SIX SIGMA MEASUREMENTS
[object Object],DON’T HAVE TO USE ALL THESE METRIC KNOWLEDGE IS NECESSARY TO INSURE GOOD COMMUNICATION
SIX SIGMA RELATIONSHIPS
DEFININITIONS Number Of Operation Steps  =  m   Defects  =  D Unit  =  U Opportunities For A Defect  =  O Yield  =  Y Nomenclature Total Opportunities (TOP) = U X O Defects Per Unit (DPU) =  D/U Defects Per Unit Opportunity (DPO) =  DPU/O = D/(U  X  O) Defects Per Million Opportunities (DPMO) = DPO  X  10 6 Basic Relationships
DISTRIBUTION OF DEFECTS IN  MANUFACTURED PRODUCT Non-Randomly  Occurring Defect Randomly  Occurring Defect Example Result Conclusion Wrong part in manual insertion parts bin Every board contains  same wrong part in same location. Defects are easier to detect/diagnose & are  less likely to be sent to next operation Mixed parts in manual insertion parts bin. Probability of a board containing wrong part is equal to proportion of  wrong parts in bin Defects are harder to detect/diagnose and are  more likely to be sent to next operation
PROBABILITY OF DEFECTS  IN MANUFACTURED PRODUCT GIVEN:  (1) Average DPU For This Product Is One (DPU=1) (2) Defects are randomly distributed What Is The Probability of Zero Defects In This Unit?
GENERAL CHARACTERISTICS  OF DPU ,[object Object],[object Object],[object Object],[object Object],Product Built In Plant Having Best Process Controls Will Have The Lowest Defects Per Unit Level
DEFECTS PER UNIT Defect  Prevents Product From Fulfilling Physical  And Functional Requirements Of The Customer ,[object Object],[object Object],[object Object],[object Object],Defects Per Unit = A Count of All Defects - Not a Measure of the Consequences of  The Defect Number of Defects Found at Any Review Point Number of Units Processed Through That Review Point
PREDICTING THE  QUALITY OF PRODUCTS FTY = e -DPU DPU = -ln FTY  Estimation of units containing “q’ defects  (where “q” is not limited to zero) If we use the Poisson distribution Becomes  (DPU) q  e  -DPU q!  x  e -    x! P{x} =
YIELD RELATIONSHIPS Throughput Yield : Y TP   = e -DPU Defects Per Unit: DPU  = -ln(Y) Rolled Throughput Yield: Y RT  =     Y TP i Total Defects Per Unit: TDPU  =  -ln(Y RT ) Normalized Yield:  Y norm   =     Defects per Normalized Unit: DPU norm   =  -ln(Y norm ) i =1 m Y RT m
YIELD Probability with zero defects Specification  Limit Probability of Defect = 1 -  e -DPU Yield =  e -DPU   Y = P(x = 0) = e-   x x! e-  = =  e -D/U   =  e -DPU
THE HIDDEN FACTORY
THE HIDDEN FACTORY Customer  Quality Operation Not OK Scrap Verify Rework Operation Not OK Scrap Verify Rework Y tp Throughput Yield Y tp Throughput Yield Non-Value Added (The Hidden Factory) Value Added (The Visible Factory) Producers Quality Supplier Quality Y rt =    Y tpi m i=10
IMPLICATIONS OF  THE HIDDEN FACTORY  Y e e TP DPU      3679 1 0 . = 1.6321 . 1.63 Equivalent Units Must Be Produced To Get Out 1 Good Unit Every Occurrence Of A Defect Within The Manufacturing  Process Requires Time To Verify, Analyze, Repair And Re-verify Average Cycle Time Per Unit Is Directly Proportional To The  Total Number Of Defects Per Unit Cycle Time  = Work In Process Throughput
#1 #6 #2 #7 #5 #9 #4 #8 #3 #10 Final  Insp.. Process Yield is 93.17% - Right?????? A FACTORY WITH 10 PROCESSES NOT QUITE!!! 1200 Good  & 88 Bad Items [93.2% Found OK]
COMPARISON OF YIELDS Y =  S U =  =  .931677   S = Number of Units That Pass U = Number of Units Tested Throughput Yield Analysis Tells Us Y TPI  =  .47774 .4774    .932 Why Not??? 1200 1288
ROLLED THROUGHPUT YIELD Operation Defects Units DPU (D/U) Throughput Yield (Y TPI  =  e -D/U   =  e -DPU ) 1 2 3 4 5 6 7 8 9 10 5 75 18 72 6 28 82 70 35 88 523 851 334 1202 252 243 943 894 234 1200 0.00956 0.08813 0.05389 0.05990 0.02381 0.11523 0.08696 0.07830 0.14957 0.07333 0.99049 0.91564 0.94753 0.94186 0.97647 0.89116 0.91672 0.92469 0.86108 0.92929 Sum of  Operation Steps  = 479  6676  0.73868  0.47774 (Y RT ) 47.9  667.6  0.07387  0.73868 =TDPU TDPU = -ln(Y RT ) Avg.. of Operation Steps =
HOW MANY UNITS PRODUCED? UNITS PRODUCED = 1 + (1 -  e -DPU ) = 1 + (1 -  e -73868 ) = 1 + (1 - .477744) = 1 + .5222558 = 1.52 To Achieve 100 Conforming Units, 152 ( 1.52  X  100)  Would Need To Be Produced
INSPECTIONS AND TESTS
Inspection  E = 0.8 Escaping  DPU Level Observed DPU Level Submitted  DPU Level QUANTIFICATION OF DEFECTS Given: Observed Defects = DPU of 0.25 Then: Submitted Defects = (0.25/0.8) = DPU of 0.31 Escaping Defects = (0.31-0.25) = DPU of 0.06
A TYPICAL PROCESS Operation 1 INSP TEST Prior  Operation d o d 1 d 2 di dt dn Operation 2 d o  = Defects Escaping Prior Process d 1  = Defects Added in Operation 1 d 2  = Defects Added in Operation 2 d i  = Defects Found by Inspection & Corrected d t  = Defects Found by Test and Corrected d n  = Defects Escaping to Next Operation
Op. 1 INSP TEST Op 2 DPU = 0.349 DPU = 0.907 DPU = 0.420 DPU = 0.075 DPU = 0.07 From Prior Process DPU = 0.279 DPU = 0.558 DPU = 0.487 DPU = 0.345 PD = Part Defective = 800 PPM SC = Solder Defective = 300 PPM PA = Part Assembly Error = 1000 PPM EFF: PA = .8 PD = .0 SC = .8 EFF: PA = .9 PD  = .95 SC  = .05 To Next Process DEFECT-BASED PLANNING FOR A TYPICAL PROCESS
DEFECT-BASED PLANNING FOR A TYPICAL PROCESS Total Observed Defects Per Unit = 0.832 Rolled Yield = 43.52% Operation 1 Operation 2 Inspection  Test # Parts PD PA SC TDU FTY Submitted Created Submitted Created Submitted Observed Submitted Observed 100 330 0.080 0.100 0.099 0.279 210 600 0.05 0.02 0.00 0.07 0.13 0.120 0.099 0.349 0.168 0.210 0.180 0.558 0.298 0.330 0.279 0.907 0.000 0.264 0.223 0.487 61.44% 0.298 0.066 0.056 0.420 0.283 0.059 0.003 0.345 70.82% Escaping 0.015 0.007 0.053 0.075
REVIEW THE THREE PHASES  OF PRODUCT LIFE Early Life Useful Life Wear Out PROB. OF  FAILURE
EARLY LIFE FAILURE RATE  & LATENT DEFECTS ,[object Object],[object Object],[object Object]
PROBABLE TIME TO FAILURE  &  DEGREE OF ABNORMALITY  Gross Moderate Slight Degree of Abnormality Probable Time to Cause Failure
MAJOR CAUSE  OF LATENT DEFECTS The Design And Execution Of Processes  Is The Major Cause of Latent Defects Cpk - Major Cause of the Degree of Abnormality The Average Number of Latent Defects Per Unit -  Determines the Shape of Early Life Failure Rate Curve
WHAT CAN BE DONE TO MINIMIZE LATENT DEFECTS? ,[object Object],[object Object],[object Object],[object Object],[object Object]
MINIMIZATION OF OTHER FAILURE TYPES? ,[object Object],[object Object],[object Object],[object Object],[object Object]
TOTAL DEFECTS PER UNIT  (TDU) TDU =   DPU For All Key Characteristics +   DPU For All Component Part Defects +   DPU For All Process Defects WHERE: Key Characteristics Are Measured By C p  & C pk Component Part Defects Are Defects Found In  Material From Suppliers. Process Defects - Created As Product Goes  Through Manufacturing Process
DPU AS A  DEFECT BUDGETING TOOL Defect Budgeting Is A Method To Ensure Robust Product Design A Robust Design Will Be Insensitive To Long-term Process & Material Variations & Product Misuse Goal Of Defect Budgeting For A New  Product/process Is A Lower TDU
OVERVIEW OF THE  DEFECT BUDGETING PROCESS Structured Process Flow Diagram - All Inspection /Test Points - Flow Of Non-conforming Product Determine Capability/Error Rate Of Existing Process Establish Maximum DPU Level For Delivered Product Work Backwards & Establish Maximum DPUs  Revise Process Flow  - Add Inspection/test Points - Redesign Operations
BENCHMARKING AGAINST  BEST IN CLASS Determine Factors Critical To Long-term Success Compare Performance With Toughest Competitors Or Others Use Info to Develop Strategies And Functional Standards The Goal Of Benchmarking Is: - Exceed The Competition - Make Your Business The Very Best
EQUIVALENT COMPARISONS IN BENCHMARKING ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
DEFECTS PER MILLION  OPPORTUNITIES (DPMO) DPMO =  DPU x 1,000,000 Parts Count DPMO =  DPU x 1,000,000 Average Opportunities  For Error in One Unit
BENCHMARKING THE PROCESS 1.  Define The Purpose Of The Project 2.  Define A Unit 3.  Determine The Number Of Opportunities For Error In A Unit - For Manufactured Product - Other Than Manufactured Product 4. Measure The Total Defects Per Unit (DPU) 5. Calculate Defects Per Million Opportunities (DPMO) 6. Estimate Specification Width
BENCHMARKING AGAINST  BEST IN CLASS 0.001 0.01 0.1 1 10 100 1K 10K 100K 2 3 4 5 6 7 .67 1.0 1.33 1.67 2.0 Sigma Cpk DPMO Specification Width    1.5 Sigma Shift Centered
PROCESS CYCLE TIME
PROCESS CYCLE TIME Time To Do An Entire Process Could Be Time From Material Arriving To Final Product  In Customer’s Hands Real Process Time Includes Waiting, Storage & In-between Operations Times. Theoretical Process Time - No Waiting Compare Real And Theoretical Process Time Reducing Real Process Cycle Time Can Reduce The  Number Of Defective Units And Improve Process Performance
THEORETICAL  PROCESS CYCLE TIME Theoretical Process  Cycle Time  Real Daily Operating Time Number of Units  Required Daily =
TEST/INSPECTION WORK LOAD  NONREPARIABLE PRODUCT Failure Of Test Or Inspection - Item Must Be Scrapped. To Yield One Acceptable Unit, We Must Test/inspect  A Larger Number Of Units 1 YIELD Starts =  =  e  DPU The Number of Parts  Required to Start (T) =  e  -DPU 1 Test/Inspection Cycle Time  =  T  x  Time Per Test =  (e  DPU )  x  time Per Test
TEST WORK LOAD  REPARIABLE PRODUCT One Test Required To Catch Each Defect Another Test Required To Pass Repaired Unit T = Number Of Tests Per Accepted Unit T = (1+DPU) Test Cycle Time  = T  x  Time Per Test = (1 + DPU)  x  Time Per Test
EXAMPLE OF TEST WORK LOAD FOR REPAIRABLE PRODUCT FTY = 187/234  =  80% TDU = 62/234  =  0.265 FTY  =  e -0.265   =  77% TDU  =  -ln(0.80)  =  0.233 Observed Results: Estimated From Observations Results Close Enough - Defects Randomly Distributed & Poisson Ok Number Of Tests Number  Of Units Number Of Defects Total Number Of Tests 1 2 3 4 187 35 9 3 234 0 35 18 9 62 187 70 27 12 296 Totals
INSPECTION  WORK LOAD  REPARIABLE PRODUCT ,[object Object],[object Object],[object Object],I = Number Of Inspections Per Accepted Unit I = 1 + (1 - Yield) =  1 + ( 1-  e  -DPU ) =  2 -  e  -DPU Inspection cycle time = I x Time Per Inspection = (2 -  e  -DPU ) x Time Per Inspection
ANALYZE WORK LOAD Every Unit Must Be Worked On Work Load Is Directly Proportional To Defects Per Unit Failures Analyzed One At A Time: Work Load = A = Analysis Per Unit = DPU Analysis Cycle Time = A x Time Per Analysis = DPU X Time Per Analysis Failures Analyzed All At One Time: Work Load = A = 1 -  e  -DPU Analysis cycle Time = A x Time Per Analysis = 1 -  e  -DPU  x time Per Analysis
REPAIR WORK LOAD For Failures Repaired One At a Time: Work Load = R = Repair Per Unit = DPU Repair Cycle time = R x Time Per Repair = DPU x Time Per Repair For Failure Repaired All At One Time: Work Load = R = 1 -  e  -DPU Repair Cycle time = R x Time Per Repair = 1 -  e  -DPU  x Time Per Repair
CYCLE TIME Test Analysis Repair Test Cycle Time   = (1+ DPU ) x Time Per Test Analysis Cycle Time = DPU x Time Per Analysis or  = 1- e -DPU  x Time Per Analysis Repair Time = DPU x Time Per Repair or = 1- e -DPU  x Time Per Repair
Stores and Bank Time Total Mfg.. Cycle Time  Queue, Run, and Changeover Time Output (capacity) Input CYCLE TIME / INVENTORY RELATIONSHIPS
INVENTORY AND  THROUGHPUT RATE How  Are Inventory and Cycle Time Related? Cycle Time =  Number of Days =  Inventory Throughput Rate Total # of Pieces in Stock Pieces Processed Per day
UNIVERSAL CYCLE TIME/ INVENTORY RELATIONSHIP Work -In-process Inventory =  Throughput Rate x Cycle Time Number Of  Work Orders Number Of Pieces Dollars Orders Per Day Pieces Per Day Dollars Per Day # Of Days # Of Days # Of Days Inventory Throughput Rate Cycle Time Examples
CYCLE TIME CONTROLS  WIP INVENTORY The Longer A Unit Of Product Remains In A Production Area, The Higher The Work In Process (WIP) Inventory Is In That Area Time Unit Is Expected To Remain In Area =  Average Total Time
Raw Material  Stores Fabrication Fabrication Stores Sub- Assembly Sub- Assembly Stores Final Assembly Finished Goods Inventory Work-In-Process Manufacturing Cycle Time Inventory Carrying Cost Total Value of  Product Raw Materials  Acquisition Finished  Goods Shipment TRUE COST OF INVENTORY $
CYCLE TIME AND  INVENTORY TURNS An Inventory Turn Is An Index Or Indicator Of How Often A Company’s Entire Inventory Stock Is Replaced Cost Of Goods Sold Average Annual Inventory Turns = 1.25 1.44 5.00 10.00 20.00 40.00 288 250 72 36 18 9 Turns Turn Days Note: Dell Has been Able to Achieve 1440 Turns
INVENTORY COST  AT MOTOROLA Inventory Carrying Cost Equals At Least 25% of the  Value of Average Annual Inventory Levels In 1991, This cost can be compared to taking $310 million  and burning it , since it adds no value to the company Year Sales Average Annual Inventory Levels Inventory Carrying Costs 1987 1989 1991 1995 $6,700,000,000 $9,620,000,000 $11,340,000,000 $27,037,000,000 $909,000,000 $1,158,000,000 $1,242,000,000 $3,528,000,000 $227,000,000 $289,000,000 $310,500,000 $882,000,000
THE BOTTOM LINE IMPACT In 1987, Motorola Discovered That  Poor Quality Accounted For Approximately 25% Of Their Annual Inventory Carrying Costs. This Expense Added No Value, It Was Just Like Taking $250,000,000 and pouring it down a drain … .Annually!
OVERALL MANUFACTURING  COST AND DPU Defects Cost Money as Result Of: Diagnostic Time Repair Time / Re-Inspection Extra Labor Extra Materials Extra Capacity Extra Support Extra Management Extra Inventory Cost of Failure (Internal) = DPU  x  Volume  x   Average Cost Defect
REDUCING CYCLE TIME &  INVENTORY SUMMARY Cycle Time & Inventory Are Key Competitive Factors Cycle Time Is The Inverse Of Inventory Turns (Shorter Cycle Times = Lower Inventories) Defects Have A Major Controlling Effect Defect Must Be Analyzed And Repaired Two Important Work Load Measures - Test & Inspection, And Analyze & Repair Capacity Of Test / Inspection Equipment Is Inversely Proportional To Work Load

Weitere ähnliche Inhalte

Was ist angesagt?

Orphan Biopharmaceuticals & the CDMO
Orphan Biopharmaceuticals & the CDMOOrphan Biopharmaceuticals & the CDMO
Orphan Biopharmaceuticals & the CDMOKBI Biopharma
 
Danh bạ Điện thoại Cục Hải quan Tp. Hồ Chí Minh và các đơn vị trực thuộc
Danh bạ Điện thoại Cục Hải quan Tp. Hồ Chí Minh và các đơn vị trực thuộcDanh bạ Điện thoại Cục Hải quan Tp. Hồ Chí Minh và các đơn vị trực thuộc
Danh bạ Điện thoại Cục Hải quan Tp. Hồ Chí Minh và các đơn vị trực thuộcCÔNG TY TNHH MTV XUẤT NHẬP KHẨU ĐÀM VIỆT
 
Concept of Value Engineering with Case Study
Concept of Value Engineering with Case StudyConcept of Value Engineering with Case Study
Concept of Value Engineering with Case StudyAditya Deshpande
 
Line balancing and its formulation
Line balancing and its formulationLine balancing and its formulation
Line balancing and its formulationavijit biswas
 
Using Single-use Technology to Overcome the Challenges of ADC Processing
Using Single-use Technology to Overcome the Challenges of ADC ProcessingUsing Single-use Technology to Overcome the Challenges of ADC Processing
Using Single-use Technology to Overcome the Challenges of ADC ProcessingMerck Life Sciences
 
Etude de cas_vsm_2013_imi
Etude de cas_vsm_2013_imiEtude de cas_vsm_2013_imi
Etude de cas_vsm_2013_imiasalmi4
 
00301---outils-damelioration-continue-201710jd-v1-1.pdf
00301---outils-damelioration-continue-201710jd-v1-1.pdf00301---outils-damelioration-continue-201710jd-v1-1.pdf
00301---outils-damelioration-continue-201710jd-v1-1.pdfFousseyniTRAORE2
 
Applications of lean manufacturing tools
Applications of lean manufacturing toolsApplications of lean manufacturing tools
Applications of lean manufacturing toolsIshmam Ahmed
 
Value engineering pom
Value engineering pomValue engineering pom
Value engineering pomVishal Naik
 
Process Development for Cell Therapy and Viral Gene Therapy
Process Development for Cell Therapy and Viral Gene TherapyProcess Development for Cell Therapy and Viral Gene Therapy
Process Development for Cell Therapy and Viral Gene TherapyMilliporeSigma
 
Luận văn: Quản trị chất lượng "Dịch vụ giao nhận hàng hóa" tại công ty vận tả...
Luận văn: Quản trị chất lượng "Dịch vụ giao nhận hàng hóa" tại công ty vận tả...Luận văn: Quản trị chất lượng "Dịch vụ giao nhận hàng hóa" tại công ty vận tả...
Luận văn: Quản trị chất lượng "Dịch vụ giao nhận hàng hóa" tại công ty vận tả...Viết thuê trọn gói ZALO 0934573149
 
What is VAVE
What is VAVE What is VAVE
What is VAVE Reff Ren
 
Spares criticality assessment methods & equipment overhaul replacementrepairs...
Spares criticality assessment methods & equipment overhaul replacementrepairs...Spares criticality assessment methods & equipment overhaul replacementrepairs...
Spares criticality assessment methods & equipment overhaul replacementrepairs...Amirul Faiz Amil Azman
 

Was ist angesagt? (20)

Orphan Biopharmaceuticals & the CDMO
Orphan Biopharmaceuticals & the CDMOOrphan Biopharmaceuticals & the CDMO
Orphan Biopharmaceuticals & the CDMO
 
Danh bạ Điện thoại Cục Hải quan Tp. Hồ Chí Minh và các đơn vị trực thuộc
Danh bạ Điện thoại Cục Hải quan Tp. Hồ Chí Minh và các đơn vị trực thuộcDanh bạ Điện thoại Cục Hải quan Tp. Hồ Chí Minh và các đơn vị trực thuộc
Danh bạ Điện thoại Cục Hải quan Tp. Hồ Chí Minh và các đơn vị trực thuộc
 
Concept of Value Engineering with Case Study
Concept of Value Engineering with Case StudyConcept of Value Engineering with Case Study
Concept of Value Engineering with Case Study
 
Line balancing and its formulation
Line balancing and its formulationLine balancing and its formulation
Line balancing and its formulation
 
Using Single-use Technology to Overcome the Challenges of ADC Processing
Using Single-use Technology to Overcome the Challenges of ADC ProcessingUsing Single-use Technology to Overcome the Challenges of ADC Processing
Using Single-use Technology to Overcome the Challenges of ADC Processing
 
Ppc 2mark answer
Ppc 2mark answerPpc 2mark answer
Ppc 2mark answer
 
Etude de cas_vsm_2013_imi
Etude de cas_vsm_2013_imiEtude de cas_vsm_2013_imi
Etude de cas_vsm_2013_imi
 
Twelve steps of qc
Twelve steps of qcTwelve steps of qc
Twelve steps of qc
 
00301---outils-damelioration-continue-201710jd-v1-1.pdf
00301---outils-damelioration-continue-201710jd-v1-1.pdf00301---outils-damelioration-continue-201710jd-v1-1.pdf
00301---outils-damelioration-continue-201710jd-v1-1.pdf
 
Applications of lean manufacturing tools
Applications of lean manufacturing toolsApplications of lean manufacturing tools
Applications of lean manufacturing tools
 
Qcc
QccQcc
Qcc
 
Batek Catalogue 2017
Batek Catalogue 2017Batek Catalogue 2017
Batek Catalogue 2017
 
Value engineering pom
Value engineering pomValue engineering pom
Value engineering pom
 
Takt Time, Cycle Time & Line Balancing
Takt Time, Cycle Time & Line BalancingTakt Time, Cycle Time & Line Balancing
Takt Time, Cycle Time & Line Balancing
 
Line balance
Line balanceLine balance
Line balance
 
Process Development for Cell Therapy and Viral Gene Therapy
Process Development for Cell Therapy and Viral Gene TherapyProcess Development for Cell Therapy and Viral Gene Therapy
Process Development for Cell Therapy and Viral Gene Therapy
 
Wcm
WcmWcm
Wcm
 
Luận văn: Quản trị chất lượng "Dịch vụ giao nhận hàng hóa" tại công ty vận tả...
Luận văn: Quản trị chất lượng "Dịch vụ giao nhận hàng hóa" tại công ty vận tả...Luận văn: Quản trị chất lượng "Dịch vụ giao nhận hàng hóa" tại công ty vận tả...
Luận văn: Quản trị chất lượng "Dịch vụ giao nhận hàng hóa" tại công ty vận tả...
 
What is VAVE
What is VAVE What is VAVE
What is VAVE
 
Spares criticality assessment methods & equipment overhaul replacementrepairs...
Spares criticality assessment methods & equipment overhaul replacementrepairs...Spares criticality assessment methods & equipment overhaul replacementrepairs...
Spares criticality assessment methods & equipment overhaul replacementrepairs...
 

Andere mochten auch

Basic Six Sigma Presentation
Basic Six Sigma PresentationBasic Six Sigma Presentation
Basic Six Sigma Presentationvivekissar
 
What+Is+Six+Sigma
What+Is+Six+SigmaWhat+Is+Six+Sigma
What+Is+Six+SigmaTyg Lucas
 
Tai lieu danh_gia
Tai lieu danh_giaTai lieu danh_gia
Tai lieu danh_giaminhlean
 
8799568 lean-manufacturing
8799568 lean-manufacturing8799568 lean-manufacturing
8799568 lean-manufacturingtruongngv
 
Fsfinalbook single
Fsfinalbook singleFsfinalbook single
Fsfinalbook singleXuan Le
 
Bạn có máu phát minh không ?
Bạn có máu phát minh không ?Bạn có máu phát minh không ?
Bạn có máu phát minh không ?Xuan Le
 
6 sigma introduction to lean manufacturing - vietnamese
6 sigma introduction to lean manufacturing - vietnamese6 sigma introduction to lean manufacturing - vietnamese
6 sigma introduction to lean manufacturing - vietnamesequanglocbp
 
Ky nang-to-chuc-cong-viec
Ky nang-to-chuc-cong-viecKy nang-to-chuc-cong-viec
Ky nang-to-chuc-cong-viecXuan Le
 
He thong quan_ly_6_sigma
He thong quan_ly_6_sigmaHe thong quan_ly_6_sigma
He thong quan_ly_6_sigmaNgô Thông
 
Kaizen cho quản lý triết lý hành động - kaizen philosophies
Kaizen cho quản lý   triết lý hành động - kaizen philosophiesKaizen cho quản lý   triết lý hành động - kaizen philosophies
Kaizen cho quản lý triết lý hành động - kaizen philosophiesKAIZEN Group Experts
 
VISUAL CONTROLS - Mieruka
VISUAL CONTROLS - MierukaVISUAL CONTROLS - Mieruka
VISUAL CONTROLS - Mierukaadcom2015
 
[Công nghệ may] giới thiệu về lean manufacturing
[Công nghệ may] giới thiệu về lean manufacturing[Công nghệ may] giới thiệu về lean manufacturing
[Công nghệ may] giới thiệu về lean manufacturingTÀI LIỆU NGÀNH MAY
 

Andere mochten auch (20)

Six sigma-tools
Six sigma-toolsSix sigma-tools
Six sigma-tools
 
Basic Six Sigma Presentation
Basic Six Sigma PresentationBasic Six Sigma Presentation
Basic Six Sigma Presentation
 
What+Is+Six+Sigma
What+Is+Six+SigmaWhat+Is+Six+Sigma
What+Is+Six+Sigma
 
İkinci El Komple Eşya Alımı
İkinci El Komple Eşya Alımıİkinci El Komple Eşya Alımı
İkinci El Komple Eşya Alımı
 
Mission Bo Kv3
Mission Bo Kv3Mission Bo Kv3
Mission Bo Kv3
 
Tai lieu danh_gia
Tai lieu danh_giaTai lieu danh_gia
Tai lieu danh_gia
 
8799568 lean-manufacturing
8799568 lean-manufacturing8799568 lean-manufacturing
8799568 lean-manufacturing
 
O P450
O P450O P450
O P450
 
Fsfinalbook single
Fsfinalbook singleFsfinalbook single
Fsfinalbook single
 
Bạn có máu phát minh không ?
Bạn có máu phát minh không ?Bạn có máu phát minh không ?
Bạn có máu phát minh không ?
 
Kaizen full
Kaizen fullKaizen full
Kaizen full
 
Kaizen 2 full
Kaizen 2 fullKaizen 2 full
Kaizen 2 full
 
Why you still stay fat
Why you still stay fatWhy you still stay fat
Why you still stay fat
 
Motion Study
Motion StudyMotion Study
Motion Study
 
6 sigma introduction to lean manufacturing - vietnamese
6 sigma introduction to lean manufacturing - vietnamese6 sigma introduction to lean manufacturing - vietnamese
6 sigma introduction to lean manufacturing - vietnamese
 
Ky nang-to-chuc-cong-viec
Ky nang-to-chuc-cong-viecKy nang-to-chuc-cong-viec
Ky nang-to-chuc-cong-viec
 
He thong quan_ly_6_sigma
He thong quan_ly_6_sigmaHe thong quan_ly_6_sigma
He thong quan_ly_6_sigma
 
Kaizen cho quản lý triết lý hành động - kaizen philosophies
Kaizen cho quản lý   triết lý hành động - kaizen philosophiesKaizen cho quản lý   triết lý hành động - kaizen philosophies
Kaizen cho quản lý triết lý hành động - kaizen philosophies
 
VISUAL CONTROLS - Mieruka
VISUAL CONTROLS - MierukaVISUAL CONTROLS - Mieruka
VISUAL CONTROLS - Mieruka
 
[Công nghệ may] giới thiệu về lean manufacturing
[Công nghệ may] giới thiệu về lean manufacturing[Công nghệ may] giới thiệu về lean manufacturing
[Công nghệ may] giới thiệu về lean manufacturing
 

Ähnlich wie Cairo 01 Six Sigma Measure

Implementation of 5S and KOBETSU KAIZEN (TPM Pillar) in a Manufacturing Organ...
Implementation of 5S and KOBETSU KAIZEN (TPM Pillar) in a Manufacturing Organ...Implementation of 5S and KOBETSU KAIZEN (TPM Pillar) in a Manufacturing Organ...
Implementation of 5S and KOBETSU KAIZEN (TPM Pillar) in a Manufacturing Organ...IRJET Journal
 
IRJET- A Case Study for Overall Equipment Effectiveness Improved in Manufactu...
IRJET- A Case Study for Overall Equipment Effectiveness Improved in Manufactu...IRJET- A Case Study for Overall Equipment Effectiveness Improved in Manufactu...
IRJET- A Case Study for Overall Equipment Effectiveness Improved in Manufactu...IRJET Journal
 
Isa saint-louis-exceptional-opportunities-short-course-day-2
Isa saint-louis-exceptional-opportunities-short-course-day-2Isa saint-louis-exceptional-opportunities-short-course-day-2
Isa saint-louis-exceptional-opportunities-short-course-day-2Jim Cahill
 
Modernization Lessons Learned -Part 2
Modernization Lessons Learned -Part 2Modernization Lessons Learned -Part 2
Modernization Lessons Learned -Part 2Emerson Exchange
 
A038301010
A038301010A038301010
A038301010theijes
 
Test Metrics
Test MetricsTest Metrics
Test MetricsDevukjs
 
D3 ver oee 3bus094475 l en_oee_white_paper_low_resolution
D3 ver oee 3bus094475 l en_oee_white_paper_low_resolutionD3 ver oee 3bus094475 l en_oee_white_paper_low_resolution
D3 ver oee 3bus094475 l en_oee_white_paper_low_resolutionMannyjg5
 
Optimal+ GSA 2014
Optimal+ GSA  2014Optimal+ GSA  2014
Optimal+ GSA 2014OptimalPlus
 
IRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
IRJET- Productivity Improvement in Manufacturing Industry using Lean ToolsIRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
IRJET- Productivity Improvement in Manufacturing Industry using Lean ToolsIRJET Journal
 
Process Capability: Step 4 (Normal Distributions)
Process Capability: Step 4 (Normal Distributions)Process Capability: Step 4 (Normal Distributions)
Process Capability: Step 4 (Normal Distributions)Matt Hansen
 
Top Metrics for Agile @Agile NCR2011
Top Metrics for Agile @Agile NCR2011Top Metrics for Agile @Agile NCR2011
Top Metrics for Agile @Agile NCR2011Priyank Pathak
 
Cs 568 Spring 10 Lecture 5 Estimation
Cs 568 Spring 10  Lecture 5 EstimationCs 568 Spring 10  Lecture 5 Estimation
Cs 568 Spring 10 Lecture 5 EstimationLawrence Bernstein
 
PLC problem troubleshooting
PLC problem troubleshooting PLC problem troubleshooting
PLC problem troubleshooting shashank tiwari
 
Failure modes effect analysis
Failure modes effect analysisFailure modes effect analysis
Failure modes effect analysisrashmi322
 
PID Control of True Integrating Processes - Greg McMillan Deminar
PID Control of True Integrating Processes - Greg McMillan DeminarPID Control of True Integrating Processes - Greg McMillan Deminar
PID Control of True Integrating Processes - Greg McMillan DeminarJim Cahill
 

Ähnlich wie Cairo 01 Six Sigma Measure (20)

Implementation of 5S and KOBETSU KAIZEN (TPM Pillar) in a Manufacturing Organ...
Implementation of 5S and KOBETSU KAIZEN (TPM Pillar) in a Manufacturing Organ...Implementation of 5S and KOBETSU KAIZEN (TPM Pillar) in a Manufacturing Organ...
Implementation of 5S and KOBETSU KAIZEN (TPM Pillar) in a Manufacturing Organ...
 
IRJET- A Case Study for Overall Equipment Effectiveness Improved in Manufactu...
IRJET- A Case Study for Overall Equipment Effectiveness Improved in Manufactu...IRJET- A Case Study for Overall Equipment Effectiveness Improved in Manufactu...
IRJET- A Case Study for Overall Equipment Effectiveness Improved in Manufactu...
 
Isa saint-louis-exceptional-opportunities-short-course-day-2
Isa saint-louis-exceptional-opportunities-short-course-day-2Isa saint-louis-exceptional-opportunities-short-course-day-2
Isa saint-louis-exceptional-opportunities-short-course-day-2
 
Modernization Lessons Learned -Part 2
Modernization Lessons Learned -Part 2Modernization Lessons Learned -Part 2
Modernization Lessons Learned -Part 2
 
A038301010
A038301010A038301010
A038301010
 
om
omom
om
 
Work measurement
Work measurementWork measurement
Work measurement
 
Test Metrics
Test MetricsTest Metrics
Test Metrics
 
D3 ver oee 3bus094475 l en_oee_white_paper_low_resolution
D3 ver oee 3bus094475 l en_oee_white_paper_low_resolutionD3 ver oee 3bus094475 l en_oee_white_paper_low_resolution
D3 ver oee 3bus094475 l en_oee_white_paper_low_resolution
 
Optimal+ GSA 2014
Optimal+ GSA  2014Optimal+ GSA  2014
Optimal+ GSA 2014
 
IRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
IRJET- Productivity Improvement in Manufacturing Industry using Lean ToolsIRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
IRJET- Productivity Improvement in Manufacturing Industry using Lean Tools
 
Process Capability: Step 4 (Normal Distributions)
Process Capability: Step 4 (Normal Distributions)Process Capability: Step 4 (Normal Distributions)
Process Capability: Step 4 (Normal Distributions)
 
Top Metrics for Agile @Agile NCR2011
Top Metrics for Agile @Agile NCR2011Top Metrics for Agile @Agile NCR2011
Top Metrics for Agile @Agile NCR2011
 
Cs 568 Spring 10 Lecture 5 Estimation
Cs 568 Spring 10  Lecture 5 EstimationCs 568 Spring 10  Lecture 5 Estimation
Cs 568 Spring 10 Lecture 5 Estimation
 
PLC problem troubleshooting
PLC problem troubleshooting PLC problem troubleshooting
PLC problem troubleshooting
 
FMICA ppt
FMICA pptFMICA ppt
FMICA ppt
 
OEE
OEEOEE
OEE
 
Failure modes effect analysis
Failure modes effect analysisFailure modes effect analysis
Failure modes effect analysis
 
Unit 3
Unit 3Unit 3
Unit 3
 
PID Control of True Integrating Processes - Greg McMillan Deminar
PID Control of True Integrating Processes - Greg McMillan DeminarPID Control of True Integrating Processes - Greg McMillan Deminar
PID Control of True Integrating Processes - Greg McMillan Deminar
 

Mehr von ahmad bassiouny (20)

Work Study & Productivity
Work Study & ProductivityWork Study & Productivity
Work Study & Productivity
 
Work Study
Work StudyWork Study
Work Study
 
Motion And Time Study
Motion And Time StudyMotion And Time Study
Motion And Time Study
 
The Christmas Story
The Christmas StoryThe Christmas Story
The Christmas Story
 
Turkey Photos
Turkey PhotosTurkey Photos
Turkey Photos
 
Miramar
MiramarMiramar
Miramar
 
Mom
MomMom
Mom
 
Linearization
LinearizationLinearization
Linearization
 
Kblmt B000 Intro Kaizen Based Lean Manufacturing
Kblmt B000 Intro Kaizen Based Lean ManufacturingKblmt B000 Intro Kaizen Based Lean Manufacturing
Kblmt B000 Intro Kaizen Based Lean Manufacturing
 
How To Survive
How To SurviveHow To Survive
How To Survive
 
Dad
DadDad
Dad
 
Ancient Hieroglyphics
Ancient HieroglyphicsAncient Hieroglyphics
Ancient Hieroglyphics
 
Dubai In 2009
Dubai In 2009Dubai In 2009
Dubai In 2009
 
DesignPeopleSystem
DesignPeopleSystemDesignPeopleSystem
DesignPeopleSystem
 
Organizational Behavior
Organizational BehaviorOrganizational Behavior
Organizational Behavior
 
Work Study Workshop
Work Study WorkshopWork Study Workshop
Work Study Workshop
 
Workstudy
WorkstudyWorkstudy
Workstudy
 
Time And Motion Study
Time And  Motion  StudyTime And  Motion  Study
Time And Motion Study
 
_olympic
_olympic_olympic
_olympic
 
_Egypt
_Egypt_Egypt
_Egypt
 

Kürzlich hochgeladen

Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsRizwan Syed
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsSergiu Bodiu
 
Powerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time ClashPowerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time Clashcharlottematthew16
 
The Future of Software Development - Devin AI Innovative Approach.pdf
The Future of Software Development - Devin AI Innovative Approach.pdfThe Future of Software Development - Devin AI Innovative Approach.pdf
The Future of Software Development - Devin AI Innovative Approach.pdfSeasiaInfotech2
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...Fwdays
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):comworks
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Commit University
 
Search Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfSearch Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfRankYa
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsMemoori
 
Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsMiki Katsuragi
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenHervé Boutemy
 
Story boards and shot lists for my a level piece
Story boards and shot lists for my a level pieceStory boards and shot lists for my a level piece
Story boards and shot lists for my a level piececharlottematthew16
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024Lorenzo Miniero
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brandgvaughan
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii SoldatenkoFwdays
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 3652toLead Limited
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr BaganFwdays
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Mark Simos
 

Kürzlich hochgeladen (20)

Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL Certs
 
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platforms
 
Powerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time ClashPowerpoint exploring the locations used in television show Time Clash
Powerpoint exploring the locations used in television show Time Clash
 
The Future of Software Development - Devin AI Innovative Approach.pdf
The Future of Software Development - Devin AI Innovative Approach.pdfThe Future of Software Development - Devin AI Innovative Approach.pdf
The Future of Software Development - Devin AI Innovative Approach.pdf
 
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks..."LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
"LLMs for Python Engineers: Advanced Data Analysis and Semantic Kernel",Oleks...
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!
 
Search Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdfSearch Engine Optimization SEO PDF for 2024.pdf
Search Engine Optimization SEO PDF for 2024.pdf
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial Buildings
 
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptxE-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
E-Vehicle_Hacking_by_Parul Sharma_null_owasp.pptx
 
Vertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering TipsVertex AI Gemini Prompt Engineering Tips
Vertex AI Gemini Prompt Engineering Tips
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache Maven
 
Story boards and shot lists for my a level piece
Story boards and shot lists for my a level pieceStory boards and shot lists for my a level piece
Story boards and shot lists for my a level piece
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024
 
WordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your BrandWordPress Websites for Engineers: Elevate Your Brand
WordPress Websites for Engineers: Elevate Your Brand
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
 

Cairo 01 Six Sigma Measure

  • 2.
  • 4. DEFININITIONS Number Of Operation Steps = m Defects = D Unit = U Opportunities For A Defect = O Yield = Y Nomenclature Total Opportunities (TOP) = U X O Defects Per Unit (DPU) = D/U Defects Per Unit Opportunity (DPO) = DPU/O = D/(U X O) Defects Per Million Opportunities (DPMO) = DPO X 10 6 Basic Relationships
  • 5. DISTRIBUTION OF DEFECTS IN MANUFACTURED PRODUCT Non-Randomly Occurring Defect Randomly Occurring Defect Example Result Conclusion Wrong part in manual insertion parts bin Every board contains same wrong part in same location. Defects are easier to detect/diagnose & are less likely to be sent to next operation Mixed parts in manual insertion parts bin. Probability of a board containing wrong part is equal to proportion of wrong parts in bin Defects are harder to detect/diagnose and are more likely to be sent to next operation
  • 6. PROBABILITY OF DEFECTS IN MANUFACTURED PRODUCT GIVEN: (1) Average DPU For This Product Is One (DPU=1) (2) Defects are randomly distributed What Is The Probability of Zero Defects In This Unit?
  • 7.
  • 8.
  • 9. PREDICTING THE QUALITY OF PRODUCTS FTY = e -DPU DPU = -ln FTY Estimation of units containing “q’ defects (where “q” is not limited to zero) If we use the Poisson distribution Becomes (DPU) q e -DPU q!  x e -  x! P{x} =
  • 10. YIELD RELATIONSHIPS Throughput Yield : Y TP = e -DPU Defects Per Unit: DPU = -ln(Y) Rolled Throughput Yield: Y RT =  Y TP i Total Defects Per Unit: TDPU = -ln(Y RT ) Normalized Yield: Y norm =  Defects per Normalized Unit: DPU norm = -ln(Y norm ) i =1 m Y RT m
  • 11. YIELD Probability with zero defects Specification Limit Probability of Defect = 1 - e -DPU Yield = e -DPU Y = P(x = 0) = e-   x x! e-  = = e -D/U = e -DPU
  • 13. THE HIDDEN FACTORY Customer Quality Operation Not OK Scrap Verify Rework Operation Not OK Scrap Verify Rework Y tp Throughput Yield Y tp Throughput Yield Non-Value Added (The Hidden Factory) Value Added (The Visible Factory) Producers Quality Supplier Quality Y rt =  Y tpi m i=10
  • 14. IMPLICATIONS OF THE HIDDEN FACTORY Y e e TP DPU      3679 1 0 . = 1.6321 . 1.63 Equivalent Units Must Be Produced To Get Out 1 Good Unit Every Occurrence Of A Defect Within The Manufacturing Process Requires Time To Verify, Analyze, Repair And Re-verify Average Cycle Time Per Unit Is Directly Proportional To The Total Number Of Defects Per Unit Cycle Time = Work In Process Throughput
  • 15. #1 #6 #2 #7 #5 #9 #4 #8 #3 #10 Final Insp.. Process Yield is 93.17% - Right?????? A FACTORY WITH 10 PROCESSES NOT QUITE!!! 1200 Good & 88 Bad Items [93.2% Found OK]
  • 16. COMPARISON OF YIELDS Y = S U = = .931677 S = Number of Units That Pass U = Number of Units Tested Throughput Yield Analysis Tells Us Y TPI = .47774 .4774  .932 Why Not??? 1200 1288
  • 17. ROLLED THROUGHPUT YIELD Operation Defects Units DPU (D/U) Throughput Yield (Y TPI = e -D/U = e -DPU ) 1 2 3 4 5 6 7 8 9 10 5 75 18 72 6 28 82 70 35 88 523 851 334 1202 252 243 943 894 234 1200 0.00956 0.08813 0.05389 0.05990 0.02381 0.11523 0.08696 0.07830 0.14957 0.07333 0.99049 0.91564 0.94753 0.94186 0.97647 0.89116 0.91672 0.92469 0.86108 0.92929 Sum of Operation Steps = 479 6676 0.73868 0.47774 (Y RT ) 47.9 667.6 0.07387 0.73868 =TDPU TDPU = -ln(Y RT ) Avg.. of Operation Steps =
  • 18. HOW MANY UNITS PRODUCED? UNITS PRODUCED = 1 + (1 - e -DPU ) = 1 + (1 - e -73868 ) = 1 + (1 - .477744) = 1 + .5222558 = 1.52 To Achieve 100 Conforming Units, 152 ( 1.52 X 100) Would Need To Be Produced
  • 20. Inspection E = 0.8 Escaping DPU Level Observed DPU Level Submitted DPU Level QUANTIFICATION OF DEFECTS Given: Observed Defects = DPU of 0.25 Then: Submitted Defects = (0.25/0.8) = DPU of 0.31 Escaping Defects = (0.31-0.25) = DPU of 0.06
  • 21. A TYPICAL PROCESS Operation 1 INSP TEST Prior Operation d o d 1 d 2 di dt dn Operation 2 d o = Defects Escaping Prior Process d 1 = Defects Added in Operation 1 d 2 = Defects Added in Operation 2 d i = Defects Found by Inspection & Corrected d t = Defects Found by Test and Corrected d n = Defects Escaping to Next Operation
  • 22. Op. 1 INSP TEST Op 2 DPU = 0.349 DPU = 0.907 DPU = 0.420 DPU = 0.075 DPU = 0.07 From Prior Process DPU = 0.279 DPU = 0.558 DPU = 0.487 DPU = 0.345 PD = Part Defective = 800 PPM SC = Solder Defective = 300 PPM PA = Part Assembly Error = 1000 PPM EFF: PA = .8 PD = .0 SC = .8 EFF: PA = .9 PD = .95 SC = .05 To Next Process DEFECT-BASED PLANNING FOR A TYPICAL PROCESS
  • 23. DEFECT-BASED PLANNING FOR A TYPICAL PROCESS Total Observed Defects Per Unit = 0.832 Rolled Yield = 43.52% Operation 1 Operation 2 Inspection Test # Parts PD PA SC TDU FTY Submitted Created Submitted Created Submitted Observed Submitted Observed 100 330 0.080 0.100 0.099 0.279 210 600 0.05 0.02 0.00 0.07 0.13 0.120 0.099 0.349 0.168 0.210 0.180 0.558 0.298 0.330 0.279 0.907 0.000 0.264 0.223 0.487 61.44% 0.298 0.066 0.056 0.420 0.283 0.059 0.003 0.345 70.82% Escaping 0.015 0.007 0.053 0.075
  • 24. REVIEW THE THREE PHASES OF PRODUCT LIFE Early Life Useful Life Wear Out PROB. OF FAILURE
  • 25.
  • 26. PROBABLE TIME TO FAILURE & DEGREE OF ABNORMALITY Gross Moderate Slight Degree of Abnormality Probable Time to Cause Failure
  • 27. MAJOR CAUSE OF LATENT DEFECTS The Design And Execution Of Processes Is The Major Cause of Latent Defects Cpk - Major Cause of the Degree of Abnormality The Average Number of Latent Defects Per Unit - Determines the Shape of Early Life Failure Rate Curve
  • 28.
  • 29.
  • 30. TOTAL DEFECTS PER UNIT (TDU) TDU =  DPU For All Key Characteristics +  DPU For All Component Part Defects +  DPU For All Process Defects WHERE: Key Characteristics Are Measured By C p & C pk Component Part Defects Are Defects Found In Material From Suppliers. Process Defects - Created As Product Goes Through Manufacturing Process
  • 31. DPU AS A DEFECT BUDGETING TOOL Defect Budgeting Is A Method To Ensure Robust Product Design A Robust Design Will Be Insensitive To Long-term Process & Material Variations & Product Misuse Goal Of Defect Budgeting For A New Product/process Is A Lower TDU
  • 32. OVERVIEW OF THE DEFECT BUDGETING PROCESS Structured Process Flow Diagram - All Inspection /Test Points - Flow Of Non-conforming Product Determine Capability/Error Rate Of Existing Process Establish Maximum DPU Level For Delivered Product Work Backwards & Establish Maximum DPUs Revise Process Flow - Add Inspection/test Points - Redesign Operations
  • 33. BENCHMARKING AGAINST BEST IN CLASS Determine Factors Critical To Long-term Success Compare Performance With Toughest Competitors Or Others Use Info to Develop Strategies And Functional Standards The Goal Of Benchmarking Is: - Exceed The Competition - Make Your Business The Very Best
  • 34.
  • 35. DEFECTS PER MILLION OPPORTUNITIES (DPMO) DPMO = DPU x 1,000,000 Parts Count DPMO = DPU x 1,000,000 Average Opportunities For Error in One Unit
  • 36. BENCHMARKING THE PROCESS 1. Define The Purpose Of The Project 2. Define A Unit 3. Determine The Number Of Opportunities For Error In A Unit - For Manufactured Product - Other Than Manufactured Product 4. Measure The Total Defects Per Unit (DPU) 5. Calculate Defects Per Million Opportunities (DPMO) 6. Estimate Specification Width
  • 37. BENCHMARKING AGAINST BEST IN CLASS 0.001 0.01 0.1 1 10 100 1K 10K 100K 2 3 4 5 6 7 .67 1.0 1.33 1.67 2.0 Sigma Cpk DPMO Specification Width  1.5 Sigma Shift Centered
  • 39. PROCESS CYCLE TIME Time To Do An Entire Process Could Be Time From Material Arriving To Final Product In Customer’s Hands Real Process Time Includes Waiting, Storage & In-between Operations Times. Theoretical Process Time - No Waiting Compare Real And Theoretical Process Time Reducing Real Process Cycle Time Can Reduce The Number Of Defective Units And Improve Process Performance
  • 40. THEORETICAL PROCESS CYCLE TIME Theoretical Process Cycle Time Real Daily Operating Time Number of Units Required Daily =
  • 41. TEST/INSPECTION WORK LOAD NONREPARIABLE PRODUCT Failure Of Test Or Inspection - Item Must Be Scrapped. To Yield One Acceptable Unit, We Must Test/inspect A Larger Number Of Units 1 YIELD Starts = = e DPU The Number of Parts Required to Start (T) = e -DPU 1 Test/Inspection Cycle Time = T x Time Per Test = (e DPU ) x time Per Test
  • 42. TEST WORK LOAD REPARIABLE PRODUCT One Test Required To Catch Each Defect Another Test Required To Pass Repaired Unit T = Number Of Tests Per Accepted Unit T = (1+DPU) Test Cycle Time = T x Time Per Test = (1 + DPU) x Time Per Test
  • 43. EXAMPLE OF TEST WORK LOAD FOR REPAIRABLE PRODUCT FTY = 187/234 = 80% TDU = 62/234 = 0.265 FTY = e -0.265 = 77% TDU = -ln(0.80) = 0.233 Observed Results: Estimated From Observations Results Close Enough - Defects Randomly Distributed & Poisson Ok Number Of Tests Number Of Units Number Of Defects Total Number Of Tests 1 2 3 4 187 35 9 3 234 0 35 18 9 62 187 70 27 12 296 Totals
  • 44.
  • 45. ANALYZE WORK LOAD Every Unit Must Be Worked On Work Load Is Directly Proportional To Defects Per Unit Failures Analyzed One At A Time: Work Load = A = Analysis Per Unit = DPU Analysis Cycle Time = A x Time Per Analysis = DPU X Time Per Analysis Failures Analyzed All At One Time: Work Load = A = 1 - e -DPU Analysis cycle Time = A x Time Per Analysis = 1 - e -DPU x time Per Analysis
  • 46. REPAIR WORK LOAD For Failures Repaired One At a Time: Work Load = R = Repair Per Unit = DPU Repair Cycle time = R x Time Per Repair = DPU x Time Per Repair For Failure Repaired All At One Time: Work Load = R = 1 - e -DPU Repair Cycle time = R x Time Per Repair = 1 - e -DPU x Time Per Repair
  • 47. CYCLE TIME Test Analysis Repair Test Cycle Time = (1+ DPU ) x Time Per Test Analysis Cycle Time = DPU x Time Per Analysis or = 1- e -DPU x Time Per Analysis Repair Time = DPU x Time Per Repair or = 1- e -DPU x Time Per Repair
  • 48. Stores and Bank Time Total Mfg.. Cycle Time Queue, Run, and Changeover Time Output (capacity) Input CYCLE TIME / INVENTORY RELATIONSHIPS
  • 49. INVENTORY AND THROUGHPUT RATE How Are Inventory and Cycle Time Related? Cycle Time = Number of Days = Inventory Throughput Rate Total # of Pieces in Stock Pieces Processed Per day
  • 50. UNIVERSAL CYCLE TIME/ INVENTORY RELATIONSHIP Work -In-process Inventory = Throughput Rate x Cycle Time Number Of Work Orders Number Of Pieces Dollars Orders Per Day Pieces Per Day Dollars Per Day # Of Days # Of Days # Of Days Inventory Throughput Rate Cycle Time Examples
  • 51. CYCLE TIME CONTROLS WIP INVENTORY The Longer A Unit Of Product Remains In A Production Area, The Higher The Work In Process (WIP) Inventory Is In That Area Time Unit Is Expected To Remain In Area = Average Total Time
  • 52. Raw Material Stores Fabrication Fabrication Stores Sub- Assembly Sub- Assembly Stores Final Assembly Finished Goods Inventory Work-In-Process Manufacturing Cycle Time Inventory Carrying Cost Total Value of Product Raw Materials Acquisition Finished Goods Shipment TRUE COST OF INVENTORY $
  • 53. CYCLE TIME AND INVENTORY TURNS An Inventory Turn Is An Index Or Indicator Of How Often A Company’s Entire Inventory Stock Is Replaced Cost Of Goods Sold Average Annual Inventory Turns = 1.25 1.44 5.00 10.00 20.00 40.00 288 250 72 36 18 9 Turns Turn Days Note: Dell Has been Able to Achieve 1440 Turns
  • 54. INVENTORY COST AT MOTOROLA Inventory Carrying Cost Equals At Least 25% of the Value of Average Annual Inventory Levels In 1991, This cost can be compared to taking $310 million and burning it , since it adds no value to the company Year Sales Average Annual Inventory Levels Inventory Carrying Costs 1987 1989 1991 1995 $6,700,000,000 $9,620,000,000 $11,340,000,000 $27,037,000,000 $909,000,000 $1,158,000,000 $1,242,000,000 $3,528,000,000 $227,000,000 $289,000,000 $310,500,000 $882,000,000
  • 55. THE BOTTOM LINE IMPACT In 1987, Motorola Discovered That Poor Quality Accounted For Approximately 25% Of Their Annual Inventory Carrying Costs. This Expense Added No Value, It Was Just Like Taking $250,000,000 and pouring it down a drain … .Annually!
  • 56. OVERALL MANUFACTURING COST AND DPU Defects Cost Money as Result Of: Diagnostic Time Repair Time / Re-Inspection Extra Labor Extra Materials Extra Capacity Extra Support Extra Management Extra Inventory Cost of Failure (Internal) = DPU x Volume x Average Cost Defect
  • 57. REDUCING CYCLE TIME & INVENTORY SUMMARY Cycle Time & Inventory Are Key Competitive Factors Cycle Time Is The Inverse Of Inventory Turns (Shorter Cycle Times = Lower Inventories) Defects Have A Major Controlling Effect Defect Must Be Analyzed And Repaired Two Important Work Load Measures - Test & Inspection, And Analyze & Repair Capacity Of Test / Inspection Equipment Is Inversely Proportional To Work Load