CTQ Matrix Identify possible “Hidden” Factories Anand Subramaniam
[object Object],[object Object]
CT Matrix = Leverage Point Factor Process A  Process B  Process C  Operation 1  Tool A  Product  System A  Sub-System 1  Element A  Characteristic 2 Characteristic 1 Characteristic 3 Characteristic 1 Characteristic 2 Characteristic 3 CTP CTQ System B  System C  Sub-System 2  Sub-System 3  Element B  Element C  Operation 3  Operation 2  Tool B  Tool C  Y = f (X) Product (Y) Tree Process (X) Tree
Relationship - CTS, CTQ, CTP Critical to Satisfaction (CTS) Business Success Critical to Quality (CTQ) Customer Satisfaction Critical to Process (CTP) Product Quality CTQ Process Input CTY (Product Tree) CTX Tree (Process Tree) The CT Matrix Structure
Process Mapping
Process Mapping – Benefits Benefits Lists all of the process steps Assists with root cause analysis Lists all of the input variables that allow each step to be carried out (KPIV) Identifies possible “Hidden” Factories It is a living document that may change as the process improvement is developed Allows the team to better scope the project as well as documents how the process is currently being performed Lists all of the output variables (KPOV)
Process Mapping - Essentials Should indicate Major activities / tasks Key Processes & Sub-processes Inputs & Outputs Process Boundaries Customers & Suppliers Document how the process actually operates, not how it is supposed to operate Process Parameters Process Owners Reviewed frequently
Process Mapping – Key Elements Elements KPIV / KPOV Type of Input  (C, N, S) Quality Indicator Specifications RTY, PPM, COPQ Types of Gages Value Added (VA) or Non-Value Added (NVA) Control Parameters Cost Per Unit
Process Mapping - Steps Identify the process to be mapped (narrow focus) List process steps of the process is currently being performed Label each process as Value Added (VA), Non-Value Added (NVA) List all KPIV’s (X’s) per process step. (Use the Cause-and-Effect diagram to aid you in identifying the KPIV’s for each process step) Identify type of Input, categorise KPIV’s (X’s) as either Controllable (C), Standard Operating Procedure (S), or Noise (N) Document KPIV’s (X) specifications List the KPOV’s (Y) for each step Document the KPOV’s specifications
Process Parameters Why ? Root cause  of a defect is variation of the X’s Reduce defects Defects are also outputs of a process step X’s must be under control to prevent defects Identify X’s which are the sources of the process variation  Y’s are the measured results of the process and include the failure modes of the process
Process Parameters - Questions ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Process Parameters C – Controllable Factors   Process factors that can be changed to see the effect on product characteristics. N - Noise Factors Uncontrollable May be controllable,  but are not controlled by decision S - Standard Operating Procedures A procedure used to define and run those factors. Tooling, Fixtures Cr - Critical Factors Determined through FMEA,  DoE, etc
Roadmap - Process Mapping
Process Mapping Macro Level Process Level Micro Level Process - Level #1 Step #1 Process - Level #2 Step #1 Step #2 Process - Level #3 Step #3 Step #1 Step #2 Step #3 Step #3 Step #2
Process & Product Inputs Outputs Process Steps / Tasks Product Parameters,  y’s y = f(x) X’s 6 M Man  (People) Machine  (Equipment) Method  (Procedures) Material Measurement Mother Nature  (Environment) Parameters C – Controllable N – Noise P – Procedure CR - Critical
[object Object],[object Object]
CREI Statement (Concern, Requirement, Evidence, Impact)
CREI – Problem Statement Concern What is wrong?  (statement of non-conformity) Requirement What is it? (not clearly known or defined) Found in procedures, policies, drawings, specifications, etc. Evidence What data demonstrates that something is wrong?  (objective evidence observed that supports statement of nonconformity) Must be verifiable Impact How significant is the problem from a performance and / or cost standpoint?
Problem Types – Simple to Complex Simple / Cause  Known / Just Do It Reflects product or process controls established when planning the process Management decision to “live with” such conditions based on acceptable level of risk Can only be eliminated by applying disciplined problem solving to understand true root cause in order to improve process Should be routinely evaluated for cost and impact Complex / Cause Unknown / Dig Deeper May also be anticipated issues for which actual level of risk is now determined to be unacceptable Require concentrated investigation to understand source of problem and process factors leading to problem condition to allow appropriate solutions Unanticipated conditions which occur
Problem Types – Action Type Origin Method Action Just do it Known Trouble- shoot : rework Seen before; can live with impact when problem recurs Dig Deeper Unknown Root cause analysis Data-driven investigation to determine actual factors causing problem condition
[object Object],[object Object]
[object Object],[object Object]

Weitere ähnliche Inhalte

Was ist angesagt? (20)

DMAIC Components
DMAIC ComponentsDMAIC Components
DMAIC Components
 
7 qc tools
7 qc tools7 qc tools
7 qc tools
 
Poka yoke
Poka yokePoka yoke
Poka yoke
 
Process Failure Modes & Effects Analysis (PFMEA)
Process Failure Modes & Effects Analysis (PFMEA)Process Failure Modes & Effects Analysis (PFMEA)
Process Failure Modes & Effects Analysis (PFMEA)
 
Lean, Six Sigma, ToC using DMAIC project management
Lean, Six Sigma, ToC  using DMAIC project managementLean, Six Sigma, ToC  using DMAIC project management
Lean, Six Sigma, ToC using DMAIC project management
 
8 D – Problem Solving Process
8 D – Problem Solving Process8 D – Problem Solving Process
8 D – Problem Solving Process
 
Process auditing as per VDA 6.3
Process auditing as per VDA 6.3Process auditing as per VDA 6.3
Process auditing as per VDA 6.3
 
Ppap la
Ppap laPpap la
Ppap la
 
IATF 16949 2016 implementation phases
IATF 16949 2016 implementation phasesIATF 16949 2016 implementation phases
IATF 16949 2016 implementation phases
 
Failure Mode & Effects Analysis (FMEA)
Failure Mode & Effects Analysis (FMEA)Failure Mode & Effects Analysis (FMEA)
Failure Mode & Effects Analysis (FMEA)
 
8 Disciplines (8D) Training
8 Disciplines (8D) Training8 Disciplines (8D) Training
8 Disciplines (8D) Training
 
Failure Mode & Effect Analysis
Failure Mode & Effect AnalysisFailure Mode & Effect Analysis
Failure Mode & Effect Analysis
 
APQP
APQPAPQP
APQP
 
Lean six sigma tools and techniques
Lean six sigma tools and techniquesLean six sigma tools and techniques
Lean six sigma tools and techniques
 
Lean Tools
Lean ToolsLean Tools
Lean Tools
 
Process Audit --VDA
Process Audit --VDAProcess Audit --VDA
Process Audit --VDA
 
PPAP
PPAPPPAP
PPAP
 
Javier Garcia - Verdugo Sanchez - The Poka - Yoke System
Javier Garcia - Verdugo Sanchez -  The Poka - Yoke SystemJavier Garcia - Verdugo Sanchez -  The Poka - Yoke System
Javier Garcia - Verdugo Sanchez - The Poka - Yoke System
 
Six sigma
Six sigmaSix sigma
Six sigma
 
Dmaic
DmaicDmaic
Dmaic
 

Andere mochten auch (20)

Project Health Check
Project Health CheckProject Health Check
Project Health Check
 
Change Management Checklist
Change Management ChecklistChange Management Checklist
Change Management Checklist
 
Sales Performance Measures
Sales Performance MeasuresSales Performance Measures
Sales Performance Measures
 
Solving Client Issues
Solving Client IssuesSolving Client Issues
Solving Client Issues
 
Business Plan
Business PlanBusiness Plan
Business Plan
 
Project Execution & Control Checklist
Project Execution & Control ChecklistProject Execution & Control Checklist
Project Execution & Control Checklist
 
Benchmarking
BenchmarkingBenchmarking
Benchmarking
 
Muda in service industries
Muda in service industriesMuda in service industries
Muda in service industries
 
LSS Idea Generation to Project Execution
LSS Idea Generation to Project ExecutionLSS Idea Generation to Project Execution
LSS Idea Generation to Project Execution
 
Project Closure Report
Project Closure ReportProject Closure Report
Project Closure Report
 
CMMI & Six Sigma Integration
CMMI & Six Sigma IntegrationCMMI & Six Sigma Integration
CMMI & Six Sigma Integration
 
Process Audit
Process AuditProcess Audit
Process Audit
 
Lesson Learned Report
Lesson Learned ReportLesson Learned Report
Lesson Learned Report
 
Six Sigma Lean (SSL)
Six Sigma Lean (SSL)Six Sigma Lean (SSL)
Six Sigma Lean (SSL)
 
Quality Tools
Quality ToolsQuality Tools
Quality Tools
 
Your Organisation
Your OrganisationYour Organisation
Your Organisation
 
Software Development
Software DevelopmentSoftware Development
Software Development
 
Professional Services (Ps) Excellence
Professional Services (Ps) ExcellenceProfessional Services (Ps) Excellence
Professional Services (Ps) Excellence
 
IT Processes & Systems
IT Processes & SystemsIT Processes & Systems
IT Processes & Systems
 
Close Loop Mrp
Close Loop MrpClose Loop Mrp
Close Loop Mrp
 

Ähnlich wie CTQ Matrix

Quality tools-asq-london-may-10-2006
Quality tools-asq-london-may-10-2006Quality tools-asq-london-may-10-2006
Quality tools-asq-london-may-10-2006Omnex Inc.
 
6 sigma-process-mapping-1233778357447980-3
6 sigma-process-mapping-1233778357447980-36 sigma-process-mapping-1233778357447980-3
6 sigma-process-mapping-1233778357447980-3jseets
 
El Llc Six Sigma June 2011
El Llc Six Sigma June 2011El Llc Six Sigma June 2011
El Llc Six Sigma June 2011ExerciseLeanLLC
 
Six Sigma for Beginners- Yellow and Green Belt
Six Sigma for Beginners- Yellow and Green BeltSix Sigma for Beginners- Yellow and Green Belt
Six Sigma for Beginners- Yellow and Green BeltRajiv Tiwari
 
2011 business process management
2011 business process management2011 business process management
2011 business process managementAreté Partners
 
Managing Quality
Managing QualityManaging Quality
Managing QualityAli BARAN
 
QM-026-Quality Management
QM-026-Quality ManagementQM-026-Quality Management
QM-026-Quality Managementhandbook
 
Sslean Validation 20070622
Sslean Validation 20070622Sslean Validation 20070622
Sslean Validation 20070622jancrielaard
 
Six sigma-measure-phase2505
Six sigma-measure-phase2505Six sigma-measure-phase2505
Six sigma-measure-phase2505densongco
 
Ancora 6Sigma - 3. la metodologia DMAIC
Ancora 6Sigma - 3.  la metodologia DMAICAncora 6Sigma - 3.  la metodologia DMAIC
Ancora 6Sigma - 3. la metodologia DMAICManager.it
 
L07 quality management
L07 quality managementL07 quality management
L07 quality managementAsa Chan
 
fy11_sh-22316-11_1-3_ProcessingMapping.pptx
fy11_sh-22316-11_1-3_ProcessingMapping.pptxfy11_sh-22316-11_1-3_ProcessingMapping.pptx
fy11_sh-22316-11_1-3_ProcessingMapping.pptxMarcosMaumesso
 
Statistical_Quality_Control esp.ppt
Statistical_Quality_Control esp.pptStatistical_Quality_Control esp.ppt
Statistical_Quality_Control esp.pptOswaldo Gonzales
 
Process excellance
Process excellanceProcess excellance
Process excellanceRDeducation
 

Ähnlich wie CTQ Matrix (20)

Quality tools-asq-london-may-10-2006
Quality tools-asq-london-may-10-2006Quality tools-asq-london-may-10-2006
Quality tools-asq-london-may-10-2006
 
Six_Sigma.pptx
Six_Sigma.pptxSix_Sigma.pptx
Six_Sigma.pptx
 
6 sigma-process-mapping-1233778357447980-3
6 sigma-process-mapping-1233778357447980-36 sigma-process-mapping-1233778357447980-3
6 sigma-process-mapping-1233778357447980-3
 
El Llc Six Sigma June 2011
El Llc Six Sigma June 2011El Llc Six Sigma June 2011
El Llc Six Sigma June 2011
 
Six Sigma for Beginners- Yellow and Green Belt
Six Sigma for Beginners- Yellow and Green BeltSix Sigma for Beginners- Yellow and Green Belt
Six Sigma for Beginners- Yellow and Green Belt
 
2011 business process management
2011 business process management2011 business process management
2011 business process management
 
Managing Quality
Managing QualityManaging Quality
Managing Quality
 
Six sigma
Six sigmaSix sigma
Six sigma
 
7qc Tools 173
7qc Tools 1737qc Tools 173
7qc Tools 173
 
7qc Tools 173
7qc Tools 1737qc Tools 173
7qc Tools 173
 
Quality tools
Quality toolsQuality tools
Quality tools
 
QM-026-Quality Management
QM-026-Quality ManagementQM-026-Quality Management
QM-026-Quality Management
 
Sslean Validation 20070622
Sslean Validation 20070622Sslean Validation 20070622
Sslean Validation 20070622
 
Six sigma-measure-phase2505
Six sigma-measure-phase2505Six sigma-measure-phase2505
Six sigma-measure-phase2505
 
Ancora 6Sigma - 3. la metodologia DMAIC
Ancora 6Sigma - 3.  la metodologia DMAICAncora 6Sigma - 3.  la metodologia DMAIC
Ancora 6Sigma - 3. la metodologia DMAIC
 
L07 quality management
L07 quality managementL07 quality management
L07 quality management
 
fy11_sh-22316-11_1-3_ProcessingMapping.pptx
fy11_sh-22316-11_1-3_ProcessingMapping.pptxfy11_sh-22316-11_1-3_ProcessingMapping.pptx
fy11_sh-22316-11_1-3_ProcessingMapping.pptx
 
Statistical_Quality_Control esp.ppt
Statistical_Quality_Control esp.pptStatistical_Quality_Control esp.ppt
Statistical_Quality_Control esp.ppt
 
Process excellance
Process excellanceProcess excellance
Process excellance
 
Process excellance
Process excellanceProcess excellance
Process excellance
 

Mehr von Anand Subramaniam (20)

Lean transformation
Lean transformationLean transformation
Lean transformation
 
Lean principles
Lean principlesLean principles
Lean principles
 
Lean thinking
Lean thinkingLean thinking
Lean thinking
 
Anand dossier 2
Anand dossier 2Anand dossier 2
Anand dossier 2
 
Anand short dossier
Anand short dossierAnand short dossier
Anand short dossier
 
Set up reduction
Set up reductionSet up reduction
Set up reduction
 
Waste Walk ~ Audit
Waste Walk ~ AuditWaste Walk ~ Audit
Waste Walk ~ Audit
 
Defects Vs. Errors
Defects Vs. ErrorsDefects Vs. Errors
Defects Vs. Errors
 
3 MU
3 MU3 MU
3 MU
 
Ninbennoaru Jidoka
Ninbennoaru JidokaNinbennoaru Jidoka
Ninbennoaru Jidoka
 
Gemba kaizen
Gemba kaizenGemba kaizen
Gemba kaizen
 
LSS - 5 Year Strategy
LSS -  5 Year StrategyLSS -  5 Year Strategy
LSS - 5 Year Strategy
 
Lean Six Sigma Projects & Strategy Linkage
Lean Six Sigma Projects & Strategy LinkageLean Six Sigma Projects & Strategy Linkage
Lean Six Sigma Projects & Strategy Linkage
 
CMMI Capability Maturity Model Integration
CMMI   Capability Maturity Model Integration CMMI   Capability Maturity Model Integration
CMMI Capability Maturity Model Integration
 
Total Productive Maintenance
Total Productive MaintenanceTotal Productive Maintenance
Total Productive Maintenance
 
TPM Implementation Strategy
TPM Implementation StrategyTPM Implementation Strategy
TPM Implementation Strategy
 
Overall Equipment Effectiveness
Overall Equipment EffectivenessOverall Equipment Effectiveness
Overall Equipment Effectiveness
 
Autonomous Maintenance
Autonomous MaintenanceAutonomous Maintenance
Autonomous Maintenance
 
VSM – Current & Future
VSM – Current & FutureVSM – Current & Future
VSM – Current & Future
 
Material Handling
Material Handling Material Handling
Material Handling
 

Kürzlich hochgeladen

HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsMichael W. Hawkins
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxpriyanshujha201
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfAdmir Softic
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityEric T. Tung
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangaloreamitlee9823
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 

Kürzlich hochgeladen (20)

HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptxB.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
B.COM Unit – 4 ( CORPORATE SOCIAL RESPONSIBILITY ( CSR ).pptx
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pillsMifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 

CTQ Matrix

  • 1. CTQ Matrix Identify possible “Hidden” Factories Anand Subramaniam
  • 2.
  • 3. CT Matrix = Leverage Point Factor Process A Process B Process C Operation 1 Tool A Product System A Sub-System 1 Element A Characteristic 2 Characteristic 1 Characteristic 3 Characteristic 1 Characteristic 2 Characteristic 3 CTP CTQ System B System C Sub-System 2 Sub-System 3 Element B Element C Operation 3 Operation 2 Tool B Tool C Y = f (X) Product (Y) Tree Process (X) Tree
  • 4. Relationship - CTS, CTQ, CTP Critical to Satisfaction (CTS) Business Success Critical to Quality (CTQ) Customer Satisfaction Critical to Process (CTP) Product Quality CTQ Process Input CTY (Product Tree) CTX Tree (Process Tree) The CT Matrix Structure
  • 6. Process Mapping – Benefits Benefits Lists all of the process steps Assists with root cause analysis Lists all of the input variables that allow each step to be carried out (KPIV) Identifies possible “Hidden” Factories It is a living document that may change as the process improvement is developed Allows the team to better scope the project as well as documents how the process is currently being performed Lists all of the output variables (KPOV)
  • 7. Process Mapping - Essentials Should indicate Major activities / tasks Key Processes & Sub-processes Inputs & Outputs Process Boundaries Customers & Suppliers Document how the process actually operates, not how it is supposed to operate Process Parameters Process Owners Reviewed frequently
  • 8. Process Mapping – Key Elements Elements KPIV / KPOV Type of Input (C, N, S) Quality Indicator Specifications RTY, PPM, COPQ Types of Gages Value Added (VA) or Non-Value Added (NVA) Control Parameters Cost Per Unit
  • 9. Process Mapping - Steps Identify the process to be mapped (narrow focus) List process steps of the process is currently being performed Label each process as Value Added (VA), Non-Value Added (NVA) List all KPIV’s (X’s) per process step. (Use the Cause-and-Effect diagram to aid you in identifying the KPIV’s for each process step) Identify type of Input, categorise KPIV’s (X’s) as either Controllable (C), Standard Operating Procedure (S), or Noise (N) Document KPIV’s (X) specifications List the KPOV’s (Y) for each step Document the KPOV’s specifications
  • 10. Process Parameters Why ? Root cause of a defect is variation of the X’s Reduce defects Defects are also outputs of a process step X’s must be under control to prevent defects Identify X’s which are the sources of the process variation Y’s are the measured results of the process and include the failure modes of the process
  • 11.
  • 12. Process Parameters C – Controllable Factors Process factors that can be changed to see the effect on product characteristics. N - Noise Factors Uncontrollable May be controllable, but are not controlled by decision S - Standard Operating Procedures A procedure used to define and run those factors. Tooling, Fixtures Cr - Critical Factors Determined through FMEA, DoE, etc
  • 13. Roadmap - Process Mapping
  • 14. Process Mapping Macro Level Process Level Micro Level Process - Level #1 Step #1 Process - Level #2 Step #1 Step #2 Process - Level #3 Step #3 Step #1 Step #2 Step #3 Step #3 Step #2
  • 15. Process & Product Inputs Outputs Process Steps / Tasks Product Parameters, y’s y = f(x) X’s 6 M Man (People) Machine (Equipment) Method (Procedures) Material Measurement Mother Nature (Environment) Parameters C – Controllable N – Noise P – Procedure CR - Critical
  • 16.
  • 17. CREI Statement (Concern, Requirement, Evidence, Impact)
  • 18. CREI – Problem Statement Concern What is wrong? (statement of non-conformity) Requirement What is it? (not clearly known or defined) Found in procedures, policies, drawings, specifications, etc. Evidence What data demonstrates that something is wrong? (objective evidence observed that supports statement of nonconformity) Must be verifiable Impact How significant is the problem from a performance and / or cost standpoint?
  • 19. Problem Types – Simple to Complex Simple / Cause Known / Just Do It Reflects product or process controls established when planning the process Management decision to “live with” such conditions based on acceptable level of risk Can only be eliminated by applying disciplined problem solving to understand true root cause in order to improve process Should be routinely evaluated for cost and impact Complex / Cause Unknown / Dig Deeper May also be anticipated issues for which actual level of risk is now determined to be unacceptable Require concentrated investigation to understand source of problem and process factors leading to problem condition to allow appropriate solutions Unanticipated conditions which occur
  • 20. Problem Types – Action Type Origin Method Action Just do it Known Trouble- shoot : rework Seen before; can live with impact when problem recurs Dig Deeper Unknown Root cause analysis Data-driven investigation to determine actual factors causing problem condition
  • 21.
  • 22.