Site Preparation/Site Clearance
            SMM2 / SECTION D / Page 16

Site Preparation / Site Clearance is a work of
clearing the ensure that the project site, ready to
built the building

The work involved as follows: -
4.Clearing of grass, shrubs.
5.Cutting trees.
6.Take out their root.
Site Clearance / Site Preparation
Site Clearance / Site Preparation
Site Clearance / Site Preparation
105.00m
                                                                                                      Symbol :
                                                                                                           ***      Bushes &
                        *           *               *           *                   U=                     ***      Grass
                                                                                    950
                                                                                                                    Hedges
                                              *
                                        *


                            45000
                                                  U=
        *                                         1050
                                                           *
                                                                * U=                                                Tree
                                          *        **               850
        *                                                   *                       *
                            *                                   *




                                                                                            210.00m
                                                                                                                    Girth
        *
                                                                          U=
                                                                          550           *                   U
                    *               U=
                                    450                               *
                                                                     U=
                                                                     250            *
    *                                U=
                                                                        U=
                                                                        290
                                                                                *
                                     650

                                                                                        *
            39000




                                                                      U=
                        *                                             1100
                                    U=                                              *
                                    1005
*                   *                                    U=
                                                         1050




                                145.00m




                                                                                                                 SMM2        T.O LIST
105.00m
                              Symbol :
                                   ***      Bushes &
                                   ***      Grass
                                            Hedges




                                            Tree




                    210.00m
                                            Girth
                                    U




145.00m




                                         SMM2        T.O LIST
CQ

                    Taking Off List

Bil                   Item                           Unit

1.    Clearing undergrowth                             m2
2.    Cutting down trees not exceeding 300mm girth    No
3.    Cutting down trees 300mm b.n.e 600mm girth      No
4.    Cutting down trees 600mm b.n.e 900mm girth      No
5.    Cutting down trees 900 b.n.e 1200mm girth       No
6.    Cutting down hedges                              m




                                                            SMM2   SITE PLAN
CQ

                Clearing site                             Cutting down trees

                                      Area
                                Ave. length               Cutting down trees n.e 300mm
                                    105.00                girth at 1.00m high above
                                Add 145.00                ground level and grubbing up
                                                 2        their roots and filling voids left
                                  2 250.00                by removal of roots with
                                                     2
                                                          material arising from
                                    125.00                excavation
                                     Width
                                     210.00

                                                          Cutting down trees 300mm
                Clearing site of undergrowth,             b.n.e 600mm girth at 1.00m
125.00          bushes, scrub and the like and            high above ground level and
210.00          grubbing up their roots          2        grubbing up their roots and
     26250.00
                                                     2    filling voids left by removal of
                                                          roots with material arising from
                                                          excavation




                                                         SMM 2         T.O List     SITE PLAN
Cutting down trees




                                             U = Girth
                     1m


According to D5 SMM2 page 16 SECTION D

                                     SMM 2   T.O List    SITE PLAN
Cutting down trees


   U = 900                 U = 250



               U = 300                           U = 450


                                 U = 550
    U = 1000
Not exceeding 300                            2 nos
Exceeding 300mm but not exceeding 600        2 nos
Exceeding 600mm b.n.e 900mm                  1 no
Exceeding 900mm b.n.e 1200mm                 1 no


                                     SMM 2    T.O List     SITE PLAN
Cutting down hedges


                    Length



   High




According to D2SMM2 page 16 SECTION D




                                        SMM 2   T.O List   SITE PLAN
CQ

        Cutting down                                       Cutting down
        trees                                              hedges
                                                                                    length

        Cutting down trees n.e 600mm                                                 45000
        b.n.e 900mm girth at 1.00m                                              Add 39000
        high above ground level and                                                  84000
2       grubbing up their roots and
    2   filling voids left by removal of
        roots with material arising from                   Cutting down hedges average
        excavation                                         900mm high and grubbing up
                                                           their roots and filling voids left
                                           84.00           by removal of roots with
                                                   84.00   material arising from
        Cutting down trees 900mm                           excavation
        b.n.e 1200mm girth at 1.00m
        high above ground level and
5       grubbing up their roots and
    5   filling voids left by removal of
        roots with material arising from
        excavation
                                                                     Sekian




                                                       SMM 2         T.O List     SITE PLAN
T.Off List         SITE PLAN



             STANDARD METHOD OF MEASUREMENT
            (Building Works) SMM 2 SECTION D Page 16
           Item                 Description                 Explanation of                 Explanation of
     (Taking Off List)                                        taking-off                    measurement
1.        Clearing site   1.   Clearing site of        D.3 –Removal of               Title of work shall
                               undergrowth bushes,          vegetation that was      be described to
                               scrub & the like &           cut does not need to     facilitate
                               grubbing up their            be mentioned             review
                               roots                        because of the work
                                                            included in the          D.3 – Site clearance must
7.        Cutting down    •    Cutting down trees           measurement items        be measured in m2.
          trees                n.e 300mm girth at
                               1.oom high above        D.4 - Give back filling the   D.4 – Cutting tree must
                               ground level &               hole dug where           be measured in no.
                               grubbing up their            necessary and work
                               roots & filling voids        are separated by
                               left by removal of           cutting trees in the
                               roots with material          tree circumference
                               arising from                 measured at 300mm
                               excavation
                                                       D.23 – Specify the type
                          •    Ditto; 300mm b.n.e          of material used to
                               600mm girth; ditto          bury behind the hole
                                                           according to the
                          •    Ditto; 600mm b.n.e          classification given.
                               900mm girth; ditto

                          •    Ditto; 900mm b.n.e
                               1200mm girth; ditto
105.00m
                                                                                                      Symbol :
                                                                                                           ***      Bushes &
                        *           *               *           *                   U=                     ***      Grass
                                                                                    950
                                                                                                                    Hedges
                                              *
                                        *


                            45000
                                                  U=
        *                                         1050
                                                           *
                                                                * U=                                                Tree
                                          *        **               850
        *                                                   *                       *
                            *                                   *




                                                                                            210.00m
                                                                                                                    Girth
        *
                                                                          U=
                                                                          550           *                   U
                    *               U=
                                    450                               *
                                                                     U=
                                                                     250            *
    *                                U=
                                                                        U=
                                                                        290
                                                                                *
                                     650

                                                                                        *
            39000




                                                                      U=
                        *                                             1100
                                    U=                                              *
                                    1005
*                   *                                    U=
                                                         1050




                                145.00m




                                                                                                                 SMM2        T.O LIST
T.Off List         SITE PLAN



             STANDARD METHOD OF MEASUREMENT
            (Building Works) SMM 2 SECTION D Page 16
           Item                Description                 Explanation of               Explanation of
     (Taking Off List)                                       taking-off                   measurement
1.       Cutting down    1.   Cutting down hibiscus   D.2 – state the type and    Title of work shall
         hedges                hedges average              high of cutting down   be described to
                               900mm high &                hedges                 facilitate
                               grubbing their roots                               review

                                                                                  D.2 – Cutting down hedges
                                                                                  shall be measured in m
SEKIAN
           TERIMA KASIH




05/23/12
KUIZ 1
                    masa: 10Minit
1. Specify the type of material used to bury behind the hole
     according to the classification given.

     Specify the girth "diameter" trees that should be
     considered in the work of cutting trees      (5 Markah)

2. State the unit of measurement for the following work: -
vi. Clearing site
vii. Cutting down trees
viii. Cutting down hedges
                                                   (5 Markah)
103.45m
                                                                                                      Symbol :
                                                                                                           ***     Bushes &
                        *           *               *           *                   U=                     ***     Grass
                                                                                    750
                                                                                                                   Hedges
                                              *
                                        *


                            45000
                                                  U=
        *                                         1250
                                                           *
                                                                * U=                                               Tree
                                          *        **               750
        *                                                   *                       *
                            *                                   *




                                                                                            207.50m
                                                                                                                   Girth
        *
                                                                          U=
                                                                          650           *                   U
                    *               U=
                                    350                               *
                                                                     U=
                                                                     220            *
    *                                U=
                                                                        U=
                                                                        350
                                                                                *
                                     650

                                                                                        *
            39000




                                                                                                       CADANGAN MEMBINA DAN
                                                                      U=                               MENYIAPKAN SEBUAH
                        *                                             1250
                                                                                                       BANGLO 2 TINGKAT DI
                                    U=                                              *                  LOT 123 MUKIM AMAN,
                                    1050
                                                                                                       JITRA
*                   *                                    U=
                                                         1050




                                155.00m
                                                                                               Drwg No: CQ103/SC/STD WK 1/DUB 1

Weitere ähnliche Inhalte

Was ist angesagt?

DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAMDIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
Anep Botak
 
Pembinaan
PembinaanPembinaan
Pembinaan
anis
 
The construction method for surface drainage (housing)
The construction method for surface drainage (housing)The construction method for surface drainage (housing)
The construction method for surface drainage (housing)
Adib Ramli
 
Chapter 2 soil investigation
Chapter 2 soil investigationChapter 2 soil investigation
Chapter 2 soil investigation
AmiRul AFiq
 
Scale of fees (rev. 2004)
Scale of fees (rev. 2004)Scale of fees (rev. 2004)
Scale of fees (rev. 2004)
helmie84
 
Chapter 3
Chapter 3Chapter 3
Chapter 3
Est
 

Was ist angesagt? (20)

DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAMDIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
DIFFERENCE BETWEEN CONTRACT FORM JKR 203A & PAM
 
Pembinaan
PembinaanPembinaan
Pembinaan
 
Ukur aras-levelling
Ukur aras-levellingUkur aras-levelling
Ukur aras-levelling
 
Wblff (1)
Wblff (1)Wblff (1)
Wblff (1)
 
DCC3113 DETERMINATION OF AGGREGATE IMPACT VALUE.
DCC3113 DETERMINATION OF AGGREGATE IMPACT VALUE.DCC3113 DETERMINATION OF AGGREGATE IMPACT VALUE.
DCC3113 DETERMINATION OF AGGREGATE IMPACT VALUE.
 
Presentation subsoil investigation foundation recommendation geotechnical ass...
Presentation subsoil investigation foundation recommendation geotechnical ass...Presentation subsoil investigation foundation recommendation geotechnical ass...
Presentation subsoil investigation foundation recommendation geotechnical ass...
 
The construction method for surface drainage (housing)
The construction method for surface drainage (housing)The construction method for surface drainage (housing)
The construction method for surface drainage (housing)
 
Method of Statement - Pavement works
Method of Statement - Pavement worksMethod of Statement - Pavement works
Method of Statement - Pavement works
 
Struktur dan asas bangunan
Struktur dan asas bangunanStruktur dan asas bangunan
Struktur dan asas bangunan
 
SITE REPORT (PAD FOOTING)
SITE REPORT (PAD FOOTING)SITE REPORT (PAD FOOTING)
SITE REPORT (PAD FOOTING)
 
Chapter 2 soil investigation
Chapter 2 soil investigationChapter 2 soil investigation
Chapter 2 soil investigation
 
Spun pile
Spun pileSpun pile
Spun pile
 
Scale of fees (rev. 2004)
Scale of fees (rev. 2004)Scale of fees (rev. 2004)
Scale of fees (rev. 2004)
 
Estimating calculation
Estimating calculationEstimating calculation
Estimating calculation
 
clause 51.0 and 53.0 - contract
clause 51.0 and 53.0 - contractclause 51.0 and 53.0 - contract
clause 51.0 and 53.0 - contract
 
50451783 taking-off-quantity
50451783 taking-off-quantity50451783 taking-off-quantity
50451783 taking-off-quantity
 
Chapter 3
Chapter 3Chapter 3
Chapter 3
 
pointing, plastering, bonding
pointing, plastering, bondingpointing, plastering, bonding
pointing, plastering, bonding
 
Pengenalan industri binaan ok
Pengenalan industri binaan okPengenalan industri binaan ok
Pengenalan industri binaan ok
 
Probe machintosh
Probe machintoshProbe machintosh
Probe machintosh
 

Andere mochten auch

07.site preparation.civil
07.site preparation.civil07.site preparation.civil
07.site preparation.civil
Nguyen Bao
 
1 1 Introduction Construction Industry
1 1 Introduction Construction Industry1 1 Introduction Construction Industry
1 1 Introduction Construction Industry
missnadz
 
Section 9.3 water treatment
Section 9.3 water treatmentSection 9.3 water treatment
Section 9.3 water treatment
Martin Brown
 
LECTURE VI CONST.TEC V Thermal Insulation of Buildings
LECTURE VI CONST.TEC V Thermal Insulation of BuildingsLECTURE VI CONST.TEC V Thermal Insulation of Buildings
LECTURE VI CONST.TEC V Thermal Insulation of Buildings
Darpan Arora
 
Room Acoustics
Room AcousticsRoom Acoustics
Room Acoustics
Drew
 

Andere mochten auch (20)

excavation equipment used for construction
excavation equipment used for constructionexcavation equipment used for construction
excavation equipment used for construction
 
Demolition Equipment/Technique Available
Demolition Equipment/Technique Available Demolition Equipment/Technique Available
Demolition Equipment/Technique Available
 
Site preparation
Site preparationSite preparation
Site preparation
 
07.site preparation.civil
07.site preparation.civil07.site preparation.civil
07.site preparation.civil
 
1 1 Introduction Construction Industry
1 1 Introduction Construction Industry1 1 Introduction Construction Industry
1 1 Introduction Construction Industry
 
Site Preparation for Home Building
Site Preparation for Home BuildingSite Preparation for Home Building
Site Preparation for Home Building
 
Formwork construction in structures
Formwork construction in structuresFormwork construction in structures
Formwork construction in structures
 
Section 9.3 water treatment
Section 9.3 water treatmentSection 9.3 water treatment
Section 9.3 water treatment
 
site preparation
 site preparation site preparation
site preparation
 
Setting Out Construction
Setting Out ConstructionSetting Out Construction
Setting Out Construction
 
LECTURE VI CONST.TEC V Thermal Insulation of Buildings
LECTURE VI CONST.TEC V Thermal Insulation of BuildingsLECTURE VI CONST.TEC V Thermal Insulation of Buildings
LECTURE VI CONST.TEC V Thermal Insulation of Buildings
 
Preparation of a site part 6
Preparation of a site part 6Preparation of a site part 6
Preparation of a site part 6
 
E-Safety Day 2016
E-Safety Day 2016E-Safety Day 2016
E-Safety Day 2016
 
Google Penguin Update: Is Your Site Ready?
Google Penguin Update: Is Your Site Ready?Google Penguin Update: Is Your Site Ready?
Google Penguin Update: Is Your Site Ready?
 
The Causes & Solutions to Water Infiltration In Your Building
The Causes & Solutions to Water Infiltration In Your BuildingThe Causes & Solutions to Water Infiltration In Your Building
The Causes & Solutions to Water Infiltration In Your Building
 
Scaffolding 101
Scaffolding 101Scaffolding 101
Scaffolding 101
 
Water Heating Options and Solar Water
Water Heating Options and Solar WaterWater Heating Options and Solar Water
Water Heating Options and Solar Water
 
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PDF
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PDFCTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PDF
CTEP - UNIT-V - CONSTRUCTION EQUIPMENTS PDF
 
Building Construction - Foundation
Building Construction - FoundationBuilding Construction - Foundation
Building Construction - Foundation
 
Room Acoustics
Room AcousticsRoom Acoustics
Room Acoustics
 

Kürzlich hochgeladen

Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
ZurliaSoop
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
daisycvs
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
vineshkumarsajnani12
 

Kürzlich hochgeladen (20)

Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service AvailableNashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
 
Kalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book nowKalyan Call Girl 98350*37198 Call Girls in Escort service book now
Kalyan Call Girl 98350*37198 Call Girls in Escort service book now
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
 
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
 
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur DubaiUAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
UAE Bur Dubai Call Girls ☏ 0564401582 Call Girl in Bur Dubai
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
 
HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024HomeRoots Pitch Deck | Investor Insights | April 2024
HomeRoots Pitch Deck | Investor Insights | April 2024
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service AvailableBerhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
 
Arti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfArti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdf
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGParadip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Paradip CALL GIRL❤7091819311❤CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 

Element site preparation new

  • 1. CQ103 – BUILDING WORKS MEASUREMENT 1 Prepared by: RUHAIZAT BINTI JUBRI Lecturer Quantity Surveyor Unit Civil Engineering Department POLIMAS
  • 2. Site Preparation/Site Clearance SMM2 / SECTION D / Page 16 Site Preparation / Site Clearance is a work of clearing the ensure that the project site, ready to built the building The work involved as follows: - 4.Clearing of grass, shrubs. 5.Cutting trees. 6.Take out their root.
  • 3. Site Clearance / Site Preparation
  • 4. Site Clearance / Site Preparation
  • 5. Site Clearance / Site Preparation
  • 6. 105.00m Symbol : *** Bushes & * * * * U= *** Grass 950 Hedges * * 45000 U= * 1050 * * U= Tree * ** 850 * * * * * 210.00m Girth * U= 550 * U * U= 450 * U= 250 * * U= U= 290 * 650 * 39000 U= * 1100 U= * 1005 * * U= 1050 145.00m SMM2 T.O LIST
  • 7. 105.00m Symbol : *** Bushes & *** Grass Hedges Tree 210.00m Girth U 145.00m SMM2 T.O LIST
  • 8. CQ Taking Off List Bil Item Unit 1. Clearing undergrowth m2 2. Cutting down trees not exceeding 300mm girth No 3. Cutting down trees 300mm b.n.e 600mm girth No 4. Cutting down trees 600mm b.n.e 900mm girth No 5. Cutting down trees 900 b.n.e 1200mm girth No 6. Cutting down hedges m SMM2 SITE PLAN
  • 9. CQ Clearing site Cutting down trees Area Ave. length Cutting down trees n.e 300mm 105.00 girth at 1.00m high above Add 145.00 ground level and grubbing up 2 their roots and filling voids left 2 250.00 by removal of roots with 2 material arising from 125.00 excavation Width 210.00 Cutting down trees 300mm Clearing site of undergrowth, b.n.e 600mm girth at 1.00m 125.00 bushes, scrub and the like and high above ground level and 210.00 grubbing up their roots 2 grubbing up their roots and 26250.00 2 filling voids left by removal of roots with material arising from excavation SMM 2 T.O List SITE PLAN
  • 10. Cutting down trees U = Girth 1m According to D5 SMM2 page 16 SECTION D SMM 2 T.O List SITE PLAN
  • 11. Cutting down trees U = 900 U = 250 U = 300 U = 450 U = 550 U = 1000 Not exceeding 300 2 nos Exceeding 300mm but not exceeding 600 2 nos Exceeding 600mm b.n.e 900mm 1 no Exceeding 900mm b.n.e 1200mm 1 no SMM 2 T.O List SITE PLAN
  • 12. Cutting down hedges Length High According to D2SMM2 page 16 SECTION D SMM 2 T.O List SITE PLAN
  • 13. CQ Cutting down Cutting down trees hedges length Cutting down trees n.e 600mm 45000 b.n.e 900mm girth at 1.00m Add 39000 high above ground level and 84000 2 grubbing up their roots and 2 filling voids left by removal of roots with material arising from Cutting down hedges average excavation 900mm high and grubbing up their roots and filling voids left 84.00 by removal of roots with 84.00 material arising from Cutting down trees 900mm excavation b.n.e 1200mm girth at 1.00m high above ground level and 5 grubbing up their roots and 5 filling voids left by removal of roots with material arising from excavation Sekian SMM 2 T.O List SITE PLAN
  • 14. T.Off List SITE PLAN STANDARD METHOD OF MEASUREMENT (Building Works) SMM 2 SECTION D Page 16 Item Description Explanation of Explanation of (Taking Off List) taking-off measurement 1. Clearing site 1. Clearing site of D.3 –Removal of Title of work shall undergrowth bushes, vegetation that was be described to scrub & the like & cut does not need to facilitate grubbing up their be mentioned review roots because of the work included in the D.3 – Site clearance must 7. Cutting down • Cutting down trees measurement items be measured in m2. trees n.e 300mm girth at 1.oom high above D.4 - Give back filling the D.4 – Cutting tree must ground level & hole dug where be measured in no. grubbing up their necessary and work roots & filling voids are separated by left by removal of cutting trees in the roots with material tree circumference arising from measured at 300mm excavation D.23 – Specify the type • Ditto; 300mm b.n.e of material used to 600mm girth; ditto bury behind the hole according to the • Ditto; 600mm b.n.e classification given. 900mm girth; ditto • Ditto; 900mm b.n.e 1200mm girth; ditto
  • 15. 105.00m Symbol : *** Bushes & * * * * U= *** Grass 950 Hedges * * 45000 U= * 1050 * * U= Tree * ** 850 * * * * * 210.00m Girth * U= 550 * U * U= 450 * U= 250 * * U= U= 290 * 650 * 39000 U= * 1100 U= * 1005 * * U= 1050 145.00m SMM2 T.O LIST
  • 16. T.Off List SITE PLAN STANDARD METHOD OF MEASUREMENT (Building Works) SMM 2 SECTION D Page 16 Item Description Explanation of Explanation of (Taking Off List) taking-off measurement 1. Cutting down 1. Cutting down hibiscus D.2 – state the type and Title of work shall hedges hedges average high of cutting down be described to 900mm high & hedges facilitate grubbing their roots review D.2 – Cutting down hedges shall be measured in m
  • 17. SEKIAN TERIMA KASIH 05/23/12
  • 18. KUIZ 1 masa: 10Minit 1. Specify the type of material used to bury behind the hole according to the classification given. Specify the girth "diameter" trees that should be considered in the work of cutting trees (5 Markah) 2. State the unit of measurement for the following work: - vi. Clearing site vii. Cutting down trees viii. Cutting down hedges (5 Markah)
  • 19. 103.45m Symbol : *** Bushes & * * * * U= *** Grass 750 Hedges * * 45000 U= * 1250 * * U= Tree * ** 750 * * * * * 207.50m Girth * U= 650 * U * U= 350 * U= 220 * * U= U= 350 * 650 * 39000 CADANGAN MEMBINA DAN U= MENYIAPKAN SEBUAH * 1250 BANGLO 2 TINGKAT DI U= * LOT 123 MUKIM AMAN, 1050 JITRA * * U= 1050 155.00m Drwg No: CQ103/SC/STD WK 1/DUB 1

Hinweis der Redaktion

  1. C 2381 - UKUR KERJA BANGUNAN
  2. C 2381 - UKUR KERJA BANGUNAN
  3. C 2381 - UKUR KERJA BANGUNAN
  4. C 2381 - UKUR KERJA BANGUNAN
  5. C 2381 - UKUR KERJA BANGUNAN
  6. C 2381 - UKUR KERJA BANGUNAN
  7. C 2381 - UKUR KERJA BANGUNAN
  8. C 2381 - UKUR KERJA BANGUNAN
  9. C 2381 - UKUR KERJA BANGUNAN
  10. C 2381 - UKUR KERJA BANGUNAN
  11. C 2381 - UKUR KERJA BANGUNAN
  12. C 2381 - UKUR KERJA BANGUNAN
  13. C 2381 - UKUR KERJA BANGUNAN
  14. C 2381 - UKUR KERJA BANGUNAN
  15. C 2381 - UKUR KERJA BANGUNAN
  16. C 2381 - UKUR KERJA BANGUNAN
  17. C 2381 - UKUR KERJA BANGUNAN
  18. C 2381 - UKUR KERJA BANGUNAN
  19. C 2381 - UKUR KERJA BANGUNAN