Drilling Engineering 2 Course (1st Ed.)
1.
2.
3.
4.
5.
6.

Laminar Flow in Pipes and Annuli
Turbulent Flow in Pipes and Annuli
Pressure Drop Across Surface Connections
Pressure Drop Across Bit
Optimization of Bit Hydraulics
Particle Slip Velocity
Casing functions
Casing costs compromise
one of the largest cost items of the drilling project.
Therefore proper planning of
casing setting depths and casing selection is vital
to realize a cost effective and safe well.

The casings themselves fulfill multiple functions
that can be summarized as:

Isolate porous formations with different fluid-pressure
regimes from contaminating the pay zone,
Prevent near surface fresh water zones
from contamination with drilling mud,
Protect the hole from caving in,
Provide a connection and support of the wellhead equipment,
Provide exact dimensions for running
testing, completion and production subsurface equipment.

Fall 13 H. AlamiNia

Drilling Engineering 2 Course (1st Ed.)

3
Casing Types
According to the different
functions,
the total casing program
consists of
different casings strings.
Conductor Casing
Surface Casing
Intermediate Casing
Production Casing
Liners

Fall 13 H. AlamiNia

Drilling Engineering 2 Course (1st Ed.)

4
Conductor Casing
The function of the conductor is
to enable circulation of the drilling fluid to
the shale shakers without eroding
the surface sediments directly below the rig foundation.
The conductor prevents the subsequent casings from
corrosion and may partly support the wellhead weight.

Commonly a diverter is installed on top of the
conductor casing to divert an unexpected inflow
of formation fluids into the wellbore
away from the rig-site and the personal.
Conductor setting depths are
in the range of 150 to 600 [ft] (46-183 m),
their seizes range from 36 to 20 [in] (0.91-0.5 m).
Fall 13 H. AlamiNia

Drilling Engineering 2 Course (1st Ed.)

5
Surface Casing
The function of the surface casing is
 to prevent cave in of unconsolidated, weak near-surface formations
as well as protect the shallow, freshwater sands
from contamination with drilling mud.
 As the conductors,
surface casing protects the subsequent casings from corrosion.

Before the surface casing is set,
 no blow out preventers (BOP) are installed.
 After setting the surface casing and installing the wellhead, a BOP is
available to handle kicks when drilling the intermediate hole section.

Surface casing setting depths are in the range
from 300 to 5,000 [ft] (91-1524 m),
their diameters range from 24 to 17-1/2 [in].
 the surface casing setting depth is often determined by government
or company policy and not selected due to technical reasoning.
Fall 13 H. AlamiNia

Drilling Engineering 2 Course (1st Ed.)

6
Intermediate Casing
The intermediate casing string
is a purely technical casing.

One or more may be necessary to handle abnormal
formation pressures, unstable shale formations, lost
circulation or cave-in zones.
An intermediate casing may also be necessary to realize
the planned mud weight profile.
When for example an abnormally pressured formation is
encountered, it may have to be protected by an intermediate
casing so when formation pressure of the formations below is
normal, a lower mud weight can be applied.

Intermediate casing diameters
range from 17-1/2 to 9- 5/8 [in].
Fall 13 H. AlamiNia

Drilling Engineering 2 Course (1st Ed.)

7
Production Casing
The production casing is set through the
prospective production zone(s).
This casing string protects the environment
in case of production tubing failure and
permits the tubing string to be maintained or
replaced during the production life.
Commonly production casing and production liners
have gas-tight connections,
their diameters range from 9-5/8 to 5 [in].
A production casing diameter of 7 [in] is encountered often.

Fall 13 H. AlamiNia

Drilling Engineering 2 Course (1st Ed.)

8
Liners
To save cost, the casing installed
sometimes doesn’t reach until the
surface but finishes within the
previous string.
Such a casing configuration is called
liner.
A liner is mounted on a so called
“liner hanger” to the previous casing
string.
Commonly the liner head is several
hundred feet into the previous
casing to enable a good cement seal.
Liner
Fall 13 H. AlamiNia

Drilling Engineering 2 Course (1st Ed.)

9
Various typical casing programs

Fall 13 H. AlamiNia

Drilling Engineering 2 Course (1st Ed.)

10
develop a casing program
To develop a casing program, first the various
casing setting depths have to be determined.
Since the primary reason to drill a well is
to produce hydrocarbons out of a reservoir,
the final casing inside diameters
have to be large enough to allow
for the forecasted completion and production schemes.
Factors like completion type
(open hole, cased hole, monobore production, etc.),
expected amount of production (production tubing seize),
expected production forecast (e.g. need of gas-lift, etc.) and
seize of evaluation tools to be run have to be considered.
In general, for production purposes
the well diameters shall be as large as possible.
Fall 13 H. AlamiNia

Drilling Engineering 2 Course (1st Ed.)

11
Advantages of small hole sizes
On the other hand, as small as possible hole seizes
reduces the total cost of the well since:

drilling times are faster,
less mud has to be used (purchase and disposal of
mud),
smaller mud equipment can be used (cleaning, pumps, etc.),
smaller casings can be used (cheaper, higher strength at same
grade),
smaller rig can be applied (lighter casings, smaller mud
volume),
rig site can be smaller (especially important offshore and
platform types like TLP where weights are limited).

Out of this reason a technology called slim-hole drilling
was developed.
Fall 13 H. AlamiNia

Drilling Engineering 2 Course (1st Ed.)

12
Drilling Engineering 2 Course Casing Program Development

Weitere ähnliche Inhalte

Was ist angesagt?

Q922+de1+l04 v1
Q922+de1+l04 v1Q922+de1+l04 v1
Q922+de1+l04 v1AFATous
 
Drilling Fluid Circulation Systems
Drilling Fluid Circulation SystemsDrilling Fluid Circulation Systems
Drilling Fluid Circulation SystemsAFATous
 
Drillstring & BHA Design
Drillstring & BHA DesignDrillstring & BHA Design
Drillstring & BHA DesignM.T.H Group
 
Q922+de1+l02 v1
Q922+de1+l02 v1Q922+de1+l02 v1
Q922+de1+l02 v1AFATous
 
Q922+de1+l06 v1
Q922+de1+l06 v1Q922+de1+l06 v1
Q922+de1+l06 v1AFATous
 
Q921 de1 lec 7 v1
Q921 de1 lec 7 v1Q921 de1 lec 7 v1
Q921 de1 lec 7 v1AFATous
 
Well Control and Well Monitoring Systems
Well Control and Well Monitoring SystemsWell Control and Well Monitoring Systems
Well Control and Well Monitoring SystemsAFATous
 
Rotary Drilling System: Introduction
Rotary Drilling System:IntroductionRotary Drilling System:Introduction
Rotary Drilling System: IntroductionAFATous
 
Q921 de1 lec 4 v1
Q921 de1 lec 4 v1Q921 de1 lec 4 v1
Q921 de1 lec 4 v1AFATous
 
Presentation 6 casing design
Presentation 6 casing designPresentation 6 casing design
Presentation 6 casing designAli Trichelli
 
Q921 de1 lec 2 v1
Q921 de1 lec 2 v1Q921 de1 lec 2 v1
Q921 de1 lec 2 v1AFATous
 
Transocean offshore operation 2
Transocean   offshore operation 2Transocean   offshore operation 2
Transocean offshore operation 2Steffones K
 
Q921 de1 lec 6 v1
Q921 de1 lec 6 v1Q921 de1 lec 6 v1
Q921 de1 lec 6 v1AFATous
 
Q921 de1 lec 5 v1
Q921 de1 lec 5 v1Q921 de1 lec 5 v1
Q921 de1 lec 5 v1AFATous
 
Horizontal Vessel Loading Calculation
 Horizontal Vessel Loading Calculation Horizontal Vessel Loading Calculation
Horizontal Vessel Loading CalculationFadhel AlMohammad
 

Was ist angesagt? (17)

Q922+de1+l04 v1
Q922+de1+l04 v1Q922+de1+l04 v1
Q922+de1+l04 v1
 
Drilling Fluid Circulation Systems
Drilling Fluid Circulation SystemsDrilling Fluid Circulation Systems
Drilling Fluid Circulation Systems
 
Drillstring & BHA Design
Drillstring & BHA DesignDrillstring & BHA Design
Drillstring & BHA Design
 
Q922+de1+l02 v1
Q922+de1+l02 v1Q922+de1+l02 v1
Q922+de1+l02 v1
 
Q922+de1+l06 v1
Q922+de1+l06 v1Q922+de1+l06 v1
Q922+de1+l06 v1
 
Q921 de1 lec 7 v1
Q921 de1 lec 7 v1Q921 de1 lec 7 v1
Q921 de1 lec 7 v1
 
Well Control and Well Monitoring Systems
Well Control and Well Monitoring SystemsWell Control and Well Monitoring Systems
Well Control and Well Monitoring Systems
 
Rotary Drilling System: Introduction
Rotary Drilling System:IntroductionRotary Drilling System:Introduction
Rotary Drilling System: Introduction
 
Q921 de1 lec 4 v1
Q921 de1 lec 4 v1Q921 de1 lec 4 v1
Q921 de1 lec 4 v1
 
Presentation 6 casing design
Presentation 6 casing designPresentation 6 casing design
Presentation 6 casing design
 
8vo ingles
8vo ingles8vo ingles
8vo ingles
 
Q921 de1 lec 2 v1
Q921 de1 lec 2 v1Q921 de1 lec 2 v1
Q921 de1 lec 2 v1
 
Directional Drilling
Directional DrillingDirectional Drilling
Directional Drilling
 
Transocean offshore operation 2
Transocean   offshore operation 2Transocean   offshore operation 2
Transocean offshore operation 2
 
Q921 de1 lec 6 v1
Q921 de1 lec 6 v1Q921 de1 lec 6 v1
Q921 de1 lec 6 v1
 
Q921 de1 lec 5 v1
Q921 de1 lec 5 v1Q921 de1 lec 5 v1
Q921 de1 lec 5 v1
 
Horizontal Vessel Loading Calculation
 Horizontal Vessel Loading Calculation Horizontal Vessel Loading Calculation
Horizontal Vessel Loading Calculation
 

Andere mochten auch

Introduction to Drilling Engineering
Introduction to Drilling EngineeringIntroduction to Drilling Engineering
Introduction to Drilling EngineeringM.T.H Group
 
Q922+de2+l07 v1
Q922+de2+l07 v1Q922+de2+l07 v1
Q922+de2+l07 v1AFATous
 
Q921 de2 lec5 v1
Q921 de2 lec5 v1Q921 de2 lec5 v1
Q921 de2 lec5 v1AFATous
 
Q922+log+l02 v1
Q922+log+l02 v1Q922+log+l02 v1
Q922+log+l02 v1AFATous
 
Q921 de2 lec4 v1
Q921 de2 lec4 v1Q921 de2 lec4 v1
Q921 de2 lec4 v1AFATous
 
Q921 de2 lec3 v1
Q921 de2 lec3 v1Q921 de2 lec3 v1
Q921 de2 lec3 v1AFATous
 
Directive008
Directive008Directive008
Directive008Billy321
 
Descgeom 01 orthographic projection
Descgeom   01 orthographic projectionDescgeom   01 orthographic projection
Descgeom 01 orthographic projectionTroy Elizaga
 
Drilling Operations of Ground Water Wells Up-Geologist Team Zagazig Univ 06-0...
Drilling Operations of Ground Water Wells Up-Geologist Team Zagazig Univ 06-0...Drilling Operations of Ground Water Wells Up-Geologist Team Zagazig Univ 06-0...
Drilling Operations of Ground Water Wells Up-Geologist Team Zagazig Univ 06-0...Mohamed _el_shora
 
Tube wells and their design
Tube wells and their designTube wells and their design
Tube wells and their designMoudud Hasan
 
Drilling and producing well
Drilling and  producing wellDrilling and  producing well
Drilling and producing wellRaja Rosenani
 
Fundamentals of Petroleum Engineering Module 6
Fundamentals of Petroleum Engineering Module 6Fundamentals of Petroleum Engineering Module 6
Fundamentals of Petroleum Engineering Module 6Aijaz Ali Mooro
 
Primary cementing and Secondary Cementing
Primary cementing  and Secondary CementingPrimary cementing  and Secondary Cementing
Primary cementing and Secondary CementingHtet Naing Htoo
 
7'' liner running and cementing
7'' liner running and cementing7'' liner running and cementing
7'' liner running and cementingKamel Elsayed
 
Well design and construction i
Well design and construction iWell design and construction i
Well design and construction iYalçın Dalgıç
 
JavaScript入門勉強会ー第二章
JavaScript入門勉強会ー第二章JavaScript入門勉強会ー第二章
JavaScript入門勉強会ー第二章mactkg
 
JavaScript入門勉強会ー第三章
JavaScript入門勉強会ー第三章JavaScript入門勉強会ー第三章
JavaScript入門勉強会ー第三章mactkg
 
Slide Khatam 2008
Slide Khatam 2008Slide Khatam 2008
Slide Khatam 2008Hamdi27378
 

Andere mochten auch (20)

Introduction to Drilling Engineering
Introduction to Drilling EngineeringIntroduction to Drilling Engineering
Introduction to Drilling Engineering
 
Q922+de2+l07 v1
Q922+de2+l07 v1Q922+de2+l07 v1
Q922+de2+l07 v1
 
Q921 de2 lec5 v1
Q921 de2 lec5 v1Q921 de2 lec5 v1
Q921 de2 lec5 v1
 
Q922+log+l02 v1
Q922+log+l02 v1Q922+log+l02 v1
Q922+log+l02 v1
 
Q921 de2 lec4 v1
Q921 de2 lec4 v1Q921 de2 lec4 v1
Q921 de2 lec4 v1
 
Q921 de2 lec3 v1
Q921 de2 lec3 v1Q921 de2 lec3 v1
Q921 de2 lec3 v1
 
Casing design
Casing designCasing design
Casing design
 
Directive008
Directive008Directive008
Directive008
 
Descgeom 01 orthographic projection
Descgeom   01 orthographic projectionDescgeom   01 orthographic projection
Descgeom 01 orthographic projection
 
Casing design
Casing designCasing design
Casing design
 
Drilling Operations of Ground Water Wells Up-Geologist Team Zagazig Univ 06-0...
Drilling Operations of Ground Water Wells Up-Geologist Team Zagazig Univ 06-0...Drilling Operations of Ground Water Wells Up-Geologist Team Zagazig Univ 06-0...
Drilling Operations of Ground Water Wells Up-Geologist Team Zagazig Univ 06-0...
 
Tube wells and their design
Tube wells and their designTube wells and their design
Tube wells and their design
 
Drilling and producing well
Drilling and  producing wellDrilling and  producing well
Drilling and producing well
 
Fundamentals of Petroleum Engineering Module 6
Fundamentals of Petroleum Engineering Module 6Fundamentals of Petroleum Engineering Module 6
Fundamentals of Petroleum Engineering Module 6
 
Primary cementing and Secondary Cementing
Primary cementing  and Secondary CementingPrimary cementing  and Secondary Cementing
Primary cementing and Secondary Cementing
 
7'' liner running and cementing
7'' liner running and cementing7'' liner running and cementing
7'' liner running and cementing
 
Well design and construction i
Well design and construction iWell design and construction i
Well design and construction i
 
JavaScript入門勉強会ー第二章
JavaScript入門勉強会ー第二章JavaScript入門勉強会ー第二章
JavaScript入門勉強会ー第二章
 
JavaScript入門勉強会ー第三章
JavaScript入門勉強会ー第三章JavaScript入門勉強会ー第三章
JavaScript入門勉強会ー第三章
 
Slide Khatam 2008
Slide Khatam 2008Slide Khatam 2008
Slide Khatam 2008
 

Ähnlich wie Drilling Engineering 2 Course Casing Program Development

GROUP_6_YOUNGMAN_L_ANNEX_15-16
GROUP_6_YOUNGMAN_L_ANNEX_15-16GROUP_6_YOUNGMAN_L_ANNEX_15-16
GROUP_6_YOUNGMAN_L_ANNEX_15-16Leo Youngman
 
Casing Seat depth and Basic casing design lecture 4.pdf
Casing Seat depth and Basic casing design  lecture 4.pdfCasing Seat depth and Basic casing design  lecture 4.pdf
Casing Seat depth and Basic casing design lecture 4.pdfssuserfec9d8
 
Deep basement excavation
Deep basement excavation Deep basement excavation
Deep basement excavation Davis Ciprikis
 
Unit 37: Advanced Civil Engineering
Unit 37: Advanced Civil EngineeringUnit 37: Advanced Civil Engineering
Unit 37: Advanced Civil EngineeringSahl Buhary
 
Life Cycle of Oil & Gas Wells
Life Cycle of Oil & Gas WellsLife Cycle of Oil & Gas Wells
Life Cycle of Oil & Gas WellsMohamed Elnagar
 
Design , Analysis and Optimization of Intze Type Water Tank With Sloshing Effect
Design , Analysis and Optimization of Intze Type Water Tank With Sloshing EffectDesign , Analysis and Optimization of Intze Type Water Tank With Sloshing Effect
Design , Analysis and Optimization of Intze Type Water Tank With Sloshing EffectIRJET Journal
 
EP- August 2015.PDF
EP- August 2015.PDFEP- August 2015.PDF
EP- August 2015.PDFMoises Nava
 
Field Failure Analysis of DTH Hammer Bit
Field Failure Analysis of DTH Hammer BitField Failure Analysis of DTH Hammer Bit
Field Failure Analysis of DTH Hammer BitIRJET Journal
 
Well_Completions.pdf
Well_Completions.pdfWell_Completions.pdf
Well_Completions.pdfAihamAltayeh1
 
Ultra-High-Pressure-Risers-for-Deepwater-Drilling-(DOT-Intl-09)
Ultra-High-Pressure-Risers-for-Deepwater-Drilling-(DOT-Intl-09)Ultra-High-Pressure-Risers-for-Deepwater-Drilling-(DOT-Intl-09)
Ultra-High-Pressure-Risers-for-Deepwater-Drilling-(DOT-Intl-09)Paul Brett
 
underwater-construction-55849d4caf8cd.pptx
underwater-construction-55849d4caf8cd.pptxunderwater-construction-55849d4caf8cd.pptx
underwater-construction-55849d4caf8cd.pptxJayachandran68
 
Asif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
Asif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptxAsif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
Asif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptxsfQyoom
 
Essential Design Criteria for Safe Braced Cuts in Excavation Projects
Essential Design Criteria for Safe Braced Cuts in Excavation ProjectsEssential Design Criteria for Safe Braced Cuts in Excavation Projects
Essential Design Criteria for Safe Braced Cuts in Excavation ProjectsErbil Polytechnic University
 

Ähnlich wie Drilling Engineering 2 Course Casing Program Development (20)

GROUP_6_YOUNGMAN_L_ANNEX_15-16
GROUP_6_YOUNGMAN_L_ANNEX_15-16GROUP_6_YOUNGMAN_L_ANNEX_15-16
GROUP_6_YOUNGMAN_L_ANNEX_15-16
 
Defining Well completion
Defining Well completionDefining Well completion
Defining Well completion
 
Casing_Design(1).ppt
Casing_Design(1).pptCasing_Design(1).ppt
Casing_Design(1).ppt
 
Casing Seat depth and Basic casing design lecture 4.pdf
Casing Seat depth and Basic casing design  lecture 4.pdfCasing Seat depth and Basic casing design  lecture 4.pdf
Casing Seat depth and Basic casing design lecture 4.pdf
 
Deep basement excavation
Deep basement excavation Deep basement excavation
Deep basement excavation
 
Construction dewatering technology data sheet
Construction dewatering technology data sheetConstruction dewatering technology data sheet
Construction dewatering technology data sheet
 
Unit 37: Advanced Civil Engineering
Unit 37: Advanced Civil EngineeringUnit 37: Advanced Civil Engineering
Unit 37: Advanced Civil Engineering
 
Life Cycle of Oil & Gas Wells
Life Cycle of Oil & Gas WellsLife Cycle of Oil & Gas Wells
Life Cycle of Oil & Gas Wells
 
Anmol bhargava casing basics
Anmol bhargava   casing basicsAnmol bhargava   casing basics
Anmol bhargava casing basics
 
Design , Analysis and Optimization of Intze Type Water Tank With Sloshing Effect
Design , Analysis and Optimization of Intze Type Water Tank With Sloshing EffectDesign , Analysis and Optimization of Intze Type Water Tank With Sloshing Effect
Design , Analysis and Optimization of Intze Type Water Tank With Sloshing Effect
 
EP- August 2015.PDF
EP- August 2015.PDFEP- August 2015.PDF
EP- August 2015.PDF
 
Field Failure Analysis of DTH Hammer Bit
Field Failure Analysis of DTH Hammer BitField Failure Analysis of DTH Hammer Bit
Field Failure Analysis of DTH Hammer Bit
 
Cut and cover
Cut and coverCut and cover
Cut and cover
 
Well_Completions.pdf
Well_Completions.pdfWell_Completions.pdf
Well_Completions.pdf
 
Ultra-High-Pressure-Risers-for-Deepwater-Drilling-(DOT-Intl-09)
Ultra-High-Pressure-Risers-for-Deepwater-Drilling-(DOT-Intl-09)Ultra-High-Pressure-Risers-for-Deepwater-Drilling-(DOT-Intl-09)
Ultra-High-Pressure-Risers-for-Deepwater-Drilling-(DOT-Intl-09)
 
Dam engineering i 5
Dam engineering i 5Dam engineering i 5
Dam engineering i 5
 
Drilling imp
Drilling impDrilling imp
Drilling imp
 
underwater-construction-55849d4caf8cd.pptx
underwater-construction-55849d4caf8cd.pptxunderwater-construction-55849d4caf8cd.pptx
underwater-construction-55849d4caf8cd.pptx
 
Asif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
Asif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptxAsif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
Asif2 CONSTRUCTION_OF_RIGID_PAVEMENT.pptx
 
Essential Design Criteria for Safe Braced Cuts in Excavation Projects
Essential Design Criteria for Safe Braced Cuts in Excavation ProjectsEssential Design Criteria for Safe Braced Cuts in Excavation Projects
Essential Design Criteria for Safe Braced Cuts in Excavation Projects
 

Mehr von AFATous

جزوه درس نمودارگیری از چاه، ویرایش ششم
جزوه درس نمودارگیری از چاه، ویرایش ششم جزوه درس نمودارگیری از چاه، ویرایش ششم
جزوه درس نمودارگیری از چاه، ویرایش ششم AFATous
 
جزوه درس مهندسی حفاری دو، ویرایش ششم
جزوه درس مهندسی حفاری دو، ویرایش ششم جزوه درس مهندسی حفاری دو، ویرایش ششم
جزوه درس مهندسی حفاری دو، ویرایش ششم AFATous
 
جزوه درس مهندسی بهره برداری دو، ویرایش دوم
جزوه درس مهندسی بهره برداری دو، ویرایش دومجزوه درس مهندسی بهره برداری دو، ویرایش دوم
جزوه درس مهندسی بهره برداری دو، ویرایش دومAFATous
 
جزوه درس مهندسی حفاری یک،ویرایش ششم
جزوه درس مهندسی حفاری یک،ویرایش ششمجزوه درس مهندسی حفاری یک،ویرایش ششم
جزوه درس مهندسی حفاری یک،ویرایش ششمAFATous
 
جزوه درس انگیزش چاه (اسیدکاری)، ویرایش دوم
جزوه درس انگیزش چاه (اسیدکاری)، ویرایش دومجزوه درس انگیزش چاه (اسیدکاری)، ویرایش دوم
جزوه درس انگیزش چاه (اسیدکاری)، ویرایش دومAFATous
 
Q933+log reference fa lec
Q933+log reference fa lecQ933+log reference fa lec
Q933+log reference fa lecAFATous
 
Q933+log reference fa lec 4x1
Q933+log reference fa lec 4x1Q933+log reference fa lec 4x1
Q933+log reference fa lec 4x1AFATous
 
Q933+po2 reference fa lec
Q933+po2 reference fa lecQ933+po2 reference fa lec
Q933+po2 reference fa lecAFATous
 
Q933+po2 reference fa lec 4x1
Q933+po2 reference fa lec 4x1Q933+po2 reference fa lec 4x1
Q933+po2 reference fa lec 4x1AFATous
 
Q933+de2 reference fa lec 4x1
Q933+de2 reference fa lec 4x1Q933+de2 reference fa lec 4x1
Q933+de2 reference fa lec 4x1AFATous
 
Q933+de2 reference fa lec
Q933+de2 reference fa lecQ933+de2 reference fa lec
Q933+de2 reference fa lecAFATous
 
Q933+de1 reference fa lec 4x1
Q933+de1 reference fa lec 4x1Q933+de1 reference fa lec 4x1
Q933+de1 reference fa lec 4x1AFATous
 
Q933+de1 reference fa lec
Q933+de1 reference fa lecQ933+de1 reference fa lec
Q933+de1 reference fa lecAFATous
 
Q932+log reference fa lec 4 x1
Q932+log reference fa lec 4 x1Q932+log reference fa lec 4 x1
Q932+log reference fa lec 4 x1AFATous
 
Q932+stm reference fa lec 4x1
Q932+stm reference fa lec 4x1Q932+stm reference fa lec 4x1
Q932+stm reference fa lec 4x1AFATous
 
Q932+rrl reference fa lec
Q932+rrl reference fa lecQ932+rrl reference fa lec
Q932+rrl reference fa lecAFATous
 
Q932+stm reference fa lec
Q932+stm reference fa lecQ932+stm reference fa lec
Q932+stm reference fa lecAFATous
 
Q932+rrl reference fa lec 4x1
Q932+rrl reference fa lec 4x1Q932+rrl reference fa lec 4x1
Q932+rrl reference fa lec 4x1AFATous
 
Q932+sgo reference fa lec 4x1
Q932+sgo reference fa lec 4x1Q932+sgo reference fa lec 4x1
Q932+sgo reference fa lec 4x1AFATous
 
Q932+sgo reference fa lec
Q932+sgo reference fa lecQ932+sgo reference fa lec
Q932+sgo reference fa lecAFATous
 

Mehr von AFATous (20)

جزوه درس نمودارگیری از چاه، ویرایش ششم
جزوه درس نمودارگیری از چاه، ویرایش ششم جزوه درس نمودارگیری از چاه، ویرایش ششم
جزوه درس نمودارگیری از چاه، ویرایش ششم
 
جزوه درس مهندسی حفاری دو، ویرایش ششم
جزوه درس مهندسی حفاری دو، ویرایش ششم جزوه درس مهندسی حفاری دو، ویرایش ششم
جزوه درس مهندسی حفاری دو، ویرایش ششم
 
جزوه درس مهندسی بهره برداری دو، ویرایش دوم
جزوه درس مهندسی بهره برداری دو، ویرایش دومجزوه درس مهندسی بهره برداری دو، ویرایش دوم
جزوه درس مهندسی بهره برداری دو، ویرایش دوم
 
جزوه درس مهندسی حفاری یک،ویرایش ششم
جزوه درس مهندسی حفاری یک،ویرایش ششمجزوه درس مهندسی حفاری یک،ویرایش ششم
جزوه درس مهندسی حفاری یک،ویرایش ششم
 
جزوه درس انگیزش چاه (اسیدکاری)، ویرایش دوم
جزوه درس انگیزش چاه (اسیدکاری)، ویرایش دومجزوه درس انگیزش چاه (اسیدکاری)، ویرایش دوم
جزوه درس انگیزش چاه (اسیدکاری)، ویرایش دوم
 
Q933+log reference fa lec
Q933+log reference fa lecQ933+log reference fa lec
Q933+log reference fa lec
 
Q933+log reference fa lec 4x1
Q933+log reference fa lec 4x1Q933+log reference fa lec 4x1
Q933+log reference fa lec 4x1
 
Q933+po2 reference fa lec
Q933+po2 reference fa lecQ933+po2 reference fa lec
Q933+po2 reference fa lec
 
Q933+po2 reference fa lec 4x1
Q933+po2 reference fa lec 4x1Q933+po2 reference fa lec 4x1
Q933+po2 reference fa lec 4x1
 
Q933+de2 reference fa lec 4x1
Q933+de2 reference fa lec 4x1Q933+de2 reference fa lec 4x1
Q933+de2 reference fa lec 4x1
 
Q933+de2 reference fa lec
Q933+de2 reference fa lecQ933+de2 reference fa lec
Q933+de2 reference fa lec
 
Q933+de1 reference fa lec 4x1
Q933+de1 reference fa lec 4x1Q933+de1 reference fa lec 4x1
Q933+de1 reference fa lec 4x1
 
Q933+de1 reference fa lec
Q933+de1 reference fa lecQ933+de1 reference fa lec
Q933+de1 reference fa lec
 
Q932+log reference fa lec 4 x1
Q932+log reference fa lec 4 x1Q932+log reference fa lec 4 x1
Q932+log reference fa lec 4 x1
 
Q932+stm reference fa lec 4x1
Q932+stm reference fa lec 4x1Q932+stm reference fa lec 4x1
Q932+stm reference fa lec 4x1
 
Q932+rrl reference fa lec
Q932+rrl reference fa lecQ932+rrl reference fa lec
Q932+rrl reference fa lec
 
Q932+stm reference fa lec
Q932+stm reference fa lecQ932+stm reference fa lec
Q932+stm reference fa lec
 
Q932+rrl reference fa lec 4x1
Q932+rrl reference fa lec 4x1Q932+rrl reference fa lec 4x1
Q932+rrl reference fa lec 4x1
 
Q932+sgo reference fa lec 4x1
Q932+sgo reference fa lec 4x1Q932+sgo reference fa lec 4x1
Q932+sgo reference fa lec 4x1
 
Q932+sgo reference fa lec
Q932+sgo reference fa lecQ932+sgo reference fa lec
Q932+sgo reference fa lec
 

Kürzlich hochgeladen

Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessAggregage
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...noida100girls
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Tina Ji
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurSuhani Kapoor
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetDenis Gagné
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechNewman George Leech
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 

Kürzlich hochgeladen (20)

Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for Success
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman Leech
 
KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 

Drilling Engineering 2 Course Casing Program Development

  • 1. Drilling Engineering 2 Course (1st Ed.)
  • 2. 1. 2. 3. 4. 5. 6. Laminar Flow in Pipes and Annuli Turbulent Flow in Pipes and Annuli Pressure Drop Across Surface Connections Pressure Drop Across Bit Optimization of Bit Hydraulics Particle Slip Velocity
  • 3. Casing functions Casing costs compromise one of the largest cost items of the drilling project. Therefore proper planning of casing setting depths and casing selection is vital to realize a cost effective and safe well. The casings themselves fulfill multiple functions that can be summarized as: Isolate porous formations with different fluid-pressure regimes from contaminating the pay zone, Prevent near surface fresh water zones from contamination with drilling mud, Protect the hole from caving in, Provide a connection and support of the wellhead equipment, Provide exact dimensions for running testing, completion and production subsurface equipment. Fall 13 H. AlamiNia Drilling Engineering 2 Course (1st Ed.) 3
  • 4. Casing Types According to the different functions, the total casing program consists of different casings strings. Conductor Casing Surface Casing Intermediate Casing Production Casing Liners Fall 13 H. AlamiNia Drilling Engineering 2 Course (1st Ed.) 4
  • 5. Conductor Casing The function of the conductor is to enable circulation of the drilling fluid to the shale shakers without eroding the surface sediments directly below the rig foundation. The conductor prevents the subsequent casings from corrosion and may partly support the wellhead weight. Commonly a diverter is installed on top of the conductor casing to divert an unexpected inflow of formation fluids into the wellbore away from the rig-site and the personal. Conductor setting depths are in the range of 150 to 600 [ft] (46-183 m), their seizes range from 36 to 20 [in] (0.91-0.5 m). Fall 13 H. AlamiNia Drilling Engineering 2 Course (1st Ed.) 5
  • 6. Surface Casing The function of the surface casing is  to prevent cave in of unconsolidated, weak near-surface formations as well as protect the shallow, freshwater sands from contamination with drilling mud.  As the conductors, surface casing protects the subsequent casings from corrosion. Before the surface casing is set,  no blow out preventers (BOP) are installed.  After setting the surface casing and installing the wellhead, a BOP is available to handle kicks when drilling the intermediate hole section. Surface casing setting depths are in the range from 300 to 5,000 [ft] (91-1524 m), their diameters range from 24 to 17-1/2 [in].  the surface casing setting depth is often determined by government or company policy and not selected due to technical reasoning. Fall 13 H. AlamiNia Drilling Engineering 2 Course (1st Ed.) 6
  • 7. Intermediate Casing The intermediate casing string is a purely technical casing. One or more may be necessary to handle abnormal formation pressures, unstable shale formations, lost circulation or cave-in zones. An intermediate casing may also be necessary to realize the planned mud weight profile. When for example an abnormally pressured formation is encountered, it may have to be protected by an intermediate casing so when formation pressure of the formations below is normal, a lower mud weight can be applied. Intermediate casing diameters range from 17-1/2 to 9- 5/8 [in]. Fall 13 H. AlamiNia Drilling Engineering 2 Course (1st Ed.) 7
  • 8. Production Casing The production casing is set through the prospective production zone(s). This casing string protects the environment in case of production tubing failure and permits the tubing string to be maintained or replaced during the production life. Commonly production casing and production liners have gas-tight connections, their diameters range from 9-5/8 to 5 [in]. A production casing diameter of 7 [in] is encountered often. Fall 13 H. AlamiNia Drilling Engineering 2 Course (1st Ed.) 8
  • 9. Liners To save cost, the casing installed sometimes doesn’t reach until the surface but finishes within the previous string. Such a casing configuration is called liner. A liner is mounted on a so called “liner hanger” to the previous casing string. Commonly the liner head is several hundred feet into the previous casing to enable a good cement seal. Liner Fall 13 H. AlamiNia Drilling Engineering 2 Course (1st Ed.) 9
  • 10. Various typical casing programs Fall 13 H. AlamiNia Drilling Engineering 2 Course (1st Ed.) 10
  • 11. develop a casing program To develop a casing program, first the various casing setting depths have to be determined. Since the primary reason to drill a well is to produce hydrocarbons out of a reservoir, the final casing inside diameters have to be large enough to allow for the forecasted completion and production schemes. Factors like completion type (open hole, cased hole, monobore production, etc.), expected amount of production (production tubing seize), expected production forecast (e.g. need of gas-lift, etc.) and seize of evaluation tools to be run have to be considered. In general, for production purposes the well diameters shall be as large as possible. Fall 13 H. AlamiNia Drilling Engineering 2 Course (1st Ed.) 11
  • 12. Advantages of small hole sizes On the other hand, as small as possible hole seizes reduces the total cost of the well since: drilling times are faster, less mud has to be used (purchase and disposal of mud), smaller mud equipment can be used (cleaning, pumps, etc.), smaller casings can be used (cheaper, higher strength at same grade), smaller rig can be applied (lighter casings, smaller mud volume), rig site can be smaller (especially important offshore and platform types like TLP where weights are limited). Out of this reason a technology called slim-hole drilling was developed. Fall 13 H. AlamiNia Drilling Engineering 2 Course (1st Ed.) 12