Institutional
March, 2012




                1
AES Brasil Group
• Presence in Brazil since 1997
• Comprised of four companies in the sectors of
energy generation and distribution
• 7.4 thousand AES Brasil People
• Investments 1998-2011: R$ 8.1 billion
• Good corporate governance practices
• Sustainable practices in businesses
• Safety as a main value
• Strong cash generation capacity
• 25% of minimum pay-out according to bylaws
• Differentiated practice of dividend distribution
since 2006:
      –   AES Tietê: 100% of net income on quarterly
          basis
      –   AES Eletropaulo: distribution above the
          minimum required (25% of net income) on
          semi-annual basis


                                                   2
AES Brasil widely recognized in 2009-2011

       Management excellence                          Quality and safety                     Environmental
                                                                                                  concern




(AES Eletropaulo)      (AES Tietê)      (AES Tietê)

                                                      (AES Eletropaulo)     (AES Sul)
                                                                                                 (AES Brasil)

                    (AES Eletropaulo)



                                                              (AES Eletropaulo)
                                        (AES Tietê)
   (AES Brasil)
                       (AES Tietê)
                                                                                                 (AES Tietê)



                      (AES Tietê)                     (AES Eletropaulo)   (AES Eletropaulo)

                                                                                                                3
Shareholding Structure


                              AES Corp                       BNDES

                                 C 50.00% + 1 share   C 50.00% - 1 share
                                 P 0.00%              P 100%
                                 T 46.15%             T 53.85%


                                           Cia. Brasiliana
                                             de Energia




                                                      C 71.35%             C 76.45%
              C 99.99%          C 99.00%              P 32.34%             P 7.38%
T 99.70%      T 99.99%          T 99.00%              T 52.55%             T 34.87%

                    AES              AES                     AES                 AES
    AES Sul
                 Infoenergy       Uruguaiana                 Tietê           Eletropaulo



                                     C = Common Shares
                                     P = Preferred Shares
                                           T = Total
                                                                                           4
Listed Companies Shareholding Composition




                                                             ¹                         ¹ Free Float                 Others²             Market Cap³



                                                 16.1%                  19.2%                   56.2%                  8.5%                 R$ 4.8 bi




                                                 24.2%                  28.3%                   39.5%                  8.0%                 R$ 8.5 bi




1 - Parent companies, AES Corp and BNDES, have similar voting capital on each of the Companies: approx 38.2% on AES Eletropaulo and 35.7% on AES Tietê
2 - Includes Federal Government and Eletrobrás shares in AES Eletropaulo and AES Tietê, respectively
3 - Base: 09/30/2011. Considers preferred shares for AES Eletropaulo and preferred and common shares for AES Tietê
                                                                                                                                                         5
AES Brasil is the second largest group in
  Ebitda1 – 2010 (R$ Billion)
                                                                            electric sector
          4.5
                           4.2

                                     3.4
                                                 3.0
                                                               2.6
                                                                         2.0    1.6
                                                                                          1.6
                                                                                                        1.5

                                                                                                                     0.6


         CEMIG      AES BRASIL      CPFL      NEOENERGIA   TRACTEBEL    CESP    EDP      LIGHT        COPEL         DUKE

  Net   Income1   – 2010 (R$ Billion)
         2.3           2.2
                                    1.8
                                                1.6
                                                             1.2
                                                                        1.0
                                                                               0.6      0.6
                                                                                                      0.2
                                                                                                                   0.1


        CEMIG      AES BRASIL    NEOENERGIA     CPFL       TRACTEBEL   COPEL   EDP     LIGHT         DUKE         CESP
                                                                                                                             6
1 – excluding Eletrobrás                                                              Source: Companies’ financial reports
AES Tietê is an important player among private
Generation Installed Capacity (MW) - 2012          1
                                                            energy generators
            Main privately held Companies
                                                                                             AES Tietê is the 3rd largest among private
               AES TIETÊ   CPFL   DUKE
                 2,3%      2,4%   1,9%
                                         EDP                                                   generation companies and 10th largest
                                         1,6%
       TRACTEBEL                           NEOENERGIA
          6,1%                                 1,2%                                            overall
                                                    ENDESA
                                                      0,8%
                                             LIGHT
                                             0,8%                                            Approximately             78%        of      country’s

                                                                                               generation installed capacity is state-

  DEMAIS                                           CHESF   ³                                   owned2
   27%                                              9%


                                                  FURNAS       ³                             There are three mega hydropower plants
                                                    8%

                                                                                               under construction in the North region of
                                                ELETRONORTE        ³
                                                     8%
                                                                                               Brazil with 18 GW in installed capacity
    COPEL                                           ITAIPU ³
     4%                                               6%
                                                                                                  – Santo Antonio and Jirau (Madeira River): 7 GW
       PETROBRÁS                                ELETRONUCLEAR          ³
           5%      CEMIG   CESP                       3%
                    6%      6%                     CGTEE   ³                                      – Belo Monte (Xingu River): 11 GW
                                                    1%
                                                  ELETROSUL        ³
                                                     0,4%                  1- Sources: ANEEL – BIG (March, 2012) and Companies websites 2- Source: Merrill Lynch
 Total Installed Capacity: 117 GW                                                                                                                                  7
                                                                           3 – Eletrobrás, totaling 35%
AES Brasil is the largest distribution group
                                                                              in Brazil
Consumption (GWh) - 2010
                        13%
                                                            • 63     distribution     companies       in   Brazil
                                                              distributing 419 TWh
 40%                              12%
                                             AES Brasil
                                             AES Brasil
                                                            • AES     Brasil    is    the   largest   electricity
                                                              distribution group in Brazil:
                                             CPFL Energia
                                             CPFL Energia
                                  10%                              – AES Eletropaulo: 43 TWh distributed,

                             7%
                                             CEMIG
                                             Cemig                   representing 10.3% of the Brazilian
            6%         6%                                            market
                  6%
                                             Neoenergia
                                             Neo Energia
Consumers – Dec/2010                                               – AES       Sul:    9    TWh       distributed,
                            12%              Copel
                                             Copel                   representing 2.2% of the Brazilian
                                                                     market
    30%                                      Light
                                             Light
                                  12%                        Distribution companies’ operations are
                                             EDP
                                             EDP
                                                              restricted to their concession areas

                                   12%
                                             Outros
                                             Outros          Acquisitions must be only performed by
   5%                                                         the holdings of economic groups
       7%
             7%         16%                                                                                          8
Energy Sector in Brazil
Energy Sector in Brazil: business segments

        Free Clients                      Distribution                           Transmission                     Generation




   • Consumption of 113 TWh          • 63 companies                         • 68 companies                 • 13 groups controlling 76% of
   (26% of Brazilian total market)   • 430 TWh of energy                    • 68% private sector            total installed capacity

   • Conventional sources:            distributed in 2011                                                  • 22% private sector
                                                                            • High voltage transmission
     above 3000 kW                                                                                         • 1,862 power plants
                                     • 70 million consumers                   (>230 kV)
   • Alternative sources:                                                                                  • 117 GW of installed capacity
                                     • 67% private sector                   • 98.648 km in extension
     between 500 kW e 3000 kW                                                                                 • 73% hydroelectric
                                     • Annual tariff adjustment               lines (SIN¹)
   • Large consumers can                                                                                      • 17% thermoelectric
                                     • Tariff reset every four or           • Regulated public service
     purchase energy directly
                                      five years                              with free access                • 5% biomass
     from generators
                                     • Regulated public service             • Regulated tariff (annually      • 4% SHPP2
   • Free contracting
                                     • Regulated contracting                  adjusted by inflation)
     environment                                                                                              • 1% Wind
                                      environment
                                                                                                           • Contracting environment –
¹ Interconected National System
                                                                                                            free and regulated markets      10
² Small Hydro Power Plants                                  Sources: EPE, Aneel, ONS and Merrill Lynch
Energy sector in Brazil:
                                                                                  contracting environment
 Regulated Market                                                       Free Market


          Generators, Independent Power Producers                                  Generators and Independent
       (IPPs), Trading companies and Auto producers                                  Power Producers (IPPs)



                      Auctions: New Energy
                                                                                    Bilateral contracts (PPAs1)
                        and Existing Energy




                      Distribution companies                                                Free clients



                          •    Main auctions (reverse auctions):
                                 – New Energy (A-5): Delivery in 5 years, 15-30 years regulated PPA1
                                 – New Energy (A-3): Delivery in 3 years, 15-30 years regulated PPA1
                                 – Existing Energy (A-1): Delivery in 1 year, 5-15 years regulated PPA1

1 – Power Purchase Agreement                                                                                      11
Energy sector in Brazil:
                                                                                                        demand perspectives
    Macroeconomic Scenario

                            GDP - Annual growth (%)                                                            EPE’s1 Assumptions:
                2004-2008          2010           2011       2012-2015                          • Latest EPE’s estimates considers an
                    3.6            7.2             4.0             5.0                            economic activity slowdown in Brazil
                                                                                                  (industrial stagnation  and   higher
                                                                                                  inflation).
    Brazilian Consumption Evolution (TWh)

                                                           5.0% p.a.                            • For the next years, the good performance
                                                                                                  of domestic market and the perspectives
                                          3.6%                                515
               4.0% p.a.                                               493                        of higher investments are factors
                                                             469                                  indicating that the Brazilian economy will
                                                     444
                                            423                                                   recover the growth path observed before
                                    408
             369
                     380    376                                                                   the global crisis.
     349

                                                                                                • Brazil will also benefit from the growth of
                                                                                                  emerging markets, with impact on
                                                                                                  exports of primary products.

     2006    2007   2008    2009    2010    2011     2012    2013      2014   2015
                                                                                                                                                12
1 - Source: EPE (Energetic Research Company) / ONS (National System Operator) – Second Review – september/11
Energy sector in Brazil:
                                                                                                  supply perspectives
Installed Energy Capacity in Brazil1

   Total installed capacity is expected to reach 171 GW by 2020
   Brazilian energy matrix will present higher diversification, but in the next 10 years hydropower plants will
    continue to prevail

                     2011: 115 GW                                                                     2020: 171 GW
                                                                                                  2
                                                                                            SHPP: 4%
                                                                                                           Natural gas: 7%
                       2
                  SHPP: 4%
                                                                                                                 Biomass: 5%
                             Natural gas: 8%

                                 Biomass: 5%                                                                                   Oil: 5%
                                                Oil: 3%                                                                        Nuclear: 2%
                                                Nuclear: 2%                                            Others: 17%             Coal: 2%
                                                                                   Hydro: 67%                                  Diesel: 1%
                      Others: 10%
    Hydro: 73%                                  Coal: 2%
                                                Diesel: 1%
                                                                                                                               Wind: 7%
                                                Wind: 1%
                                                Steam: 1%                                                                      Steam: 0%




1- Source: EPE (Energetic Research Company), Ten-year Energy Plan 2020, May/2011         2 - Small Hydro Power Plant
                                                                                                                                         13
Energy sector in Brazil:
                                                                                          regulatory methodology
Tariff Reset and Readjustment

• Tariff Reset is applied each 4 years for AES Eletropaulo
   − Base date: Jul/2011                                                                    • Parcel A Costs
   − Parcel A: costs are largely passed through to the tariff                Energy            − Non-manageable costs that are largely
                                                                            Purchase             passed through to the tariff
   − Parcel B: costs are set by ANEEL                                     Transmission
                                                                                               − Incentives to reduces costs
                                                                         Sector Charges
• Tariff Readjustment: annually
   − Parcel A : costs are largely passed through to the tariff
                                                                           Regulatory
   − Parcel B: cost are adjusted by IGPM +/- X(1) Factor                     Opex           • Regulatory Opex:
                                                                            (PMSO)
                                                                                               – Efficient operating cost determined by
                                                                                                 ANEEL (National Electricity Agency)

                                                        X WACC            Investment
                                                                         Remuneration
                                                                                            • Remuneration Asset Base:
                              Remuneration
                               Asset Base                                                      – Prudent investments used to calculate
                                                                                                 the investment remuneration (applying
                                                        X Depreciation                           WACC) and depreciation
                                                                          Depreciation



                                                                          Regulatory           Parcel A - Non-Manageable Costs
                                                                            Ebitda
                                                                                               Parcel B - Manageable Costs           14
 1 – X Factor: index that captures productivity gains
Energy sector in Brazil:
                                                                            regulatory methodology
3rd Cycle of Tariff Reset – X Factor


  X FACTOR                           Pd                            Q                                T
                       =                              +                             +



                                Distribution                                              Operational expenses
   DEFINITION                                              Quality of service
                                productivity                                                   trajectory



                                To capture                   To stimulate the           To implement operational
   OBJECTIVE                productivity gains             improvement of the           expenses trajectory during
                             with distribution                service quality                the tariff cycle


                           Defined at tariff reset,
                              considering the              Defined at each tariff         Defined at tariff reset,
                           average productivity of            readjustement,                 considering the
                           sector adjusted by the            according to the            expenses established by
   APPLICATION               market growth and            variation of SAIDI and         reference company and
                           variation of consumer          SAIFI and comparative               benchmarking
                           units of the distributor       performance of discos               methodologies          15
                              since last reset
AES Tietê Overview
Generation facilities



                                                           17 hydroelectric plants operating within the states of

                                                            São Paulo and Minas Gerais

                                                           30-year concession valid until 2029; renewable for

                                                            another 30 years

                                                           Installed capacity of 2,659 MW, with physical guarantee1

                                                            of 1,280 MW average

                                                           Almost all the amount of energy that AES Tietê can sell

                                                            in the long term is contracted to AES Eletropaulo until

                                                            the end of 2015

                                                           AES Tietê can invest in generation, its main activity, and

                                                            operate in energy trading

                                                           355 employees
                                                                                                                     17
1 - Amount of energy allowed to be long term contracted
Generated energy shows high
                                                                                 operational availability
Generated energy (MW avarage1)                                           Generated energy by power plant (MW avarage1)


                     130%
                                          125%
                                                                  124%
                                                                                           4%                         Água Vermelha
 118%                                                                             10%
                                                                                                                      Bariri
                                                                                                                      Barra Bonita
                                                                            8%
                                                                                                                      Euclides da Cunha
                                                                          6%                                    58%   Ibitinga
                      1,665
                                        1,599                              3%                                         Nova Avanhandava
                                                          1,582
                                                                            5%                                        Promissão
   1,512
                                                                                  6%                                  Other Power Plants*

   2008               2009               2010              2011

        Generation - Mw avg           Generation/Physical guarantee




            1 – Generated energy divided by the amount of hours           * Caconde, Limoeiro, Mogi and SHPPs                         18
A significant amount of billed energy and net
                                               revenues comes from the bilateral contract with
                                                                               AES Eletropaulo
Energy Billed (GWh)                                                                    Net Revenues (%)




                                                                                                                     94%
                                                                                                                     94%
                          14,706                14,729              15,122
       13,148                                                            554
                       117 117         301        301
         331
                      1,1501,150      1,340      1,340                  1,519
           331
                      2,3312,331                    215
                                                  1,980
        1,680
          1,680                       1,980                      346 1,942
                                                   1,135
                                                                1,188
                                                  1,554
                                                                1,535


       11,138             11,108                 11,108             11,108                           1%
         11,138       11,108          11,108
                                                  8,578                                                   1%            3%
                                                                8,045                                           2% 2%            3%

                                                                                                               AES Eletropaulo

                                                                                                               Other bilateral contracts
        20081                2009                2010                   2011
          2008        2009            2010        9M10          9M11
                                                                                                               Spot Market
      AES Eletropaulo          MRE2     Spot Market        Other bilateral contracts

   1 – Leap Year   2 – Energy Reallocation Mechanism                                                           MRE                         19
Investments in the modernization of Nova
                                                          Avanhandava, Ibitinga and Caconde
                                                                                power plants
    Investments (R$ million)                                       2011 Investments


                                               175


                                                19                                    85%


                                    82
          59            56                              174
                                    12         156

                        13                                                             4%      11%
          20
                                    70
          39            43


         2008         2009         2010        2011    2012(e)
                                                                                 Equipment and Modernization

                     Investments         New SHPPs*                              New SHPPs*

                                                                                 IT Projects
*Small Hydro Power Plants                                                                                      20
Growth opportunities
Perspectives


 • Project features
  -      Combined cycle using natural gas
  -      Estimated investment of R$ 1.1 billion
  -      Natural gas consumption: 2.5 million m3/day
  -      550 MW of installed capacity

 • Updates
 -       Environmental license obtained on October, 20th 2011
         (valid for 5 years)
 -       Gas unavailability for A-5 in 2011 and A-3 Energy
         Auction in 2012

• Next events
     -   Get the installation license
     -   Obtain gas supply in order to:
            -   Participate in the next auctions; or
            -   Evaluate energy offering in the free market
                                                                                   21
Financial highlights*

 Net Revenue (R$ million)                                 Ebitda (R$ million)




                                                                                1,255           1,320

                                                                                                        9
                                                              1,254      1,255          1,320
                                                                                                    1,035   1,048
                                                  1,886                                         9
                                          1,754
          1,605            1,670                                1,254           1,309           1,311       1,466

                                                                         1,309          1,311

                                                                                         (54)
         2008             2009            2010    2011          2008
                                                               2008         2009 2010
                                                                         2009                   2010
                                                                                                  9M10      2011
                                                                                                            9M11
                                                                78%              75%            75%         78%


                                                                        Recurring           Non-recurring
                                                                Recurring        Non-Recurring
                                                                                  Ebitda Margin
(*) 2009, 2010 and 2011 numbers in IFRS                                                                             22
Practice of total net income distribution on
                                                                               quarterly basis*
Net Income and Dividend Pay-out1 (R$ million)
                                                                               117%
                                                             110%                             109%
                                          100%

                                          12%                11%               11%            11%

                                                              706               737
                                                                                      31




                                           692                816               784            845




                                                                       (74)            (78)
                                                                       (36)

                                           2008               2009             2010            2011
                       Pay - out                Yield Pref         Recurring          Non- recurring   IFRS Effect
1 – Gross value
(*) 2009, 2010 and 2011 numbers in IFRS
                                                                                                                     23
Debt profile
 Net Debt (R$ billion)                                                              Amortization Schedule – Principal (R$ million)




    0.3x                   0.3x               0.3x                  0.3x


                                                                                               300           300             300

                                                                 0.5
         0.4                 0.4              0.4




        2008               2009               2010              2011                          2013           2014           2015

               Dívida Líquida                       Net Debt / EBITDA



                                   •    December, 2011:
                                          –    Average debt cost in 2011 was 115% of CDI1 p.a. or 15% p.a.
                                          –    Average debt maturity of 2.6 years

                                                                                                                                     24
1 – Brazilian Interbank Interest Rate
Capital Markets
    AES Tietê X Ibovespa X IEE                                                                     Daily Avg. Volume (R$ thousand)

                                          12 Months 1
140
130
                                                                                        + 22%
                                                                                                                                                   17,980
                                                                                        + 21%                           13,922        12,970
120
                                                                                        + 11%
110                                                                                                    10,187                                      4,344
                                                                                        + 4%
100                                                                                                                     4,239
                                                                                          -2%                                         3,397
    90                                                                                                  2,101
    80                                                                                                                                             13,635
                                                                                                        8,086           9,683         9,573
    70
    60
    Feb-11              May-11               Aug-11           Nov-11               Feb-12               2009            2010          2011     YTD Feb/12

             Ibovespa            IEE²           GETI4          TSR³             GETI3
                                                                                                                          Preferred       Common

•        Market Cap4: R$ 9.1 billion
•        BM&FBovespa: GETI3 (common shares) and GETI4 (preferred shares)
•        ADRs negotiated in US OTC Market: AESAY (common shares) and AESYY
         (preferred shares)


1 – Index: 02/28/2011 = 100       2 – Electric Energy Index   3 – Total Shareholders’ Return    4 – Index: 02/29/2012                                       25
AES Eletropaulo overview
Concession Area



                   Largest electricity distribution company in Latin America

                   Serving 24 municipalities in the São Paulo Metropolitan area

                   Concession contract valid until 2028; renewable for another 30

                    years

                   Concession area with the highest GDP in Brazil

                   45 thousand kilometers of lines and 6.3 million consumption

                    units in a concession area of 4,526 km2

                   Total distributed volume of 45 TWh in 2011

                   AES Eletropaulo, as a distribution company, can only invest in

                    assets within its concession area

                   5,668 employees

                                                                                     27
Consumption evolution

Total Market1 (GWh)                                  2011 Consumption by Class (%)



                                                                               6%            9
                                                                       14
                                                                    14%
                                            45,102
                                 43,345                                                36% 26
       41,243         41,269
                                             8,284
                                 7,911
        7,383          6,832                                      18% 43

                                                                                26%          28

                                                                          17
                      34,436     35,434     36,817
       33,860

                                                                                            36
                                                                          26



        2008           2009      2010       2011                     Brazil           AES Eletropaulo
                Captive Market     Free Clients
                                                            Residential        Commercial   Industrial   Others


                                                                                                                  28
1 – Net of own consumption
Industrial class
 Industrial class X industrial production in São Paulo State
 15%

 10%

  5%                                                                                     •   Industrial    consumption         is
  0%                                                                                         influenced    by     manufacturing
  -5%                                                                                        industry performance in São Paulo
 -10%                      Economic crisis           Economic recovery                       State
 -15%
                                                                               Dec/11    •   Recent slowdown is influenced by
     Jul/07           Aug/08                Sep/09            Oct/10          Nov/11
        Industrial Production of SP (% 12 months)             Industrial (% 12 months)       the     decrease     of   industrial
Consumption of industrial class by activity – AES Eletropaulo                                production in 2011

                                                                                         •   Moreover, the migration of clients
                                                                                             to other regions of São Paulo State
                                                                                             and of the country negatively
                                                  Vehicles,
                         Other industries
                                              Chemical, Rubber,
                                              Plastic and Metal
                                                                                             impacts this class
                               50%
                                                  products
                                                     50%




                                                                                                                               29
Residential class
 Residential class X Average income in São Paulo Metropolitan Area
                                1,800                                                                              4,800
                                                                                                                                                •
Average Income R$ - SP (q-2¹)




                                                                                                                                                     Residential class is influenced by




                                                                                                                           Residential (GWh)
                                                                                                                                                     income in São Paulo Metropolitan
                                1,600                                                                              4,300
                                                                                                                                                     Area
                                1,400                                                                              3,800                        •    Maintenance            of     the      income
                                                                                                                                                     expansion trend in São Paulo
                                1,200                                                                              3,300
                                                                                                                                                     Metropolitan         Area      will    sustain
                                1,000                                                                   2,800
                                                                                                                                                     growth of residential class
                                                                                                    4Q11
                                        1Q06 3Q06 1Q07 3Q07 1Q08 3Q08 1Q09 3Q09 1Q10 3Q10 1Q11 3Q11
                                                                                                                                                •    Average        annual       growth       (2003-
                                              Avg Real Income R$ - SP (q-2¹)                   Residential (GWh)
                                                                                                                                                     2011):
 Consumption per consumer (in kWh)
                                                                                                                                                        – total residential market: 5.5%
                                                                                                                                                             y.y.
                                                                     - 9.4%
                 258                                                                                                                                    – consumption            per     consumer:
                                                                                                                                                             2.1% y.y.
                                                                                                            229     234
                                                                                             223    228
                                                                                      219                                                           Consumption per consumer is
                                    220                                        213
                                                             203    207
                                                     199                                                                                             still      9.4%       lower         than         in
                                             192
                                                                                                                                                     the period before the rationing



                                                                                                                                               1 - Two quarters of delay in relation to consumption    30
               2000                 2001     2002   2003    2004    2005       2006   2007   2008   2009    2010    2011
Investments amounted
                                                                    R$ 739 million in 2011
Investments Breakdown (R$ million)                    Investments 2011 (R$ million)




                                              841                                     227
                                     739      46
                         682          22                                                          172
                                                                      55
                         28
                                                                      22
              516                                                      39
    457                                                                     35
               37
                                                                                            189
    47
                                             794
                                      717
                         654
              478
    410                                                                          Maintenance
                                                                                 Client Service
                                                                                 System Expansion
                                                                                 Losses Recovery
   2008      2009       2010         2011   2012(e)
                                                                                 IT
             Capex    Paid by Customers                                          Paid by the Clients
                                                                                 Others



                                                                                                        31
SAIDI & SAIFI

 SAIDI - System Average Interruption Duration Index                       SAIFI - System Average Interruption Frequency Index

                                                                                                   7.87
                                                                                     8.41                        7.39
                                                                                                                             6.93
     10.92
                     10.09
                                     9.32
                                                   8.68


      9.20           11.86         10.60
                                                  10.36
                                                                                     5.20          6.17         5.43         5.45




      2008            2009          2010          2011                              2008          2009          2010         2011
       5th            8th            7th           6th                                1st          7th           3rd          4th

             SAIDI (hours)         SAIDI Aneel Reference                               SAIFI (times)          SAIFI Aneel Reference

                              ABRADEE ranking position among the 28 utilities with more than 500 thousand customers


          ►     2012 SAIDI ANEEL Reference: 8.67 hours                                 ►    2012 SAIFI ANEEL Reference: 6.87 times

Sources: ANEEL, AES Eletropaulo and ABRADEE
                                                                                                                                      32
Operational Indexes

 Losses (%)                                                                       Collection Rate (% over Gross Revenues)




             11.6              11.8
                                                 10.9            10.5                                          102.4        102.1
                                                                                                  101.1
                                                                                       98.5
              5.1               5.3               4.4            4.0



              6.5               6.5               6.5            6.5



             2008             2009              2010             2011                 2008        2009         2010         2011
                    Technical Losses¹           Commercial Losses


     ANEEL References:

   From Jul/09 to Jun/10: 12.32%                  From Jul/10 to Jun/11: 12.45%


                                                                                                                                    33
1 – Current technical losses used retroactively as a reference
“Creating Value” Project


          Internal process review:
(i) operating activities; (ii) support functions      Objective: to operate
  Target definition for productivity                  within the regulatory
              increase
                                                         framework for
 Reassess organization structure
                                                       operational costs,

   Review supply management                           and seek benchmark

                                                         position in the
Reassess and reinforce non-technical
         losses initiatives                                  sector


                                                                              34
Financial Highlights*

  Net Revenues (R$ million)                               Ebitda (R$ million)



                                                                                                                2,848
                                                                                                2,413
                                          9,697   9,836
                          8,786                                                                  426                933
                                                                                1,775
         7,530                                                  1,696                            339
                                                                                  87                                372
                                                                   -
                                                                  89             197



                                                                1,607           1,491           1,648           1,542




         2008             2009            2010    2011          2008            2009            2010            2011
                                                                                Recurring
                                                                                Regulatory assets and liabilities
                                                                                Non-recurring


(*) 2009, 2010 and 2011 numbers in IFRS
                                                                                                                          35
Practice of dividend distribution
                                                                                   on semi-annual basis*
 Net Income and Dividend Payout1 (R$ million)

                                          101,5%        93,4%          100,0%

                                                                                          54,4%


                                                         20,4%           28,6%
                                          20,3%                                           15,8%

                                                                         1.348            1.572
                                                         1.156
                                          1.027                           350              652
                                                          374
                                           329                            236
                                                                                           241
                                                          160

                                           698                            761              680
                                                          622



                                          2008           2009            2010             2011
                                                        Pay-out                Yield PN
                                           Net Income - Ex one-offs, regulatory assets and liabilities
                                           Regulatory assets and liabilities
                                                                                                                            36
(*) 2009, 2010 and 2011 numbers in IFRS    One-offs                                                      1 – Gross amount
Debt Profile
      Net Debt

                                                                       2.4x
                                                                                      2.0x
                                                                                                                                                                     66%
                                                                              1.5x                    1.6x                                   1%
                                                                                             1.4x                   1.3x
                        2.7                                                                                  0.9x
                                                                                                                           0.8x
             2.5                    2.4
                                                  2.3                                                                                         33%


         2008          2009        2010         2011                       2008          2009          2010          2011
                                                                            Gross Debt/Ebitda Adjusted with Fcesp
                   Net Debt (R$ billion)                                                                                                     CDI¹       IGP - DI²     Others
                                                                            Net Debt/Ebitda Adjusted with Fcesp
      Amortization Schedule – Principal (R$ million)
                                                                                                                                                                           941   1


         •     December, 2011:
                                                                                                574
                                                                                                               580                                                         762
       - Average debt cost was 110% of CDI¹                                                     46                                                434
                                                                                                               49          385                                             439
                                                                     375      347                                                           391
       or 12.1% p.a.                                                           342            347                                               61                         64
                                                                                                             272           53 278    279     56           285
       - Average debt maturity of 6.7 years                      244 94       6743            46
                                                                 44                           527             531
                                                                                                             50                 52    57                  60
                                                                              281             301                                           335 373                        375
                                                                 200 281        299                                        332 225                        225
                                                                                                                                                            65
                                                                                                             223                     222                                   179
                                                                                                                                                               65
                                                            2H11              2012           2013             2014           2015           2016         2017          2018      2
                                                                    2012          2013       2014            2015      2016          2017      2018           2019     2020 -
                                                                                                                                                                       2028 37   2
1 – Brazilian Interbank Interest Rate      2 – Inflation Index        3 – Pension Fund
                                                                                                      Local Currency (ex FCesp)                      Fcesp³
Capital Markets
AES Eletropaulo X Ibovespa X IEE                                                               Average Daily Volume (R$ thousand)

                                       12 Months 1
130           A                    B                                              + 30%                                        26,897         26,044
                                                                                  + 22%                           24,496
120
                                                                                  + 15%
110                                                                                                  21,960

100                                                                                -2%
90

80

70
 Feb-11               May-11            Aug-11             Nov-11           Feb-12
                                                                                                      2009         2010         2011 YTD Feb/12
      Ibovespa         IEE²      AES Eletropaulo PN         AES Eletropaulo TSR³

           A Ex dividends: 04/30/2011                B Ex dividends: 08/11/2011


 •     Market cap4: U$ 3.6 billion
 •     BM&FBOVESPA: ELPL3 (common shares) and ELPL4 (preferred shares)
 •     ADRs at US OTC Market: EPUMY (preferred shares)


1 – Index: 12/29/2011 = 100                                                 2 – Electric Energy Index                                                  38
3 – Total Shareholders’ Return                                              4 - Index: 02/29/12. Calculation includes only preferred shares
Sustainability and
Social Responsibility
Commitment with sustainability
Our Commitment with Sustainability


  We act as a transformer agent understanding, meeting and anticipating our customers electric power needs with safe and
  innovative solutions for the economic, environmental and social development of the communities in which we are present.




                                                                                                                            40
Commitment with sustainability

                              SUSTAINABLE ENERGY      INNOVATION IN PRODUCTS      EFFICIENCY IN THE USE OF   DEVELOPMENT & VALUATION
        SAFETY
                                  GENERATION                AND SERVICES                RESOURCES            OF COWORKERS, SUPPLIERS
                                                                                                                 AND COMMUNITIES



... means an attitude of        ... means using         ... means providing an       ... means allocating       ...means knowing,
    protection of our        economic, social and           environment and        them in such a manner           involving in a
 coworkers, suppliers           environmental              culture that inspire       that balanced and       transparent form and
and of the population.      resources in a balanced     solutions that improve      perennial results are      positively influencing
                            fashion, preserving the     people’s life, ensuring          ensured for all          our coworkers,
                               present time and         quality and excellence    stakeholders, abiding by         suppliers and
                              ensuring the future      in the services rendered    the values practiced by    communities to build a
                                                            to the customer.             the company          collective agenda that
                                                                                                                generates value for
                                                                                                                     everyone



                                                      TRANSVERSAL THEMES



                                                                                                     Communication
                                                      Stakeholders active
         Education for sustainability                                                                  Knowledge
                                                         participation
                   Transversal                                                                        Information
                      Themes
                                  To learn more access: www.aesbrasilsustentabilidade.com.br
                                                                                                                                        41
Social Responsibility: Main Projects

                     Development and transformation of communities
Education, culture                         “Casa de Cultura e Cidadania” Project
    and sport
                      Offers activities in culture and sports, courses, workshops and
                      lectures. Directly benefits approximately 5.6 thousand children
                        and teenagers and, indirectly, 290 thousand people in 7 units
                             located within AES Brazil companies’ area of operation.




                             Children education and development
                             “Centros Educacionais Luz e Lápis” Project
                             Two units in São Paulo attending 320 children from 1 to 6 years old, in social
                             vulnerability.




                                                                                                              42
Social Responsibility: Main Projects

                                                      Converting Consumers to Clients
                                                      A project developed to work on electrical network regularization.
                                                      Since 2004, more than 500 thousand families in low income
                                                      communities were benefited from better energy supply conditions
                                                      and social inclusion.




  Education about Safety and Efficiency in energy consumption
                                                    “AES Eletropaulo nas Escolas” Project
Education about safe and efficient use of energy to 4.5 thousand teachers and 404 thousand
 students from 900 public schools, between 2010 and 2011. The actions include recreational
                                                           activities offered in adapted trucks.




                                                                                                                          43
Attachments
Costs and Expenses

Costs and operational expenses1 (R$ million)




                                                                     415                    433                    420
                                              351

                                                                                            187                    174
                                              112                    201



                                             239                     214                    246                    245



                                            2008                    2009                   2010                   2011
                               Energy Purchase, Transmission and Connection Charges, and Water Resources

                               Other Costs and Expenses 2

1 – Do not include depreciation and amortization 2 - Personnel, Material, Third Party Services and Other Costs and Expenses   45
Costs and Expenses

Costs and operational expenses1 (R$ million)                                 PMS2 and Other Expenses (R$ million)



                                                                                                 1,306           1,255          1,272
                                                                  6,961           1,193
                                              6,745
                           6,431                                                                  254                               138
                                                                                                                  165
        5,893                                                     1,272
                                               1,255                               379
                           1,306
        1,193
                                                                                                  352             443               513

                                                                                   329

                                               5,490              5,689
        4,700              5,125
                                                                                                  700             647               622
                                                                                   485




        2008               2009                2010               2011            2008           2009             2010              2011
                 Energy Supply and Transmission Charges
                 PMS² and Others Expenses                                      Personnel and Payroll     Material and Third Party     Others


1 – Do not include depreciation and amortization
2 - Personnel, Material, Third Party Services and Other Costs and Expenses                                                                     46
Action Plan: R$ 242 million in 2011-2012


                 increase of 212 emergency teams, totalizing 353 teams trained to
                  perform attendances in powered grid
                 hiring and training of 580 maintanance and construction electricians
                 hiring of 30 additional prunning electricians
Concluded in
   2011          38% increase in call center positions (150 positions)
                 doubling of SMS receipt capacity to 100 thousand / day
                 increase of call center service capacity by 27 times from 2 thousand to
                 54 thousand calls / hour
                 300 additional stand-by positions in call center for emergency
                 situations



December/11
                increase of 120 emergency teams, totaling 473 teams
to March/12




                                                                                            47
AES Tiete's expansion obligation

  Privatization Notice                                     Judicial Notice:                    AES Tietê was
     established the           Aneel informed                                             summoned to answer a              São Paulo State
                                                      The Company was notified
obligation to expand the      that the issue is                                             Lawsuit filed by the             Supreme Court        Efforts being made
                                                       by the State of São Paulo
  installed capacity in         not related to                                              State of São Paulo,           rejected AES Tietê’s
                                                      Attorney's Office to present                                                                by the Company to
  15% (400 MW) until           the concession                                              which requested the                 appeal. The
                                                        its understanding on the
     2007, either in           agreement and                                                  fulfillment of the             grounds for the     meet the obligation :
                                                          matter, having filed its
   greenfield projects             must be                                                obligation in 24 months.            denial and the
                                                          response on time, the
  and/or through long          addressed with          proceedings were ended,              An injunction was                contents of the      • Long-term energy
     term purchase            the State of São         since no other action was         granted in order to have           decision have not
                                                                                                                                                  contracts (biomass)
 agreements with new                Paulo                taken by the Attorney's           a project submitted             yet been disclosed.
          plants                                                  Office                     within 60 days.                                     totaling an average of
                                                                                                                                                        10 MW

                                                                                                                                                 • SHPP São Joaquim
                                                                                                                                                 - started operating in
   1999          2007               Aug/08        Oct/08         Jul/09         Sep/10           Sep/11        Nov/11           Feb/12           July, 2011, with 3 MW
                                                                                                                                                  of installed capacity

                                                                                                                                                  • SHPP São José –
                                                                                                                                                  under construction,
   Company faces restrictions until
                                                                                   Popular Action:                                               with 4 MW of installed
            deadline:                        In response to a Popular                                                Lawsuit:
                                                                               Due to the plaintiffs failure
  • Insufficiency of hydro resources               Action (filed by           to specify the persons that        The Company                     capacity, expected to
     • Environmental restrictions              individuals against the           should be named as             appealed to the                  be operational in 1H12
                                                Federal Government,             Defendants, a favorable           State of Sao
 • Insufficiency of natural gas supply          Aneel, AES Tietê and           decision was rendered by        Paulo State Court                 • Thermo-SP - Project
• New Model of Electric Sector (Law #           Duke), the Company              the first Instance Court         of Appeals and
 10,848/2004), which forbids bilateral          presents its defense                                           the injunction was                of a 550MW gas fired
                                                                              (an appeal has been filed)
 agreements between generators and            before the first instance                                              stayed                          thermal plant
            distributors

                                                                                                                                                                     48
Eletrobras Lawsuit
                               State-owned
                            Eletropaulo was
                            spun-off into four             Eletrobras, after                                                                    On July 7, the      Next Steps:
                            companies and,                   winning the                                                                      judge determined
                                                                                         Eletrobras and                   Eletrobras                              1 - The auditing
  Stated-owned              according to our                    interest                                                                       Eletropaulo and
                                                                                        CTEEP appealed               requested the 1st                            procedure (AP)
   Eletropaulo               understanding                    calculation                                                                     CTEEP to present
                                                                                         to the Superior                level of court                             is expected to
borrowed money                based on the                 discussion, filed                                                                         their
                                                                                         Court of Justice             judge to appoint                            begin by the 1st
 from Eletrobras                 spin-off                 an Execution Suit                                                                    considerations,
                                                                                              (SCJ)                       an expert                                  half of 2012
                             agreement, the               to collect the due                                                                  which occurred in
                             discussion was                     amount                                                                              August           2 – AP is
                              transferred to                                                                                                                      expected to be
                                 CTEEP                                                                                                                            concluded in at
                                                                                                                                                                  least 6 months
                                                                                                                                                                   3 - After AP’s
                                                                                                                                                                   conclusion, a
                                                                                                                                                                   1st level court
                                                                                                                                                                  decision will be
   Nov/86          Dec/88        Jan/98          Apr/98       Sep/01           Sep/03       Oct/05          Jun/06       May/09          Dec/10    Jul/11             released
                                                                                                                                                                  4 - Appealing to
                                                                                                                                                                  the 2nd instance
                                                                                                                                                                        court
                                                                                                                                                                  5 - Foreclosure
                                                                                                                                                                       starts.
                                                                                                                                                                  Presentation of
               State-owned
                                                                         The 2nd level of                                              Eletrobras                     guaranty
             Eletropaulo and                Privatization                                                                            requested the
                                                                         court excluded              The SCJ decided
                Eletrobras                  event . State-                                                                                                        6 - Request to
                                                                        AES Eletropaulo                 to send the                 beginning of the
           disagreed on how                    owned                                                                                                               withdraw the
                                                                             from the                 Execution Suit                   appraisal
               to calculate                  Eletropaulo                                                                                                             guaranty
                                                                        discussion based              back to the 1st             procedure, which is
            interest over that              became AES                                                                            under 1st. instance              7 - Appeals to
                                                                          on the spin-off              level of court
           loan and a lawsuit                Eletropaulo                                                                             court analysis               the 3rd instance
                                                                           agreement
               was started                                                                                                                                             courts

                                                                                                                                                                            49
Shareholders Agreement
On Dec 2003 AES and BNDES signed a Shareholders’ Agreement to regulate their relationship as shareholders of
Brasiliana and its controlled companies. The Agreement is available at www.aeseletropaulo.com.br/ri

Shareholders can dispose its share at any time, considering the following terms:


Right of 1st     Any party with an intention to dispose its shares should first provide the other party the right to buy
refusal          that participation at the same price offered by a third party



Tag along        In the case of change in Brasiliana’s control, tag along rights are triggered for the following
rights             companies (only if AES is no longer controlling shareholder):
                     – AES Eletropaulo: Tag along of 100% in its common and preferred shares
                     – AES Tietê: Tag along of 80% in its common shares
                     – AES Elpa: Tag along of 80% in its common shares



Drag along       Once the offering party exercises the Drag Along clause, offered party is obligated to dispose of all
rights          its shares at the time, if the Right of 1st Refusal is not exercised by offered party


                                                                                                                       50
Brazilian Main Taxes


                      AES Tietê
                                                                        AES Eletropaulo
• Income Tax / Social Contribution:
                                                       • Income Tax / Social Contribution:
     – 34% over taxable income
                                                            – 34% over taxable income

• ICMS (VAT tax)                                       • ICMS: 22% over Revenue (average rate)
     – deferred tax                                         – Residential: 25%

• PIS/Cofins (sales tax):                                   – Industrial and Commercial: 18%

     – Eletropaulo s PPA: 3.65% over Revenue                – Public Entities: free

     – Other bilateral contracts: 9.25% over Revenue   • PIS/Cofins:

     minus Costs                                            – 9.25% over Revenue minus Costs




                                                                                                 51
Contacts:
 ri.aeseletropaulo@aes.com
 ri.aestiete@aes.com
 + 55 11 2195 7048
The statements contained in this document with regard to the business prospects, projected operating and financial
results, and growth potential are merely forecasts based on the expectations of the Company’s Management in
relation to its future performance. Such estimates are highly dependent on market behavior and on the conditions
affecting Brazil’s macroeconomic performance as well as the electric sector and international market, and they are
therefore subject to changes.

Weitere ähnliche Inhalte

Was ist angesagt?

Apresentação institucional 3Q10
Apresentação institucional 3Q10Apresentação institucional 3Q10
Apresentação institucional 3Q10AES Eletropaulo
 
Apresentação institucional 1_q12_en_v8
Apresentação institucional 1_q12_en_v8Apresentação institucional 1_q12_en_v8
Apresentação institucional 1_q12_en_v8AES Eletropaulo
 
Apresentação institucional 1_q12_en_v11
Apresentação institucional 1_q12_en_v11Apresentação institucional 1_q12_en_v11
Apresentação institucional 1_q12_en_v11AES Eletropaulo
 
Santander Annual Conference
Santander Annual ConferenceSantander Annual Conference
Santander Annual ConferenceAES Eletropaulo
 
Santander - 14th annual latin American CEO Conference
Santander - 14th annual latin American CEO ConferenceSantander - 14th annual latin American CEO Conference
Santander - 14th annual latin American CEO ConferenceAES Tietê
 
Apresentao Institucional 4 T09 Eng Final 18032010
Apresentao Institucional 4 T09 Eng Final 18032010Apresentao Institucional 4 T09 Eng Final 18032010
Apresentao Institucional 4 T09 Eng Final 18032010AES Eletropaulo
 
01/27/2010 - Credit Suisse Conference
01/27/2010  	-   	Credit Suisse Conference01/27/2010  	-   	Credit Suisse Conference
01/27/2010 - Credit Suisse ConferenceAES Tietê
 
Deutsche EuroShop | Company Presentation | 10/12
Deutsche EuroShop | Company Presentation | 10/12Deutsche EuroShop | Company Presentation | 10/12
Deutsche EuroShop | Company Presentation | 10/12Deutsche EuroShop AG
 
Latibex Forum– Novembro de 2009
Latibex Forum– Novembro de 2009Latibex Forum– Novembro de 2009
Latibex Forum– Novembro de 2009AES Eletropaulo
 
2011 08-15 cteep-release_2_q11
2011 08-15 cteep-release_2_q112011 08-15 cteep-release_2_q11
2011 08-15 cteep-release_2_q11Cteep
 
Deutsche EuroShop | Company Presentation | 07/12
Deutsche EuroShop | Company Presentation | 07/12Deutsche EuroShop | Company Presentation | 07/12
Deutsche EuroShop | Company Presentation | 07/12Deutsche EuroShop AG
 
Corporate presentation november_2011_4
Corporate presentation november_2011_4Corporate presentation november_2011_4
Corporate presentation november_2011_4NALenergy
 
Bw Plantation Making The Leap From Good To Great
Bw Plantation   Making The Leap From Good To GreatBw Plantation   Making The Leap From Good To Great
Bw Plantation Making The Leap From Good To GreatLinda Lauwira
 

Was ist angesagt? (16)

Apresentação institucional 3Q10
Apresentação institucional 3Q10Apresentação institucional 3Q10
Apresentação institucional 3Q10
 
Apresentação institucional 1_q12_en_v8
Apresentação institucional 1_q12_en_v8Apresentação institucional 1_q12_en_v8
Apresentação institucional 1_q12_en_v8
 
Apresentação institucional 1_q12_en_v11
Apresentação institucional 1_q12_en_v11Apresentação institucional 1_q12_en_v11
Apresentação institucional 1_q12_en_v11
 
Apre 3 t06
Apre 3 t06Apre 3 t06
Apre 3 t06
 
Santander Annual Conference
Santander Annual ConferenceSantander Annual Conference
Santander Annual Conference
 
Santander - 14th annual latin American CEO Conference
Santander - 14th annual latin American CEO ConferenceSantander - 14th annual latin American CEO Conference
Santander - 14th annual latin American CEO Conference
 
Apresentao Institucional 4 T09 Eng Final 18032010
Apresentao Institucional 4 T09 Eng Final 18032010Apresentao Institucional 4 T09 Eng Final 18032010
Apresentao Institucional 4 T09 Eng Final 18032010
 
01/27/2010 - Credit Suisse Conference
01/27/2010  	-   	Credit Suisse Conference01/27/2010  	-   	Credit Suisse Conference
01/27/2010 - Credit Suisse Conference
 
Apre 4 t06
Apre 4 t06Apre 4 t06
Apre 4 t06
 
Deutsche EuroShop | Company Presentation | 10/12
Deutsche EuroShop | Company Presentation | 10/12Deutsche EuroShop | Company Presentation | 10/12
Deutsche EuroShop | Company Presentation | 10/12
 
Tata motors update
Tata motors updateTata motors update
Tata motors update
 
Latibex Forum– Novembro de 2009
Latibex Forum– Novembro de 2009Latibex Forum– Novembro de 2009
Latibex Forum– Novembro de 2009
 
2011 08-15 cteep-release_2_q11
2011 08-15 cteep-release_2_q112011 08-15 cteep-release_2_q11
2011 08-15 cteep-release_2_q11
 
Deutsche EuroShop | Company Presentation | 07/12
Deutsche EuroShop | Company Presentation | 07/12Deutsche EuroShop | Company Presentation | 07/12
Deutsche EuroShop | Company Presentation | 07/12
 
Corporate presentation november_2011_4
Corporate presentation november_2011_4Corporate presentation november_2011_4
Corporate presentation november_2011_4
 
Bw Plantation Making The Leap From Good To Great
Bw Plantation   Making The Leap From Good To GreatBw Plantation   Making The Leap From Good To Great
Bw Plantation Making The Leap From Good To Great
 

Andere mochten auch

Assessment is an investment
Assessment is an investmentAssessment is an investment
Assessment is an investmentJoe Matthews
 
Տաթև Աբրահամյան կիսամյակային հաշվետվություն
Տաթև Աբրահամյան կիսամյակային հաշվետվությունՏաթև Աբրահամյան կիսամյակային հաշվետվություն
Տաթև Աբրահամյան կիսամյակային հաշվետվությունՆվարդ Սարգսյան
 
PinoyWatchDog.com | Atty James Beirne Lita Brutas Sex Scandal
PinoyWatchDog.com | Atty James Beirne Lita Brutas Sex ScandalPinoyWatchDog.com | Atty James Beirne Lita Brutas Sex Scandal
PinoyWatchDog.com | Atty James Beirne Lita Brutas Sex ScandalPinoyInsider
 
17. Workshop.Inspired
17. Workshop.Inspired17. Workshop.Inspired
17. Workshop.Inspiredheleenverkerk
 
1 serie a verdadeira ecologia
1 serie   a verdadeira ecologia1 serie   a verdadeira ecologia
1 serie a verdadeira ecologiaaquieomeulugar
 
SIFE Україна
SIFE УкраїнаSIFE Україна
SIFE Українаsifeinua
 

Andere mochten auch (8)

Assessment is an investment
Assessment is an investmentAssessment is an investment
Assessment is an investment
 
Lamb N1
Lamb N1Lamb N1
Lamb N1
 
Տաթև Աբրահամյան կիսամյակային հաշվետվություն
Տաթև Աբրահամյան կիսամյակային հաշվետվությունՏաթև Աբրահամյան կիսամյակային հաշվետվություն
Տաթև Աբրահամյան կիսամյակային հաշվետվություն
 
PinoyWatchDog.com | Atty James Beirne Lita Brutas Sex Scandal
PinoyWatchDog.com | Atty James Beirne Lita Brutas Sex ScandalPinoyWatchDog.com | Atty James Beirne Lita Brutas Sex Scandal
PinoyWatchDog.com | Atty James Beirne Lita Brutas Sex Scandal
 
Ze01
Ze01Ze01
Ze01
 
17. Workshop.Inspired
17. Workshop.Inspired17. Workshop.Inspired
17. Workshop.Inspired
 
1 serie a verdadeira ecologia
1 serie   a verdadeira ecologia1 serie   a verdadeira ecologia
1 serie a verdadeira ecologia
 
SIFE Україна
SIFE УкраїнаSIFE Україна
SIFE Україна
 

Ähnlich wie Apresentação institucional 4_q11_en_v3

Institutional presentation 3Q10
Institutional presentation 3Q10Institutional presentation 3Q10
Institutional presentation 3Q10AES Tietê
 
08/17/2007 - Apimec - 1st HALF 2007
08/17/2007  	-   	Apimec - 1st HALF 200708/17/2007  	-   	Apimec - 1st HALF 2007
08/17/2007 - Apimec - 1st HALF 2007AES Tietê
 
Aeseletropaulo aestiete presentation_2010_santandercancun_finalna
Aeseletropaulo aestiete presentation_2010_santandercancun_finalnaAeseletropaulo aestiete presentation_2010_santandercancun_finalna
Aeseletropaulo aestiete presentation_2010_santandercancun_finalnaAES Tietê
 
Aeseletropaulo aestiete presentation_2010_santandercancun_finalna
Aeseletropaulo aestiete presentation_2010_santandercancun_finalnaAeseletropaulo aestiete presentation_2010_santandercancun_finalna
Aeseletropaulo aestiete presentation_2010_santandercancun_finalnaAES Tietê
 
Apresentao institucional 3_t09_ing_final_grafica_26012010pdf
Apresentao institucional 3_t09_ing_final_grafica_26012010pdfApresentao institucional 3_t09_ing_final_grafica_26012010pdf
Apresentao institucional 3_t09_ing_final_grafica_26012010pdfAES Tietê
 
Apresentao institucional 4_t09_eng_final_18032010
Apresentao institucional 4_t09_eng_final_18032010Apresentao institucional 4_t09_eng_final_18032010
Apresentao institucional 4_t09_eng_final_18032010AES Tietê
 
Citi's 3rd Annual Brazil Equity Conference_ENG
Citi's 3rd Annual Brazil Equity Conference_ENGCiti's 3rd Annual Brazil Equity Conference_ENG
Citi's 3rd Annual Brazil Equity Conference_ENGAES Tietê
 
Citi's 3rd Annual Brazil Equity Conference
Citi's 3rd Annual Brazil Equity ConferenceCiti's 3rd Annual Brazil Equity Conference
Citi's 3rd Annual Brazil Equity ConferenceAES Tietê
 
Citi's 3rd Annual Brazil Equity Conference_Eng
Citi's 3rd Annual Brazil Equity Conference_EngCiti's 3rd Annual Brazil Equity Conference_Eng
Citi's 3rd Annual Brazil Equity Conference_EngAES Eletropaulo
 
Apresentação institucional 1T10_Eng
Apresentação institucional 1T10_EngApresentação institucional 1T10_Eng
Apresentação institucional 1T10_EngAES Eletropaulo
 
Apresentação institucional 1T10_ENG
Apresentação institucional 1T10_ENGApresentação institucional 1T10_ENG
Apresentação institucional 1T10_ENGAES Tietê
 
Apresentação institucional 3_q12_en_v8-
Apresentação institucional 3_q12_en_v8-Apresentação institucional 3_q12_en_v8-
Apresentação institucional 3_q12_en_v8-AES Eletropaulo
 
Apresentação institucional 1_q13_en_final3
Apresentação institucional 1_q13_en_final3Apresentação institucional 1_q13_en_final3
Apresentação institucional 1_q13_en_final3AES Tietê
 
Apresentação institucional 1_q13_en_final3
Apresentação institucional 1_q13_en_final3Apresentação institucional 1_q13_en_final3
Apresentação institucional 1_q13_en_final3AES Tietê
 
Brasil 2013 btg pactual xiv ceo conference
Brasil 2013 btg pactual xiv ceo conferenceBrasil 2013 btg pactual xiv ceo conference
Brasil 2013 btg pactual xiv ceo conferenceAES Eletropaulo
 
Itaú bba 8th annual lat am ceo conference in ny
Itaú bba   8th annual lat am ceo conference in nyItaú bba   8th annual lat am ceo conference in ny
Itaú bba 8th annual lat am ceo conference in nyAES Eletropaulo
 
Apresentação institucional 3_q12_en_v8
Apresentação institucional 3_q12_en_v8Apresentação institucional 3_q12_en_v8
Apresentação institucional 3_q12_en_v8AES Tietê
 
Apresentação institucional 3_q12_en_v8
Apresentação institucional 3_q12_en_v8Apresentação institucional 3_q12_en_v8
Apresentação institucional 3_q12_en_v8AES Tietê
 
CTEEP - 3rd Quarter 2009 Results Presentation
CTEEP - 3rd Quarter 2009 Results PresentationCTEEP - 3rd Quarter 2009 Results Presentation
CTEEP - 3rd Quarter 2009 Results PresentationCTEEP
 

Ähnlich wie Apresentação institucional 4_q11_en_v3 (20)

Institutional presentation 3Q10
Institutional presentation 3Q10Institutional presentation 3Q10
Institutional presentation 3Q10
 
Apre 2 t07
Apre 2 t07Apre 2 t07
Apre 2 t07
 
08/17/2007 - Apimec - 1st HALF 2007
08/17/2007  	-   	Apimec - 1st HALF 200708/17/2007  	-   	Apimec - 1st HALF 2007
08/17/2007 - Apimec - 1st HALF 2007
 
Aeseletropaulo aestiete presentation_2010_santandercancun_finalna
Aeseletropaulo aestiete presentation_2010_santandercancun_finalnaAeseletropaulo aestiete presentation_2010_santandercancun_finalna
Aeseletropaulo aestiete presentation_2010_santandercancun_finalna
 
Aeseletropaulo aestiete presentation_2010_santandercancun_finalna
Aeseletropaulo aestiete presentation_2010_santandercancun_finalnaAeseletropaulo aestiete presentation_2010_santandercancun_finalna
Aeseletropaulo aestiete presentation_2010_santandercancun_finalna
 
Apresentao institucional 3_t09_ing_final_grafica_26012010pdf
Apresentao institucional 3_t09_ing_final_grafica_26012010pdfApresentao institucional 3_t09_ing_final_grafica_26012010pdf
Apresentao institucional 3_t09_ing_final_grafica_26012010pdf
 
Apresentao institucional 4_t09_eng_final_18032010
Apresentao institucional 4_t09_eng_final_18032010Apresentao institucional 4_t09_eng_final_18032010
Apresentao institucional 4_t09_eng_final_18032010
 
Citi's 3rd Annual Brazil Equity Conference_ENG
Citi's 3rd Annual Brazil Equity Conference_ENGCiti's 3rd Annual Brazil Equity Conference_ENG
Citi's 3rd Annual Brazil Equity Conference_ENG
 
Citi's 3rd Annual Brazil Equity Conference
Citi's 3rd Annual Brazil Equity ConferenceCiti's 3rd Annual Brazil Equity Conference
Citi's 3rd Annual Brazil Equity Conference
 
Citi's 3rd Annual Brazil Equity Conference_Eng
Citi's 3rd Annual Brazil Equity Conference_EngCiti's 3rd Annual Brazil Equity Conference_Eng
Citi's 3rd Annual Brazil Equity Conference_Eng
 
Apresentação institucional 1T10_Eng
Apresentação institucional 1T10_EngApresentação institucional 1T10_Eng
Apresentação institucional 1T10_Eng
 
Apresentação institucional 1T10_ENG
Apresentação institucional 1T10_ENGApresentação institucional 1T10_ENG
Apresentação institucional 1T10_ENG
 
Apresentação institucional 3_q12_en_v8-
Apresentação institucional 3_q12_en_v8-Apresentação institucional 3_q12_en_v8-
Apresentação institucional 3_q12_en_v8-
 
Apresentação institucional 1_q13_en_final3
Apresentação institucional 1_q13_en_final3Apresentação institucional 1_q13_en_final3
Apresentação institucional 1_q13_en_final3
 
Apresentação institucional 1_q13_en_final3
Apresentação institucional 1_q13_en_final3Apresentação institucional 1_q13_en_final3
Apresentação institucional 1_q13_en_final3
 
Brasil 2013 btg pactual xiv ceo conference
Brasil 2013 btg pactual xiv ceo conferenceBrasil 2013 btg pactual xiv ceo conference
Brasil 2013 btg pactual xiv ceo conference
 
Itaú bba 8th annual lat am ceo conference in ny
Itaú bba   8th annual lat am ceo conference in nyItaú bba   8th annual lat am ceo conference in ny
Itaú bba 8th annual lat am ceo conference in ny
 
Apresentação institucional 3_q12_en_v8
Apresentação institucional 3_q12_en_v8Apresentação institucional 3_q12_en_v8
Apresentação institucional 3_q12_en_v8
 
Apresentação institucional 3_q12_en_v8
Apresentação institucional 3_q12_en_v8Apresentação institucional 3_q12_en_v8
Apresentação institucional 3_q12_en_v8
 
CTEEP - 3rd Quarter 2009 Results Presentation
CTEEP - 3rd Quarter 2009 Results PresentationCTEEP - 3rd Quarter 2009 Results Presentation
CTEEP - 3rd Quarter 2009 Results Presentation
 

Mehr von AES Eletropaulo

Apresentação bradesco ceo_forum2013_final (2)
Apresentação bradesco ceo_forum2013_final (2)Apresentação bradesco ceo_forum2013_final (2)
Apresentação bradesco ceo_forum2013_final (2)AES Eletropaulo
 
Apresentacao aes eletropaulo_3_q13_ing
Apresentacao aes eletropaulo_3_q13_ingApresentacao aes eletropaulo_3_q13_ing
Apresentacao aes eletropaulo_3_q13_ingAES Eletropaulo
 
Apresentacao aes eletropaulo_3_t13_final
Apresentacao aes eletropaulo_3_t13_finalApresentacao aes eletropaulo_3_t13_final
Apresentacao aes eletropaulo_3_t13_finalAES Eletropaulo
 
Apresentacao aes eletropaulo_4_q12_eng
Apresentacao aes eletropaulo_4_q12_engApresentacao aes eletropaulo_4_q12_eng
Apresentacao aes eletropaulo_4_q12_engAES Eletropaulo
 
Apresentacao aes eletropaulo_4_t12_v7
Apresentacao aes eletropaulo_4_t12_v7Apresentacao aes eletropaulo_4_t12_v7
Apresentacao aes eletropaulo_4_t12_v7AES Eletropaulo
 
Presentation aes eletropaulo_3_q12_sem discurso_v2
Presentation aes eletropaulo_3_q12_sem discurso_v2Presentation aes eletropaulo_3_q12_sem discurso_v2
Presentation aes eletropaulo_3_q12_sem discurso_v2AES Eletropaulo
 
Apresentacao aes eletropaulo_3_t12_sem discurso_v12
Apresentacao aes eletropaulo_3_t12_sem discurso_v12Apresentacao aes eletropaulo_3_t12_sem discurso_v12
Apresentacao aes eletropaulo_3_t12_sem discurso_v12AES Eletropaulo
 
Apresentacao aes eletropaulo_1_q13_eng_final
Apresentacao aes eletropaulo_1_q13_eng_finalApresentacao aes eletropaulo_1_q13_eng_final
Apresentacao aes eletropaulo_1_q13_eng_finalAES Eletropaulo
 
Apresentacao aes eletropaulo_1_t13_final - sem discurso
Apresentacao aes eletropaulo_1_t13_final - sem discursoApresentacao aes eletropaulo_1_t13_final - sem discurso
Apresentacao aes eletropaulo_1_t13_final - sem discursoAES Eletropaulo
 
Hsbc utilities ceo roundtable
Hsbc utilities ceo roundtableHsbc utilities ceo roundtable
Hsbc utilities ceo roundtableAES Eletropaulo
 
6th annual citi brazil equity conference são paulo
6th annual citi brazil equity conference   são paulo6th annual citi brazil equity conference   são paulo
6th annual citi brazil equity conference são pauloAES Eletropaulo
 
Apresentação institucional 3_q12_en_v11
Apresentação institucional 3_q12_en_v11Apresentação institucional 3_q12_en_v11
Apresentação institucional 3_q12_en_v11AES Eletropaulo
 
Apresentação institucional audiencia pub lica
Apresentação institucional audiencia pub licaApresentação institucional audiencia pub lica
Apresentação institucional audiencia pub licaAES Eletropaulo
 
Apresentação expomoney en_v1 - impressão
Apresentação expomoney en_v1 - impressãoApresentação expomoney en_v1 - impressão
Apresentação expomoney en_v1 - impressãoAES Eletropaulo
 
Apresentação expomoney pt_cvm
Apresentação expomoney pt_cvmApresentação expomoney pt_cvm
Apresentação expomoney pt_cvmAES Eletropaulo
 
Apresentação institucional 3_q12_en_v11
Apresentação institucional 3_q12_en_v11Apresentação institucional 3_q12_en_v11
Apresentação institucional 3_q12_en_v11AES Eletropaulo
 
Apresentação institucional 3_q12_en_v11
Apresentação institucional 3_q12_en_v11Apresentação institucional 3_q12_en_v11
Apresentação institucional 3_q12_en_v11AES Eletropaulo
 
Apresentação institucional 4_t10_eng
Apresentação institucional 4_t10_engApresentação institucional 4_t10_eng
Apresentação institucional 4_t10_engAES Eletropaulo
 
Apresentação institucional 4_t10_port
Apresentação institucional 4_t10_portApresentação institucional 4_t10_port
Apresentação institucional 4_t10_portAES Eletropaulo
 
Nd roadshow santander e conferência itaú ny eng
Nd roadshow santander e conferência itaú ny engNd roadshow santander e conferência itaú ny eng
Nd roadshow santander e conferência itaú ny engAES Eletropaulo
 

Mehr von AES Eletropaulo (20)

Apresentação bradesco ceo_forum2013_final (2)
Apresentação bradesco ceo_forum2013_final (2)Apresentação bradesco ceo_forum2013_final (2)
Apresentação bradesco ceo_forum2013_final (2)
 
Apresentacao aes eletropaulo_3_q13_ing
Apresentacao aes eletropaulo_3_q13_ingApresentacao aes eletropaulo_3_q13_ing
Apresentacao aes eletropaulo_3_q13_ing
 
Apresentacao aes eletropaulo_3_t13_final
Apresentacao aes eletropaulo_3_t13_finalApresentacao aes eletropaulo_3_t13_final
Apresentacao aes eletropaulo_3_t13_final
 
Apresentacao aes eletropaulo_4_q12_eng
Apresentacao aes eletropaulo_4_q12_engApresentacao aes eletropaulo_4_q12_eng
Apresentacao aes eletropaulo_4_q12_eng
 
Apresentacao aes eletropaulo_4_t12_v7
Apresentacao aes eletropaulo_4_t12_v7Apresentacao aes eletropaulo_4_t12_v7
Apresentacao aes eletropaulo_4_t12_v7
 
Presentation aes eletropaulo_3_q12_sem discurso_v2
Presentation aes eletropaulo_3_q12_sem discurso_v2Presentation aes eletropaulo_3_q12_sem discurso_v2
Presentation aes eletropaulo_3_q12_sem discurso_v2
 
Apresentacao aes eletropaulo_3_t12_sem discurso_v12
Apresentacao aes eletropaulo_3_t12_sem discurso_v12Apresentacao aes eletropaulo_3_t12_sem discurso_v12
Apresentacao aes eletropaulo_3_t12_sem discurso_v12
 
Apresentacao aes eletropaulo_1_q13_eng_final
Apresentacao aes eletropaulo_1_q13_eng_finalApresentacao aes eletropaulo_1_q13_eng_final
Apresentacao aes eletropaulo_1_q13_eng_final
 
Apresentacao aes eletropaulo_1_t13_final - sem discurso
Apresentacao aes eletropaulo_1_t13_final - sem discursoApresentacao aes eletropaulo_1_t13_final - sem discurso
Apresentacao aes eletropaulo_1_t13_final - sem discurso
 
Hsbc utilities ceo roundtable
Hsbc utilities ceo roundtableHsbc utilities ceo roundtable
Hsbc utilities ceo roundtable
 
6th annual citi brazil equity conference são paulo
6th annual citi brazil equity conference   são paulo6th annual citi brazil equity conference   são paulo
6th annual citi brazil equity conference são paulo
 
Apresentação institucional 3_q12_en_v11
Apresentação institucional 3_q12_en_v11Apresentação institucional 3_q12_en_v11
Apresentação institucional 3_q12_en_v11
 
Apresentação institucional audiencia pub lica
Apresentação institucional audiencia pub licaApresentação institucional audiencia pub lica
Apresentação institucional audiencia pub lica
 
Apresentação expomoney en_v1 - impressão
Apresentação expomoney en_v1 - impressãoApresentação expomoney en_v1 - impressão
Apresentação expomoney en_v1 - impressão
 
Apresentação expomoney pt_cvm
Apresentação expomoney pt_cvmApresentação expomoney pt_cvm
Apresentação expomoney pt_cvm
 
Apresentação institucional 3_q12_en_v11
Apresentação institucional 3_q12_en_v11Apresentação institucional 3_q12_en_v11
Apresentação institucional 3_q12_en_v11
 
Apresentação institucional 3_q12_en_v11
Apresentação institucional 3_q12_en_v11Apresentação institucional 3_q12_en_v11
Apresentação institucional 3_q12_en_v11
 
Apresentação institucional 4_t10_eng
Apresentação institucional 4_t10_engApresentação institucional 4_t10_eng
Apresentação institucional 4_t10_eng
 
Apresentação institucional 4_t10_port
Apresentação institucional 4_t10_portApresentação institucional 4_t10_port
Apresentação institucional 4_t10_port
 
Nd roadshow santander e conferência itaú ny eng
Nd roadshow santander e conferência itaú ny engNd roadshow santander e conferência itaú ny eng
Nd roadshow santander e conferência itaú ny eng
 

Kürzlich hochgeladen

KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...Any kyc Account
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in managementchhavia330
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 DelhiCall Girls in Delhi
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurSuhani Kapoor
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaShree Krishna Exports
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 

Kürzlich hochgeladen (20)

KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in management
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
Nepali Escort Girl Kakori \ 9548273370 Indian Call Girls Service Lucknow ₹,9517
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
Best Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in IndiaBest Basmati Rice Manufacturers in India
Best Basmati Rice Manufacturers in India
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 

Apresentação institucional 4_q11_en_v3

  • 2. AES Brasil Group • Presence in Brazil since 1997 • Comprised of four companies in the sectors of energy generation and distribution • 7.4 thousand AES Brasil People • Investments 1998-2011: R$ 8.1 billion • Good corporate governance practices • Sustainable practices in businesses • Safety as a main value • Strong cash generation capacity • 25% of minimum pay-out according to bylaws • Differentiated practice of dividend distribution since 2006: – AES Tietê: 100% of net income on quarterly basis – AES Eletropaulo: distribution above the minimum required (25% of net income) on semi-annual basis 2
  • 3. AES Brasil widely recognized in 2009-2011  Management excellence  Quality and safety  Environmental concern (AES Eletropaulo) (AES Tietê) (AES Tietê) (AES Eletropaulo) (AES Sul) (AES Brasil) (AES Eletropaulo) (AES Eletropaulo) (AES Tietê) (AES Brasil) (AES Tietê) (AES Tietê) (AES Tietê) (AES Eletropaulo) (AES Eletropaulo) 3
  • 4. Shareholding Structure AES Corp BNDES C 50.00% + 1 share C 50.00% - 1 share P 0.00% P 100% T 46.15% T 53.85% Cia. Brasiliana de Energia C 71.35% C 76.45% C 99.99% C 99.00% P 32.34% P 7.38% T 99.70% T 99.99% T 99.00% T 52.55% T 34.87% AES AES AES AES AES Sul Infoenergy Uruguaiana Tietê Eletropaulo C = Common Shares P = Preferred Shares T = Total 4
  • 5. Listed Companies Shareholding Composition ¹ ¹ Free Float Others² Market Cap³ 16.1% 19.2% 56.2% 8.5% R$ 4.8 bi 24.2% 28.3% 39.5% 8.0% R$ 8.5 bi 1 - Parent companies, AES Corp and BNDES, have similar voting capital on each of the Companies: approx 38.2% on AES Eletropaulo and 35.7% on AES Tietê 2 - Includes Federal Government and Eletrobrás shares in AES Eletropaulo and AES Tietê, respectively 3 - Base: 09/30/2011. Considers preferred shares for AES Eletropaulo and preferred and common shares for AES Tietê 5
  • 6. AES Brasil is the second largest group in Ebitda1 – 2010 (R$ Billion) electric sector 4.5 4.2 3.4 3.0 2.6 2.0 1.6 1.6 1.5 0.6 CEMIG AES BRASIL CPFL NEOENERGIA TRACTEBEL CESP EDP LIGHT COPEL DUKE Net Income1 – 2010 (R$ Billion) 2.3 2.2 1.8 1.6 1.2 1.0 0.6 0.6 0.2 0.1 CEMIG AES BRASIL NEOENERGIA CPFL TRACTEBEL COPEL EDP LIGHT DUKE CESP 6 1 – excluding Eletrobrás Source: Companies’ financial reports
  • 7. AES Tietê is an important player among private Generation Installed Capacity (MW) - 2012 1 energy generators Main privately held Companies  AES Tietê is the 3rd largest among private AES TIETÊ CPFL DUKE 2,3% 2,4% 1,9% EDP generation companies and 10th largest 1,6% TRACTEBEL NEOENERGIA 6,1% 1,2% overall ENDESA 0,8% LIGHT 0,8%  Approximately 78% of country’s generation installed capacity is state- DEMAIS CHESF ³ owned2 27% 9% FURNAS ³  There are three mega hydropower plants 8% under construction in the North region of ELETRONORTE ³ 8% Brazil with 18 GW in installed capacity COPEL ITAIPU ³ 4% 6% – Santo Antonio and Jirau (Madeira River): 7 GW PETROBRÁS ELETRONUCLEAR ³ 5% CEMIG CESP 3% 6% 6% CGTEE ³ – Belo Monte (Xingu River): 11 GW 1% ELETROSUL ³ 0,4% 1- Sources: ANEEL – BIG (March, 2012) and Companies websites 2- Source: Merrill Lynch Total Installed Capacity: 117 GW 7 3 – Eletrobrás, totaling 35%
  • 8. AES Brasil is the largest distribution group in Brazil Consumption (GWh) - 2010 13% • 63 distribution companies in Brazil distributing 419 TWh 40% 12% AES Brasil AES Brasil • AES Brasil is the largest electricity distribution group in Brazil: CPFL Energia CPFL Energia 10% – AES Eletropaulo: 43 TWh distributed, 7% CEMIG Cemig representing 10.3% of the Brazilian 6% 6% market 6% Neoenergia Neo Energia Consumers – Dec/2010 – AES Sul: 9 TWh distributed, 12% Copel Copel representing 2.2% of the Brazilian market 30% Light Light 12%  Distribution companies’ operations are EDP EDP restricted to their concession areas 12% Outros Outros  Acquisitions must be only performed by 5% the holdings of economic groups 7% 7% 16% 8
  • 10. Energy Sector in Brazil: business segments Free Clients Distribution Transmission Generation • Consumption of 113 TWh • 63 companies • 68 companies • 13 groups controlling 76% of (26% of Brazilian total market) • 430 TWh of energy • 68% private sector total installed capacity • Conventional sources: distributed in 2011 • 22% private sector • High voltage transmission above 3000 kW • 1,862 power plants • 70 million consumers (>230 kV) • Alternative sources: • 117 GW of installed capacity • 67% private sector • 98.648 km in extension between 500 kW e 3000 kW • 73% hydroelectric • Annual tariff adjustment lines (SIN¹) • Large consumers can • 17% thermoelectric • Tariff reset every four or • Regulated public service purchase energy directly five years with free access • 5% biomass from generators • Regulated public service • Regulated tariff (annually • 4% SHPP2 • Free contracting • Regulated contracting adjusted by inflation) environment • 1% Wind environment • Contracting environment – ¹ Interconected National System free and regulated markets 10 ² Small Hydro Power Plants Sources: EPE, Aneel, ONS and Merrill Lynch
  • 11. Energy sector in Brazil: contracting environment Regulated Market Free Market Generators, Independent Power Producers Generators and Independent (IPPs), Trading companies and Auto producers Power Producers (IPPs) Auctions: New Energy Bilateral contracts (PPAs1) and Existing Energy Distribution companies Free clients • Main auctions (reverse auctions): – New Energy (A-5): Delivery in 5 years, 15-30 years regulated PPA1 – New Energy (A-3): Delivery in 3 years, 15-30 years regulated PPA1 – Existing Energy (A-1): Delivery in 1 year, 5-15 years regulated PPA1 1 – Power Purchase Agreement 11
  • 12. Energy sector in Brazil: demand perspectives Macroeconomic Scenario GDP - Annual growth (%) EPE’s1 Assumptions: 2004-2008 2010 2011 2012-2015 • Latest EPE’s estimates considers an 3.6 7.2 4.0 5.0 economic activity slowdown in Brazil (industrial stagnation and higher inflation). Brazilian Consumption Evolution (TWh) 5.0% p.a. • For the next years, the good performance of domestic market and the perspectives 3.6% 515 4.0% p.a. 493 of higher investments are factors 469 indicating that the Brazilian economy will 444 423 recover the growth path observed before 408 369 380 376 the global crisis. 349 • Brazil will also benefit from the growth of emerging markets, with impact on exports of primary products. 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 12 1 - Source: EPE (Energetic Research Company) / ONS (National System Operator) – Second Review – september/11
  • 13. Energy sector in Brazil: supply perspectives Installed Energy Capacity in Brazil1  Total installed capacity is expected to reach 171 GW by 2020  Brazilian energy matrix will present higher diversification, but in the next 10 years hydropower plants will continue to prevail 2011: 115 GW 2020: 171 GW 2 SHPP: 4% Natural gas: 7% 2 SHPP: 4% Biomass: 5% Natural gas: 8% Biomass: 5% Oil: 5% Oil: 3% Nuclear: 2% Nuclear: 2% Others: 17% Coal: 2% Hydro: 67% Diesel: 1% Others: 10% Hydro: 73% Coal: 2% Diesel: 1% Wind: 7% Wind: 1% Steam: 1% Steam: 0% 1- Source: EPE (Energetic Research Company), Ten-year Energy Plan 2020, May/2011 2 - Small Hydro Power Plant 13
  • 14. Energy sector in Brazil: regulatory methodology Tariff Reset and Readjustment • Tariff Reset is applied each 4 years for AES Eletropaulo − Base date: Jul/2011 • Parcel A Costs − Parcel A: costs are largely passed through to the tariff Energy − Non-manageable costs that are largely Purchase passed through to the tariff − Parcel B: costs are set by ANEEL Transmission − Incentives to reduces costs Sector Charges • Tariff Readjustment: annually − Parcel A : costs are largely passed through to the tariff Regulatory − Parcel B: cost are adjusted by IGPM +/- X(1) Factor Opex • Regulatory Opex: (PMSO) – Efficient operating cost determined by ANEEL (National Electricity Agency) X WACC Investment Remuneration • Remuneration Asset Base: Remuneration Asset Base – Prudent investments used to calculate the investment remuneration (applying X Depreciation WACC) and depreciation Depreciation Regulatory Parcel A - Non-Manageable Costs Ebitda Parcel B - Manageable Costs 14 1 – X Factor: index that captures productivity gains
  • 15. Energy sector in Brazil: regulatory methodology 3rd Cycle of Tariff Reset – X Factor X FACTOR Pd Q T = + + Distribution Operational expenses DEFINITION Quality of service productivity trajectory To capture To stimulate the To implement operational OBJECTIVE productivity gains improvement of the expenses trajectory during with distribution service quality the tariff cycle Defined at tariff reset, considering the Defined at each tariff Defined at tariff reset, average productivity of readjustement, considering the sector adjusted by the according to the expenses established by APPLICATION market growth and variation of SAIDI and reference company and variation of consumer SAIFI and comparative benchmarking units of the distributor performance of discos methodologies 15 since last reset
  • 16.
  • 17. AES Tietê Overview Generation facilities  17 hydroelectric plants operating within the states of São Paulo and Minas Gerais  30-year concession valid until 2029; renewable for another 30 years  Installed capacity of 2,659 MW, with physical guarantee1 of 1,280 MW average  Almost all the amount of energy that AES Tietê can sell in the long term is contracted to AES Eletropaulo until the end of 2015  AES Tietê can invest in generation, its main activity, and operate in energy trading  355 employees 17 1 - Amount of energy allowed to be long term contracted
  • 18. Generated energy shows high operational availability Generated energy (MW avarage1) Generated energy by power plant (MW avarage1) 130% 125% 124% 4% Água Vermelha 118% 10% Bariri Barra Bonita 8% Euclides da Cunha 6% 58% Ibitinga 1,665 1,599 3% Nova Avanhandava 1,582 5% Promissão 1,512 6% Other Power Plants* 2008 2009 2010 2011 Generation - Mw avg Generation/Physical guarantee 1 – Generated energy divided by the amount of hours * Caconde, Limoeiro, Mogi and SHPPs 18
  • 19. A significant amount of billed energy and net revenues comes from the bilateral contract with AES Eletropaulo Energy Billed (GWh) Net Revenues (%) 94% 94% 14,706 14,729 15,122 13,148 554 117 117 301 301 331 1,1501,150 1,340 1,340 1,519 331 2,3312,331 215 1,980 1,680 1,680 1,980 346 1,942 1,135 1,188 1,554 1,535 11,138 11,108 11,108 11,108 1% 11,138 11,108 11,108 8,578 1% 3% 8,045 2% 2% 3% AES Eletropaulo Other bilateral contracts 20081 2009 2010 2011 2008 2009 2010 9M10 9M11 Spot Market AES Eletropaulo MRE2 Spot Market Other bilateral contracts 1 – Leap Year 2 – Energy Reallocation Mechanism MRE 19
  • 20. Investments in the modernization of Nova Avanhandava, Ibitinga and Caconde power plants Investments (R$ million) 2011 Investments 175 19 85% 82 59 56 174 12 156 13 4% 11% 20 70 39 43 2008 2009 2010 2011 2012(e) Equipment and Modernization Investments New SHPPs* New SHPPs* IT Projects *Small Hydro Power Plants 20
  • 21. Growth opportunities Perspectives • Project features - Combined cycle using natural gas - Estimated investment of R$ 1.1 billion - Natural gas consumption: 2.5 million m3/day - 550 MW of installed capacity • Updates - Environmental license obtained on October, 20th 2011 (valid for 5 years) - Gas unavailability for A-5 in 2011 and A-3 Energy Auction in 2012 • Next events - Get the installation license - Obtain gas supply in order to: - Participate in the next auctions; or - Evaluate energy offering in the free market 21
  • 22. Financial highlights* Net Revenue (R$ million) Ebitda (R$ million) 1,255 1,320 9 1,254 1,255 1,320 1,035 1,048 1,886 9 1,754 1,605 1,670 1,254 1,309 1,311 1,466 1,309 1,311 (54) 2008 2009 2010 2011 2008 2008 2009 2010 2009 2010 9M10 2011 9M11 78% 75% 75% 78% Recurring Non-recurring Recurring Non-Recurring Ebitda Margin (*) 2009, 2010 and 2011 numbers in IFRS 22
  • 23. Practice of total net income distribution on quarterly basis* Net Income and Dividend Pay-out1 (R$ million) 117% 110% 109% 100% 12% 11% 11% 11% 706 737 31 692 816 784 845 (74) (78) (36) 2008 2009 2010 2011 Pay - out Yield Pref Recurring Non- recurring IFRS Effect 1 – Gross value (*) 2009, 2010 and 2011 numbers in IFRS 23
  • 24. Debt profile Net Debt (R$ billion) Amortization Schedule – Principal (R$ million) 0.3x 0.3x 0.3x 0.3x 300 300 300 0.5 0.4 0.4 0.4 2008 2009 2010 2011 2013 2014 2015 Dívida Líquida Net Debt / EBITDA • December, 2011: – Average debt cost in 2011 was 115% of CDI1 p.a. or 15% p.a. – Average debt maturity of 2.6 years 24 1 – Brazilian Interbank Interest Rate
  • 25. Capital Markets AES Tietê X Ibovespa X IEE Daily Avg. Volume (R$ thousand) 12 Months 1 140 130 + 22% 17,980 + 21% 13,922 12,970 120 + 11% 110 10,187 4,344 + 4% 100 4,239 -2% 3,397 90 2,101 80 13,635 8,086 9,683 9,573 70 60 Feb-11 May-11 Aug-11 Nov-11 Feb-12 2009 2010 2011 YTD Feb/12 Ibovespa IEE² GETI4 TSR³ GETI3 Preferred Common • Market Cap4: R$ 9.1 billion • BM&FBovespa: GETI3 (common shares) and GETI4 (preferred shares) • ADRs negotiated in US OTC Market: AESAY (common shares) and AESYY (preferred shares) 1 – Index: 02/28/2011 = 100 2 – Electric Energy Index 3 – Total Shareholders’ Return 4 – Index: 02/29/2012 25
  • 26.
  • 27. AES Eletropaulo overview Concession Area  Largest electricity distribution company in Latin America  Serving 24 municipalities in the São Paulo Metropolitan area  Concession contract valid until 2028; renewable for another 30 years  Concession area with the highest GDP in Brazil  45 thousand kilometers of lines and 6.3 million consumption units in a concession area of 4,526 km2  Total distributed volume of 45 TWh in 2011  AES Eletropaulo, as a distribution company, can only invest in assets within its concession area  5,668 employees 27
  • 28. Consumption evolution Total Market1 (GWh) 2011 Consumption by Class (%) 6% 9 14 14% 45,102 43,345 36% 26 41,243 41,269 8,284 7,911 7,383 6,832 18% 43 26% 28 17 34,436 35,434 36,817 33,860 36 26 2008 2009 2010 2011 Brazil AES Eletropaulo Captive Market Free Clients Residential Commercial Industrial Others 28 1 – Net of own consumption
  • 29. Industrial class Industrial class X industrial production in São Paulo State 15% 10% 5% • Industrial consumption is 0% influenced by manufacturing -5% industry performance in São Paulo -10% Economic crisis Economic recovery State -15% Dec/11 • Recent slowdown is influenced by Jul/07 Aug/08 Sep/09 Oct/10 Nov/11 Industrial Production of SP (% 12 months) Industrial (% 12 months) the decrease of industrial Consumption of industrial class by activity – AES Eletropaulo production in 2011 • Moreover, the migration of clients to other regions of São Paulo State and of the country negatively Vehicles, Other industries Chemical, Rubber, Plastic and Metal impacts this class 50% products 50% 29
  • 30. Residential class Residential class X Average income in São Paulo Metropolitan Area 1,800 4,800 • Average Income R$ - SP (q-2¹) Residential class is influenced by Residential (GWh) income in São Paulo Metropolitan 1,600 4,300 Area 1,400 3,800 • Maintenance of the income expansion trend in São Paulo 1,200 3,300 Metropolitan Area will sustain 1,000 2,800 growth of residential class 4Q11 1Q06 3Q06 1Q07 3Q07 1Q08 3Q08 1Q09 3Q09 1Q10 3Q10 1Q11 3Q11 • Average annual growth (2003- Avg Real Income R$ - SP (q-2¹) Residential (GWh) 2011): Consumption per consumer (in kWh) – total residential market: 5.5% y.y. - 9.4% 258 – consumption per consumer: 2.1% y.y. 229 234 223 228 219  Consumption per consumer is 220 213 203 207 199 still 9.4% lower than in 192 the period before the rationing 1 - Two quarters of delay in relation to consumption 30 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011
  • 31. Investments amounted R$ 739 million in 2011 Investments Breakdown (R$ million) Investments 2011 (R$ million) 841 227 739 46 682 22 172 55 28 22 516 39 457 35 37 189 47 794 717 654 478 410 Maintenance Client Service System Expansion Losses Recovery 2008 2009 2010 2011 2012(e) IT Capex Paid by Customers Paid by the Clients Others 31
  • 32. SAIDI & SAIFI SAIDI - System Average Interruption Duration Index SAIFI - System Average Interruption Frequency Index 7.87 8.41 7.39 6.93 10.92 10.09 9.32 8.68 9.20 11.86 10.60 10.36 5.20 6.17 5.43 5.45 2008 2009 2010 2011 2008 2009 2010 2011 5th 8th 7th 6th 1st 7th 3rd 4th SAIDI (hours) SAIDI Aneel Reference SAIFI (times) SAIFI Aneel Reference ABRADEE ranking position among the 28 utilities with more than 500 thousand customers ► 2012 SAIDI ANEEL Reference: 8.67 hours ► 2012 SAIFI ANEEL Reference: 6.87 times Sources: ANEEL, AES Eletropaulo and ABRADEE 32
  • 33. Operational Indexes Losses (%) Collection Rate (% over Gross Revenues) 11.6 11.8 10.9 10.5 102.4 102.1 101.1 98.5 5.1 5.3 4.4 4.0 6.5 6.5 6.5 6.5 2008 2009 2010 2011 2008 2009 2010 2011 Technical Losses¹ Commercial Losses ANEEL References: From Jul/09 to Jun/10: 12.32% From Jul/10 to Jun/11: 12.45% 33 1 – Current technical losses used retroactively as a reference
  • 34. “Creating Value” Project Internal process review: (i) operating activities; (ii) support functions Objective: to operate Target definition for productivity within the regulatory increase framework for Reassess organization structure operational costs, Review supply management and seek benchmark position in the Reassess and reinforce non-technical losses initiatives sector 34
  • 35. Financial Highlights* Net Revenues (R$ million) Ebitda (R$ million) 2,848 2,413 9,697 9,836 8,786 426 933 1,775 7,530 1,696 339 87 372 - 89 197 1,607 1,491 1,648 1,542 2008 2009 2010 2011 2008 2009 2010 2011 Recurring Regulatory assets and liabilities Non-recurring (*) 2009, 2010 and 2011 numbers in IFRS 35
  • 36. Practice of dividend distribution on semi-annual basis* Net Income and Dividend Payout1 (R$ million) 101,5% 93,4% 100,0% 54,4% 20,4% 28,6% 20,3% 15,8% 1.348 1.572 1.156 1.027 350 652 374 329 236 241 160 698 761 680 622 2008 2009 2010 2011 Pay-out Yield PN Net Income - Ex one-offs, regulatory assets and liabilities Regulatory assets and liabilities 36 (*) 2009, 2010 and 2011 numbers in IFRS One-offs 1 – Gross amount
  • 37. Debt Profile Net Debt 2.4x 2.0x 66% 1.5x 1.6x 1% 1.4x 1.3x 2.7 0.9x 0.8x 2.5 2.4 2.3 33% 2008 2009 2010 2011 2008 2009 2010 2011 Gross Debt/Ebitda Adjusted with Fcesp Net Debt (R$ billion) CDI¹ IGP - DI² Others Net Debt/Ebitda Adjusted with Fcesp Amortization Schedule – Principal (R$ million) 941 1 • December, 2011: 574 580 762 - Average debt cost was 110% of CDI¹ 46 434 49 385 439 375 347 391 or 12.1% p.a. 342 347 61 64 272 53 278 279 56 285 - Average debt maturity of 6.7 years 244 94 6743 46 44 527 531 50 52 57 60 281 301 335 373 375 200 281 299 332 225 225 65 223 222 179 65 2H11 2012 2013 2014 2015 2016 2017 2018 2 2012 2013 2014 2015 2016 2017 2018 2019 2020 - 2028 37 2 1 – Brazilian Interbank Interest Rate 2 – Inflation Index 3 – Pension Fund Local Currency (ex FCesp) Fcesp³
  • 38. Capital Markets AES Eletropaulo X Ibovespa X IEE Average Daily Volume (R$ thousand) 12 Months 1 130 A B + 30% 26,897 26,044 + 22% 24,496 120 + 15% 110 21,960 100 -2% 90 80 70 Feb-11 May-11 Aug-11 Nov-11 Feb-12 2009 2010 2011 YTD Feb/12 Ibovespa IEE² AES Eletropaulo PN AES Eletropaulo TSR³ A Ex dividends: 04/30/2011 B Ex dividends: 08/11/2011 • Market cap4: U$ 3.6 billion • BM&FBOVESPA: ELPL3 (common shares) and ELPL4 (preferred shares) • ADRs at US OTC Market: EPUMY (preferred shares) 1 – Index: 12/29/2011 = 100 2 – Electric Energy Index 38 3 – Total Shareholders’ Return 4 - Index: 02/29/12. Calculation includes only preferred shares
  • 40. Commitment with sustainability Our Commitment with Sustainability We act as a transformer agent understanding, meeting and anticipating our customers electric power needs with safe and innovative solutions for the economic, environmental and social development of the communities in which we are present. 40
  • 41. Commitment with sustainability SUSTAINABLE ENERGY INNOVATION IN PRODUCTS EFFICIENCY IN THE USE OF DEVELOPMENT & VALUATION SAFETY GENERATION AND SERVICES RESOURCES OF COWORKERS, SUPPLIERS AND COMMUNITIES ... means an attitude of ... means using ... means providing an ... means allocating ...means knowing, protection of our economic, social and environment and them in such a manner involving in a coworkers, suppliers environmental culture that inspire that balanced and transparent form and and of the population. resources in a balanced solutions that improve perennial results are positively influencing fashion, preserving the people’s life, ensuring ensured for all our coworkers, present time and quality and excellence stakeholders, abiding by suppliers and ensuring the future in the services rendered the values practiced by communities to build a to the customer. the company collective agenda that generates value for everyone TRANSVERSAL THEMES Communication Stakeholders active Education for sustainability Knowledge participation Transversal Information Themes To learn more access: www.aesbrasilsustentabilidade.com.br 41
  • 42. Social Responsibility: Main Projects Development and transformation of communities Education, culture “Casa de Cultura e Cidadania” Project and sport Offers activities in culture and sports, courses, workshops and lectures. Directly benefits approximately 5.6 thousand children and teenagers and, indirectly, 290 thousand people in 7 units located within AES Brazil companies’ area of operation. Children education and development “Centros Educacionais Luz e Lápis” Project Two units in São Paulo attending 320 children from 1 to 6 years old, in social vulnerability. 42
  • 43. Social Responsibility: Main Projects Converting Consumers to Clients A project developed to work on electrical network regularization. Since 2004, more than 500 thousand families in low income communities were benefited from better energy supply conditions and social inclusion. Education about Safety and Efficiency in energy consumption “AES Eletropaulo nas Escolas” Project Education about safe and efficient use of energy to 4.5 thousand teachers and 404 thousand students from 900 public schools, between 2010 and 2011. The actions include recreational activities offered in adapted trucks. 43
  • 45. Costs and Expenses Costs and operational expenses1 (R$ million) 415 433 420 351 187 174 112 201 239 214 246 245 2008 2009 2010 2011 Energy Purchase, Transmission and Connection Charges, and Water Resources Other Costs and Expenses 2 1 – Do not include depreciation and amortization 2 - Personnel, Material, Third Party Services and Other Costs and Expenses 45
  • 46. Costs and Expenses Costs and operational expenses1 (R$ million) PMS2 and Other Expenses (R$ million) 1,306 1,255 1,272 6,961 1,193 6,745 6,431 254 138 165 5,893 1,272 1,255 379 1,306 1,193 352 443 513 329 5,490 5,689 4,700 5,125 700 647 622 485 2008 2009 2010 2011 2008 2009 2010 2011 Energy Supply and Transmission Charges PMS² and Others Expenses Personnel and Payroll Material and Third Party Others 1 – Do not include depreciation and amortization 2 - Personnel, Material, Third Party Services and Other Costs and Expenses 46
  • 47. Action Plan: R$ 242 million in 2011-2012  increase of 212 emergency teams, totalizing 353 teams trained to perform attendances in powered grid  hiring and training of 580 maintanance and construction electricians  hiring of 30 additional prunning electricians Concluded in 2011  38% increase in call center positions (150 positions)  doubling of SMS receipt capacity to 100 thousand / day  increase of call center service capacity by 27 times from 2 thousand to 54 thousand calls / hour  300 additional stand-by positions in call center for emergency situations December/11  increase of 120 emergency teams, totaling 473 teams to March/12 47
  • 48. AES Tiete's expansion obligation Privatization Notice Judicial Notice: AES Tietê was established the Aneel informed summoned to answer a São Paulo State The Company was notified obligation to expand the that the issue is Lawsuit filed by the Supreme Court Efforts being made by the State of São Paulo installed capacity in not related to State of São Paulo, rejected AES Tietê’s Attorney's Office to present by the Company to 15% (400 MW) until the concession which requested the appeal. The its understanding on the 2007, either in agreement and fulfillment of the grounds for the meet the obligation : matter, having filed its greenfield projects must be obligation in 24 months. denial and the response on time, the and/or through long addressed with proceedings were ended, An injunction was contents of the • Long-term energy term purchase the State of São since no other action was granted in order to have decision have not contracts (biomass) agreements with new Paulo taken by the Attorney's a project submitted yet been disclosed. plants Office within 60 days. totaling an average of 10 MW • SHPP São Joaquim - started operating in 1999 2007 Aug/08 Oct/08 Jul/09 Sep/10 Sep/11 Nov/11 Feb/12 July, 2011, with 3 MW of installed capacity • SHPP São José – under construction, Company faces restrictions until Popular Action: with 4 MW of installed deadline: In response to a Popular Lawsuit: Due to the plaintiffs failure • Insufficiency of hydro resources Action (filed by to specify the persons that The Company capacity, expected to • Environmental restrictions individuals against the should be named as appealed to the be operational in 1H12 Federal Government, Defendants, a favorable State of Sao • Insufficiency of natural gas supply Aneel, AES Tietê and decision was rendered by Paulo State Court • Thermo-SP - Project • New Model of Electric Sector (Law # Duke), the Company the first Instance Court of Appeals and 10,848/2004), which forbids bilateral presents its defense the injunction was of a 550MW gas fired (an appeal has been filed) agreements between generators and before the first instance stayed thermal plant distributors 48
  • 49. Eletrobras Lawsuit State-owned Eletropaulo was spun-off into four Eletrobras, after On July 7, the Next Steps: companies and, winning the judge determined Eletrobras and Eletrobras 1 - The auditing Stated-owned according to our interest Eletropaulo and CTEEP appealed requested the 1st procedure (AP) Eletropaulo understanding calculation CTEEP to present to the Superior level of court is expected to borrowed money based on the discussion, filed their Court of Justice judge to appoint begin by the 1st from Eletrobras spin-off an Execution Suit considerations, (SCJ) an expert half of 2012 agreement, the to collect the due which occurred in discussion was amount August 2 – AP is transferred to expected to be CTEEP concluded in at least 6 months 3 - After AP’s conclusion, a 1st level court decision will be Nov/86 Dec/88 Jan/98 Apr/98 Sep/01 Sep/03 Oct/05 Jun/06 May/09 Dec/10 Jul/11 released 4 - Appealing to the 2nd instance court 5 - Foreclosure starts. Presentation of State-owned The 2nd level of Eletrobras guaranty Eletropaulo and Privatization requested the court excluded The SCJ decided Eletrobras event . State- 6 - Request to AES Eletropaulo to send the beginning of the disagreed on how owned withdraw the from the Execution Suit appraisal to calculate Eletropaulo guaranty discussion based back to the 1st procedure, which is interest over that became AES under 1st. instance 7 - Appeals to on the spin-off level of court loan and a lawsuit Eletropaulo court analysis the 3rd instance agreement was started courts 49
  • 50. Shareholders Agreement On Dec 2003 AES and BNDES signed a Shareholders’ Agreement to regulate their relationship as shareholders of Brasiliana and its controlled companies. The Agreement is available at www.aeseletropaulo.com.br/ri Shareholders can dispose its share at any time, considering the following terms: Right of 1st  Any party with an intention to dispose its shares should first provide the other party the right to buy refusal that participation at the same price offered by a third party Tag along  In the case of change in Brasiliana’s control, tag along rights are triggered for the following rights companies (only if AES is no longer controlling shareholder): – AES Eletropaulo: Tag along of 100% in its common and preferred shares – AES Tietê: Tag along of 80% in its common shares – AES Elpa: Tag along of 80% in its common shares Drag along  Once the offering party exercises the Drag Along clause, offered party is obligated to dispose of all rights its shares at the time, if the Right of 1st Refusal is not exercised by offered party 50
  • 51. Brazilian Main Taxes AES Tietê AES Eletropaulo • Income Tax / Social Contribution: • Income Tax / Social Contribution: – 34% over taxable income – 34% over taxable income • ICMS (VAT tax) • ICMS: 22% over Revenue (average rate) – deferred tax – Residential: 25% • PIS/Cofins (sales tax): – Industrial and Commercial: 18% – Eletropaulo s PPA: 3.65% over Revenue – Public Entities: free – Other bilateral contracts: 9.25% over Revenue • PIS/Cofins: minus Costs – 9.25% over Revenue minus Costs 51
  • 52. Contacts: ri.aeseletropaulo@aes.com ri.aestiete@aes.com + 55 11 2195 7048 The statements contained in this document with regard to the business prospects, projected operating and financial results, and growth potential are merely forecasts based on the expectations of the Company’s Management in relation to its future performance. Such estimates are highly dependent on market behavior and on the conditions affecting Brazil’s macroeconomic performance as well as the electric sector and international market, and they are therefore subject to changes.