Strategic Air Planning: Is
the Time for a PAL Here?
Presented to Georgia AWMA by All4 Inc.
Mark Wenclawiak, CCM| mwenclawiak@all4inc.com | (678) 460-0324
October 24, 2013

www.all4inc.com
Kimberton, PA | 610.933.5246
Kennesaw, GA | 678.460.0324
Agenda


Air permitting to support growth
• Plantwide Applicability Limit (PAL) permitting
• Not new concept but time for a kick start?








2

Mounting air pressures
Facility needs and expectations
Major New Source Review (NSR) struggles
Importance of strategic planning
What is a PAL, how it can be smart strategic
decision
Your environmental compliance is clearly our business.
Air Pressure





National Ambient Air Quality Standard (NAAQS)
NSR
Greenhouse Gas (GHG) Regulation
National Emission Standards for Hazardous Air
Pollutants (NESHAPs)
• Boiler MACT



Project happening again
• Significant capital expenditures and complicated
permitting efforts
• Balancing these pressures with economic recovery
and growth

3

Your environmental compliance is clearly our business.
Air Pressure (continued)




In years past, actual emission increases predicted
and realized from projects
Common theme of this new day and age has
emerged:
For most facilities, future emissions will decrease
from historic actual levels as a result of new and
developing air regulations and standards, regardless
of growth in productivity.



4

Preserve those historically high emissions!

Your environmental compliance is clearly our business.
Facility Needs



Ability to change operations quickly & as needed
Long range targets for planning:
• Internal - production/energy/economics (more
production at lower costs)
• External – new rules driving up costs to comply
• You – caught in the middle



Energy study – modify process line to generate
steam savings and increase in production
• Emissions from boiler decrease – good thing
• But…still need that PSD applicability analysis

5

Your environmental compliance is clearly our business.
Future Planning


Strategic planning for the future must consider
implications of both new air rule applicability and
air permitting implications:
•
•
•
•



6

Lots of rules/lots of issues/lots of confusion
New rules likely require facility changes
No exemption for pollution control projects
Permitting issues can impact project design

Do you install scrubber to control HCl for MACT?
• Co-benefit: SO2 will decrease as well – how does that
impact your NAAQS compliance
• Scrubber project many now be desirable

Your environmental compliance is clearly our business.
Future Planning (continued)




Air issues must be integrated into facility
operations planning
Result will be same old push/pull for projects
whether needed or required:
• PSD applicability analysis
• Potential impacts to project design, cost, schedule
• Confusion and frustration




7

System for evaluating projects must be
established and adhered to
Compliance with NAAQS is critical
Your environmental compliance is clearly our business.
PAL Option






“Plantwide Applicability Limitation” (PAL) is an
available regulatory option that can potentially
ease the PSD permitting cycle
Federal PSD rule provides for PALs based on
historic actual emissions
PALs are pollutant specific and could be a critical
part of a facility strategic plan…Why????
• Preserve that baseline!

8

Your environmental compliance is clearly our business.
PAL Advantages




9

For a facility with a PAL permit that maintains
emissions below PAL, physical changes and
changes in method of operation are not major
modifications and do not require approval under
PSD
Decisions regarding process and air pollution
control technology now remain with the source,
not the agency (e.g., BACT)

Your environmental compliance is clearly our business.
Why a PAL Now?






10

PALs historically worked for relatively simple
industries with limited sources and where
technology was driving emissions lower per unit
of production
New air quality world we are in is forcing facilities
to realization that future emissions will be lower
per unit of production driven by rules, standards,
permitting, technology, etc.
Emerging in complex plants like cement, pulp and
paper
Your environmental compliance is clearly our business.
Why a PAL Now? (continued)



Air permitting complicated enough
Largely avoided up until now
• Must be able to track and report emissions against
PAL
• Historically facilities saw too many sources and not
enough data to justify a PAL




11

However, data and tools now available for
demonstrating compliance due to other rule
activities
So how do you establish a PAL?
Your environmental compliance is clearly our business.
Establishing A PAL




One or more pollutants (including GHGs)
Based on 12-month rolling total (tons/yr)
Same baseline actual emissions used in PSD
applicability assessment:
• 24-month consecutive period during the prior
10 years of operation
• Add PSD/NNSR significance threshold

12

Your environmental compliance is clearly our business.
PAL Concerns – Big Picture







13

PAL established for 10 year period
PAL can be adjusted down to account for new
applicable requirements, NAAQS compliance
concerns
Getting out of a PAL can have serious
ramifications (e.g., BACT)
State/local air construction permits may still be
required

Your environmental compliance is clearly our business.
PAL Concerns – Specifics


Effort associated with developing PAL application
• Ahead of the game more than you think



Developing methods to demonstrate compliance
• Also likely in place



NAAQS are a driver – know where you stand
• Modifications under a PAL will not trigger modeling



But NSR reform rules appear to be working
• Could have accommodated
• Even non-applicability evaluations not simple


14

SIP permits, NSPS, NESHAPs, RACT, etc. still apply
Your environmental compliance is clearly our business.
PAL Planning Approach




Develop historic facility-wide baseline emission
rates and potential PAL levels
Major planning sessions
• Consider new rules, facility operations plans, potential
energy efficiency improvements, new technologies,
low hanging fruit for emissions reductions




Address potential NAAQS issues
Weigh value of PAL for each pollutant
• PM and VOC from coating operations

15

Your environmental compliance is clearly our business.
Parting Thoughts









16

Allows you to implement projects quickly
For typical facility projects, PSD is no longer a
consideration under a PAL
Economic and competitive advantage over
competitors
For planning facility now has a clear bright line it
can manage operations to (12-month emissions)
Future second guessing by agency of PSD
applicability decisions and potential enforcement
issues off the table
Your environmental compliance is clearly our business.
Questions?

Mark Wenclawiak, CCM| mwenclawiak@all4inc.com | (678) 460-0324

www.all4inc.com
Kimberton, PA | 610.933.5246
Kennesaw, GA | 678.460.0324

Weitere ähnliche Inhalte

Was ist angesagt?

BlueScape and Cooper White - BAAQMD Air Toxics Risk Reduction Rule 11-18 Webi...
BlueScape and Cooper White - BAAQMD Air Toxics Risk Reduction Rule 11-18 Webi...BlueScape and Cooper White - BAAQMD Air Toxics Risk Reduction Rule 11-18 Webi...
BlueScape and Cooper White - BAAQMD Air Toxics Risk Reduction Rule 11-18 Webi...BlueScape
 
Designing a gas program impact evaluation
Designing a gas program impact evaluationDesigning a gas program impact evaluation
Designing a gas program impact evaluationZondits
 
Adam Ward, Ohio EPA, Air Pollution Control Updates, Midwest Environmental Com...
Adam Ward, Ohio EPA, Air Pollution Control Updates, Midwest Environmental Com...Adam Ward, Ohio EPA, Air Pollution Control Updates, Midwest Environmental Com...
Adam Ward, Ohio EPA, Air Pollution Control Updates, Midwest Environmental Com...Kevin Perry
 
Project Management Analysis on Project Manager at Lydall Inc.
Project Management Analysis on Project Manager at Lydall Inc.Project Management Analysis on Project Manager at Lydall Inc.
Project Management Analysis on Project Manager at Lydall Inc.huangg
 
Overview carbonaccountingprotocol v1
Overview carbonaccountingprotocol v1Overview carbonaccountingprotocol v1
Overview carbonaccountingprotocol v1Bill St. Arnaud
 
Smart Integrated Infrastructure and Controlling Water Loss
Smart Integrated Infrastructure and Controlling Water LossSmart Integrated Infrastructure and Controlling Water Loss
Smart Integrated Infrastructure and Controlling Water LossBlack & Veatch
 
Gerdeman_Lance_Resume 1.7.16
Gerdeman_Lance_Resume 1.7.16Gerdeman_Lance_Resume 1.7.16
Gerdeman_Lance_Resume 1.7.16Lance Gerdeman
 
Mark Wenclawiak All4 GHG PSD Permitting Challenges
Mark Wenclawiak All4 GHG PSD Permitting ChallengesMark Wenclawiak All4 GHG PSD Permitting Challenges
Mark Wenclawiak All4 GHG PSD Permitting ChallengesAll4 Inc.
 
Monetizing Risks - A Prioritization & Optimization Solution
Monetizing Risks - A Prioritization & Optimization SolutionMonetizing Risks - A Prioritization & Optimization Solution
Monetizing Risks - A Prioritization & Optimization SolutionBlack & Veatch
 
Challenges and Opportunities in Implementing an Asset Management Program
Challenges and Opportunities in Implementing an Asset Management Program Challenges and Opportunities in Implementing an Asset Management Program
Challenges and Opportunities in Implementing an Asset Management Program Black & Veatch
 
Derek Schwartz Fed Lessons Learned.Final
Derek Schwartz Fed Lessons Learned.FinalDerek Schwartz Fed Lessons Learned.Final
Derek Schwartz Fed Lessons Learned.Finalwlambert_2001
 
Production Performance Results Internet Sample
Production Performance Results   Internet SampleProduction Performance Results   Internet Sample
Production Performance Results Internet Sampleantonioharenas
 
Curveball Problems for Your Benzene Fenceline Monitoring Program and How to H...
Curveball Problems for Your Benzene Fenceline Monitoring Program and How to H...Curveball Problems for Your Benzene Fenceline Monitoring Program and How to H...
Curveball Problems for Your Benzene Fenceline Monitoring Program and How to H...All4 Inc.
 
The Hazardous Waste Generator Improvements Rule Proposal
The Hazardous Waste Generator Improvements Rule ProposalThe Hazardous Waste Generator Improvements Rule Proposal
The Hazardous Waste Generator Improvements Rule ProposalTriumvirate Environmental
 

Was ist angesagt? (16)

BlueScape and Cooper White - BAAQMD Air Toxics Risk Reduction Rule 11-18 Webi...
BlueScape and Cooper White - BAAQMD Air Toxics Risk Reduction Rule 11-18 Webi...BlueScape and Cooper White - BAAQMD Air Toxics Risk Reduction Rule 11-18 Webi...
BlueScape and Cooper White - BAAQMD Air Toxics Risk Reduction Rule 11-18 Webi...
 
Designing a gas program impact evaluation
Designing a gas program impact evaluationDesigning a gas program impact evaluation
Designing a gas program impact evaluation
 
Adam Ward, Ohio EPA, Air Pollution Control Updates, Midwest Environmental Com...
Adam Ward, Ohio EPA, Air Pollution Control Updates, Midwest Environmental Com...Adam Ward, Ohio EPA, Air Pollution Control Updates, Midwest Environmental Com...
Adam Ward, Ohio EPA, Air Pollution Control Updates, Midwest Environmental Com...
 
AESP_Spring
AESP_SpringAESP_Spring
AESP_Spring
 
Project Management Analysis on Project Manager at Lydall Inc.
Project Management Analysis on Project Manager at Lydall Inc.Project Management Analysis on Project Manager at Lydall Inc.
Project Management Analysis on Project Manager at Lydall Inc.
 
Overview carbonaccountingprotocol v1
Overview carbonaccountingprotocol v1Overview carbonaccountingprotocol v1
Overview carbonaccountingprotocol v1
 
Smart Integrated Infrastructure and Controlling Water Loss
Smart Integrated Infrastructure and Controlling Water LossSmart Integrated Infrastructure and Controlling Water Loss
Smart Integrated Infrastructure and Controlling Water Loss
 
Gerdeman_Lance_Resume 1.7.16
Gerdeman_Lance_Resume 1.7.16Gerdeman_Lance_Resume 1.7.16
Gerdeman_Lance_Resume 1.7.16
 
Mark Wenclawiak All4 GHG PSD Permitting Challenges
Mark Wenclawiak All4 GHG PSD Permitting ChallengesMark Wenclawiak All4 GHG PSD Permitting Challenges
Mark Wenclawiak All4 GHG PSD Permitting Challenges
 
Monetizing Risks - A Prioritization & Optimization Solution
Monetizing Risks - A Prioritization & Optimization SolutionMonetizing Risks - A Prioritization & Optimization Solution
Monetizing Risks - A Prioritization & Optimization Solution
 
Challenges and Opportunities in Implementing an Asset Management Program
Challenges and Opportunities in Implementing an Asset Management Program Challenges and Opportunities in Implementing an Asset Management Program
Challenges and Opportunities in Implementing an Asset Management Program
 
Derek Schwartz Fed Lessons Learned.Final
Derek Schwartz Fed Lessons Learned.FinalDerek Schwartz Fed Lessons Learned.Final
Derek Schwartz Fed Lessons Learned.Final
 
Production Performance Results Internet Sample
Production Performance Results   Internet SampleProduction Performance Results   Internet Sample
Production Performance Results Internet Sample
 
Curveball Problems for Your Benzene Fenceline Monitoring Program and How to H...
Curveball Problems for Your Benzene Fenceline Monitoring Program and How to H...Curveball Problems for Your Benzene Fenceline Monitoring Program and How to H...
Curveball Problems for Your Benzene Fenceline Monitoring Program and How to H...
 
The Hazardous Waste Generator Improvements Rule Proposal
The Hazardous Waste Generator Improvements Rule ProposalThe Hazardous Waste Generator Improvements Rule Proposal
The Hazardous Waste Generator Improvements Rule Proposal
 
Cold-Climate Research Round-Up
Cold-Climate Research Round-UpCold-Climate Research Round-Up
Cold-Climate Research Round-Up
 

Andere mochten auch

Potential PM2.5 and CPM Pitfalls in Permitting, Testing, and Compliance
Potential PM2.5 and CPM Pitfalls in Permitting, Testing, and CompliancePotential PM2.5 and CPM Pitfalls in Permitting, Testing, and Compliance
Potential PM2.5 and CPM Pitfalls in Permitting, Testing, and ComplianceAll4 Inc.
 
The Future of Startup, Shutdown, and Malfunction
The Future of Startup, Shutdown, and Malfunction The Future of Startup, Shutdown, and Malfunction
The Future of Startup, Shutdown, and Malfunction All4 Inc.
 
Marcellus Shale Gas Air Quality Issues
Marcellus Shale Gas Air Quality IssuesMarcellus Shale Gas Air Quality Issues
Marcellus Shale Gas Air Quality IssuesAll4 Inc.
 
Continuing Evolution of New Source Review
Continuing Evolution of New Source ReviewContinuing Evolution of New Source Review
Continuing Evolution of New Source ReviewAll4 Inc.
 
The New Era of NO2 and SO2 National Ambient Air Quality Standards
The New Era of NO2 and SO2 National Ambient Air Quality StandardsThe New Era of NO2 and SO2 National Ambient Air Quality Standards
The New Era of NO2 and SO2 National Ambient Air Quality StandardsAll4 Inc.
 
Fuel Monitoring Requirements and Alternative Monitoring Petition
Fuel Monitoring Requirements and Alternative Monitoring PetitionFuel Monitoring Requirements and Alternative Monitoring Petition
Fuel Monitoring Requirements and Alternative Monitoring PetitionAll4 Inc.
 

Andere mochten auch (7)

Potential PM2.5 and CPM Pitfalls in Permitting, Testing, and Compliance
Potential PM2.5 and CPM Pitfalls in Permitting, Testing, and CompliancePotential PM2.5 and CPM Pitfalls in Permitting, Testing, and Compliance
Potential PM2.5 and CPM Pitfalls in Permitting, Testing, and Compliance
 
The Future of Startup, Shutdown, and Malfunction
The Future of Startup, Shutdown, and Malfunction The Future of Startup, Shutdown, and Malfunction
The Future of Startup, Shutdown, and Malfunction
 
Marcellus Shale Gas Air Quality Issues
Marcellus Shale Gas Air Quality IssuesMarcellus Shale Gas Air Quality Issues
Marcellus Shale Gas Air Quality Issues
 
Continuing Evolution of New Source Review
Continuing Evolution of New Source ReviewContinuing Evolution of New Source Review
Continuing Evolution of New Source Review
 
The New Era of NO2 and SO2 National Ambient Air Quality Standards
The New Era of NO2 and SO2 National Ambient Air Quality StandardsThe New Era of NO2 and SO2 National Ambient Air Quality Standards
The New Era of NO2 and SO2 National Ambient Air Quality Standards
 
Rmb value gap
Rmb value gapRmb value gap
Rmb value gap
 
Fuel Monitoring Requirements and Alternative Monitoring Petition
Fuel Monitoring Requirements and Alternative Monitoring PetitionFuel Monitoring Requirements and Alternative Monitoring Petition
Fuel Monitoring Requirements and Alternative Monitoring Petition
 

Ähnlich wie Strategic Air Planning: Is the Time for a PAL Here?

Implementing New State and Federal Air Regulatory Programs – A Systematic App...
Implementing New State and Federal Air Regulatory Programs – A Systematic App...Implementing New State and Federal Air Regulatory Programs – A Systematic App...
Implementing New State and Federal Air Regulatory Programs – A Systematic App...Trihydro Corporation
 
Introduction to Carbon Capture and Storage
Introduction to Carbon Capture and Storage Introduction to Carbon Capture and Storage
Introduction to Carbon Capture and Storage The Climate Institute
 
Program - American Chemical Manufacturing Summit 2013, Pittsburgh
Program - American Chemical Manufacturing Summit 2013, PittsburghProgram - American Chemical Manufacturing Summit 2013, Pittsburgh
Program - American Chemical Manufacturing Summit 2013, PittsburghMark Blendheim
 
Ska Rating CIBSE-Journal-2014-08
Ska Rating CIBSE-Journal-2014-08Ska Rating CIBSE-Journal-2014-08
Ska Rating CIBSE-Journal-2014-08Dave Cheshire
 
Common problems and recent trends with HAZOPs
Common problems and recent trends with HAZOPsCommon problems and recent trends with HAZOPs
Common problems and recent trends with HAZOPsAlan Munn
 
RE-DELAYS: Documenting and analising the cost of regulatory delays
RE-DELAYS: Documenting and analising the cost of regulatory delaysRE-DELAYS: Documenting and analising the cost of regulatory delays
RE-DELAYS: Documenting and analising the cost of regulatory delaysIEA_RETD
 
Hurley Palmer Flatt - Critical Thinking Issue 12
Hurley Palmer Flatt - Critical Thinking Issue 12Hurley Palmer Flatt - Critical Thinking Issue 12
Hurley Palmer Flatt - Critical Thinking Issue 12Hurley Palmer Flatt
 
Boiler MACT and Strategic Air Permitting
Boiler MACT and Strategic Air PermittingBoiler MACT and Strategic Air Permitting
Boiler MACT and Strategic Air PermittingAll4 Inc.
 
Integrated Delivery of Supply Chain Solutions_5C Contracts_02-Nov-15
Integrated Delivery of Supply Chain Solutions_5C Contracts_02-Nov-15Integrated Delivery of Supply Chain Solutions_5C Contracts_02-Nov-15
Integrated Delivery of Supply Chain Solutions_5C Contracts_02-Nov-15Ian Carr SCMP, MCIPS
 
Project Management Track: Lean Projects, Cost Controls, Price Forecasts, & Re...
Project Management Track: Lean Projects, Cost Controls, Price Forecasts, & Re...Project Management Track: Lean Projects, Cost Controls, Price Forecasts, & Re...
Project Management Track: Lean Projects, Cost Controls, Price Forecasts, & Re...Energy Construction Forum
 
Unlock Your Buildings Hidden Energy Data - Corenet Seattle
Unlock Your Buildings Hidden Energy Data - Corenet SeattleUnlock Your Buildings Hidden Energy Data - Corenet Seattle
Unlock Your Buildings Hidden Energy Data - Corenet SeattleJason Burt
 
The complexities of nsr permitting ddix
The complexities of nsr permitting ddixThe complexities of nsr permitting ddix
The complexities of nsr permitting ddixAll4 Inc.
 
BlueScape GHG Tailoring Rule Webinar 9-9-10
BlueScape GHG Tailoring Rule Webinar  9-9-10BlueScape GHG Tailoring Rule Webinar  9-9-10
BlueScape GHG Tailoring Rule Webinar 9-9-10BlueScape
 
BlueScape Get the Air Permit for Energy Projects Webinar 9-10-13
BlueScape Get the Air Permit for Energy Projects Webinar 9-10-13BlueScape Get the Air Permit for Energy Projects Webinar 9-10-13
BlueScape Get the Air Permit for Energy Projects Webinar 9-10-13BlueScape
 
Case Study - NSR 2010
Case Study - NSR 2010Case Study - NSR 2010
Case Study - NSR 2010All4 Inc.
 
Conflict Mineral Compliance Toolkit For Executives
Conflict Mineral Compliance Toolkit For Executives Conflict Mineral Compliance Toolkit For Executives
Conflict Mineral Compliance Toolkit For Executives Matt Whitteker
 
Climate Check Canarie Workshop March4
Climate Check Canarie Workshop March4Climate Check Canarie Workshop March4
Climate Check Canarie Workshop March4Bill St. Arnaud
 

Ähnlich wie Strategic Air Planning: Is the Time for a PAL Here? (20)

Implementing New State and Federal Air Regulatory Programs – A Systematic App...
Implementing New State and Federal Air Regulatory Programs – A Systematic App...Implementing New State and Federal Air Regulatory Programs – A Systematic App...
Implementing New State and Federal Air Regulatory Programs – A Systematic App...
 
Introduction to Carbon Capture and Storage
Introduction to Carbon Capture and Storage Introduction to Carbon Capture and Storage
Introduction to Carbon Capture and Storage
 
Program - American Chemical Manufacturing Summit 2013, Pittsburgh
Program - American Chemical Manufacturing Summit 2013, PittsburghProgram - American Chemical Manufacturing Summit 2013, Pittsburgh
Program - American Chemical Manufacturing Summit 2013, Pittsburgh
 
Ska Rating CIBSE-Journal-2014-08
Ska Rating CIBSE-Journal-2014-08Ska Rating CIBSE-Journal-2014-08
Ska Rating CIBSE-Journal-2014-08
 
Common problems and recent trends with HAZOPs
Common problems and recent trends with HAZOPsCommon problems and recent trends with HAZOPs
Common problems and recent trends with HAZOPs
 
RE-DELAYS: Documenting and analising the cost of regulatory delays
RE-DELAYS: Documenting and analising the cost of regulatory delaysRE-DELAYS: Documenting and analising the cost of regulatory delays
RE-DELAYS: Documenting and analising the cost of regulatory delays
 
Meec introductory presentation jan 2015 copy
Meec introductory presentation jan 2015 copyMeec introductory presentation jan 2015 copy
Meec introductory presentation jan 2015 copy
 
Hurley Palmer Flatt - Critical Thinking Issue 12
Hurley Palmer Flatt - Critical Thinking Issue 12Hurley Palmer Flatt - Critical Thinking Issue 12
Hurley Palmer Flatt - Critical Thinking Issue 12
 
Boiler MACT and Strategic Air Permitting
Boiler MACT and Strategic Air PermittingBoiler MACT and Strategic Air Permitting
Boiler MACT and Strategic Air Permitting
 
Integrated Delivery of Supply Chain Solutions_5C Contracts_02-Nov-15
Integrated Delivery of Supply Chain Solutions_5C Contracts_02-Nov-15Integrated Delivery of Supply Chain Solutions_5C Contracts_02-Nov-15
Integrated Delivery of Supply Chain Solutions_5C Contracts_02-Nov-15
 
Project Management Track: Lean Projects, Cost Controls, Price Forecasts, & Re...
Project Management Track: Lean Projects, Cost Controls, Price Forecasts, & Re...Project Management Track: Lean Projects, Cost Controls, Price Forecasts, & Re...
Project Management Track: Lean Projects, Cost Controls, Price Forecasts, & Re...
 
Unlock Your Buildings Hidden Energy Data - Corenet Seattle
Unlock Your Buildings Hidden Energy Data - Corenet SeattleUnlock Your Buildings Hidden Energy Data - Corenet Seattle
Unlock Your Buildings Hidden Energy Data - Corenet Seattle
 
The complexities of nsr permitting ddix
The complexities of nsr permitting ddixThe complexities of nsr permitting ddix
The complexities of nsr permitting ddix
 
BlueScape GHG Tailoring Rule Webinar 9-9-10
BlueScape GHG Tailoring Rule Webinar  9-9-10BlueScape GHG Tailoring Rule Webinar  9-9-10
BlueScape GHG Tailoring Rule Webinar 9-9-10
 
BlueScape Get the Air Permit for Energy Projects Webinar 9-10-13
BlueScape Get the Air Permit for Energy Projects Webinar 9-10-13BlueScape Get the Air Permit for Energy Projects Webinar 9-10-13
BlueScape Get the Air Permit for Energy Projects Webinar 9-10-13
 
Case Study - NSR 2010
Case Study - NSR 2010Case Study - NSR 2010
Case Study - NSR 2010
 
Environmental regulation update for the asphalt industry in California
Environmental regulation update for the asphalt industry in CaliforniaEnvironmental regulation update for the asphalt industry in California
Environmental regulation update for the asphalt industry in California
 
Richard clark cv
Richard clark cvRichard clark cv
Richard clark cv
 
Conflict Mineral Compliance Toolkit For Executives
Conflict Mineral Compliance Toolkit For Executives Conflict Mineral Compliance Toolkit For Executives
Conflict Mineral Compliance Toolkit For Executives
 
Climate Check Canarie Workshop March4
Climate Check Canarie Workshop March4Climate Check Canarie Workshop March4
Climate Check Canarie Workshop March4
 

Mehr von All4 Inc.

Impacts of U.S. EPA Region 6 Guidance on CMS Downtime and Data Calculations
Impacts of U.S. EPA Region 6 Guidance on CMS Downtime and Data CalculationsImpacts of U.S. EPA Region 6 Guidance on CMS Downtime and Data Calculations
Impacts of U.S. EPA Region 6 Guidance on CMS Downtime and Data CalculationsAll4 Inc.
 
Implementing a DAHS for Compliance with the Refinery Sector Rule
Implementing a DAHS for Compliance with the Refinery Sector RuleImplementing a DAHS for Compliance with the Refinery Sector Rule
Implementing a DAHS for Compliance with the Refinery Sector RuleAll4 Inc.
 
NSR Reform Updates
NSR Reform Updates NSR Reform Updates
NSR Reform Updates All4 Inc.
 
Tceq recent permitting changes 4 c-2019-f_dougherty (1-31-19)
Tceq recent permitting changes 4 c-2019-f_dougherty (1-31-19)Tceq recent permitting changes 4 c-2019-f_dougherty (1-31-19)
Tceq recent permitting changes 4 c-2019-f_dougherty (1-31-19)All4 Inc.
 
All4 impacts of recent u.s. epa region 6 guidance on cms downtime and data ...
All4   impacts of recent u.s. epa region 6 guidance on cms downtime and data ...All4   impacts of recent u.s. epa region 6 guidance on cms downtime and data ...
All4 impacts of recent u.s. epa region 6 guidance on cms downtime and data ...All4 Inc.
 
D dix awma conference air toxics evaluation requirements 062718
D dix awma conference air toxics evaluation requirements 062718D dix awma conference air toxics evaluation requirements 062718
D dix awma conference air toxics evaluation requirements 062718All4 Inc.
 
All4 inc awma re-entrainment
All4 inc awma re-entrainmentAll4 inc awma re-entrainment
All4 inc awma re-entrainmentAll4 Inc.
 
All4 tcc acit pres ipt guidance 2017
All4 tcc acit pres ipt guidance 2017All4 tcc acit pres ipt guidance 2017
All4 tcc acit pres ipt guidance 2017All4 Inc.
 
Air Quality Compliance Training 12-8-16
Air Quality Compliance Training 12-8-16Air Quality Compliance Training 12-8-16
Air Quality Compliance Training 12-8-16All4 Inc.
 
CEDRI-NextGen
CEDRI-NextGenCEDRI-NextGen
CEDRI-NextGenAll4 Inc.
 
understanding the validity and increased scrutiny of data used for compliance...
understanding the validity and increased scrutiny of data used for compliance...understanding the validity and increased scrutiny of data used for compliance...
understanding the validity and increased scrutiny of data used for compliance...All4 Inc.
 
CUHMMC Presentation
CUHMMC PresentationCUHMMC Presentation
CUHMMC PresentationAll4 Inc.
 
Preview of ALL4 Air Quality Compliance - PIOGATech
Preview of ALL4 Air Quality Compliance - PIOGATechPreview of ALL4 Air Quality Compliance - PIOGATech
Preview of ALL4 Air Quality Compliance - PIOGATechAll4 Inc.
 
Top 5 Environmental Compliance Issues for Engineers and Managers
Top 5 Environmental Compliance Issues for Engineers and ManagersTop 5 Environmental Compliance Issues for Engineers and Managers
Top 5 Environmental Compliance Issues for Engineers and ManagersAll4 Inc.
 
SO2 Data Requirements Rule Modeling Strategies
SO2 Data Requirements Rule Modeling StrategiesSO2 Data Requirements Rule Modeling Strategies
SO2 Data Requirements Rule Modeling StrategiesAll4 Inc.
 
The complexities of new source review air permitting – a case study ddix 020116
The complexities of new source review air permitting – a case study ddix 020116The complexities of new source review air permitting – a case study ddix 020116
The complexities of new source review air permitting – a case study ddix 020116All4 Inc.
 
The Good vs. Bad: The Specifics for Validating CMS Data
The Good vs. Bad: The Specifics for Validating CMS DataThe Good vs. Bad: The Specifics for Validating CMS Data
The Good vs. Bad: The Specifics for Validating CMS DataAll4 Inc.
 
Benzene Fenceline Monitoring: An Introduction and What the Regulations Don’...
Benzene Fenceline Monitoring:  An Introduction and What the Regulations Don’...Benzene Fenceline Monitoring:  An Introduction and What the Regulations Don’...
Benzene Fenceline Monitoring: An Introduction and What the Regulations Don’...All4 Inc.
 
The Petroleum Refinery Sector Rule: What’s all the fuss about and what are th...
The Petroleum Refinery Sector Rule: What’s all the fuss about and what are th...The Petroleum Refinery Sector Rule: What’s all the fuss about and what are th...
The Petroleum Refinery Sector Rule: What’s all the fuss about and what are th...All4 Inc.
 
US EPA's Electronic Reporting Tool and Compliance and Emissions Data Reportin...
US EPA's Electronic Reporting Tool and Compliance and Emissions Data Reportin...US EPA's Electronic Reporting Tool and Compliance and Emissions Data Reportin...
US EPA's Electronic Reporting Tool and Compliance and Emissions Data Reportin...All4 Inc.
 

Mehr von All4 Inc. (20)

Impacts of U.S. EPA Region 6 Guidance on CMS Downtime and Data Calculations
Impacts of U.S. EPA Region 6 Guidance on CMS Downtime and Data CalculationsImpacts of U.S. EPA Region 6 Guidance on CMS Downtime and Data Calculations
Impacts of U.S. EPA Region 6 Guidance on CMS Downtime and Data Calculations
 
Implementing a DAHS for Compliance with the Refinery Sector Rule
Implementing a DAHS for Compliance with the Refinery Sector RuleImplementing a DAHS for Compliance with the Refinery Sector Rule
Implementing a DAHS for Compliance with the Refinery Sector Rule
 
NSR Reform Updates
NSR Reform Updates NSR Reform Updates
NSR Reform Updates
 
Tceq recent permitting changes 4 c-2019-f_dougherty (1-31-19)
Tceq recent permitting changes 4 c-2019-f_dougherty (1-31-19)Tceq recent permitting changes 4 c-2019-f_dougherty (1-31-19)
Tceq recent permitting changes 4 c-2019-f_dougherty (1-31-19)
 
All4 impacts of recent u.s. epa region 6 guidance on cms downtime and data ...
All4   impacts of recent u.s. epa region 6 guidance on cms downtime and data ...All4   impacts of recent u.s. epa region 6 guidance on cms downtime and data ...
All4 impacts of recent u.s. epa region 6 guidance on cms downtime and data ...
 
D dix awma conference air toxics evaluation requirements 062718
D dix awma conference air toxics evaluation requirements 062718D dix awma conference air toxics evaluation requirements 062718
D dix awma conference air toxics evaluation requirements 062718
 
All4 inc awma re-entrainment
All4 inc awma re-entrainmentAll4 inc awma re-entrainment
All4 inc awma re-entrainment
 
All4 tcc acit pres ipt guidance 2017
All4 tcc acit pres ipt guidance 2017All4 tcc acit pres ipt guidance 2017
All4 tcc acit pres ipt guidance 2017
 
Air Quality Compliance Training 12-8-16
Air Quality Compliance Training 12-8-16Air Quality Compliance Training 12-8-16
Air Quality Compliance Training 12-8-16
 
CEDRI-NextGen
CEDRI-NextGenCEDRI-NextGen
CEDRI-NextGen
 
understanding the validity and increased scrutiny of data used for compliance...
understanding the validity and increased scrutiny of data used for compliance...understanding the validity and increased scrutiny of data used for compliance...
understanding the validity and increased scrutiny of data used for compliance...
 
CUHMMC Presentation
CUHMMC PresentationCUHMMC Presentation
CUHMMC Presentation
 
Preview of ALL4 Air Quality Compliance - PIOGATech
Preview of ALL4 Air Quality Compliance - PIOGATechPreview of ALL4 Air Quality Compliance - PIOGATech
Preview of ALL4 Air Quality Compliance - PIOGATech
 
Top 5 Environmental Compliance Issues for Engineers and Managers
Top 5 Environmental Compliance Issues for Engineers and ManagersTop 5 Environmental Compliance Issues for Engineers and Managers
Top 5 Environmental Compliance Issues for Engineers and Managers
 
SO2 Data Requirements Rule Modeling Strategies
SO2 Data Requirements Rule Modeling StrategiesSO2 Data Requirements Rule Modeling Strategies
SO2 Data Requirements Rule Modeling Strategies
 
The complexities of new source review air permitting – a case study ddix 020116
The complexities of new source review air permitting – a case study ddix 020116The complexities of new source review air permitting – a case study ddix 020116
The complexities of new source review air permitting – a case study ddix 020116
 
The Good vs. Bad: The Specifics for Validating CMS Data
The Good vs. Bad: The Specifics for Validating CMS DataThe Good vs. Bad: The Specifics for Validating CMS Data
The Good vs. Bad: The Specifics for Validating CMS Data
 
Benzene Fenceline Monitoring: An Introduction and What the Regulations Don’...
Benzene Fenceline Monitoring:  An Introduction and What the Regulations Don’...Benzene Fenceline Monitoring:  An Introduction and What the Regulations Don’...
Benzene Fenceline Monitoring: An Introduction and What the Regulations Don’...
 
The Petroleum Refinery Sector Rule: What’s all the fuss about and what are th...
The Petroleum Refinery Sector Rule: What’s all the fuss about and what are th...The Petroleum Refinery Sector Rule: What’s all the fuss about and what are th...
The Petroleum Refinery Sector Rule: What’s all the fuss about and what are th...
 
US EPA's Electronic Reporting Tool and Compliance and Emissions Data Reportin...
US EPA's Electronic Reporting Tool and Compliance and Emissions Data Reportin...US EPA's Electronic Reporting Tool and Compliance and Emissions Data Reportin...
US EPA's Electronic Reporting Tool and Compliance and Emissions Data Reportin...
 

Kürzlich hochgeladen

20200723_insight_release_plan_v6.pdf20200723_insight_release_plan_v6.pdf
20200723_insight_release_plan_v6.pdf20200723_insight_release_plan_v6.pdf20200723_insight_release_plan_v6.pdf20200723_insight_release_plan_v6.pdf
20200723_insight_release_plan_v6.pdf20200723_insight_release_plan_v6.pdfJamie (Taka) Wang
 
Salesforce Miami User Group Event - 1st Quarter 2024
Salesforce Miami User Group Event - 1st Quarter 2024Salesforce Miami User Group Event - 1st Quarter 2024
Salesforce Miami User Group Event - 1st Quarter 2024SkyPlanner
 
GenAI and AI GCC State of AI_Object Automation Inc
GenAI and AI GCC State of AI_Object Automation IncGenAI and AI GCC State of AI_Object Automation Inc
GenAI and AI GCC State of AI_Object Automation IncObject Automation
 
Cybersecurity Workshop #1.pptx
Cybersecurity Workshop #1.pptxCybersecurity Workshop #1.pptx
Cybersecurity Workshop #1.pptxGDSC PJATK
 
UiPath Platform: The Backend Engine Powering Your Automation - Session 1
UiPath Platform: The Backend Engine Powering Your Automation - Session 1UiPath Platform: The Backend Engine Powering Your Automation - Session 1
UiPath Platform: The Backend Engine Powering Your Automation - Session 1DianaGray10
 
Linked Data in Production: Moving Beyond Ontologies
Linked Data in Production: Moving Beyond OntologiesLinked Data in Production: Moving Beyond Ontologies
Linked Data in Production: Moving Beyond OntologiesDavid Newbury
 
The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...
The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...
The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...Aggregage
 
PicPay - GenAI Finance Assistant - ChatGPT for Customer Service
PicPay - GenAI Finance Assistant - ChatGPT for Customer ServicePicPay - GenAI Finance Assistant - ChatGPT for Customer Service
PicPay - GenAI Finance Assistant - ChatGPT for Customer ServiceRenan Moreira de Oliveira
 
Do we need a new standard for visualizing the invisible?
Do we need a new standard for visualizing the invisible?Do we need a new standard for visualizing the invisible?
Do we need a new standard for visualizing the invisible?SANGHEE SHIN
 
Crea il tuo assistente AI con lo Stregatto (open source python framework)
Crea il tuo assistente AI con lo Stregatto (open source python framework)Crea il tuo assistente AI con lo Stregatto (open source python framework)
Crea il tuo assistente AI con lo Stregatto (open source python framework)Commit University
 
Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...
Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...
Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...Will Schroeder
 
Videogame localization & technology_ how to enhance the power of translation.pdf
Videogame localization & technology_ how to enhance the power of translation.pdfVideogame localization & technology_ how to enhance the power of translation.pdf
Videogame localization & technology_ how to enhance the power of translation.pdfinfogdgmi
 
Cloud Revolution: Exploring the New Wave of Serverless Spatial Data
Cloud Revolution: Exploring the New Wave of Serverless Spatial DataCloud Revolution: Exploring the New Wave of Serverless Spatial Data
Cloud Revolution: Exploring the New Wave of Serverless Spatial DataSafe Software
 
NIST Cybersecurity Framework (CSF) 2.0 Workshop
NIST Cybersecurity Framework (CSF) 2.0 WorkshopNIST Cybersecurity Framework (CSF) 2.0 Workshop
NIST Cybersecurity Framework (CSF) 2.0 WorkshopBachir Benyammi
 
Things you didn't know you can use in your Salesforce
Things you didn't know you can use in your SalesforceThings you didn't know you can use in your Salesforce
Things you didn't know you can use in your SalesforceMartin Humpolec
 
Spring24-Release Overview - Wellingtion User Group-1.pdf
Spring24-Release Overview - Wellingtion User Group-1.pdfSpring24-Release Overview - Wellingtion User Group-1.pdf
Spring24-Release Overview - Wellingtion User Group-1.pdfAnna Loughnan Colquhoun
 
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyesHow to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyesThousandEyes
 
UiPath Studio Web workshop series - Day 7
UiPath Studio Web workshop series - Day 7UiPath Studio Web workshop series - Day 7
UiPath Studio Web workshop series - Day 7DianaGray10
 
UiPath Community: AI for UiPath Automation Developers
UiPath Community: AI for UiPath Automation DevelopersUiPath Community: AI for UiPath Automation Developers
UiPath Community: AI for UiPath Automation DevelopersUiPathCommunity
 
Anypoint Code Builder , Google Pub sub connector and MuleSoft RPA
Anypoint Code Builder , Google Pub sub connector and MuleSoft RPAAnypoint Code Builder , Google Pub sub connector and MuleSoft RPA
Anypoint Code Builder , Google Pub sub connector and MuleSoft RPAshyamraj55
 

Kürzlich hochgeladen (20)

20200723_insight_release_plan_v6.pdf20200723_insight_release_plan_v6.pdf
20200723_insight_release_plan_v6.pdf20200723_insight_release_plan_v6.pdf20200723_insight_release_plan_v6.pdf20200723_insight_release_plan_v6.pdf
20200723_insight_release_plan_v6.pdf20200723_insight_release_plan_v6.pdf
 
Salesforce Miami User Group Event - 1st Quarter 2024
Salesforce Miami User Group Event - 1st Quarter 2024Salesforce Miami User Group Event - 1st Quarter 2024
Salesforce Miami User Group Event - 1st Quarter 2024
 
GenAI and AI GCC State of AI_Object Automation Inc
GenAI and AI GCC State of AI_Object Automation IncGenAI and AI GCC State of AI_Object Automation Inc
GenAI and AI GCC State of AI_Object Automation Inc
 
Cybersecurity Workshop #1.pptx
Cybersecurity Workshop #1.pptxCybersecurity Workshop #1.pptx
Cybersecurity Workshop #1.pptx
 
UiPath Platform: The Backend Engine Powering Your Automation - Session 1
UiPath Platform: The Backend Engine Powering Your Automation - Session 1UiPath Platform: The Backend Engine Powering Your Automation - Session 1
UiPath Platform: The Backend Engine Powering Your Automation - Session 1
 
Linked Data in Production: Moving Beyond Ontologies
Linked Data in Production: Moving Beyond OntologiesLinked Data in Production: Moving Beyond Ontologies
Linked Data in Production: Moving Beyond Ontologies
 
The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...
The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...
The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...
 
PicPay - GenAI Finance Assistant - ChatGPT for Customer Service
PicPay - GenAI Finance Assistant - ChatGPT for Customer ServicePicPay - GenAI Finance Assistant - ChatGPT for Customer Service
PicPay - GenAI Finance Assistant - ChatGPT for Customer Service
 
Do we need a new standard for visualizing the invisible?
Do we need a new standard for visualizing the invisible?Do we need a new standard for visualizing the invisible?
Do we need a new standard for visualizing the invisible?
 
Crea il tuo assistente AI con lo Stregatto (open source python framework)
Crea il tuo assistente AI con lo Stregatto (open source python framework)Crea il tuo assistente AI con lo Stregatto (open source python framework)
Crea il tuo assistente AI con lo Stregatto (open source python framework)
 
Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...
Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...
Apres-Cyber - The Data Dilemma: Bridging Offensive Operations and Machine Lea...
 
Videogame localization & technology_ how to enhance the power of translation.pdf
Videogame localization & technology_ how to enhance the power of translation.pdfVideogame localization & technology_ how to enhance the power of translation.pdf
Videogame localization & technology_ how to enhance the power of translation.pdf
 
Cloud Revolution: Exploring the New Wave of Serverless Spatial Data
Cloud Revolution: Exploring the New Wave of Serverless Spatial DataCloud Revolution: Exploring the New Wave of Serverless Spatial Data
Cloud Revolution: Exploring the New Wave of Serverless Spatial Data
 
NIST Cybersecurity Framework (CSF) 2.0 Workshop
NIST Cybersecurity Framework (CSF) 2.0 WorkshopNIST Cybersecurity Framework (CSF) 2.0 Workshop
NIST Cybersecurity Framework (CSF) 2.0 Workshop
 
Things you didn't know you can use in your Salesforce
Things you didn't know you can use in your SalesforceThings you didn't know you can use in your Salesforce
Things you didn't know you can use in your Salesforce
 
Spring24-Release Overview - Wellingtion User Group-1.pdf
Spring24-Release Overview - Wellingtion User Group-1.pdfSpring24-Release Overview - Wellingtion User Group-1.pdf
Spring24-Release Overview - Wellingtion User Group-1.pdf
 
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyesHow to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
 
UiPath Studio Web workshop series - Day 7
UiPath Studio Web workshop series - Day 7UiPath Studio Web workshop series - Day 7
UiPath Studio Web workshop series - Day 7
 
UiPath Community: AI for UiPath Automation Developers
UiPath Community: AI for UiPath Automation DevelopersUiPath Community: AI for UiPath Automation Developers
UiPath Community: AI for UiPath Automation Developers
 
Anypoint Code Builder , Google Pub sub connector and MuleSoft RPA
Anypoint Code Builder , Google Pub sub connector and MuleSoft RPAAnypoint Code Builder , Google Pub sub connector and MuleSoft RPA
Anypoint Code Builder , Google Pub sub connector and MuleSoft RPA
 

Strategic Air Planning: Is the Time for a PAL Here?

  • 1. Strategic Air Planning: Is the Time for a PAL Here? Presented to Georgia AWMA by All4 Inc. Mark Wenclawiak, CCM| mwenclawiak@all4inc.com | (678) 460-0324 October 24, 2013 www.all4inc.com Kimberton, PA | 610.933.5246 Kennesaw, GA | 678.460.0324
  • 2. Agenda  Air permitting to support growth • Plantwide Applicability Limit (PAL) permitting • Not new concept but time for a kick start?      2 Mounting air pressures Facility needs and expectations Major New Source Review (NSR) struggles Importance of strategic planning What is a PAL, how it can be smart strategic decision Your environmental compliance is clearly our business.
  • 3. Air Pressure     National Ambient Air Quality Standard (NAAQS) NSR Greenhouse Gas (GHG) Regulation National Emission Standards for Hazardous Air Pollutants (NESHAPs) • Boiler MACT  Project happening again • Significant capital expenditures and complicated permitting efforts • Balancing these pressures with economic recovery and growth 3 Your environmental compliance is clearly our business.
  • 4. Air Pressure (continued)   In years past, actual emission increases predicted and realized from projects Common theme of this new day and age has emerged: For most facilities, future emissions will decrease from historic actual levels as a result of new and developing air regulations and standards, regardless of growth in productivity.  4 Preserve those historically high emissions! Your environmental compliance is clearly our business.
  • 5. Facility Needs   Ability to change operations quickly & as needed Long range targets for planning: • Internal - production/energy/economics (more production at lower costs) • External – new rules driving up costs to comply • You – caught in the middle  Energy study – modify process line to generate steam savings and increase in production • Emissions from boiler decrease – good thing • But…still need that PSD applicability analysis 5 Your environmental compliance is clearly our business.
  • 6. Future Planning  Strategic planning for the future must consider implications of both new air rule applicability and air permitting implications: • • • •  6 Lots of rules/lots of issues/lots of confusion New rules likely require facility changes No exemption for pollution control projects Permitting issues can impact project design Do you install scrubber to control HCl for MACT? • Co-benefit: SO2 will decrease as well – how does that impact your NAAQS compliance • Scrubber project many now be desirable Your environmental compliance is clearly our business.
  • 7. Future Planning (continued)   Air issues must be integrated into facility operations planning Result will be same old push/pull for projects whether needed or required: • PSD applicability analysis • Potential impacts to project design, cost, schedule • Confusion and frustration   7 System for evaluating projects must be established and adhered to Compliance with NAAQS is critical Your environmental compliance is clearly our business.
  • 8. PAL Option    “Plantwide Applicability Limitation” (PAL) is an available regulatory option that can potentially ease the PSD permitting cycle Federal PSD rule provides for PALs based on historic actual emissions PALs are pollutant specific and could be a critical part of a facility strategic plan…Why???? • Preserve that baseline! 8 Your environmental compliance is clearly our business.
  • 9. PAL Advantages   9 For a facility with a PAL permit that maintains emissions below PAL, physical changes and changes in method of operation are not major modifications and do not require approval under PSD Decisions regarding process and air pollution control technology now remain with the source, not the agency (e.g., BACT) Your environmental compliance is clearly our business.
  • 10. Why a PAL Now?    10 PALs historically worked for relatively simple industries with limited sources and where technology was driving emissions lower per unit of production New air quality world we are in is forcing facilities to realization that future emissions will be lower per unit of production driven by rules, standards, permitting, technology, etc. Emerging in complex plants like cement, pulp and paper Your environmental compliance is clearly our business.
  • 11. Why a PAL Now? (continued)   Air permitting complicated enough Largely avoided up until now • Must be able to track and report emissions against PAL • Historically facilities saw too many sources and not enough data to justify a PAL   11 However, data and tools now available for demonstrating compliance due to other rule activities So how do you establish a PAL? Your environmental compliance is clearly our business.
  • 12. Establishing A PAL    One or more pollutants (including GHGs) Based on 12-month rolling total (tons/yr) Same baseline actual emissions used in PSD applicability assessment: • 24-month consecutive period during the prior 10 years of operation • Add PSD/NNSR significance threshold 12 Your environmental compliance is clearly our business.
  • 13. PAL Concerns – Big Picture     13 PAL established for 10 year period PAL can be adjusted down to account for new applicable requirements, NAAQS compliance concerns Getting out of a PAL can have serious ramifications (e.g., BACT) State/local air construction permits may still be required Your environmental compliance is clearly our business.
  • 14. PAL Concerns – Specifics  Effort associated with developing PAL application • Ahead of the game more than you think  Developing methods to demonstrate compliance • Also likely in place  NAAQS are a driver – know where you stand • Modifications under a PAL will not trigger modeling  But NSR reform rules appear to be working • Could have accommodated • Even non-applicability evaluations not simple  14 SIP permits, NSPS, NESHAPs, RACT, etc. still apply Your environmental compliance is clearly our business.
  • 15. PAL Planning Approach   Develop historic facility-wide baseline emission rates and potential PAL levels Major planning sessions • Consider new rules, facility operations plans, potential energy efficiency improvements, new technologies, low hanging fruit for emissions reductions   Address potential NAAQS issues Weigh value of PAL for each pollutant • PM and VOC from coating operations 15 Your environmental compliance is clearly our business.
  • 16. Parting Thoughts      16 Allows you to implement projects quickly For typical facility projects, PSD is no longer a consideration under a PAL Economic and competitive advantage over competitors For planning facility now has a clear bright line it can manage operations to (12-month emissions) Future second guessing by agency of PSD applicability decisions and potential enforcement issues off the table Your environmental compliance is clearly our business.
  • 17. Questions? Mark Wenclawiak, CCM| mwenclawiak@all4inc.com | (678) 460-0324 www.all4inc.com Kimberton, PA | 610.933.5246 Kennesaw, GA | 678.460.0324

Hinweis der Redaktion

  1. Good morning and thanks again for the introduction. In keeping with the theme of the conference, I wanted to discuss how air quality permitting can be used to support growth for Georgia industries. Today’s presentation will discuss a topic call Plantwide applicability limits (or PALs), which are certainly not new to those of us that are involved with air permitting, but it is a topic that I feel needs to be re-introduced into the thoughts of industry and environmental professionals as a distinct strategy to achieve a facility’s needs and expectations for growth. We’ll review the pressures that are impacting industry and then briefly discuss what a PAL is but more importantly, how a PAL can be a smart strategic decision for a facility.
  2. On this slide is just some of the regulations impacting industry today. These regulations are often requiring significant capital expenditures and complicated permitting efforts to obatin authorization for projects. As the recovery from the recession continues, we are seeing industry revamp and overhaul their growth plans. Significant projects are happening again and the regulatory climate for these projects continues to evolve. Therefore, we must strike a balance between these regulatory pressures and growth.
  3. We are seeing a common theme with all these pressures and that is that actualemissions are decreasing and will continue to do so, even as we see gains in production.Traditionally this was not case. Historically in attainment areas actual emissions increases were typically predicted for most projects. Even in non-attainment areas a facility could project an emissions increase so long as offsets were obtained. However, it now appears that the days of multiple ton increases are likely behind us and the new goal looks to be protecting/preserving as much baseline as possible. This is a key observation regarding PALs that we will touch on again later.
  4. Let’s face it, we all know that facilities need to make changes all the time.There are internal folks charged with figuring out ways to increase productivity and decrease costs and there are external folks charged with developing and implementing new rules, and the majority of the people in this room are right in the middle between them - which can be an extremely difficult position.Take a typical seemingly simple example – a facility completes an energy study and determines that modifications to a process line will result in substantial steam savings and also allow for a modest increase in production. The steam savings will directly reduce boiler emissions and the project is a real win for the facility and the environment. But guess what, those physical changes to the process line require a PSD applicability analysis and that seemingly simple task can give all of you that have to deal with it a lot of heartburn. And remember – this is a relatively simple example of a clean project. This points to another key concept about PALs and how they relate to air permitting for projects (particularly with respect to PSD) that we will explore later.
  5. Know that people are looking hard at compliance options for future rules fuels like boiler MACT & CISWI, also questioning fuels – is it a fuel or is it waste. In planning you can’t forget the permitting – there is no out just because you are only adding APCE. Doesn’t matter if it is MACT, RACT, BART, NAAQS driven – there is no out from air permitting.The other point here is that you also need to consider other requirements in planning process – like NAAQS compliance. E.g., MACT scrubber for HCl will reduce SO2, consider new stacks w/projects to address NAAQS…
  6. I know that this has improved over time but you can’t be the last to learn about a project.Opportunities in planning exist – most bang for buck e.g. new stack with new scrubberAlways been a disconnect and is now more critical than ever. PSD process not getting easier – getting worse
  7. A “Plantwide Applicability Limitation” (PAL) is an available regulatory option that can potentially ease air the PSD permitting cycle. The federal rules provide for pals based on historical actual emissions. PALs are pollutant specific and could be a critical part of a facility strategic plan…Why???? Recall an earlier slide when we discuss how actual emissions at facilities are trending downward. The use of a PAL allows a facility to preserve that higher baseline emissions. So what so is important about that?
  8. For facilities with a PAL, by maintaining emissions below the limit, physical changes and changes in the method of operation (i.e., those that could otherwise be subject to PSD permitting) do not require approval under PSD! What a concept. Plus, decisions regarding process and air pollution control technology now remain with the source, not the agency, as is the case with BACT determinations
  9. PALs historically worked for relatively simple industries with limited sources and where technology was driving emissions lower per unit of production (automotive, glass manufacturing)New air quality world we are in is forcing facilities to realization that future emissions will be lower per unit of production driven by rules, standards, permitting, technology…Now have more complex facilities like cement plants and pulp and paper mills seeking PALs
  10. Our take is that facilities have always had enough trouble with the complications of air permitting that they have avoided investigating the benefits of PALs. Because PALs require detailed tracking and reporting of emissions, facilities were concerned with the effort associated with developing a PAL application. Now, consider the emissions related work that has likely already been completed over the past years through minor permits, enhanced inventories for reporting purposes and the completion of information requests for regulatory support. By now there should not be emission units at most major facilities that are not identified in a spreadsheet with appropriate emission factors. Therefore, tracking and calculating emissions for PAL purposes should just be a matter of linking production data to the appropriate spreadsheet cells. So how do you establish a PAL?
  11. PALs can be established for one or more pollutant. Each PAL is based on a 12-month rolling total expressed in tons per year and compliance must be demonstrated monthly during the permit term.Each limit is generally established based on the average annual (baseline) emission rate for a 24-month consecutive period during the prior 10 years of facility operation. Different baselines can be established for different pollutants. The PSD or nonattainment new source review threshold is then added to the baseline actual emission rate to set the PAL level.
  12. Some big picture concerns are highlighted on this slide.The PAL is in place for 10 years and at renewal can be adjusted (and likely it will be adjusted downward). The PAL can be reopened during its term and the limit can be adjusted accordingly – for example for new applicable requirements or to address issues like NAAQS compliance. NAAQS is becoming a driver because as more stringent standards get established, the PSD permitting process unravels at the modeling step – now that means your project may not be able to go at all!PAL termination requirements are included in the regulation. However, if you get out of a PAL, existing federally applicable requirements such as BACT continue to apply.
  13. As we touched on earlier, some of the initial drawbacks regarding PALs were related to the efforts associated with developing the application. Again, with the efforts required lately to prepare detailed emissions inventories due to various regulations, the hard work should be done already. Likewise for the methods to demonstrate compliance. As we move forward with policy, it is clear that NAAQS compliance is one of the top priorities for facilities and that is not alleviated with NAAQS. However, to reiterate a point earlier, the benefit of a PAL is that the changes are not considered modifications that required PSD modeling – therefore, if you have done your diligence regarding your naaqs compliance prior to entering into the PAL, you can feel confident that your bases are covered. Also, the PSD reform rules are working, particularly with the could have accommodated provisions that have help reduce the projected emissions increase in the accounting process. More projects are able to not trigger PSD; however, even the work to demonstrate nonapplicability of PSD for a given project is rarely simple. Finally, the PAL permit process does not relieve a facility of complying with requirements such as construction permitting, NSPS, NESHAPs, etc.
  14. To summarize the planning steps, It begins with the baseline emissions inventory and identifying the potential PAL levels. Then it becomes an all hands on deck planning session with management, engineering, corporate, and other decision makers to evaluate what the next 10 years for the facility will be from a production basis as well as the types of project that will be implementsNow is the time to address potential NAAQS issues – whether you go for the PAL or not, knowing where you stand with respect to NAAQS will reap many benefits.If you are considering more than 1 pollutant, consider the findings of your planning session and evaluate if a pal for a given pollutant will be too limiting. Will the types of projects under consideration impact one pollutant more heavily (e.g., coating operations may impact VOC emissions more than PM).
  15. The PAL allows a facility to implement projects more quickly and efficiently by avoiding the PSD process. This streamlined process may result in a competitive advantage over your competitors.The pal process establishes a bright line that facilities can manage toward rather than managing toward mystical PSD emission thresholds, significant impact levels, increments, BACT and all those PSD related elements that make people cringe.Lastly, it eliminates the liability associated with a mistake in a PSD applicability evaluation that could have dire consequences for a facility.