C.V
AHMED FATHI ABOUZAED ELSAYED
AL-ZAHER DISTRICT, MECCA
Tel:
00966-548176749
00966-593946965
E-Mail: Eng.ahmad102010@gmail.com
Eng.ahmed102010@yahoo.com
______________________________________________
Personal information
Date of birth 05/ 01/ 1985
Nationality Egyptian
Gender Male
Religion Moslem
Martial states Married
Military status DONE
Education:
Bachelor of Mechanical power Engineering Department, Shoubra Faculty of
Engineering
Benha-University-2007-Grade: GOOD
Major B.S.C Mechanical power
Grade Good
Project Design of Central air conditioning
system for Residential Building
(Grade: Excellent)
Work Experiences
1- Inside Egypt:
(E.N.CO) ENGINEERING OFFICE COMPANY
Type of business or sector:-
Design and Project Management Engineering Company.
Occupation or Position held and Dates.
- Mechanical engineer from JULY 2007-JULY 2008
Projects:
GOLDEN COAST RESORT (Sharm El-sheikh)
Site mechanical engineer
Installation of all mechanical (Plumbing, Fire, HVAC) Systems.
Activities
- Review all shop drawing and coordinate any another works In project
- Responsible of man power activities and ensure that they Have the latest and
update modification
- Manage and supervise the site progress against contract program In project.
- Installation of Mechanical Work (Plumbing, Fire, HVAC) System
HVAC:
- Installation of duct work & equipments, chilled water pipes network.
- Installation of all equipments (AHU & FCU & Exhaust fan)
- Installation control valve assembly of equipments (AHU & FCU & Pump )
- Preparation of as-built drawings.
- Participation in testing & commissioning.
Fire Fighting:
- Installation of fire fighting network.
- Installation of fire pumps and mechanical pumps room.
- Participation in testing & commissioning.
- Preparation of as-built drawings.
Plumbing:
- Installation of plumbing system (drainage & water supply)..
- Installation sanitary fixture
- Installation pump room
- Participation in testing & commissioning.
- Preparation of as-built drawing
Previous Experiences
2. Saudi Arabia
1- Issa ben laden company (iblec)
Type of business or Sector:-
Electromechanical contractor.
Occupation or Position held and Dates.
Senior mechanical engineer from December 2012 Up to Up to now.
Projects:
1-Al-HARAM THIRD EXPANSION (EL-SHAMIYIA) –
MECCA: From December 2015 till now:
Senior mechanical engineer responsible for overview all mechanical work
Activities
Responsible in the Mechanical Work
- Installation of Mechanical Work (Plumbing, Fire, HVAC) System
HVAC:
- Installation of duct work & equipments, chilled water pipes network.
- Installation of all equipments ( Chiller & AHU & FCU & Exhaust fan)
- Installation control valve assembly of equipments (chiller & AHU & FCU &
Pump).
- Preparation of as-built drawings.
- Participation in testing & commissioning.
Fire Fighting:
- Installation of fire fighting network.
- Installation of fire pumps and mechanical pumps room.
- Participation in testing & commissioning.
- Preparation of as-built drawings.
Plumbing:
- Installation of plumbing system (drainage & water supply)..
- Installation sanitary fixture
- Installation pump room
- Participation in testing & commissioning.
- Preparation of as-built drawing
- Review all shop drawing and coordinate any another works In project
- Responsible of man power activities and ensure that they Have the
Latest and update modification
- Daily, weekly, and monthly reporting
- Manage and supervise the site progress against contract program In project.
- Rectifying site constrain with site engineers.
- Prepare the final reports.
- Hand over and sign off reports
2–DAMAC TOWER (2 TOWER)-ALRIYADH:
From January 2015 TO December 2015
QAQC mechanical engineer responsible for check all mechanical work and
reviewing the quality of work.
Activities
Responsible in the Mechanical Work
-Check-up of Mechanical Work (Plumbing, Fire, HVAC) System
HVAC:
- Installation of duct work
- Installation of all equipments (Package & Split duct & Exhaust fan)
- Preparation of as-built drawings.
- Participation in testing & commissioning.
Fire Fighting:
- Installation of fire fighting network.
- Installation of fire pumps and mechanical pumps room.
- Participation in testing & commissioning.
- Preparation of as-built drawings.
Plumbing:
- Installation of plumbing system (drainage & water supply)..
- Installation sanitary fixture
- Installation pump room
- Participation in testing & commissioning.
- preparation of as-built drawing
- Review all shop drawing and coordinate any another works In project
- Daily, weekly, and monthly reporting
- Manage and supervise the site progress against contract program In project.
- Rectifying site constrain with site engineers.
- Prepare the final reports.
- Hand over and sign off reports.
3–Ministry of Interior (MOI CORRECTION FACILITIES) –
ALRIYADH:
From January 2011 to December 2014
Site mechanical engineer responsible for installation all mechanical
work in site.
Activities
Responsible in the Mechanical Work
- Installation of Mechanical Work (Plumbing, Fire, HVAC) System
HVAC:
- Installation of duct work & equipments, chilled water pipes network.
- Installation of all equipments ( Chiller & AHU & Package & FCU & Exhaust fan)
- Installation control valve assembly of equipments (chiller & AHU & FCU &
Pump).
- Preparation of as-built drawings.
- Participation in testing & commissioning.
Fire Fighting:
- Installation of fire fighting network.
- Installation of fire pumps and mechanical pumps room.
- Participation in testing & commissioning.
- Preparation of as-built drawings.
Plumbing:
- Installation of plumbing system (drainage & water suppy)
- Installation sanitary fixture
- Installation pump room
- Participation in testing & commissioning.
- Preparation of as-built drawing
DDiieesseell ssyysstteemm::
-- IInnssttaallllaattiioonn ooff ddiieesseell ppiippee ssyysstteemm tthhaatt ffeeeeddiinngg ggeenneerraattoorr wwiitthh aacccceessssoorriieess
-- [[EExxtteerrnnaall ttaannkkss,, ppiippeess ((eexxtteerrnnaall,, iinntteerrnnaall)),, ddiieesseell ppuummpp]]
2-Saudi ben laden group
Type of business or Sector:-
Electromechanical contractor.
Occupation or Position held and Dates.
Site mechanical engineer from July 2008 Up to Up December 2012.
4-PRINCESS NORA BENT ABDULRAHMAN UNIVERSITY –RIYADH
From December 2009 to January 2011
Site mechanical engineer responsible for installation all mechanical
work in site.
.Activities
Responsible in the Mechanical Work
- Installation of Mechanical Work (Plumbing, Fire, HVAC) System
HVAC:
- Installation of duct work & equipments, chilled water pipes network.
- Installation of all equipments ( Chiller & AHU & Package & FCU & Exhaust fan)
- Installation control valve assembly of equipments (chiller & AHU & FCU &
Pump).
- Preparation of as-built drawings.
- Participation in testing & commissioning.
Fire Fighting:
- Installation of fire fighting network.
- Preparation of as-built drawings.
Plumbing:
- Installation of plumbing system (drainage & water supply)..
- Installation sanitary fixture
- Preparation of as-built drawing
5. King ABDULLAH UNIVERSITY OF SCIENCE AND
TECHNOLOGY (KAUST)-Jeddah:
From July 2008 to October 2009
Site mechanical engineer responsible for installation all mechanical
work in site.
Activities
Responsible in the Mechanical Work
- Installation of Mechanical Work (Plumbing, Fire, HVAC) System
HVAC:
- Installation of duct work & equipments, chilled water pipes network.
- Installation of all equipments ( Chiller & AHU & Package & FCU & Exhaust fan)
- Installation control valve assembly of equipments (chiller & AHU & FCU &
Pump).
- Preparation of as-built drawings.
- Participation in testing & commissioning.
Fire Fighting:
- Installation of fire fighting network.
- Installation of fire pumps and mechanical pumps room.
- Participation in testing & commissioning.
- Preparation of as-built drawings.
Plumbing:
- Installation of plumbing system (drainage & water supply)..
- Installation sanitary fixture
- Installation pump room
- Participation in testing & commissioning.
- Preparation of as-built drawing
- Professional user windows (XP / W7 /W8/W10)
- Professional user in Office (XP / ME / 2013)
- Auto CAD 2013.
- ELITE- Firefighting (program from firefighting systems design).
- Reading.
-I'm seeking to improve my skills in design software by taking courses online.

Weitere ähnliche Inhalte

Was ist angesagt?

Was ist angesagt? (20)

Instrumentation supervisor cv
Instrumentation supervisor cv Instrumentation supervisor cv
Instrumentation supervisor cv
 
Tom van wyk c.v.
Tom van wyk c.v.Tom van wyk c.v.
Tom van wyk c.v.
 
Alaa QA-QC last Applicant CV-2
Alaa QA-QC  last Applicant CV-2Alaa QA-QC  last Applicant CV-2
Alaa QA-QC last Applicant CV-2
 
Mohamed_Quandeel_Quandeel
Mohamed_Quandeel_QuandeelMohamed_Quandeel_Quandeel
Mohamed_Quandeel_Quandeel
 
CV Pete Mcelwee 2016
CV Pete Mcelwee 2016CV Pete Mcelwee 2016
CV Pete Mcelwee 2016
 
cv_Ariel A. Quisto - Copy
cv_Ariel A. Quisto - Copycv_Ariel A. Quisto - Copy
cv_Ariel A. Quisto - Copy
 
Ibrahim Mohamed Ibrahim Issa Resume
Ibrahim Mohamed Ibrahim Issa  ResumeIbrahim Mohamed Ibrahim Issa  Resume
Ibrahim Mohamed Ibrahim Issa Resume
 
Salah Salem CV
Salah Salem CVSalah Salem CV
Salah Salem CV
 
Ahmed Rageh_CV (3)
Ahmed Rageh_CV (3)Ahmed Rageh_CV (3)
Ahmed Rageh_CV (3)
 
Ayman curriculum vitae2
Ayman curriculum vitae2Ayman curriculum vitae2
Ayman curriculum vitae2
 
Ayman curriculum vitae
Ayman curriculum vitaeAyman curriculum vitae
Ayman curriculum vitae
 
Welcome
WelcomeWelcome
Welcome
 
Elect Eng. Rizwan CV
Elect Eng. Rizwan CVElect Eng. Rizwan CV
Elect Eng. Rizwan CV
 
ali al omari CV
ali al omari CVali al omari CV
ali al omari CV
 
CV_-_Salman_Shaikh-NEW.doc
CV_-_Salman_Shaikh-NEW.docCV_-_Salman_Shaikh-NEW.doc
CV_-_Salman_Shaikh-NEW.doc
 
Current Job Description
Current Job DescriptionCurrent Job Description
Current Job Description
 
Giridhar
GiridharGiridhar
Giridhar
 
Hassan CV
Hassan CVHassan CV
Hassan CV
 
mamdouh fawzy CV----
mamdouh fawzy CV----mamdouh fawzy CV----
mamdouh fawzy CV----
 
CVBERTRANDeng
CVBERTRANDengCVBERTRANDeng
CVBERTRANDeng
 

Ähnlich wie eng.ahmad fathi C.V (20)

Mostafa omar el beh 2015 cv
Mostafa omar el beh 2015 cvMostafa omar el beh 2015 cv
Mostafa omar el beh 2015 cv
 
MCV
MCVMCV
MCV
 
Ahmed Fahmy_CV
Ahmed Fahmy_CVAhmed Fahmy_CV
Ahmed Fahmy_CV
 
tayssircv_(2)1
tayssircv_(2)1tayssircv_(2)1
tayssircv_(2)1
 
my_cv_WP
my_cv_WPmy_cv_WP
my_cv_WP
 
CV_WALEED
CV_WALEEDCV_WALEED
CV_WALEED
 
CV_Alaa Eldin_Mech
CV_Alaa Eldin_MechCV_Alaa Eldin_Mech
CV_Alaa Eldin_Mech
 
Mohammed seddik-cv
Mohammed seddik-cvMohammed seddik-cv
Mohammed seddik-cv
 
Eng Ahmed Afifi final CV
Eng Ahmed Afifi final CVEng Ahmed Afifi final CV
Eng Ahmed Afifi final CV
 
Ahmad-Adnan cv
Ahmad-Adnan cvAhmad-Adnan cv
Ahmad-Adnan cv
 
Anwar Morsi _________July 2015
Anwar Morsi _________July 2015Anwar Morsi _________July 2015
Anwar Morsi _________July 2015
 
Nagy_CV_Docx
Nagy_CV_DocxNagy_CV_Docx
Nagy_CV_Docx
 
Nagy_CV_Docx
Nagy_CV_DocxNagy_CV_Docx
Nagy_CV_Docx
 
Eslam cv final 2016
Eslam cv final 2016Eslam cv final 2016
Eslam cv final 2016
 
C V ALAA AMMAR 2
C V   ALAA AMMAR 2 C V   ALAA AMMAR 2
C V ALAA AMMAR 2
 
ahmed saad cv
ahmed saad cvahmed saad cv
ahmed saad cv
 
C.V. khaled galal - new(1)
C.V. khaled galal - new(1)C.V. khaled galal - new(1)
C.V. khaled galal - new(1)
 
sherif Gharib Dec 2016 CV ver 1P
sherif Gharib Dec 2016 CV  ver 1Psherif Gharib Dec 2016 CV  ver 1P
sherif Gharib Dec 2016 CV ver 1P
 
ahmed nady-c
ahmed nady-cahmed nady-c
ahmed nady-c
 
bio data 1
bio data 1bio data 1
bio data 1
 

eng.ahmad fathi C.V

  • 1. C.V AHMED FATHI ABOUZAED ELSAYED AL-ZAHER DISTRICT, MECCA Tel: 00966-548176749 00966-593946965 E-Mail: Eng.ahmad102010@gmail.com Eng.ahmed102010@yahoo.com ______________________________________________ Personal information Date of birth 05/ 01/ 1985 Nationality Egyptian Gender Male Religion Moslem Martial states Married Military status DONE Education: Bachelor of Mechanical power Engineering Department, Shoubra Faculty of Engineering Benha-University-2007-Grade: GOOD Major B.S.C Mechanical power Grade Good Project Design of Central air conditioning system for Residential Building (Grade: Excellent)
  • 2. Work Experiences 1- Inside Egypt: (E.N.CO) ENGINEERING OFFICE COMPANY Type of business or sector:- Design and Project Management Engineering Company. Occupation or Position held and Dates. - Mechanical engineer from JULY 2007-JULY 2008 Projects: GOLDEN COAST RESORT (Sharm El-sheikh) Site mechanical engineer Installation of all mechanical (Plumbing, Fire, HVAC) Systems. Activities - Review all shop drawing and coordinate any another works In project - Responsible of man power activities and ensure that they Have the latest and update modification - Manage and supervise the site progress against contract program In project. - Installation of Mechanical Work (Plumbing, Fire, HVAC) System HVAC: - Installation of duct work & equipments, chilled water pipes network. - Installation of all equipments (AHU & FCU & Exhaust fan) - Installation control valve assembly of equipments (AHU & FCU & Pump ) - Preparation of as-built drawings. - Participation in testing & commissioning. Fire Fighting: - Installation of fire fighting network. - Installation of fire pumps and mechanical pumps room. - Participation in testing & commissioning. - Preparation of as-built drawings.
  • 3. Plumbing: - Installation of plumbing system (drainage & water supply).. - Installation sanitary fixture - Installation pump room - Participation in testing & commissioning. - Preparation of as-built drawing Previous Experiences 2. Saudi Arabia 1- Issa ben laden company (iblec) Type of business or Sector:- Electromechanical contractor. Occupation or Position held and Dates. Senior mechanical engineer from December 2012 Up to Up to now. Projects: 1-Al-HARAM THIRD EXPANSION (EL-SHAMIYIA) – MECCA: From December 2015 till now: Senior mechanical engineer responsible for overview all mechanical work Activities Responsible in the Mechanical Work - Installation of Mechanical Work (Plumbing, Fire, HVAC) System HVAC: - Installation of duct work & equipments, chilled water pipes network. - Installation of all equipments ( Chiller & AHU & FCU & Exhaust fan) - Installation control valve assembly of equipments (chiller & AHU & FCU & Pump). - Preparation of as-built drawings. - Participation in testing & commissioning.
  • 4. Fire Fighting: - Installation of fire fighting network. - Installation of fire pumps and mechanical pumps room. - Participation in testing & commissioning. - Preparation of as-built drawings. Plumbing: - Installation of plumbing system (drainage & water supply).. - Installation sanitary fixture - Installation pump room - Participation in testing & commissioning. - Preparation of as-built drawing - Review all shop drawing and coordinate any another works In project - Responsible of man power activities and ensure that they Have the Latest and update modification - Daily, weekly, and monthly reporting - Manage and supervise the site progress against contract program In project. - Rectifying site constrain with site engineers. - Prepare the final reports. - Hand over and sign off reports 2–DAMAC TOWER (2 TOWER)-ALRIYADH: From January 2015 TO December 2015 QAQC mechanical engineer responsible for check all mechanical work and reviewing the quality of work. Activities Responsible in the Mechanical Work -Check-up of Mechanical Work (Plumbing, Fire, HVAC) System HVAC: - Installation of duct work - Installation of all equipments (Package & Split duct & Exhaust fan) - Preparation of as-built drawings. - Participation in testing & commissioning.
  • 5. Fire Fighting: - Installation of fire fighting network. - Installation of fire pumps and mechanical pumps room. - Participation in testing & commissioning. - Preparation of as-built drawings. Plumbing: - Installation of plumbing system (drainage & water supply).. - Installation sanitary fixture - Installation pump room - Participation in testing & commissioning. - preparation of as-built drawing - Review all shop drawing and coordinate any another works In project - Daily, weekly, and monthly reporting - Manage and supervise the site progress against contract program In project. - Rectifying site constrain with site engineers. - Prepare the final reports. - Hand over and sign off reports. 3–Ministry of Interior (MOI CORRECTION FACILITIES) – ALRIYADH: From January 2011 to December 2014 Site mechanical engineer responsible for installation all mechanical work in site. Activities Responsible in the Mechanical Work - Installation of Mechanical Work (Plumbing, Fire, HVAC) System HVAC: - Installation of duct work & equipments, chilled water pipes network. - Installation of all equipments ( Chiller & AHU & Package & FCU & Exhaust fan) - Installation control valve assembly of equipments (chiller & AHU & FCU & Pump). - Preparation of as-built drawings. - Participation in testing & commissioning.
  • 6. Fire Fighting: - Installation of fire fighting network. - Installation of fire pumps and mechanical pumps room. - Participation in testing & commissioning. - Preparation of as-built drawings. Plumbing: - Installation of plumbing system (drainage & water suppy) - Installation sanitary fixture - Installation pump room - Participation in testing & commissioning. - Preparation of as-built drawing DDiieesseell ssyysstteemm:: -- IInnssttaallllaattiioonn ooff ddiieesseell ppiippee ssyysstteemm tthhaatt ffeeeeddiinngg ggeenneerraattoorr wwiitthh aacccceessssoorriieess -- [[EExxtteerrnnaall ttaannkkss,, ppiippeess ((eexxtteerrnnaall,, iinntteerrnnaall)),, ddiieesseell ppuummpp]] 2-Saudi ben laden group Type of business or Sector:- Electromechanical contractor. Occupation or Position held and Dates. Site mechanical engineer from July 2008 Up to Up December 2012. 4-PRINCESS NORA BENT ABDULRAHMAN UNIVERSITY –RIYADH From December 2009 to January 2011 Site mechanical engineer responsible for installation all mechanical work in site. .Activities Responsible in the Mechanical Work - Installation of Mechanical Work (Plumbing, Fire, HVAC) System HVAC: - Installation of duct work & equipments, chilled water pipes network. - Installation of all equipments ( Chiller & AHU & Package & FCU & Exhaust fan) - Installation control valve assembly of equipments (chiller & AHU & FCU & Pump). - Preparation of as-built drawings. - Participation in testing & commissioning.
  • 7. Fire Fighting: - Installation of fire fighting network. - Preparation of as-built drawings. Plumbing: - Installation of plumbing system (drainage & water supply).. - Installation sanitary fixture - Preparation of as-built drawing 5. King ABDULLAH UNIVERSITY OF SCIENCE AND TECHNOLOGY (KAUST)-Jeddah: From July 2008 to October 2009 Site mechanical engineer responsible for installation all mechanical work in site. Activities Responsible in the Mechanical Work - Installation of Mechanical Work (Plumbing, Fire, HVAC) System HVAC: - Installation of duct work & equipments, chilled water pipes network. - Installation of all equipments ( Chiller & AHU & Package & FCU & Exhaust fan) - Installation control valve assembly of equipments (chiller & AHU & FCU & Pump). - Preparation of as-built drawings. - Participation in testing & commissioning. Fire Fighting: - Installation of fire fighting network. - Installation of fire pumps and mechanical pumps room. - Participation in testing & commissioning. - Preparation of as-built drawings.
  • 8. Plumbing: - Installation of plumbing system (drainage & water supply).. - Installation sanitary fixture - Installation pump room - Participation in testing & commissioning. - Preparation of as-built drawing - Professional user windows (XP / W7 /W8/W10) - Professional user in Office (XP / ME / 2013) - Auto CAD 2013. - ELITE- Firefighting (program from firefighting systems design). - Reading. -I'm seeking to improve my skills in design software by taking courses online.