SlideShare ist ein Scribd-Unternehmen logo
1 von 32
BUILDING CONDITION
  SURVEY :
   What's More from Defects
   Identification

           Adi Irfan Che-Ani
    Norngainy Mohd. Tawil
   Azalillah Ramdani Musa
       Mazlan Mohd. Tahir
                       UKM
UKM Pakarunding Sdn. Bhd.      UKM:Che-Ani 2012
                                                  http://www.eagle-wi.gov
1. Survey & defect
               2. Building defect: example
               3. Building condition
                  survey: inspection
               4. Building condition
                  survey: reporting
               5. Next: analysis
               6. Next: performance
PRESENTATION      measurement
  OUTLINE      7. Next: how “defect”
                  benefit us
               8. Summary
Survey & Defect
   Survey (Hollis & Gibson – Surveying
   Buildings, 2005):
   Inspection & investigation of construction &
   services of property in sufficient details to enable
   surveyor to advise what impact the condition &
   circumstances of that property will have upon client.
  Defects:
  areas of non-compliance to the bye-law, regulation,                          http://myprservices.com

  standard (mostly not subjective)
  Out of acceptable condition (subjective)
                                 http://www.buildingdefects.com.au/




 “Defects will occur in buildings. It is one of the great certainties in
 construction, the equivalent of death and taxes in life more generally”.
 (Professor Anthony Lavers)
    http://www.blaketurner.com
Page  3                                        UKM:Che-Ani 2012
Survey & Defect




Page  4   UKM:Che-Ani 2012
Growth of mould and algae due
  to water ponding and continuous
             dampness               Water ponding due to blockage
                                    of outlet to rainwater downpipe
                                    (due to small outlet) – it’s very
                                        hot during the course of
Page  5
                                                inspection
Water mark on the ceiling
     surface due to water penetration
                                        Stalactite effect due to
       from leaking roof (the brown
                                        water proofing failure at
        color suggest it dripped via
                                            upstairs toilet
        timber trusses, perhaps the
           trusses need structural
                 inspection)
Page  6
BUILDING DEFECT: CRACKS




           http://www.youtube.com/watch?v=wvTlB1EVKbQ&feature=player_embedded

Page  7                              UKM:Che-Ani 2012
BUILDING DEFECT: FOUNDATIONS DEFECT




                http://www.youtube.com/watch?v=7rAhPhB46oc&feature=player_embedded
Page  8                               UKM:Che-Ani 2012
BUILDING DEFECT




           http://www.youtube.com/watch?v=OeAB9XLjA8k&feature=player_embedded
Page  9                             UKM:Che-Ani 2012
BUILDING CONDITION SURVEY : INSPECTION
                         An apparent defect has been
                               perceived when




  It looks                        Someone            It just felt   Something
   wrong      Something             heard              wrong           felt
             smells strange       something




Page  10                         UKM:Che-Ani 2012
                                                                    http://www.nienergyrating.com
Inspect           All seem    No further
                                                    OK?      action at this
                                                                  time


                                                Defect        Record and
                                               confirmed     keep in mind
                                                               for future

  Is a matter of                 Allocate priority in
health and safety               accord with agreed
                                      criteria

                    UKM:Che-Ani 2012
Page  11
Initiate urgent   Prepare or select                Select
            action        appropriate                  appropriate
                                                      specialists for
                          rectification                   further
                          specification                 inspection




                         Discuss and agree with client and users



                             Commission rectification work



                          Check and record work in progress early
                                     on and periodically




Page  12
                                                    Review periodically
                          UKM:Che-Ani 2012               (annually)
BUILDING CONDITION SURVEY : REPORTING
 Various standard available
No   Piawaian/        Tahun     Kerja Pra-    Kerja        Keperluan   Keperluan   Kaedah          Penggunaan   Input data    Cadangan       Kandungan
     Dokumen          dibang-   Pemeriksaan   ukur         nilai       anggaran    pengkadaran/    kod warna                  pembaikan      utama
                      unkan                   kondisi      pasaran     kos         numerik                                                   pelaporan
1    RICS Building    2005      Kajian Meja   Protokol     Tidak       Tidak       Tiada           Tiada        Keadaan,      Ada            Pemeriksaan,
     Survey Report                            1 (visual)   perlu       perlu                                    sebab,                       Laporan,
                                                                                                                tahap                        Penilaian
                                                                                                                kerosakan
2    BRE Design       2007      Tiada         Protokol     Perlu       Perlu       Ada             Tiada        Keadaan       Ada            Pemeriksaan,
     Quality Manual                           1 (visual)                                                                                     Laporan,
                                                                                                                                             Penilaian
                                                                                                                    http://www.home-building-inspectors-ny.com/
3    ASTM E-2018      2008      Penelitian    Protokol                 Perlu       Tiada           Tiada        Keadaan      Ada             Laporan
                                dokumen &     1 (visual)                                                                                     Keadaan
                                temubual                                                                                                     Hartanah
4    The RICS Home    2009      Tidak perlu   Protokol     Perlu       Perlu       3 kadaran       Ada          Keadaan      Ada             Pemeriksaan,
     Buyer Report                             1 (visual)                                                                                     Laporan,
     2009                                                                                                                                    Penilaian
5    Matriks CSP1     2010      Kajian meja   Protokol     Tidak       Tidak       Keadaan (5      Ada          Keadaan,     Tiada           Jadual keadaan
                                              1 (visual)   perlu       perlu       kadaran) &                   Kepenting                    bangunan,
                                                                                   Keutamaan (4                 an                           Kotak
                                                                                   kadaran)                                                  gambarfoto,
                                                                                                                                             pelan tandaan
                                                                                                                                             kecacatan
6    RICS Condition   2010      Tidak perlu   Protokol     Tidak       Tidak       3 kadaran       Ada          Keadaan      Tiada           Pemeriksaan,
     Report                                   1 (visual)   perlu       perlu                                                                 Laporan

7    CP BS101         2011      Kajian meja   Protokol     Tidak       Perlu       Ada (Building   Ada          Keadaan,      Ada            Jadual keadaan
                                              1 (visual)   perlu                   Assessment &                 Kepenting                    bangunan,
                                                                                   Rating System                an                           Kotak
                                                                                   – BARIS)                                                  gambarfoto,
                                                                                                                                             pelan tandaan
                                                                                                                                             kecacatan


                                                                                                   And many more…
     Page  13                                                     UKM:Che-Ani 2012
BUILDING CONDITION SURVEY : REPORTING
Problem: No standard is adopted….
Then you need
 to be
 certified….but
 who certified




 Page  14                 UKM:Che-Ani 2012
NEXT: ANALYSIS
Common building defects
Overall building rating
Distribution of defects
Predictive model
                                                            http://www.home-building-inspectors-ny.com/




  http://www.researchrockstar.com/mark
  et-research-challenge-analysis-bias/




 Page  15                               UKM:Che-Ani 2012
NEXT: ANALYSIS
Komponen        Bilangan Kecacatan           Peratus
Pintu                  222                    23.5
Lantai                  63                     6.7
Dinding                177                    18.7

Tingkap                 32                     3.4
Siling                 138                     14.6
Sanitari               230                     24.3
Kelengkapan             48                     5.1
Paip Buangan            26                     2.7
Paip Agihan             7                      0.7
Pintu Utiliti           1                      0.1
Meja Konkrit            1                      0.1
Paip Bekalan            1                      0.1
Jumlah                 946                    100.0



                               Common defects: toilet
                                (design input for future projects)

Page  16                 UKM:Che-Ani 2012
Table 6: BUILDING CONDITION ASSESSMENT for ECSTRACT, LANGKAWI, KEDAH
                                                                       Schedule of Building Condition (CSP1 Matrix)
                                                                                                                         NEXT: ANALYSIS
Overall Building Rating
   NO.           AREA                               DEFECTS                            Condition         Priority
                                                                                                                  Condition Survey Protocol (CSP) 1

                                                                                                                      Matrix A’lysis [c]    Photo No. /
                                                                                      Assessment       Assessment                                         Defect Plan Tag
                                                                                                                           (a x b)         (Sketch No.)
                                                                                          [a]              [b]

    A         EXTERNAL                  Rainwater outlet
                                   1    Front outlet: Blockage with dried leaf              2               2                 4                 1               1
                                        Rainwater collector
                                   2    Back collector: Had little gap                      2               2                 4                 2               2
                                   3    Back collector: Sealant fail                        1               2                 2                 3               3
                                        Gutter at bothsides
                                   4    Back gutter: Blockage with dried leaf               2               2                 4                 4               4
                                        Water tank
                                   5    Water tank (front): Distortion                      3               4                12                 5               5
                                   6    Water tank (back): Sagging and leaking              3               4                12                 6               6
                                        Water tank support
                                   7    Supporting bar: Corrosion                           2               2                 4                 7               7
                                        Distribution board (DB)
                                   8    Cover: Can not open and close properly              1               1                 1                 8               8
    B            MALE
         First cubicle (Disable)        Water closet (WC)
                                   9    Flush does not function                             2               2                 4                 9               9
                                        Door
                                   10   Misaligment                                         2               2                 4                 10              10
                                   11   Can not close and lock properly                     2               2                 4                 11              11
             Second cubicle             Water closet (WC)
                                   12   Flush does not function                             2               2                 4                 12              12
                                        Tap
                                   13   Function with low water pressure                    2               2                 4                 13              13
               Circulation              Hand dryer
                                   14   Not function and not fix at wall                    2               2                 4                 14              14
                                        Dustbin
                                   15   Not properly fix at floor and sagging               1               2                 2                 15              15
                                        Sink


 Page  17
16
                                     17
                                           Sink tap 1: Function with low water
                                           pressure
                                           Sink tap 2: Not function
                                                                                              2
                                                                                              2
                                                                                                  2
                                                                                                  2
                                                                                                      NEXT: ANALYSIS
                                                                                                      4
                                                                                                      4
                                                                                                                  16
                                                                                                                  17
                                                                                                                       16
                                                                                                                       17
                                     18    Outlet: Blockage                                   3   2   6           18   18
                                           Lamp
                                     19    Not function                                       2   2   4           19   19
                                           Vegetation area
                                     20    Vegetation: Not available anymore                  2   2   4           20   20
  C               FEMALE
          First cubicle (Disable)          Tap
                                     21    Function with low water pressure                   2   2   4           21   21
             Second cubicle                Tap
                                           Pipe disconnected and function with
                                     22    low water pressure                                 2   3   6           22   22
                                           Door
                                     23    Can not close properly                             2   2   4           23   23
                Circulation                Hand dryer
                                     24    Not properly fix at wall                           2   2   4           24   24
                                           Dustbin
                                     25    Not properly fix at floor                          1   2   2           25   25
                                           Sink
                                           Sink tap 1: Function with low water
                                     26    pressure                                           2   2   4           26   26
                                           Sink tap 2: Function with low water
                                     27    pressure                                           2   2   4           27   27
                                           Lamp
                                     28    Not function                                       2   2   4           28   28
                                           Vegetation area
                                     29    Vegetation: Not available anymore                  2   2   4           29   29
                                                 Total marks [d] (∑ of c)                                  127
                                                  Number of defects [e]                                     29
                                                     Total score (d/e)                                     4.38
                                                Overall building rating                                   Good
Limitation(s):
     1. Roof top is not inspected as there is no safe access during the time of inspection.


      Page  18
                                                                                      Overall Building Rating
NEXT: ANALYSIS
             5.6
                                                      5.49
             5.4
                        5.31
             5.2
Nilai skor




                                    5.07
              5

             4.8                                                      4.81

             4.6

             4.4
                    Pelajar/   K.Tangan        Pelajar           K.Tangan/
                   K.Tangan                                       Pelawat
                                  Kategori pengguna

                                      Matriks CSP1
                                                   Distribution of defects:
                                                    toilet (perhaps frequency of toilet
                                                      cleaning can be reasonably
                                                      distributed)
Page  19                                     UKM:Che-Ani 2012
NEXT: ANALYSIS
Predictive model: multiple logistic regression –
 school (possibly to predict the building condition with focusing to
 critical defect )
                                                                 1
                                                      f ( z)
  Kebarangkalian (bangunan tidak selamat) =                    1 e   z


  di mana z = -0.606 – 0.891(Dinding) + 1.372(Kasau Bumbung) +
  1.961(Kekuda) + 1.968(Papak) - 1.628(Pendawaian) – 1.479(Tiang)




  Page  20                            UKM:Che-Ani 2012
Sampel



  NEXT: ANALYSIS
                                          Komponen
                                                                 1        2        3        4        5         6       7        8        9       10
                                          Anak Tangga            0        0        0        0        0         0       0        0        0       0
                                          Apron                  1        1        1        0        0         0       0        1        0       0
                                          Atap                   0        0        0        0        0         0       0        0        0       0
                                          Atap bumbung           0        0        0        0        0         0       0        0        0       0

Predictive model:                        Balkoni
                                          Beam
                                          Bilik
                                                                 0
                                                                 0
                                                                 0
                                                                          0
                                                                          0
                                                                          0
                                                                                   0
                                                                                   0
                                                                                   0
                                                                                            0
                                                                                            0
                                                                                            0
                                                                                                     0
                                                                                                     0
                                                                                                     0
                                                                                                               0
                                                                                                               0
                                                                                                               0
                                                                                                                       0
                                                                                                                       0
                                                                                                                       0
                                                                                                                                0
                                                                                                                                0
                                                                                                                                0
                                                                                                                                         0
                                                                                                                                         0
                                                                                                                                         0
                                                                                                                                                 0
                                                                                                                                                 0
                                                                                                                                                 0


 multiple logistic                        Bumbung
                                          Dinding
                                          Footing
                                                                 0
                                                                 1
                                                                 0
                                                                          1
                                                                          1
                                                                          0
                                                                                   0
                                                                                   1
                                                                                   0
                                                                                            0
                                                                                            1
                                                                                            0
                                                                                                     0
                                                                                                     0
                                                                                                     0
                                                                                                               0
                                                                                                               0
                                                                                                               0
                                                                                                                       0
                                                                                                                       1
                                                                                                                       0
                                                                                                                                0
                                                                                                                                1
                                                                                                                                0
                                                                                                                                         0
                                                                                                                                         0
                                                                                                                                         0
                                                                                                                                                 1
                                                                                                                                                 1
                                                                                                                                                 1


 regression – school
                                          Halaman Luar           0        0        0        0        0         0       0        0        0       0
                                          Kasau Bumbung          0        0        0        0        0         0       0        0        0       0
                                          Kekuda                 0        0        0        0        1         0       0        0        0       0
                                          Kelengkapan            1        1        0        1        0         0       0        1        0       1

 (possibly to predict the building        Lantai
                                          Lantai Apron
                                          Longkang
                                                                 1
                                                                 0
                                                                 0
                                                                          1
                                                                          0
                                                                          0
                                                                                   1
                                                                                   0
                                                                                   0
                                                                                            0
                                                                                            0
                                                                                            0
                                                                                                     0
                                                                                                     0
                                                                                                     0
                                                                                                               1
                                                                                                               0
                                                                                                               0
                                                                                                                       1
                                                                                                                       0
                                                                                                                       0
                                                                                                                                1
                                                                                                                                0
                                                                                                                                0
                                                                                                                                         0
                                                                                                                                         0
                                                                                                                                         0
                                                                                                                                                 1
                                                                                                                                                 0
                                                                                                                                                 1
 condition with focusing to critical      Lubang
                                          Pengudaraan            1        0        0        0        0         0       0        0        0        0

 defect)                                  Manhole
                                          Pagar
                                                                 0
                                                                 0
                                                                          0
                                                                          0
                                                                                   0
                                                                                   0
                                                                                            0
                                                                                            0
                                                                                                     0
                                                                                                     0
                                                                                                               0
                                                                                                               0
                                                                                                                       0
                                                                                                                       0
                                                                                                                                0
                                                                                                                                0
                                                                                                                                         0
                                                                                                                                         0
                                                                                                                                                  0
                                                                                                                                                  0
                                          Paip                   1        0        0        0        0         0       1        0        0        0
                                          Paip Agihan            0        0        0        0        0         0       0        0        0        0
                                          Paip Air Hujan         0        0        0        0        0         0       0        0        0        0
                                          Paip Bekalan           0        0        0        0        0         0       0        0        0        1


 help to select the critical school to
                                          Paip Buangan           0        0        0        0        0         0       0        0        0        0
                                          Paip    Penghawa
                                          Dingin                 0        0        0        0        0         0       0        0        0        0

  be repair urgently: budget is very      Papak
                                          Pendawaian
                                                                 0
                                                                 0
                                                                          0
                                                                          1
                                                                                   0
                                                                                   0
                                                                                            0
                                                                                            1
                                                                                                     0
                                                                                                     0
                                                                                                               0
                                                                                                               0
                                                                                                                       0
                                                                                                                       0
                                                                                                                                0
                                                                                                                                0
                                                                                                                                         0
                                                                                                                                         0
                                                                                                                                                  0
                                                                                                                                                  1

  limited                                 Pentas
                                          Perabot
                                                                 0        0        0        0        0         0       0        0        0        0

                                          Kelengkapan            0        0        0        0        0         0       0        1        0        0
                                          Pintu                  1        0        1        1        0         0       0        1        1        0
                                          Rasuk                  0        0        0        0        0         0       0        0        0        0
                                          Saliran                0        0        0        0        0         0       0        0        0        0
                                          Sanitari               0        0        0        1        0         0       0        1        1        1
                                          Servis                 0        0        0        0        0         0       0        0        0        1
                                          Siling                 1        1        1        0        0         0       0        1        0        1
                                          Sinki                  0        0        0        0        0         0       0        0        0        0
                                          Talang hujan           0        0        0        0        0         0       0        0        0        0
                                          Tangga                 1        0        0        0        0         1       1        1        0        0
                                          Tiang                  0        0        0        0        0         1       0        0        0        0
                                          Tingkap                1        1        1        1        0         0       0        1        0        1
                                          Matriks                0        0        0        0        1         0       0        1        0        0

                                          Kebarangkalian       0.1829   0.0421   0.1829   0.0421   0.7948   0.1105   0.1829   0.1829   0.3529   0.0421
  Page  21
                                          Status keselamatan     0        0        0        0        1         0       0        0        0        0
                 UKM:Che-Ani 2012
NEXT: PERFORMANCE MEASUREMENT
Qlassic
Building condition




                                                                            http://mrtplus.wordpress.com/2011/07/14/meauring-up/




  http://www.cartoonstock.com/directory/m/measures.asp




 Page  22                                               UKM:Che-Ani 2012
NEXT: PERFORMANCE MEASUREMENT
                                  Qlassic (construction quality,
                                   especially contractor)




    Sampling guideline for
    architectural works




                                     Defects Group For Assessment Of
                                     Architectural Works (Internal Finishes)
Weightage for
architectural elements
Page  23                        UKM:Che-Ani 2012
NEXT: PERFORMANCE MEASUREMENT
 25



 20



 15



 10



   5



   0
         R01 R03 R05 R07 R09 R11 R13 R15 R17 R19 R21 R23 R25 R27 R29 R31 R33 R35 R37 R39 R41 R43 R45 R47 R49 R51 R53 R55 R57 R59 R61 R63 R65 R67 R69 R71

                                  Priority Assessment
             Scale
                          E4         U3         R2        N1
Assessment




                     5    20          15        10        5
Condition




                     4    16          12         8        4
                     3    12          9          6        3
                     2
                     1
                           8
                           4
                                      6
                                      3
                                                 4
                                                 2
                                                          2
                                                          1
                                                                       Construction quality of 72
                                                                        newly completed terrace
                                                                        houses (by the same consultant
                                                                        + contractor)
Page  24                                                            UKM:Che-Ani 2012
NEXT: How “defect” benefit us…




It wasn’t hit by the massive earthquake. In true fashion of the Ripley Legacy, it
    was built to reflect the odd 1812 earthquake that measured 8.0 on the rick.
     The building has now become one of the most photographed in the world.
 Page  25                         UKM:Che-Ani 2012
NEXT: How “defect” benefit us…




Page  26        UKM:Che-Ani 2012
NEXT: How “defect” benefit us…




Page  27        UKM:Che-Ani 2012
NEXT: How “defect” benefit us…




Page  28        UKM:Che-Ani 2012
CONCEPT
               BUILDING
       U.S General Service
            Administration
                (GSA), LA
Page  29   HOK & VANDERWEIL
NEXT: How “defect” benefit us…




Page  30        UKM:Che-Ani 2012
SUMMARY
 Start up: building defects identification – more than an “album”
 Reporting: standard and certified – qualify to stand in court
 Next level: building defect analysis – defects are here & there:
  so what?
 Next level: performance measurement – information for future
  design
 Next level: building defect “advantage”? – new theory around
  the corner


 “We do not want a structural survey. If you can just have a quick
   look at the house to make sure that it is structurally sound, that
                             will be fine”

  Page  31
              (Extract from client’s letter of instruction)
                               UKM:Che-Ani 2012
Thank you very much
             adiirfan@gmail.com
                - reflection -

Page  32

Weitere ähnliche Inhalte

Was ist angesagt?

Site organization in Construction
Site organization in ConstructionSite organization in Construction
Site organization in ConstructionSamsonFemiAdesope
 
Building condition assessment
Building condition assessmentBuilding condition assessment
Building condition assessmentabhishekabhi123
 
Insepction and quality control
Insepction and quality controlInsepction and quality control
Insepction and quality controlSOURAV4798
 
Construction process
Construction processConstruction process
Construction processMazen Al-Qadi
 
Precast concrete construction
Precast concrete constructionPrecast concrete construction
Precast concrete constructionJenilPatel22
 
Blockwork system
Blockwork systemBlockwork system
Blockwork systemWen Crystal
 
Building services 2 assignment
Building services 2 assignmentBuilding services 2 assignment
Building services 2 assignmentShao Xun Sean Thun
 
industrialised building systems_achah
industrialised building systems_achahindustrialised building systems_achah
industrialised building systems_achahAisyah Asyikin
 
Industrialised Building System
Industrialised Building SystemIndustrialised Building System
Industrialised Building Systemjisunfoo
 
Project 1: Industrialised Building System [ IBS ]
Project 1: Industrialised Building System [ IBS ]Project 1: Industrialised Building System [ IBS ]
Project 1: Industrialised Building System [ IBS ]JerotichMaswan
 
Building Service 2 Presentation
Building Service 2 PresentationBuilding Service 2 Presentation
Building Service 2 PresentationKellyann Hiew
 
Architecture Museum Malacca Dilapidation Report
Architecture Museum Malacca Dilapidation ReportArchitecture Museum Malacca Dilapidation Report
Architecture Museum Malacca Dilapidation ReportNaqiuddin Johari
 
Construction Materials site visit report
Construction Materials site visit report Construction Materials site visit report
Construction Materials site visit report Batoul Alshamali
 
Building technology 1 "Industrialized Building System" IBS
Building technology 1 "Industrialized Building System" IBSBuilding technology 1 "Industrialized Building System" IBS
Building technology 1 "Industrialized Building System" IBSDigital Space Consultancy Ltd
 
Standard bill of quantities
Standard bill of quantitiesStandard bill of quantities
Standard bill of quantitiesBt Lee
 

Was ist angesagt? (20)

Site organization in Construction
Site organization in ConstructionSite organization in Construction
Site organization in Construction
 
Building maintenance
Building maintenanceBuilding maintenance
Building maintenance
 
Building condition assessment
Building condition assessmentBuilding condition assessment
Building condition assessment
 
Insepction and quality control
Insepction and quality controlInsepction and quality control
Insepction and quality control
 
Construction process
Construction processConstruction process
Construction process
 
BS M'sia
BS M'siaBS M'sia
BS M'sia
 
Precast concrete construction
Precast concrete constructionPrecast concrete construction
Precast concrete construction
 
Blockwork system
Blockwork systemBlockwork system
Blockwork system
 
Building services 2 assignment
Building services 2 assignmentBuilding services 2 assignment
Building services 2 assignment
 
Refurbishment
RefurbishmentRefurbishment
Refurbishment
 
industrialised building systems_achah
industrialised building systems_achahindustrialised building systems_achah
industrialised building systems_achah
 
Industrialised Building System
Industrialised Building SystemIndustrialised Building System
Industrialised Building System
 
Project 1: Industrialised Building System [ IBS ]
Project 1: Industrialised Building System [ IBS ]Project 1: Industrialised Building System [ IBS ]
Project 1: Industrialised Building System [ IBS ]
 
Building Service 2 Presentation
Building Service 2 PresentationBuilding Service 2 Presentation
Building Service 2 Presentation
 
Architecture Museum Malacca Dilapidation Report
Architecture Museum Malacca Dilapidation ReportArchitecture Museum Malacca Dilapidation Report
Architecture Museum Malacca Dilapidation Report
 
Building Services Case Study
Building Services Case StudyBuilding Services Case Study
Building Services Case Study
 
Construction Materials site visit report
Construction Materials site visit report Construction Materials site visit report
Construction Materials site visit report
 
Building technology 1 "Industrialized Building System" IBS
Building technology 1 "Industrialized Building System" IBSBuilding technology 1 "Industrialized Building System" IBS
Building technology 1 "Industrialized Building System" IBS
 
Standard bill of quantities
Standard bill of quantitiesStandard bill of quantities
Standard bill of quantities
 
Material approval procedure
Material approval procedureMaterial approval procedure
Material approval procedure
 

Andere mochten auch

Defective Construction Work
Defective Construction WorkDefective Construction Work
Defective Construction WorkAdiirfan Che-ani
 
Sustainable in asset management
Sustainable in asset managementSustainable in asset management
Sustainable in asset managementAdiirfan Che-ani
 
Journal Writing: Lets Start
Journal Writing: Lets StartJournal Writing: Lets Start
Journal Writing: Lets StartAdiirfan Che-ani
 
Maintenance and repair of buildings.
Maintenance and repair of buildings.Maintenance and repair of buildings.
Maintenance and repair of buildings.Satyaki Sikdar
 
Home Condition Survey
Home Condition SurveyHome Condition Survey
Home Condition SurveyPeter Onipe
 
Facility Condition Assessment And Asset Management With GIS
Facility Condition Assessment And Asset Management With GISFacility Condition Assessment And Asset Management With GIS
Facility Condition Assessment And Asset Management With GISJohn Przybyla
 
Fire protection io may 2014 c
Fire protection io may 2014 cFire protection io may 2014 c
Fire protection io may 2014 cAmit PATNI
 
Ada Transition Plans (Apbp webinar)
Ada Transition Plans (Apbp webinar)Ada Transition Plans (Apbp webinar)
Ada Transition Plans (Apbp webinar)Franz Loewenherz
 

Andere mochten auch (20)

Defective Construction Work
Defective Construction WorkDefective Construction Work
Defective Construction Work
 
Fm getting online
Fm getting onlineFm getting online
Fm getting online
 
Mpam 3 basic steps
Mpam 3 basic stepsMpam 3 basic steps
Mpam 3 basic steps
 
Sustainable in asset management
Sustainable in asset managementSustainable in asset management
Sustainable in asset management
 
Student building survey
Student building surveyStudent building survey
Student building survey
 
Taklimat ifolio pelajar
Taklimat ifolio pelajarTaklimat ifolio pelajar
Taklimat ifolio pelajar
 
GBI: Role of BS
GBI: Role of BSGBI: Role of BS
GBI: Role of BS
 
Dampness in buildings
Dampness in buildingsDampness in buildings
Dampness in buildings
 
Cracks in Buildings
Cracks in BuildingsCracks in Buildings
Cracks in Buildings
 
Journal Writing: Lets Start
Journal Writing: Lets StartJournal Writing: Lets Start
Journal Writing: Lets Start
 
Maintenance and repair of buildings.
Maintenance and repair of buildings.Maintenance and repair of buildings.
Maintenance and repair of buildings.
 
Home Condition Survey
Home Condition SurveyHome Condition Survey
Home Condition Survey
 
Tri-Tech sample LBP-RA report
Tri-Tech sample LBP-RA reportTri-Tech sample LBP-RA report
Tri-Tech sample LBP-RA report
 
twintech wshop2-main ppt
twintech wshop2-main ppttwintech wshop2-main ppt
twintech wshop2-main ppt
 
Building Analysis-1
Building Analysis-1Building Analysis-1
Building Analysis-1
 
twintech wshop1-main ppt
twintech wshop1-main ppttwintech wshop1-main ppt
twintech wshop1-main ppt
 
Facility Condition Assessment And Asset Management With GIS
Facility Condition Assessment And Asset Management With GISFacility Condition Assessment And Asset Management With GIS
Facility Condition Assessment And Asset Management With GIS
 
Fire protection io may 2014 c
Fire protection io may 2014 cFire protection io may 2014 c
Fire protection io may 2014 c
 
Guidance 2010 ada_standards_prt
Guidance 2010 ada_standards_prtGuidance 2010 ada_standards_prt
Guidance 2010 ada_standards_prt
 
Ada Transition Plans (Apbp webinar)
Ada Transition Plans (Apbp webinar)Ada Transition Plans (Apbp webinar)
Ada Transition Plans (Apbp webinar)
 

Ähnlich wie Building condition survey whats more

Environmental assessment methods
Environmental assessment methodsEnvironmental assessment methods
Environmental assessment methodsemmak781
 
3 f6 10_testing
3 f6 10_testing3 f6 10_testing
3 f6 10_testingop205
 
YuryMakedonov_SavingRunawayProject_DKL_2005_07
YuryMakedonov_SavingRunawayProject_DKL_2005_07YuryMakedonov_SavingRunawayProject_DKL_2005_07
YuryMakedonov_SavingRunawayProject_DKL_2005_07Yury M
 
IRJET- Structural Audit – A Case Study of Educational Building
IRJET-  	  Structural Audit – A Case Study of Educational BuildingIRJET-  	  Structural Audit – A Case Study of Educational Building
IRJET- Structural Audit – A Case Study of Educational BuildingIRJET Journal
 
Structural Audit of Building: A Structural Health Analysis of Building
Structural Audit of Building: A Structural Health Analysis of BuildingStructural Audit of Building: A Structural Health Analysis of Building
Structural Audit of Building: A Structural Health Analysis of BuildingIRJET Journal
 
Field Time Effeicincy Analysis Presentation
Field Time Effeicincy Analysis  PresentationField Time Effeicincy Analysis  Presentation
Field Time Effeicincy Analysis PresentationMohamed Hassan
 
Field Time Effeicincy Analysis Presentation
Field Time Effeicincy Analysis  PresentationField Time Effeicincy Analysis  Presentation
Field Time Effeicincy Analysis PresentationMohamed Hassan
 
Understanding Test Management And the Relationship with Quality Management
Understanding Test Management And the Relationship with Quality ManagementUnderstanding Test Management And the Relationship with Quality Management
Understanding Test Management And the Relationship with Quality ManagementIT Weekend
 
Chapt12 w04
Chapt12 w04Chapt12 w04
Chapt12 w04meimeiyo
 
Error Proofing And Cost Reduction 2
Error Proofing And Cost Reduction 2Error Proofing And Cost Reduction 2
Error Proofing And Cost Reduction 2Brian King
 
Mitigation,performance
Mitigation,performanceMitigation,performance
Mitigation,performancedina lithy
 
TECHBlue Center - Example Waterfront Studies & Reviews
TECHBlue Center - Example Waterfront Studies & ReviewsTECHBlue Center - Example Waterfront Studies & Reviews
TECHBlue Center - Example Waterfront Studies & ReviewsDale Gilbert
 
E2.KEY_ELEMENTS_OF_EIA_PROCESS-1
E2.KEY_ELEMENTS_OF_EIA_PROCESS-1E2.KEY_ELEMENTS_OF_EIA_PROCESS-1
E2.KEY_ELEMENTS_OF_EIA_PROCESS-1hirencd
 
TOOLS OF CONTINUOUS IMPROVEMENT
TOOLS OF CONTINUOUS IMPROVEMENTTOOLS OF CONTINUOUS IMPROVEMENT
TOOLS OF CONTINUOUS IMPROVEMENTPharmaceutical
 

Ähnlich wie Building condition survey whats more (20)

Environmental assessment methods
Environmental assessment methodsEnvironmental assessment methods
Environmental assessment methods
 
3 f6 10_testing
3 f6 10_testing3 f6 10_testing
3 f6 10_testing
 
YuryMakedonov_SavingRunawayProject_DKL_2005_07
YuryMakedonov_SavingRunawayProject_DKL_2005_07YuryMakedonov_SavingRunawayProject_DKL_2005_07
YuryMakedonov_SavingRunawayProject_DKL_2005_07
 
IRJET- Structural Audit – A Case Study of Educational Building
IRJET-  	  Structural Audit – A Case Study of Educational BuildingIRJET-  	  Structural Audit – A Case Study of Educational Building
IRJET- Structural Audit – A Case Study of Educational Building
 
Structural Audit of Building: A Structural Health Analysis of Building
Structural Audit of Building: A Structural Health Analysis of BuildingStructural Audit of Building: A Structural Health Analysis of Building
Structural Audit of Building: A Structural Health Analysis of Building
 
Evaluating Environmental and Social Effects of International Projects
Evaluating Environmental and Social Effects of International ProjectsEvaluating Environmental and Social Effects of International Projects
Evaluating Environmental and Social Effects of International Projects
 
Field Time Effeicincy Analysis Presentation
Field Time Effeicincy Analysis  PresentationField Time Effeicincy Analysis  Presentation
Field Time Effeicincy Analysis Presentation
 
Field Time Effeicincy Analysis Presentation
Field Time Effeicincy Analysis  PresentationField Time Effeicincy Analysis  Presentation
Field Time Effeicincy Analysis Presentation
 
Understanding Test Management And the Relationship with Quality Management
Understanding Test Management And the Relationship with Quality ManagementUnderstanding Test Management And the Relationship with Quality Management
Understanding Test Management And the Relationship with Quality Management
 
Requirements Engineering
Requirements EngineeringRequirements Engineering
Requirements Engineering
 
Chapt12 w04
Chapt12 w04Chapt12 w04
Chapt12 w04
 
Peer Review
Peer ReviewPeer Review
Peer Review
 
Error Proofing And Cost Reduction 2
Error Proofing And Cost Reduction 2Error Proofing And Cost Reduction 2
Error Proofing And Cost Reduction 2
 
Mitigation,performance
Mitigation,performanceMitigation,performance
Mitigation,performance
 
TECHBlue Center - Example Waterfront Studies & Reviews
TECHBlue Center - Example Waterfront Studies & ReviewsTECHBlue Center - Example Waterfront Studies & Reviews
TECHBlue Center - Example Waterfront Studies & Reviews
 
E2.KEY_ELEMENTS_OF_EIA_PROCESS-1
E2.KEY_ELEMENTS_OF_EIA_PROCESS-1E2.KEY_ELEMENTS_OF_EIA_PROCESS-1
E2.KEY_ELEMENTS_OF_EIA_PROCESS-1
 
Static techniques
Static techniquesStatic techniques
Static techniques
 
Improving the Auditor's Report
Improving the Auditor's ReportImproving the Auditor's Report
Improving the Auditor's Report
 
Keeping up with current regulatory trends
Keeping up with current regulatory trendsKeeping up with current regulatory trends
Keeping up with current regulatory trends
 
TOOLS OF CONTINUOUS IMPROVEMENT
TOOLS OF CONTINUOUS IMPROVEMENTTOOLS OF CONTINUOUS IMPROVEMENT
TOOLS OF CONTINUOUS IMPROVEMENT
 

Kürzlich hochgeladen

~Call Girls In Roop Nagar {8447779280}(Low Price) Escort Service In Delhi
~Call Girls In Roop Nagar {8447779280}(Low Price) Escort Service In Delhi~Call Girls In Roop Nagar {8447779280}(Low Price) Escort Service In Delhi
~Call Girls In Roop Nagar {8447779280}(Low Price) Escort Service In Delhiasmaqueen5
 
Cheap Rate ✨➥9711108085▻✨Call Girls In Connaught Place (Delhi)
Cheap Rate ✨➥9711108085▻✨Call Girls In Connaught Place (Delhi)Cheap Rate ✨➥9711108085▻✨Call Girls In Connaught Place (Delhi)
Cheap Rate ✨➥9711108085▻✨Call Girls In Connaught Place (Delhi)delhi24hrs1
 
Prestige Sancoale Goa Residneces Brochure.pdf
Prestige Sancoale Goa Residneces Brochure.pdfPrestige Sancoale Goa Residneces Brochure.pdf
Prestige Sancoale Goa Residneces Brochure.pdfkishor21012022
 
Nyati Elite NIBM Road Pune E Brochure.pdf
Nyati Elite NIBM Road Pune E Brochure.pdfNyati Elite NIBM Road Pune E Brochure.pdf
Nyati Elite NIBM Road Pune E Brochure.pdfabbu831446
 
Eldeco Dwarka Project In Delhi-brochure.pdf.pdf
Eldeco Dwarka Project In Delhi-brochure.pdf.pdfEldeco Dwarka Project In Delhi-brochure.pdf.pdf
Eldeco Dwarka Project In Delhi-brochure.pdf.pdfkratirudram
 
Low Rate ✨➥9711108085▻✨Call Girls In East Of Kailash (E.K) (Delhi)
Low Rate ✨➥9711108085▻✨Call Girls In East Of Kailash (E.K) (Delhi)Low Rate ✨➥9711108085▻✨Call Girls In East Of Kailash (E.K) (Delhi)
Low Rate ✨➥9711108085▻✨Call Girls In East Of Kailash (E.K) (Delhi)delhi24hrs1
 
Top tourism places in Dubai - Inch & Brick Realty
Top tourism places in Dubai - Inch & Brick RealtyTop tourism places in Dubai - Inch & Brick Realty
Top tourism places in Dubai - Inch & Brick Realtypunitranainchbrick02
 
BPTP THE AMAARIO Luxury Project Invest Like Royalty in Sector 37D Gurgaon Dwa...
BPTP THE AMAARIO Luxury Project Invest Like Royalty in Sector 37D Gurgaon Dwa...BPTP THE AMAARIO Luxury Project Invest Like Royalty in Sector 37D Gurgaon Dwa...
BPTP THE AMAARIO Luxury Project Invest Like Royalty in Sector 37D Gurgaon Dwa...ApartmentWala1
 
BPTP THE AMAARIO For The Royals Of Tomorrow in Sector 37D Gurgaon Dwarka Expr...
BPTP THE AMAARIO For The Royals Of Tomorrow in Sector 37D Gurgaon Dwarka Expr...BPTP THE AMAARIO For The Royals Of Tomorrow in Sector 37D Gurgaon Dwarka Expr...
BPTP THE AMAARIO For The Royals Of Tomorrow in Sector 37D Gurgaon Dwarka Expr...ApartmentWala1
 
Yashwin Enchante Uppar Kharadi Pune E-Brochue.pdf
Yashwin Enchante Uppar Kharadi Pune  E-Brochue.pdfYashwin Enchante Uppar Kharadi Pune  E-Brochue.pdf
Yashwin Enchante Uppar Kharadi Pune E-Brochue.pdfManishSaxena95
 
Call Girls in Maurice Nagar (Delhi) ꧁8447779280꧂ Female Escorts Service in De...
Call Girls in Maurice Nagar (Delhi) ꧁8447779280꧂ Female Escorts Service in De...Call Girls in Maurice Nagar (Delhi) ꧁8447779280꧂ Female Escorts Service in De...
Call Girls in Maurice Nagar (Delhi) ꧁8447779280꧂ Female Escorts Service in De...asmaqueen5
 
Low Rate ✨➥9582086666▻✨Call Girls In Gurgaon Sector 21 (Gurgaon)
Low Rate ✨➥9582086666▻✨Call Girls In Gurgaon Sector 21 (Gurgaon)Low Rate ✨➥9582086666▻✨Call Girls In Gurgaon Sector 21 (Gurgaon)
Low Rate ✨➥9582086666▻✨Call Girls In Gurgaon Sector 21 (Gurgaon)delhi24hrs1
 
Low Density Living New Project in BPTP THE AMAARIO Sector 37D Gurgaon Haryana...
Low Density Living New Project in BPTP THE AMAARIO Sector 37D Gurgaon Haryana...Low Density Living New Project in BPTP THE AMAARIO Sector 37D Gurgaon Haryana...
Low Density Living New Project in BPTP THE AMAARIO Sector 37D Gurgaon Haryana...ApartmentWala1
 
Kohinoor Courtyard One Wakad Pune | Elegant Living Spaces
Kohinoor Courtyard One Wakad Pune | Elegant Living SpacesKohinoor Courtyard One Wakad Pune | Elegant Living Spaces
Kohinoor Courtyard One Wakad Pune | Elegant Living Spacesaidasheikh47
 
Jaipur Escorts 🥰 8617370543 Call Girls Offer VIP Hot Girls
Jaipur Escorts 🥰 8617370543 Call Girls Offer VIP Hot GirlsJaipur Escorts 🥰 8617370543 Call Girls Offer VIP Hot Girls
Jaipur Escorts 🥰 8617370543 Call Girls Offer VIP Hot GirlsDeepika Singh
 
Explore Dual Citizenship in Africa | Citizenship Benefits & Requirements
Explore Dual Citizenship in Africa | Citizenship Benefits & RequirementsExplore Dual Citizenship in Africa | Citizenship Benefits & Requirements
Explore Dual Citizenship in Africa | Citizenship Benefits & Requirementsmarketingkingdomofku
 
Madhugiri Boucher Managed Farmland (knx)
Madhugiri Boucher Managed Farmland (knx)Madhugiri Boucher Managed Farmland (knx)
Madhugiri Boucher Managed Farmland (knx)knoxdigital1
 
Vanam At Purva Soukhyam Guduvanchery.pdf.pdf
Vanam At Purva Soukhyam Guduvanchery.pdf.pdfVanam At Purva Soukhyam Guduvanchery.pdf.pdf
Vanam At Purva Soukhyam Guduvanchery.pdf.pdfkratirudram
 
Call Girls In Sarai Rohilla ☎️8447779280{Sarai Rohilla Escort Service In Delh...
Call Girls In Sarai Rohilla ☎️8447779280{Sarai Rohilla Escort Service In Delh...Call Girls In Sarai Rohilla ☎️8447779280{Sarai Rohilla Escort Service In Delh...
Call Girls In Sarai Rohilla ☎️8447779280{Sarai Rohilla Escort Service In Delh...asmaqueen5
 
Bptp The Amaario Launch Luxury Project Sector 37D Gurgaon Dwarka Expressway...
Bptp The Amaario Launch  Luxury Project  Sector 37D Gurgaon Dwarka Expressway...Bptp The Amaario Launch  Luxury Project  Sector 37D Gurgaon Dwarka Expressway...
Bptp The Amaario Launch Luxury Project Sector 37D Gurgaon Dwarka Expressway...ApartmentWala1
 

Kürzlich hochgeladen (20)

~Call Girls In Roop Nagar {8447779280}(Low Price) Escort Service In Delhi
~Call Girls In Roop Nagar {8447779280}(Low Price) Escort Service In Delhi~Call Girls In Roop Nagar {8447779280}(Low Price) Escort Service In Delhi
~Call Girls In Roop Nagar {8447779280}(Low Price) Escort Service In Delhi
 
Cheap Rate ✨➥9711108085▻✨Call Girls In Connaught Place (Delhi)
Cheap Rate ✨➥9711108085▻✨Call Girls In Connaught Place (Delhi)Cheap Rate ✨➥9711108085▻✨Call Girls In Connaught Place (Delhi)
Cheap Rate ✨➥9711108085▻✨Call Girls In Connaught Place (Delhi)
 
Prestige Sancoale Goa Residneces Brochure.pdf
Prestige Sancoale Goa Residneces Brochure.pdfPrestige Sancoale Goa Residneces Brochure.pdf
Prestige Sancoale Goa Residneces Brochure.pdf
 
Nyati Elite NIBM Road Pune E Brochure.pdf
Nyati Elite NIBM Road Pune E Brochure.pdfNyati Elite NIBM Road Pune E Brochure.pdf
Nyati Elite NIBM Road Pune E Brochure.pdf
 
Eldeco Dwarka Project In Delhi-brochure.pdf.pdf
Eldeco Dwarka Project In Delhi-brochure.pdf.pdfEldeco Dwarka Project In Delhi-brochure.pdf.pdf
Eldeco Dwarka Project In Delhi-brochure.pdf.pdf
 
Low Rate ✨➥9711108085▻✨Call Girls In East Of Kailash (E.K) (Delhi)
Low Rate ✨➥9711108085▻✨Call Girls In East Of Kailash (E.K) (Delhi)Low Rate ✨➥9711108085▻✨Call Girls In East Of Kailash (E.K) (Delhi)
Low Rate ✨➥9711108085▻✨Call Girls In East Of Kailash (E.K) (Delhi)
 
Top tourism places in Dubai - Inch & Brick Realty
Top tourism places in Dubai - Inch & Brick RealtyTop tourism places in Dubai - Inch & Brick Realty
Top tourism places in Dubai - Inch & Brick Realty
 
BPTP THE AMAARIO Luxury Project Invest Like Royalty in Sector 37D Gurgaon Dwa...
BPTP THE AMAARIO Luxury Project Invest Like Royalty in Sector 37D Gurgaon Dwa...BPTP THE AMAARIO Luxury Project Invest Like Royalty in Sector 37D Gurgaon Dwa...
BPTP THE AMAARIO Luxury Project Invest Like Royalty in Sector 37D Gurgaon Dwa...
 
BPTP THE AMAARIO For The Royals Of Tomorrow in Sector 37D Gurgaon Dwarka Expr...
BPTP THE AMAARIO For The Royals Of Tomorrow in Sector 37D Gurgaon Dwarka Expr...BPTP THE AMAARIO For The Royals Of Tomorrow in Sector 37D Gurgaon Dwarka Expr...
BPTP THE AMAARIO For The Royals Of Tomorrow in Sector 37D Gurgaon Dwarka Expr...
 
Yashwin Enchante Uppar Kharadi Pune E-Brochue.pdf
Yashwin Enchante Uppar Kharadi Pune  E-Brochue.pdfYashwin Enchante Uppar Kharadi Pune  E-Brochue.pdf
Yashwin Enchante Uppar Kharadi Pune E-Brochue.pdf
 
Call Girls in Maurice Nagar (Delhi) ꧁8447779280꧂ Female Escorts Service in De...
Call Girls in Maurice Nagar (Delhi) ꧁8447779280꧂ Female Escorts Service in De...Call Girls in Maurice Nagar (Delhi) ꧁8447779280꧂ Female Escorts Service in De...
Call Girls in Maurice Nagar (Delhi) ꧁8447779280꧂ Female Escorts Service in De...
 
Low Rate ✨➥9582086666▻✨Call Girls In Gurgaon Sector 21 (Gurgaon)
Low Rate ✨➥9582086666▻✨Call Girls In Gurgaon Sector 21 (Gurgaon)Low Rate ✨➥9582086666▻✨Call Girls In Gurgaon Sector 21 (Gurgaon)
Low Rate ✨➥9582086666▻✨Call Girls In Gurgaon Sector 21 (Gurgaon)
 
Low Density Living New Project in BPTP THE AMAARIO Sector 37D Gurgaon Haryana...
Low Density Living New Project in BPTP THE AMAARIO Sector 37D Gurgaon Haryana...Low Density Living New Project in BPTP THE AMAARIO Sector 37D Gurgaon Haryana...
Low Density Living New Project in BPTP THE AMAARIO Sector 37D Gurgaon Haryana...
 
Kohinoor Courtyard One Wakad Pune | Elegant Living Spaces
Kohinoor Courtyard One Wakad Pune | Elegant Living SpacesKohinoor Courtyard One Wakad Pune | Elegant Living Spaces
Kohinoor Courtyard One Wakad Pune | Elegant Living Spaces
 
Jaipur Escorts 🥰 8617370543 Call Girls Offer VIP Hot Girls
Jaipur Escorts 🥰 8617370543 Call Girls Offer VIP Hot GirlsJaipur Escorts 🥰 8617370543 Call Girls Offer VIP Hot Girls
Jaipur Escorts 🥰 8617370543 Call Girls Offer VIP Hot Girls
 
Explore Dual Citizenship in Africa | Citizenship Benefits & Requirements
Explore Dual Citizenship in Africa | Citizenship Benefits & RequirementsExplore Dual Citizenship in Africa | Citizenship Benefits & Requirements
Explore Dual Citizenship in Africa | Citizenship Benefits & Requirements
 
Madhugiri Boucher Managed Farmland (knx)
Madhugiri Boucher Managed Farmland (knx)Madhugiri Boucher Managed Farmland (knx)
Madhugiri Boucher Managed Farmland (knx)
 
Vanam At Purva Soukhyam Guduvanchery.pdf.pdf
Vanam At Purva Soukhyam Guduvanchery.pdf.pdfVanam At Purva Soukhyam Guduvanchery.pdf.pdf
Vanam At Purva Soukhyam Guduvanchery.pdf.pdf
 
Call Girls In Sarai Rohilla ☎️8447779280{Sarai Rohilla Escort Service In Delh...
Call Girls In Sarai Rohilla ☎️8447779280{Sarai Rohilla Escort Service In Delh...Call Girls In Sarai Rohilla ☎️8447779280{Sarai Rohilla Escort Service In Delh...
Call Girls In Sarai Rohilla ☎️8447779280{Sarai Rohilla Escort Service In Delh...
 
Bptp The Amaario Launch Luxury Project Sector 37D Gurgaon Dwarka Expressway...
Bptp The Amaario Launch  Luxury Project  Sector 37D Gurgaon Dwarka Expressway...Bptp The Amaario Launch  Luxury Project  Sector 37D Gurgaon Dwarka Expressway...
Bptp The Amaario Launch Luxury Project Sector 37D Gurgaon Dwarka Expressway...
 

Building condition survey whats more

  • 1. BUILDING CONDITION SURVEY : What's More from Defects Identification Adi Irfan Che-Ani Norngainy Mohd. Tawil Azalillah Ramdani Musa Mazlan Mohd. Tahir UKM UKM Pakarunding Sdn. Bhd. UKM:Che-Ani 2012 http://www.eagle-wi.gov
  • 2. 1. Survey & defect 2. Building defect: example 3. Building condition survey: inspection 4. Building condition survey: reporting 5. Next: analysis 6. Next: performance PRESENTATION measurement OUTLINE 7. Next: how “defect” benefit us 8. Summary
  • 3. Survey & Defect Survey (Hollis & Gibson – Surveying Buildings, 2005): Inspection & investigation of construction & services of property in sufficient details to enable surveyor to advise what impact the condition & circumstances of that property will have upon client. Defects: areas of non-compliance to the bye-law, regulation, http://myprservices.com standard (mostly not subjective) Out of acceptable condition (subjective) http://www.buildingdefects.com.au/ “Defects will occur in buildings. It is one of the great certainties in construction, the equivalent of death and taxes in life more generally”. (Professor Anthony Lavers) http://www.blaketurner.com Page  3 UKM:Che-Ani 2012
  • 4. Survey & Defect Page  4 UKM:Che-Ani 2012
  • 5. Growth of mould and algae due to water ponding and continuous dampness Water ponding due to blockage of outlet to rainwater downpipe (due to small outlet) – it’s very hot during the course of Page  5 inspection
  • 6. Water mark on the ceiling surface due to water penetration Stalactite effect due to from leaking roof (the brown water proofing failure at color suggest it dripped via upstairs toilet timber trusses, perhaps the trusses need structural inspection) Page  6
  • 7. BUILDING DEFECT: CRACKS http://www.youtube.com/watch?v=wvTlB1EVKbQ&feature=player_embedded Page  7 UKM:Che-Ani 2012
  • 8. BUILDING DEFECT: FOUNDATIONS DEFECT http://www.youtube.com/watch?v=7rAhPhB46oc&feature=player_embedded Page  8 UKM:Che-Ani 2012
  • 9. BUILDING DEFECT http://www.youtube.com/watch?v=OeAB9XLjA8k&feature=player_embedded Page  9 UKM:Che-Ani 2012
  • 10. BUILDING CONDITION SURVEY : INSPECTION An apparent defect has been perceived when It looks Someone It just felt Something wrong Something heard wrong felt smells strange something Page  10 UKM:Che-Ani 2012 http://www.nienergyrating.com
  • 11. Inspect All seem No further OK? action at this time Defect Record and confirmed keep in mind for future Is a matter of Allocate priority in health and safety accord with agreed criteria UKM:Che-Ani 2012 Page  11
  • 12. Initiate urgent Prepare or select Select action appropriate appropriate specialists for rectification further specification inspection Discuss and agree with client and users Commission rectification work Check and record work in progress early on and periodically Page  12 Review periodically UKM:Che-Ani 2012 (annually)
  • 13. BUILDING CONDITION SURVEY : REPORTING  Various standard available No Piawaian/ Tahun Kerja Pra- Kerja Keperluan Keperluan Kaedah Penggunaan Input data Cadangan Kandungan Dokumen dibang- Pemeriksaan ukur nilai anggaran pengkadaran/ kod warna pembaikan utama unkan kondisi pasaran kos numerik pelaporan 1 RICS Building 2005 Kajian Meja Protokol Tidak Tidak Tiada Tiada Keadaan, Ada Pemeriksaan, Survey Report 1 (visual) perlu perlu sebab, Laporan, tahap Penilaian kerosakan 2 BRE Design 2007 Tiada Protokol Perlu Perlu Ada Tiada Keadaan Ada Pemeriksaan, Quality Manual 1 (visual) Laporan, Penilaian http://www.home-building-inspectors-ny.com/ 3 ASTM E-2018 2008 Penelitian Protokol Perlu Tiada Tiada Keadaan Ada Laporan dokumen & 1 (visual) Keadaan temubual Hartanah 4 The RICS Home 2009 Tidak perlu Protokol Perlu Perlu 3 kadaran Ada Keadaan Ada Pemeriksaan, Buyer Report 1 (visual) Laporan, 2009 Penilaian 5 Matriks CSP1 2010 Kajian meja Protokol Tidak Tidak Keadaan (5 Ada Keadaan, Tiada Jadual keadaan 1 (visual) perlu perlu kadaran) & Kepenting bangunan, Keutamaan (4 an Kotak kadaran) gambarfoto, pelan tandaan kecacatan 6 RICS Condition 2010 Tidak perlu Protokol Tidak Tidak 3 kadaran Ada Keadaan Tiada Pemeriksaan, Report 1 (visual) perlu perlu Laporan 7 CP BS101 2011 Kajian meja Protokol Tidak Perlu Ada (Building Ada Keadaan, Ada Jadual keadaan 1 (visual) perlu Assessment & Kepenting bangunan, Rating System an Kotak – BARIS) gambarfoto, pelan tandaan kecacatan And many more… Page  13 UKM:Che-Ani 2012
  • 14. BUILDING CONDITION SURVEY : REPORTING Problem: No standard is adopted…. Then you need to be certified….but who certified Page  14 UKM:Che-Ani 2012
  • 15. NEXT: ANALYSIS Common building defects Overall building rating Distribution of defects Predictive model http://www.home-building-inspectors-ny.com/ http://www.researchrockstar.com/mark et-research-challenge-analysis-bias/ Page  15 UKM:Che-Ani 2012
  • 16. NEXT: ANALYSIS Komponen Bilangan Kecacatan Peratus Pintu 222 23.5 Lantai 63 6.7 Dinding 177 18.7 Tingkap 32 3.4 Siling 138 14.6 Sanitari 230 24.3 Kelengkapan 48 5.1 Paip Buangan 26 2.7 Paip Agihan 7 0.7 Pintu Utiliti 1 0.1 Meja Konkrit 1 0.1 Paip Bekalan 1 0.1 Jumlah 946 100.0 Common defects: toilet (design input for future projects) Page  16 UKM:Che-Ani 2012
  • 17. Table 6: BUILDING CONDITION ASSESSMENT for ECSTRACT, LANGKAWI, KEDAH Schedule of Building Condition (CSP1 Matrix) NEXT: ANALYSIS Overall Building Rating NO. AREA DEFECTS Condition Priority Condition Survey Protocol (CSP) 1 Matrix A’lysis [c] Photo No. / Assessment Assessment Defect Plan Tag (a x b) (Sketch No.) [a] [b] A EXTERNAL Rainwater outlet 1 Front outlet: Blockage with dried leaf 2 2 4 1 1 Rainwater collector 2 Back collector: Had little gap 2 2 4 2 2 3 Back collector: Sealant fail 1 2 2 3 3 Gutter at bothsides 4 Back gutter: Blockage with dried leaf 2 2 4 4 4 Water tank 5 Water tank (front): Distortion 3 4 12 5 5 6 Water tank (back): Sagging and leaking 3 4 12 6 6 Water tank support 7 Supporting bar: Corrosion 2 2 4 7 7 Distribution board (DB) 8 Cover: Can not open and close properly 1 1 1 8 8 B MALE First cubicle (Disable) Water closet (WC) 9 Flush does not function 2 2 4 9 9 Door 10 Misaligment 2 2 4 10 10 11 Can not close and lock properly 2 2 4 11 11 Second cubicle Water closet (WC) 12 Flush does not function 2 2 4 12 12 Tap 13 Function with low water pressure 2 2 4 13 13 Circulation Hand dryer 14 Not function and not fix at wall 2 2 4 14 14 Dustbin 15 Not properly fix at floor and sagging 1 2 2 15 15 Sink Page  17
  • 18. 16 17 Sink tap 1: Function with low water pressure Sink tap 2: Not function 2 2 2 2 NEXT: ANALYSIS 4 4 16 17 16 17 18 Outlet: Blockage 3 2 6 18 18 Lamp 19 Not function 2 2 4 19 19 Vegetation area 20 Vegetation: Not available anymore 2 2 4 20 20 C FEMALE First cubicle (Disable) Tap 21 Function with low water pressure 2 2 4 21 21 Second cubicle Tap Pipe disconnected and function with 22 low water pressure 2 3 6 22 22 Door 23 Can not close properly 2 2 4 23 23 Circulation Hand dryer 24 Not properly fix at wall 2 2 4 24 24 Dustbin 25 Not properly fix at floor 1 2 2 25 25 Sink Sink tap 1: Function with low water 26 pressure 2 2 4 26 26 Sink tap 2: Function with low water 27 pressure 2 2 4 27 27 Lamp 28 Not function 2 2 4 28 28 Vegetation area 29 Vegetation: Not available anymore 2 2 4 29 29 Total marks [d] (∑ of c) 127 Number of defects [e] 29 Total score (d/e) 4.38 Overall building rating Good Limitation(s): 1. Roof top is not inspected as there is no safe access during the time of inspection. Page  18 Overall Building Rating
  • 19. NEXT: ANALYSIS 5.6 5.49 5.4 5.31 5.2 Nilai skor 5.07 5 4.8 4.81 4.6 4.4 Pelajar/ K.Tangan Pelajar K.Tangan/ K.Tangan Pelawat Kategori pengguna Matriks CSP1 Distribution of defects: toilet (perhaps frequency of toilet cleaning can be reasonably distributed) Page  19 UKM:Che-Ani 2012
  • 20. NEXT: ANALYSIS Predictive model: multiple logistic regression – school (possibly to predict the building condition with focusing to critical defect ) 1 f ( z) Kebarangkalian (bangunan tidak selamat) = 1 e z di mana z = -0.606 – 0.891(Dinding) + 1.372(Kasau Bumbung) + 1.961(Kekuda) + 1.968(Papak) - 1.628(Pendawaian) – 1.479(Tiang) Page  20 UKM:Che-Ani 2012
  • 21. Sampel NEXT: ANALYSIS Komponen 1 2 3 4 5 6 7 8 9 10 Anak Tangga 0 0 0 0 0 0 0 0 0 0 Apron 1 1 1 0 0 0 0 1 0 0 Atap 0 0 0 0 0 0 0 0 0 0 Atap bumbung 0 0 0 0 0 0 0 0 0 0 Predictive model: Balkoni Beam Bilik 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 multiple logistic Bumbung Dinding Footing 0 1 0 1 1 0 0 1 0 0 1 0 0 0 0 0 0 0 0 1 0 0 1 0 0 0 0 1 1 1 regression – school Halaman Luar 0 0 0 0 0 0 0 0 0 0 Kasau Bumbung 0 0 0 0 0 0 0 0 0 0 Kekuda 0 0 0 0 1 0 0 0 0 0 Kelengkapan 1 1 0 1 0 0 0 1 0 1 (possibly to predict the building Lantai Lantai Apron Longkang 1 0 0 1 0 0 1 0 0 0 0 0 0 0 0 1 0 0 1 0 0 1 0 0 0 0 0 1 0 1 condition with focusing to critical Lubang Pengudaraan 1 0 0 0 0 0 0 0 0 0 defect) Manhole Pagar 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Paip 1 0 0 0 0 0 1 0 0 0 Paip Agihan 0 0 0 0 0 0 0 0 0 0 Paip Air Hujan 0 0 0 0 0 0 0 0 0 0 Paip Bekalan 0 0 0 0 0 0 0 0 0 1  help to select the critical school to Paip Buangan 0 0 0 0 0 0 0 0 0 0 Paip Penghawa Dingin 0 0 0 0 0 0 0 0 0 0 be repair urgently: budget is very Papak Pendawaian 0 0 0 1 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 1 limited Pentas Perabot 0 0 0 0 0 0 0 0 0 0 Kelengkapan 0 0 0 0 0 0 0 1 0 0 Pintu 1 0 1 1 0 0 0 1 1 0 Rasuk 0 0 0 0 0 0 0 0 0 0 Saliran 0 0 0 0 0 0 0 0 0 0 Sanitari 0 0 0 1 0 0 0 1 1 1 Servis 0 0 0 0 0 0 0 0 0 1 Siling 1 1 1 0 0 0 0 1 0 1 Sinki 0 0 0 0 0 0 0 0 0 0 Talang hujan 0 0 0 0 0 0 0 0 0 0 Tangga 1 0 0 0 0 1 1 1 0 0 Tiang 0 0 0 0 0 1 0 0 0 0 Tingkap 1 1 1 1 0 0 0 1 0 1 Matriks 0 0 0 0 1 0 0 1 0 0 Kebarangkalian 0.1829 0.0421 0.1829 0.0421 0.7948 0.1105 0.1829 0.1829 0.3529 0.0421 Page  21 Status keselamatan 0 0 0 0 1 0 0 0 0 0 UKM:Che-Ani 2012
  • 22. NEXT: PERFORMANCE MEASUREMENT Qlassic Building condition http://mrtplus.wordpress.com/2011/07/14/meauring-up/ http://www.cartoonstock.com/directory/m/measures.asp Page  22 UKM:Che-Ani 2012
  • 23. NEXT: PERFORMANCE MEASUREMENT  Qlassic (construction quality, especially contractor) Sampling guideline for architectural works Defects Group For Assessment Of Architectural Works (Internal Finishes) Weightage for architectural elements Page  23 UKM:Che-Ani 2012
  • 24. NEXT: PERFORMANCE MEASUREMENT 25 20 15 10 5 0 R01 R03 R05 R07 R09 R11 R13 R15 R17 R19 R21 R23 R25 R27 R29 R31 R33 R35 R37 R39 R41 R43 R45 R47 R49 R51 R53 R55 R57 R59 R61 R63 R65 R67 R69 R71 Priority Assessment Scale E4 U3 R2 N1 Assessment 5 20 15 10 5 Condition 4 16 12 8 4 3 12 9 6 3 2 1 8 4 6 3 4 2 2 1 Construction quality of 72 newly completed terrace houses (by the same consultant + contractor) Page  24 UKM:Che-Ani 2012
  • 25. NEXT: How “defect” benefit us… It wasn’t hit by the massive earthquake. In true fashion of the Ripley Legacy, it was built to reflect the odd 1812 earthquake that measured 8.0 on the rick. The building has now become one of the most photographed in the world. Page  25 UKM:Che-Ani 2012
  • 26. NEXT: How “defect” benefit us… Page  26 UKM:Che-Ani 2012
  • 27. NEXT: How “defect” benefit us… Page  27 UKM:Che-Ani 2012
  • 28. NEXT: How “defect” benefit us… Page  28 UKM:Che-Ani 2012
  • 29. CONCEPT BUILDING U.S General Service Administration (GSA), LA Page  29 HOK & VANDERWEIL
  • 30. NEXT: How “defect” benefit us… Page  30 UKM:Che-Ani 2012
  • 31. SUMMARY  Start up: building defects identification – more than an “album”  Reporting: standard and certified – qualify to stand in court  Next level: building defect analysis – defects are here & there: so what?  Next level: performance measurement – information for future design  Next level: building defect “advantage”? – new theory around the corner “We do not want a structural survey. If you can just have a quick look at the house to make sure that it is structurally sound, that will be fine” Page  31 (Extract from client’s letter of instruction) UKM:Che-Ani 2012
  • 32. Thank you very much adiirfan@gmail.com - reflection - Page  32