel units Dozer type of work : Track / 2-4 December 2010 Description of activities Refill diesel units Dozer Tools used:  Pumps How it works:  Open the tank lid and fill with diesel fuel That has been provided using the pump  Fill the tank if there is enough diesel fuel is spilled IMMEDIATELY clean by using Sawdust That has been provided.
  • 44. competency/topic : Install the cover undercarige type of work : Track / 5-9 December 2010 Description of Activity Install cover undercarige Tools used:  Combination Lock 30  Socket 30  Handle 1 “ How it works:  Attach the cover to undercarige already repaired  Replace the which the bolts 30 are provided using a combination lock 30  In order to use the bolts are securely attached socket 30 and handle 1“  Painting undercarige up neatly
  • 45. competency/topic : Washing unit Dozer type of work : Track / 10-11 December 2010 Description of Activity Washing unit Dozer Tools used:  Scraps  Katcher How it works:  Clean trackling with using a scrap of land That Sticks  Spray trackling using katcher until clean.
  • 46. Format prakerin student assessment (PSG) (Assessment by supervisor) Name of company Address No aspect of the assessment value a. Aspects of personality 1. Attitudes and behavior 80 2. Presence attendance / discipline 88 3. Initiative and creative ability 74 4. Motivation and responsibili 95 5. Mental readiness in working 85
  • 47. b. Aspects of competence 1. Timeliness of work completed 85 2. Quality of work 80 3. Knowledge of 75 4. The timing of the prakerin 78 5. Knowledge of machining 85 6. Knowledge of production process 87 7. Read engineering drawings 85 8. The use of machining 80 9. Number of values 1007 The average value 82,85 Pass both the
  • 48. I. IDENTITY Name : Anggra Rivaldi Place / Date of birth : Bekasi Augustus 22, 1994 Gender : Male Blood Type :- NIS / Class / progli : 10097662/XI TP 2 Name of parent / guardian : Arief sutandi Address : Rt 02/05 kp. babakan, ds. Dayeuh Kec. Cileungsi Kab. Bogor No HP / Tel : 02126724528 Cileungsi, December 11, 2011 Signature of student
  • 49. COMPANY IDENTITY (DU / IN) Name of DU / IN : PT. PAMA PERSADA NUSANTARA Bid. / Type of Business : Industrial Address : Jln. Kingdom Narogong km.23, 8 tower scenic area of ​industry Tel / fax : Name of leader : Personal Mr. Santoso Name of supervisor : Mr. Samsudin Pkl start date : 11 October 2010 Pkl completion date : December 11, 2010
  • 50. STUDENT COUNTER
  • 51. CHAPTER II COMPANY OVERVIEW A. History of company PT. Pama Persada Nusantara (PAMA) was formed in 1989. PAMA derived from heavy equipment rental division to its parent company PT United Tractor Tbk is specialized heavy equipment sales and distributors. For many, many famous brands Such as Komatsu and Nisan. Major shareholder of PT. Astra International Tbk, one of the companies in Indonesia. PAMA is one herald mining contractor in Indonesia, where Indonesia has a wealth not inferior to other nations. Against the backdrop of a solid and constant desire to Improve Their professional and generate customer satisfaction, PAMA has grown in Indonesia's mining industry, and provides all the capabilities and services to clients and partners. PAMA is the largest mining contractor in Indonesia, has done 40% of coal mining spread in parts of Indonesia in 2003. PAMA today operate with many mining regions in Kalimantan and Sumatra, the scope of the projects handled include coal mining. Gold mining, construction and removal of soil. Coal mining into business with the majority of 140.68 million cubic meters of bada areas in the mine and Transported in 2003.
  • 52. In 2003, PAMA earn income above U.S. $ 320 million. PAMA assets includes 1028 units of heavy equipment and the number of employees 4316 people, in the conduct of mining with Various conditions in Indonesia, PAMA has gained much experience covers all the steps the which have been operating a fare study of wealth, preproduction, development and production of regular mining construction. PAMA has built a good relationship with his client. With the success of operations in the construction and mining projects have been rewarded / reward with an extension of negotiations on the repetition of the original mining contract is a commitment to quality reporting PAMA perfect operational flexibility and reliability. PAMA attention to the importance of safety, health and the environment to introduce the draft PAMA / good design and management system (PSMS) a, the which is based on three design Accreditation international recognition, the international ONV SEQ Rating System; National Occupatil Safety Association ( NOSA); AND Sut Africa Chamber of Mine-mine Safty Management System (MSMS). PAMA also apply seperty management system ISO 9001, ISO 14001, Gren Astra company (AGC), siystems Management of safety and health (SMK3) PAMA Mnagemen Human Resources (PHRM) PAMA production management system (PPMs), Total Productive Mantenance (TPM), With a trainer / instructor with a good and professional workers and full support from the parent company,
  • 53. PAMA Will continue to expand on the overall planning to become a leading contractor in Southeast Asia. B. Vision and Mission The vision and mission of the PT. Pama Persada Nusantara are as follows: 1. Company Vision Being a mining contractor grade world with productivity, enggenering, safety and environmental best. 2. Company Mission a. Providing services with the operation of heavy equipment in the field of open and mining overburden That enables subscriber to get the best return on the world stage b. Provide opportunities for employees to develop their competence to measure in objective c. Providing the best MVA and EVA to shareholders. d. Continually seeks to master the technology and engineering capabilities and environmentally sound as well as human safety for the progress of the nation and the State
  • 54. III. Noted the company's organizational structure (owners & responsible person)
  • 55. IV. Take note of the manufacturing process (production) and or service 1. Unit at the Promontory Priuk pic: GL. Mekanik Activity : Mobilisai : - Helper mechanical Pic : Expedition welder 2. To in yards Cileungsi Activity: part-Genune Activity : Check documents spb.c / ws / n-Local Part Pic : Mechanics security 3. The unit Entered the parking lot 8. Running Activity : Lower unit Pic : Mechanical Helper mechanical 4. Parking in accordance Activity status model: Activity : Set the distance units of the between unit + 15 m Pic : Mechanical
  • 56. 5. Completeness and check the condition of the unit Pic-GL. Mechanical Activity : Q.A.L Unit condition report Recommended part Pic : Fore - GL.mekanik UNIT READY -Logistic - ppc USE / SALE Activity promotion repair cost analysis DEMO ASIS <$
  • 57. 6. The process of major & minor ripaire Activity : Entrance bayS Cleaning the unit Fabrication Pic : GL.mekanik Helper mechanical welder 7. Running Pic : GL.mekanik Helper mechanical 8. Unit ready for use Activity : Gtound test unit Q.A.I Performance + 80%
  • 58. Pic : GL. Mekanik Helper mechanical UNIT READY FORE USE / SALE >$ Activity : Promotion Demo
  • 59. V. Take note of the marketing process and marketing area
  • 60. VI. Take note of the selection process or the hiring of employees 1. Identified there (identify Them) 2. Develop a position description (explanation of the development of positions) 3. Offer (offer) 4. Identify the key selection criteria (to identify the key criteria) 5. Create the advertis-ment (making the advertisement) 6. Paper selection listiny short (forum / paper checks initial selection) 7. Initial screening interview (interview) 8. Psicometric testing (pisicotes) 9. Assessment centers / simulation (removal and simulation) 10. Second / tehnical interview (interview techniques) 11. Reference checking (checking of certificate) 12. New employees (new hires) 4. Note safty equipment for the industry and carry out the work  Sefty shoes  Sefty helmet
  • 61. Welding gloves  Masks  Ear plug  Ear Muff 5. Take note of the steps in operation any or all of the machines used when prakerin  Washing machine  P2h (checks, equipment, daily)  Prepaire hose to spray water  Hose that contain the flow of water put into washing machine  Put hose into the electrical panel legran  Turn on the washing machine are marked with green or start  To turn off the washing machine or simply press the red button off 6. Mencatat raw materials and auxiliary materials used in industry  Auxiliary materials  WD 40 to remove the rust  Sandpaper  Thiner  Cat  Clean and remove rust on electric einer
  • 62. VII. DAILY ACTIVITY REPORTS STUDENTS Student Activities Report No. DAY / DATE TYPE OF ACTIVITY 1. 11-14 October 2010 : > p5m (talk five minutes) > Cleaning grader 2. 15 October 2010 : > Cleaning blade > Cleaning propeller of a pile of oil > Open the hose auto lube 3. 16 October 2010 : > Break > Cleaning system on the grader over 233 units > Cleaning Minning plate > Cleaning sap 4. 18 October 2010 : > 233 unit graders cabin cleaning > Sand the cover unit 233 Grader 5. 19 October 2010 : > Clean the filter > Sand the cover unit 233 Grader
  • 63. 6. 20 Octobe, 2010 : > Cleaning the tandem > Attach nipple grase 7. 21 October 2010 : > Cleaning and wrap it over breake system demean plastic wrap 8. 22 October 2010 : > Sand the front as 233 units graders 9. 25 October 2010 : > Pump oil pump chain tandem with Install the nuts 10. 26 October 2010 : > Replacing the wheel and tire unit 233 Grader > Cleaning the glass cabin 233 unit graders 11. 27 October 2010 : > Cleaning the glass cabin unit 233 Grader : > Suck the oil in 233 unit graders because of leakages in sap / breaking system 12. 28 October 2010 : > Painting cabin units graders > Sucking oil > Grader unit 233 13. 01 November 2010 : > Cleaning air from red silicon tandem > Cleaning the red rings on silicon > Sand the tandem unit 233 Grader > Sand tendem chain
  • 64. 14. 2-4 November 2010 : > Placing and open tire unit 233 Grader > Installing over breaking the system 15. 5 November 2010 : > Cleaning the glass cabin 16. 6 November 2010 : > Transmission oil change on a 233 unit graders 17. 8 November 2010 : > Put nuts guard fh 16 > Remove the site operator fh 16 18. 9 November 2010 : > Scrap skotlet fh 16 : > Fill the oil tendem 233 unit graders 19. 10 November 2010 : > Filling oil tendem > Install the plate on the sap : > Install tire Grader 233 : > Painting graders hose 233 20. 11 November 2010 : > Sand the chassis / cab fh 16 : > Support painting cabin fh 16 21. 12 November 2010 : > Cleaning covers fh 16
  • 65. 22. 13 November 2010 : > Support graders painting cabin 266 > Clean the work area / bays 23. 14 November 2010 : > Sand the door Grader 266 > Cleaning the area 24. 15 November 2010 : > Rreleasing water separator / filter fh 16 > Painting the cover fh 16 25. 18 November 2010 : > Cleaning water separator FH 16 > Painting water separator fh 16 > Filling diesel water separator fh 16 > Cleaning the chain graders tendem 277 26. 19 November 2010 : > 266 painting door graders 27. 22 November 2010 : > 266 washing graders 28. 23 November 2010 : > 266 painting door graders 29. 24 November 2010 : > 266 washing graders > Fix the cylinder riper 30. 25 November 2010 : > Rreplacing the valve WL > Riper GR-fixing cylinder 266.
  • 66. 31. 26 November 2010 : > Fixing cylinder 266 riper GR 32. 29 November 2010 : > Attach hose cylinder > Clining area 33. 30 November - 3 December : > After finish the workshop area > Support unit parking 34. 4 December 2010 : > Cannibal mud guard fh 16 35. 6 December 2010 : > Release the piping > Releasing electrically ct system (crane truck) 018 36. 8 December 2010 : > Moving cabin ct (truck crane) 018 37. 9 December 2010 : > Release unit of a crane truck covers 018 > Cleaning cabins ct (truck crane) 018 38. 10 December 2010 : > washing cabin ct (truck crane) 018 > washing cover (truck crane) 018 39. 11 December 2010 : > Washing engine ct (truck crane) 018 > Clening area ct (truck crane) 018
  • 67. Format prakerin student assessment (PSG) (Assessment by supervisor) Name of company Address No aspect of the assessment Value a. Aspects of personality 1. Attitudes and behavior 80 2. Presence attendance / discipline 80 3. Initiative and creative ability 75 4. Motivation and responsibility 75 5. Mental readiness in working 75
  • 68. Value b. Aspects of competence 1. Timeliness of work completed 75 2. Quality of work 75 3. Knowledge of safety 70 4. The timing of the prakerin 80 5. Knowledge of machining 75 6. Knowledge of production process 78 7. Read engineering drawings 70 8. The use of machining 70 Number of values the average value Pass both the
  • 69. IDENTITY Name : WAHYUDIN Place / Date of birth : Bogor December 12, 1993 Gender : Male Blood Type :A NIS / Class / progli : 10097857/XI tp 3 Name of parent / guardian : Nasan Address : Kp. Walahir Rt. 07/ 04 Ds. Nambo Kec. Klapanunggal No HP / Tel : 085714211271 Cileungsi, December 11, 2011 Signature of student
  • 70. COMPANY IDENTITY (DU / IN) Name of DU / IN : CV. RIZKY JAYA PERSADA Bid. / Type of Business : - Address : Jln. Pesantren Ds. Pasir angin Rt 01/05 Pasir angin, Cileungsi, Bogor Tel / fak : (021) 82498741, 82498640 Name of leader : Mr. Waliyadi I Adnan. ST Name of supervisor : Mr. Tony Pkl start date : July 27, 2010 Pkl completion date : October 26, 2010
  • 72. III. Noted the company's organizational structure (owners & responsible person)
  • 73. NOTE THE PREPARATION WORK AND K 3 1. Record the steps or preparatory work has not  Following the directives of the leadership of the company  Making planning what work will be done  Preparing sefty 2. Noting industrial machines that are used the following function  M / c Tool =) make the goods according to customer perrmintaan (corresponding image)  M / c scrap =) make / take over the plate thickness of 1 mm  M / c milling =) Make goods according to customer demand (corresponding image)  M / c grinding surface =) make the goods to be fine (go to precision measurements)  Mic weld =) welding / connect between the plate 3. Take note of the following hand tools in the industry functions  Hand grinding machine (smooths rough objects)  Stingy (smooths rough objects)  Sandpaper (removing rust and dirt)
  • 74. 4. Noting sefty equipment for the industry and carry out the work  Gloves (to avoid minor cuts / scrapes hand)  Masks (avoid dust)  Helmet (avoiding impact in the head)  Glass eyes (avoid dirt / dust)  Shoes (to protect feet) 5. Take note of the steps in operate any or all of the machines used when prakerin  Lathes  Reading working drawings  Preparation tool and the workpiece  Operation lathes  Put the material into a machine with a fast dibble  On the dial (should be straight)  Prepare a chisel  Turn the key on
  • 75. 6. Record the raw materials and auxiliary materials used in industry  Material 400 ss  Material s 45 c  Material SKD 11  Material VCN  Material pvc  Material crethane  Material mc blue  Material credits 304 (stainless) 7. Take note of the manufacturing process (production) and or service  Machining of materials  The process of cutting  Lathe process  Milling process  Cnc process
  • 76. 8. Notes the marketing process and marketing area Costumer  PT. Yamaha  PT. VTE  PT. Sanyo  PT. Winteq  PT. Toyota t huso 9. Record the employee selection process or acceptance hires Jobs - (notably, the Internet) - (Directly in the test on the machine in their respective fields) Interview salary + placementmachine 3 - month trial Contract 1 year AGENDA NOTE TO MAKE WORK 1. 27 Juli 2010 : > Grinding components gaspan > Clean pvc news
  • 77. 2. 28 July 2010 : > Attach the clamp bolts > Paint the gutters 5 assy line 7 > Install cables 3. 29 July 2010 : > Grinding plate t-2 > Grinding pvc-news > Install clamp bolt 4. 30 July 2010 : > Grinding plate > Install adjuster-plate > Install clamp bolt 5. 02 August 2010 : > Clean test jigli > Painting the carrier > Grinding plate 6. 03 August 2010 : > Cutting oil gaspan > Pressing oil gaspan 7. 04 August 2010 : > Sand the bushing or ring > Sand the pin > Sand the shim ute > Grinding oil gaspan
  • 78. 8. 05 August 2010 : > Grinding oil containment secodry collector > Clean the bushing / rings 9. 06 August 2010 : > Grinding components gaspan > Welding components gaspan > Lathe gaspan round d = 405 10. 09 August 2010 : > Sand the pin > Welding components gaspan > Sand the rounded gaspan d = 40510 August 2010 11. 10 August 2010 : > Drilled components gaspan > Lathe gaspan round d = 405 12. 11 August 2010 : > Weld components gaspan > Grinding carier 13. 12 August 2010 : > Sand component gaspan > Grinding carier > Cut pindal 13 14. 13 August 2010 : > Weld carier > Grinding carier
  • 79. 15. 16 August 2010 : > a lathe bushing or ring > Sand the pin 16. 18 August 2010 : > Grinding carier > Cut the plate (m / c cutt whell) > Cut The Iron (M / C Cutt Whell) > Grinding iron 17. 19 August 2010 : > a lathe bolts d = 9. 40 > Grinding plate > Drill the plate d = 6 18. 20 August 2010 : > Cut the pvc (m / c jig saw) > Drilled pvc (m / c drill) 19. 23 August 2010 : > Lathe bolts d = 9. 40 > Grinding plate t = 2 > Sand the plate t = 2 20. 24 August 2010 : > Install adjuster plate > Lathe bolts d = 9. 40 21. 25 August 2010 : > a lathe bolts d = 9.40 > Sand the bushing / rings 22. 26 August 2010 : > Cut the plate t = 2 > Grinding plate t = 2 > Gluing acrylic saind bord
  • 80. 23. 27 August 2010 : > a lathe bolts d = 9.40 > Pressing gaspan box 24. 30 August 2010 : > Gluing pvc news > Grinding pvc news > Clear pvc news 25. 31 August 2010 : > a lathe pin > Improving the welding transformer 220 26. 01 September 2010 : > Repair welding transformer 220 > Improving the ac outlet 27. 02 september 2010 : > lathe bolts d = 9.40 > Cut round gaspan 28. 03 september 2010 : > Cut plate > Grinding plate > Drill the plate d = 10 29. 16 September 2010 : > to cut iron > Grinding of iron > Sand box gaspan > Clean the box gaspan
  • 81. 30. 17 september 2010 : > Sand the pin > Sand box gaspan 31. 20 september 2010 : > Drilled pvc > Sand box gaspan 32. 21 september 2010 : > Drilled pvc > Sand box gaspan 33. 22 september 2010 : > Cut the iron > Grinding of iron > Cut the plate (m / c cutt whell) > Grinding plate 34. 23 september 2010 : > Oil pressing gaspan 35. 24 september 2010 : > Gluing pvc news > Grinding pvc news > Cut the clear rubber 36. 27 September 2010 : > Gluing pvc news : > Clear pvc news 37. 28 September 2010 : > Gluing pvc news > Clear pvc news > Cut the clear rubber
  • 82. 38. 29 september 2010 : > Grinding oil gaspan > Gaspan oil sand > Filing pin 39. 30 september 2010 : > Gaspan oil sand > Clean up oil gaspan 40. 01 october 2010 : > Sand component gaspan > Pressing oil gaspan > Filing pin 41. 04 october 2010 : > Install pvc > Clean the grinding machine 42. 05 october 2010 : > Grinding oil gaspan > Gaspan oil sand > Drill carrier 43. 06 october 2010 : > Clean carrier > Gaspan oil sand > Lathe vacuum tank assy 44. 07 october 2010 : > Cleaning jig cover uder > Clean the jig side cover 3 > Clean the jig sped meters 45. 08 october 2010 : > Cutting plate > Grinding plate > Sand the pin
  • 83. 46. 13 October 2010 : > Cut pvc (m / c mosque s) > Sand box gaspan > Cut the plate 47. 14 october 2010 : > Cut pvc (m / c jig saw) > Sand box gaspan 48. 15 October 2010 : > Gaspan sand box > Cut the pin (m / c jig saw) > Sand the pin (m / c lathe) 49. 18 october 2010 : > Grinding carier > Help make the carrier 50. 19 October 2010 : > Helped make the carrier >Grinding carier > Gaspan oil sand 51. 20 October 2010 : > Helped improve the milling machine > Grinding oil gaspan > Gaspan oil sand
  • 84. 52. 21 October 2010 : > Helped make the carrier > Lathe pin > Drilled pvc (m / c drill) 53. 25 october 2010 : > Cutting pin (m / c jig saw) > Cut the pvc (m / c jig saw) 54. 26 October 2010 : > Cut pvc (m / c jig saw) > Cut acrylic (m / c jig saw)
  • 85. Format prakerin student assessment (PSG) (Assessment by supervisor) Name of company Address No aspect of the assessment value a. Aspects of personality 1. Attitudes and behavior 92 2. Presence attendance / discipline 91 3. Initiative and creative ability 95 4. Motivation and responsibility 95 5. Mental readiness in working 95
  • 86. b. Aspects of competence 1. Timeliness of work completed 90 2. Quality of work 90 3. Knowledge of safety 89 4. The timing of the prakerin 89 5. Knowledge of machining 89 6. Knowledge of production process 89 7. Read engineering drawings 89 8. The use of machining 82 9. Number of values 1.175 The average value Pass both the