Transboundary flood risk management
The Rhine basin




Nijmegen
20 september 2012
Aline te Linde
Titel




CV Aline te Linde
1995 – 2001                  Earth Sciences, VU University Amsterdam
                             MSc hydrology
2002 – 2007                  WL | Delft Hydraulics
                             Integrated Water Management
2008 – 2012                  Deltares
                             Unit Scenarios and Policy Analysis
2006 – present Institute for Environmental Studies, VU A’dam
                             PhD - 2011
2012 – present Twynstra Gudde Consultants and Managers
                             Advisory group Water
© Twynstra Gudde | Deltares 20-9-2012                                  2
Titel




                                        http://www.ubvu.vu.nl




© Twynstra Gudde | Deltares 20-9-2012                           3
Titel




© Twynstra Gudde | Deltares 20-9-2012   4
Titel




© Twynstra Gudde | Deltares 20-9-2012   5
Titel




© Twynstra Gudde | Deltares 20-9-2012   6
Titel




© Twynstra Gudde | Deltares 20-9-2012   7
Titel




River manager has four questions
1. How often does this happen?
2. What is the expected damage?
3. Does this change in the future?
4. Which measures can I take?


Flood risk = probabiliy x damage


Scenarios
–       Climate change
–       Socio-economic / land use
© Twynstra Gudde | Deltares 20-9-2012   8
Titel




Titel
Text




               Rhine                             River basin
    length: 1320 km                      surface area: 185.000 km2
  shipping > 200 t/year                           7 countries
                                            58 million inhabitants
                                        11 million in flood prone areas
© Twynstra Gudde | Deltares 20-9-2012                                9
Titel




Design discharge Lobith




© Twynstra Gudde | Deltares 20-9-2012                       10
                                        19 september 2012
Titel




Land use                                Water depth   Potential damage


Text




© Twynstra Gudde | Deltares 20-9-2012                                11
Titel




Titel
Text




                                        Risk = probability x damage
© Twynstra Gudde | Deltares 20-9-2012                                 12
Titel




Titel
Text




                                        Risk = probability x damage
© Twynstra Gudde | Deltares 20-9-2012                                 13
Titel




Titel
Text
                                        Increase flood risk entire
                                              River basin:

                                           54 – 230% in 2030

                                           (reference = 2000)




© Twynstra Gudde | Deltares 20-9-2012                           14
Titel




Transboundary floods




© Twynstra Gudde | Deltares 20-9-2012   15
Titel




1926




 © Twynstra Gudde | Deltares 20-9-2012   16
Titel




Transboundary low flows




NL = most downstream country
Alpine water towers
Low flows: ~90 % of Rhine discharge from the Alps

© Twynstra Gudde | Deltares 20-9-2012               17
Titel




Transboundary policy
EU legislation for all countries
– EU Water Framework Directive (2000)
        commits European Union member states to achieve good qualitative and
        quantitative status of all water bodies by 2015

– EU Floods Directive (2007)
        “Member States shall furthermore coordinate their flood risk management practices
        in shared river basins, […] and shall in solidarity not undertake measures that
        would increase the flood risk in neighbouring countries.”



Transboundary cooperation obviously relevant for downstream
   countries , however

© Twynstra Gudde | Deltares 20-9-2012                                                  18
Titel




The Dutch Delta Programme
“The object of the new-style Delta Plan (the Delta Works of the future)
   is to protect our country against high water and keep our
   freshwater supply up to standard, now and in the future.”


http://www.deltacommissaris.nl/english/


Quite revolutionary:
–       Integrated plan (combine functions and scales)
–       Act now, and not after a next flooding disaster
–       Long-term planning



© Twynstra Gudde | Deltares 20-9-2012                                19
Titel




Delta Programme
– 3 Generic Programmes
     •     Safety
     •     Fresh water
     •     New urban developments and
           restructuring
– 6 Area-based sub-programmes


– Delta Commissioner and small
  staff
– 5 Delta Decisions in 2015
– Delta Law
– Delta Fund
– 2050 en 2100

         © Twynstra Gudde | Deltares 20-9-2012   20
Titel




Scope is national
– Models of Rhine, Meuse and smaller rivers start at the Dutch
  border
          –    Water safety
          –    Low flow / drought analysis

– Possibility of cross-boundary flooding not taken into account


Except:
– Climate scenarios projections for future discharge regime
        (Rhine and Meuse models do include whole basin)

– Some interest now in upstream water use Rhine basin


© Twynstra Gudde | Deltares 20-9-2012                         21
Titel




Final remarks
River management DP rather conservative approach, not
   transboundary
Very strong believe in exact design discharge at the border,
   while in fact this is very uncertain:
         1.     High safety norm – extreme value statistics
         2.     Impact of climate change – scenarios / bandwidth
         3.     Potential of cross-boundary flooding



Why a national scope of the Delta Programme and Delta law?
Does this result in optimal measures?
How does this link to transboundary European legislation?
© Twynstra Gudde | Deltares 20-9-2012                              22
Titel




Aline te Linde
aln@tg.nl


www.twynstragudde.nl
www.deltares.nl
www.ivm.vu.nl




© Twynstra Gudde | Deltares 20-9-2012   23

Weitere ähnliche Inhalte

Andere mochten auch

Balancing science and policy while developing Delta Scenarios for the Netherl...
Balancing science and policy while developing Delta Scenarios for the Netherl...Balancing science and policy while developing Delta Scenarios for the Netherl...
Balancing science and policy while developing Delta Scenarios for the Netherl...Aline te Linde
 
20100922 Te Linde Future Flood Risk 2
20100922 Te Linde Future Flood Risk 220100922 Te Linde Future Flood Risk 2
20100922 Te Linde Future Flood Risk 2Aline te Linde
 
Simulating flood-peak probability in the Rhine basin and the effect of climat...
Simulating flood-peak probability in the Rhine basin and the effect of climat...Simulating flood-peak probability in the Rhine basin and the effect of climat...
Simulating flood-peak probability in the Rhine basin and the effect of climat...Aline te Linde
 
Hydrologische consequenties van klimaatverandering
Hydrologische consequenties van klimaatveranderingHydrologische consequenties van klimaatverandering
Hydrologische consequenties van klimaatveranderingAline te Linde
 
Project Governance Sydney Uni 2009
Project Governance   Sydney Uni 2009Project Governance   Sydney Uni 2009
Project Governance Sydney Uni 2009UNSW Canberra
 
Water Integrity: Governance model in the Dutch Water Safety Programme
Water Integrity: Governance model in the Dutch Water Safety ProgrammeWater Integrity: Governance model in the Dutch Water Safety Programme
Water Integrity: Governance model in the Dutch Water Safety ProgrammeAline te Linde
 

Andere mochten auch (7)

Balancing science and policy while developing Delta Scenarios for the Netherl...
Balancing science and policy while developing Delta Scenarios for the Netherl...Balancing science and policy while developing Delta Scenarios for the Netherl...
Balancing science and policy while developing Delta Scenarios for the Netherl...
 
20100922 Te Linde Future Flood Risk 2
20100922 Te Linde Future Flood Risk 220100922 Te Linde Future Flood Risk 2
20100922 Te Linde Future Flood Risk 2
 
Plenair 4 chris
Plenair 4 chrisPlenair 4 chris
Plenair 4 chris
 
Simulating flood-peak probability in the Rhine basin and the effect of climat...
Simulating flood-peak probability in the Rhine basin and the effect of climat...Simulating flood-peak probability in the Rhine basin and the effect of climat...
Simulating flood-peak probability in the Rhine basin and the effect of climat...
 
Hydrologische consequenties van klimaatverandering
Hydrologische consequenties van klimaatveranderingHydrologische consequenties van klimaatverandering
Hydrologische consequenties van klimaatverandering
 
Project Governance Sydney Uni 2009
Project Governance   Sydney Uni 2009Project Governance   Sydney Uni 2009
Project Governance Sydney Uni 2009
 
Water Integrity: Governance model in the Dutch Water Safety Programme
Water Integrity: Governance model in the Dutch Water Safety ProgrammeWater Integrity: Governance model in the Dutch Water Safety Programme
Water Integrity: Governance model in the Dutch Water Safety Programme
 

Ähnlich wie Transboundary Flood Risk Management in the Rhine Basin

Deguchte adaptation in the netherlands
Deguchte adaptation in the netherlandsDeguchte adaptation in the netherlands
Deguchte adaptation in the netherlandsOECD Environment
 
Advanced Bathing Water Forecasting - Aarhus Water Case Story
Advanced Bathing Water Forecasting - Aarhus Water Case StoryAdvanced Bathing Water Forecasting - Aarhus Water Case Story
Advanced Bathing Water Forecasting - Aarhus Water Case StoryStephen Flood
 
Building with nature to adapt to climate change
Building with nature to adapt to climate changeBuilding with nature to adapt to climate change
Building with nature to adapt to climate changeNL MFA Global Issues
 
Helen Davies
Helen DaviesHelen Davies
Helen Davies7391456
 
DSD-INT 2017 Aqueduct Global Flood Analyzer 2.0 - Winsemius
DSD-INT 2017 Aqueduct Global Flood Analyzer 2.0 - WinsemiusDSD-INT 2017 Aqueduct Global Flood Analyzer 2.0 - Winsemius
DSD-INT 2017 Aqueduct Global Flood Analyzer 2.0 - WinsemiusDeltares
 
Snow Monitoring for Water Availability and Irrigation
Snow Monitoring for Water Availability and IrrigationSnow Monitoring for Water Availability and Irrigation
Snow Monitoring for Water Availability and IrrigationExtremeEarth
 
Presentation - Workshop 1: Water Investment Planning and Financing, Martijn L...
Presentation - Workshop 1: Water Investment Planning and Financing, Martijn L...Presentation - Workshop 1: Water Investment Planning and Financing, Martijn L...
Presentation - Workshop 1: Water Investment Planning and Financing, Martijn L...OECD Environment
 
Building With Nature.pptx
Building With Nature.pptxBuilding With Nature.pptx
Building With Nature.pptxMohammadFarid34
 
13ArjanBraamskamp_NICHI_BusinessSummit
13ArjanBraamskamp_NICHI_BusinessSummit13ArjanBraamskamp_NICHI_BusinessSummit
13ArjanBraamskamp_NICHI_BusinessSummitNICHI_USA
 
50 emmanuel brochard - dcns
50   emmanuel brochard - dcns50   emmanuel brochard - dcns
50 emmanuel brochard - dcnsjohannaparans
 
NAP Expo 2015 Session IX Flood risks in a changing climate
NAP Expo 2015 Session IX Flood risks in a changing climate NAP Expo 2015 Session IX Flood risks in a changing climate
NAP Expo 2015 Session IX Flood risks in a changing climate NAP Events
 
Green Week presentation - bart fokkens
Green Week presentation - bart fokkensGreen Week presentation - bart fokkens
Green Week presentation - bart fokkensRESTORE
 
[Mazen alqadi]case study flood risk reduction in netherland
[Mazen alqadi]case study   flood risk reduction in netherland[Mazen alqadi]case study   flood risk reduction in netherland
[Mazen alqadi]case study flood risk reduction in netherlandMazen Al-Qadi
 
DSD-INT 2017 Keynote: towards using XBeach in the Dutch formal assessment of ...
DSD-INT 2017 Keynote: towards using XBeach in the Dutch formal assessment of ...DSD-INT 2017 Keynote: towards using XBeach in the Dutch formal assessment of ...
DSD-INT 2017 Keynote: towards using XBeach in the Dutch formal assessment of ...Deltares
 
Floating ecocities as a strategy to reduce the vulnerability of delta areas
Floating ecocities as a strategy to reduce the vulnerability of delta areasFloating ecocities as a strategy to reduce the vulnerability of delta areas
Floating ecocities as a strategy to reduce the vulnerability of delta areasGlobal Risk Forum GRFDavos
 
Room for the River Presentation 2011
Room for the River Presentation 2011Room for the River Presentation 2011
Room for the River Presentation 2011NLandUSA
 
150207 IWEC Lyon - Dietrich Bartelt
150207 IWEC Lyon - Dietrich Bartelt150207 IWEC Lyon - Dietrich Bartelt
150207 IWEC Lyon - Dietrich BarteltDietrich Bartelt
 
Water & The Netherlands: A New Relationship
Water & The Netherlands: A New Relationship Water & The Netherlands: A New Relationship
Water & The Netherlands: A New Relationship U.S. Water Alliance
 

Ähnlich wie Transboundary Flood Risk Management in the Rhine Basin (20)

Deguchte adaptation in the netherlands
Deguchte adaptation in the netherlandsDeguchte adaptation in the netherlands
Deguchte adaptation in the netherlands
 
Advanced Bathing Water Forecasting - Aarhus Water Case Story
Advanced Bathing Water Forecasting - Aarhus Water Case StoryAdvanced Bathing Water Forecasting - Aarhus Water Case Story
Advanced Bathing Water Forecasting - Aarhus Water Case Story
 
K thompson may 2014
K thompson may 2014K thompson may 2014
K thompson may 2014
 
Building with nature to adapt to climate change
Building with nature to adapt to climate changeBuilding with nature to adapt to climate change
Building with nature to adapt to climate change
 
Helen Davies
Helen DaviesHelen Davies
Helen Davies
 
DSD-INT 2017 Aqueduct Global Flood Analyzer 2.0 - Winsemius
DSD-INT 2017 Aqueduct Global Flood Analyzer 2.0 - WinsemiusDSD-INT 2017 Aqueduct Global Flood Analyzer 2.0 - Winsemius
DSD-INT 2017 Aqueduct Global Flood Analyzer 2.0 - Winsemius
 
Snow Monitoring for Water Availability and Irrigation
Snow Monitoring for Water Availability and IrrigationSnow Monitoring for Water Availability and Irrigation
Snow Monitoring for Water Availability and Irrigation
 
Presentation - Workshop 1: Water Investment Planning and Financing, Martijn L...
Presentation - Workshop 1: Water Investment Planning and Financing, Martijn L...Presentation - Workshop 1: Water Investment Planning and Financing, Martijn L...
Presentation - Workshop 1: Water Investment Planning and Financing, Martijn L...
 
Building With Nature.pptx
Building With Nature.pptxBuilding With Nature.pptx
Building With Nature.pptx
 
13ArjanBraamskamp_NICHI_BusinessSummit
13ArjanBraamskamp_NICHI_BusinessSummit13ArjanBraamskamp_NICHI_BusinessSummit
13ArjanBraamskamp_NICHI_BusinessSummit
 
A Safe and Sustainable Future_Durney_v1
A Safe and Sustainable Future_Durney_v1A Safe and Sustainable Future_Durney_v1
A Safe and Sustainable Future_Durney_v1
 
50 emmanuel brochard - dcns
50   emmanuel brochard - dcns50   emmanuel brochard - dcns
50 emmanuel brochard - dcns
 
NAP Expo 2015 Session IX Flood risks in a changing climate
NAP Expo 2015 Session IX Flood risks in a changing climate NAP Expo 2015 Session IX Flood risks in a changing climate
NAP Expo 2015 Session IX Flood risks in a changing climate
 
Green Week presentation - bart fokkens
Green Week presentation - bart fokkensGreen Week presentation - bart fokkens
Green Week presentation - bart fokkens
 
[Mazen alqadi]case study flood risk reduction in netherland
[Mazen alqadi]case study   flood risk reduction in netherland[Mazen alqadi]case study   flood risk reduction in netherland
[Mazen alqadi]case study flood risk reduction in netherland
 
DSD-INT 2017 Keynote: towards using XBeach in the Dutch formal assessment of ...
DSD-INT 2017 Keynote: towards using XBeach in the Dutch formal assessment of ...DSD-INT 2017 Keynote: towards using XBeach in the Dutch formal assessment of ...
DSD-INT 2017 Keynote: towards using XBeach in the Dutch formal assessment of ...
 
Floating ecocities as a strategy to reduce the vulnerability of delta areas
Floating ecocities as a strategy to reduce the vulnerability of delta areasFloating ecocities as a strategy to reduce the vulnerability of delta areas
Floating ecocities as a strategy to reduce the vulnerability of delta areas
 
Room for the River Presentation 2011
Room for the River Presentation 2011Room for the River Presentation 2011
Room for the River Presentation 2011
 
150207 IWEC Lyon - Dietrich Bartelt
150207 IWEC Lyon - Dietrich Bartelt150207 IWEC Lyon - Dietrich Bartelt
150207 IWEC Lyon - Dietrich Bartelt
 
Water & The Netherlands: A New Relationship
Water & The Netherlands: A New Relationship Water & The Netherlands: A New Relationship
Water & The Netherlands: A New Relationship
 

Transboundary Flood Risk Management in the Rhine Basin

  • 1. Transboundary flood risk management The Rhine basin Nijmegen 20 september 2012 Aline te Linde
  • 2. Titel CV Aline te Linde 1995 – 2001 Earth Sciences, VU University Amsterdam MSc hydrology 2002 – 2007 WL | Delft Hydraulics Integrated Water Management 2008 – 2012 Deltares Unit Scenarios and Policy Analysis 2006 – present Institute for Environmental Studies, VU A’dam PhD - 2011 2012 – present Twynstra Gudde Consultants and Managers Advisory group Water © Twynstra Gudde | Deltares 20-9-2012 2
  • 3. Titel http://www.ubvu.vu.nl © Twynstra Gudde | Deltares 20-9-2012 3
  • 4. Titel © Twynstra Gudde | Deltares 20-9-2012 4
  • 5. Titel © Twynstra Gudde | Deltares 20-9-2012 5
  • 6. Titel © Twynstra Gudde | Deltares 20-9-2012 6
  • 7. Titel © Twynstra Gudde | Deltares 20-9-2012 7
  • 8. Titel River manager has four questions 1. How often does this happen? 2. What is the expected damage? 3. Does this change in the future? 4. Which measures can I take? Flood risk = probabiliy x damage Scenarios – Climate change – Socio-economic / land use © Twynstra Gudde | Deltares 20-9-2012 8
  • 9. Titel Titel Text Rhine River basin length: 1320 km surface area: 185.000 km2 shipping > 200 t/year 7 countries 58 million inhabitants 11 million in flood prone areas © Twynstra Gudde | Deltares 20-9-2012 9
  • 10. Titel Design discharge Lobith © Twynstra Gudde | Deltares 20-9-2012 10 19 september 2012
  • 11. Titel Land use Water depth Potential damage Text © Twynstra Gudde | Deltares 20-9-2012 11
  • 12. Titel Titel Text Risk = probability x damage © Twynstra Gudde | Deltares 20-9-2012 12
  • 13. Titel Titel Text Risk = probability x damage © Twynstra Gudde | Deltares 20-9-2012 13
  • 14. Titel Titel Text Increase flood risk entire River basin: 54 – 230% in 2030 (reference = 2000) © Twynstra Gudde | Deltares 20-9-2012 14
  • 15. Titel Transboundary floods © Twynstra Gudde | Deltares 20-9-2012 15
  • 16. Titel 1926 © Twynstra Gudde | Deltares 20-9-2012 16
  • 17. Titel Transboundary low flows NL = most downstream country Alpine water towers Low flows: ~90 % of Rhine discharge from the Alps © Twynstra Gudde | Deltares 20-9-2012 17
  • 18. Titel Transboundary policy EU legislation for all countries – EU Water Framework Directive (2000) commits European Union member states to achieve good qualitative and quantitative status of all water bodies by 2015 – EU Floods Directive (2007) “Member States shall furthermore coordinate their flood risk management practices in shared river basins, […] and shall in solidarity not undertake measures that would increase the flood risk in neighbouring countries.” Transboundary cooperation obviously relevant for downstream countries , however © Twynstra Gudde | Deltares 20-9-2012 18
  • 19. Titel The Dutch Delta Programme “The object of the new-style Delta Plan (the Delta Works of the future) is to protect our country against high water and keep our freshwater supply up to standard, now and in the future.” http://www.deltacommissaris.nl/english/ Quite revolutionary: – Integrated plan (combine functions and scales) – Act now, and not after a next flooding disaster – Long-term planning © Twynstra Gudde | Deltares 20-9-2012 19
  • 20. Titel Delta Programme – 3 Generic Programmes • Safety • Fresh water • New urban developments and restructuring – 6 Area-based sub-programmes – Delta Commissioner and small staff – 5 Delta Decisions in 2015 – Delta Law – Delta Fund – 2050 en 2100 © Twynstra Gudde | Deltares 20-9-2012 20
  • 21. Titel Scope is national – Models of Rhine, Meuse and smaller rivers start at the Dutch border – Water safety – Low flow / drought analysis – Possibility of cross-boundary flooding not taken into account Except: – Climate scenarios projections for future discharge regime (Rhine and Meuse models do include whole basin) – Some interest now in upstream water use Rhine basin © Twynstra Gudde | Deltares 20-9-2012 21
  • 22. Titel Final remarks River management DP rather conservative approach, not transboundary Very strong believe in exact design discharge at the border, while in fact this is very uncertain: 1. High safety norm – extreme value statistics 2. Impact of climate change – scenarios / bandwidth 3. Potential of cross-boundary flooding Why a national scope of the Delta Programme and Delta law? Does this result in optimal measures? How does this link to transboundary European legislation? © Twynstra Gudde | Deltares 20-9-2012 22