BY ABHIJEET B. BHOSALE
Info & history of Golden Gate
Bridge
 A suspension bridge spanning across Golden Gate, opening

into the san Francisco
 a link to the city of San Francisco by connecting the
northern tip of the San Francisco Peninsula to Marin
County as part of US Highway 101 and California State
Highway 1
 Built by Joseph Strauss
 Second longest suspension bridge in US
Principal of long suspension bridge
 the deck is always suspended by hangers, each attached to

the main cable, which in turn is anchored into the ground
at its ends.
 Suspension bridge usually has a slender deck which carries
bending only (no compression).
 In order to suspend something of uniform weight ‘for An
equation was developed to prove the cable deformed into a
parabola and the horizontal component force in the cable
was a constant value.
H=wl*l/8f
Construction
 Challenges
1. The bridge in this location should withstand brutal

winds, tide, and fog.
2. It is also located less than 13km from the epicenter of the
most catastrophic earthquake in history.
 Components
1. The anchorages - the massive blocks that grip the bridge's
supporting cables.
2. The north pier, which supports the tower, was built easily
on a bedrock ledge 6m below the water.
3. But on the southern San Francisco side, Strauss had to
build his pier in the open ocean, 30m below the surface.
4. Steel frame and steel cables
A parallel wire construction tech. is used
4. weight-blocks which ballast the cable anchorage.
 Provided for stabilization

5. Pier: The pier, made up of 147,600 tons of concrete, was
built in 37m of open water. This was achieved by the
concrete fender that in itself is a marvel of construction; it
is 108m long and 56m wide at the centre line of the bridge.
6. Suspended cantilever construction
Design Issue & Structure details
 Leon S. Moisseiff was named one of the consulting

engineers proposed a bridge far more efficient and
beautiful
 In addition to the suspension bridge the approaches
include a steel arch bridge, two concrete anchorages, two
steel truss viaducts and three concrete pylons.
 The Golden Gate followed this design below the roadbed,
but modified it above the deck to big open rectangles
without cross-members, framing the blue sky and
producing a lighter look.
 The bridge’s cable design
Structure details: 1. San Francisco (south) Approach Viaduct
2. San Francisco (south) Anchorage Housing and
Pylons S1 and S2
3. Fort Point Arch
4. Main Suspension Bridge
5. Marin (north) Approach Viaduct
6. Marin (north) Anchorage Housing and Pylons N1 and N2
 Total length of Bridge including approaches: = 2,737 m
 Length of suspension span including main span and side spans:
= 1,966 m
 Length of main span portion of suspended structure (distance
between towers): = 1,280 m
 Length of one side span: = 343
 Width of Bridge: = 27 m
 Clearance above mean higher high water: = 67 m
Asthetics
 Fulfillment of function The bridge fulfilled a high degree








of simplicity, which make the bridge beautiful.
Proportions:conveys a decent impression of balance
between its mass and voids, and between light and shadow
Order:The appearance of the bridge looks like a mirror
image of two similar towers with cables.
Integrating into the Environment
Texture:It has rough finishing for piers and
abutments, which makes sense for bridge design.
Colour :This colour brings a big contrast with the sky and
sea
Complexity :
Loading

 The most important types of loadings we need to consider on the bridge are:

1. Dead load,
2. Super-imposed dead load,
3. Live Traffic,
4. Wind,
5. Temperature
There are five combinations of load:
1. All permanent load + primary live loads (vertical
traffic loads)
2. Combination 1 + wind, and if erection considered, temporary erection loads.
3. Combination 1 + temperature, and if erection considered, temporary loads
4. All permanent loads + secondary live loads and associated primary live loads
5. All permanent loads + loads due to friction at support.
 Wind loads
max. wind gust: Vc=VK1S1S2
 Clear height of bridge = 67m
 V = 15m/s
 K1 = 1.53

 S1 = 1.00
 S2 = 1.39
 Therefore, Vc = 32m/s

 Horizontal wind load:Pt = qA1Cþ
q = 0.613Vc², A1 = solid horizontal projected area , Cþ = 1.3 (found
from b/d ratio = 3.6) Pt (factored) = 9.6kN/m
 Vertical wind load:Pv = qA3CL
q = 0.613Vc²
A3 = plan area = 27*1280 = 34560m²
CL = 0.4 (found from b/d ratio = 3.6)
Pv(factored) = 10.4kN/m
 Temperature effect
∆T

α

E

σ

20

12*10-6

200000

48 N/sq.mm

 Other load factors: shrinkage, creep, stress

relaxation, earthquake, earth pressure behind
abutments, erection loads and so on.
 Bending moments
σ

I =bd³/12

Y

M

48000kN/sq.
m

27*7.6³/12

3.8m

1.2MNm
Serviceability
 In addition to traffic loading, the Golden Gate Bridge

must withstand the following environments:
1. Earthquakes, primary originating on the San Andreas and
Hayward faults.
2. Wind of up to 70 miles per hour.
3. Strong ocean current.
4. Temperature stresses.
Creep effect
 Although the Golden Gate Bridge is regarded as a steel

frame and steel cable structure, large amount of concrete is
used on the bridge; including the anchorages, paving,
pylons, piers, approaches and so on.
 To minimize this effect, an antiseismic stop device for
girder structures of Golden Gate Bridge, is used.
Potential weakness and improvement of the
Golden Gate Bridge
 In 1989, the epicenter of the Loma Prieta earthquake was

too strong to damage the Golden Gate Bridge.
 After the earthquake,a restrainer retrofit project was
necessary in order to increase its earthquake resistance, as
scientific organizations say that there is a 62% probability
of at least one magnitude 6.7 or greater quake capable of
causing widespread damage, impacting the San Francisco
Bay within the next 30 years.
Improvement of bridge
 Phase 1 would retrofit the Marin (north) Approach Viaduct
 Phase 2 would retrofit the San Francisco (south) Approach

Viaduct, San Francisco (south) Anchorage Housing, Fort
Point Arch, and Pylons S1 and S2
 Phase 3 would Main Suspension Bridge and Marin (north)

Anchorage Housing

More Related Content

What's hot

Skyscrapers ppt
Skyscrapers pptSkyscrapers ppt
Skyscrapers pptSAI KIRAN
 
Vierendeel truss bs5
Vierendeel truss bs5Vierendeel truss bs5
Vierendeel truss bs5Sandhya Singh
 
Howrah bridge ppt
Howrah bridge pptHowrah bridge ppt
Howrah bridge pptSourav Roy
 
Retrofitting case study of RCC structure
Retrofitting case study of RCC structureRetrofitting case study of RCC structure
Retrofitting case study of RCC structureManish Sharma
 
TAIPEI 101, CASE STUDY
TAIPEI 101, CASE STUDY TAIPEI 101, CASE STUDY
TAIPEI 101, CASE STUDY Rifquthsb1
 
Urbanization & new york city
Urbanization & new york city Urbanization & new york city
Urbanization & new york city simpsonic
 
Large span structures
Large span structuresLarge span structures
Large span structuresaduiti
 
High rise buildings
High rise buildingsHigh rise buildings
High rise buildingsAnas Adel
 
Case Study: Metropol Parasol, Seville (Spain)
Case Study: Metropol Parasol, Seville (Spain)Case Study: Metropol Parasol, Seville (Spain)
Case Study: Metropol Parasol, Seville (Spain)Prasad Thanthratey
 
CAPITAL GATE, ABU DHABI
CAPITAL GATE, ABU DHABICAPITAL GATE, ABU DHABI
CAPITAL GATE, ABU DHABISelf employed
 
Contemporary Architects Of Nepal
Contemporary Architects Of NepalContemporary Architects Of Nepal
Contemporary Architects Of NepalStoj Shakya
 
Prefabrication construction
Prefabrication constructionPrefabrication construction
Prefabrication constructionDivya Vishnoi
 

What's hot (20)

cannaught place
cannaught place cannaught place
cannaught place
 
Skyscrapers ppt
Skyscrapers pptSkyscrapers ppt
Skyscrapers ppt
 
Vierendeel truss bs5
Vierendeel truss bs5Vierendeel truss bs5
Vierendeel truss bs5
 
Howrah bridge ppt
Howrah bridge pptHowrah bridge ppt
Howrah bridge ppt
 
Retrofitting case study of RCC structure
Retrofitting case study of RCC structureRetrofitting case study of RCC structure
Retrofitting case study of RCC structure
 
High rise building
High rise buildingHigh rise building
High rise building
 
Rivet connection
Rivet connectionRivet connection
Rivet connection
 
Retaining wall
 Retaining wall  Retaining wall
Retaining wall
 
TAIPEI 101, CASE STUDY
TAIPEI 101, CASE STUDY TAIPEI 101, CASE STUDY
TAIPEI 101, CASE STUDY
 
Urbanization & new york city
Urbanization & new york city Urbanization & new york city
Urbanization & new york city
 
Highrise structure
Highrise structureHighrise structure
Highrise structure
 
Prefabrication
PrefabricationPrefabrication
Prefabrication
 
Large span structures
Large span structuresLarge span structures
Large span structures
 
High rise buildings
High rise buildingsHigh rise buildings
High rise buildings
 
Case Study: Metropol Parasol, Seville (Spain)
Case Study: Metropol Parasol, Seville (Spain)Case Study: Metropol Parasol, Seville (Spain)
Case Study: Metropol Parasol, Seville (Spain)
 
CAPITAL GATE, ABU DHABI
CAPITAL GATE, ABU DHABICAPITAL GATE, ABU DHABI
CAPITAL GATE, ABU DHABI
 
Skyscraper
SkyscraperSkyscraper
Skyscraper
 
Contemporary Architects Of Nepal
Contemporary Architects Of NepalContemporary Architects Of Nepal
Contemporary Architects Of Nepal
 
High rise buildings
High rise buildingsHigh rise buildings
High rise buildings
 
Prefabrication construction
Prefabrication constructionPrefabrication construction
Prefabrication construction
 

Similar to Golden gate bridge

Engineering mistakes in the world
Engineering mistakes in the worldEngineering mistakes in the world
Engineering mistakes in the worldAnishaJalathota
 
suspension bridge ppt
suspension bridge pptsuspension bridge ppt
suspension bridge pptSAI KIRAN
 
Bridges new
Bridges newBridges new
Bridges newagtom02
 
Assignment 2
Assignment 2Assignment 2
Assignment 2Lisa Cain
 
stress ribbon bridge.pptx
stress ribbon bridge.pptxstress ribbon bridge.pptx
stress ribbon bridge.pptxSauravShahane
 
Suspension bridge
Suspension bridgeSuspension bridge
Suspension bridgemominzaki
 
Bridge
BridgeBridge
Bridgeillpa
 
BUILDING STRUCTURE ASSIGNMENT 1
BUILDING STRUCTURE ASSIGNMENT 1BUILDING STRUCTURE ASSIGNMENT 1
BUILDING STRUCTURE ASSIGNMENT 1Nur Zaas
 
Bridges (1)
Bridges (1)Bridges (1)
Bridges (1)wpooler
 
Details of RCC Building
Details of RCC BuildingDetails of RCC Building
Details of RCC Buildingppt_master
 
Case Study 7.3 249 CASE STUDY 7.3 Classic Case Tacoma Narrows Suspen.pdf
Case Study 7.3 249 CASE STUDY 7.3 Classic Case Tacoma Narrows Suspen.pdfCase Study 7.3 249 CASE STUDY 7.3 Classic Case Tacoma Narrows Suspen.pdf
Case Study 7.3 249 CASE STUDY 7.3 Classic Case Tacoma Narrows Suspen.pdfSANDEEPARIHANT
 
theory_of_structures.ppt
theory_of_structures.ppttheory_of_structures.ppt
theory_of_structures.pptAmgad Fahmy
 
Suspension bridge (modern const. tech)
Suspension bridge (modern const. tech)Suspension bridge (modern const. tech)
Suspension bridge (modern const. tech)Vivek Chauhan
 
Suspension Bridges VS Cable-Stayed Bridges
Suspension Bridges VS Cable-Stayed BridgesSuspension Bridges VS Cable-Stayed Bridges
Suspension Bridges VS Cable-Stayed BridgesHussein Zidan
 

Similar to Golden gate bridge (20)

Descriptive text micro.pptx
Descriptive text micro.pptxDescriptive text micro.pptx
Descriptive text micro.pptx
 
Engineering mistakes in the world
Engineering mistakes in the worldEngineering mistakes in the world
Engineering mistakes in the world
 
Suspension Bridges
Suspension BridgesSuspension Bridges
Suspension Bridges
 
suspension bridge ppt
suspension bridge pptsuspension bridge ppt
suspension bridge ppt
 
Bridges new
Bridges newBridges new
Bridges new
 
Busan Geoje
Busan GeojeBusan Geoje
Busan Geoje
 
Assignment 2
Assignment 2Assignment 2
Assignment 2
 
stress ribbon bridge.pptx
stress ribbon bridge.pptxstress ribbon bridge.pptx
stress ribbon bridge.pptx
 
Suspension bridge
Suspension bridgeSuspension bridge
Suspension bridge
 
Bridge
BridgeBridge
Bridge
 
Babita
BabitaBabita
Babita
 
BUILDING STRUCTURE ASSIGNMENT 1
BUILDING STRUCTURE ASSIGNMENT 1BUILDING STRUCTURE ASSIGNMENT 1
BUILDING STRUCTURE ASSIGNMENT 1
 
Bridges (1)
Bridges (1)Bridges (1)
Bridges (1)
 
Details of RCC Building
Details of RCC BuildingDetails of RCC Building
Details of RCC Building
 
Case Study 7.3 249 CASE STUDY 7.3 Classic Case Tacoma Narrows Suspen.pdf
Case Study 7.3 249 CASE STUDY 7.3 Classic Case Tacoma Narrows Suspen.pdfCase Study 7.3 249 CASE STUDY 7.3 Classic Case Tacoma Narrows Suspen.pdf
Case Study 7.3 249 CASE STUDY 7.3 Classic Case Tacoma Narrows Suspen.pdf
 
theory_of_structures.ppt
theory_of_structures.ppttheory_of_structures.ppt
theory_of_structures.ppt
 
1115
11151115
1115
 
Suspension bridge (modern const. tech)
Suspension bridge (modern const. tech)Suspension bridge (modern const. tech)
Suspension bridge (modern const. tech)
 
S7
S7S7
S7
 
Suspension Bridges VS Cable-Stayed Bridges
Suspension Bridges VS Cable-Stayed BridgesSuspension Bridges VS Cable-Stayed Bridges
Suspension Bridges VS Cable-Stayed Bridges
 

More from Abhijeet Bhosale

Washington dc transit system
Washington dc transit systemWashington dc transit system
Washington dc transit systemAbhijeet Bhosale
 
Grading of bitumen by SURAJ KUMAR
Grading of bitumen by SURAJ KUMARGrading of bitumen by SURAJ KUMAR
Grading of bitumen by SURAJ KUMARAbhijeet Bhosale
 
production tests aging of bitumen and modified Bitumen
production tests aging of bitumen and modified Bitumen production tests aging of bitumen and modified Bitumen
production tests aging of bitumen and modified Bitumen Abhijeet Bhosale
 
Quantity surveying -scope and purpose
Quantity surveying -scope and purposeQuantity surveying -scope and purpose
Quantity surveying -scope and purposeAbhijeet Bhosale
 
Feasibility report -basic concepts with example
Feasibility report -basic concepts with exampleFeasibility report -basic concepts with example
Feasibility report -basic concepts with exampleAbhijeet Bhosale
 

More from Abhijeet Bhosale (8)

Washington dc transit system
Washington dc transit systemWashington dc transit system
Washington dc transit system
 
6 typesofvariables
6 typesofvariables6 typesofvariables
6 typesofvariables
 
Its technologies
Its technologiesIts technologies
Its technologies
 
Grading of bitumen by SURAJ KUMAR
Grading of bitumen by SURAJ KUMARGrading of bitumen by SURAJ KUMAR
Grading of bitumen by SURAJ KUMAR
 
production tests aging of bitumen and modified Bitumen
production tests aging of bitumen and modified Bitumen production tests aging of bitumen and modified Bitumen
production tests aging of bitumen and modified Bitumen
 
design of questionnaire
design of questionnairedesign of questionnaire
design of questionnaire
 
Quantity surveying -scope and purpose
Quantity surveying -scope and purposeQuantity surveying -scope and purpose
Quantity surveying -scope and purpose
 
Feasibility report -basic concepts with example
Feasibility report -basic concepts with exampleFeasibility report -basic concepts with example
Feasibility report -basic concepts with example
 

Recently uploaded

Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsTechSoup
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Disha Kariya
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
General AI for Medical Educators April 2024
General AI for Medical Educators April 2024General AI for Medical Educators April 2024
General AI for Medical Educators April 2024Janet Corral
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfAdmir Softic
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 

Recently uploaded (20)

Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
General AI for Medical Educators April 2024
General AI for Medical Educators April 2024General AI for Medical Educators April 2024
General AI for Medical Educators April 2024
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 

Golden gate bridge

  • 1. BY ABHIJEET B. BHOSALE
  • 2. Info & history of Golden Gate Bridge  A suspension bridge spanning across Golden Gate, opening into the san Francisco  a link to the city of San Francisco by connecting the northern tip of the San Francisco Peninsula to Marin County as part of US Highway 101 and California State Highway 1  Built by Joseph Strauss  Second longest suspension bridge in US
  • 3. Principal of long suspension bridge  the deck is always suspended by hangers, each attached to the main cable, which in turn is anchored into the ground at its ends.  Suspension bridge usually has a slender deck which carries bending only (no compression).  In order to suspend something of uniform weight ‘for An equation was developed to prove the cable deformed into a parabola and the horizontal component force in the cable was a constant value. H=wl*l/8f
  • 4. Construction  Challenges 1. The bridge in this location should withstand brutal winds, tide, and fog. 2. It is also located less than 13km from the epicenter of the most catastrophic earthquake in history.  Components 1. The anchorages - the massive blocks that grip the bridge's supporting cables. 2. The north pier, which supports the tower, was built easily on a bedrock ledge 6m below the water. 3. But on the southern San Francisco side, Strauss had to build his pier in the open ocean, 30m below the surface. 4. Steel frame and steel cables
  • 5. A parallel wire construction tech. is used 4. weight-blocks which ballast the cable anchorage.  Provided for stabilization 
  • 6. 5. Pier: The pier, made up of 147,600 tons of concrete, was built in 37m of open water. This was achieved by the concrete fender that in itself is a marvel of construction; it is 108m long and 56m wide at the centre line of the bridge. 6. Suspended cantilever construction
  • 7. Design Issue & Structure details  Leon S. Moisseiff was named one of the consulting engineers proposed a bridge far more efficient and beautiful  In addition to the suspension bridge the approaches include a steel arch bridge, two concrete anchorages, two steel truss viaducts and three concrete pylons.  The Golden Gate followed this design below the roadbed, but modified it above the deck to big open rectangles without cross-members, framing the blue sky and producing a lighter look.  The bridge’s cable design
  • 8. Structure details: 1. San Francisco (south) Approach Viaduct 2. San Francisco (south) Anchorage Housing and Pylons S1 and S2 3. Fort Point Arch 4. Main Suspension Bridge 5. Marin (north) Approach Viaduct 6. Marin (north) Anchorage Housing and Pylons N1 and N2  Total length of Bridge including approaches: = 2,737 m  Length of suspension span including main span and side spans: = 1,966 m  Length of main span portion of suspended structure (distance between towers): = 1,280 m  Length of one side span: = 343  Width of Bridge: = 27 m  Clearance above mean higher high water: = 67 m
  • 9. Asthetics  Fulfillment of function The bridge fulfilled a high degree       of simplicity, which make the bridge beautiful. Proportions:conveys a decent impression of balance between its mass and voids, and between light and shadow Order:The appearance of the bridge looks like a mirror image of two similar towers with cables. Integrating into the Environment Texture:It has rough finishing for piers and abutments, which makes sense for bridge design. Colour :This colour brings a big contrast with the sky and sea Complexity :
  • 10. Loading  The most important types of loadings we need to consider on the bridge are: 1. Dead load, 2. Super-imposed dead load, 3. Live Traffic, 4. Wind, 5. Temperature There are five combinations of load: 1. All permanent load + primary live loads (vertical traffic loads) 2. Combination 1 + wind, and if erection considered, temporary erection loads. 3. Combination 1 + temperature, and if erection considered, temporary loads 4. All permanent loads + secondary live loads and associated primary live loads 5. All permanent loads + loads due to friction at support.
  • 11.  Wind loads max. wind gust: Vc=VK1S1S2  Clear height of bridge = 67m  V = 15m/s  K1 = 1.53  S1 = 1.00  S2 = 1.39  Therefore, Vc = 32m/s  Horizontal wind load:Pt = qA1Cþ q = 0.613Vc², A1 = solid horizontal projected area , Cþ = 1.3 (found from b/d ratio = 3.6) Pt (factored) = 9.6kN/m  Vertical wind load:Pv = qA3CL q = 0.613Vc² A3 = plan area = 27*1280 = 34560m² CL = 0.4 (found from b/d ratio = 3.6) Pv(factored) = 10.4kN/m
  • 12.  Temperature effect ∆T α E σ 20 12*10-6 200000 48 N/sq.mm  Other load factors: shrinkage, creep, stress relaxation, earthquake, earth pressure behind abutments, erection loads and so on.  Bending moments σ I =bd³/12 Y M 48000kN/sq. m 27*7.6³/12 3.8m 1.2MNm
  • 13. Serviceability  In addition to traffic loading, the Golden Gate Bridge must withstand the following environments: 1. Earthquakes, primary originating on the San Andreas and Hayward faults. 2. Wind of up to 70 miles per hour. 3. Strong ocean current. 4. Temperature stresses.
  • 14. Creep effect  Although the Golden Gate Bridge is regarded as a steel frame and steel cable structure, large amount of concrete is used on the bridge; including the anchorages, paving, pylons, piers, approaches and so on.  To minimize this effect, an antiseismic stop device for girder structures of Golden Gate Bridge, is used.
  • 15. Potential weakness and improvement of the Golden Gate Bridge  In 1989, the epicenter of the Loma Prieta earthquake was too strong to damage the Golden Gate Bridge.  After the earthquake,a restrainer retrofit project was necessary in order to increase its earthquake resistance, as scientific organizations say that there is a 62% probability of at least one magnitude 6.7 or greater quake capable of causing widespread damage, impacting the San Francisco Bay within the next 30 years.
  • 16. Improvement of bridge  Phase 1 would retrofit the Marin (north) Approach Viaduct  Phase 2 would retrofit the San Francisco (south) Approach Viaduct, San Francisco (south) Anchorage Housing, Fort Point Arch, and Pylons S1 and S2  Phase 3 would Main Suspension Bridge and Marin (north) Anchorage Housing