SlideShare a Scribd company logo
1 of 29
Specialization
 Behavioral Approaches to Job
Design
 Teams
 Methods Analysis
 Motions Study
 Working conditions

 Job

design involves specifying the
content and methods of job

•
•
•
•

What will be done?
Who will do the job?
How the job will be done?
Where the job will be done?
Successful Job Design must be:
 Carried

out by experienced personnel
with the necessary training and
background
 Consistent with the goals of the
organization
 In

written form
 Understood and agreed to by both
For
Management:Labor:
For
1. Low education a
1. Simplifies training

skill requirement
2. High productivity
2.Minimum
3. Low wage costs responsibilities
3.Little mental effo
needed
For anagement: Labor:
M
For

1.
1. Difficult to motivateMonotonous work
quality
2. Limited opportuni
for advancement
2. Worker dissatisfaction,
possibly resulting3. Little control over
in
absenteeism, high Little opportunity
4.
turnover, disruptiveself-fulfillment
tactics, poor attention
to quality


Job Enlargement - giving a

worker a larger portion of the
total task by horizontal loading

 Job

Rotation - workers

 Job

Enrichment - increasing

periodically exchange jobs

responsibility for planning and
coordination tasks, by vertical


Motivation
◦Influences quality and
productivity
◦Contributes to work environment



Trust
◦Influences productivity and
employee-management relations


Benefits of teams
◦Higher quality
◦Higher productivity
◦Greater worker satisfaction



Self-directed teams
◦Groups of empowered to make
certain changes in their work
process
Analyzing how a job
gets done
Begins with overall
analysis
Moves to specific
details
The need for methods analysis can
come from a number of different
sources:






Changes in tools and equipment
Changes in product design
or new products

Changes in materials or procedures
Other factors (e.g. accidents, quality
problems)
Identify the operation to be studied
2.Get employee input
3.Study and document current method
4.Analyze the job
5.Propose new methods
6.Install new methods
7.Follow-up to ensure improvements
have been achieved
1.
Selecting a job to study consider:
◦ High labor content
◦ Done frequently
◦ Unsafe
◦ Tiring
◦ Unpleasant
◦ Noisy
◦ Designated problem


Flow process chart
◦ Chart used to examine the overall
sequence of an operation by
focusing on movements of the
operator or flow of materials



Worker-machine chart
◦ Chart used to determine portions of
a work cycle during which an
operator and equipment are busy or
Motion study
- is the
systematic
study of the
human
motions used
to perform an






Motion study principles - guidelines
for designing motion-efficient work
procedures
Analysis of therbligs - basic elemental
motions into which a job can be broken
down
Micromotion study - use of motion
pictures and slow motion to study motions
that otherwise would be too rapid to
analyze
Eliminate unnecessary
motions
2. Combine activities
3. Reduce fatigue
4. Improve the arrangement of
the workplace
5. Improve the design of tools
1.
Therbligs - basic elemental motions
that make up a job.
◦ Search
◦ Select
◦ Grasp
◦ Hold
◦ Transport load
◦ Release load
Temperature &
Humidity

Illumination

Ventilation

Color
Noise & Vibration

Safety

Work Breaks

Causes of Accidents
Work measurement - determining how
long it should take to do a job.
◦ Standard time
◦ Stopwatch time study
◦ Historical times
◦ Predetermined data
◦ Work Sampling
The amount of time it should
take a qualified worker to
complete a specific
task, working at a
sustainable rate, using given
methods, tools and
equipment, raw
Stopwatch Time Study - development of
a time standard based on observations
of one worker taken over a number of
cycles.
The basic steps in a time study
1.
2.
3.
4.

Define the task to be studied
Determine the number of cycles to observe
Time the job
Compute the standard time
Standard elemental times - time
standards derived from a firm’s
historical data.
Steps for standard elemental
times
1. Analyze the job
2. Check file for historical times
3. Modify file times if necessary
Predetermined time standards published data based on extensive
research to determine standard
elemental times.
Advantages
1. Based on large number of workers
under controlled conditions
2. Analyst not requires to rate
Work sampling - technique for
estimating the proportion of time that
a worker or machine spends on
various activities and idle time.
- involves making brief observations of
a worker or machine at random
intervals
Work sampling does not require
◦ timing an activity


Accurate

 Easy

to apply

 Consistent
 Easy

to
understand

 Fair


Time-based system
◦Compensation based on time an
employee has worked during a
pay period



Output-based (incentive)
system
◦Compensation based on the
 Individual

Incentive Plans

 Group

Plans

Incentive

 Knowledge-Based

Pay System

 Management

More Related Content

What's hot (20)

Capacity Management
Capacity ManagementCapacity Management
Capacity Management
 
Capacity planning
Capacity planningCapacity planning
Capacity planning
 
Ch17 scheduling
Ch17 schedulingCh17 scheduling
Ch17 scheduling
 
Capacity planning
Capacity planningCapacity planning
Capacity planning
 
Process selection
Process selectionProcess selection
Process selection
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
 
Assembly Line Balancing -Example
Assembly Line Balancing -ExampleAssembly Line Balancing -Example
Assembly Line Balancing -Example
 
Product and service design
Product and service designProduct and service design
Product and service design
 
Work measurement
Work measurementWork measurement
Work measurement
 
Aggregate Planning Report
Aggregate Planning ReportAggregate Planning Report
Aggregate Planning Report
 
Work design & measurement
Work design & measurementWork design & measurement
Work design & measurement
 
Lean operations presentation
Lean operations   presentationLean operations   presentation
Lean operations presentation
 
Chapter-7 Job Design and Work Measurement Final.pptx
Chapter-7 Job Design and Work Measurement Final.pptxChapter-7 Job Design and Work Measurement Final.pptx
Chapter-7 Job Design and Work Measurement Final.pptx
 
Work measurement (1)
Work measurement (1)Work measurement (1)
Work measurement (1)
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
 
work measurement_operation management
work measurement_operation managementwork measurement_operation management
work measurement_operation management
 
Motion and time study
Motion and time studyMotion and time study
Motion and time study
 
PRODUCT AND SERVICE DESIGN
 PRODUCT AND SERVICE DESIGN  PRODUCT AND SERVICE DESIGN
PRODUCT AND SERVICE DESIGN
 
Facility planning
Facility planningFacility planning
Facility planning
 
Time study
Time studyTime study
Time study
 

Viewers also liked

Chapter 7 process strategy production and operation and management
Chapter 7  process strategy production and operation and management Chapter 7  process strategy production and operation and management
Chapter 7 process strategy production and operation and management Christine Aguirre Cayanan
 
Motion economy work design_
Motion economy work design_Motion economy work design_
Motion economy work design_Selman Kaymaz
 
Scheduling and how scheduling in best buses
Scheduling and how scheduling in best busesScheduling and how scheduling in best buses
Scheduling and how scheduling in best busesSagar Srivastava
 
Sample Systems Design Case Study (Systems Analysis & Design)
Sample Systems Design Case Study (Systems Analysis & Design)Sample Systems Design Case Study (Systems Analysis & Design)
Sample Systems Design Case Study (Systems Analysis & Design)Ai Lun Wu
 
Design an HR architecture for the differentiated workforce”
Design an HR architecture for the differentiated workforce”Design an HR architecture for the differentiated workforce”
Design an HR architecture for the differentiated workforce” Najeebhemat Malikzia
 
8 ethical and social considerations in strategy development
8 ethical and social considerations in strategy development8 ethical and social considerations in strategy development
8 ethical and social considerations in strategy developmentTaranpreet Kaur
 
Summit14 -T2.5: Global Recruitment Plan -Oxfam
Summit14 -T2.5: Global Recruitment Plan -OxfamSummit14 -T2.5: Global Recruitment Plan -Oxfam
Summit14 -T2.5: Global Recruitment Plan -OxfamJobvite
 
Selection for Fit, Recruitment and selection, HRM
Selection for Fit, Recruitment and selection, HRMSelection for Fit, Recruitment and selection, HRM
Selection for Fit, Recruitment and selection, HRMRaja Manzar
 
Measuring work by physiological methods
Measuring work by physiological methodsMeasuring work by physiological methods
Measuring work by physiological methodsKiran Hanjar
 
Design and redesign of work system
Design and redesign of work systemDesign and redesign of work system
Design and redesign of work systemSeredup Maya
 
Investment perspective of human resource management
Investment perspective of human resource managementInvestment perspective of human resource management
Investment perspective of human resource managementSeredup Maya
 
Ere webinar 082615 recruiting strategies
Ere webinar 082615 recruiting strategiesEre webinar 082615 recruiting strategies
Ere webinar 082615 recruiting strategiesDr. John Sullivan
 
Attract & Retain Millennial Talent in the Food Industry
Attract & Retain Millennial Talent in the Food Industry Attract & Retain Millennial Talent in the Food Industry
Attract & Retain Millennial Talent in the Food Industry Alchemy Systems
 
Digital recruitment strategies to attract top talent
Digital recruitment strategies to attract top talentDigital recruitment strategies to attract top talent
Digital recruitment strategies to attract top talentMargaret Buj
 

Viewers also liked (20)

Work system design
Work system designWork system design
Work system design
 
Chapter 7 process strategy production and operation and management
Chapter 7  process strategy production and operation and management Chapter 7  process strategy production and operation and management
Chapter 7 process strategy production and operation and management
 
Motion economy work design_
Motion economy work design_Motion economy work design_
Motion economy work design_
 
Scheduling and how scheduling in best buses
Scheduling and how scheduling in best busesScheduling and how scheduling in best buses
Scheduling and how scheduling in best buses
 
Sample Systems Design Case Study (Systems Analysis & Design)
Sample Systems Design Case Study (Systems Analysis & Design)Sample Systems Design Case Study (Systems Analysis & Design)
Sample Systems Design Case Study (Systems Analysis & Design)
 
Design an HR architecture for the differentiated workforce”
Design an HR architecture for the differentiated workforce”Design an HR architecture for the differentiated workforce”
Design an HR architecture for the differentiated workforce”
 
Marriott Hotel
Marriott HotelMarriott Hotel
Marriott Hotel
 
Work system
Work systemWork system
Work system
 
Banapple
BanappleBanapple
Banapple
 
Knowledge Work 2020
Knowledge Work 2020Knowledge Work 2020
Knowledge Work 2020
 
8 ethical and social considerations in strategy development
8 ethical and social considerations in strategy development8 ethical and social considerations in strategy development
8 ethical and social considerations in strategy development
 
Summit14 -T2.5: Global Recruitment Plan -Oxfam
Summit14 -T2.5: Global Recruitment Plan -OxfamSummit14 -T2.5: Global Recruitment Plan -Oxfam
Summit14 -T2.5: Global Recruitment Plan -Oxfam
 
Selection for Fit, Recruitment and selection, HRM
Selection for Fit, Recruitment and selection, HRMSelection for Fit, Recruitment and selection, HRM
Selection for Fit, Recruitment and selection, HRM
 
Measuring work by physiological methods
Measuring work by physiological methodsMeasuring work by physiological methods
Measuring work by physiological methods
 
Design and redesign of work system
Design and redesign of work systemDesign and redesign of work system
Design and redesign of work system
 
Work physiology
Work physiologyWork physiology
Work physiology
 
Investment perspective of human resource management
Investment perspective of human resource managementInvestment perspective of human resource management
Investment perspective of human resource management
 
Ere webinar 082615 recruiting strategies
Ere webinar 082615 recruiting strategiesEre webinar 082615 recruiting strategies
Ere webinar 082615 recruiting strategies
 
Attract & Retain Millennial Talent in the Food Industry
Attract & Retain Millennial Talent in the Food Industry Attract & Retain Millennial Talent in the Food Industry
Attract & Retain Millennial Talent in the Food Industry
 
Digital recruitment strategies to attract top talent
Digital recruitment strategies to attract top talentDigital recruitment strategies to attract top talent
Digital recruitment strategies to attract top talent
 

Similar to Design of Work Systems

Work study method study-work measurement
Work study method study-work measurementWork study method study-work measurement
Work study method study-work measurementEr. Vaibhav Agarwal
 
presentation group 5.pptx
presentation group 5.pptxpresentation group 5.pptx
presentation group 5.pptxDouglassRasuh1
 
Om lect 08(r0-june-08)_basics of work study_work measurement_mms_bharti_sies
Om lect 08(r0-june-08)_basics of work study_work measurement_mms_bharti_siesOm lect 08(r0-june-08)_basics of work study_work measurement_mms_bharti_sies
Om lect 08(r0-june-08)_basics of work study_work measurement_mms_bharti_siesvideoaakash15
 
Operations ManagementServices
Operations ManagementServicesOperations ManagementServices
Operations ManagementServicesahmad bassiouny
 
CH-7 Design.ppt
CH-7 Design.pptCH-7 Design.ppt
CH-7 Design.pptAbinet17
 
Civil Construction management : time and motion study
Civil Construction management : time and motion study Civil Construction management : time and motion study
Civil Construction management : time and motion study Yash Shah
 
Work study-1223702337445335-9
Work study-1223702337445335-9Work study-1223702337445335-9
Work study-1223702337445335-9varsharocks
 
Work study-1223702337445335-9
Work study-1223702337445335-9Work study-1223702337445335-9
Work study-1223702337445335-9Shweta Varshney
 
Time and Motion Study
Time and Motion StudyTime and Motion Study
Time and Motion Studylearnito
 
Method Study
Method StudyMethod Study
Method Studyajithsrc
 
Ppc unit-2-work study
Ppc   unit-2-work studyPpc   unit-2-work study
Ppc unit-2-work studykarthi keyan
 

Similar to Design of Work Systems (20)

Lecture9,10,11
Lecture9,10,11Lecture9,10,11
Lecture9,10,11
 
Work study
Work studyWork study
Work study
 
Work study method study-work measurement
Work study method study-work measurementWork study method study-work measurement
Work study method study-work measurement
 
Work study new
Work study newWork study new
Work study new
 
Garments
Garments Garments
Garments
 
Management tools
Management toolsManagement tools
Management tools
 
presentation group 5.pptx
presentation group 5.pptxpresentation group 5.pptx
presentation group 5.pptx
 
Jivan work study
Jivan work studyJivan work study
Jivan work study
 
Om lect 08(r0-june-08)_basics of work study_work measurement_mms_bharti_sies
Om lect 08(r0-june-08)_basics of work study_work measurement_mms_bharti_siesOm lect 08(r0-june-08)_basics of work study_work measurement_mms_bharti_sies
Om lect 08(r0-june-08)_basics of work study_work measurement_mms_bharti_sies
 
Operations ManagementServices
Operations ManagementServicesOperations ManagementServices
Operations ManagementServices
 
CH-7 Design.ppt
CH-7 Design.pptCH-7 Design.ppt
CH-7 Design.ppt
 
Civil Construction management : time and motion study
Civil Construction management : time and motion study Civil Construction management : time and motion study
Civil Construction management : time and motion study
 
Work Study
Work StudyWork Study
Work Study
 
Work study-1223702337445335-9
Work study-1223702337445335-9Work study-1223702337445335-9
Work study-1223702337445335-9
 
Work study-1223702337445335-9
Work study-1223702337445335-9Work study-1223702337445335-9
Work study-1223702337445335-9
 
Time and Motion Study
Time and Motion StudyTime and Motion Study
Time and Motion Study
 
Measurment techniques
Measurment techniquesMeasurment techniques
Measurment techniques
 
Work Study
Work Study Work Study
Work Study
 
Method Study
Method StudyMethod Study
Method Study
 
Ppc unit-2-work study
Ppc   unit-2-work studyPpc   unit-2-work study
Ppc unit-2-work study
 

More from aizellbernal

Strategic Human Resource
Strategic Human ResourceStrategic Human Resource
Strategic Human Resourceaizellbernal
 
Pay-for-Performance Plan
Pay-for-Performance Plan Pay-for-Performance Plan
Pay-for-Performance Plan aizellbernal
 
Business Process Benchmarking
Business Process BenchmarkingBusiness Process Benchmarking
Business Process Benchmarkingaizellbernal
 
Learning: Theories and Program Design
Learning: Theories and Program DesignLearning: Theories and Program Design
Learning: Theories and Program Designaizellbernal
 
Job Analysis and Rewards
Job Analysis and RewardsJob Analysis and Rewards
Job Analysis and Rewardsaizellbernal
 
Supply Chain Management
Supply Chain ManagementSupply Chain Management
Supply Chain Managementaizellbernal
 
Ownership and Organization
Ownership and OrganizationOwnership and Organization
Ownership and Organizationaizellbernal
 
The Struggle for Survival and Prosperity
The Struggle for Survival and ProsperityThe Struggle for Survival and Prosperity
The Struggle for Survival and Prosperityaizellbernal
 
Employment and Security of Tenure
Employment and Security of TenureEmployment and Security of Tenure
Employment and Security of Tenureaizellbernal
 
The Human Element In An Iindustrial Organization
The Human Element In An Iindustrial OrganizationThe Human Element In An Iindustrial Organization
The Human Element In An Iindustrial Organizationaizellbernal
 
Concept of 5S and Office Management
Concept of 5S and Office ManagementConcept of 5S and Office Management
Concept of 5S and Office Managementaizellbernal
 

More from aizellbernal (20)

Strategic Human Resource
Strategic Human ResourceStrategic Human Resource
Strategic Human Resource
 
Strategic HR
Strategic HRStrategic HR
Strategic HR
 
Pay-for-Performance Plan
Pay-for-Performance Plan Pay-for-Performance Plan
Pay-for-Performance Plan
 
Job Analysis
Job AnalysisJob Analysis
Job Analysis
 
Change Management
Change ManagementChange Management
Change Management
 
Business Process Benchmarking
Business Process BenchmarkingBusiness Process Benchmarking
Business Process Benchmarking
 
Single Parenthood
Single ParenthoodSingle Parenthood
Single Parenthood
 
Learning: Theories and Program Design
Learning: Theories and Program DesignLearning: Theories and Program Design
Learning: Theories and Program Design
 
e-learning
e-learninge-learning
e-learning
 
eHRM
eHRMeHRM
eHRM
 
Job Analysis and Rewards
Job Analysis and RewardsJob Analysis and Rewards
Job Analysis and Rewards
 
Supply Chain Management
Supply Chain ManagementSupply Chain Management
Supply Chain Management
 
Scramble King
Scramble KingScramble King
Scramble King
 
Belo Essentials
Belo EssentialsBelo Essentials
Belo Essentials
 
Bejeweled
BejeweledBejeweled
Bejeweled
 
Ownership and Organization
Ownership and OrganizationOwnership and Organization
Ownership and Organization
 
The Struggle for Survival and Prosperity
The Struggle for Survival and ProsperityThe Struggle for Survival and Prosperity
The Struggle for Survival and Prosperity
 
Employment and Security of Tenure
Employment and Security of TenureEmployment and Security of Tenure
Employment and Security of Tenure
 
The Human Element In An Iindustrial Organization
The Human Element In An Iindustrial OrganizationThe Human Element In An Iindustrial Organization
The Human Element In An Iindustrial Organization
 
Concept of 5S and Office Management
Concept of 5S and Office ManagementConcept of 5S and Office Management
Concept of 5S and Office Management
 

Recently uploaded

08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking MenDelhi Call girls
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksSoftradix Technologies
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
Maximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxMaximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxOnBoard
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...HostedbyConfluent
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticscarlostorres15106
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking MenDelhi Call girls
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitecturePixlogix Infotech
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...shyamraj55
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsMark Billinghurst
 
How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?XfilesPro
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Allon Mureinik
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxMalak Abu Hammad
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 

Recently uploaded (20)

08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other Frameworks
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
Maximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxMaximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptx
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
Transforming Data Streams with Kafka Connect: An Introduction to Single Messa...
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC Architecture
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
 
Human Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR SystemsHuman Factors of XR: Using Human Factors to Design XR Systems
Human Factors of XR: Using Human Factors to Design XR Systems
 
How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 

Design of Work Systems

  • 1.
  • 2. Specialization  Behavioral Approaches to Job Design  Teams  Methods Analysis  Motions Study  Working conditions 
  • 3.  Job design involves specifying the content and methods of job • • • • What will be done? Who will do the job? How the job will be done? Where the job will be done?
  • 4. Successful Job Design must be:  Carried out by experienced personnel with the necessary training and background  Consistent with the goals of the organization  In written form  Understood and agreed to by both
  • 5. For Management:Labor: For 1. Low education a 1. Simplifies training skill requirement 2. High productivity 2.Minimum 3. Low wage costs responsibilities 3.Little mental effo needed
  • 6. For anagement: Labor: M For 1. 1. Difficult to motivateMonotonous work quality 2. Limited opportuni for advancement 2. Worker dissatisfaction, possibly resulting3. Little control over in absenteeism, high Little opportunity 4. turnover, disruptiveself-fulfillment tactics, poor attention to quality
  • 7.  Job Enlargement - giving a worker a larger portion of the total task by horizontal loading  Job Rotation - workers  Job Enrichment - increasing periodically exchange jobs responsibility for planning and coordination tasks, by vertical
  • 8.  Motivation ◦Influences quality and productivity ◦Contributes to work environment  Trust ◦Influences productivity and employee-management relations
  • 9.  Benefits of teams ◦Higher quality ◦Higher productivity ◦Greater worker satisfaction  Self-directed teams ◦Groups of empowered to make certain changes in their work process
  • 10. Analyzing how a job gets done Begins with overall analysis Moves to specific details
  • 11. The need for methods analysis can come from a number of different sources:     Changes in tools and equipment Changes in product design or new products Changes in materials or procedures Other factors (e.g. accidents, quality problems)
  • 12. Identify the operation to be studied 2.Get employee input 3.Study and document current method 4.Analyze the job 5.Propose new methods 6.Install new methods 7.Follow-up to ensure improvements have been achieved 1.
  • 13. Selecting a job to study consider: ◦ High labor content ◦ Done frequently ◦ Unsafe ◦ Tiring ◦ Unpleasant ◦ Noisy ◦ Designated problem
  • 14.  Flow process chart ◦ Chart used to examine the overall sequence of an operation by focusing on movements of the operator or flow of materials  Worker-machine chart ◦ Chart used to determine portions of a work cycle during which an operator and equipment are busy or
  • 15. Motion study - is the systematic study of the human motions used to perform an
  • 16.    Motion study principles - guidelines for designing motion-efficient work procedures Analysis of therbligs - basic elemental motions into which a job can be broken down Micromotion study - use of motion pictures and slow motion to study motions that otherwise would be too rapid to analyze
  • 17. Eliminate unnecessary motions 2. Combine activities 3. Reduce fatigue 4. Improve the arrangement of the workplace 5. Improve the design of tools 1.
  • 18. Therbligs - basic elemental motions that make up a job. ◦ Search ◦ Select ◦ Grasp ◦ Hold ◦ Transport load ◦ Release load
  • 20. Noise & Vibration Safety Work Breaks Causes of Accidents
  • 21. Work measurement - determining how long it should take to do a job. ◦ Standard time ◦ Stopwatch time study ◦ Historical times ◦ Predetermined data ◦ Work Sampling
  • 22. The amount of time it should take a qualified worker to complete a specific task, working at a sustainable rate, using given methods, tools and equipment, raw
  • 23. Stopwatch Time Study - development of a time standard based on observations of one worker taken over a number of cycles. The basic steps in a time study 1. 2. 3. 4. Define the task to be studied Determine the number of cycles to observe Time the job Compute the standard time
  • 24. Standard elemental times - time standards derived from a firm’s historical data. Steps for standard elemental times 1. Analyze the job 2. Check file for historical times 3. Modify file times if necessary
  • 25. Predetermined time standards published data based on extensive research to determine standard elemental times. Advantages 1. Based on large number of workers under controlled conditions 2. Analyst not requires to rate
  • 26. Work sampling - technique for estimating the proportion of time that a worker or machine spends on various activities and idle time. - involves making brief observations of a worker or machine at random intervals Work sampling does not require ◦ timing an activity
  • 27.  Accurate  Easy to apply  Consistent  Easy to understand  Fair
  • 28.  Time-based system ◦Compensation based on time an employee has worked during a pay period  Output-based (incentive) system ◦Compensation based on the
  • 29.  Individual Incentive Plans  Group Plans Incentive  Knowledge-Based Pay System  Management