The document provides details on multiple projects including the Blue River Hotel, West Elm retail store, Bay Community Bank, Barley & Vine restaurant, and Loft on the Rail. It includes preliminary sketches, floor plans, perspectives, finish schedules, and other architectural drawings for each project. The document acts as a portfolio of work for Amanda Eubanks, showcasing her expertise in commercial and hospitality design.
2. CONTENTS PAGE
Blue River Hotel 2
West Elm 3-6
Bay Community Bank 7-9
Barley & Vine 10-14
Loft on the Rail 15-16
Tackable Wall Panels 17-18
Auburn University Hotel 19-22
1
2 AMANDA M EUBANKS : EUBANAM@AUBURN.EDU : 251.404.3499 : 343 EAST LONGLEAF DRIVE AUBURN, AL 36832
3. BLUE RiVER HOTEL
Preliminary Sketch
Logo
Blue River Hotel Typical Room Layout
Guest Room + Suite Perspective Guest Room Perspective Bathroom Perspective
32
4. WEST ELM UP
RUG DISPLAY
ROTATING CHAIR DISPLAY
Retail Design
CHECK-OUT
COMPUTER STATION
D
A
B
ROTATING
WINDOW DISPLAY LIVING ROOM
DISPLAY
DISPLAY AREA
ENTRY
BEDROOM DISPLAY
C
ELEV.
Floor Plan with Letters Indicating Elevations (pg 5)
Exterior Perspective : Front Facade
3
4 Interior Perspective : Bedroom & Living Room Areas
AMANDA M EUBANKS : EUBANAM@AUBURN.EDU : 251.404.3499 : 343 EAST LONGLEAF DRIVE AUBURN, AL 36832
5. continued...
WEST ELM Ceiling & Lighting
Lighting Specification Information
Type Manufacturer Catalog # Description Lamp Volts Mounting Notes
6" Compact Fluorescent
R1 Gotham AFV 42TRT 6AR 277 Downlight; Open 3200 Lumens 277 V Recessed Triple-Tube Lamp
Reflector
6" Adjustable Accent Center beam allows for
R2 Gotham DTH T6 70MHC 6ACT00 M 277 Downlight; ceramic 6600 Lumens 277 V Recessed optimizing lamp
metal halide lamp efficiency
Effective general
8" Compact Fluorescent
illumination with a
Downlight; open
compact fluorescent
R3 Gotham PDLFV 32TRT 8AR 277 reflector; vertical triple- 2400 Lumens 277 V Recessed
source independent
tube lamp; LED color
from a color-changing
changing options
LED source
4" In Ground Fixture;
G1 Advanced ALS-INF-IG-Y 5 watts 12 V In ground burial Yellow colored filter
outdoor
Emergency Operation
Surface back
Partial Lighting Lightolier
E1 Specifications LU N W 1 G BF edge-lit exits with LED 5.4 watts 120 V
mount
LED green color
illumination
12" concealed color LED Connect at 12"
T1 Lightolier IS-CCL06WF12 60 watt 120 V Recessed Track
adjustable increments
Attach to
CAP30/CPC/HPS25-277- 30" capitol luminaire; No rings, no windows;
SL1 Beacon 250 watts 277 V 5"structural
D/SR2/EB/NRNW/WH exterior street light attach to 5" pole
pole
outdoor wall 2Lt
W1 Kichler 9244WH 65 watts x 2 120 V Wall mount White finish
incandescent
14" D; Gray glass edged Hanging Grey glass; use CFL
P1 West Elm stripe bowl pendant 500 Lumens 40 V
with a silver stripe pendant #89629-FLE11/2/G25XL
Hanging Grey glass; use CFL
P2 West Elm globe pendant 11" D; Gray color glass 500 Lumens 40 V
pendant #89629-FLE11/2/G25XL
Polished-nickel frame;
30.5"W x 15.5"H natural Hanging
P3 West Elm large rectangle hanging capiz pendant 500 Lumens x 3 40 V x 3 use CFL #89629-
Capiz shells pieces pendant
FLE11/2/G25XL
Each letter contains
Mont on inside
Tetra Max Red 2 LED different amounts of
S1 GE GERDMXS6 21 Lumens/ Foot 120 V of signage
Module lights depending on the
lettering
size of the letter
CFL GE 89629-FLE11/2/G25XL Lighting Detail
Compact Fluorescent-
self ballasted
500 Lumens 40 V Bulb
Used for any additional
display fixtures
Signage Lighting Detail Reflective Ceiling Plan 54
6. continued...
WEST ELM
Elevation of Wall B
B
Elevation of Wall A
A
Elevation of Wall D
D
5 C Elevation of Wall C
AMANDA M EUBANKS : EUBANAM@AUBURN.EDU : 251.404.3499 : 343 EAST LONGLEAF DRIVE AUBURN, AL 36832
8. BAY 37
COMMUNiTY
35
38
31
32 30
36
BANK 29
Commercial Design 34 33 26 28
39 25
41 40
FLOOR PLAN KEY:
1. South Entry 26. Waiting Area 02 44 24
2. Information 27. Trust Meeting 47
43 45
3. Waiting Area 01 28. Maintenance Room 42 46 18
29. Private Walk-Station 27
4. Executive Assistant 23
5. Executive Meeting 30. Board Room 48
17
6. President Office 31. Ante
7. President Lavatory 32. Library Meeting 20 21 22 16 13
8. Coffee Bar 33. Men’s Lavatory
9. Vice President Office 34. Women’s Lavatory
10. VP Lavatory 35. Loan Meeting 50 12
19 14
11. Trust Office 01 36. Break Room
12. Trust Office 02 37. Outdoor Break Space 15 11
13. Trust Office 03 38. Walk-Stations
14. Trust Support 01 39. Casual Conference Room
15. Trust Support 02 40. Internet Pod Stations 49 3 9
16. Trust Support 03 41. Waiting Area 03 2
17. Trust Copy/Fax 42. Waiting Area 04 10
18. Loan Copy/Fax 43. Vault Attendant 8 7
19. Loan Support 01 44. Private Viewing 01 5
20. Loan Support 02 45. Private Viewing 02
21. Loan Support 03 46. Vault 1 4 6
22. Filing Area 47. Night Deposit Box
23. Loan Office 01 48. West Entry
24. Loan Office 02 49. Coffee Lounge
7 25. Loan Office 03 50. Teller Area Bay Community Bank Floor Plan
AMANDA M EUBANKS : EUBANAM@AUBURN.EDU : 251.404.3499 : 343 EAST LONGLEAF DRIVE AUBURN, AL 36832
9. continued...
Panel Systems Model
Materials & Finishes Board
Panel Systems Rendering 98
10. continued...
BAY
COMMUNiTY
BANK
Detailed ADA Lavatory Elevation
Custom Water Feature & Entry
9 Teller and Cafe Perspective
AMANDA M EUBANKS : EUBANAM@AUBURN.EDU : 251.404.3499 : 343 EAST LONGLEAF DRIVE AUBURN, AL 36832
20. AUBURN UNiVERSiTY HOTEL
Hospitality Design
19 Floor Plan
AMANDA M EUBANKS : EUBANAM@AUBURN.EDU : 251.404.3499 : 343 EAST LONGLEAF DRIVE AUBURN, AL 36832
22. Continued...
AUBURN
UNiVERSiTY MEETING
ROOM D
HOTEL
RECEPTION
GENERAL
MANAGER
SALES DEPARTMENT
Office Areal Perspective
Preliminary Sketch
21 Hallway Perspective
AMANDA M EUBANKS : EUBANAM@AUBURN.EDU : 251.404.3499 : 343 EAST LONGLEAF DRIVE AUBURN, AL 36832
23. Continued...
Meeting Room Perspective
Exterior Perspective of Pool & Fireplace Exterior Perspective of Meeting Lounge 3222