NREL's Windturbine design cost and scaling model: LANDBASED                                                   POSSIBLE CONFIGURATIONS
http://www.nrel.gov/wind/pdfs/40566.pdf                                                                       BLADES MATERIAL       TOWER MATERIAL       LOCATION       DRIVE TRAIN
                                                                                                                   BASELINE             BASELINE            LANDBASED   3 STAGE
This spreadsheet is made for the following configuration:          CHOOSE CONFIGURATION                           ADVANCED             ADVANCED                         SINGLE STAGE
Blades material                                                             BASELINE                                                                                    DIRECT DRIVE
Tower material                                                              BASELINE                                                                                    MULTIPATH
Drive train                                                                  3 STAGE
Windturbine location                                                      LANDBASED



DATA                                                               CHOOSE INPUTS
Machine Rating (kW) (mr)                                                      1,500.00
Rotor Diameter (m)                                                               70.00
Hub Height (m)                                                                   65.00
OMEGA (rad/s)                                                                     2.14
CAPACITY FACTOR                                                                   0.33
Radio del rotor (m)                                                              35.00
b (número de palas)                                                                  3
ROTOR SWEPT AREA                                                              3,848.45
LOW SPEED SHAFT TORQUE                                                          700.00

                                                                      COST IN $ 2002      COST IN $ 2002
COMPONENT                                                              PART COST $        TOTAL COST $          PART MASS (kg)       TOTAL MASS (kg)
ROTOR                                                                                            237,083.78                                  28,290.43
BLADES                                                                        50,477.41          151,432.22              4,614.88            13,844.63
HUB                                                                                               42,852.30                                  10,082.89
PITCH MECHANISM &BEARINGS                                                                         38,485.29              2,284.19             3,588.40
SPINNER, NOSE CONE                                                                                 4,313.97                                     774.50
DRIVE TRAIN, NACELLE                                                                             571,539.06                                  34,169.32
LOW SPEED SHAFT                                                                                   21,222.57                                   3,026.44
BEARINGS                                                                                          11,953.06               339.58                679.15
GEARBOX                                                                                          152,441.74                                  10,240.49
MECH BRAKE                                                                                         2,983.99                                     298.40
GENERATOR                                                                                         97,500.00                                   5,498.11
VARIABLE SPEED ELECTRONICS                                                                       118,500.00                                          0
YAW DRIVE & BEARING                                                            9,978.62           19,957.23              1,171.92             1,875.07
MAIN FRAME                                                                                        47,825.28                                  10,081.33
                                                      DRIVE                   38,080.00                                  8,961.18
                                        PLATFORMS $ RAILINGS                   9,745.28                                  1,120.15
ELECTRICAL CONNECTIONS                                                                            60,000.00                                          0
HYDRAULIC, COOLING SYSTEM                                                                         18,000.00                                     120.00
NACELLE COVER                                                                                     21,155.20                                   2,350.34
CONTROL, SAFETY SYSTEM, CONDITION MONITORING                                                      35,000.00                                          0
TOWER                                                                                            146,955.48                                  97,970.32
                                  TURBINE CAPITAL COST (TCC)                                     990,578.33                                 160,430.07

FOUNDATIONS                                                                                       45,818.36
TRANSPORTATION                                                                                    51,033.75
ROADS, CIVIL WORK                                                                                 79,008.75
ASSEMBLY & INSTALLATION                                                                           38,583.78
ELECTRICAL INTERFACE/ CONNECTIONS                                                                126,603.75
ENGINEERING & PERMITS                                                                             32,703.75
                             BALANCE OF STATION COST (BOS)                                       373,752.14
                         INITIAL CAPITAL COST (ICC=BOS+TCC)                                    1,364,330.46
                      Installed Cost per kW (ICC/machine rating)                                     909.55
           Turbine capital per kW sans BOS & Warranty (TCC/mr)                                       660.39


                               Levelized Replacement Cost(LRC)                                    16,050.00
                                       Operations & Maintenance                                   30,353.40
                                         Land Lease Costs (LLC)                                    4,683.10


                                              CAPACITY FACTOR                                          0.33 heq (h)                           2,890.80
                                                     AEP (Kwh)                                 4,336,200.00
                                                AOE ($/kWh)                                            0.01
                            FIXED CHARGE RATE (FCR)= 11,58%                 0,1158*ICC=          157,989.47
                                                COE ($/kWh)                                            0.05

ALL COSTS IN $ 2002
NREL's Windturbine design cost and scaling model: OFFSHORE
http://www.nrel.gov/wind/pdfs/40566.pdf

This spreadsheet is made for the following configuration:      CHOOSE CONFIGURATION…
Blades material                                                         BASELINE
Tower material                                                          BASELINE
Drive train                                                              3 STAGE
Windturbine location                                                   OFFSHORE



DATA                                                           CHOOSE INPUTS…
Machine Rating (kW) (mr)                                                  3,000.00
Rotor Diameter (m)                                                           90.00
Hub Height (m)                                                               80.00
OMEGA (rad/s)                                                                 2.00
CAPACITY FACTOR                                                               0.38
Radio del rotor (m)                                                          45.00
b (número de palas)                                                              3
ROTOR SWEPT AREA                                                          6,361.73
LOW SPEED SHAFT TORQUE                                                    1,500.00

                                                                  COST IN $ 2002      COST IN $ 2002
COMPONENT                                                          PART COST $        TOTAL COST $
ROTOR                                                                                         449,947.70
BLADES                                                                   101,813.87           305,441.61
HUB                                                                                            63,076.35
PITCH MECHANISM &BEARINGS                                                                      75,054.88
SPINNER, NOSE CONE                                                                              6,374.87
DRIVE TRAIN, NACELLE                                                                        1,187,794.83
LOW SPEED SHAFT                                                                                43,842.78
BEARINGS                                                                                       29,040.74
GEARBOX                                                                                       362,318.37
MECH BRAKE                                                                                      5,968.09
GENERATOR                                                                                     195,000.00
VARIABLE SPEED ELECTRONICS                                                                    237,000.00
YAW DRIVE & BEARING                                                       21,017.18            42,034.37
MAIN FRAME                                                                                     78,129.79
                                                      DRIVE               62,209.41
                                        PLATFORMS $ RAILINGS              15,920.39
ELECTRICAL CONNECTIONS                                                                       120,000.00
HYDRAULIC, COOLING SYSTEM                                                                     36,000.00
NACELLE COVER                                                                                 38,460.70
CONTROL, SAFETY SYSTEM, CONDITION MONITORING                                                  55,000.00
TOWER                                                                                        301,180.61
MARINIZATION                                                                                 269,179.62
                                  TURBINE CAPITAL COST (TCC)                                2,263,102.76

MONOPILE FOUNDATION/SUPPORT ESTRUCTURE                                                        878906.25
OFFSHORE TRANSPORTATION                                                                          253470
PORT AND STAGING EQUIPTMENT                                                                       60000
OFFSHORE TURBINE INSTALLATION                                                                 292968.75
OFFSHORE ELECTRICAL INTERFACE/ CONNECTIONS                                                    761718.75
OFFSHORE PERMITS, ENGINEERING & SITE ASSESMENT                                              108398.4375
PERSONNEL ACCESS REQUIREMENT                                                                   58593.75
SCOUR PROTECTION                                                                            161132.8125
SURETY BOND(3% ICC- OFFSHORE WARRANTY COST)                                                 145148.7454
BALANCE OF STATION COST (BOS)                        2720337.495
                             OFFSHORE WARRANTY PREMIUM                           299088.4708
                        INITIAL CAPITAL COST (ICC=BOS+TCC)                       5282528.728
                                        Installed Cost per kW                    1760.842909
                  Turbine capital per kW sans BOS & Warranty                     754.3675874


                              Levelized Replacement Cost(LRC)                     49804.6875
                      Operations & Maintenance per turbine/year                  195714.1406
                                        Land Lease Costs (LLC)                   10822.20912


                                            CAPACITY FACTOR                              0.38
                                                   AEP (Kwh)                    10,020,564.00
                                               AOE ($/kWh)                       0.025581498
                           FIXED CHARGE RATE (FCR)= 11,58%        0,1158*ICC=    611716.8268
                                               COE ($/kWh)                       0.086627645

ALL COSTS IN $ 2002
POSSIBLE CONFIGURATIONS
BLADES MATERIAL       TOWER MATERIAL        LOCATION       DRIVE TRAIN
    BASELINE              BASELINE              OFFSHORE   3 STAGE
    ADVANCED             ADVANCED                          SINGLE STAGE
                                                           DIRECT DRIVE
                                                           MULTIPATH




  PART MASS (kg)       TOTAL MASS (kg)
                                50,956.66
           9,602.93             28,808.78
                                14,841.49
           4,222.05              6,161.88
                                 1,144.50
                                62,473.03
                                 6,253.75
             825.02              1,650.04
                                18,261.84
                                   596.81
                                10,419.65
                                        0
           2,695.27              4,312.43
                                16,469.37
          14,639.44
           1,829.93
                                        0
                                   240.00
                                 4,269.14
                                        0
                               200,787.07
                                        0
                               314,216.75
heq (h)   3,340.19

Weitere ähnliche Inhalte

Andere mochten auch

Wind Turbine Generators
Wind Turbine GeneratorsWind Turbine Generators
Wind Turbine GeneratorsJasjot Singh
 
Annual Environmental Events
Annual Environmental EventsAnnual Environmental Events
Annual Environmental EventsWindTurbines.net
 
Wind turbine eshan ahuja presentation-anu
Wind turbine   eshan ahuja presentation-anuWind turbine   eshan ahuja presentation-anu
Wind turbine eshan ahuja presentation-anueshanahuja
 
Planetary gearbox a series
Planetary gearbox a seriesPlanetary gearbox a series
Planetary gearbox a seriesMeita Laksmiati
 
Fantastic Wind Turbine Locations
Fantastic Wind Turbine LocationsFantastic Wind Turbine Locations
Fantastic Wind Turbine LocationsWindTurbines.net
 
World's Largest Wind Farms
World's Largest Wind FarmsWorld's Largest Wind Farms
World's Largest Wind FarmsWindTurbines.net
 
Design of wind turbine controllers in simulation x jagath_ireshika_bernad_dim...
Design of wind turbine controllers in simulation x jagath_ireshika_bernad_dim...Design of wind turbine controllers in simulation x jagath_ireshika_bernad_dim...
Design of wind turbine controllers in simulation x jagath_ireshika_bernad_dim...Dimuthu Darshana
 
Aerodynamic,rotor design and rotor performance of horizontal axis wind turbin...
Aerodynamic,rotor design and rotor performance of horizontal axis wind turbin...Aerodynamic,rotor design and rotor performance of horizontal axis wind turbin...
Aerodynamic,rotor design and rotor performance of horizontal axis wind turbin...Sarmad Adnan
 
Top 10 Wind-Powered Countries
Top 10 Wind-Powered CountriesTop 10 Wind-Powered Countries
Top 10 Wind-Powered CountriesWindTurbines.net
 
Factors Affecting Wind Turbine Efficiency
Factors Affecting Wind Turbine EfficiencyFactors Affecting Wind Turbine Efficiency
Factors Affecting Wind Turbine EfficiencyWindTurbines.net
 
Full-scale converter for synchronous wind turbine generators
Full-scale converter for synchronous wind turbine generatorsFull-scale converter for synchronous wind turbine generators
Full-scale converter for synchronous wind turbine generatorsLong Thang Pham
 
Integrated Wind Energy Storage
Integrated Wind Energy StorageIntegrated Wind Energy Storage
Integrated Wind Energy StorageMilesh Gogad
 
Power Electronic Converter
Power Electronic ConverterPower Electronic Converter
Power Electronic ConverterAli
 
Power control of a wind energy conversion system
Power control of a wind energy conversion systemPower control of a wind energy conversion system
Power control of a wind energy conversion system7597861730
 
Advance Power Electronic Converters for Renewable Energy Systems
Advance Power Electronic Converters for Renewable Energy SystemsAdvance Power Electronic Converters for Renewable Energy Systems
Advance Power Electronic Converters for Renewable Energy SystemsTexas A&M University
 

Andere mochten auch (20)

Gear box –industrial applications
Gear box –industrial applicationsGear box –industrial applications
Gear box –industrial applications
 
Wind Turbine Generators
Wind Turbine GeneratorsWind Turbine Generators
Wind Turbine Generators
 
Wind Power Myths
Wind Power MythsWind Power Myths
Wind Power Myths
 
Annual Environmental Events
Annual Environmental EventsAnnual Environmental Events
Annual Environmental Events
 
Reinventing Wind Turbines
Reinventing Wind TurbinesReinventing Wind Turbines
Reinventing Wind Turbines
 
Top Wind Farm Jobs
Top Wind Farm JobsTop Wind Farm Jobs
Top Wind Farm Jobs
 
Wind turbine eshan ahuja presentation-anu
Wind turbine   eshan ahuja presentation-anuWind turbine   eshan ahuja presentation-anu
Wind turbine eshan ahuja presentation-anu
 
Planetary gearbox a series
Planetary gearbox a seriesPlanetary gearbox a series
Planetary gearbox a series
 
Fantastic Wind Turbine Locations
Fantastic Wind Turbine LocationsFantastic Wind Turbine Locations
Fantastic Wind Turbine Locations
 
World's Largest Wind Farms
World's Largest Wind FarmsWorld's Largest Wind Farms
World's Largest Wind Farms
 
Design of wind turbine controllers in simulation x jagath_ireshika_bernad_dim...
Design of wind turbine controllers in simulation x jagath_ireshika_bernad_dim...Design of wind turbine controllers in simulation x jagath_ireshika_bernad_dim...
Design of wind turbine controllers in simulation x jagath_ireshika_bernad_dim...
 
Aerodynamic,rotor design and rotor performance of horizontal axis wind turbin...
Aerodynamic,rotor design and rotor performance of horizontal axis wind turbin...Aerodynamic,rotor design and rotor performance of horizontal axis wind turbin...
Aerodynamic,rotor design and rotor performance of horizontal axis wind turbin...
 
Top 10 Wind-Powered Countries
Top 10 Wind-Powered CountriesTop 10 Wind-Powered Countries
Top 10 Wind-Powered Countries
 
History of Wind Power
History of Wind PowerHistory of Wind Power
History of Wind Power
 
Factors Affecting Wind Turbine Efficiency
Factors Affecting Wind Turbine EfficiencyFactors Affecting Wind Turbine Efficiency
Factors Affecting Wind Turbine Efficiency
 
Full-scale converter for synchronous wind turbine generators
Full-scale converter for synchronous wind turbine generatorsFull-scale converter for synchronous wind turbine generators
Full-scale converter for synchronous wind turbine generators
 
Integrated Wind Energy Storage
Integrated Wind Energy StorageIntegrated Wind Energy Storage
Integrated Wind Energy Storage
 
Power Electronic Converter
Power Electronic ConverterPower Electronic Converter
Power Electronic Converter
 
Power control of a wind energy conversion system
Power control of a wind energy conversion systemPower control of a wind energy conversion system
Power control of a wind energy conversion system
 
Advance Power Electronic Converters for Renewable Energy Systems
Advance Power Electronic Converters for Renewable Energy SystemsAdvance Power Electronic Converters for Renewable Energy Systems
Advance Power Electronic Converters for Renewable Energy Systems
 

Ähnlich wie Spreadsheet windturbine design cost model (NREL)

Ähnlich wie Spreadsheet windturbine design cost model (NREL) (20)

Gas Turbine Project
Gas Turbine ProjectGas Turbine Project
Gas Turbine Project
 
Libya
LibyaLibya
Libya
 
Final presentation 4 19
Final presentation 4 19Final presentation 4 19
Final presentation 4 19
 
Ice Slurry TES for District Cooling
Ice Slurry TES for District CoolingIce Slurry TES for District Cooling
Ice Slurry TES for District Cooling
 
Uci274 f
Uci274 fUci274 f
Uci274 f
 
PV System Cost Analysis
PV System Cost AnalysisPV System Cost Analysis
PV System Cost Analysis
 
Boiler ea case study 16 jan 2012 varanasi
Boiler ea case study  16 jan 2012 varanasiBoiler ea case study  16 jan 2012 varanasi
Boiler ea case study 16 jan 2012 varanasi
 
Three Lions Store design sample
Three Lions Store design sampleThree Lions Store design sample
Three Lions Store design sample
 
Withholding tax response 2011
Withholding tax response 2011Withholding tax response 2011
Withholding tax response 2011
 
441 colombia-energy-efficiency-2008
441 colombia-energy-efficiency-2008441 colombia-energy-efficiency-2008
441 colombia-energy-efficiency-2008
 
Moneysukh margin report 15/3/2010
Moneysukh margin report 15/3/2010Moneysukh margin report 15/3/2010
Moneysukh margin report 15/3/2010
 
moneysukh margin report 5/3/2010
moneysukh margin report 5/3/2010moneysukh margin report 5/3/2010
moneysukh margin report 5/3/2010
 
MPOrtigas_samplecompFlat_ValidMarOnly
MPOrtigas_samplecompFlat_ValidMarOnlyMPOrtigas_samplecompFlat_ValidMarOnly
MPOrtigas_samplecompFlat_ValidMarOnly
 
Freight Check 09 02 20
Freight Check 09 02 20Freight Check 09 02 20
Freight Check 09 02 20
 
Moneysukh Margin Report 8/3/2010
Moneysukh Margin Report 8/3/2010Moneysukh Margin Report 8/3/2010
Moneysukh Margin Report 8/3/2010
 
Uci274 d
Uci274 dUci274 d
Uci274 d
 
Gto1014 td
Gto1014 tdGto1014 td
Gto1014 td
 
Southern chemicals with changes
Southern chemicals with changesSouthern chemicals with changes
Southern chemicals with changes
 
Unit val at 30
Unit val at 30Unit val at 30
Unit val at 30
 
Moneysukh Margin level report 25/3/2010
Moneysukh Margin level report 25/3/2010Moneysukh Margin level report 25/3/2010
Moneysukh Margin level report 25/3/2010
 

Kürzlich hochgeladen

"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii SoldatenkoFwdays
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsPixlogix Infotech
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenHervé Boutemy
 
SALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICESSALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICESmohitsingh558521
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxNavinnSomaal
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfAddepto
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.Curtis Poe
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity PlanDatabarracks
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek SchlawackFwdays
 
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfHyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfPrecisely
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Mattias Andersson
 
Advanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionAdvanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionDilum Bandara
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupFlorian Wilhelm
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Commit University
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024Lorenzo Miniero
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Mark Simos
 
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024BookNet Canada
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 3652toLead Limited
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 

Kürzlich hochgeladen (20)

"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and Cons
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache Maven
 
SALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICESSALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICES
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptx
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdf
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity Plan
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
"Subclassing and Composition – A Pythonic Tour of Trade-Offs", Hynek Schlawack
 
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdfHyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
Hyperautomation and AI/ML: A Strategy for Digital Transformation Success.pdf
 
Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?Are Multi-Cloud and Serverless Good or Bad?
Are Multi-Cloud and Serverless Good or Bad?
 
Advanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionAdvanced Computer Architecture – An Introduction
Advanced Computer Architecture – An Introduction
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project Setup
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
 
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 

Spreadsheet windturbine design cost model (NREL)

  • 1. NREL's Windturbine design cost and scaling model: LANDBASED POSSIBLE CONFIGURATIONS http://www.nrel.gov/wind/pdfs/40566.pdf BLADES MATERIAL TOWER MATERIAL LOCATION DRIVE TRAIN BASELINE BASELINE LANDBASED 3 STAGE This spreadsheet is made for the following configuration: CHOOSE CONFIGURATION ADVANCED ADVANCED SINGLE STAGE Blades material BASELINE DIRECT DRIVE Tower material BASELINE MULTIPATH Drive train 3 STAGE Windturbine location LANDBASED DATA CHOOSE INPUTS Machine Rating (kW) (mr) 1,500.00 Rotor Diameter (m) 70.00 Hub Height (m) 65.00 OMEGA (rad/s) 2.14 CAPACITY FACTOR 0.33 Radio del rotor (m) 35.00 b (número de palas) 3 ROTOR SWEPT AREA 3,848.45 LOW SPEED SHAFT TORQUE 700.00 COST IN $ 2002 COST IN $ 2002 COMPONENT PART COST $ TOTAL COST $ PART MASS (kg) TOTAL MASS (kg) ROTOR 237,083.78 28,290.43 BLADES 50,477.41 151,432.22 4,614.88 13,844.63 HUB 42,852.30 10,082.89 PITCH MECHANISM &BEARINGS 38,485.29 2,284.19 3,588.40 SPINNER, NOSE CONE 4,313.97 774.50 DRIVE TRAIN, NACELLE 571,539.06 34,169.32 LOW SPEED SHAFT 21,222.57 3,026.44 BEARINGS 11,953.06 339.58 679.15 GEARBOX 152,441.74 10,240.49 MECH BRAKE 2,983.99 298.40 GENERATOR 97,500.00 5,498.11 VARIABLE SPEED ELECTRONICS 118,500.00 0 YAW DRIVE & BEARING 9,978.62 19,957.23 1,171.92 1,875.07 MAIN FRAME 47,825.28 10,081.33 DRIVE 38,080.00 8,961.18 PLATFORMS $ RAILINGS 9,745.28 1,120.15 ELECTRICAL CONNECTIONS 60,000.00 0 HYDRAULIC, COOLING SYSTEM 18,000.00 120.00 NACELLE COVER 21,155.20 2,350.34 CONTROL, SAFETY SYSTEM, CONDITION MONITORING 35,000.00 0 TOWER 146,955.48 97,970.32 TURBINE CAPITAL COST (TCC) 990,578.33 160,430.07 FOUNDATIONS 45,818.36 TRANSPORTATION 51,033.75 ROADS, CIVIL WORK 79,008.75 ASSEMBLY & INSTALLATION 38,583.78 ELECTRICAL INTERFACE/ CONNECTIONS 126,603.75 ENGINEERING & PERMITS 32,703.75 BALANCE OF STATION COST (BOS) 373,752.14 INITIAL CAPITAL COST (ICC=BOS+TCC) 1,364,330.46 Installed Cost per kW (ICC/machine rating) 909.55 Turbine capital per kW sans BOS & Warranty (TCC/mr) 660.39 Levelized Replacement Cost(LRC) 16,050.00 Operations & Maintenance 30,353.40 Land Lease Costs (LLC) 4,683.10 CAPACITY FACTOR 0.33 heq (h) 2,890.80 AEP (Kwh) 4,336,200.00 AOE ($/kWh) 0.01 FIXED CHARGE RATE (FCR)= 11,58% 0,1158*ICC= 157,989.47 COE ($/kWh) 0.05 ALL COSTS IN $ 2002
  • 2. NREL's Windturbine design cost and scaling model: OFFSHORE http://www.nrel.gov/wind/pdfs/40566.pdf This spreadsheet is made for the following configuration: CHOOSE CONFIGURATION… Blades material BASELINE Tower material BASELINE Drive train 3 STAGE Windturbine location OFFSHORE DATA CHOOSE INPUTS… Machine Rating (kW) (mr) 3,000.00 Rotor Diameter (m) 90.00 Hub Height (m) 80.00 OMEGA (rad/s) 2.00 CAPACITY FACTOR 0.38 Radio del rotor (m) 45.00 b (número de palas) 3 ROTOR SWEPT AREA 6,361.73 LOW SPEED SHAFT TORQUE 1,500.00 COST IN $ 2002 COST IN $ 2002 COMPONENT PART COST $ TOTAL COST $ ROTOR 449,947.70 BLADES 101,813.87 305,441.61 HUB 63,076.35 PITCH MECHANISM &BEARINGS 75,054.88 SPINNER, NOSE CONE 6,374.87 DRIVE TRAIN, NACELLE 1,187,794.83 LOW SPEED SHAFT 43,842.78 BEARINGS 29,040.74 GEARBOX 362,318.37 MECH BRAKE 5,968.09 GENERATOR 195,000.00 VARIABLE SPEED ELECTRONICS 237,000.00 YAW DRIVE & BEARING 21,017.18 42,034.37 MAIN FRAME 78,129.79 DRIVE 62,209.41 PLATFORMS $ RAILINGS 15,920.39 ELECTRICAL CONNECTIONS 120,000.00 HYDRAULIC, COOLING SYSTEM 36,000.00 NACELLE COVER 38,460.70 CONTROL, SAFETY SYSTEM, CONDITION MONITORING 55,000.00 TOWER 301,180.61 MARINIZATION 269,179.62 TURBINE CAPITAL COST (TCC) 2,263,102.76 MONOPILE FOUNDATION/SUPPORT ESTRUCTURE 878906.25 OFFSHORE TRANSPORTATION 253470 PORT AND STAGING EQUIPTMENT 60000 OFFSHORE TURBINE INSTALLATION 292968.75 OFFSHORE ELECTRICAL INTERFACE/ CONNECTIONS 761718.75 OFFSHORE PERMITS, ENGINEERING & SITE ASSESMENT 108398.4375 PERSONNEL ACCESS REQUIREMENT 58593.75 SCOUR PROTECTION 161132.8125 SURETY BOND(3% ICC- OFFSHORE WARRANTY COST) 145148.7454
  • 3. BALANCE OF STATION COST (BOS) 2720337.495 OFFSHORE WARRANTY PREMIUM 299088.4708 INITIAL CAPITAL COST (ICC=BOS+TCC) 5282528.728 Installed Cost per kW 1760.842909 Turbine capital per kW sans BOS & Warranty 754.3675874 Levelized Replacement Cost(LRC) 49804.6875 Operations & Maintenance per turbine/year 195714.1406 Land Lease Costs (LLC) 10822.20912 CAPACITY FACTOR 0.38 AEP (Kwh) 10,020,564.00 AOE ($/kWh) 0.025581498 FIXED CHARGE RATE (FCR)= 11,58% 0,1158*ICC= 611716.8268 COE ($/kWh) 0.086627645 ALL COSTS IN $ 2002
  • 4. POSSIBLE CONFIGURATIONS BLADES MATERIAL TOWER MATERIAL LOCATION DRIVE TRAIN BASELINE BASELINE OFFSHORE 3 STAGE ADVANCED ADVANCED SINGLE STAGE DIRECT DRIVE MULTIPATH PART MASS (kg) TOTAL MASS (kg) 50,956.66 9,602.93 28,808.78 14,841.49 4,222.05 6,161.88 1,144.50 62,473.03 6,253.75 825.02 1,650.04 18,261.84 596.81 10,419.65 0 2,695.27 4,312.43 16,469.37 14,639.44 1,829.93 0 240.00 4,269.14 0 200,787.07 0 314,216.75
  • 5. heq (h) 3,340.19