SlideShare ist ein Scribd-Unternehmen logo
1 von 24
KNOW YOUR PROFESSION BETTER
THE ROLES & INVOLVEMENT OF
BUILDING SURVEYORS
IN
THE MALAYSIAN BUILDING INDUSTRY
Building Surveying Division
The Royal Institution of Surveyors Malaysia (RISM)
Sep 2013
MUQADIMAH
Who is Building Surveyor
(RISM website)
2
A Professional Building Surveyor is a
qualified person, by examination and
experience, and
a member of the Royal Institution of
Surveyors Malaysia
(hold the “Sr” title as prefix to their
name)
MUQADIMAH
EXAMPLE / ANALOGY OF SERVICE
(As Basic Illustration & Comparison)
No EXAMPLE
TYPE OF SERVICE
EXAMPLE
SCOPE OF WORK
APPROPRIATE
PROFESSION AS
(i) Actor/Implementer
(ii) Monitor
1.0
2.0
3.0
4.0
Transportation Service
Professional Service
Property Development
Building Construction
CHECK
Implementation of road and
transportation laws
Control of Professional Work
Ethics
Housing Construction
Design
AND
- Driver
- Police
- Profession Practitioner
- Professional Board
- Developer
- Planner
- Architect/ Engineer
- Building Surveyor
BALANCE
3
NICHE OF THE SERVICE
BUILDING CONTROL
AND COMPLIANCE (BCC)
(IN TERM OF)
BUILDING QUALITY
(Good Practice In)
BUILDING PERFORMANCE
(Good Practice In)
CONSTRUCTION &
BLDG. COMPLETION
BUILDING AUDIT &
INSPECTION
MAINTENANCE &
CONSERVATION
RISK ASSESSMENT &
MANAGEMENT
TO PRODUCE
PERFECT & SUSTAINABLE
BUILDING
BUILDING CONTROL & COMPLIANCE
FULFILLMENT OF THE ROLES THROUGH MAJOR INPUTS
QUALITY OF CONSTRUCTION
AND BUILDING COMPLETION
QUALITY OF
INSPECTION AND
BUILDING AUDIT
QUALITY OF BUILDING
ASSET MAINTENANCE &
FACILITIES MANAGEMENT
AND
CONSERVATION OF
BUILDING
QUALITY
OF BUILDING USAGE AND POST
OCCUPANCY EVALUATION
(iv) Fulfillment /completion
of construction works
(i) Search of complete building recordCorrective/responsive maintenance (i)
Assessment of (iv)
service performance
building facilities
INPUTINPUT
5
SOME OF THE JUSTIFICATIONS
WHY THE SERVICE OF BUILDING SURVEYOR IS NEEDED
(WHAT-WHEN-WHY-HOW)
N0. WHAT TYPE OF
SERVICE
(WHAT)
(examples of services needed)
WHEN THE SERVICE IS
NEEDED
(WHEN)
WHY THE SERVICE OF
B.S IS NEEDED
(WHY)
HOW A BUILDING
SURVEYOR CAN
CONTRIBUTE
(HOW)
1,
2.
3.
4.
Building control & building
completion inspection
Building maintenance
management
Building dilapidation and
condition survey
Post occupancy
evaluation
Obtain building plans
approval and certificate of
fitness for occupancy
(CFO)
Building in the design
process, during
construction and after
completion/occupation
Purchase, rent, lease, sell,
take over, re-develop,
construct new buildings &
conservation works and
also asset maintenance
Building during occupancy
period and still in use.
●To overcome
problems of abandon
project, delay & non-
compliance to building
laws
●To overcome building
dilapidation, defects,
deterioration and not
properly maintain. To
promote/cultivate
maintenance culture
●To determine actual
physical value, cond of
buildings/surrounding
& plan for remedial
works, costing and
maintenance programs
●To determine building
performance, safety &
health of building users
& usage level
●Inspect the needs of
building laws & protect
public or stakeholder
interest.
●Provide advisory
services, planned,
preventive & predictive
maintenance as well as
building asset audit and
maintenance training on
DIY techniques.
●Provide Added value/
value for money‟ & assist
in cost planning for client/
developer/ purchaser/
government. Building
asset assessment
●Enforcement of COB,
compliance to building
laws & risk assessment,
building audit works
6
BRIEF HISTORY & BACKGROUND OF THE EXISTENCE OF
BUILDING SURVEYORS
IN MALAYSIA
- As Professional Entity:
i. Established under General Practice with 3 other practices in ISM. 1961
ii. Registered under General Practice in the Surveyors Act, 1967
iii. Scope of work park under Valuation Act, 1972
iv. Building Surveying Division established under RISM, 1990
- Services of BS in the Public Sector:
i. Dewan Bandaran Kuala Lumpur (DBKL)/ PBT, 1950s
ii. Penang City Council, 1950s
iii. Petaling City Council (Majlis Bandaran Petaling), 1970s
iv. Building Surveyors scope of service was gazetted, 1989
v. BS program in the IPTA/IPTS started, 1993
vi. Employment started in the public service sector – PWD/JKR, 2008
- Services of BS in the Private Sector :
i. Malaysian Building Society Berhad (MBSB), 1973
ii. Private practice consultancy & general practice, 1978
7
Current Development In Malaysia
BUILDING SURVEYOR
- Recognition/Accreditation from local bodies and foreign countries :
i. Recognition from JPA/PSD as „Personal to holder‟ for DBKL, 1970
ii. Accepted as Professional degree by JPA/PSD and PWD, 1995
iii. Recognition as Professional by RISM, 1997
iv. Overseas BS degree recognised by JPA, 1998
v. The Assoc. of Building Engineers UK recognised local degree, 2002
vi. JPA approved grade and scheme for Building Surveyors, 2002
vii. RICS UK recognised local degree, 2005
- Total Graduates in Malaysia:
Statistic of graduates since 1970 up to date, >more 2,000
8
Approval of Practice
BUILDING SURVEYOR
- Professional practice
Proposed establishment of the Act :
Has agreed by the Cabinet , 1 & 8 Aug 2007 (proposed Act to be submitted to
Parliament by KKR)
- MOF Registration
2 May 2012: Code for BS – 330208 Ukur Bangunan (Institut Juruukur Malaysia) :
dalam kategori Perkhidmatan Perunding Fizikal Bukan Kejuruteraan
(this recognition as equivalent with the other consultants; such as Architects, QS,
Valuer, Interior Architecture, Value Management etc)
9
SCOPE OF SERVICES
BUILDING SURVEYOR
(As agreed by BAM/LAM dan BEM/LJM July, 2007)
1. Building Control : Inspect, check, advise and prepare building control report
(i.e. Compliance to building laws/requirements) and propose for design,
development and building plans integrity for interested party/stakeholder
2. Maintenance and Conservation of Building : Inspect, report and prepare
programs for implementing planned maintenance, facilities management,
building conservation and restoration
3. Risk Management and Building Audit : Inspect and prepare report on the
condition and performance of building, post occupancy evaluation, building
pathology works, site condition inspection and safety and health, as well as
building audit and risk assessment
10
ROLE OF
BUILDING SURVEYOR
PRE-CONSTRUCTION
Inspect and Recommend Building Plan Approval
Dilapidation & Building Condition Survey
Site Safety and Health Inspection
DURING CONSTRUCTION
Site and Construction Quality Inspection
Compliance to Approved Building Plans
Inspection for Issuance of CCC/ Compliance & Fulfillment of Building Laws
POST CONSTRUCTION
Monitoring of Building Performance
Maintenance Management
Post Occupancy Evaluation (P.O.E)
Building Audit & Inspection of Defects
Building Conservation & Restoration Works
Risk Assessment & Monitoring Demolition Works
Management & Maintenance of Common Property
Implementation of JMB – under COB
11
Comparison – The Basic Scope of Services
Within Professionals In the Construction Industry
(As agreed by MQF/MQA)
Specific Scope of Service Professionals that Accountable
to The Specific Scope of Service
a. Building Control & Compliance
b. Building Design
c. Engineering/Structure/Infra.
d. Cost & Contract Admin.
e. Valuation, Property Services
f. Urban Planning
g. Landscaping
h. Land Surveying
i. Interior Designing
BUILDING SURVEYOR
ARCHITECT
ENGINEER
QUANTITY SURVEYOR
VALUER
URBAN PLANNER
LANDSCAPE ARCHITECT
LAND SURVEYOR
INTERIOR ARCHITECTURE
12
Distribution of Works Among Professionals In A Project Implementation
MAIN ACTIVITIES WORKS
LEVEL
INVOLVEMENT OF MAIN
PROFESSION
SPECIAL ROLE OF
BUILDING SURVEYOR
Planning and design of project /
development and D.O. 1
Urban Planner
Architect/Engineer
BUILDING SURVEYOR
Advisory service & design
feedback toward producing
maintenance friendly buildings
Building plan inspection & approval
in the local authority service 2
Urban Planner
BUILDING SURVEYOR
Check plans, construction
integrity, record management,
building plans approval
Contract administration,
specification and cost 3
Architect/Engineer
Quantity Surveyor
NO MAIN ROLE
Construction and project
management, quality, safety and
health at construction site
4
Builder/ Architect/Engineer
Quantity Surveyor
BUILDING SURVEYOR
Inspect compliance to approved
building plans, requirements of
safety & health at construction
site.
Handover of project from contractor
to developer 5
Builder/Architect/Engineer
BUILDING SURVEYOR
Inspect compliance & project
completion details for CCC/ CF/
PCF
Vacant possession (handover unit
from developer to purchaser) 6
Builder/Architect/Engineer
BUILDING SURVEYOR
Inspect quality, defects, and
compliance to S&P contract.
Maintenance and building services,
interior decoration, sales and
property management.
7
Purchaser/Designer/
Valuer
BUILDING SURVEYOR
Implement common property
management, maintenace,
facilities, POE, insurance, risk
Building conservation, restoration,
refurbishment and upgrade 8
Owner/ client
BUILDING SURVEYOR
Implement building pathology,
building audit, conservation etc.
New proposal of development on
the site. 9
Owner/ client
BUILDING SURVEYOR
Condition survey, advisor for
redevelopment project.
13
ARKITEK. J41
JURUUKUR
BANGUNAN.J41
PEG.PENILAI. W41
STUDIO
COMMUNICATION
COMP.GRAPHIC
CONST.MAT
WRKG.DRWG
BLDG.ENG
BLDGSTRUCT
BLDG.ANALYSIS
ARCH.HIST
MESRD.DRWG.
DESGN.THEORY
ENVIR.PHYSIC
SUSTAINABLE
PLNNGSTUDIES
PROF.STUDIES
ADV.DESIG
PROF.PRACTICE
BLDG.TECH
BLDG.ANALYSIS
THEORY&PHIILO
BLDG.CONSEV
URBANSTDS
PLNG&URB.DES
ENV. SC&SUSTAIN
LAW STUDIES
STRUC. ANALYSIS
MATERL. & CONC.
BLDG. SERVICES
STRUC. DESIGN
CONC. TECH
BLDG. LAW
DEV. STUDIES
M&E SERVICS
BDG. PRCU&SPEC.
BDG.CTL&DESN
BDG.PATH&DILAP
BDG.MAINT.MNGT
COMP. ADD DESG
BDG.SERVS.AUDIT
BDG.MEAS&ANLS
MAINT.TECH.
FACILITY.MANGT
BLDG.CONSRV
SAFETY& RISK
FIRE AUDIT
BLDG ECON
CONC. LAW
PROF.PRAC
INTRTOPROP
PRINC.ECON
LEGALSTUDS
ACC.&FINMGT.
CONC.ECON.
PROP.MKT.ANS
PROP.INV.ANS
INTRTWN.PLG
MTHD.EVALU
PROP.MAINT
LAND&DEV.LAW
UR.LND.ECON
INVES.VALUE
PROP.MGT.
BLDG.LEGISTN
BUSS.VLUATN
LANDACQUISN
TWN.PLG.PROJ
PROP.FINANCE
PROP.DEVMNT.
COR.REALEST
GIS.&SPATANS
MKT&BUSSKIL
PROP.PRACTS
AVD.VALUATN
1. AKTA 663 2. AKTA 318 3. UBBL 1984
5. AKTA J,P & B 19744. AKTA WARISAN
JURUTERA.J41
HASILPEMBELAJARANMESTISAMADENGANFUNGSIKERJA(MQA)
ELAKKANPUBLIKKELIRU&TERTIPU(ETIKAPROFESIONAL)
PENILAIAN & PENGURUSAN HARTANAH
REKABENTUKSTRUKTURDANKERJAAWAM
KAWALANBANGUNAN,SENGGARA&PRESTASI
SEMAK & KELULUSAN PLAN BANGUNAN
PERIKSA KEADAAN TAPAK & BINAAN
PERIKSA PEMATUHAN PLAN & UNDANG2
PERIKSA KEPERLUAN CFO/CCC/OSC
LAKSANA ODIT & PERIKSA KONDISI BGN.
PANTAU KUALITI & PRESTASI BANGUNAN
PNILN LPAS DDUK(POE) & ODIT RUANG
SENGGARA BANGUNAN & HARTA TANAH
SENGGARA FASILITI & RUANG BERSAMA
KNSEV BGN & KERJA LUK TRUKUR/TBINA
URUS RISIKO BGN& PANTAU PROBOHAN
URUS ASET MENYELURUH
1
2
REKABENTUK BANGUNAN & URUS BINA
3
4
5
1 2
6. AKTA KERAJAAN TEMPATAN
6
6
3 4 5
PERTINDIHAN 33%
PERTINDIHAN 40%
PERTINDIHAN100%
SYARATSTANDARDKELAYAKANPERTINDIHANMESTI80%KEATAS
PERTINDIHANLEBIH60%MEMERLUKANLATIHANTAMBAHAN
PERTINDAHANKURANG60%TAKLAYAKMELAKSANAFUNGSIKERJA
KETIKAMENDAPATKANKHIDMATUKURBANGUNAN
ECON, FINAN & ENGG
PROJ. MGMT
ENG. LAW
ENTRE. ENG.& MGT
CAD
ENG.MEC&STR.MTRIAL
CONC. MATERIAL
& ENG. DRWG
TIMBER DESIGN
STRUCT. THEORY
SOIL MECHANIC
REINF.CONC.DESIGN
STEEL STRUC.DESIGN
ENVIRON. ENGG
STRUCT ANALYSIS
CONC. MGMT
PRE-STRES CONC.DES
FUNDAMENTL ENGG
ENGG GEOLOGY
FUND. MATRL SCIENC
LAND SURVEY
PROF. PRACTICE
5
3
PERTINDIHAN50%
No. Courses Credit
hour
Bac. Bldg.
Surveying
BSc.
Archi’ture
Bachelor
Civil Eng.
1 Building Design 3 √ √ X
2 BS-Planning & Plan Checking Practice 4 √ X X
3 Building Control 3 √ X X
4 Building Services Audit 4 √ X X
5 Project Management Practice 4 √ √ √
6 Introduction to CAD 2 √ √ √
7 Building Defects & Diagnosis (Pathology) 4 √ X X
8 Measurement & Analysis of Buildings 4 √ X X
9 Building Conservation & Cond. Monitoring 4 √ X X
10 Environmental Science 3 √ √ √
11 Building Services 3 √ √ √
12 M & E Services & checking System in
Building
3 √ X X
13 Building Maintenance Management 4 √ X X
14 Building Fire Audit 3 √ X X
15 Facilities and Building Aset Management 3 √ X X
16 General Principles of Malaysian Law 3 √ X X
17 Property Development Studies 2 √ X X
18 Building Law 4 √ X X
19 Construction Quality Management 3 √ X X
20 Professional Practice (Building Surveying) 3 √ √ √
As example
comparison
in Universiti
of Malaya
syllabus
Coverage of Subjects in Building Surveying Program
15
No. Courses Credit
hour
Building
Surveying
Archi’ture Civil
Engineering
Dept. Courses (cont.)
21 Construction Law 3 √ √ √
22 Structural Analysis 3 √ X √
23 Structural Design 3 √ X √
24 Material Science 3 √ √ √
25 Construction Technology I 3 √ √ √
26 Construction Technology II 3 √ √ √
27 Construction Technology III 3 √ √ √
28 Construction Quantification/Specification 3 √ X X
29 Building Economics 2 √ X X
30 Research Methodology/Academic Writing 2 √ √ √
31 Academic Project – Building Surveying 6 √ X X
32 Industrial Training 6 √ √ √
Sub-Total Credit Hour 106 100 106
Elective Courses / Faculty 2 2 2
University Courses 12 12 12
Total Credit Hour 120 114 120
16
WHY THE SERVICE OF A BUILDING SURVEYOR IS NEEDED
I. In Building Construction & Completion Works :
1. To ensure building plans were prepared completely by a competent person
before the project is constructed and complied to all relevant laws.
2. To ensure construction site is free from any debris, obstruction, clean & safe for
workers to work and no public interference/trespass, no negative impact on
environment and public property.
3. To ensure building was constructed as per approved building plans and to be re-
inspected by a competent staff of Local Authority or a Building Surveyor.
4. To ensure no abandon project. Require close supervision/monitoring by a
competent Building Surveyor to protect the interest or act on behalf of financial
institutions, insurance companies or purchasers before releasing of any progress
payment or full settlement of payment or insurance coverage.
5. To ensure all defects were rectified and building laws were complied before the
process of handing-over of keys/taking vacant possession of building to
purchasers or stakeholders.
17
II. In Building Maintenance and Conservation Works :
1. To ensure no repetitive of design mistakes that have caused the same defects
occurred on building. Require close supervision, inspection and feedback from a
competent Building Surveyor
2. To ensure minimum cost for inspection of building defects and rectification works.
Require comprehensive and efficient investigation and proper cost planning by a
competent Building Surveyor.
3. To ensure the planning and implementation of maintenance works are done orderly
and scheduled. Require preparation by a competent Building Surveyor.
4. To ensure building/asset has a proper and complete record for the purpose of
building usage and future maintenance. Require comprehensive building and space
audit by a competent Building Surveyor.
5. To ensure the source and causes of building defects are identified correctly. Require
correct building forensic or pathology techniques by a competent Building Surveyor.
6. To ensure conservation works are done through proper procedures/techniques and
correctly maintained. Require scientific, correct equipment and tools application by a
competent Building Surveyor.
18
III. In Building Audit and Risk Management Works :
1. To ensure the premium of insurance coverage is suitable based on the actual defects
inspected. Require correct inspection, report and suggestion by a competent Building
Surveyor.
2. To ensure the existing level or status of building failures/defects are identified correctly
in order to reduce future building risk/ collapse. Require proper inspection of building
condition and scheduling by a competent Building Surveyor.
3. To ensure compensation amount is paid correctly as per defects/failures occurred.
Require proper and correct assessment by a competent Building Surveyor.
4. To ensure the usage of building in term of space, equipments, facilities is according to
the actual needs and as it was designed. Require proper and correct building audit by
a competent Building Surveyor
5. To ensure the maintenance of buildings, facilities and enforcement of building laws in
the building & common property/strata title/ heritage Act is implemented correctly.
Require correct inspection and supervision by a competent Building Surveyor.
6. To ensure all building demolition and dismantling works are done as per approved
measures/procedures/rules by local authority. Require monitoring by a competent
PBT staff or a competent Building Surveyor.
19
RELATED LAWS
FOR BS
PRACTICE
20
IMPORTANT LAWS AND REGULATIONS
FOR BUILDING SURVEYOR‟S PRACTICE
1. STREET, DRAINAGE AND BUILDING ACT 1974 (ACT 133)
2. UNIFORM BUILDING BY-LAWS 1984 (UBBL)
3. FIRE SERVICES ACT 1988 (ACT 341)
4. NATIONAL HERITAGE ACT 2005 (ACT 645)
5. STRATA TITLE MANAGEMENT ACT 2013 (ACT 757)
6. STRATA TITLES ACT 1985 (ACT 318)
2. OTHER RELATED REFERENCES
FOR THE PRACTICE
1. LOCAL GOVERNMENT ACT 1976 (ACT 171)
2. TOWN & COUNTRY PLANNING ACT 1976 (ACT 172)
3. HOUSING DEVELOPMENT (CONTROL AND LICENSING) ACT
1966 (ACT 118)
4. OCCUPATIONAL SAFETY & HEALTH ACT 1994 (ACT 514)
MAIN BENEFITS OF BS PRACTICE
TO THE PUBLIC AND GOVERNMENT
• To ensure building comply to all building laws
• To provide defect-free and maintenance-friendly building
• To fulfill all requirements of safety and health
• To provide actual physical value based on building condition
• To provide proper performance and usage of space through building audit
• To ensure functionality of building through building inspection
• To function as mediator in dispute resolution as independent party (example: tribunal
claim)
• To establish correct value of protection for building in risk assessment and insurance
claim 23
TERIMA
KASIHBUILDING
SURVEYORS
MALAYSIA

Weitere ähnliche Inhalte

Was ist angesagt?

LEGAL ISSUES ON HOUSING DEVELOPMENT WITHIN THE CONTEXT OF LAND LAW IN MALAYSIA
LEGAL ISSUES ON HOUSING DEVELOPMENT WITHIN THE CONTEXT OF LAND LAW IN MALAYSIALEGAL ISSUES ON HOUSING DEVELOPMENT WITHIN THE CONTEXT OF LAND LAW IN MALAYSIA
LEGAL ISSUES ON HOUSING DEVELOPMENT WITHIN THE CONTEXT OF LAND LAW IN MALAYSIAASMAH CHE WAN
 
Construction Contract in Malaysia
Construction Contract in MalaysiaConstruction Contract in Malaysia
Construction Contract in MalaysiaDayat Mohamad
 
Building technology 1 "Industrialized Building System" IBS
Building technology 1 "Industrialized Building System" IBSBuilding technology 1 "Industrialized Building System" IBS
Building technology 1 "Industrialized Building System" IBSDigital Space Consultancy Ltd
 
House Inspection Report
House Inspection ReportHouse Inspection Report
House Inspection Reportpnnazz
 
Passive Fire Protection According to UBBL Malaysia
Passive Fire Protection According to UBBL MalaysiaPassive Fire Protection According to UBBL Malaysia
Passive Fire Protection According to UBBL MalaysiaZhao Wei Kim
 
Project management (1)
Project management (1)Project management (1)
Project management (1)aarenneoone
 
LAND LAW 1 TOL 2014
LAND LAW 1 TOL 2014LAND LAW 1 TOL 2014
LAND LAW 1 TOL 2014xareejx
 
industrialised building systems_achah
industrialised building systems_achahindustrialised building systems_achah
industrialised building systems_achahAisyah Asyikin
 
Subdivision, partition and amalgamation
Subdivision, partition and amalgamationSubdivision, partition and amalgamation
Subdivision, partition and amalgamationFAROUQ
 
Industrialised Building System
Industrialised Building SystemIndustrialised Building System
Industrialised Building Systemjisunfoo
 
Professional practice 2
Professional practice 2Professional practice 2
Professional practice 2ahmong4
 
Construction Law Assignment BQS Taylor's University
Construction Law Assignment BQS Taylor's UniversityConstruction Law Assignment BQS Taylor's University
Construction Law Assignment BQS Taylor's UniversityPang Khai Shuen
 
Group Assignment:IBS System
Group Assignment:IBS SystemGroup Assignment:IBS System
Group Assignment:IBS System마 이환
 
LAND ACQUISITION (PENILAIAN PENGAMBILAN TANAH)
LAND ACQUISITION (PENILAIAN PENGAMBILAN TANAH)LAND ACQUISITION (PENILAIAN PENGAMBILAN TANAH)
LAND ACQUISITION (PENILAIAN PENGAMBILAN TANAH)anuarhab
 
Assignment - Preliminary Cost Appraisal
Assignment - Preliminary Cost AppraisalAssignment - Preliminary Cost Appraisal
Assignment - Preliminary Cost AppraisalKai Yun Pang
 
Contract implementation and management phase in Malaysia Construction Practice
Contract implementation and management phase in Malaysia Construction PracticeContract implementation and management phase in Malaysia Construction Practice
Contract implementation and management phase in Malaysia Construction PracticeZhao Wei Kim
 

Was ist angesagt? (20)

LEGAL ISSUES ON HOUSING DEVELOPMENT WITHIN THE CONTEXT OF LAND LAW IN MALAYSIA
LEGAL ISSUES ON HOUSING DEVELOPMENT WITHIN THE CONTEXT OF LAND LAW IN MALAYSIALEGAL ISSUES ON HOUSING DEVELOPMENT WITHIN THE CONTEXT OF LAND LAW IN MALAYSIA
LEGAL ISSUES ON HOUSING DEVELOPMENT WITHIN THE CONTEXT OF LAND LAW IN MALAYSIA
 
Construction Contract in Malaysia
Construction Contract in MalaysiaConstruction Contract in Malaysia
Construction Contract in Malaysia
 
Site Possession
Site PossessionSite Possession
Site Possession
 
Building technology 1 "Industrialized Building System" IBS
Building technology 1 "Industrialized Building System" IBSBuilding technology 1 "Industrialized Building System" IBS
Building technology 1 "Industrialized Building System" IBS
 
House Inspection Report
House Inspection ReportHouse Inspection Report
House Inspection Report
 
Passive Fire Protection According to UBBL Malaysia
Passive Fire Protection According to UBBL MalaysiaPassive Fire Protection According to UBBL Malaysia
Passive Fire Protection According to UBBL Malaysia
 
Project management (1)
Project management (1)Project management (1)
Project management (1)
 
LAND LAW 1 TOL 2014
LAND LAW 1 TOL 2014LAND LAW 1 TOL 2014
LAND LAW 1 TOL 2014
 
Ibs part1
Ibs part1Ibs part1
Ibs part1
 
Defects liability
Defects liabilityDefects liability
Defects liability
 
industrialised building systems_achah
industrialised building systems_achahindustrialised building systems_achah
industrialised building systems_achah
 
Subdivision, partition and amalgamation
Subdivision, partition and amalgamationSubdivision, partition and amalgamation
Subdivision, partition and amalgamation
 
Industrialised Building System
Industrialised Building SystemIndustrialised Building System
Industrialised Building System
 
Professional practice 2
Professional practice 2Professional practice 2
Professional practice 2
 
National land code 1965
National land code 1965National land code 1965
National land code 1965
 
Construction Law Assignment BQS Taylor's University
Construction Law Assignment BQS Taylor's UniversityConstruction Law Assignment BQS Taylor's University
Construction Law Assignment BQS Taylor's University
 
Group Assignment:IBS System
Group Assignment:IBS SystemGroup Assignment:IBS System
Group Assignment:IBS System
 
LAND ACQUISITION (PENILAIAN PENGAMBILAN TANAH)
LAND ACQUISITION (PENILAIAN PENGAMBILAN TANAH)LAND ACQUISITION (PENILAIAN PENGAMBILAN TANAH)
LAND ACQUISITION (PENILAIAN PENGAMBILAN TANAH)
 
Assignment - Preliminary Cost Appraisal
Assignment - Preliminary Cost AppraisalAssignment - Preliminary Cost Appraisal
Assignment - Preliminary Cost Appraisal
 
Contract implementation and management phase in Malaysia Construction Practice
Contract implementation and management phase in Malaysia Construction PracticeContract implementation and management phase in Malaysia Construction Practice
Contract implementation and management phase in Malaysia Construction Practice
 

Andere mochten auch (20)

Building survrying
Building survryingBuilding survrying
Building survrying
 
Strata titles
Strata titlesStrata titles
Strata titles
 
Strata titles
Strata titles Strata titles
Strata titles
 
Management of strata schemes
Management of strata schemesManagement of strata schemes
Management of strata schemes
 
Document 1
Document 1Document 1
Document 1
 
Chapter 10a Insurance:Contractor's Indemnity to Employer
Chapter 10a   Insurance:Contractor's Indemnity to EmployerChapter 10a   Insurance:Contractor's Indemnity to Employer
Chapter 10a Insurance:Contractor's Indemnity to Employer
 
Kebenaran merancang
Kebenaran merancangKebenaran merancang
Kebenaran merancang
 
Cesmed presentation [22]
Cesmed presentation [22]Cesmed presentation [22]
Cesmed presentation [22]
 
Potential Careers in Insurance in Malaysia
Potential Careers in Insurance in MalaysiaPotential Careers in Insurance in Malaysia
Potential Careers in Insurance in Malaysia
 
Fm getting online
Fm getting onlineFm getting online
Fm getting online
 
Building Regulations
Building RegulationsBuilding Regulations
Building Regulations
 
Telekom tower
Telekom towerTelekom tower
Telekom tower
 
Kompetensi 1 lengkap
Kompetensi 1 lengkapKompetensi 1 lengkap
Kompetensi 1 lengkap
 
Construction Insurance
Construction InsuranceConstruction Insurance
Construction Insurance
 
Mpam 3 basic steps
Mpam 3 basic stepsMpam 3 basic steps
Mpam 3 basic steps
 
Sustainable in asset management
Sustainable in asset managementSustainable in asset management
Sustainable in asset management
 
Taklimat ifolio pelajar
Taklimat ifolio pelajarTaklimat ifolio pelajar
Taklimat ifolio pelajar
 
Kebenaran merancang
Kebenaran merancangKebenaran merancang
Kebenaran merancang
 
Law of Tort
Law of TortLaw of Tort
Law of Tort
 
Defective Construction Work
Defective Construction WorkDefective Construction Work
Defective Construction Work
 

Ähnlich wie BS Role

Project Management Assignment 1
Project Management Assignment 1Project Management Assignment 1
Project Management Assignment 1DavidJPCChai
 
Summary of NBC 2016
Summary of NBC 2016Summary of NBC 2016
Summary of NBC 2016ssuserfa2cfd
 
Architect as a project manager
Architect as a project managerArchitect as a project manager
Architect as a project managerJackson Sampson
 
Azem Al-Kurdi CV - 4.9.2016
Azem Al-Kurdi CV - 4.9.2016Azem Al-Kurdi CV - 4.9.2016
Azem Al-Kurdi CV - 4.9.2016Azem Al Kurdi
 
CV-ABDELKHALIG 2016 - CONSTRUCTION &MAINTENA NCE
CV-ABDELKHALIG 2016 - CONSTRUCTION &MAINTENA NCECV-ABDELKHALIG 2016 - CONSTRUCTION &MAINTENA NCE
CV-ABDELKHALIG 2016 - CONSTRUCTION &MAINTENA NCEAbdoo Sowar
 
Atef_Tayeb_CV-Jan 2015 (2)
Atef_Tayeb_CV-Jan 2015 (2)Atef_Tayeb_CV-Jan 2015 (2)
Atef_Tayeb_CV-Jan 2015 (2)?Atef Tayeb
 
Abdul Latif Updated 2022.docx
Abdul Latif   Updated 2022.docxAbdul Latif   Updated 2022.docx
Abdul Latif Updated 2022.docxRASIDULISLAM17
 
CV-Atif_Ashraf-4
CV-Atif_Ashraf-4CV-Atif_Ashraf-4
CV-Atif_Ashraf-4Atif Ashraf
 
Sadeeq Khan_Senior Planning Engineer- Delay Analyst
Sadeeq Khan_Senior Planning Engineer- Delay AnalystSadeeq Khan_Senior Planning Engineer- Delay Analyst
Sadeeq Khan_Senior Planning Engineer- Delay AnalystSadeeq Ullah Khan
 
ACO General Profile 2021.pdf
ACO General Profile 2021.pdfACO General Profile 2021.pdf
ACO General Profile 2021.pdfFathy19
 
Role of Project Management Consultancy in Construction Project
Role of Project Management Consultancy in Construction ProjectRole of Project Management Consultancy in Construction Project
Role of Project Management Consultancy in Construction ProjectIOSR Journals
 
Metro Learning Centre-2014 Career Talk
Metro Learning Centre-2014 Career TalkMetro Learning Centre-2014 Career Talk
Metro Learning Centre-2014 Career TalkREDceo.net
 

Ähnlich wie BS Role (20)

Project Management Assignment 1
Project Management Assignment 1Project Management Assignment 1
Project Management Assignment 1
 
Summary of NBC 2016
Summary of NBC 2016Summary of NBC 2016
Summary of NBC 2016
 
Architect as a project manager
Architect as a project managerArchitect as a project manager
Architect as a project manager
 
Azem Al-Kurdi CV - 4.9.2016
Azem Al-Kurdi CV - 4.9.2016Azem Al-Kurdi CV - 4.9.2016
Azem Al-Kurdi CV - 4.9.2016
 
CV-ABDELKHALIG 2016 - CONSTRUCTION &MAINTENA NCE
CV-ABDELKHALIG 2016 - CONSTRUCTION &MAINTENA NCECV-ABDELKHALIG 2016 - CONSTRUCTION &MAINTENA NCE
CV-ABDELKHALIG 2016 - CONSTRUCTION &MAINTENA NCE
 
ICI MAGAZINE
ICI MAGAZINE  ICI MAGAZINE
ICI MAGAZINE
 
Atef_Tayeb_CV-Jan 2015 (2)
Atef_Tayeb_CV-Jan 2015 (2)Atef_Tayeb_CV-Jan 2015 (2)
Atef_Tayeb_CV-Jan 2015 (2)
 
RMTT CV
RMTT CVRMTT CV
RMTT CV
 
Vivek_Mohanta_QS
Vivek_Mohanta_QSVivek_Mohanta_QS
Vivek_Mohanta_QS
 
Abdul Latif Updated 2022.docx
Abdul Latif   Updated 2022.docxAbdul Latif   Updated 2022.docx
Abdul Latif Updated 2022.docx
 
CV-Atif_Ashraf-4
CV-Atif_Ashraf-4CV-Atif_Ashraf-4
CV-Atif_Ashraf-4
 
RAVIKUMAR CV updated 08092016
RAVIKUMAR CV updated 08092016RAVIKUMAR CV updated 08092016
RAVIKUMAR CV updated 08092016
 
Sadeeq Khan_Senior Planning Engineer- Delay Analyst
Sadeeq Khan_Senior Planning Engineer- Delay AnalystSadeeq Khan_Senior Planning Engineer- Delay Analyst
Sadeeq Khan_Senior Planning Engineer- Delay Analyst
 
ACO General Profile 2021.pdf
ACO General Profile 2021.pdfACO General Profile 2021.pdf
ACO General Profile 2021.pdf
 
Role of Project Management Consultancy in Construction Project
Role of Project Management Consultancy in Construction ProjectRole of Project Management Consultancy in Construction Project
Role of Project Management Consultancy in Construction Project
 
CV 2018 Series
CV 2018 SeriesCV 2018 Series
CV 2018 Series
 
CV-MEP-Ahmad Majdalawi
CV-MEP-Ahmad MajdalawiCV-MEP-Ahmad Majdalawi
CV-MEP-Ahmad Majdalawi
 
CV-MEP-Ahmad Majdalawi
CV-MEP-Ahmad MajdalawiCV-MEP-Ahmad Majdalawi
CV-MEP-Ahmad Majdalawi
 
Jahangir.Contractor
Jahangir.ContractorJahangir.Contractor
Jahangir.Contractor
 
Metro Learning Centre-2014 Career Talk
Metro Learning Centre-2014 Career TalkMetro Learning Centre-2014 Career Talk
Metro Learning Centre-2014 Career Talk
 

Mehr von Adiirfan Che-ani

Mehr von Adiirfan Che-ani (7)

GBI: Role of BS
GBI: Role of BSGBI: Role of BS
GBI: Role of BS
 
Building condition survey whats more
Building condition survey whats moreBuilding condition survey whats more
Building condition survey whats more
 
Journal Writing: Lets Start
Journal Writing: Lets StartJournal Writing: Lets Start
Journal Writing: Lets Start
 
Brief profile adiirfan
Brief profile adiirfanBrief profile adiirfan
Brief profile adiirfan
 
Briefcv adiirfan
Briefcv adiirfanBriefcv adiirfan
Briefcv adiirfan
 
twintech wshop2-main ppt
twintech wshop2-main ppttwintech wshop2-main ppt
twintech wshop2-main ppt
 
twintech wshop1-main ppt
twintech wshop1-main ppttwintech wshop1-main ppt
twintech wshop1-main ppt
 

Kürzlich hochgeladen

定制(UQ毕业证书)澳洲昆士兰大学毕业证成绩单原版一比一
定制(UQ毕业证书)澳洲昆士兰大学毕业证成绩单原版一比一定制(UQ毕业证书)澳洲昆士兰大学毕业证成绩单原版一比一
定制(UQ毕业证书)澳洲昆士兰大学毕业证成绩单原版一比一lvtagr7
 
定制(SCU毕业证书)南十字星大学毕业证成绩单原版一比一
定制(SCU毕业证书)南十字星大学毕业证成绩单原版一比一定制(SCU毕业证书)南十字星大学毕业证成绩单原版一比一
定制(SCU毕业证书)南十字星大学毕业证成绩单原版一比一z xss
 
Black and White Minimalist Co Letter.pdf
Black and White Minimalist Co Letter.pdfBlack and White Minimalist Co Letter.pdf
Black and White Minimalist Co Letter.pdfpadillaangelina0023
 
Escort Service Andheri WhatsApp:+91-9833363713
Escort Service Andheri WhatsApp:+91-9833363713Escort Service Andheri WhatsApp:+91-9833363713
Escort Service Andheri WhatsApp:+91-9833363713Riya Pathan
 
8377877756 Full Enjoy @24/7 Call Girls in Pitampura Delhi NCR
8377877756 Full Enjoy @24/7 Call Girls in Pitampura Delhi NCR8377877756 Full Enjoy @24/7 Call Girls in Pitampura Delhi NCR
8377877756 Full Enjoy @24/7 Call Girls in Pitampura Delhi NCRdollysharma2066
 
Back on Track: Navigating the Return to Work after Parental Leave
Back on Track: Navigating the Return to Work after Parental LeaveBack on Track: Navigating the Return to Work after Parental Leave
Back on Track: Navigating the Return to Work after Parental LeaveMarharyta Nedzelska
 
LinkedIn for Your Job Search in April 2024
LinkedIn for Your Job Search in April 2024LinkedIn for Your Job Search in April 2024
LinkedIn for Your Job Search in April 2024Bruce Bennett
 
LinkedIn Strategic Guidelines April 2024
LinkedIn Strategic Guidelines April 2024LinkedIn Strategic Guidelines April 2024
LinkedIn Strategic Guidelines April 2024Bruce Bennett
 
定制(Waikato毕业证书)新西兰怀卡托大学毕业证成绩单原版一比一
定制(Waikato毕业证书)新西兰怀卡托大学毕业证成绩单原版一比一定制(Waikato毕业证书)新西兰怀卡托大学毕业证成绩单原版一比一
定制(Waikato毕业证书)新西兰怀卡托大学毕业证成绩单原版一比一Fs
 
办理老道明大学毕业证成绩单|购买美国ODU文凭证书
办理老道明大学毕业证成绩单|购买美国ODU文凭证书办理老道明大学毕业证成绩单|购买美国ODU文凭证书
办理老道明大学毕业证成绩单|购买美国ODU文凭证书saphesg8
 
Gurgaon Call Girls: Free Delivery 24x7 at Your Doorstep G.G.N = 8377087607
Gurgaon Call Girls: Free Delivery 24x7 at Your Doorstep G.G.N = 8377087607Gurgaon Call Girls: Free Delivery 24x7 at Your Doorstep G.G.N = 8377087607
Gurgaon Call Girls: Free Delivery 24x7 at Your Doorstep G.G.N = 8377087607dollysharma2066
 
办理学位证(Massey证书)新西兰梅西大学毕业证成绩单原版一比一
办理学位证(Massey证书)新西兰梅西大学毕业证成绩单原版一比一办理学位证(Massey证书)新西兰梅西大学毕业证成绩单原版一比一
办理学位证(Massey证书)新西兰梅西大学毕业证成绩单原版一比一A SSS
 
原版快速办理MQU毕业证麦考瑞大学毕业证成绩单留信学历认证
原版快速办理MQU毕业证麦考瑞大学毕业证成绩单留信学历认证原版快速办理MQU毕业证麦考瑞大学毕业证成绩单留信学历认证
原版快速办理MQU毕业证麦考瑞大学毕业证成绩单留信学历认证nhjeo1gg
 
Escorts Service Near Surya International Hotel, New Delhi |9873777170| Find H...
Escorts Service Near Surya International Hotel, New Delhi |9873777170| Find H...Escorts Service Near Surya International Hotel, New Delhi |9873777170| Find H...
Escorts Service Near Surya International Hotel, New Delhi |9873777170| Find H...nitagrag2
 
Ioannis Tzachristas Self-Presentation for MBA.pdf
Ioannis Tzachristas Self-Presentation for MBA.pdfIoannis Tzachristas Self-Presentation for MBA.pdf
Ioannis Tzachristas Self-Presentation for MBA.pdfjtzach
 
ME 205- Chapter 6 - Pure Bending of Beams.pdf
ME 205- Chapter 6 - Pure Bending of Beams.pdfME 205- Chapter 6 - Pure Bending of Beams.pdf
ME 205- Chapter 6 - Pure Bending of Beams.pdfaae4149584
 
Introduction to phyton , important topic
Introduction to phyton , important topicIntroduction to phyton , important topic
Introduction to phyton , important topicakpgenious67
 
办理学位证(纽伦堡大学文凭证书)纽伦堡大学毕业证成绩单原版一模一样
办理学位证(纽伦堡大学文凭证书)纽伦堡大学毕业证成绩单原版一模一样办理学位证(纽伦堡大学文凭证书)纽伦堡大学毕业证成绩单原版一模一样
办理学位证(纽伦堡大学文凭证书)纽伦堡大学毕业证成绩单原版一模一样umasea
 
Nathan_Baughman_Resume_copywriter_and_editor
Nathan_Baughman_Resume_copywriter_and_editorNathan_Baughman_Resume_copywriter_and_editor
Nathan_Baughman_Resume_copywriter_and_editorNathanBaughman3
 

Kürzlich hochgeladen (20)

定制(UQ毕业证书)澳洲昆士兰大学毕业证成绩单原版一比一
定制(UQ毕业证书)澳洲昆士兰大学毕业证成绩单原版一比一定制(UQ毕业证书)澳洲昆士兰大学毕业证成绩单原版一比一
定制(UQ毕业证书)澳洲昆士兰大学毕业证成绩单原版一比一
 
定制(SCU毕业证书)南十字星大学毕业证成绩单原版一比一
定制(SCU毕业证书)南十字星大学毕业证成绩单原版一比一定制(SCU毕业证书)南十字星大学毕业证成绩单原版一比一
定制(SCU毕业证书)南十字星大学毕业证成绩单原版一比一
 
Black and White Minimalist Co Letter.pdf
Black and White Minimalist Co Letter.pdfBlack and White Minimalist Co Letter.pdf
Black and White Minimalist Co Letter.pdf
 
Escort Service Andheri WhatsApp:+91-9833363713
Escort Service Andheri WhatsApp:+91-9833363713Escort Service Andheri WhatsApp:+91-9833363713
Escort Service Andheri WhatsApp:+91-9833363713
 
8377877756 Full Enjoy @24/7 Call Girls in Pitampura Delhi NCR
8377877756 Full Enjoy @24/7 Call Girls in Pitampura Delhi NCR8377877756 Full Enjoy @24/7 Call Girls in Pitampura Delhi NCR
8377877756 Full Enjoy @24/7 Call Girls in Pitampura Delhi NCR
 
Back on Track: Navigating the Return to Work after Parental Leave
Back on Track: Navigating the Return to Work after Parental LeaveBack on Track: Navigating the Return to Work after Parental Leave
Back on Track: Navigating the Return to Work after Parental Leave
 
Students with Oppositional Defiant Disorder
Students with Oppositional Defiant DisorderStudents with Oppositional Defiant Disorder
Students with Oppositional Defiant Disorder
 
LinkedIn for Your Job Search in April 2024
LinkedIn for Your Job Search in April 2024LinkedIn for Your Job Search in April 2024
LinkedIn for Your Job Search in April 2024
 
LinkedIn Strategic Guidelines April 2024
LinkedIn Strategic Guidelines April 2024LinkedIn Strategic Guidelines April 2024
LinkedIn Strategic Guidelines April 2024
 
定制(Waikato毕业证书)新西兰怀卡托大学毕业证成绩单原版一比一
定制(Waikato毕业证书)新西兰怀卡托大学毕业证成绩单原版一比一定制(Waikato毕业证书)新西兰怀卡托大学毕业证成绩单原版一比一
定制(Waikato毕业证书)新西兰怀卡托大学毕业证成绩单原版一比一
 
办理老道明大学毕业证成绩单|购买美国ODU文凭证书
办理老道明大学毕业证成绩单|购买美国ODU文凭证书办理老道明大学毕业证成绩单|购买美国ODU文凭证书
办理老道明大学毕业证成绩单|购买美国ODU文凭证书
 
Gurgaon Call Girls: Free Delivery 24x7 at Your Doorstep G.G.N = 8377087607
Gurgaon Call Girls: Free Delivery 24x7 at Your Doorstep G.G.N = 8377087607Gurgaon Call Girls: Free Delivery 24x7 at Your Doorstep G.G.N = 8377087607
Gurgaon Call Girls: Free Delivery 24x7 at Your Doorstep G.G.N = 8377087607
 
办理学位证(Massey证书)新西兰梅西大学毕业证成绩单原版一比一
办理学位证(Massey证书)新西兰梅西大学毕业证成绩单原版一比一办理学位证(Massey证书)新西兰梅西大学毕业证成绩单原版一比一
办理学位证(Massey证书)新西兰梅西大学毕业证成绩单原版一比一
 
原版快速办理MQU毕业证麦考瑞大学毕业证成绩单留信学历认证
原版快速办理MQU毕业证麦考瑞大学毕业证成绩单留信学历认证原版快速办理MQU毕业证麦考瑞大学毕业证成绩单留信学历认证
原版快速办理MQU毕业证麦考瑞大学毕业证成绩单留信学历认证
 
Escorts Service Near Surya International Hotel, New Delhi |9873777170| Find H...
Escorts Service Near Surya International Hotel, New Delhi |9873777170| Find H...Escorts Service Near Surya International Hotel, New Delhi |9873777170| Find H...
Escorts Service Near Surya International Hotel, New Delhi |9873777170| Find H...
 
Ioannis Tzachristas Self-Presentation for MBA.pdf
Ioannis Tzachristas Self-Presentation for MBA.pdfIoannis Tzachristas Self-Presentation for MBA.pdf
Ioannis Tzachristas Self-Presentation for MBA.pdf
 
ME 205- Chapter 6 - Pure Bending of Beams.pdf
ME 205- Chapter 6 - Pure Bending of Beams.pdfME 205- Chapter 6 - Pure Bending of Beams.pdf
ME 205- Chapter 6 - Pure Bending of Beams.pdf
 
Introduction to phyton , important topic
Introduction to phyton , important topicIntroduction to phyton , important topic
Introduction to phyton , important topic
 
办理学位证(纽伦堡大学文凭证书)纽伦堡大学毕业证成绩单原版一模一样
办理学位证(纽伦堡大学文凭证书)纽伦堡大学毕业证成绩单原版一模一样办理学位证(纽伦堡大学文凭证书)纽伦堡大学毕业证成绩单原版一模一样
办理学位证(纽伦堡大学文凭证书)纽伦堡大学毕业证成绩单原版一模一样
 
Nathan_Baughman_Resume_copywriter_and_editor
Nathan_Baughman_Resume_copywriter_and_editorNathan_Baughman_Resume_copywriter_and_editor
Nathan_Baughman_Resume_copywriter_and_editor
 

BS Role

  • 1. KNOW YOUR PROFESSION BETTER THE ROLES & INVOLVEMENT OF BUILDING SURVEYORS IN THE MALAYSIAN BUILDING INDUSTRY Building Surveying Division The Royal Institution of Surveyors Malaysia (RISM) Sep 2013
  • 2. MUQADIMAH Who is Building Surveyor (RISM website) 2 A Professional Building Surveyor is a qualified person, by examination and experience, and a member of the Royal Institution of Surveyors Malaysia (hold the “Sr” title as prefix to their name)
  • 3. MUQADIMAH EXAMPLE / ANALOGY OF SERVICE (As Basic Illustration & Comparison) No EXAMPLE TYPE OF SERVICE EXAMPLE SCOPE OF WORK APPROPRIATE PROFESSION AS (i) Actor/Implementer (ii) Monitor 1.0 2.0 3.0 4.0 Transportation Service Professional Service Property Development Building Construction CHECK Implementation of road and transportation laws Control of Professional Work Ethics Housing Construction Design AND - Driver - Police - Profession Practitioner - Professional Board - Developer - Planner - Architect/ Engineer - Building Surveyor BALANCE 3
  • 4. NICHE OF THE SERVICE BUILDING CONTROL AND COMPLIANCE (BCC) (IN TERM OF) BUILDING QUALITY (Good Practice In) BUILDING PERFORMANCE (Good Practice In) CONSTRUCTION & BLDG. COMPLETION BUILDING AUDIT & INSPECTION MAINTENANCE & CONSERVATION RISK ASSESSMENT & MANAGEMENT TO PRODUCE PERFECT & SUSTAINABLE BUILDING
  • 5. BUILDING CONTROL & COMPLIANCE FULFILLMENT OF THE ROLES THROUGH MAJOR INPUTS QUALITY OF CONSTRUCTION AND BUILDING COMPLETION QUALITY OF INSPECTION AND BUILDING AUDIT QUALITY OF BUILDING ASSET MAINTENANCE & FACILITIES MANAGEMENT AND CONSERVATION OF BUILDING QUALITY OF BUILDING USAGE AND POST OCCUPANCY EVALUATION (iv) Fulfillment /completion of construction works (i) Search of complete building recordCorrective/responsive maintenance (i) Assessment of (iv) service performance building facilities INPUTINPUT 5
  • 6. SOME OF THE JUSTIFICATIONS WHY THE SERVICE OF BUILDING SURVEYOR IS NEEDED (WHAT-WHEN-WHY-HOW) N0. WHAT TYPE OF SERVICE (WHAT) (examples of services needed) WHEN THE SERVICE IS NEEDED (WHEN) WHY THE SERVICE OF B.S IS NEEDED (WHY) HOW A BUILDING SURVEYOR CAN CONTRIBUTE (HOW) 1, 2. 3. 4. Building control & building completion inspection Building maintenance management Building dilapidation and condition survey Post occupancy evaluation Obtain building plans approval and certificate of fitness for occupancy (CFO) Building in the design process, during construction and after completion/occupation Purchase, rent, lease, sell, take over, re-develop, construct new buildings & conservation works and also asset maintenance Building during occupancy period and still in use. ●To overcome problems of abandon project, delay & non- compliance to building laws ●To overcome building dilapidation, defects, deterioration and not properly maintain. To promote/cultivate maintenance culture ●To determine actual physical value, cond of buildings/surrounding & plan for remedial works, costing and maintenance programs ●To determine building performance, safety & health of building users & usage level ●Inspect the needs of building laws & protect public or stakeholder interest. ●Provide advisory services, planned, preventive & predictive maintenance as well as building asset audit and maintenance training on DIY techniques. ●Provide Added value/ value for money‟ & assist in cost planning for client/ developer/ purchaser/ government. Building asset assessment ●Enforcement of COB, compliance to building laws & risk assessment, building audit works 6
  • 7. BRIEF HISTORY & BACKGROUND OF THE EXISTENCE OF BUILDING SURVEYORS IN MALAYSIA - As Professional Entity: i. Established under General Practice with 3 other practices in ISM. 1961 ii. Registered under General Practice in the Surveyors Act, 1967 iii. Scope of work park under Valuation Act, 1972 iv. Building Surveying Division established under RISM, 1990 - Services of BS in the Public Sector: i. Dewan Bandaran Kuala Lumpur (DBKL)/ PBT, 1950s ii. Penang City Council, 1950s iii. Petaling City Council (Majlis Bandaran Petaling), 1970s iv. Building Surveyors scope of service was gazetted, 1989 v. BS program in the IPTA/IPTS started, 1993 vi. Employment started in the public service sector – PWD/JKR, 2008 - Services of BS in the Private Sector : i. Malaysian Building Society Berhad (MBSB), 1973 ii. Private practice consultancy & general practice, 1978 7
  • 8. Current Development In Malaysia BUILDING SURVEYOR - Recognition/Accreditation from local bodies and foreign countries : i. Recognition from JPA/PSD as „Personal to holder‟ for DBKL, 1970 ii. Accepted as Professional degree by JPA/PSD and PWD, 1995 iii. Recognition as Professional by RISM, 1997 iv. Overseas BS degree recognised by JPA, 1998 v. The Assoc. of Building Engineers UK recognised local degree, 2002 vi. JPA approved grade and scheme for Building Surveyors, 2002 vii. RICS UK recognised local degree, 2005 - Total Graduates in Malaysia: Statistic of graduates since 1970 up to date, >more 2,000 8
  • 9. Approval of Practice BUILDING SURVEYOR - Professional practice Proposed establishment of the Act : Has agreed by the Cabinet , 1 & 8 Aug 2007 (proposed Act to be submitted to Parliament by KKR) - MOF Registration 2 May 2012: Code for BS – 330208 Ukur Bangunan (Institut Juruukur Malaysia) : dalam kategori Perkhidmatan Perunding Fizikal Bukan Kejuruteraan (this recognition as equivalent with the other consultants; such as Architects, QS, Valuer, Interior Architecture, Value Management etc) 9
  • 10. SCOPE OF SERVICES BUILDING SURVEYOR (As agreed by BAM/LAM dan BEM/LJM July, 2007) 1. Building Control : Inspect, check, advise and prepare building control report (i.e. Compliance to building laws/requirements) and propose for design, development and building plans integrity for interested party/stakeholder 2. Maintenance and Conservation of Building : Inspect, report and prepare programs for implementing planned maintenance, facilities management, building conservation and restoration 3. Risk Management and Building Audit : Inspect and prepare report on the condition and performance of building, post occupancy evaluation, building pathology works, site condition inspection and safety and health, as well as building audit and risk assessment 10
  • 11. ROLE OF BUILDING SURVEYOR PRE-CONSTRUCTION Inspect and Recommend Building Plan Approval Dilapidation & Building Condition Survey Site Safety and Health Inspection DURING CONSTRUCTION Site and Construction Quality Inspection Compliance to Approved Building Plans Inspection for Issuance of CCC/ Compliance & Fulfillment of Building Laws POST CONSTRUCTION Monitoring of Building Performance Maintenance Management Post Occupancy Evaluation (P.O.E) Building Audit & Inspection of Defects Building Conservation & Restoration Works Risk Assessment & Monitoring Demolition Works Management & Maintenance of Common Property Implementation of JMB – under COB 11
  • 12. Comparison – The Basic Scope of Services Within Professionals In the Construction Industry (As agreed by MQF/MQA) Specific Scope of Service Professionals that Accountable to The Specific Scope of Service a. Building Control & Compliance b. Building Design c. Engineering/Structure/Infra. d. Cost & Contract Admin. e. Valuation, Property Services f. Urban Planning g. Landscaping h. Land Surveying i. Interior Designing BUILDING SURVEYOR ARCHITECT ENGINEER QUANTITY SURVEYOR VALUER URBAN PLANNER LANDSCAPE ARCHITECT LAND SURVEYOR INTERIOR ARCHITECTURE 12
  • 13. Distribution of Works Among Professionals In A Project Implementation MAIN ACTIVITIES WORKS LEVEL INVOLVEMENT OF MAIN PROFESSION SPECIAL ROLE OF BUILDING SURVEYOR Planning and design of project / development and D.O. 1 Urban Planner Architect/Engineer BUILDING SURVEYOR Advisory service & design feedback toward producing maintenance friendly buildings Building plan inspection & approval in the local authority service 2 Urban Planner BUILDING SURVEYOR Check plans, construction integrity, record management, building plans approval Contract administration, specification and cost 3 Architect/Engineer Quantity Surveyor NO MAIN ROLE Construction and project management, quality, safety and health at construction site 4 Builder/ Architect/Engineer Quantity Surveyor BUILDING SURVEYOR Inspect compliance to approved building plans, requirements of safety & health at construction site. Handover of project from contractor to developer 5 Builder/Architect/Engineer BUILDING SURVEYOR Inspect compliance & project completion details for CCC/ CF/ PCF Vacant possession (handover unit from developer to purchaser) 6 Builder/Architect/Engineer BUILDING SURVEYOR Inspect quality, defects, and compliance to S&P contract. Maintenance and building services, interior decoration, sales and property management. 7 Purchaser/Designer/ Valuer BUILDING SURVEYOR Implement common property management, maintenace, facilities, POE, insurance, risk Building conservation, restoration, refurbishment and upgrade 8 Owner/ client BUILDING SURVEYOR Implement building pathology, building audit, conservation etc. New proposal of development on the site. 9 Owner/ client BUILDING SURVEYOR Condition survey, advisor for redevelopment project. 13
  • 14. ARKITEK. J41 JURUUKUR BANGUNAN.J41 PEG.PENILAI. W41 STUDIO COMMUNICATION COMP.GRAPHIC CONST.MAT WRKG.DRWG BLDG.ENG BLDGSTRUCT BLDG.ANALYSIS ARCH.HIST MESRD.DRWG. DESGN.THEORY ENVIR.PHYSIC SUSTAINABLE PLNNGSTUDIES PROF.STUDIES ADV.DESIG PROF.PRACTICE BLDG.TECH BLDG.ANALYSIS THEORY&PHIILO BLDG.CONSEV URBANSTDS PLNG&URB.DES ENV. SC&SUSTAIN LAW STUDIES STRUC. ANALYSIS MATERL. & CONC. BLDG. SERVICES STRUC. DESIGN CONC. TECH BLDG. LAW DEV. STUDIES M&E SERVICS BDG. PRCU&SPEC. BDG.CTL&DESN BDG.PATH&DILAP BDG.MAINT.MNGT COMP. ADD DESG BDG.SERVS.AUDIT BDG.MEAS&ANLS MAINT.TECH. FACILITY.MANGT BLDG.CONSRV SAFETY& RISK FIRE AUDIT BLDG ECON CONC. LAW PROF.PRAC INTRTOPROP PRINC.ECON LEGALSTUDS ACC.&FINMGT. CONC.ECON. PROP.MKT.ANS PROP.INV.ANS INTRTWN.PLG MTHD.EVALU PROP.MAINT LAND&DEV.LAW UR.LND.ECON INVES.VALUE PROP.MGT. BLDG.LEGISTN BUSS.VLUATN LANDACQUISN TWN.PLG.PROJ PROP.FINANCE PROP.DEVMNT. COR.REALEST GIS.&SPATANS MKT&BUSSKIL PROP.PRACTS AVD.VALUATN 1. AKTA 663 2. AKTA 318 3. UBBL 1984 5. AKTA J,P & B 19744. AKTA WARISAN JURUTERA.J41 HASILPEMBELAJARANMESTISAMADENGANFUNGSIKERJA(MQA) ELAKKANPUBLIKKELIRU&TERTIPU(ETIKAPROFESIONAL) PENILAIAN & PENGURUSAN HARTANAH REKABENTUKSTRUKTURDANKERJAAWAM KAWALANBANGUNAN,SENGGARA&PRESTASI SEMAK & KELULUSAN PLAN BANGUNAN PERIKSA KEADAAN TAPAK & BINAAN PERIKSA PEMATUHAN PLAN & UNDANG2 PERIKSA KEPERLUAN CFO/CCC/OSC LAKSANA ODIT & PERIKSA KONDISI BGN. PANTAU KUALITI & PRESTASI BANGUNAN PNILN LPAS DDUK(POE) & ODIT RUANG SENGGARA BANGUNAN & HARTA TANAH SENGGARA FASILITI & RUANG BERSAMA KNSEV BGN & KERJA LUK TRUKUR/TBINA URUS RISIKO BGN& PANTAU PROBOHAN URUS ASET MENYELURUH 1 2 REKABENTUK BANGUNAN & URUS BINA 3 4 5 1 2 6. AKTA KERAJAAN TEMPATAN 6 6 3 4 5 PERTINDIHAN 33% PERTINDIHAN 40% PERTINDIHAN100% SYARATSTANDARDKELAYAKANPERTINDIHANMESTI80%KEATAS PERTINDIHANLEBIH60%MEMERLUKANLATIHANTAMBAHAN PERTINDAHANKURANG60%TAKLAYAKMELAKSANAFUNGSIKERJA KETIKAMENDAPATKANKHIDMATUKURBANGUNAN ECON, FINAN & ENGG PROJ. MGMT ENG. LAW ENTRE. ENG.& MGT CAD ENG.MEC&STR.MTRIAL CONC. MATERIAL & ENG. DRWG TIMBER DESIGN STRUCT. THEORY SOIL MECHANIC REINF.CONC.DESIGN STEEL STRUC.DESIGN ENVIRON. ENGG STRUCT ANALYSIS CONC. MGMT PRE-STRES CONC.DES FUNDAMENTL ENGG ENGG GEOLOGY FUND. MATRL SCIENC LAND SURVEY PROF. PRACTICE 5 3 PERTINDIHAN50%
  • 15. No. Courses Credit hour Bac. Bldg. Surveying BSc. Archi’ture Bachelor Civil Eng. 1 Building Design 3 √ √ X 2 BS-Planning & Plan Checking Practice 4 √ X X 3 Building Control 3 √ X X 4 Building Services Audit 4 √ X X 5 Project Management Practice 4 √ √ √ 6 Introduction to CAD 2 √ √ √ 7 Building Defects & Diagnosis (Pathology) 4 √ X X 8 Measurement & Analysis of Buildings 4 √ X X 9 Building Conservation & Cond. Monitoring 4 √ X X 10 Environmental Science 3 √ √ √ 11 Building Services 3 √ √ √ 12 M & E Services & checking System in Building 3 √ X X 13 Building Maintenance Management 4 √ X X 14 Building Fire Audit 3 √ X X 15 Facilities and Building Aset Management 3 √ X X 16 General Principles of Malaysian Law 3 √ X X 17 Property Development Studies 2 √ X X 18 Building Law 4 √ X X 19 Construction Quality Management 3 √ X X 20 Professional Practice (Building Surveying) 3 √ √ √ As example comparison in Universiti of Malaya syllabus Coverage of Subjects in Building Surveying Program 15
  • 16. No. Courses Credit hour Building Surveying Archi’ture Civil Engineering Dept. Courses (cont.) 21 Construction Law 3 √ √ √ 22 Structural Analysis 3 √ X √ 23 Structural Design 3 √ X √ 24 Material Science 3 √ √ √ 25 Construction Technology I 3 √ √ √ 26 Construction Technology II 3 √ √ √ 27 Construction Technology III 3 √ √ √ 28 Construction Quantification/Specification 3 √ X X 29 Building Economics 2 √ X X 30 Research Methodology/Academic Writing 2 √ √ √ 31 Academic Project – Building Surveying 6 √ X X 32 Industrial Training 6 √ √ √ Sub-Total Credit Hour 106 100 106 Elective Courses / Faculty 2 2 2 University Courses 12 12 12 Total Credit Hour 120 114 120 16
  • 17. WHY THE SERVICE OF A BUILDING SURVEYOR IS NEEDED I. In Building Construction & Completion Works : 1. To ensure building plans were prepared completely by a competent person before the project is constructed and complied to all relevant laws. 2. To ensure construction site is free from any debris, obstruction, clean & safe for workers to work and no public interference/trespass, no negative impact on environment and public property. 3. To ensure building was constructed as per approved building plans and to be re- inspected by a competent staff of Local Authority or a Building Surveyor. 4. To ensure no abandon project. Require close supervision/monitoring by a competent Building Surveyor to protect the interest or act on behalf of financial institutions, insurance companies or purchasers before releasing of any progress payment or full settlement of payment or insurance coverage. 5. To ensure all defects were rectified and building laws were complied before the process of handing-over of keys/taking vacant possession of building to purchasers or stakeholders. 17
  • 18. II. In Building Maintenance and Conservation Works : 1. To ensure no repetitive of design mistakes that have caused the same defects occurred on building. Require close supervision, inspection and feedback from a competent Building Surveyor 2. To ensure minimum cost for inspection of building defects and rectification works. Require comprehensive and efficient investigation and proper cost planning by a competent Building Surveyor. 3. To ensure the planning and implementation of maintenance works are done orderly and scheduled. Require preparation by a competent Building Surveyor. 4. To ensure building/asset has a proper and complete record for the purpose of building usage and future maintenance. Require comprehensive building and space audit by a competent Building Surveyor. 5. To ensure the source and causes of building defects are identified correctly. Require correct building forensic or pathology techniques by a competent Building Surveyor. 6. To ensure conservation works are done through proper procedures/techniques and correctly maintained. Require scientific, correct equipment and tools application by a competent Building Surveyor. 18
  • 19. III. In Building Audit and Risk Management Works : 1. To ensure the premium of insurance coverage is suitable based on the actual defects inspected. Require correct inspection, report and suggestion by a competent Building Surveyor. 2. To ensure the existing level or status of building failures/defects are identified correctly in order to reduce future building risk/ collapse. Require proper inspection of building condition and scheduling by a competent Building Surveyor. 3. To ensure compensation amount is paid correctly as per defects/failures occurred. Require proper and correct assessment by a competent Building Surveyor. 4. To ensure the usage of building in term of space, equipments, facilities is according to the actual needs and as it was designed. Require proper and correct building audit by a competent Building Surveyor 5. To ensure the maintenance of buildings, facilities and enforcement of building laws in the building & common property/strata title/ heritage Act is implemented correctly. Require correct inspection and supervision by a competent Building Surveyor. 6. To ensure all building demolition and dismantling works are done as per approved measures/procedures/rules by local authority. Require monitoring by a competent PBT staff or a competent Building Surveyor. 19
  • 21. IMPORTANT LAWS AND REGULATIONS FOR BUILDING SURVEYOR‟S PRACTICE 1. STREET, DRAINAGE AND BUILDING ACT 1974 (ACT 133) 2. UNIFORM BUILDING BY-LAWS 1984 (UBBL) 3. FIRE SERVICES ACT 1988 (ACT 341) 4. NATIONAL HERITAGE ACT 2005 (ACT 645) 5. STRATA TITLE MANAGEMENT ACT 2013 (ACT 757) 6. STRATA TITLES ACT 1985 (ACT 318)
  • 22. 2. OTHER RELATED REFERENCES FOR THE PRACTICE 1. LOCAL GOVERNMENT ACT 1976 (ACT 171) 2. TOWN & COUNTRY PLANNING ACT 1976 (ACT 172) 3. HOUSING DEVELOPMENT (CONTROL AND LICENSING) ACT 1966 (ACT 118) 4. OCCUPATIONAL SAFETY & HEALTH ACT 1994 (ACT 514)
  • 23. MAIN BENEFITS OF BS PRACTICE TO THE PUBLIC AND GOVERNMENT • To ensure building comply to all building laws • To provide defect-free and maintenance-friendly building • To fulfill all requirements of safety and health • To provide actual physical value based on building condition • To provide proper performance and usage of space through building audit • To ensure functionality of building through building inspection • To function as mediator in dispute resolution as independent party (example: tribunal claim) • To establish correct value of protection for building in risk assessment and insurance claim 23