Demerit Control Charts

       A control chart is an important tool in statistical process control. Control charts

provide a way to see whether a process is in control by being able to see if the process is

within the set upper and lower limits. Control charts were created by Walter A. Shewart

in the 1920’s and then picked up and used widely by W. Edward Demings.

       The demerit control chart was created by H.F. Dodge while working at Bell

Laboratories as a means to chart products with more than one kind of possible defect.

Some defects had very serious consequences on the performance of the product and some

were not very serious. Dodge classified the various types of defects into four different

categories. Conerly, et al described these different categories as follows:

       Class quot;Aquot; Defects-Very Serious.
       -Will render unit totally unfit for service.
       -Will surely cause operating failure of the unit in service which cannot be readily
       corrected on the job.
       -Liable to cause personal injury or property damage.

       Class quot;Bquot; Defects-Serious.
       -Will probably, but not surely cause Class quot;Aquot; operating failure of the unit in
       service.
       -Will surely cause trouble of a nature less serious than Class quot;Aquot;
       -Will surely cause increased maintenance or decreased life.

       Class quot;Cquot; Defects-Moderately Serious.
       -Will possibly cause operating failure of the unit in service. Likely to cause
       trouble of a nature less serious than operating failure.
       -Likely to cause increased maintenance or decreased life.
       -Major defects of appearance, finish, or workmanship.

       Class quot;Dquot; Defects-Not Serious.
       -Will not cause operating failure of the unit in service.
       -Minor defects of appearance, finish, or workmanship.
The different types of defects first need to be classified as either A, B, C, or D.

Once each defect is classified, a weight is given to each class depending on its severity.

The most common weights used today are 100 for As, 50 for Bs, 10 for Cs, and 1 for Ds.

Demerits are a defect of a product multiplied by its weight.



Steps to Constructing a Demerit Control Chart

1. Calculate the number of demerits per sample. This is done by counting the number of
A, B, C, and D defects and multiplying that number by the weight of each class. If there
were 3 Class A defects then 3 would be multiplied by the Class A weight of 100 for a
total of 300 demerits. Add up the total demerits for each class to get the number of
demerits per inspection sample represented by d. This process is shown in the following
formula:
         d = 100XA + 50XB + 10XC + XD, where XA is the number of Class A defects

2. Find the average number of demerits per unit, represented by u, by taking the number
of demerits per sample, d, and dividing by the number of units in the sample, N.

       u=d/N

3. Find the average number of each class of defect per unit. For Class A, take the total
number of Class A defects in the sample and divide by the number of units in the sample,
N. Repeat for each class.

          A=   XA / N


4. Calculate the standard deviation through the following formula.

       σ = SqRt ((1002      A   + 502   B   + 102   C   +   D)/N)
       -where A is the average number of Class A defects per unit
       -N is the number of units in the sample
5. Calculate the control limits through the following formulas.

       Center Line =        = 100      A   + 50   B   + 10   C   +   D


       Upper Control Limit =               + 3σ

       Lower Control Limit =               - 3σ

6. Now that the center line and control limits have been calculated, a control chart can be
constructed. Information from future inspections can be charted using these limits to
monitor the performance of the process and to insure that the process is in control.


Example
       The easiest way to learn to construct a demerit control chart is by following an

example using real numbers. For this example, the following information will be used.


                  Sample size = 1500                  Class of Defects
                                             A           B         C      D
                  Number of Defects               2         5        12       13

First, calculate the total number of demerits in the sample using the formula from step 1.
        d = 100(2) + 50(5) + 10(12) + 13 = 583

Next, find the average number of demerits per unit.
        u = 583/1500 = .39

Next, find the average number of each class of defect per unit.
          A = 2/1500 = .0013
          B = 5/1500 = .0033
          C = 12/1500 = .008
          D = 13/1500 = .009

Next, calculate the standard deviation.
       σ = SqRt ((1002(.0013) + 502(.0033) + 102(.008) + .009)/N) = .12

Next, calculate the control limits.
       Center Line = 100(.0013) + 50(.0033) + 10(.008) + .009 =.384
       UCL = .384 + 3(.12) = .744
       LCL = .384 – 3(.12) = .024
Additional Information

       A large quantity of information can be found discussing control charts and the

uses of control charts. However, compared to regular control charts, not much has been

published describing the demerit control chart and the reasons for it. The best resources

found are the articles cited in the bibliography of this paper. A demerit chart is a type of

control chart, however, so a lot can be learned about them by reading what is available

about control charts and seeing how a demerit chart can relate.
Bibliography

Conerly, Michael D.; Jones, L Allison,; Woodall, William H. “Exact properties of
       demerit control charts.” Journal of Quality Technology. Milwaukee: Apr
       1999.Vol.31, Iss. 2; pg. 207, 10 pgs.

Crossley, Mark L. “Weighted Pareto Control Charts Work”
       http://www.qualitydigest.com/mar05/departments/what_works.shtml.

Dawson, Cree S.; McCallum, Jr ,Charles J.; Murphy, R. Bradford; Wolman, Eric.
     “Operations Research at Bell Laboratories through the 1970s: Part III.”
     Operations Research, Vol. 48, No. 4. (Jul. - Aug., 2000), pp. 517-526.

Dodge, H. F. (1928). quot;A Method of Rating a Manufactured Productquot;. Bell System
      Technical Journal 7, pp. 350-368.

Weitere Àhnliche Inhalte

Was ist angesagt?

control Chart u np c p
control Chart u np c pcontrol Chart u np c p
control Chart u np c p
blactigger401
 
Leak Detection And Repair
Leak Detection And RepairLeak Detection And Repair
Leak Detection And Repair
Ashutosh Soni
 
Control chart qm
Control chart qmControl chart qm
Control chart qm
Ashu0711
 
Measurement System Analysis (MSA)
Measurement System Analysis (MSA)Measurement System Analysis (MSA)
Measurement System Analysis (MSA)
Ram Kumar
 
fault tree analysis
fault tree analysisfault tree analysis
fault tree analysis
Siti Mastura
 
3.... acceptance sampling
3.... acceptance sampling3.... acceptance sampling
3.... acceptance sampling
DEVIKA ANTHARJANAM
 
Taguchi introduction concept 1
Taguchi introduction concept 1Taguchi introduction concept 1
Taguchi introduction concept 1
Sliet2017
 

Was ist angesagt? (20)

5. spc control charts
5. spc   control charts5. spc   control charts
5. spc control charts
 
Statistical Process control
Statistical Process controlStatistical Process control
Statistical Process control
 
control Chart u np c p
control Chart u np c pcontrol Chart u np c p
control Chart u np c p
 
Control Charts[1]
Control Charts[1]Control Charts[1]
Control Charts[1]
 
Leak Detection And Repair
Leak Detection And RepairLeak Detection And Repair
Leak Detection And Repair
 
Hydraulic pumps performance and Characteristics
Hydraulic pumps performance and CharacteristicsHydraulic pumps performance and Characteristics
Hydraulic pumps performance and Characteristics
 
Week 2 3_hydraulic_pump
Week 2 3_hydraulic_pumpWeek 2 3_hydraulic_pump
Week 2 3_hydraulic_pump
 
CONDITION BASED MAINTAINACE BASICS presentation
CONDITION BASED MAINTAINACE BASICS presentation CONDITION BASED MAINTAINACE BASICS presentation
CONDITION BASED MAINTAINACE BASICS presentation
 
Introduction to Failure Mode and Effects Analysis (FMEA) in TQM
Introduction to Failure Mode and Effects Analysis (FMEA) in TQMIntroduction to Failure Mode and Effects Analysis (FMEA) in TQM
Introduction to Failure Mode and Effects Analysis (FMEA) in TQM
 
Control chart qm
Control chart qmControl chart qm
Control chart qm
 
Measurement System Analysis (MSA)
Measurement System Analysis (MSA)Measurement System Analysis (MSA)
Measurement System Analysis (MSA)
 
fault tree analysis
fault tree analysisfault tree analysis
fault tree analysis
 
PROCESS STORAGE TANK LAH & LAHH LEVEL CALCULATION
PROCESS STORAGE TANK LAH & LAHH LEVEL CALCULATIONPROCESS STORAGE TANK LAH & LAHH LEVEL CALCULATION
PROCESS STORAGE TANK LAH & LAHH LEVEL CALCULATION
 
Compressor trouble shooting
Compressor trouble shootingCompressor trouble shooting
Compressor trouble shooting
 
PPT ON TAGUCHI METHODS / TECHNIQUES - KAUSTUBH BABREKAR
PPT ON TAGUCHI METHODS / TECHNIQUES - KAUSTUBH BABREKARPPT ON TAGUCHI METHODS / TECHNIQUES - KAUSTUBH BABREKAR
PPT ON TAGUCHI METHODS / TECHNIQUES - KAUSTUBH BABREKAR
 
FMEA Introduction.ppt
FMEA Introduction.pptFMEA Introduction.ppt
FMEA Introduction.ppt
 
Spc training
Spc training Spc training
Spc training
 
3.... acceptance sampling
3.... acceptance sampling3.... acceptance sampling
3.... acceptance sampling
 
Taguchi introduction concept 1
Taguchi introduction concept 1Taguchi introduction concept 1
Taguchi introduction concept 1
 
RCM
RCMRCM
RCM
 

Andere mochten auch

Vietnamese phonologicaldisorders kimberly jones
Vietnamese phonologicaldisorders kimberly jonesVietnamese phonologicaldisorders kimberly jones
Vietnamese phonologicaldisorders kimberly jones
kmbrlyslp
 
Kaizen_ABB_IT_18Nov13
Kaizen_ABB_IT_18Nov13Kaizen_ABB_IT_18Nov13
Kaizen_ABB_IT_18Nov13
Munj Bhatt
 
5. will be going to tong hop
5. will be going to tong hop  5. will be going to tong hop
5. will be going to tong hop
Trang Đinh Văn
 
5. will be going to bai tap
5. will be going to bai tap  5. will be going to bai tap
5. will be going to bai tap
Trang Đinh Văn
 
Publicidad en internet slideshare
Publicidad en internet slidesharePublicidad en internet slideshare
Publicidad en internet slideshare
paolodiego2005
 

Andere mochten auch (20)

Vietnamese phonologicaldisorders kimberly jones
Vietnamese phonologicaldisorders kimberly jonesVietnamese phonologicaldisorders kimberly jones
Vietnamese phonologicaldisorders kimberly jones
 
Ciclo de Charlas Doppler Relay: Presente y futuro del Email Transaccional
Ciclo de Charlas Doppler Relay: Presente y futuro del Email TransaccionalCiclo de Charlas Doppler Relay: Presente y futuro del Email Transaccional
Ciclo de Charlas Doppler Relay: Presente y futuro del Email Transaccional
 
Kaizen_ABB_IT_18Nov13
Kaizen_ABB_IT_18Nov13Kaizen_ABB_IT_18Nov13
Kaizen_ABB_IT_18Nov13
 
5-S Technique
5-S Technique5-S Technique
5-S Technique
 
Hr audit questionnaire copy
Hr audit questionnaire   copyHr audit questionnaire   copy
Hr audit questionnaire copy
 
5. will be going to tong hop
5. will be going to tong hop  5. will be going to tong hop
5. will be going to tong hop
 
5. will be going to bai tap
5. will be going to bai tap  5. will be going to bai tap
5. will be going to bai tap
 
Doppler Academy: Email Marketing Navideño, estrategias para aumentar tus ventas
Doppler Academy: Email Marketing Navideño, estrategias para aumentar tus ventasDoppler Academy: Email Marketing Navideño, estrategias para aumentar tus ventas
Doppler Academy: Email Marketing Navideño, estrategias para aumentar tus ventas
 
Syslog
SyslogSyslog
Syslog
 
4.linking sounds
4.linking sounds4.linking sounds
4.linking sounds
 
Backend as a service Scorocode for mobile, web and desktop apps
Backend as a service Scorocode for mobile, web and desktop appsBackend as a service Scorocode for mobile, web and desktop apps
Backend as a service Scorocode for mobile, web and desktop apps
 
Facebook feed tricks
Facebook feed tricksFacebook feed tricks
Facebook feed tricks
 
hr audit
hr audithr audit
hr audit
 
DHCP & AAA in ONOS application
DHCP & AAA in ONOS applicationDHCP & AAA in ONOS application
DHCP & AAA in ONOS application
 
Acceptance Sampling
Acceptance SamplingAcceptance Sampling
Acceptance Sampling
 
Publicidad en internet slideshare
Publicidad en internet slidesharePublicidad en internet slideshare
Publicidad en internet slideshare
 
Fish quality deterioration
Fish quality deteriorationFish quality deterioration
Fish quality deterioration
 
Repaso unidad 10
Repaso unidad 10Repaso unidad 10
Repaso unidad 10
 
Unitat 9. Els orĂ­gens de l'Edat Moderna.
Unitat 9. Els orĂ­gens de l'Edat Moderna.Unitat 9. Els orĂ­gens de l'Edat Moderna.
Unitat 9. Els orĂ­gens de l'Edat Moderna.
 
La funciĂłn de relaciĂłn
La funciĂłn de relaciĂłnLa funciĂłn de relaciĂłn
La funciĂłn de relaciĂłn
 

Ähnlich wie Demerit Control Charts

Control charts[1]
Control charts[1]Control charts[1]
Control charts[1]
66784532
 
Ppt On S.Q.C.
Ppt On S.Q.C.Ppt On S.Q.C.
Ppt On S.Q.C.
dvietians
 
7qc_tools_173.ppt for 7 QC tools implementation of the quality
7qc_tools_173.ppt for 7 QC tools implementation of the quality7qc_tools_173.ppt for 7 QC tools implementation of the quality
7qc_tools_173.ppt for 7 QC tools implementation of the quality
MANISHDUBEY14500
 
Statistical Process Control & Operations Management
Statistical Process Control & Operations ManagementStatistical Process Control & Operations Management
Statistical Process Control & Operations Management
ajithsrc
 

Ähnlich wie Demerit Control Charts (20)

Control charts[1]
Control charts[1]Control charts[1]
Control charts[1]
 
Control Charts[1]
Control Charts[1]Control Charts[1]
Control Charts[1]
 
Statistical Process Control
Statistical Process ControlStatistical Process Control
Statistical Process Control
 
control charts to enhance your problem solving abilities
control charts to enhance your problem solving abilitiescontrol charts to enhance your problem solving abilities
control charts to enhance your problem solving abilities
 
C Charts2
C Charts2C Charts2
C Charts2
 
CHAPTER 4 SQC.pptx
CHAPTER 4 SQC.pptxCHAPTER 4 SQC.pptx
CHAPTER 4 SQC.pptx
 
7qctools173-100325112603-phpapp01.ppt
7qctools173-100325112603-phpapp01.ppt7qctools173-100325112603-phpapp01.ppt
7qctools173-100325112603-phpapp01.ppt
 
Ppt On S.Q.C.
Ppt On S.Q.C.Ppt On S.Q.C.
Ppt On S.Q.C.
 
Final notes on s1 qc
Final notes on s1 qcFinal notes on s1 qc
Final notes on s1 qc
 
Final notes on s1 qc
Final notes on s1 qcFinal notes on s1 qc
Final notes on s1 qc
 
7qc_tools_173.ppt for 7 QC tools implementation of the quality
7qc_tools_173.ppt for 7 QC tools implementation of the quality7qc_tools_173.ppt for 7 QC tools implementation of the quality
7qc_tools_173.ppt for 7 QC tools implementation of the quality
 
Production & Operation Management Chapter9[1]
Production & Operation Management Chapter9[1]Production & Operation Management Chapter9[1]
Production & Operation Management Chapter9[1]
 
Chapter9[1]
Chapter9[1]Chapter9[1]
Chapter9[1]
 
6 statistical quality control
6   statistical quality control6   statistical quality control
6 statistical quality control
 
Statistical Process Control & Operations Management
Statistical Process Control & Operations ManagementStatistical Process Control & Operations Management
Statistical Process Control & Operations Management
 
5854579.ppt
5854579.ppt5854579.ppt
5854579.ppt
 
Introduction to Six Sigma
Introduction to Six SigmaIntroduction to Six Sigma
Introduction to Six Sigma
 
The 7 basic quality tools through minitab 18
The 7 basic quality tools through minitab 18The 7 basic quality tools through minitab 18
The 7 basic quality tools through minitab 18
 
7 qc tool training
7 qc tool  training7 qc tool  training
7 qc tool training
 
7qc Tools 173
7qc Tools 1737qc Tools 173
7qc Tools 173
 

Mehr von ahmad bassiouny (20)

Work Study & Productivity
Work Study & ProductivityWork Study & Productivity
Work Study & Productivity
 
Work Study
Work StudyWork Study
Work Study
 
Motion And Time Study
Motion And Time StudyMotion And Time Study
Motion And Time Study
 
Motion Study
Motion StudyMotion Study
Motion Study
 
The Christmas Story
The Christmas StoryThe Christmas Story
The Christmas Story
 
Turkey Photos
Turkey PhotosTurkey Photos
Turkey Photos
 
Mission Bo Kv3
Mission Bo Kv3Mission Bo Kv3
Mission Bo Kv3
 
Miramar
MiramarMiramar
Miramar
 
Mom
MomMom
Mom
 
Linearization
LinearizationLinearization
Linearization
 
Kblmt B000 Intro Kaizen Based Lean Manufacturing
Kblmt B000 Intro Kaizen Based Lean ManufacturingKblmt B000 Intro Kaizen Based Lean Manufacturing
Kblmt B000 Intro Kaizen Based Lean Manufacturing
 
How To Survive
How To SurviveHow To Survive
How To Survive
 
Dad
DadDad
Dad
 
Ancient Hieroglyphics
Ancient HieroglyphicsAncient Hieroglyphics
Ancient Hieroglyphics
 
Dubai In 2009
Dubai In 2009Dubai In 2009
Dubai In 2009
 
DesignPeopleSystem
DesignPeopleSystemDesignPeopleSystem
DesignPeopleSystem
 
Organizational Behavior
Organizational BehaviorOrganizational Behavior
Organizational Behavior
 
Work Study Workshop
Work Study WorkshopWork Study Workshop
Work Study Workshop
 
Workstudy
WorkstudyWorkstudy
Workstudy
 
Time And Motion Study
Time And  Motion  StudyTime And  Motion  Study
Time And Motion Study
 

KĂŒrzlich hochgeladen

The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
heathfieldcps1
 

KĂŒrzlich hochgeladen (20)

Spatium Project Simulation student brief
Spatium Project Simulation student briefSpatium Project Simulation student brief
Spatium Project Simulation student brief
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
Sensory_Experience_and_Emotional_Resonance_in_Gabriel_Okaras_The_Piano_and_Th...
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
SOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning PresentationSOC 101 Demonstration of Learning Presentation
SOC 101 Demonstration of Learning Presentation
 
80 ĐỀ THI THỏ TUYỂN SINH TIáșŸNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỏ TUYỂN SINH TIáșŸNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...80 ĐỀ THI THỏ TUYỂN SINH TIáșŸNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỏ TUYỂN SINH TIáșŸNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptxSKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
SKILL OF INTRODUCING THE LESSON MICRO SKILLS.pptx
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
How to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptxHow to setup Pycharm environment for Odoo 17.pptx
How to setup Pycharm environment for Odoo 17.pptx
 

Demerit Control Charts

  • 1. Mark Smallwood Quality Management March 15, 2006 Demerit Control Charts A control chart is an important tool in statistical process control. Control charts provide a way to see whether a process is in control by being able to see if the process is within the set upper and lower limits. Control charts were created by Walter A. Shewart in the 1920’s and then picked up and used widely by W. Edward Demings. The demerit control chart was created by H.F. Dodge while working at Bell Laboratories as a means to chart products with more than one kind of possible defect. Some defects had very serious consequences on the performance of the product and some were not very serious. Dodge classified the various types of defects into four different categories. Conerly, et al described these different categories as follows: Class quot;Aquot; Defects-Very Serious. -Will render unit totally unfit for service. -Will surely cause operating failure of the unit in service which cannot be readily corrected on the job. -Liable to cause personal injury or property damage. Class quot;Bquot; Defects-Serious. -Will probably, but not surely cause Class quot;Aquot; operating failure of the unit in service. -Will surely cause trouble of a nature less serious than Class quot;Aquot; -Will surely cause increased maintenance or decreased life. Class quot;Cquot; Defects-Moderately Serious. -Will possibly cause operating failure of the unit in service. Likely to cause trouble of a nature less serious than operating failure. -Likely to cause increased maintenance or decreased life. -Major defects of appearance, finish, or workmanship. Class quot;Dquot; Defects-Not Serious. -Will not cause operating failure of the unit in service. -Minor defects of appearance, finish, or workmanship.
  • 2. The different types of defects first need to be classified as either A, B, C, or D. Once each defect is classified, a weight is given to each class depending on its severity. The most common weights used today are 100 for As, 50 for Bs, 10 for Cs, and 1 for Ds. Demerits are a defect of a product multiplied by its weight. Steps to Constructing a Demerit Control Chart 1. Calculate the number of demerits per sample. This is done by counting the number of A, B, C, and D defects and multiplying that number by the weight of each class. If there were 3 Class A defects then 3 would be multiplied by the Class A weight of 100 for a total of 300 demerits. Add up the total demerits for each class to get the number of demerits per inspection sample represented by d. This process is shown in the following formula: d = 100XA + 50XB + 10XC + XD, where XA is the number of Class A defects 2. Find the average number of demerits per unit, represented by u, by taking the number of demerits per sample, d, and dividing by the number of units in the sample, N. u=d/N 3. Find the average number of each class of defect per unit. For Class A, take the total number of Class A defects in the sample and divide by the number of units in the sample, N. Repeat for each class. A= XA / N 4. Calculate the standard deviation through the following formula. σ = SqRt ((1002 A + 502 B + 102 C + D)/N) -where A is the average number of Class A defects per unit -N is the number of units in the sample
  • 3. 5. Calculate the control limits through the following formulas. Center Line = = 100 A + 50 B + 10 C + D Upper Control Limit = + 3σ Lower Control Limit = - 3σ 6. Now that the center line and control limits have been calculated, a control chart can be constructed. Information from future inspections can be charted using these limits to monitor the performance of the process and to insure that the process is in control. Example The easiest way to learn to construct a demerit control chart is by following an example using real numbers. For this example, the following information will be used. Sample size = 1500 Class of Defects A B C D Number of Defects 2 5 12 13 First, calculate the total number of demerits in the sample using the formula from step 1. d = 100(2) + 50(5) + 10(12) + 13 = 583 Next, find the average number of demerits per unit. u = 583/1500 = .39 Next, find the average number of each class of defect per unit. A = 2/1500 = .0013 B = 5/1500 = .0033 C = 12/1500 = .008 D = 13/1500 = .009 Next, calculate the standard deviation. σ = SqRt ((1002(.0013) + 502(.0033) + 102(.008) + .009)/N) = .12 Next, calculate the control limits. Center Line = 100(.0013) + 50(.0033) + 10(.008) + .009 =.384 UCL = .384 + 3(.12) = .744 LCL = .384 – 3(.12) = .024
  • 4. Additional Information A large quantity of information can be found discussing control charts and the uses of control charts. However, compared to regular control charts, not much has been published describing the demerit control chart and the reasons for it. The best resources found are the articles cited in the bibliography of this paper. A demerit chart is a type of control chart, however, so a lot can be learned about them by reading what is available about control charts and seeing how a demerit chart can relate.
  • 5. Bibliography Conerly, Michael D.; Jones, L Allison,; Woodall, William H. “Exact properties of demerit control charts.” Journal of Quality Technology. Milwaukee: Apr 1999.Vol.31, Iss. 2; pg. 207, 10 pgs. Crossley, Mark L. “Weighted Pareto Control Charts Work” http://www.qualitydigest.com/mar05/departments/what_works.shtml. Dawson, Cree S.; McCallum, Jr ,Charles J.; Murphy, R. Bradford; Wolman, Eric. “Operations Research at Bell Laboratories through the 1970s: Part III.” Operations Research, Vol. 48, No. 4. (Jul. - Aug., 2000), pp. 517-526. Dodge, H. F. (1928). quot;A Method of Rating a Manufactured Productquot;. Bell System Technical Journal 7, pp. 350-368.