This document is a CV for Ahmed Fathi Abouzaed Elsayed. It provides his personal details such as date of birth and contact information. It then outlines his education, including obtaining a Bachelor's degree in Mechanical Power Engineering in 2007. The bulk of the CV discusses his work experience over 10 years as a mechanical engineer in Egypt and Saudi Arabia, focusing on HVAC, fire protection, and plumbing systems for various construction projects including hotels, universities, and government facilities. His roles included installation, project management, and quality control responsibilities.
1. C.V
AHMED FATHI ABOUZAED ELSAYED
AL-ZAHER DISTRICT, MECCA
Tel:
00966-548176749
00966-593946965
E-Mail: Eng.ahmad102010@gmail.com
Eng.ahmed102010@yahoo.com
______________________________________________
Personal information
Date of birth 05/ 01/ 1985
Nationality Egyptian
Gender Male
Religion Moslem
Martial states Married
Military status DONE
Education:
Bachelor of Mechanical power Engineering Department, Shoubra Faculty of
Engineering
Benha-University-2007-Grade: GOOD
Major B.S.C Mechanical power
Grade Good
Project Design of Central air conditioning
system for Residential Building
(Grade: Excellent)
2. Work Experiences
1- Inside Egypt:
(E.N.CO) ENGINEERING OFFICE COMPANY
Type of business or sector:-
Design and Project Management Engineering Company.
Occupation or Position held and Dates.
- Mechanical engineer from JULY 2007-JULY 2008
Projects:
GOLDEN COAST RESORT (Sharm El-sheikh)
Site mechanical engineer
Installation of all mechanical (Plumbing, Fire, HVAC) Systems.
Activities
- Review all shop drawing and coordinate any another works In project
- Responsible of man power activities and ensure that they Have the latest and
update modification
- Manage and supervise the site progress against contract program In project.
- Installation of Mechanical Work (Plumbing, Fire, HVAC) System
HVAC:
- Installation of duct work & equipments, chilled water pipes network.
- Installation of all equipments (AHU & FCU & Exhaust fan)
- Installation control valve assembly of equipments (AHU & FCU & Pump )
- Preparation of as-built drawings.
- Participation in testing & commissioning.
Fire Fighting:
- Installation of fire fighting network.
- Installation of fire pumps and mechanical pumps room.
- Participation in testing & commissioning.
- Preparation of as-built drawings.
3. Plumbing:
- Installation of plumbing system (drainage & water supply)..
- Installation sanitary fixture
- Installation pump room
- Participation in testing & commissioning.
- Preparation of as-built drawing
Previous Experiences
2. Saudi Arabia
1- Issa ben laden company (iblec)
Type of business or Sector:-
Electromechanical contractor.
Occupation or Position held and Dates.
Senior mechanical engineer from December 2012 Up to Up to now.
Projects:
1-Al-HARAM THIRD EXPANSION (EL-SHAMIYIA) –
MECCA: From December 2015 till now:
Senior mechanical engineer responsible for overview all mechanical work
Activities
Responsible in the Mechanical Work
- Installation of Mechanical Work (Plumbing, Fire, HVAC) System
HVAC:
- Installation of duct work & equipments, chilled water pipes network.
- Installation of all equipments ( Chiller & AHU & FCU & Exhaust fan)
- Installation control valve assembly of equipments (chiller & AHU & FCU &
Pump).
- Preparation of as-built drawings.
- Participation in testing & commissioning.
4. Fire Fighting:
- Installation of fire fighting network.
- Installation of fire pumps and mechanical pumps room.
- Participation in testing & commissioning.
- Preparation of as-built drawings.
Plumbing:
- Installation of plumbing system (drainage & water supply)..
- Installation sanitary fixture
- Installation pump room
- Participation in testing & commissioning.
- Preparation of as-built drawing
- Review all shop drawing and coordinate any another works In project
- Responsible of man power activities and ensure that they Have the
Latest and update modification
- Daily, weekly, and monthly reporting
- Manage and supervise the site progress against contract program In project.
- Rectifying site constrain with site engineers.
- Prepare the final reports.
- Hand over and sign off reports
2–DAMAC TOWER (2 TOWER)-ALRIYADH:
From January 2015 TO December 2015
QAQC mechanical engineer responsible for check all mechanical work and
reviewing the quality of work.
Activities
Responsible in the Mechanical Work
-Check-up of Mechanical Work (Plumbing, Fire, HVAC) System
HVAC:
- Installation of duct work
- Installation of all equipments (Package & Split duct & Exhaust fan)
- Preparation of as-built drawings.
- Participation in testing & commissioning.
5. Fire Fighting:
- Installation of fire fighting network.
- Installation of fire pumps and mechanical pumps room.
- Participation in testing & commissioning.
- Preparation of as-built drawings.
Plumbing:
- Installation of plumbing system (drainage & water supply)..
- Installation sanitary fixture
- Installation pump room
- Participation in testing & commissioning.
- preparation of as-built drawing
- Review all shop drawing and coordinate any another works In project
- Daily, weekly, and monthly reporting
- Manage and supervise the site progress against contract program In project.
- Rectifying site constrain with site engineers.
- Prepare the final reports.
- Hand over and sign off reports.
3–Ministry of Interior (MOI CORRECTION FACILITIES) –
ALRIYADH:
From January 2011 to December 2014
Site mechanical engineer responsible for installation all mechanical
work in site.
Activities
Responsible in the Mechanical Work
- Installation of Mechanical Work (Plumbing, Fire, HVAC) System
HVAC:
- Installation of duct work & equipments, chilled water pipes network.
- Installation of all equipments ( Chiller & AHU & Package & FCU & Exhaust fan)
- Installation control valve assembly of equipments (chiller & AHU & FCU &
Pump).
- Preparation of as-built drawings.
- Participation in testing & commissioning.
6. Fire Fighting:
- Installation of fire fighting network.
- Installation of fire pumps and mechanical pumps room.
- Participation in testing & commissioning.
- Preparation of as-built drawings.
Plumbing:
- Installation of plumbing system (drainage & water suppy)
- Installation sanitary fixture
- Installation pump room
- Participation in testing & commissioning.
- Preparation of as-built drawing
DDiieesseell ssyysstteemm::
-- IInnssttaallllaattiioonn ooff ddiieesseell ppiippee ssyysstteemm tthhaatt ffeeeeddiinngg ggeenneerraattoorr wwiitthh aacccceessssoorriieess
-- [[EExxtteerrnnaall ttaannkkss,, ppiippeess ((eexxtteerrnnaall,, iinntteerrnnaall)),, ddiieesseell ppuummpp]]
2-Saudi ben laden group
Type of business or Sector:-
Electromechanical contractor.
Occupation or Position held and Dates.
Site mechanical engineer from July 2008 Up to Up December 2012.
4-PRINCESS NORA BENT ABDULRAHMAN UNIVERSITY –RIYADH
From December 2009 to January 2011
Site mechanical engineer responsible for installation all mechanical
work in site.
.Activities
Responsible in the Mechanical Work
- Installation of Mechanical Work (Plumbing, Fire, HVAC) System
HVAC:
- Installation of duct work & equipments, chilled water pipes network.
- Installation of all equipments ( Chiller & AHU & Package & FCU & Exhaust fan)
- Installation control valve assembly of equipments (chiller & AHU & FCU &
Pump).
- Preparation of as-built drawings.
- Participation in testing & commissioning.
7. Fire Fighting:
- Installation of fire fighting network.
- Preparation of as-built drawings.
Plumbing:
- Installation of plumbing system (drainage & water supply)..
- Installation sanitary fixture
- Preparation of as-built drawing
5. King ABDULLAH UNIVERSITY OF SCIENCE AND
TECHNOLOGY (KAUST)-Jeddah:
From July 2008 to October 2009
Site mechanical engineer responsible for installation all mechanical
work in site.
Activities
Responsible in the Mechanical Work
- Installation of Mechanical Work (Plumbing, Fire, HVAC) System
HVAC:
- Installation of duct work & equipments, chilled water pipes network.
- Installation of all equipments ( Chiller & AHU & Package & FCU & Exhaust fan)
- Installation control valve assembly of equipments (chiller & AHU & FCU &
Pump).
- Preparation of as-built drawings.
- Participation in testing & commissioning.
Fire Fighting:
- Installation of fire fighting network.
- Installation of fire pumps and mechanical pumps room.
- Participation in testing & commissioning.
- Preparation of as-built drawings.
8. Plumbing:
- Installation of plumbing system (drainage & water supply)..
- Installation sanitary fixture
- Installation pump room
- Participation in testing & commissioning.
- Preparation of as-built drawing
- Professional user windows (XP / W7 /W8/W10)
- Professional user in Office (XP / ME / 2013)
- Auto CAD 2013.
- ELITE- Firefighting (program from firefighting systems design).
- Reading.
-I'm seeking to improve my skills in design software by taking courses online.