Civil engineer Andrés José Barrós Velázquez has extensive experience in various civil engineering projects. These include designing infrastructure projects like roads, harbors, and buildings. He has worked on projects in Spain, including the Balearic Islands, Andalusia, and Cantabria regions. Barrós Velázquez has expertise in areas like project engineering, construction management, and research.
2. INTRODUCCIÓN
CIVIL ENINEERING
Civil engineering is the branch of engineering that applies the
knowledge of physics, chemistry, calculus and geology to the
development of infrastructure, transport and hydraulic works. The
term "civil" is used because of the origin of civil engineering is distinct
from military engineering.
It also has a strong organization component that achieves its
application in the management of urban environment mainly rural
and often, not only in terms of construction, but also the
maintenance, control and operation of the built and in planning life in
the environment designed from the same. This includes territorial
organization plans such as disaster prevention, traffic control and
transportation, water management, utilities, waste and all activities
that guarantee the welfare of humanity that develops life built on civil
works and operated by engineers.
Andrés José Barrós Velázquez
Civil Engineer
3. INTRODUCTION
CIVIL ENGINEERING
Andrés José Barrós Velázquez
Civil Engineer
4.
5. MAIN QUALIFICATION
CIVIL ENGINEERING DEGREE
Andrés José Barrós Velázquez
Civil Engineer
18. MAIN WORKS
PROJECT ENGINEER
TECHNICAL PROJECT MANAGEMENT AT SITE
HEALTH AND SAFETY MANAGER AT SITE
TECHNICAL OFFERS
RESEARCHER R+D+I
CONSTRUCTION ENGINEER INTERNSHIP (PRODUCTION Y
TECHNICAL OFFICE)
PARTICIPATION IN NATIONAL AND INTERNATIONAL
TENDERS
Andrés José Barrós Velázquez
Civil Engineer
19. DETAILED WORKS
PROJECT ENGINEER
Engineering projects
Hydraulics
Roads
Maritime Engineering
Railway
Structural design
Building
Airport engineering
TECHNICAL PROJECT MANAGER AT SITE
Civil works and buildings project management at site
HEALTH AND SAFETY MANAGER
Health and safety manager at project phase
Health and safety manager at site (Civil work and building)
TECHNICAL OFFERS
Offer preparation for technical assintances, engineering project s, technical project and health and safety manager a site for
Public Administrations (Govern Balear, Junta de Andalucía, Consell Insular de Mallorca, Consell Insular
d’Eivissa, Aquamed, Aena, Puertos del Estado, Ministerio de Fomento…)
Offer preparation for works for construction companies (Ferrovial-Agromán, FCC, Amer e Hijos, Llull Sastre, Pyocsa, Astilleros
Amilibia.
Public tender redaction for administrative concessions(Basic Project, Financial-economic studies…)
RESEARCHER R+D+I
Development of research in hydrology and maritime works.
CONSTRUCTION ENGINEER INTERNSHIP (TECHNICAL OFFICE AND PRODUCTION)
Support for excavating & trucking production unit and structures production unit
Support for the technical office unit at site
Support for te quality unit at site
PARTICIPATION IN NATIONAL AND INTERNATIONAL TENDERS
Participation in ideas contests both in Spain and abroad
Andrés José Barrós Velázquez
Civil Engineer
21. GANTRY CRANE DESIGN IN SLAG TREATMENT AREHOUSE
CLIENT:
TIRME S.A.
SCOPE OF THE WORKS:
Construction project
COMPLETION PERIOD:
June 2010– July 2010
KEY INFORMATION:
Span between pillars: 9 m
Overload: 3 Ton
INVESTMENT BUDGET
83.000 €
LOCATION:
Palma (Mallorca). Balearic Islands,
Spain.
Andrés José Barrós Velázquez
Civil Engineer
22. MA-30 ROAD CONVERSION IN A FOUR LANE-ROAD BETWEEN
SON FERRIOL AND INCA ROAD (MA-13). ACCÉS PLA DE NA TESA
CLIENT:
Consell Insular de Mallorca
SCOPE OF THE WORKS:
Basic and Construction Project
COMPLETION PERIOD:
June 2010– December 2010
KEY INFORMATION:
3500 m of road
Overpass and underpass Projets
Containment walls
INVESTMENT BUDGET:
8.808.503,37 €
LOCATION:
Palma andMarratxí (Mallorca).
Balearic Islands, Spain.
GENERAL INFORMATION:
Four-lane conversion and road surface
replacement
One intersection with three branches.
Four roundabouts
Structures (Overpass, underpass and
containment walls)
Andrés José Barrós Velázquez
Civil Engineer
23. MASTER PLAN OF SANT ANTONI DE PORMANY HARBOR
CLIENT:
Ports de les Balearic Islands
SCOPE OF THE WORKS:
Master Plan
COMPLETION PERIOD:
March 2010– Marzo 2011
KEY INFORMATION:
Infrastructures, land uses and
operations master plan
INVESTMENT BUDGET
67.512,00 €
LOCATION:
Sant Antoni de Portmany (Ibiza).
Balearic Islands, Spain.
GENERAL INFORMATION:
Optimization of land uses and
moorings
Maneuverability studies
Maritime climate studies
Structures predimensioning
Andrés José Barrós Velázquez
Civil Engineer
24. MASTER PLAN OF ANDRATX HARBOR AND SECONDARY
INSTALLATIONS
CLIENT:
Ports de les Balearic Islands
SCOPE OF THE WORKS:
Master Plan
COMPLETION PERIOD:
Marzo 2011–
KEY INFORMATION:
Infrastructures, land uses and
operations master plan.
It also includes the installations of Sant
Elm, Estellencs, Banyalbufar and Cala
Lladó
INVESTMENT BUDGET:
95.960,00 €
LOCATION:
Andratx (Mallorca). Balearic
Islands, Spain.
DATOS GENERALES:
Optimization of land uses and
moorings
Maneuverability studies
Maritime climate studies
Andrés José Barrós Velázquez
Structures predimensioning Civil Engineer
25. ACCESS TO A-315 ROAD FROM THE AREA OF THE PARTIAL PLAN
P5 AT ZUJAR
CLIENT:
Junta de Andalucía - Sa Costa de
Bunyola S.L.
SCOPE OF THE WORKS:
Construction Project
COMPLETION PERIOD:
June 2011 - July 2011
KEY INFORMATION:
T intersection. Existing drainage
improvement and containment wall.
INVESTMENT BUDGET:
36.536,12 €
LOCATION:
Zújar (Granada). Andalucia, Spain.
Andrés José Barrós Velázquez
Civil Engineer
26. PARKING AND OFFICES BUILDING
CLIENT:
Autoritat Portuaria de Balears – La
Savina Urbana S. L.
SCOPE OF THE WORKS:
Basic project
COMPLETION PERIOD:
September 2010 – October 2010
KEY INFORMATION:
A four-story building with one of them
subterranean.
INVESTMENT BUDGET:
3.466.878,89 €
LOCATION:
La Savina Harbor (Formentera).
Balearic Islands, Spain.
Andrés José Barrós Velázquez
Civil Engineer
27. STABILITY REPORT OF A PILOTED JETTY
CLIENT:
Ports de les Balearic Islands – Amer e
hijos, Obres i Serveis
SCOPE OF THE WORKS:
Technical report
COMPLETION PERIOD:
April 2011
KEY INFORMATION:
Justification of the chosen solution in
the modified project.
AWARDING BUDGET:
-
LOCATION:
Pollença Harbor (Mallorca). Balearic
Islands, Spain.
Andrés José Barrós Velázquez
Civil Engineer
28. THREE SILOS FOR CEMENT STORAGE
CLIENT:
Autoritat Portuaria de Balears – Sitges
Reunides S. L.
SCOPE OF THE WORKS:
Construction project
COMPLETION PERIOD:
January 2010 – May 2010
KEY INFORMATION:
2.200 m2 of surface
3 silos with storage capacity of 5.000 t
of cement
INVESTMENT BUDGET:
14.575.367,39 €
LOCATION:
Alcudia Harbor (Mallorca). Balearic
Islands, Spain.
Andrés José Barrós Velázquez
Civil Engineer
29. TWO WAREHOUSES FOR STORAGING CHEMICAL PRODUCTS
CLIENT:
TIRME
SCOPE OF THE WORKS:
Construction project
COMPLETION PERIOD:
January 2010 – Mayo2011
KEY INFORMATION:
Two warehouses for storaging chemical
products.
Surface of 400m2
PRESUPUESTO DE EJECUCIÓN:
121.425,05 + 116.135,35 €
LOCATION:
Palma (Mallorca). Balearic Islands,
Spain.
Andrés José Barrós Velázquez
Civil Engineer
30. PLOT ADAPTATION FOR RENT A CAR
CLIENT:
Goldcar Rental
SCOPE OF THE WORKS:
Construction project
COMPLETION PERIOD:
April 2010 – May 2010
KEY INFORMATION:
Plot and installations
(plumbing, ellectrical…) adaptation for
rent a car.
INVESTMENT BUDGET:
446.796,79 €
LOCATION:
Palma airport (Mallorca). Balearic
Islands, Spain.
Andrés José Barrós Velázquez
Civil Engineer
31. LEVEL CROSSING DISMANTLING. JACKED UNDERPASS SYSTEM I
CLIENT:
Serveis Ferroviaris de Mallorca
SCOPE OF THE WORKS:
Construction project
COMPLETION PERIOD:
September 2010 – February 2011
KEY INFORMATION:
Underpass project using jacked
underpass system
INVESTMENT BUDGET:
999.632,63 €
LOCATION:
Pont d’Inca (Mallorca). Balearic
Islands, Spain.
Andrés José Barrós Velázquez
Civil Engineer
32. LEVEL CROSSING DISMANTLING. JACKED UNDERPASS SYSTEM II
CLIENT:
Serveis Ferroviaris de Mallorca
SCOPE OF THE WORKS:
Construction project
COMPLETION PERIOD:
September 2010 – February 2011
KEY INFORMATION:
Underpass project using jacked
underpass system
INVESTMENT BUDGET:
612.565,48 €
LOCATION:
Marratxí (Mallorca). Balearic
Islands, Spain.
Andrés José Barrós Velázquez
Civil Engineer
33. LEVEL CROSSING DISMANTLING. OVERPASS
CLIENT:
Serveis Ferroviaris de Mallorca
SCOPE OF THE WORKS:
Construction Project
COMPLETION PERIOD:
September 2010 – February 2011
KEY INFORMATION:
Overpass of prestressed concrete
INVESTMENT BUDGET:
352.197,51 €
LOCATION:
Petra(Mallorca). Balearic
Islands, Spain.
Andrés José Barrós Velázquez
Civil Engineer
34. REFORM OF FUEL SUPPLY FACILITY FOR SHIPS
CLIENT:
Marina de Formentera S.L. – Autoritat
Portuaria de Balears
SCOPE OF THE WORKS:
Basic project
COMPLETION PERIOD:
September 2010
KEY INFORMATION:
Reform of fuel supply facility for ships
INVESTMENT BUDGET:
317.980,80 €
LOCATION:
La Savina Harbor(Formentera).
Balearic Islands, Spain.
Andrés José Barrós Velázquez
Civil Engineer
35. MEDITERRÁNEO JETTY
CLIENT:
Port Ebussus S.L. – Autoritat Portuaria
de Balears
SCOPE OF THE WORKS:
Basic Poject
COMPLETION PERIOD:
September 2010 – October 2010
KEY INFORMATION:
Reorganization and reform of jetty
INVESTMENT BUDGET:
1.505.469,38 €
LOCATION:
Palma Harbor (Mallorca). Balearic
Islands, Spain.
Andrés José Barrós Velázquez
Civil Engineer
36. BUILDING ADAPTATION
CLIENT:
Marina de Formentera S.L.– Autoritat
Portuaria de Balears
SCOPE OF THE WORKS:
Basic and Construction project
COMPLETION PERIOD:
January 2011 – February 2011
KEY INFORMATION:
Bricklaying reform
Plumbling, electric an gas installations
INVESTMENT BUDGET:
208.455,66 €
LOCATION:
La Savina Harbor(Formentera).
Balearic Islands, Spain.
Andrés José Barrós Velázquez
Civil Engineer
37. STRUCTURE FOR PLOT ACCESS
CLIENT:
Private - ABAQUA
SCOPE OF THE WORKS:
Construction
COMPLETION PERIOD:
April 2011 – June 2011
KEY INFORMATION:
Concrete underpass for crossing
stream
Hydrological study
INVESTMENT BUDGET:
16.893,23 €
LOCATION:
Sencelles (Mallorca). Balearic
Islands, Spain.
Andrés José Barrós Velázquez
Civil Engineer
38. NOISE MAPS AND CORRECTIVE MEASURES FOR ROADS
CLIENT:
Consell Insular d’Eivissa
SCOPE OF THE WORKS:
Preparation of noise maps
Proposition of corrective measures
COMPLETION PERIOD:
July 2010 –
KEY INFORMATION:
PHASE A: Noise Maps (phonograms)
FASE B: Proposition of corrective
measures
AWARD BUDGET:
133.945,20 €
LOCATION:
Ibiza . Balearic Islands, Spain.
Andrés José Barrós Velázquez
Civil Engineer
39. INSTALLATION AND EMERGENCY PROJECTS
CLIENT:
Ajuntament de Calviá
SCOPE OF THE WORKS:
Installation and emergency projects of
public buildings
COMPLETION PERIOD:
April 2010 –
KEY INFORMATION:
Installation and emergency projects of
49 public buildings
AWARD BUDGET:
97.754,71 €
LOCATION:
Calviá (Mallorca). Balearic
Islands, Spain.
Andrés José Barrós Velázquez
Civil Engineer
40. TECHNICAL AND OPERATIVE REORGANIZATION
CLIENT:
Autoridad Portuaria de Santander
SCOPE OF THE WORKS:
Economic and technical viability study.
Basic Project of reorganization
COMPLETION PERIOD:
Diciembre 2009 –
KEY INFORMATION:
814 moorings.
18.000 m2 superficie construida.
42.000m2 de superficie a desarrollar
65.000m2 de espejo de agua
24.000 m2 de superficie de amarre
PRESUPUESTO DE INVERSIÓN
8.000.000,00 €
LOCATION:
Santander. Cantabria, Spain.
Andrés José Barrós Velázquez
Civil Engineer
41. GEOTECHNICAL AND ESTRUCTURAL DESIGN SPECIALIST:
REMODELING OF AIRPORT PLATFORM
CLIENT:
UTE TYPSA GPB – AENA
SCOPE OF THE WORKS:
Technical reports
COMPLETION PERIOD:
June 2011
KEY INFORMATION:
Report about submerged concrete
structure which will contain a
hydrocarbon separator plant.
tablestacasssssssssssssss
INVESTMENT BUDGET:
27.603.542,14€
LOCATION:
Palma Airport(Mallorca). Balearic
Islands, Spain.
GENERAL INFORMATION:
Obra Remodelación de la Plataforma
A, Fase II de Aeropuerto de Palma de
Mallorca.
Andrés José Barrós Velázquez
Civil Engineer
42. PORT FACILITIES INSPECTIONS
CLIENT:
Autoritat Portuaria de Balears
SCOPE OF THE WORKS:
Development of inspection systems of
the bathymetry and infrastructure
related to defense and maritime
berthing works rates and for obtaining
the status of port operations.
COMPLETION PERIOD:
December 2008 – June 2010
KEY INFORMATION:
11.000 ml of docks
4.000 ml of breakwaters
INVESTMENT BUDGET:
197.890 €
LOCATION:
Palma Harbor (Mallorca). Balearic
Islands, Spain.
Andrés José Barrós Velázquez
Civil Engineer
43. STRUCTURE OF SINGULAR TOWER
CLIENT:
delCorral Arquitectos
SCOPE OF THE WORKS:
Structural design
COMPLETION PERIOD:
October 2008 – January 2009
KEY INFORMATION:
Helicoid structure design
Thyssen Krupp International Contest
INVESTMENT BUDGET
-
LOCATION:
Al-Jazaabel Park (Dubai). United
Arabian Emirates
Andrés José Barrós Velázquez
Civil Engineer
44. CICCP NEW HEADQUARTERS
CLIENT:
delCorral Arquitectos
SCOPE OF THE WORKS:
Structural design
COMPLETION PERIOD:
October 2009 – December 2009
KEY INFORMATION:
Concrete structure design
CICCP new Headquarters contest
INVESTMENT BUDGET:
-
LOCATION:
Granada. Andalucía, Spain.
Andrés José Barrós Velázquez
Civil Engineer
45. TECHNICAL PROJECT MANAGER AT SITE
HEALTH AND SAFETY MANAGER AT SITE
Andrés José Barrós Velázquez
Civil Engineer
46. ADECUACIÓN DE EDIFICIO
CLIENT:
Marina de Formentera S.L.– Autoritat
Portuaria de Balears
SCOPE OF THE WORKS:
Basic and Construction project
COMPLETION PERIOD:
April 2011 – June 2011
KEY INFORMATION:
Bricklaying reform
Plumbling, electric an gas installations
INVESTMENT BUDGET:
208.455,66 €
LOCATION:
La Savina Harbor(Formentera).
Balearic Islands, Spain.
Andrés José Barrós Velázquez
Civil Engineer
47. ENCLOSURE FOR INSTALLING METAL STRUCTURE TO LIFT AT
WASTE TREATMENT PLANT EXISTING
CLIENT:
TIRME S.A.
SCOPE OF THE WORKS:
Technical project manager at site
Health and safety manager al site
COMPLETION PERIOD:
March 2011 – October 2011
KEY INFORMATION:
Steel structure of 39 m high
Concrete slab foundation and concrete
walls
INVESTMENT BUDGET:
119.185,40 €
LOCATION:
Palma (Mallorca). Balearic
Islands, Spain.
Andrés José Barrós Velázquez
Civil Engineer
51. PILOT PROJECT FOR INTEGRATED MANAGEMENT OF
GUADALFEO RIVER BASIN
CLIENT:
Junta de Andalucía - UGR
SCOPE OF THE WORKS:
Hydrological studies
Computer programmer
COMPLETION PERIOD:
December 2004- August 2005
KEY INFORMATION:
General characterization odf the rver
basin (biological, urbanistic,
meteorological)
GIS integratio of the river basin
Sedimentological studies
Scale model studies
ASSIGNED BUDGET:
2.437.620,00 €
LOCATION:
Granada. Andalucía, Spain.
Andrés José Barrós Velázquez
Civil Engineer
52. DESIGN, CONSTRUCTION AND START UP OF
MULTIDIRECTIONAL WAVE TANK
CLIENT:
UGR
SCOPE OF THE WORKS:
Structural design
Technical project manager at site
Computer programmer
COMPLETION PERIOD:
January 2005 – June 2005
KEY INFORMATION:
Design, construction, start up and
programming of control and data
acquisition system in multidirectional
wave tank in ETSICCP hydraulics
laboratory, Universidad de Granada
ASIGNED BUDGET
10.000,00 €
LOCATION:
Granada. Andalucía, Spain.
Andrés José Barrós Velázquez
Civil Engineer
53. STABILITY STUDIES, USING A SCALE MODEL IN
MULTIDIRECTIONAL WAVE TANK MULTIDIRECCIONAL
CLIENT:
Autoridad portuaria de Gijón - UGR
SCOPE OF THE WORKS:
Programmer
Results interpretation
COMPLETION PERIOD:
Mayo 2005 – Agosto 2005
KEY INFORMATION:
Stability studies, using a scale model in
multidirectional wave tank for the
Torres Dam (Gijón)
INVESTMENT BUDGET:
-
LOCATION:
Granada. Andalucía, Spain.
Andrés José Barrós Velázquez
Civil Engineer