Lesson Learned Report

 Post Implementation Review -
        Questionnaire


     Anand Subramaniam
“Norms are things that are always
  perceived, but never achieved.”

                           - Phillip A. Trella




                                             2
Highlights
 Scope                   Approach
 Business Case           Implementation
  Drivers                 Risk
 Value                   Result
 Measures                ERP
 Governance /
  Stewardship



                                            3
Scope
 Please describe the business functions and organisations involved
  in this project?
 What was the planned duration of the project?
 What was the actual duration?
 What was your organisation's role and level of involvement?
 What is the original project cost (in dollars)?
 What was the total cost at completion?
 Which core business processes were targeted for improvement?
 Were external resources (consultants) used? If yes, please specify
  their role?
 Did you leverage your existing technology or did you procure a new
  system?
 Was the project team a cross functional team?




                                                                       4
Business Case Drivers
 What were the internal business drivers (eg. cost
  reduction, performance improvement)?
 What were the external business drivers (eg. regulatory
  reasons, market pressure) for change?
 What were the desired outcomes/goals)?
 What were the financial and non-financial goals?
 Was a business case (financial and non-financial)
  developed?
 What was your ROI and Pay-back time according to the
  business case?
 Were there rapid improvement opportunities that would
  have shortened the payback period?

                                                            5
Value
 How did you distinguish "must-have"
  features of COTS (Commercial, off-the-
  shelf) from the "nice-to-have"?
 Which improvements had greatest
  impact?
 Did vendors influence your project
  spending decisions?
 What were the top three cost drivers?

                                           6
Measures
 Did the project have intermediate goals / evaluation
  points at which decisions could be made to stop further
  effort?
 How were metrics used in your decision making
  process?
 Were performance metrics tied to the user
  requirements? If yes, how did you measure your
  progress?
 What were the Critical Success Factors?
 How was performance reported to the leadership team /
  sponsors?
 Was Balanced Score card used for reporting?
 What were the key measures of performance?

                                                            7
Governance / Stewardship
 Were customers/stakeholders involved in developing the
  new processes?
 Who was (were) the sponsor (s)? Please state their
  position (s).
 Were executive sponsors involved (CEO,CFO, COO)?
  How?
 Were key executives committed to the project from the
  beginning?
 Were user forums established to support continuous
  user awareness during transition?
 Was a steering committee established? If yes, please
  explain their role?
 Were corporate process owners identified? If yes, did
  they have the proper authority?
                                                       8
Governance / Stewardship (Contd.)
 Did organisational policies and regulations
  require updating as a result of new processes?
 Was the project led by technical, functional, or
  management staff?
 Did you use an industry standard Project
  Management methodologies (EVM,PMBOK,
  Prince 2, others)?
 Are you Project Managers certified?
 Does your organisation follow any of the industry
  standard process improvement techniques (Six
  Sigma, Lean Six Sigma, TQM)?
                                                  9
Approach (Benchmarking)
 Was the initiative based on an organisation strategic plan
  or a reactive plan based on lack of systems / operations
  functionalities?
 Were in-house solutions considered? If yes, what was
  the outcome?
 Were alternative solutions considered?
 How were user requirements collected to support
  building the implementation plan?
 Did you use industry benchmarks?
 Was a benchmark initiative conducted based on best
  business practices?
 What were the most significant assumptions going into
  the project?

                                                          10
Approach (Enterprise Architecture)
 Did you have a documented Enterprise
  Architecture (EA)?
 Was existing infrastructure used to
  support change project?
 What method or framework was used to
  develop your EA?



                                         11
Approach (Reference Models)
 Were scenarios or reference models
  developed to facilitate selecting the vendor
  or modules?
 Were the scenarios designed, tested and
  evaluated prior to implementing the
  solution?



                                            12
Approach (Change Management)
 Was radical change necessary?, If yes, in what areas
  (People, Process Technology)?
 Were alternatives / work around considered?
 Were key component of change management defined
  prior to project kick-off? If yes, at what level was change
  management introduced into the project?
 Were there employee impact assessment done prior to
  initiation of the project? How were they handled?
 How much of total project cost was spent on change
  management? (training, communications, etc)
 What change management tools and techniques did you
  use?
 Was the soft cost for change management planned into
  the budget?
                                                            13
Implementation
   Were all planned process changes fully implemented?
   Were new processes disruptive to business operations?
   How did you reduce the impact of process change?
   Was an issue resolution process defined and used?
   What were the key processes that helped or hindered
    the implementation?
   Was a Center of Excellence (CoE) or competency center
    established? (Knowledge Repository?)
   Was there a pilot?
   Was the pilot successful?
   Was any new technology or software used?

                                                       14
Risk
 Was risk sufficiently evaluated before
  undertaking the change project?
 What were some of the known risks?
 Was a risk mitigation strategy developed?
 What elements of the mitigation strategy were
  implemented?
 What were some of the unanticipated risks?
 How were unanticipated risks handled?
 Was consideration given to a modular approach
  to reduce risk?
                                              15
Result
 Were desired improvements achieved?
 Was sufficient value created by new processes
  to justify the effort and cost?
 What were some (examples) of the tangible
  financial impacts of your change efforts?
 Could similar benefits have been achieved for
  less cost?
 What additional challenges were encountered?


                                                  16
ERP
 What was the rationale for selecting ERP versus other COTS
  solutions?
 What processes were targeted for improvement by ERP?
 Was the desired process designed prior to implementation efforts?
 Was process modeling used?
 How many existing systems did the ERP replace?
 Was a systems integrator (SI) used?
 Were scenarios developed to facilitate selecting the vendor or
  modules?
 How much of the COTS solution was used “out of the box”?
 What was the implementation plan? (Big bang, phased?)
 How many vendors were used? What type?
 Was unexpected customisation required?
 How many modifications were required?
 How much did customisation cost?

                                                                      17
ERP (Contd.)
   Who could authorise customisations?
   How were legacy systems retired?
   Who could authorise customisations?
   Was the ERP software solution chosen by the SI or by the sponsor?
   Were multiple COTS solutions used during this change project?
   Were any non-essential features included in COTS product?
   What ERP implementation methodology was used? (software
    vendor, yours, industry standard Project Management
    methodologies, systems integrator?)
   What was your strategy for testing the ERP implementation?
   Were reference models used during blueprinting? (As~Is and
    To~Be)
   How would you rate the COTS product(s) for quality, performance,
    ease of use, functionality, etc.?
    Did systems integrator perform to your expectations?

                                                                   18
“When you get right down to it, one of the
   most important tasks of a leader is to
 eliminate his people's excuse for failure.”

                              - Robert Townsend



                                              19
Good Luck
http://www.linkedin.com/in/anandsubramaniam




                                              20

Weitere ähnliche Inhalte

Was ist angesagt?

Organization Chart & Project Responsibilities
Organization Chart & Project ResponsibilitiesOrganization Chart & Project Responsibilities
Organization Chart & Project Responsibilities
Chris Garbett
 
Civil Construction Project Management Powerpoint Presentation Slides
Civil Construction Project Management Powerpoint Presentation SlidesCivil Construction Project Management Powerpoint Presentation Slides
Civil Construction Project Management Powerpoint Presentation Slides
SlideTeam
 
Project Management (PMP Material)
Project Management (PMP Material)Project Management (PMP Material)
Project Management (PMP Material)
VR M
 

Was ist angesagt? (20)

NEC Engineering and Construction Contract (ECC) -The Supervisor's roles and r...
NEC Engineering and Construction Contract (ECC) -The Supervisor's roles and r...NEC Engineering and Construction Contract (ECC) -The Supervisor's roles and r...
NEC Engineering and Construction Contract (ECC) -The Supervisor's roles and r...
 
Organization Chart & Project Responsibilities
Organization Chart & Project ResponsibilitiesOrganization Chart & Project Responsibilities
Organization Chart & Project Responsibilities
 
Project Management PowerPoint Presentation Slides
Project Management PowerPoint Presentation SlidesProject Management PowerPoint Presentation Slides
Project Management PowerPoint Presentation Slides
 
Practical Project Management - full course
Practical Project Management - full coursePractical Project Management - full course
Practical Project Management - full course
 
Brief introduction to project management and project management tools
Brief introduction to project management and project management toolsBrief introduction to project management and project management tools
Brief introduction to project management and project management tools
 
PROJECT CHARTER
PROJECT CHARTERPROJECT CHARTER
PROJECT CHARTER
 
project management
project managementproject management
project management
 
Project planning and control training with lego
Project planning and control training with legoProject planning and control training with lego
Project planning and control training with lego
 
Estimating Time & Costs
 Estimating Time & Costs Estimating Time & Costs
Estimating Time & Costs
 
Initial Project Meeting Agenda PowerPoint Presentation Slides
Initial Project Meeting Agenda PowerPoint Presentation Slides Initial Project Meeting Agenda PowerPoint Presentation Slides
Initial Project Meeting Agenda PowerPoint Presentation Slides
 
Civil Construction Project Management Powerpoint Presentation Slides
Civil Construction Project Management Powerpoint Presentation SlidesCivil Construction Project Management Powerpoint Presentation Slides
Civil Construction Project Management Powerpoint Presentation Slides
 
Introduction to Project Management (workshop) - v.1
Introduction to Project Management (workshop) - v.1Introduction to Project Management (workshop) - v.1
Introduction to Project Management (workshop) - v.1
 
Project integration management
Project integration managementProject integration management
Project integration management
 
Fidic db-yellow-book
Fidic db-yellow-bookFidic db-yellow-book
Fidic db-yellow-book
 
Project Kickoff Meeting Agenda PowerPoint Presentation Slides
Project Kickoff Meeting Agenda PowerPoint Presentation SlidesProject Kickoff Meeting Agenda PowerPoint Presentation Slides
Project Kickoff Meeting Agenda PowerPoint Presentation Slides
 
Project Management Steps
Project Management StepsProject Management Steps
Project Management Steps
 
Project Management
Project ManagementProject Management
Project Management
 
Project Management (PMP Material)
Project Management (PMP Material)Project Management (PMP Material)
Project Management (PMP Material)
 
7 Steps Project Execution Process
7 Steps Project Execution Process7 Steps Project Execution Process
7 Steps Project Execution Process
 
Project management
Project managementProject management
Project management
 

Andere mochten auch

The 7 sorrows of mary
The 7 sorrows of maryThe 7 sorrows of mary
The 7 sorrows of mary
Lulu Salud
 

Andere mochten auch (20)

Innovation – What, Why, How…
Innovation – What, Why, How…Innovation – What, Why, How…
Innovation – What, Why, How…
 
Innovation
InnovationInnovation
Innovation
 
Design For Six Sigma
Design For Six SigmaDesign For Six Sigma
Design For Six Sigma
 
Project Execution & Control Checklist
Project Execution & Control ChecklistProject Execution & Control Checklist
Project Execution & Control Checklist
 
IT Processes & Systems
IT Processes & SystemsIT Processes & Systems
IT Processes & Systems
 
Process Audit
Process AuditProcess Audit
Process Audit
 
Project Initiation Checklist
Project Initiation ChecklistProject Initiation Checklist
Project Initiation Checklist
 
3 MU
3 MU3 MU
3 MU
 
Overall Equipment Effectiveness
Overall Equipment EffectivenessOverall Equipment Effectiveness
Overall Equipment Effectiveness
 
Project Health Check
Project Health CheckProject Health Check
Project Health Check
 
Benchmarking
BenchmarkingBenchmarking
Benchmarking
 
QMS & ISO 9001:2000
QMS & ISO 9001:2000QMS & ISO 9001:2000
QMS & ISO 9001:2000
 
Project Closure Report
Project Closure ReportProject Closure Report
Project Closure Report
 
Service Delivery & Support
Service Delivery & SupportService Delivery & Support
Service Delivery & Support
 
Content Management System
Content Management SystemContent Management System
Content Management System
 
Material Handling
Material Handling Material Handling
Material Handling
 
Ninbennoaru Jidoka
Ninbennoaru JidokaNinbennoaru Jidoka
Ninbennoaru Jidoka
 
LSS - 5 Year Strategy
LSS -  5 Year StrategyLSS -  5 Year Strategy
LSS - 5 Year Strategy
 
Gemba kaizen
Gemba kaizenGemba kaizen
Gemba kaizen
 
The 7 sorrows of mary
The 7 sorrows of maryThe 7 sorrows of mary
The 7 sorrows of mary
 

Ähnlich wie Lesson Learned Report

Project Management
Project ManagementProject Management
Project Management
AdinaaM
 
Lean six sigma tollgate checklists
Lean six sigma tollgate checklistsLean six sigma tollgate checklists
Lean six sigma tollgate checklists
Steven Bonacorsi
 
Lean six sigma tollgate checklists
Lean six sigma tollgate checklistsLean six sigma tollgate checklists
Lean six sigma tollgate checklists
Steven Bonacorsi
 

Ähnlich wie Lesson Learned Report (20)

Active Problem Solving
Active Problem SolvingActive Problem Solving
Active Problem Solving
 
Art of Implementing a Business Solution
Art of Implementing a Business SolutionArt of Implementing a Business Solution
Art of Implementing a Business Solution
 
Hmaria1
Hmaria1Hmaria1
Hmaria1
 
Flevy.com - Business Performance Audit Questionnaires
Flevy.com - Business Performance Audit QuestionnairesFlevy.com - Business Performance Audit Questionnaires
Flevy.com - Business Performance Audit Questionnaires
 
Process Innovation Capabilities Diagnostic Tool - Working Draft
Process Innovation Capabilities Diagnostic Tool - Working DraftProcess Innovation Capabilities Diagnostic Tool - Working Draft
Process Innovation Capabilities Diagnostic Tool - Working Draft
 
ISG: TechChange Presentation on M&E MIS Systems
ISG: TechChange Presentation on M&E MIS SystemsISG: TechChange Presentation on M&E MIS Systems
ISG: TechChange Presentation on M&E MIS Systems
 
Achieving Escape Velocity in Your Digital Transformation Through Product Thin...
Achieving Escape Velocity in Your Digital Transformation Through Product Thin...Achieving Escape Velocity in Your Digital Transformation Through Product Thin...
Achieving Escape Velocity in Your Digital Transformation Through Product Thin...
 
ERP: Start The Discussion
ERP: Start The DiscussionERP: Start The Discussion
ERP: Start The Discussion
 
Making IT Work for Your Business - 4 Key Concepts to Get the Most Out of Your...
Making IT Work for Your Business - 4 Key Concepts to Get the Most Out of Your...Making IT Work for Your Business - 4 Key Concepts to Get the Most Out of Your...
Making IT Work for Your Business - 4 Key Concepts to Get the Most Out of Your...
 
The Management Consulting Toolkit_ Fifty of the most versatile an.pdf
The Management Consulting Toolkit_ Fifty of the most versatile an.pdfThe Management Consulting Toolkit_ Fifty of the most versatile an.pdf
The Management Consulting Toolkit_ Fifty of the most versatile an.pdf
 
Core Skills for Change Agents
Core Skills for Change AgentsCore Skills for Change Agents
Core Skills for Change Agents
 
Hopmere, Michael Its Better Building 080410
Hopmere, Michael Its Better Building 080410Hopmere, Michael Its Better Building 080410
Hopmere, Michael Its Better Building 080410
 
Are You Really Agile?
Are You Really Agile?Are You Really Agile?
Are You Really Agile?
 
Project Management
Project ManagementProject Management
Project Management
 
How To Choose The Right HR Software - 7 Steps To Success
How To Choose The Right HR Software - 7 Steps To SuccessHow To Choose The Right HR Software - 7 Steps To Success
How To Choose The Right HR Software - 7 Steps To Success
 
Doniel Wilson Presents: Surviving the Shift. Agile and its Impact to your Fut...
Doniel Wilson Presents: Surviving the Shift. Agile and its Impact to your Fut...Doniel Wilson Presents: Surviving the Shift. Agile and its Impact to your Fut...
Doniel Wilson Presents: Surviving the Shift. Agile and its Impact to your Fut...
 
ch03-Design Project.ppt
ch03-Design Project.pptch03-Design Project.ppt
ch03-Design Project.ppt
 
Value Summary 2.0 Overview
Value Summary 2.0 OverviewValue Summary 2.0 Overview
Value Summary 2.0 Overview
 
Lean six sigma tollgate checklists
Lean six sigma tollgate checklistsLean six sigma tollgate checklists
Lean six sigma tollgate checklists
 
Lean six sigma tollgate checklists
Lean six sigma tollgate checklistsLean six sigma tollgate checklists
Lean six sigma tollgate checklists
 

Mehr von Anand Subramaniam

Mehr von Anand Subramaniam (20)

Lean transformation
Lean transformationLean transformation
Lean transformation
 
Lean principles
Lean principlesLean principles
Lean principles
 
Lean thinking
Lean thinkingLean thinking
Lean thinking
 
Anand dossier 2
Anand dossier 2Anand dossier 2
Anand dossier 2
 
Anand short dossier
Anand short dossierAnand short dossier
Anand short dossier
 
Set up reduction
Set up reductionSet up reduction
Set up reduction
 
Waste Walk ~ Audit
Waste Walk ~ AuditWaste Walk ~ Audit
Waste Walk ~ Audit
 
Muda in service industries
Muda in service industriesMuda in service industries
Muda in service industries
 
Defects Vs. Errors
Defects Vs. ErrorsDefects Vs. Errors
Defects Vs. Errors
 
LSS Idea Generation to Project Execution
LSS Idea Generation to Project ExecutionLSS Idea Generation to Project Execution
LSS Idea Generation to Project Execution
 
Lean Six Sigma Projects & Strategy Linkage
Lean Six Sigma Projects & Strategy LinkageLean Six Sigma Projects & Strategy Linkage
Lean Six Sigma Projects & Strategy Linkage
 
CMMI & Six Sigma Integration
CMMI & Six Sigma IntegrationCMMI & Six Sigma Integration
CMMI & Six Sigma Integration
 
CMMI Capability Maturity Model Integration
CMMI   Capability Maturity Model Integration CMMI   Capability Maturity Model Integration
CMMI Capability Maturity Model Integration
 
8 D – Problem Solving Process
8 D – Problem Solving Process8 D – Problem Solving Process
8 D – Problem Solving Process
 
Total Productive Maintenance
Total Productive MaintenanceTotal Productive Maintenance
Total Productive Maintenance
 
TPM Implementation Strategy
TPM Implementation StrategyTPM Implementation Strategy
TPM Implementation Strategy
 
Autonomous Maintenance
Autonomous MaintenanceAutonomous Maintenance
Autonomous Maintenance
 
VSM – Current & Future
VSM – Current & FutureVSM – Current & Future
VSM – Current & Future
 
Service / Product Innovation
Service / Product InnovationService / Product Innovation
Service / Product Innovation
 
Innovation Assessment & Tools
Innovation Assessment & ToolsInnovation Assessment & Tools
Innovation Assessment & Tools
 

Kürzlich hochgeladen

Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Dipal Arora
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
lizamodels9
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
amitlee9823
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
dollysharma2066
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
amitlee9823
 

Kürzlich hochgeladen (20)

Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdf
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 

Lesson Learned Report

  • 1. Lesson Learned Report Post Implementation Review - Questionnaire Anand Subramaniam
  • 2. “Norms are things that are always perceived, but never achieved.” - Phillip A. Trella 2
  • 3. Highlights  Scope  Approach  Business Case  Implementation Drivers  Risk  Value  Result  Measures  ERP  Governance / Stewardship 3
  • 4. Scope  Please describe the business functions and organisations involved in this project?  What was the planned duration of the project?  What was the actual duration?  What was your organisation's role and level of involvement?  What is the original project cost (in dollars)?  What was the total cost at completion?  Which core business processes were targeted for improvement?  Were external resources (consultants) used? If yes, please specify their role?  Did you leverage your existing technology or did you procure a new system?  Was the project team a cross functional team? 4
  • 5. Business Case Drivers  What were the internal business drivers (eg. cost reduction, performance improvement)?  What were the external business drivers (eg. regulatory reasons, market pressure) for change?  What were the desired outcomes/goals)?  What were the financial and non-financial goals?  Was a business case (financial and non-financial) developed?  What was your ROI and Pay-back time according to the business case?  Were there rapid improvement opportunities that would have shortened the payback period? 5
  • 6. Value  How did you distinguish "must-have" features of COTS (Commercial, off-the- shelf) from the "nice-to-have"?  Which improvements had greatest impact?  Did vendors influence your project spending decisions?  What were the top three cost drivers? 6
  • 7. Measures  Did the project have intermediate goals / evaluation points at which decisions could be made to stop further effort?  How were metrics used in your decision making process?  Were performance metrics tied to the user requirements? If yes, how did you measure your progress?  What were the Critical Success Factors?  How was performance reported to the leadership team / sponsors?  Was Balanced Score card used for reporting?  What were the key measures of performance? 7
  • 8. Governance / Stewardship  Were customers/stakeholders involved in developing the new processes?  Who was (were) the sponsor (s)? Please state their position (s).  Were executive sponsors involved (CEO,CFO, COO)? How?  Were key executives committed to the project from the beginning?  Were user forums established to support continuous user awareness during transition?  Was a steering committee established? If yes, please explain their role?  Were corporate process owners identified? If yes, did they have the proper authority? 8
  • 9. Governance / Stewardship (Contd.)  Did organisational policies and regulations require updating as a result of new processes?  Was the project led by technical, functional, or management staff?  Did you use an industry standard Project Management methodologies (EVM,PMBOK, Prince 2, others)?  Are you Project Managers certified?  Does your organisation follow any of the industry standard process improvement techniques (Six Sigma, Lean Six Sigma, TQM)? 9
  • 10. Approach (Benchmarking)  Was the initiative based on an organisation strategic plan or a reactive plan based on lack of systems / operations functionalities?  Were in-house solutions considered? If yes, what was the outcome?  Were alternative solutions considered?  How were user requirements collected to support building the implementation plan?  Did you use industry benchmarks?  Was a benchmark initiative conducted based on best business practices?  What were the most significant assumptions going into the project? 10
  • 11. Approach (Enterprise Architecture)  Did you have a documented Enterprise Architecture (EA)?  Was existing infrastructure used to support change project?  What method or framework was used to develop your EA? 11
  • 12. Approach (Reference Models)  Were scenarios or reference models developed to facilitate selecting the vendor or modules?  Were the scenarios designed, tested and evaluated prior to implementing the solution? 12
  • 13. Approach (Change Management)  Was radical change necessary?, If yes, in what areas (People, Process Technology)?  Were alternatives / work around considered?  Were key component of change management defined prior to project kick-off? If yes, at what level was change management introduced into the project?  Were there employee impact assessment done prior to initiation of the project? How were they handled?  How much of total project cost was spent on change management? (training, communications, etc)  What change management tools and techniques did you use?  Was the soft cost for change management planned into the budget? 13
  • 14. Implementation  Were all planned process changes fully implemented?  Were new processes disruptive to business operations?  How did you reduce the impact of process change?  Was an issue resolution process defined and used?  What were the key processes that helped or hindered the implementation?  Was a Center of Excellence (CoE) or competency center established? (Knowledge Repository?)  Was there a pilot?  Was the pilot successful?  Was any new technology or software used? 14
  • 15. Risk  Was risk sufficiently evaluated before undertaking the change project?  What were some of the known risks?  Was a risk mitigation strategy developed?  What elements of the mitigation strategy were implemented?  What were some of the unanticipated risks?  How were unanticipated risks handled?  Was consideration given to a modular approach to reduce risk? 15
  • 16. Result  Were desired improvements achieved?  Was sufficient value created by new processes to justify the effort and cost?  What were some (examples) of the tangible financial impacts of your change efforts?  Could similar benefits have been achieved for less cost?  What additional challenges were encountered? 16
  • 17. ERP  What was the rationale for selecting ERP versus other COTS solutions?  What processes were targeted for improvement by ERP?  Was the desired process designed prior to implementation efforts?  Was process modeling used?  How many existing systems did the ERP replace?  Was a systems integrator (SI) used?  Were scenarios developed to facilitate selecting the vendor or modules?  How much of the COTS solution was used “out of the box”?  What was the implementation plan? (Big bang, phased?)  How many vendors were used? What type?  Was unexpected customisation required?  How many modifications were required?  How much did customisation cost? 17
  • 18. ERP (Contd.)  Who could authorise customisations?  How were legacy systems retired?  Who could authorise customisations?  Was the ERP software solution chosen by the SI or by the sponsor?  Were multiple COTS solutions used during this change project?  Were any non-essential features included in COTS product?  What ERP implementation methodology was used? (software vendor, yours, industry standard Project Management methodologies, systems integrator?)  What was your strategy for testing the ERP implementation?  Were reference models used during blueprinting? (As~Is and To~Be)  How would you rate the COTS product(s) for quality, performance, ease of use, functionality, etc.?  Did systems integrator perform to your expectations? 18
  • 19. “When you get right down to it, one of the most important tasks of a leader is to eliminate his people's excuse for failure.” - Robert Townsend 19