SlideShare a Scribd company logo
1 of 61
Chapter 5:  Construction Process by Syed Burhanuddin Hilmi Syed Mohamad
Project Format ,[object Object],[object Object],[object Object]
Project Development ,[object Object],[object Object],[object Object],[object Object],[object Object]
Project Development ,[object Object],[object Object],[object Object]
Project Development ,[object Object],[object Object]
Project Development ,[object Object],[object Object],[object Object]
Process ,[object Object],[object Object],[object Object],[object Object]
Construction Processes ,[object Object],[object Object],[object Object]
Managing the Project Life Cycle Cleland & King, 1983 ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Phase 4 Termination Phase 3 Execution phase Phase 2 Planning phase Phase 1 Conceptual Phase
Construction Process ,[object Object],[object Object],[object Object]
Construction Process ,[object Object],[object Object]
Activities at Various Stages of a construction project Members of the design team develop brief, consider the technical and functional feasibility of the client’s intentions, make general proposals for the project including form, layout, height and floor area, Architect applies for outline planning approval. Outline proposals Client considers project requirements, acquires land, sets up project team, appoints and briefs architect/engineer. Inception Activities Substage
Activities at Various Stages of a construction project Design team prepares the full design of the project and all relevant production information and contract documentation. Architect applies for building plan approval. Detailed design Architect/Engineer finalises brief, and with other consultants, prepares sketch designs which are submitted to the client for approval. Scheme Design Activities Substage
Activities at Various Stages of a construction project Prepares a programme for the project and mobilises resources for construction on sie. Project planning Invites tenders. Quantity Surveyor evaluates the tenders and report to client. Recommends to Client. Client signs a contract with the successful bidder. Tender Activities Substage
Activities at Various Stages of a construction project Main Contractor and subcontractors transform the production information into a physical facility. Members of the design team supervise construction. Architect/engineer issues payment certificates periodically on the recommendation of the Quantity Surveyor. Site Meeting. On completion, Architect, applies for a temporary occupation license. Application for a final certificate. Site Operation Activities Substage
Activities at Various Stages of a construction project George Ofori, 1990 All faults becoming evident during the defects liability period are made good by the contractor. Quantity surveyor prepares the final account for the project. Clients arranges for the management and maintenance of the facility. Operation Activities Substage
On time and within budget ,[object Object]
Construction Process ,[object Object],[object Object],[object Object]
Construction Process ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Activities During Construction ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Activities During Construction ,[object Object],[object Object],[object Object],[object Object],[object Object]
Site Preparation ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Detail Process ,[object Object],[object Object],[object Object]
Key Players ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Clients ,[object Object],[object Object],[object Object],[object Object]
SUPPLIER CONTRACTOR MANPOWER AUTHORITIES FINANCIER CONSULTANTS CLIENT Project Management Consultant Planner Architect Engineers; C&S, M, E Quantity Surveyor Land Surveyor Interior Designer Landscape Architect Administration Site Management Site Worker Domestic Sub Contractor Nominated Sub Contractor Main Contractor Nominated Supplier Manufacturer Vendor Distributor Bank Finance Company Credit Corporation Leasing Company Federal State Local Private Sector Public Sector Parties Involved in the  Construction Industry
[object Object]
Construction Site Management ,[object Object],[object Object],[object Object],[object Object],[object Object]
Project Planning and Control ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Planning ,[object Object],[object Object]
Control ,[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object]
INTRODUCTION ,[object Object],[object Object],[object Object]
MONITORING and CONTROL ,[object Object],[object Object],[object Object],[object Object]
Progress Curves Table 3.4  Combination between S-Curves and Bar Charts Original Schedule Actual progress Cumulative progress (%) 100 0                     Dismantle Plant, Clean Up 12                     Curtain Grout 11                     Spillway Bridge 10                     Radial Gates 9                     Prestress 8                     Install Trash Racks 7                     Install Outlet Gates 6                     Dam Concrete 5                     Foundation Grouting 4                     Diversion Stage  3                     Foundation Excavation 2                     Mobilization 1 10 9 8 7 6 5 4 3 2 1     Month Description No.
Project Controlling Procedure ,[object Object],[object Object],[object Object],[object Object],[object Object],Figure 3.12  Project Controlling Procedure Project plan Project implementation Project control Project updating Measurement Of work performance
Project Controlling  Figure 3.13  Implementation of Project Controlling in Construction Project Implementation of  Project Controlling Construction Design Subcontract Procurement Project Site Main office
Elements of Project Controlling  Figure 3.14  Elements of Project Controlling Action Plan Budget Elements of  Project Controlling Tools Milestone Forecasting
Figure below presents a Gantt Chart generated by Microsoft Project.   Gantt Chart:   The Gantt chart (invented by Henry L. Gantt in 1900's) is a bar chart presentation showing a horizontal bar for each task,  the length of the bar representing the duration of the task.
Construct Bar Chart ,[object Object],[object Object],[object Object],[object Object]
Bar Charts Limitations ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Time Controlling  ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Need an effective supervision
Suggestion of Practices ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
The Planning & Scheduling Process IDENTIFY THE PROJECT ACTIVITIES EXTIMATE DURATION OF ACTIVITY DEVELOPED THE PROJECT PLAN SCHEDULE PROJECT ACTIVITIES REVIEW AND ANALYSE THE SCHEDULE OK? IMPLEMENT YES NO
Historical Background ,[object Object],[object Object],[object Object],[object Object],[object Object]
Choice of Scheduling Method ,[object Object],[object Object],[object Object],[object Object],[object Object]
Familiarity on the technique to be used ,[object Object],[object Object],[object Object]
Type and Size of the Project ,[object Object],[object Object],[object Object]
Purpose & Important of Schedule ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
ACTIVITY IDENTIFICATION CRITERIA FOR BREAKING DOWN PROJECTS: WHAT? WHERE? WHO? WHEN? HOW?
ACTIVITY DETAIL DEPENDS ON THE FOLLOWING: >Purpose Complexity >Philosophy >Information >Responsibility >Effect of detail
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object]
Work Sequence ,[object Object],[object Object],[object Object],[object Object]
                        Jumlah Terkumpul (Dilaksana) 36 35 34 31 27 22 17 13 9 6 3 1 Jumlah Terkumpul (Dirancang) 1 1 3 4 5 5 4 4 3 3 2 1 Jumlah Mingguan                         36 Jumlah                                                 4 Kerja Bata                                                 4 Tuang Konkrit Tiang                                                 4 Pasang Tetulang Tiang                                                 4 Pasang Acuan Tiang                                                 4 Penambakan                                                 4 Tuang Konkrit Asas                                                 4 Pasang Tetulang Asas                                                 4 Korek Asas                                                 4 Bersih Tapak 12 11 10 9 8 7 6 5 4 3 2 1 MINGGU MASA AKTIVITI
2200 3 Finish HVAC 2400 2200 2 Finish plumbing 2300 2600 3 Internal paint 2200 2200 4 Internal finish carpentry 2100 2200 3 Ext paint 2000 2100, 2300 2 Cabinets 1900 1900, 2400, 2500 4 Finish drywall 1800 1800 4 Hang drywall 1700 1500 2 Ext finish carpentry 1600 20000 3 Ext siding 1500 1000, 1600, 2700 3 Shingles 1400 1000 3 Rough Electrical 1300 1300 3 Rough HVAC 1200 Successors Duration (days) Description Act. ID 2 Punch list 2800 2800 4 Grading and landscaping 2700 2800 3 Flooring 2600 2200 2 Finish electrical 2500
[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object]

More Related Content

What's hot

Stages In Construction
Stages In ConstructionStages In Construction
Stages In ConstructionAB MAKASANA
 
Construction phases
Construction phasesConstruction phases
Construction phasesMeesum Zaidi
 
Types of Contract in Construction Management
Types of Contract in Construction ManagementTypes of Contract in Construction Management
Types of Contract in Construction ManagementShahin MB
 
Construction Management & Equipments
Construction Management & EquipmentsConstruction Management & Equipments
Construction Management & EquipmentsGAURAV. H .TANDON
 
Construction Planing & Schedule
Construction Planing & ScheduleConstruction Planing & Schedule
Construction Planing & ScheduleVîñõđ Kůmåř
 
Standard bill of quantities
Standard bill of quantitiesStandard bill of quantities
Standard bill of quantitiesBt Lee
 
Insepction and quality control
Insepction and quality controlInsepction and quality control
Insepction and quality controlSOURAV4798
 
Types of resources in civil engineering field
Types of resources in civil engineering fieldTypes of resources in civil engineering field
Types of resources in civil engineering fieldswetha110
 
02 Construction Projects
02 Construction Projects02 Construction Projects
02 Construction Projectsakashpadole
 
03 Construction Project Planning and Scheduling
03 Construction Project Planning and Scheduling03 Construction Project Planning and Scheduling
03 Construction Project Planning and Schedulingakashpadole
 
Estimation and Costing - Contracts
Estimation and Costing - ContractsEstimation and Costing - Contracts
Estimation and Costing - Contractssrinivas2036
 
Procurement in construction
Procurement in constructionProcurement in construction
Procurement in constructionMahSobeh
 
Construction project management
Construction project managementConstruction project management
Construction project managementSenthil Kannan
 

What's hot (20)

Stages In Construction
Stages In ConstructionStages In Construction
Stages In Construction
 
Construction phases
Construction phasesConstruction phases
Construction phases
 
Types of Contract in Construction Management
Types of Contract in Construction ManagementTypes of Contract in Construction Management
Types of Contract in Construction Management
 
Construction Management & Equipments
Construction Management & EquipmentsConstruction Management & Equipments
Construction Management & Equipments
 
Analysis of rates
Analysis of ratesAnalysis of rates
Analysis of rates
 
Construction Planing & Schedule
Construction Planing & ScheduleConstruction Planing & Schedule
Construction Planing & Schedule
 
Types of contract
Types of contractTypes of contract
Types of contract
 
Contracts and-tenders
Contracts and-tendersContracts and-tenders
Contracts and-tenders
 
Standard bill of quantities
Standard bill of quantitiesStandard bill of quantities
Standard bill of quantities
 
Insepction and quality control
Insepction and quality controlInsepction and quality control
Insepction and quality control
 
Module 2:Resource Management,Construction Equipments,Materials Inventory by D...
Module 2:Resource Management,Construction Equipments,Materials Inventory by D...Module 2:Resource Management,Construction Equipments,Materials Inventory by D...
Module 2:Resource Management,Construction Equipments,Materials Inventory by D...
 
Types of resources in civil engineering field
Types of resources in civil engineering fieldTypes of resources in civil engineering field
Types of resources in civil engineering field
 
Construction industry
Construction industryConstruction industry
Construction industry
 
02 Construction Projects
02 Construction Projects02 Construction Projects
02 Construction Projects
 
03 Construction Project Planning and Scheduling
03 Construction Project Planning and Scheduling03 Construction Project Planning and Scheduling
03 Construction Project Planning and Scheduling
 
Estimation and Costing - Contracts
Estimation and Costing - ContractsEstimation and Costing - Contracts
Estimation and Costing - Contracts
 
Bills of quantities
Bills of quantitiesBills of quantities
Bills of quantities
 
Estimating and-costing
Estimating and-costingEstimating and-costing
Estimating and-costing
 
Procurement in construction
Procurement in constructionProcurement in construction
Procurement in construction
 
Construction project management
Construction project managementConstruction project management
Construction project management
 

Viewers also liked

Stages in Construction
Stages in Construction Stages in Construction
Stages in Construction Mereia Kali
 
3. construction planning. construction project management
3. construction planning. construction project management3. construction planning. construction project management
3. construction planning. construction project managementKabilan Kabi
 
Project management final report ENG3004 Griffith University Guri Dam & Chunne...
Project management final report ENG3004 Griffith University Guri Dam & Chunne...Project management final report ENG3004 Griffith University Guri Dam & Chunne...
Project management final report ENG3004 Griffith University Guri Dam & Chunne...peter747
 
Arega Siyum D/r revised
Arega  Siyum D/r revisedArega  Siyum D/r revised
Arega Siyum D/r revisedFiker Love
 
Ranking of scientists in saudi institutions according to their gsc public pro...
Ranking of scientists in saudi institutions according to their gsc public pro...Ranking of scientists in saudi institutions according to their gsc public pro...
Ranking of scientists in saudi institutions according to their gsc public pro...haroldtaylor1113
 
Stakeholder management In Construction Industry
Stakeholder management In  Construction IndustryStakeholder management In  Construction Industry
Stakeholder management In Construction IndustryGirish Singh
 
Lecture slides4; Construction Project Planning
Lecture slides4; Construction Project PlanningLecture slides4; Construction Project Planning
Lecture slides4; Construction Project PlanningJB Nartey
 
Project Monitoring And Controlling
Project Monitoring And ControllingProject Monitoring And Controlling
Project Monitoring And ControllingTom Milner
 
Determination of reservoir storage capacity
Determination of reservoir storage capacityDetermination of reservoir storage capacity
Determination of reservoir storage capacitychingtony mbuma
 
Construction Project Management Class Project Presentation
Construction Project Management Class Project PresentationConstruction Project Management Class Project Presentation
Construction Project Management Class Project PresentationWayne Holley
 
Project Controlling and Project Monitoring
Project Controlling and Project MonitoringProject Controlling and Project Monitoring
Project Controlling and Project Monitoringharoldtaylor1113
 
Project Monitoring and Control
Project Monitoring and ControlProject Monitoring and Control
Project Monitoring and Controlguy_davis
 
building material
building materialbuilding material
building materialnicocarlos
 

Viewers also liked (20)

Stages in Construction
Stages in Construction Stages in Construction
Stages in Construction
 
3. construction planning. construction project management
3. construction planning. construction project management3. construction planning. construction project management
3. construction planning. construction project management
 
Get Commercial Building Construction Company Auburn by TopRung LLC
Get Commercial Building Construction Company Auburn by TopRung LLC  Get Commercial Building Construction Company Auburn by TopRung LLC
Get Commercial Building Construction Company Auburn by TopRung LLC
 
Project management final report ENG3004 Griffith University Guri Dam & Chunne...
Project management final report ENG3004 Griffith University Guri Dam & Chunne...Project management final report ENG3004 Griffith University Guri Dam & Chunne...
Project management final report ENG3004 Griffith University Guri Dam & Chunne...
 
Arega Siyum D/r revised
Arega  Siyum D/r revisedArega  Siyum D/r revised
Arega Siyum D/r revised
 
Ranking of scientists in saudi institutions according to their gsc public pro...
Ranking of scientists in saudi institutions according to their gsc public pro...Ranking of scientists in saudi institutions according to their gsc public pro...
Ranking of scientists in saudi institutions according to their gsc public pro...
 
Construction tender process
Construction tender processConstruction tender process
Construction tender process
 
Stakeholder management In Construction Industry
Stakeholder management In  Construction IndustryStakeholder management In  Construction Industry
Stakeholder management In Construction Industry
 
Lecture slides4; Construction Project Planning
Lecture slides4; Construction Project PlanningLecture slides4; Construction Project Planning
Lecture slides4; Construction Project Planning
 
Volume and Area Calculation
Volume and Area Calculation Volume and Area Calculation
Volume and Area Calculation
 
Project Monitoring and Control
Project Monitoring and ControlProject Monitoring and Control
Project Monitoring and Control
 
Project Monitoring And Controlling
Project Monitoring And ControllingProject Monitoring And Controlling
Project Monitoring And Controlling
 
Project control
Project controlProject control
Project control
 
Determination of reservoir storage capacity
Determination of reservoir storage capacityDetermination of reservoir storage capacity
Determination of reservoir storage capacity
 
Construction Project Management Class Project Presentation
Construction Project Management Class Project PresentationConstruction Project Management Class Project Presentation
Construction Project Management Class Project Presentation
 
Project Controlling and Project Monitoring
Project Controlling and Project MonitoringProject Controlling and Project Monitoring
Project Controlling and Project Monitoring
 
Project Monitoring and Control
Project Monitoring and ControlProject Monitoring and Control
Project Monitoring and Control
 
Site Possession
Site PossessionSite Possession
Site Possession
 
Tender procedure slide
Tender procedure slideTender procedure slide
Tender procedure slide
 
building material
building materialbuilding material
building material
 

Similar to Construction process

Project management-project life cycle-pdf
Project management-project life cycle-pdfProject management-project life cycle-pdf
Project management-project life cycle-pdfAditi Garg
 
Construction-Project-cycle-and-organization.pptx
Construction-Project-cycle-and-organization.pptxConstruction-Project-cycle-and-organization.pptx
Construction-Project-cycle-and-organization.pptxlexfred55
 
1-7Projectmanagement-120312002842-Phpapp01
1-7Projectmanagement-120312002842-Phpapp011-7Projectmanagement-120312002842-Phpapp01
1-7Projectmanagement-120312002842-Phpapp01Amy Roman
 
1.7 project management
1.7 project management1.7 project management
1.7 project managementexemplar2401
 
Project and project management
Project and project managementProject and project management
Project and project managementwodato
 
1.7 project management
1.7 project management1.7 project management
1.7 project managementchaithanya1025
 
MBA 572Project Management WorksheetsReprinted from The Project.docx
MBA 572Project Management WorksheetsReprinted from The Project.docxMBA 572Project Management WorksheetsReprinted from The Project.docx
MBA 572Project Management WorksheetsReprinted from The Project.docxandreecapon
 
Stakeholder’s Involvement in Construction Industry
Stakeholder’s Involvement in Construction IndustryStakeholder’s Involvement in Construction Industry
Stakeholder’s Involvement in Construction IndustryAkshika Mahanama
 
Learnit buildit-manageit-141124083859-conversion-gate01
Learnit buildit-manageit-141124083859-conversion-gate01Learnit buildit-manageit-141124083859-conversion-gate01
Learnit buildit-manageit-141124083859-conversion-gate01David Eagle
 
Project management basics
Project management basicsProject management basics
Project management basicsAdewale Alafia
 
Projectmanagement 130721095616-phpapp01
Projectmanagement 130721095616-phpapp01Projectmanagement 130721095616-phpapp01
Projectmanagement 130721095616-phpapp01samansari22
 
CONSTRUCTION-PROJECT-MANAGEMENT-ppt.ppt
CONSTRUCTION-PROJECT-MANAGEMENT-ppt.pptCONSTRUCTION-PROJECT-MANAGEMENT-ppt.ppt
CONSTRUCTION-PROJECT-MANAGEMENT-ppt.pptpisal3
 
140704 project planning presentation
140704 project planning presentation140704 project planning presentation
140704 project planning presentationMadhusudan Kashyap
 
Project management life cycle
Project management life cycleProject management life cycle
Project management life cycleAndrei Crăciun
 

Similar to Construction process (20)

ACH 216 Lecture 02 (Project Format)
ACH 216 Lecture 02 (Project Format)ACH 216 Lecture 02 (Project Format)
ACH 216 Lecture 02 (Project Format)
 
Project management-project life cycle-pdf
Project management-project life cycle-pdfProject management-project life cycle-pdf
Project management-project life cycle-pdf
 
Phases of a Project
Phases of a ProjectPhases of a Project
Phases of a Project
 
Construction-Project-cycle-and-organization.pptx
Construction-Project-cycle-and-organization.pptxConstruction-Project-cycle-and-organization.pptx
Construction-Project-cycle-and-organization.pptx
 
1-7Projectmanagement-120312002842-Phpapp01
1-7Projectmanagement-120312002842-Phpapp011-7Projectmanagement-120312002842-Phpapp01
1-7Projectmanagement-120312002842-Phpapp01
 
1.7 project management
1.7 project management1.7 project management
1.7 project management
 
Project and project management
Project and project managementProject and project management
Project and project management
 
1.7 project management
1.7 project management1.7 project management
1.7 project management
 
PPRPreparationGuide
PPRPreparationGuidePPRPreparationGuide
PPRPreparationGuide
 
MBA 572Project Management WorksheetsReprinted from The Project.docx
MBA 572Project Management WorksheetsReprinted from The Project.docxMBA 572Project Management WorksheetsReprinted from The Project.docx
MBA 572Project Management WorksheetsReprinted from The Project.docx
 
Stakeholder’s Involvement in Construction Industry
Stakeholder’s Involvement in Construction IndustryStakeholder’s Involvement in Construction Industry
Stakeholder’s Involvement in Construction Industry
 
Learnit buildit-manageit-141124083859-conversion-gate01
Learnit buildit-manageit-141124083859-conversion-gate01Learnit buildit-manageit-141124083859-conversion-gate01
Learnit buildit-manageit-141124083859-conversion-gate01
 
Project management basics
Project management basicsProject management basics
Project management basics
 
CEM unit -I ppt.pptx
CEM unit -I ppt.pptxCEM unit -I ppt.pptx
CEM unit -I ppt.pptx
 
012 bussiness planning process
012 bussiness planning process012 bussiness planning process
012 bussiness planning process
 
Planning skill.pdf
Planning skill.pdfPlanning skill.pdf
Planning skill.pdf
 
Projectmanagement 130721095616-phpapp01
Projectmanagement 130721095616-phpapp01Projectmanagement 130721095616-phpapp01
Projectmanagement 130721095616-phpapp01
 
CONSTRUCTION-PROJECT-MANAGEMENT-ppt.ppt
CONSTRUCTION-PROJECT-MANAGEMENT-ppt.pptCONSTRUCTION-PROJECT-MANAGEMENT-ppt.ppt
CONSTRUCTION-PROJECT-MANAGEMENT-ppt.ppt
 
140704 project planning presentation
140704 project planning presentation140704 project planning presentation
140704 project planning presentation
 
Project management life cycle
Project management life cycleProject management life cycle
Project management life cycle
 

Recently uploaded

8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...lizamodels9
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...lizamodels9
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Timedelhimodelshub1
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?Olivia Kresic
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionMintel Group
 

Recently uploaded (20)

Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
Call Girls In Connaught Place Delhi ❤️88604**77959_Russian 100% Genuine Escor...
 
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Time
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted Version
 

Construction process

  • 1. Chapter 5: Construction Process by Syed Burhanuddin Hilmi Syed Mohamad
  • 2.
  • 3.
  • 4.
  • 5.
  • 6.
  • 7.
  • 8.
  • 9.
  • 10.
  • 11.
  • 12. Activities at Various Stages of a construction project Members of the design team develop brief, consider the technical and functional feasibility of the client’s intentions, make general proposals for the project including form, layout, height and floor area, Architect applies for outline planning approval. Outline proposals Client considers project requirements, acquires land, sets up project team, appoints and briefs architect/engineer. Inception Activities Substage
  • 13. Activities at Various Stages of a construction project Design team prepares the full design of the project and all relevant production information and contract documentation. Architect applies for building plan approval. Detailed design Architect/Engineer finalises brief, and with other consultants, prepares sketch designs which are submitted to the client for approval. Scheme Design Activities Substage
  • 14. Activities at Various Stages of a construction project Prepares a programme for the project and mobilises resources for construction on sie. Project planning Invites tenders. Quantity Surveyor evaluates the tenders and report to client. Recommends to Client. Client signs a contract with the successful bidder. Tender Activities Substage
  • 15. Activities at Various Stages of a construction project Main Contractor and subcontractors transform the production information into a physical facility. Members of the design team supervise construction. Architect/engineer issues payment certificates periodically on the recommendation of the Quantity Surveyor. Site Meeting. On completion, Architect, applies for a temporary occupation license. Application for a final certificate. Site Operation Activities Substage
  • 16. Activities at Various Stages of a construction project George Ofori, 1990 All faults becoming evident during the defects liability period are made good by the contractor. Quantity surveyor prepares the final account for the project. Clients arranges for the management and maintenance of the facility. Operation Activities Substage
  • 17.
  • 18.
  • 19.
  • 20.
  • 21.
  • 22.
  • 23.
  • 24.
  • 25.
  • 26. SUPPLIER CONTRACTOR MANPOWER AUTHORITIES FINANCIER CONSULTANTS CLIENT Project Management Consultant Planner Architect Engineers; C&S, M, E Quantity Surveyor Land Surveyor Interior Designer Landscape Architect Administration Site Management Site Worker Domestic Sub Contractor Nominated Sub Contractor Main Contractor Nominated Supplier Manufacturer Vendor Distributor Bank Finance Company Credit Corporation Leasing Company Federal State Local Private Sector Public Sector Parties Involved in the Construction Industry
  • 27.
  • 28.
  • 29.
  • 30.
  • 31.
  • 32.
  • 33.
  • 34.
  • 35.
  • 36. Progress Curves Table 3.4 Combination between S-Curves and Bar Charts Original Schedule Actual progress Cumulative progress (%) 100 0                     Dismantle Plant, Clean Up 12                     Curtain Grout 11                     Spillway Bridge 10                     Radial Gates 9                     Prestress 8                     Install Trash Racks 7                     Install Outlet Gates 6                     Dam Concrete 5                     Foundation Grouting 4                     Diversion Stage 3                     Foundation Excavation 2                     Mobilization 1 10 9 8 7 6 5 4 3 2 1     Month Description No.
  • 37.
  • 38. Project Controlling Figure 3.13 Implementation of Project Controlling in Construction Project Implementation of Project Controlling Construction Design Subcontract Procurement Project Site Main office
  • 39. Elements of Project Controlling Figure 3.14 Elements of Project Controlling Action Plan Budget Elements of Project Controlling Tools Milestone Forecasting
  • 40. Figure below presents a Gantt Chart generated by Microsoft Project. Gantt Chart: The Gantt chart (invented by Henry L. Gantt in 1900's) is a bar chart presentation showing a horizontal bar for each task, the length of the bar representing the duration of the task.
  • 41.
  • 42.
  • 43.
  • 44.
  • 45. The Planning & Scheduling Process IDENTIFY THE PROJECT ACTIVITIES EXTIMATE DURATION OF ACTIVITY DEVELOPED THE PROJECT PLAN SCHEDULE PROJECT ACTIVITIES REVIEW AND ANALYSE THE SCHEDULE OK? IMPLEMENT YES NO
  • 46.
  • 47.
  • 48.
  • 49.
  • 50.
  • 51.
  • 52.
  • 53. ACTIVITY IDENTIFICATION CRITERIA FOR BREAKING DOWN PROJECTS: WHAT? WHERE? WHO? WHEN? HOW?
  • 54. ACTIVITY DETAIL DEPENDS ON THE FOLLOWING: >Purpose Complexity >Philosophy >Information >Responsibility >Effect of detail
  • 55.
  • 56.
  • 57.
  • 58.                         Jumlah Terkumpul (Dilaksana) 36 35 34 31 27 22 17 13 9 6 3 1 Jumlah Terkumpul (Dirancang) 1 1 3 4 5 5 4 4 3 3 2 1 Jumlah Mingguan                         36 Jumlah                                                 4 Kerja Bata                                                 4 Tuang Konkrit Tiang                                                 4 Pasang Tetulang Tiang                                                 4 Pasang Acuan Tiang                                                 4 Penambakan                                                 4 Tuang Konkrit Asas                                                 4 Pasang Tetulang Asas                                                 4 Korek Asas                                                 4 Bersih Tapak 12 11 10 9 8 7 6 5 4 3 2 1 MINGGU MASA AKTIVITI
  • 59. 2200 3 Finish HVAC 2400 2200 2 Finish plumbing 2300 2600 3 Internal paint 2200 2200 4 Internal finish carpentry 2100 2200 3 Ext paint 2000 2100, 2300 2 Cabinets 1900 1900, 2400, 2500 4 Finish drywall 1800 1800 4 Hang drywall 1700 1500 2 Ext finish carpentry 1600 20000 3 Ext siding 1500 1000, 1600, 2700 3 Shingles 1400 1000 3 Rough Electrical 1300 1300 3 Rough HVAC 1200 Successors Duration (days) Description Act. ID 2 Punch list 2800 2800 4 Grading and landscaping 2700 2800 3 Flooring 2600 2200 2 Finish electrical 2500
  • 60.
  • 61.