LINE BALANCING
 This is an analysis process which tries to equally divide

work to be carried out in a production process among
workstations.
 In production line workstations and work centers are
arranged in a sequence of task to be done along a
straight or curved line.
GOAL AND OBJECTIVE
Goal of production line analysis:
 Number of workstations needed.
 Type of task should be assigned to each workstation.
 To know the minimum number of workers, tools and

machines that can be used to provide the required amount
of capacity.

Objective of line balancing:
 Assigning task to each workstation in such a way that there

is only a little idle time.
TERMINOLOGIES RELATED TO
PRODUCTION LINE ANALYSIS
 TASKS: All the elements of work.
 TASK PRECEDENCE: The sequence in which tasks are
performed.

 TASK TIMES: Time required by a well-trained worker or
unattended machine to perform a task. This is usually
expressed in minutes.

 CYCLE TIME: The time expressed in minutes between
two simultaneous products coming off the end of a
production line.
Continued…
 PRODUCTIVE TIME PER HOUR: The average
number of minutes a workstation is working in an hour.
 WORKSTATION: A physical area where a worker with
tools/ one or more machines, or an unattended machines
like a robot performs a particular set of task in a
production line.
 WORK CENTER: A small group of identical
workstations, where each workstation performs the same
set of task.
 NUMBER OF WORKSTATIONS WORKING: The
amount of work done at a work center expressed in
number of workstations.
Continued…
 MINIMUM NUMBER OF WORKSTATIONS: The
least number of workstation that provides the required
production.

 ACTUAL NUMBER OF WORKSTATIONS: This is
the total number of workstations required on the entire
production line. It is calculated as the next higher integer
of the number of workstations working.

 UTILIZATION: The percentage of time a production
line is working.
LINE BALANCING PROCEDURE
1.

2.
3.

4.
5.
6.
7.

Determination of tasks that must be performed to
complete one unit of a product.
Determining the order or sequence of performing
the whole set of tasks.
Drawing precedence diagram. In this flowchart
circles represents task and joining arrows represents
precedence.
Estimation of task time.
Calculation of cycle time.
Determination of minimum number of workstation
required.
Using one of the heuristics to assign tasks to
workstations for balancing production line.
COMPUTERIZED LINE BALANCING
 Line balancing by hand becomes unwieldy as the problems grow

in size.
 There are software packages that will balance large lines quickly.
IBM's COMSOAL (Computer Method for Sequencing
Operations for Assembly Lines) and GE's ASYBL (Assembly Line
Configuration Program) can assign hundreds of work elements
to workstations on an assembly line.
 They use various heuristics, to balance the line at an acceptable
level of efficiency.
 The POM for Windows software lets the user select from five
different heuristics: ranked positional weight, longest operation
time, shortest operation time, most number of following
tasks, and least number of following tasks. These heuristics
specify the order in which work elements are considered for
allocation to workstations.
Line Balancing Heuristics
Two types
 Incremental Utilization Heuristic
 Longest Task Time Heuristic
Incremental Heuristic
 Tasks are added to each workstation in order of task

precedence one at a time until utilization is 100
percent or is observed to fall.
 Used when one or more task time is equal to or greater

than the cycle time.
Incremental Heuristics
Example
Textech, a large electronics manufacturer, assembles model
AT7S handheld calculators at its Midland , Texas, plant.
The assembly tasks that must be performed on each
calculator are shown below.
The parts used in this assembly line are supplied by
materials-handling personnel to parts bins used in each
task. The assemblies are moved along by belt conveyors
between workstations.
Textech wants this assembly line to produce 540
calculators per hour.
a. Compute the cycle time per calculator in minutes.
b. Compute the minimum number of workstations.
c. How would you combine the tasks into workstations to
minimize idle time? Evaluate your proposal.
SOLUTION
Precedence
Diagram
Longest-Task-Time Heuristic
 Add tasks to a workstation one at a time in the order

of task precedence.
 If a choice must be made between two or more
tasks, the one with the longest task time is added.
 This has the effect of assigning as quickly as possible
the tasks that are the most difficult to fit into a station.
 Tasks with shorter times are then saved for finetuning the solution.
Conditions
It can be used only when each and every task time is
less than or equal to the cycle time.
2. There can be no duplicate work stations.
1.

 If each and every task time is less than or equal to the

cycle time, and if the primary focus of the analysis of
production lines is minimizing the number of
workstations and the amount of tools and equipment
required, then this heuristic would be appropriate.
Steps in the Longest-Task-Time
Heuristic
1.
2.

3.

4.

Lei i = I. where i is the number of the workstation being formed.
Make a list of all the tasks that are to be assigned to a workstation.
Have to satisfy the following conditions
a. It cannot have been previously assigned to this or any previous
workstation.
b. Its immediate predecessors must have been assigned to this or a
previous workstation.
c. The sum of its task time and all other times of tasks are already
assigned to work station must be less than or equal to the cycle time
. If no such tasks are found. Go to step 4.
Assign the from the list with the longest task time to the
workstation. Go back to the step 2.
Close the assignment of tasks to Workstation i. This can occur in
two ways. If there are no tasks on the list for the work station but
there are still tasks to be assigned, set i=i+1 and go back to step 2. If
there are no more tasks, the procedure is completed.
PROBLEM

Using the above information in the table
a.
Draw a precedence diagram
b. Assuming that 55 minutes per hour are productive, compute the
cycle time needed to obtain 50 units per hour.
SOLUTION
LINE BALANCING ISSUES
 Earlier conveyor belts are paced with the speed of the

employees work.
 Now they are paced with the machine speed.
APPLICATIONS
 The classic example is Henry Ford’s auto chassis line.

• Before the “assembly line Balancing” was

introduced in 1913, each chassis was
assembled by one worker and required
12.5 hours.
• Once the new technology was
installed, this time was reduced to 93
minutes.
Line balancing and heuristics

Weitere ähnliche Inhalte

Was ist angesagt?

Was ist angesagt? (20)

Aggregate Planning
Aggregate PlanningAggregate Planning
Aggregate Planning
 
Assembly line balancing
Assembly line balancingAssembly line balancing
Assembly line balancing
 
Just in time manufacturing ppt
Just in time manufacturing pptJust in time manufacturing ppt
Just in time manufacturing ppt
 
Manufacturing planning & control (mpc) system
Manufacturing planning & control (mpc) systemManufacturing planning & control (mpc) system
Manufacturing planning & control (mpc) system
 
Line balancing
Line balancingLine balancing
Line balancing
 
Types of layout
Types of layoutTypes of layout
Types of layout
 
JIT case study of Toyota
JIT case study of ToyotaJIT case study of Toyota
JIT case study of Toyota
 
Line balancing
Line balancingLine balancing
Line balancing
 
Assembly line balancing
Assembly line balancingAssembly line balancing
Assembly line balancing
 
Chapter 2 line_balancing no pics
Chapter 2 line_balancing no picsChapter 2 line_balancing no pics
Chapter 2 line_balancing no pics
 
Capacity planning
Capacity planning Capacity planning
Capacity planning
 
Ranked Positional Weight Method | Management
Ranked Positional Weight Method | ManagementRanked Positional Weight Method | Management
Ranked Positional Weight Method | Management
 
Toyota Production System
Toyota Production SystemToyota Production System
Toyota Production System
 
cycle time, normal time and standard allowance
cycle time, normal time and standard allowancecycle time, normal time and standard allowance
cycle time, normal time and standard allowance
 
assembly line balancing
assembly line balancingassembly line balancing
assembly line balancing
 
BASIC OF TOYOTA PRODUCTION SYSTEM
BASIC OF TOYOTA PRODUCTION SYSTEMBASIC OF TOYOTA PRODUCTION SYSTEM
BASIC OF TOYOTA PRODUCTION SYSTEM
 
Chapter 8 slides operations management
Chapter 8 slides   operations managementChapter 8 slides   operations management
Chapter 8 slides operations management
 
work measurement_operation management
work measurement_operation managementwork measurement_operation management
work measurement_operation management
 
Facility layout ppt
Facility layout pptFacility layout ppt
Facility layout ppt
 
Capacity planning
Capacity planningCapacity planning
Capacity planning
 

Ähnlich wie Line balancing and heuristics

Industrial engineeering pli
Industrial engineeering   pliIndustrial engineeering   pli
Industrial engineeering pliDhyey Shukla
 
Chapter 6-Scheduling in Industrial of Engineering
Chapter 6-Scheduling in Industrial of EngineeringChapter 6-Scheduling in Industrial of Engineering
Chapter 6-Scheduling in Industrial of EngineeringFaizAzmy2
 
Parallel Line and Machine Job Scheduling Using Genetic Algorithm
Parallel Line and Machine Job Scheduling Using Genetic AlgorithmParallel Line and Machine Job Scheduling Using Genetic Algorithm
Parallel Line and Machine Job Scheduling Using Genetic AlgorithmIRJET Journal
 
Loading jobs and methods definitivo
Loading jobs and methods definitivo Loading jobs and methods definitivo
Loading jobs and methods definitivo Jorge Fuentes
 
Final line balancing ppt 4
Final line balancing ppt 4Final line balancing ppt 4
Final line balancing ppt 4navyamukhi1
 
Sheet1Address60741024Offsetaddress0102450506074120484026230723002p.docx
Sheet1Address60741024Offsetaddress0102450506074120484026230723002p.docxSheet1Address60741024Offsetaddress0102450506074120484026230723002p.docx
Sheet1Address60741024Offsetaddress0102450506074120484026230723002p.docxbagotjesusa
 
Chapter5-Facility Layout_POM.ppt
Chapter5-Facility Layout_POM.pptChapter5-Facility Layout_POM.ppt
Chapter5-Facility Layout_POM.pptKuvaneshWaran
 
Craft software for dummies
Craft software for dummiesCraft software for dummies
Craft software for dummiesRama Renspandy
 
Product layout in Food Industry and Line Balancing
Product layout in Food Industry and Line BalancingProduct layout in Food Industry and Line Balancing
Product layout in Food Industry and Line BalancingAbhishek Thakur
 
Operations scheduling
Operations schedulingOperations scheduling
Operations schedulingRajThakuri
 
Work Center Scheduling
Work Center Scheduling Work Center Scheduling
Work Center Scheduling Shivangi Singh
 
Introduction to Cellular Manufacturing - ADDVALUE - Nilesh Arora
Introduction to Cellular Manufacturing - ADDVALUE - Nilesh AroraIntroduction to Cellular Manufacturing - ADDVALUE - Nilesh Arora
Introduction to Cellular Manufacturing - ADDVALUE - Nilesh AroraADD VALUE CONSULTING Inc
 
Problem-solving and design 1.pptx
Problem-solving and design 1.pptxProblem-solving and design 1.pptx
Problem-solving and design 1.pptxTadiwaMawere
 
Operation engine ii session iv operations scheduling
Operation engine  ii session iv  operations schedulingOperation engine  ii session iv  operations scheduling
Operation engine ii session iv operations schedulingFatima Aliza
 
final Line balancing slide12.ppt
final Line balancing slide12.pptfinal Line balancing slide12.ppt
final Line balancing slide12.pptxicohos114
 

Ähnlich wie Line balancing and heuristics (20)

Industrial engineeering pli
Industrial engineeering   pliIndustrial engineeering   pli
Industrial engineeering pli
 
Chapter 6-Scheduling in Industrial of Engineering
Chapter 6-Scheduling in Industrial of EngineeringChapter 6-Scheduling in Industrial of Engineering
Chapter 6-Scheduling in Industrial of Engineering
 
Parallel Line and Machine Job Scheduling Using Genetic Algorithm
Parallel Line and Machine Job Scheduling Using Genetic AlgorithmParallel Line and Machine Job Scheduling Using Genetic Algorithm
Parallel Line and Machine Job Scheduling Using Genetic Algorithm
 
Tn6 facility layout
Tn6 facility layoutTn6 facility layout
Tn6 facility layout
 
Tn6 facility+layout
Tn6 facility+layoutTn6 facility+layout
Tn6 facility+layout
 
Loading jobs and methods definitivo
Loading jobs and methods definitivo Loading jobs and methods definitivo
Loading jobs and methods definitivo
 
CIM 15ME62 Module-3
CIM 15ME62  Module-3CIM 15ME62  Module-3
CIM 15ME62 Module-3
 
Final line balancing ppt 4
Final line balancing ppt 4Final line balancing ppt 4
Final line balancing ppt 4
 
PRODUCTIVITY IMPROVEMENT OF AUTOMOTIVE ASSEMBLY LINE THROUGH LINE BALANCING
PRODUCTIVITY IMPROVEMENT OF AUTOMOTIVE ASSEMBLY LINE THROUGH LINE BALANCINGPRODUCTIVITY IMPROVEMENT OF AUTOMOTIVE ASSEMBLY LINE THROUGH LINE BALANCING
PRODUCTIVITY IMPROVEMENT OF AUTOMOTIVE ASSEMBLY LINE THROUGH LINE BALANCING
 
vignesh conference
vignesh conferencevignesh conference
vignesh conference
 
Sheet1Address60741024Offsetaddress0102450506074120484026230723002p.docx
Sheet1Address60741024Offsetaddress0102450506074120484026230723002p.docxSheet1Address60741024Offsetaddress0102450506074120484026230723002p.docx
Sheet1Address60741024Offsetaddress0102450506074120484026230723002p.docx
 
Chapter5-Facility Layout_POM.ppt
Chapter5-Facility Layout_POM.pptChapter5-Facility Layout_POM.ppt
Chapter5-Facility Layout_POM.ppt
 
Craft software for dummies
Craft software for dummiesCraft software for dummies
Craft software for dummies
 
Product layout in Food Industry and Line Balancing
Product layout in Food Industry and Line BalancingProduct layout in Food Industry and Line Balancing
Product layout in Food Industry and Line Balancing
 
Operations scheduling
Operations schedulingOperations scheduling
Operations scheduling
 
Work Center Scheduling
Work Center Scheduling Work Center Scheduling
Work Center Scheduling
 
Introduction to Cellular Manufacturing - ADDVALUE - Nilesh Arora
Introduction to Cellular Manufacturing - ADDVALUE - Nilesh AroraIntroduction to Cellular Manufacturing - ADDVALUE - Nilesh Arora
Introduction to Cellular Manufacturing - ADDVALUE - Nilesh Arora
 
Problem-solving and design 1.pptx
Problem-solving and design 1.pptxProblem-solving and design 1.pptx
Problem-solving and design 1.pptx
 
Operation engine ii session iv operations scheduling
Operation engine  ii session iv  operations schedulingOperation engine  ii session iv  operations scheduling
Operation engine ii session iv operations scheduling
 
final Line balancing slide12.ppt
final Line balancing slide12.pptfinal Line balancing slide12.ppt
final Line balancing slide12.ppt
 

Mehr von Abrity Bhattacharya

Mehr von Abrity Bhattacharya (10)

360 degree feedback system
360 degree feedback system360 degree feedback system
360 degree feedback system
 
National thermal power corporation limited report
National thermal power corporation limited reportNational thermal power corporation limited report
National thermal power corporation limited report
 
Cremica slides
Cremica slidesCremica slides
Cremica slides
 
Service sector presentation
Service sector presentationService sector presentation
Service sector presentation
 
Insurance sector in india
Insurance sector in indiaInsurance sector in india
Insurance sector in india
 
Deloitte case presentation
Deloitte case presentationDeloitte case presentation
Deloitte case presentation
 
Ntpc my slides
Ntpc my slidesNtpc my slides
Ntpc my slides
 
Environmental scanning and knowledge management
Environmental scanning and knowledge managementEnvironmental scanning and knowledge management
Environmental scanning and knowledge management
 
Facebook
FacebookFacebook
Facebook
 
Eurozone spain and italy
Eurozone spain and italyEurozone spain and italy
Eurozone spain and italy
 

Kürzlich hochgeladen

CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppCeline George
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 

Kürzlich hochgeladen (20)

CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Staff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSDStaff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSD
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website App
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 

Line balancing and heuristics

  • 2. LINE BALANCING  This is an analysis process which tries to equally divide work to be carried out in a production process among workstations.  In production line workstations and work centers are arranged in a sequence of task to be done along a straight or curved line.
  • 3. GOAL AND OBJECTIVE Goal of production line analysis:  Number of workstations needed.  Type of task should be assigned to each workstation.  To know the minimum number of workers, tools and machines that can be used to provide the required amount of capacity. Objective of line balancing:  Assigning task to each workstation in such a way that there is only a little idle time.
  • 4. TERMINOLOGIES RELATED TO PRODUCTION LINE ANALYSIS  TASKS: All the elements of work.  TASK PRECEDENCE: The sequence in which tasks are performed.  TASK TIMES: Time required by a well-trained worker or unattended machine to perform a task. This is usually expressed in minutes.  CYCLE TIME: The time expressed in minutes between two simultaneous products coming off the end of a production line.
  • 5. Continued…  PRODUCTIVE TIME PER HOUR: The average number of minutes a workstation is working in an hour.  WORKSTATION: A physical area where a worker with tools/ one or more machines, or an unattended machines like a robot performs a particular set of task in a production line.  WORK CENTER: A small group of identical workstations, where each workstation performs the same set of task.  NUMBER OF WORKSTATIONS WORKING: The amount of work done at a work center expressed in number of workstations.
  • 6. Continued…  MINIMUM NUMBER OF WORKSTATIONS: The least number of workstation that provides the required production.  ACTUAL NUMBER OF WORKSTATIONS: This is the total number of workstations required on the entire production line. It is calculated as the next higher integer of the number of workstations working.  UTILIZATION: The percentage of time a production line is working.
  • 7. LINE BALANCING PROCEDURE 1. 2. 3. 4. 5. 6. 7. Determination of tasks that must be performed to complete one unit of a product. Determining the order or sequence of performing the whole set of tasks. Drawing precedence diagram. In this flowchart circles represents task and joining arrows represents precedence. Estimation of task time. Calculation of cycle time. Determination of minimum number of workstation required. Using one of the heuristics to assign tasks to workstations for balancing production line.
  • 8. COMPUTERIZED LINE BALANCING  Line balancing by hand becomes unwieldy as the problems grow in size.  There are software packages that will balance large lines quickly. IBM's COMSOAL (Computer Method for Sequencing Operations for Assembly Lines) and GE's ASYBL (Assembly Line Configuration Program) can assign hundreds of work elements to workstations on an assembly line.  They use various heuristics, to balance the line at an acceptable level of efficiency.  The POM for Windows software lets the user select from five different heuristics: ranked positional weight, longest operation time, shortest operation time, most number of following tasks, and least number of following tasks. These heuristics specify the order in which work elements are considered for allocation to workstations.
  • 9. Line Balancing Heuristics Two types  Incremental Utilization Heuristic  Longest Task Time Heuristic
  • 10. Incremental Heuristic  Tasks are added to each workstation in order of task precedence one at a time until utilization is 100 percent or is observed to fall.  Used when one or more task time is equal to or greater than the cycle time.
  • 12. Example Textech, a large electronics manufacturer, assembles model AT7S handheld calculators at its Midland , Texas, plant. The assembly tasks that must be performed on each calculator are shown below. The parts used in this assembly line are supplied by materials-handling personnel to parts bins used in each task. The assemblies are moved along by belt conveyors between workstations. Textech wants this assembly line to produce 540 calculators per hour. a. Compute the cycle time per calculator in minutes. b. Compute the minimum number of workstations. c. How would you combine the tasks into workstations to minimize idle time? Evaluate your proposal.
  • 13.
  • 16.
  • 17.
  • 18. Longest-Task-Time Heuristic  Add tasks to a workstation one at a time in the order of task precedence.  If a choice must be made between two or more tasks, the one with the longest task time is added.  This has the effect of assigning as quickly as possible the tasks that are the most difficult to fit into a station.  Tasks with shorter times are then saved for finetuning the solution.
  • 19. Conditions It can be used only when each and every task time is less than or equal to the cycle time. 2. There can be no duplicate work stations. 1.  If each and every task time is less than or equal to the cycle time, and if the primary focus of the analysis of production lines is minimizing the number of workstations and the amount of tools and equipment required, then this heuristic would be appropriate.
  • 20. Steps in the Longest-Task-Time Heuristic 1. 2. 3. 4. Lei i = I. where i is the number of the workstation being formed. Make a list of all the tasks that are to be assigned to a workstation. Have to satisfy the following conditions a. It cannot have been previously assigned to this or any previous workstation. b. Its immediate predecessors must have been assigned to this or a previous workstation. c. The sum of its task time and all other times of tasks are already assigned to work station must be less than or equal to the cycle time . If no such tasks are found. Go to step 4. Assign the from the list with the longest task time to the workstation. Go back to the step 2. Close the assignment of tasks to Workstation i. This can occur in two ways. If there are no tasks on the list for the work station but there are still tasks to be assigned, set i=i+1 and go back to step 2. If there are no more tasks, the procedure is completed.
  • 21. PROBLEM Using the above information in the table a. Draw a precedence diagram b. Assuming that 55 minutes per hour are productive, compute the cycle time needed to obtain 50 units per hour.
  • 23.
  • 24.
  • 25.
  • 26. LINE BALANCING ISSUES  Earlier conveyor belts are paced with the speed of the employees work.  Now they are paced with the machine speed.
  • 27. APPLICATIONS  The classic example is Henry Ford’s auto chassis line. • Before the “assembly line Balancing” was introduced in 1913, each chassis was assembled by one worker and required 12.5 hours. • Once the new technology was installed, this time was reduced to 93 minutes.